HomeMy WebLinkAboutApplication.10-70 Truscott Place.20211007CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090April 2020
COMMUNITY DEVELOPMENT DEPARTMENT
GENERAL LAND USE PACKET
Attached is an Application for review of Development that requires Land Use Review pursuant to
The City of Aspen Land Use Code: Included in this package are the following attachments:
1.Development Application Fee Policy, Fee Schedule andAgreement
to Pay Application Fees Form
2.Land Use Application Form
3.Dimensional Requirements Form (ifrequired)
4.HOA Compliance Form
5.Development Review Procedure
ůůĂƉƉůŝĐĂƚŝŽŶƐĂƌĞƌĞǀŝĞǁĞĚďĂƐĞĚŽŶƚŚĞĐƌŝƚĞƌŝĂĞƐƚĂďůŝƐŚĞĚŝŶdŝƚůĞϮϲŽĨƚŚĞƐƉĞŶDƵŶŝĐŝƉĂůŽĚĞ͘dŝƚůĞϮϲŽĨ
ƚŚĞƐƉĞŶDƵŶŝĐŝƉĂůŽĚĞŝƐĂǀĂŝůĂďůĞĂƚƚŚĞŝƚLJůĞƌŬ͛ƐKĨĨŝĐĞŽŶƚŚĞƐĞĐŽŶĚĨůŽŽƌŽĨŝƚLJ,ĂůůĂŶĚŽŶƚŚĞ
ŝŶƚĞƌŶĞƚĂƚ ŚƚƚƉƐ͗ͬͬůŝďƌĂƌLJ͘ŵƵŶŝĐŽĚĞ͘ĐŽŵͬĐŽͬĂƐƉĞŶͬĐŽĚĞƐͬŵƵŶŝĐŝƉĂůͺĐŽĚĞ͘
tĞƌĞƋƵŝƌĞĂůůĂƉƉůŝĐĂŶƚƐƚŽŚŽůĚĂWƌĞͲƉƉůŝĐĂƚŝŽŶŽŶĨĞƌĞŶĐĞǁŝƚŚĂWůĂŶŶĞƌŝŶƚŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚ
ĞƉĂƌƚŵĞŶƚƐŽƚŚĂƚƚŚĞƌĞƋƵŝƌĞŵĞŶƚƐĨŽƌƐƵďŵŝƚƚŝŶŐĂĐŽŵƉůĞƚĞĂƉƉůŝĐĂƚŝŽŶĐĂŶďĞĨƵůůLJĚĞƐĐƌŝďĞĚ͘dŚŝƐ
ŵĞĞƚŝŶŐĐĂŶŚĂƉƉĞŶŝŶƉĞƌƐŽŶŽƌďLJƉŚŽŶĞŽƌĞŵĂŝů͘ůƐŽ͕ĚĞƉĞŶĚŝŶŐƵƉŽŶƚŚĞĐŽŵƉůĞdžŝƚLJŽĨƚŚĞĚĞǀĞůŽƉŵĞŶƚ
ƉƌŽƉŽƐĞĚ͕ƐƵďŵŝƚƚŝŶŐŽŶĞĐŽƉLJŽĨƚŚĞĚĞǀĞůŽƉŵĞŶƚĂƉƉůŝĐĂƚŝŽŶƚŽƚŚĞĂƐĞWůĂŶŶĞƌƚŽĚĞƚĞƌŵŝŶĞĂĐĐƵƌĂĐLJ͕
ŝŶĞĨĨŝĐŝĞŶĐŝĞƐ͕ŽƌƌĞĚƵŶĚĂŶĐŝĞƐĐĂŶƌĞĚƵĐĞƚŚĞŽǀĞƌĂůůĐŽƐƚŽĨŵĂƚĞƌŝĂůƐĂŶĚƐƚĂĨĨƚŝŵĞ͘
