Loading...
HomeMy WebLinkAboutFile Documents.13 E Water Pl.0008-2023-BREP (14) CTL'THOMPSONCompaction Testing Client: Project: MEP' 4 Report#: SNG-000001 City of Aspen GS06786.000E-345 10/25/2023 427 Rio Grande Place 13 East Water Place Glenwood Springs Report Date: 11/19/2023 Aspen, CO 81611 13 East Water Place 234 Center Drive Test Method:ASTM D 6938 Aspen, CO Glenwood Springs,CO 81601 Phone:970-945-2809 Test Results In Place In Place Optimum Optimum Maximum In Place Dry Wet Probe Moisture Retest Soil Moisture Dry Density Moisture Density Density Depth Percent Min Comp. Tolerance Test# Of Test Date Proctor ID Method Classification (%) (pcf) (%) (pcf) (pcf) (in) Compaction (%) (%) Remark 1 10/25/23 Curve No. 698C Granular 7.9 131.2 8.1 130.5 141.1 10 99 95 -2/2 A 50 Test Information Gauge Test# Test Location Elevation Reference Make/Model/SN/Calibrated Field Technician 1 Site Grading: Micropile cap NW corner 0.5 Existing grade CPN/MC-1 /MD40201885/ Barto, Matthew 04/16/2020 Remarks Comments A:Test results comply with specifications. Tests are"Direct Transmission"(Method A)unless probe depth is noted as "Backscatter".Gauge calibration data on file with the testing agency. 1: Periodic site visits made as requested for density testing in import- 3"ABC used as fill adjacent to and overlying North half of newly poured concrete micropile cap in residence back yard. Fill material pre-moisture treated and placed in lifts with compactive effort applied using a walk behind vibratory sheepsfoot roller.Test result satisfactory. Earthwork contractor informed and indicated our office will be notified when further site visits are needed. This report presents opinions formed as a result of our observations of fill placement and the test results shown above. Test data are not the sole basis for Page 1 of 1 opinions whether the fill meets project specifications. The contractor is responsible to apply necessary compaction effort and moisture to comply with project specifications. Our test results, observations and opinions do not constitute acceptance of the work. )47 • • a yA A s h a rr 4 � i � d ` ,s 7 la Li4v. � ils)b. . '�xz. ,T- ram',,' • 'r' ;� +►ter , ` c. ' ..' ah o 1 ti~ w l,q..s L ^�.' •. ai .x. "�.4 s : • 2 tc a,• CITY OF ASPEN Fig. 1 13 EAST WATER PLACE CTLIT PROJECT NO.GS06786.000-345