Founded in 1871 Field Observation Report 10/02/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 10/02/2023 Technician: Barto, Matthew
Placement Location: Micropile slope stabilization Plans/Details:
RJ Engineering &Consulting Inc.#23-004R-D1 dated 05/11/23.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
n Yes nNo
Discrepancy:
n Yes nNo
General Remarks:
Afternoon site visit made as requested. Excavation for micropile installation east of and adjacent to 13/14 E.Water Place
complete.An approximate 35'x9'area was excavated in residences backyard at top of existing slope. Clayey gravels and
cobbles are exposed in base of excavation at about 3 feet below existing grade. No micropile installation observed while on-
site.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 2
CTLITHOMPSON Report#: FOR-000001
Founded in 1871 Field Observation Report 10/02/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Images:
- - ) i `r'. Ies `' r� A< , h 9 grill 1.
A�� e + .,
• ',1`111;111111". " !....-1, .igt_4 . .,
, 1
1,1 ,111\1 11, . .
ii„.• ,
' .", •
•• ,.
. _tip:- ... .
, . .....# ........ „,i„*„.. '4`r• A ,' .' • ,
Iti.,4;‘.7‘4/.1
c., .„ . . .,4.. ,,,,,...
, . . _ .... .
....,_ ...,,,,,.,.. .. _ . ....
. , - ..,.,...;,_... ,,„...„
...„ ,,,.., • s.,„ __ Ti,‘,„. .„..„..„... ,, . .. ..0a,_ ' `••••' . ". -/..• c. .••••i,.•• ,Z.-
+}.urs. may✓__ A 1
t.�it,,,Iirisw •'vim at r =i""'l _ 4 ..lik,. ,,, a.� ,`. '�1` .
} /
' : : -11'
r
• _ t ?• i jy.. " a Y� • .pyr
•
T, •• � _
Comments: North view. Comments: South view.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 2 of 2
CTLITHOMPSON Report#: FOR-000002
Founded in 1871 Field Observation Report 10/04/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 10/04/2023 Technician: Barto, Matthew
Plans/Details:
RJ Engineering &Consulting Inc. #23-004R-D1 dated 05/11/23.
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
n Yes nNo
Discrepancy:
n Yes nNo
Discrepancy Remarks:
As requested, a site visit was made to observe ongoing micropile installation. Partial installation of hollow injection micropile
bars continuing in northern section of pile cap excavation. Micropile construction sequence not as shown on plans. No grout
injection observed at time of installation.
Images:.!' '1�-. / --Y f$ I. i 'Val\ w,,?'''�1 \iy
I � . Lv \ ,mod Ti _ � _
s
, , :J.
.161
III ,.,,
.., 4 I:: _
Comments: Grout plant.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 1
CTL THOMPSON Report#: FOR-000003
Founded in 1871 Field Observation Report 10/06/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 10/06/2023 Technician: Barto, Matthew
Plans/Details: RJ Engineering &Consulting Inc. #23-0004R-D1
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
0 Yes ElNo
Discrepancy:
f Yes fNo
Discrepancy Remarks:
General Remarks:
Mid afternoon site visit made for micropile observation. Micropile installation ongoing in northern section of pile cap excavation.
We were informed due to slow drilling progress, hollow injection bars are being grouted upon completion of micropile
installation. Construction sequence not as shown on plans.
Images:
`
44
. l7::::... i..:;40,47,..1':P.::::::131,1tili'?;*).
I 3r
: ,.'4414 ti .
Tigri44i: . ,. j.4110,... l i
off`
= --
.-� - ,.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 1
CTLITHOMPSON Report#: FOR-000004
Founded in 1871 Field Observation Report 10/11/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 10/11/2023 Technician: Barto, Matthew
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
f Yes No
Discrepancy:
f Yes fNo
General Remarks:
Afternoon site visit made. Drilling contractor informed us drill rig not operational (stripped drill head)and that no further
micropile installation will be done today. Drilling contractor suggested we revisit Friday, 10/13/23.