WůĞĂƐĞƌĞĐŽŐŶŝnjĞƚŚĂƚƌĞǀŝĞǁŽĨƚŚĞƐĞŵĂƚĞƌŝĂůƐĚŽĞƐŶŽƚƐƵďƐƚŝƚƵƚĞĨŽƌĂĐŽŵƉůĞƚĞƌĞǀŝĞǁŽĨƚŚĞƐƉĞŶ>ĂŶĚhƐĞ
ZĞŐƵůĂƚŝŽŶƐ͘tŚŝůĞƚŚŝƐĂƉƉůŝĐĂƚŝŽŶƉĂĐŬĂŐĞĂƚƚĞŵƉƚƐƚŽƐƵŵŵĂƌŝnjĞƚŚĞŬĞLJƉƌŽǀŝƐŝŽŶƐŽĨƚŚĞŽĚĞĂƐƚŚĞLJĂƉƉůLJ
ƚŽLJŽƵƌƚLJƉĞŽĨĚĞǀĞůŽƉŵĞŶƚ͕ŝƚĐĂŶŶŽƚƉŽƐƐŝďůLJƌĞƉůŝĐĂƚĞƚŚĞĚĞƚĂŝůŽƌƚŚĞƐĐŽƉĞŽĨƚŚĞŽĚĞ͘/ĨLJŽƵŚĂǀĞ
ƋƵĞƐƚŝŽŶƐƚŚĂƚĂƌĞŶŽƚĂŶƐǁĞƌĞĚďLJƚŚĞŵĂƚĞƌŝĂůƐŝŶƚŚŝƐƉĂĐŬĂŐĞ͕ǁĞƐƵŐŐĞƐƚƚŚĂƚLJŽƵĐŽŶƚĂĐƚƚŚĞƐƚĂĨĨŵĞŵďĞƌ
ĂƐƐŝŐŶĞĚƚŽLJŽƵƌĐĂƐĞ͕ĐŽŶƚĂĐƚWůĂŶŶĞƌŽĨƚŚĞĂLJ;ϵϳϬͲϰϮϵͲϮϳϲϰͬƉůĂŶŶĞƌŽĨƚŚĞĚĂLJΛŐŵĂŝů͘ĐŽŵͿ͕ŽƌĐŽŶƐƵůƚƚŚĞ
ĂƉƉůŝĐĂďůĞƐĞĐƚŝŽŶƐŽĨƚŚĞƐƉĞŶ>ĂŶĚhƐĞŽĚĞ͘
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
Land Use Review Fee Policy
The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is
collected for land use applications based on the type of application submitted.
ĨůĂƚĨĞĞŝƐĐŽůůĞĐƚĞĚďLJŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚĨŽƌĂƉƉůŝĐĂƚŝŽŶƐƚŚĂƚŶŽƌŵĂůůLJƚĂŬĞĂŵŝŶŝŵĂůĂŶĚƉƌĞĚŝĐƚĂďůĞĂŵŽƵŶƚŽĨƐƚĂĨĨ
ƚŝŵĞƚŽƉƌŽĐĞƐƐ͘ZĞǀŝĞǁĨĞĞƐĨŽƌŽƚŚĞƌŝƚLJĞƉĂƌƚŵĞŶƚƐƌĞǀŝĞǁŝŶŐƚŚĞĂƉƉůŝĐĂƚŝŽŶ;ƌĞĨĞƌƌĂůĚĞƉĂƌƚŵĞŶƚƐͿĂůƐŽǁŝůůďĞĐŽůůĞĐƚĞĚ
ǁŚĞŶŶĞĐĞƐƐĂƌLJ͘&ůĂƚĨĞĞƐĂƌĞĐƵŵƵůĂƚŝǀĞ͕ŝ͘Ğ͕͘ĂŶĂƉƉůŝĐĂƚŝŽŶǁŝƚŚŵƵůƚŝƉůĞĨůĂƚĨĞĞƐŵƵƐƚƉĂLJƚŚĞƐƵŵŽĨƚŚŽƐĞĨůĂƚĨĞĞƐ͘&ůĂƚĨĞĞƐ
ĂƌĞŶŽƚƌĞĨƵŶĚĂďůĞ͘
ƌĞǀŝĞǁĨĞĞĚĞƉŽƐŝƚŝƐĐŽůůĞĐƚĞĚďLJŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚǁŚĞŶŵŽƌĞĞdžƚĞŶƐŝǀĞƐƚĂĨĨƚŝŵĞŝƐƌĞƋƵŝƌĞĚ͘ĐƚƵĂůƐƚĂĨĨƚŝŵĞƐƉĞŶƚ
ǁŝůůďĞĐŚĂƌŐĞĚĂŐĂŝŶƐƚƚŚĞĚĞƉŽƐŝƚ͘sĂƌŝŽƵƐŝƚLJƐƚĂĨĨĂůƐŽŵĂLJĐŚĂƌŐĞƚŚĞŝƌƚŝŵĞƐƉĞŶƚŽŶƚŚĞĐĂƐĞŝŶĂĚĚŝƚŝŽŶƚŽƚŚĞĂƐĞ
WůĂŶŶĞƌ͘dŚĞĚĞƉŽƐŝƚĂŵŽƵŶƚŵĂLJďĞƌĞĚƵĐĞĚŝĨ͕ŝŶƚŚĞŽƉŝŶŝŽŶŽĨƚŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚĞƉĂƌƚŵĞŶƚŝƌĞĐƚŽƌ͕ƚŚĞƉƌŽũĞĐƚ
ŝƐĞdžƉĞĐƚĞĚƚŽƚĂŬĞƐŝŐŶŝĨŝĐĂŶƚůLJůĞƐƐƚŝŵĞƚŽƉƌŽĐĞƐƐƚŚĂŶƚŚĞĚĞƉŽƐŝƚŝŶĚŝĐĂƚĞƐ͘ĚĞƚĞƌŵŝŶĂƚŝŽŶŽŶƚŚĞĚĞƉŽƐŝƚĂŵŽƵŶƚƐŚĂůůďĞ
ŵĂĚĞĚƵƌŝŶŐƚŚĞƉƌĞͲĂƉƉůŝĐĂƚŝŽŶĐŽŶĨĞƌĞŶĐĞďLJƚŚĞĂƐĞWůĂŶŶĞƌ͘,ŽƵƌůLJďŝůůŝŶŐƐŚĂůůƐƚŝůůĂƉƉůLJ͘
ůůĂƉƉůŝĐĂƚŝŽŶƐŵƵƐƚŝŶĐůƵĚĞĂŶŐƌĞĞŵĞŶƚƚŽWĂLJƉƉůŝĐĂƚŝŽŶ&ĞĞƐ͘KŶĞƉĂLJŵĞŶƚŝŶĐůƵĚŝŶŐƚŚĞĚĞƉŽƐŝƚĨŽƌWůĂŶŶŝŶŐĂŶĚƌĞĨĞƌƌĂů
ĂŐĞŶĐLJĨĞĞƐŵƵƐƚďĞƐƵďŵŝƚƚĞĚǁŝƚŚĞĂĐŚůĂŶĚƵƐĞĂƉƉůŝĐĂƚŝŽŶ͕ŵĂĚĞƉĂLJĂďůĞƚŽƚŚĞŝƚLJŽĨƐƉĞŶ͘ƉƉůŝĐĂƚŝŽŶƐǁŝůůŶŽƚďĞ
ĂĐĐĞƉƚĞĚĨŽƌƉƌŽĐĞƐƐŝŶŐǁŝƚŚŽƵƚƚŚĞƌĞƋƵŝƌĞĚĨĞĞ;ƐͿ͘
dŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚĞƉĂƌƚŵĞŶƚƐŚĂůůŬĞĞƉĂŶĂĐĐƵƌĂƚĞƌĞĐŽƌĚŽĨƚŚĞĂĐƚƵĂůƚŝŵĞƌĞƋƵŝƌĞĚƚŽƉƌŽĐĞƐƐĂůĂŶĚƵƐĞ
ĂƉƉůŝĐĂƚŝŽŶƌĞƋƵŝƌŝŶŐĂĚĞƉŽƐŝƚ͘dŚĞŝƚLJĐĂŶƉƌŽǀŝĚĞĂƐƵŵŵĂƌLJƌĞƉŽƌƚŽĨĨĞĞƐĚƵĞĂƚƚŚĞĂƉƉůŝĐĂŶƚ͛ƐƌĞƋƵĞƐƚ͘dŚĞĂƉƉůŝĐĂŶƚǁŝůů
ďĞďŝůůĞĚĨŽƌƚŚĞĂĚĚŝƚŝŽŶĂůĐŽƐƚƐŝŶĐƵƌƌĞĚďLJƚŚĞŝƚLJǁŚĞŶƚŚĞƉƌŽĐĞƐƐŝŶŐŽĨĂŶĂƉƉůŝĐĂƚŝŽŶďLJƚŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚ
ĞƉĂƌƚŵĞŶƚƚĂŬĞƐŵŽƌĞƚŝŵĞŽƌĞdžƉĞŶƐĞƚŚĂŶŝƐĐŽǀĞƌĞĚďLJƚŚĞĚĞƉŽƐŝƚ͘ŶLJĚŝƌĞĐƚĐŽƐƚƐĂƚƚƌŝďƵƚĂďůĞƚŽĂƉƌŽũĞĐƚƌĞǀŝĞǁƐŚĂůůďĞ
ďŝůůĞĚƚŽƚŚĞĂƉƉůŝĐĂŶƚǁŝƚŚŶŽĂĚĚŝƚŝŽŶĂůĂĚŵŝŶŝƐƚƌĂƚŝǀĞĐŚĂƌŐĞ͘/ŶƚŚĞĞǀĞŶƚƚŚĞƉƌŽĐĞƐƐŝŶŐŽĨĂŶĂƉƉůŝĐĂƚŝŽŶƚĂŬĞƐůĞƐƐƚŝŵĞƚŚĂŶ
ƉƌŽǀŝĚĞĚĨŽƌďLJƚŚĞĚĞƉŽƐŝƚ͕ƚŚĞĞƉĂƌƚŵĞŶƚƐŚĂůůƌĞĨƵŶĚƚŚĞƵŶƵƐĞĚƉŽƌƚŝŽŶŽĨƚŚĞĚĞƉŽƐŝƚĞĚĨĞĞƚŽƚŚĞĂƉƉůŝĐĂŶƚ͘&ĞĞƐƐŚĂůůďĞ