Images:
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 1
CTLITHOMPSON Report#: FOR-000005
Founded in 1871 Field Observation Report 10/13/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 10/13/2023 Technician: Barto, Matthew
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
f Yes No
Discrepancy:
f Yes fNo
General Remarks:
Afternoon site visit made. No further micropile installation done as of previous site visits. No drilling contractor representatives
present then. We will revisit later next week unless notified otherwise.
Images:
W! I
ryry Slf'
. )
t „S t.t l
T x ` ,
,�eC c , 'AA ,l 1 1 ` i I J-
- Aims. -.q 44 d
•_ L
Comments: Present condition.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 1
CTLITHOMPSON Report#: FOR-000006
Founded in 1871 Field Observation Report 10/20/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 10/20/2023 Technician: Barto, Matthew
Placement Location: Micropile slope stabilization Plans/Details:
RJ Engineering &Consulting Inc.#23-0004R-D1 dated 05/11/23
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
n Yes nNo
Discrepancy:
n Yes nNo
Discrepancy Remarks: *grouting procedure
General Remarks:
Afternoon site visit made. Drilling contractor informed us installation hollow injection micropile bars complete and that grout
was mixed in small batches and placed by hand. Drilling contractor preparing exposed bar ends for pile cap connections. We
requested our office be notified when further site visits are needed.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 2
CTLITHOMPSON Report#: FOR-000006
Founded in 1871 Field Observation Report 10/20/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Images:
' t; yam,, -1 i f x 11 '.
/ ,,'40-.c ,Y -IN, *-.. ,� n, zi
11 /i ce,— 1 1k 9 " ; Ii'i Ai,
' •
,„,4,... .. ,,,, r
...,,,. ._ , .., _, -a
r, ii,
L
1 1........„
..
h
,.
1
.,.;.- _,----.1.7 '''''-,: ,, "I'''' , • ii I: _ ' '. __ 7-10'._
rw . li•1 lF .
•1,1 .4 ovit.,
�
t-
344
x v V/
44 i. • ,.--
a y f .& r � j d s
Comments: Completed micropile installation.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 2 of 2
CTLITHOMPSON Report#: FOR-000007
Founded in 1871 Field Observation Report 11/02/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 11/02/2023 Technician: Barto, Matthew
Placement Location: Micropile slope stabilization Plans/Details:
RJ Engineering &Consulting, Inc.#23-004R-D1 dated 01/12/23
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
n Yes nNo
Discrepancy:
n Yes nNo
General Remarks:
As requested, a site visit was made to observe micropile installation.At the time of our arrival the drilling contractor informed us
the drill rig was under repair and not operational. We observed that three micropiles had been installed in southern section of
the micropile cap excavation since our last site visit. Our office will be contacted when a return visit is required.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 2
CTL THOMPSON Report#: FOR-000007
Founded in 1871 Field Observation Report 11/02/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Images:
4 n... 'IMF 1. *, p.-o..--w.•t.
40P >• J yr ._ _p 't as
•?.;".',";;;*.,,c, . -......e• •1.'.•1:• ' - 'SI' a. • ' ' ' 1.'1.-V,:. . katit;[? 4,4: ' .„1 .
:,-,
. .
i to -. w „f Atio .tF r ; -•te�� ,, .I -it ,- 1d__ fir.
`:ems ..„'.. • .,� , ♦ � > ✓.' r .. I. I \ '"'. -., -
_ r, - .4 . , - ik,vI
i S f 'r'-
Comments: Micropile hollow injection bars. \ I - I
Or
''. ' ,I,gr.-.."‘'.do-' .11;r. i ,
LI,...,2kr— • , ,
-=','''' ' .-A4,-.1,i. 1.4. .7 ''.c-,..1°104 ii.W -`-.- --.-,4.c't.ic•
,.,..w4 terki..., .„-v..,. -. _....lt . ,..,.;,,q,„ ,...,,,,),,,... :,...1... .,.