ĚƵĞƌĞŐĂƌĚůĞƐƐŽĨǁŚĞƚŚĞƌĂŶĂƉƉůŝĐĂŶƚƌĞĐĞŝǀĞƐĂƉƉƌŽǀĂů͘
hŶůĞƐƐŽƚŚĞƌǁŝƐĞĐŽŵďŝŶĞĚďLJƚŚĞŝƌĞĐƚŽƌĨŽƌƐŝŵƉůŝĐŝƚLJŽĨďŝůůŝŶŐ͕ĂůůĂƉƉůŝĐĂƚŝŽŶƐĨŽƌĐŽŶĐĞƉƚƵĂů͕ĨŝŶĂů͕ĂŶĚƌĞĐŽƌĚĂƚŝŽŶŽĨ
ĂƉƉƌŽǀĂůĚŽĐƵŵĞŶƚƐƐŚĂůůďĞŚĂŶĚůĞĚĂƐŝŶĚŝǀŝĚƵĂůĐĂƐĞƐĨŽƌƚŚĞƉƵƌƉŽƐĞŽĨďŝůůŝŶŐ͘hƉŽŶĐŽŶĐĞƉƚƵĂůĂƉƉƌŽǀĂů͕ĂůůďŝůůŝŶŐƐŚĂůůďĞ
ƌĞĐŽŶĐŝůĞĚ͕ĂŶĚƉĂƐƚĚƵĞŝŶǀŽŝĐĞƐƐŚĂůůďĞƉĂŝĚƉƌŝŽƌƚŽƚŚĞŝƌĞĐƚŽƌĂĐĐĞƉƚŝŶŐĂŶĂƉƉůŝĐĂƚŝŽŶĨŽƌĨŝŶĂůƌĞǀŝĞǁ͘&ŝŶĂůƌĞǀŝĞǁƐŚĂůů
ƌĞƋƵŝƌĞĂŶĞǁĚĞƉŽƐŝƚĂƚƚŚĞƌĂƚĞŝŶĞĨĨĞĐƚĂƚƚŚĞƚŝŵĞŽĨĨŝŶĂůƐƵďŵŝƐƐŝŽŶ͘hƉŽŶĨŝŶĂůĂƉƉƌŽǀĂů͕ĂůůďŝůůŝŶŐƐŚĂůůĂŐĂŝŶďĞƌĞĐŽŶĐŝůĞĚ
ƉƌŝŽƌƚŽƚŚĞŝƌĞĐƚŽƌĂĐĐĞƉƚŝŶŐĂŶĂƉƉůŝĐĂƚŝŽŶĨŽƌƌĞǀŝĞǁŽĨƚĞĐŚŶŝĐĂůĚŽĐƵŵĞŶƚƐĨŽƌƌĞĐŽƌĚĂƚŝŽŶ͘
dŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚŝƌĞĐƚŽƌŵĂLJĐĞĂƐĞƉƌŽĐĞƐƐŝŶŐŽĨĂůĂŶĚƵƐĞĂƉƉůŝĐĂƚŝŽŶĨŽƌǁŚŝĐŚĂŶƵŶƉĂŝĚŝŶǀŽŝĐĞŝƐϯϬŽƌŵŽƌĞ
ĚĂLJƐƉĂƐƚĚƵĞ͘hŶƉĂŝĚŝŶǀŽŝĐĞƐŽĨϵϬĚĂLJƐŽƌŵŽƌĞƉĂƐƚĚƵĞŵĂLJďĞĂƐƐĞƐƐĞĚĂůĂƚĞĨĞĞŽĨϭ͘ϳϱйƉĞƌŵŽŶƚŚ͘ŶƵŶƉĂŝĚŝŶǀŽŝĐĞŽĨ
ϭϮϬĚĂLJƐŽƌŵŽƌĞŵĂLJďĞƐƵďũĞĐƚƚŽĂĚĚŝƚŝŽŶĂůĂĐƚŝŽŶƐĂƐŵĂLJďĞĂƐƐŝŐŶĞĚďLJƚŚĞDƵŶŝĐŝƉĂůŽƵƌƚũƵĚŐĞ͘ůůƉĂLJŵĞŶƚŝŶĨŽƌŵĂƚŝŽŶ
ŝƐƉƵďůŝĐĚŽŵĂŝŶ͘
ůůŝŶǀŽŝĐĞƐƐŚĂůůďĞƉĂŝĚƉƌŝŽƌƚŽŝƐƐƵĂŶĐĞŽĨĂĞǀĞůŽƉŵĞŶƚKƌĚĞƌŽƌƌĞĐŽƌĚĂƚŝŽŶŽĨĚĞǀĞůŽƉŵĞŶƚĂŐƌĞĞŵĞŶƚƐĂŶĚƉůĂƚƐ͘dŚĞŝƚLJ
ǁŝůůŶŽƚĂĐĐĞƉƚĂďƵŝůĚŝŶŐƉĞƌŵŝƚĨŽƌĂƉƌŽƉĞƌƚLJƵŶƚŝůĂůůŝŶǀŽŝĐĞƐĂƌĞƉĂŝĚŝŶĨƵůů͘&ŽƌƉĞƌŵŝƚƐĂůƌĞĂĚLJĂĐĐĞƉƚĞĚ͕ĂŶLJƵŶƉĂŝĚŝŶǀŽŝĐĞ
ŽĨϵϬŽƌŵŽƌĞĚĂLJƐŵĂLJƌĞƐƵůƚŝŶĐĞƐƐĂƚŝŽŶŽĨďƵŝůĚŝŶŐƉĞƌŵŝƚƉƌŽĐĞƐƐŝŶŐŽƌŝƐƐƵĂŶĐĞŽĨĂƐƚŽƉǁŽƌŬŽƌĚĞƌƵŶƚŝůĨƵůůƉĂLJŵĞŶƚŝƐ
ŵĂĚĞ͘
The property owner of record is the party responsible for payment of all costs associated with a land use application for the
property. Any secondary agreement between a property owner and an applicant representing the owner (e.g. a contract
purchaser) regarding payment of fees is solely between those private parties.
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
Agreement to Pay Application Fees
An agreement between the City of Aspen (“City”) and
Address of Property:
Please type or print in all caps
Property Owner Name: Representative Name (if different from Property Owner)͗
Billing Name and Address - Send Bills to:
Contact info for billing: e-mail: Phone:
/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚƚŚĞŝƚLJŚĂƐĂĚŽƉƚĞĚ͕ǀŝĂKƌĚŝŶĂŶĐĞEŽ͘ϮϬ͕^ĞƌŝĞƐŽĨϮϬϮϬ͕ƌĞǀŝĞǁĨĞĞƐĨŽƌ>ĂŶĚhƐĞĂƉƉůŝĐĂƚŝŽŶƐ͕ĂŶĚ
ƉĂLJŵĞŶƚŽĨƚŚĞƐĞĨĞĞƐŝƐĂĐŽŶĚŝƚŝŽŶƉƌĞĐĞĚĞŶƚƚŽĚĞƚĞƌŵŝŶŝŶŐĂƉƉůŝĐĂƚŝŽŶĐŽŵƉůĞƚĞŶĞƐƐ͘/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚĂƐƚŚĞƉƌŽƉĞƌƚLJ
ŽǁŶĞƌ͕/ĂŵƌĞƐƉŽŶƐŝďůĞĨŽƌƉĂLJŝŶŐĂůůĨĞĞƐĨŽƌƚŚŝƐĚĞǀĞůŽƉŵĞŶƚĂƉƉůŝĐĂƚŝŽŶ͘
&ŽƌĨůĂƚĨĞĞƐĂŶĚƌĞĨĞƌƌĂůĨĞĞƐ͗/ĂŐƌĞĞƚŽƉĂLJƚŚĞĨŽůůŽǁŝŶŐĨĞĞƐĨŽƌƚŚĞƐĞƌǀŝĐĞƐŝŶĚŝĐĂƚĞĚ͘/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚƚŚĞƐĞĨůĂƚĨĞĞƐ
ĂƌĞŶŽŶͲƌĞĨƵŶĚĂďůĞ͘
$. flat fee for . $. flat fee for
$. flat fee for . $. flat fee for
&ŽƌĚĞƉŽƐŝƚĐĂƐĞƐŽŶůLJ͗dŚĞŝƚLJĂŶĚ/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚďĞĐĂƵƐĞŽĨƚŚĞƐŝnjĞ͕ŶĂƚƵƌĞ͕ŽƌƐĐŽƉĞŽĨƚŚĞƉƌŽƉŽƐĞĚƉƌŽũĞĐƚ͕ŝƚŝƐŶŽƚ