141
itit
Comments:
Drill rig under repair at southern section of micropile cap
excavation.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 2 of 2
CTLITHOMPSON Report#: FOR-000008
Founded in 1871 Field Observation Report 11/14/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 11/14/2023 Technician: Barto, Matthew
Placement Location: Micropile slope stabilization Plans/Details:
RJ Engineering &Consulting Inc.#23-004R-D1 dated 01/12/23
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
n Yes nNo
Discrepancy:
n Yes nNo
General Remarks:
Micropile installation in Southern section of micropile cap area ongoing. Drilling contractor indicated an average of 2 micropiles
completed per day. Due to extended drilling time, grout is being placed upon completion of drilling at end of work day with grout
pump. Site visit requested tomorrow, 11/15/23.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 2
CTL THOMPSON Report#: FOR-000008
Founded in 1871 Field Observation Report 11/14/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Images:
11,! 1
F• G(E ,,.,
re
.ki,i,31:',4°'_, ' ' j'.,.„. ::•••1(...t.4.',.-1'.., :.:,‘"?:,.....,
i, , ,
v ~ f)
4e, ...,
_ss_7:.,_ .'". 41 It- 'ti I lil
. _ V ..v•4,.....i,.r. ....r..7,,,
-.4i it tit -... , • 4a--.,..-: , 1 le -- t , ',' -.': . ,'', ' !,-'-'-'- '.1 -
•
' r s ✓' i
.4....,..--. , ; , A , i, --.. , ...:,4,... .1.-ilog.1 , - _A-
t., i a
/117;..*:41 '''`^-, ptit''.--: ' f i. `A - • . - • i , ,.,, ••••. ,....
4.Igittlit4;,. .--- -. -. - •-. 'F,'": ' 4, 40-a-
s. ''' ' );•10111000010° I,
S A I,C'
`1 I r.ids` .
Comments: South view presently. Comments: North view presently.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 2 of 2
CTL THOMPSON Report#: FOR-000009
Founded in 1871 Field Observation Report 11/15/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
Activity Date: 11/15/2023 Technician: Barto, Matthew
Placement Location: Micropile slope stabilization Plans/Details:
RJ Engineering &Consulting Inc.#23-004R-D1 dated 01/12/23
Discrepancy:
The items observed were found to be in general conformance with the approved drawings and standard construction
practice:
n Yes nNo
Discrepancy:
n Yes nNo
General Remarks:
Site visit made as requested. Micropile installation nearing completion in southern half of micropile cap excavation. Coupled
hollow injection bars installed to to depths shown on plans. Bar spacing and drill angles of micropiles in place are within
tolerances shown on plans. Grouting of micropiles done upon completion of installation. Grout sample obtained this date.
Further site visits will be made when notified.
Images: qq�} s 1
•
.3:" ` ♦.-\''`.uAti 11 t .� ?pr- , 1 ikt Vo t .1— .a ,� :� fir - _ ,.r^, .
- u l 1N1
ir
!_Z ♦ ( -�� i Sj ,,,. + •ram
Oat i
-�- - 0 .. >
.rti
rwift. _i" .-, . .
Comments: Comments: North view of micropile cap excavation.
East view of micropile cap excavation between 13 and 14 E.
Water Place.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 1 of 2
CTL THOMPSON Report#: FOR-000009
Founded in 1871 Field Observation Report 11/15/2023
Glenwood Springs Client: Project:
234 Center Drive
Glenwood Springs,CO 81601 City of Aspen GS06786.000E-346
Phone:970-945-2809 427 Rio Grande Place 13 East Water Place
Aspen,CO 81611 13 East Water Place
Aspen,CO
'',\:1'` , ' .‘r..,:lireg' 2 : . ,: '' .
— irrAis ',t•. .
I
..
! v ti
,,,14.. ilL1 41 4
1, 1 , ,..114, ; it . 1
''''-i.,''',' ",:. : • (''. 1. 'P. \ ';';'.'7'1.7—. ...
Comments: Grout batching.
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities. Page 2 of 2