ƉŽƐƐŝďůĞĂƚƚŚŝƐƚŝŵĞƚŽŬŶŽǁƚŚĞĨƵůůĞdžƚĞŶƚŽƌƚŽƚĂůĐŽƐƚƐŝŶǀŽůǀĞĚŝŶƉƌŽĐĞƐƐŝŶŐƚŚĞĂƉƉůŝĐĂƚŝŽŶ͘/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚĂĚĚŝƚŝŽŶĂů
ĐŽƐƚƐŽǀĞƌĂŶĚĂďŽǀĞƚŚĞĚĞƉŽƐŝƚŵĂLJĂĐĐƌƵĞ͘/ƵŶĚĞƌƐƚĂŶĚĂŶĚĂŐƌĞĞƚŚĂƚŝƚŝƐŝŵƉƌĂĐƚŝĐĂďůĞĨŽƌŝƚLJƐƚĂĨĨƚŽĐŽŵƉůĞƚĞ
ƉƌŽĐĞƐƐŝŶŐ͕ƌĞǀŝĞǁ͕ĂŶĚƉƌĞƐĞŶƚĂƚŝŽŶŽĨƐƵĨĨŝĐŝĞŶƚŝŶĨŽƌŵĂƚŝŽŶƚŽĞŶĂďůĞůĞŐĂůůLJƌĞƋƵŝƌĞĚĨŝŶĚŝŶŐƐƚŽďĞŵĂĚĞĨŽƌƉƌŽũĞĐƚ
ĐŽŶƐŝĚĞƌĂƚŝŽŶƵŶůĞƐƐŝŶǀŽŝĐĞƐĂƌĞƉĂŝĚŝŶĨƵůů͘
dŚĞŝƚLJĂŶĚ/ƵŶĚĞƌƐƚĂŶĚĂŶĚĂŐƌĞĞƚŚĂƚŝŶǀŽŝĐĞƐƐĞŶƚďLJƚŚĞŝƚLJƚŽƚŚĞĂďŽǀĞůŝƐƚĞĚďŝůůŝŶŐĂĚĚƌĞƐƐĂŶĚŶŽƚƌĞƚƵƌŶĞĚƚŽƚŚĞ
ŝƚLJƐŚĂůůďĞĐŽŶƐŝĚĞƌĞĚďLJƚŚĞŝƚLJĂƐďĞŝŶŐƌĞĐĞŝǀĞĚďLJŵĞ͘/ĂŐƌĞĞƚŽƌĞŵŝƚƉĂLJŵĞŶƚǁŝƚŚŝŶϯϬĚĂLJƐŽĨƉƌĞƐĞŶƚĂƚŝŽŶŽĨĂŶ
ŝŶǀŽŝĐĞďLJƚŚĞŝƚLJĨŽƌƐƵĐŚƐĞƌǀŝĐĞƐ͘
/ŚĂǀĞƌĞĂĚ͕ƵŶĚĞƌƐƚŽŽĚ͕ĂŶĚĂŐƌĞĞƚŽƚŚĞ>ĂŶĚhƐĞZĞǀŝĞǁ&ĞĞWŽůŝĐLJ͕ŝŶĐůƵĚŝŶŐĐŽŶƐĞƋƵĞŶĐĞƐĨŽƌŶŽŶͲƉĂLJŵĞŶƚ͘/ĂŐƌĞĞƚŽ
ƉĂLJƚŚĞĨŽůůŽǁŝŶŐŝŶŝƚŝĂůĚĞƉŽƐŝƚĂŵŽƵŶƚƐĨŽƌƚŚĞƐƉĞĐŝĨŝĞĚŚŽƵƌƐŽĨƐƚĂĨĨƚŝŵĞ͘/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚƉĂLJŵĞŶƚŽĨĂĚĞƉŽƐŝƚĚŽĞƐ
ŶŽƚƌĞŶĚĞƌĂŶĂƉƉůŝĐĂƚŝŽŶĐŽŵƉůĞƚĞŽƌĐŽŵƉůŝĂŶƚǁŝƚŚĂƉƉƌŽǀĂůĐƌŝƚĞƌŝĂ͘/ĨĂĐƚƵĂůƌĞĐŽƌĚĞĚĐŽƐƚƐĞdžĐĞĞĚƚŚĞŝŶŝƚŝĂůĚĞƉŽƐŝƚ͕/
ĂŐƌĞĞƚŽƉĂLJĂĚĚŝƚŝŽŶĂůŵŽŶƚŚůLJďŝůůŝŶŐƐƚŽƚŚĞŝƚLJƚŽƌĞŝŵďƵƌƐĞƚŚĞŝƚLJĨŽƌƉƌŽĐĞƐƐŝŶŐŵLJĂƉƉůŝĐĂƚŝŽŶĂƚƚŚĞŚŽƵƌůLJƌĂƚĞƐ
ŚĞƌĞŝŶĂĨƚĞƌƐƚĂƚĞĚ͘
$ deposit for hours of Community Development Department staff time. Additional time
above the deposit amount will be billed at $325.00 per hour.
$ deposit for hours of Engineering Department staff time. Additional time above the
deposit amount will be billed at $325.00 per hour.
City of Aspen:
Phillip Supino, AICP
Community Development Director
City Use:
Fees Due: $ Received $
Case #
Signature:
PRINT Name:
Title:
10-70 TRUSCOTT PLACE, ASPEN, COLORADO 81611
TRUSCOTT PHASE II LLLP EVAN PLETCHER
EVAN PLETCHER
evan.pletcher@cityofaspen.com (970) 429-1779
0 PLANNING FEES
0 REFFERAL FEES
Evan Pletcher Digitally signed by Evan Pletcher
Date: 2021.09.22 13:41:05 -06'00'
EVAN PLETCHER
PROJECT MANAGER - CAPITOL ASSET MANAGMENT
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
LAND USE APPLICATION
APPLICANT:
REPRESENTIVATIVE:
Description: Existing and Proposed Conditions
Review: Administrative or Board Review
Required Land Use Review(s):
Growth Management Quota System (GMQS) required fields:
Net Leasable square footage Lodge Pillows Free Market dwelling units
Affordable Housing dwelling units Essential Public Facility square footage
Have you included the following? FEES DUE: $
Pre-Application Conference Summary
Signed Fee Agreement
HOA Compliance form
All items listed in checklist on PreApplication Conference Summary
Name:
Address:
Phone#: email:
Address:
Phone #: email:
Name:
Project Name and Address:
Parcel ID # (REQUIRED)
BUILDINGS 10-70 TRUSCOTT PLACE IS THE LOCATION OF 5 EXISTING MULTIFAMILY RESIDENTIAL BUILDINGS WITH FOUR EXTERIOR
EGRESS STAIRS. THE SCOPE OF WORK IS LIMITED TO THE CONSTRUCTION OF SCREEN WALLS AND ROOFS AROUND THE EXISTING
EXTERIOR EGRESS STAIRS, AND THE REPLACEMENT OF THE EXISTING CONCRETE STAIR TREADS OF THE EXISTING EXTERIOR
EGRESS STAIRS WITH METAL TREADS. NO WORK IS TO BE PERFORMED ON THE FACADES OF THE EXISTING BUILDINGS. THE EXISTING
STAIR STRUCTURES AND CONFIGURATIONS ARE TO REMAIN.
10-70 TRUSCOTT PLACE, ASPEN, COLORADO 81611
273511109703
BG ARCHITECTURE & DESIGN
111H ASPEN AIRPORT BUSINESS CENTER, ASPEN, COLORADO 81611
(970) 948-6709
BARRY.GEREB@BGADASPEN.COM
EVAN PLETCHER
130 SOUTH GALENA STREET, ASPEN, COLORADO 81611
(970) 429-1779
evan.pletcher@cityofaspen.com
0
✔
✔
✔
✔
INSUBSTANTIAL PLANNED DEVELOPMENT AMENDMENT
INSUBSTANTIAL PLANNED DEVELOPMENT AMENDMENT
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
DIMENSIONAL REQUIREMENTS FORM
Complete only if required by the PreApplication checklist
Project and Location
Applicant:
Zone District: Gross Lot Area: Net Lot Area:
**Please refer to section 26.575.020 for information on how to calculate Net Lot Area
Please fill out all relevant dimensions
Single Family and Duplex Residential
1) Floor Area (square feet)
2) Maximum Height
3) Front Setback
4) Rear Setback
5) Side Setbacks
6) Combined Side Setbacks
7) % Site Coverage
Existing Allowed Proposed
Multi-family Residential
1) Number of Units
2) Parcel Density (see 26.710.090.C.10)
3) FAR (Floor Area Ratio)
4) Floor Area (square feet)
Existing Allowed Proposed
8) Minimum distance between buildings
Proposed % of demolition
ϱͿMaximum Height
ϲͿFront Setback
ϳͿRear Setback
ϴͿSide Setbacks
Proposed % of demolition
Commercial
Proposed Use(s)
Existing Allowed Proposed
1) FAR (Floor Area Ratio)
2) Floor Area (square feet)
3) Maximum Height
4) Off-Street Parking Spaces
5) Second Tier (square feet)
6) Pedestrian Amenity (square feet)
Proposed % of demolition
Existing non-conformities or encroachments:
Variations requested:
Lodge
Additional Use(s)
1) FAR (Floor Area Ratio)
2) Floor Area (square feet)
3) Maximum Height
4) Free Market Residential(square feet)
4) Front setback
5) Rear setback
6) Side setbacks
7) Off-Street Parking Spaces
8) Pedestrian Amenity (square feet)
Proposed % of demolition
Existing Allowed Proposed
10-70 TRUSCOTT PLACE, ASPEN, COLORADO 81611
BG ARCHITECTURE & DESIGN
PD 88,703.2SF 88,703.2SF
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
NONE
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
Homeowner Association Compliance Policy
All land use applications within the City of Aspen are required to include a Homeowner Association
Compliance Form (this form) certifying WKDWthe scope of work included in the land use application
complies with all applicable covenants and homeowner association policies. The certification must be
signed by the property owner or Attorney representing the property owner.
Property
Owner (“I”):
Name:
Email: Phone No.:
Address of
Property:
(subject of
application)
I certify as follows: (pick one)
Ƒ This property is not subject to a homeowner association or other form of private covenant.
Ƒ This property is subject to a homeownerassociation or private covenant and the improvements
proposed in this land use application do not require approval by the homeowners association or
covenant beneficiary.
Ƒ This property is subject to a homeowners association or private covenant and the improvements
proposed in this land use application have been approved by the homeowners association or
covenant beneficiary.
I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the
applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I
understand that this document is a public document.
Owner signature: 'ate:
Owner printed name:
or,
Attorney signature: 'ate:
Attorney printed name:
10-70 TRUSCOTT PLACE
ASPEN, COLORADO 81611
Evan Pletcher Digitally signed by Evan Pletcher
Date: 2021.09.22 13:42:58
-06'00'9/22/2021
Evan Pletcher, City of Aspen
TRUSCOTT PHASE II LLLP
evan.pletcher@cityofaspen.(970) 429-1779
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
DEVELOPMENT REVIEW PROCEDURE
ϭ͘Attend pre-application conference. During this one-on-one meeting, staff will determine the review process
applies to your development proposal and will identify the materials necessary to review your application.
Ϯ͘Submit Development Application. Based on your pre-application meeting, you should ĐŽŵƉůĞƚĞ to the
application package and submit the requested number of copies of the complete application and the appropriate
processing fee to the Community Development Department.
ϯ͘Determination of Completeness. Within five;ϱͿworking days of the date of your submission, staff will review
theapplicationand notify you in writing whether the application is complete or if additional materials are
required. Please be aware that the purpose of the completeness review is to determine whether or not the
information you have submitted is adequate to review the request, and not whether the information is sufficient
to obtain approval.
ϰ͘Staff Review of Development Application. KŶĐĞLJŽƵƌĂƉƉůŝĐĂƚŝŽŶŝƐĚĞƚĞƌŵŝŶĞĚƚŽďĞĐŽŵƉůĞƚĞ͕ŝƚǁŝůůďĞ
ƌĞǀŝĞǁĞĚďLJƚŚĞƐƚĂĨĨĨŽƌĐŽŵƉůŝĂŶĐĞǁŝƚŚƚŚĞĂƉƉůŝĐĂďůĞƐƚĂŶĚĂƌĚƐŽĨƚŚĞŽĚĞ͘ƵƌŝŶŐƚŚĞƐƚĂĨĨƌĞǀŝĞǁƐƚĂŐĞ͕ƚŚĞ
ĂƉƉůŝĐĂƚŝŽŶǁŝůůďĞƌĞĨĞƌƌĞĚƚŽŽƚŚĞƌĂŐĞŶĐŝĞƐĨŽƌĐŽŵŵĞŶƚƐ͘dŚĞWůĂŶŶĞƌĂƐƐŝŐŶĞĚƚŽLJŽƵƌĐĂƐĞŽƌƚŚĞĂŐĞŶĐLJŵĂLJ
ĐŽŶƚĂĐƚLJŽƵŝĨĂĚĚŝƚŝŽŶĂůŝŶĨŽƌŵĂƚŝŽŶŝƐŶĞĞĚĞĚŽƌŝĨƉƌŽďůĞŵƐĂƌĞŝĚĞŶƚŝĨŝĞĚ͘^ƚĂĨĨǁŝůůĚƌĂĨƚĂŵĞŵŽĨŽƌƐŝŐŶĂƚƵƌĞ
ďLJƚŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚŝƌĞĐƚŽƌƚŚĂƚĞdžƉůĂŝŶƐǁŚĞƚŚĞƌLJŽƵƌĂƉƉůŝĐĂƚŝŽŶĐŽŵƉůŝĞƐǁŝƚŚƚŚĞŽĚĞ͕ĂŶĚǁŝůů
ůŝƐƚĂŶLJĐŽŶĚŝƚŝŽŶƐƚŚĂƚƐŚŽƵůĚĂƉƉůLJŝĨƚŚĞĂƉƉůŝĐĂƚŝŽŶŝƐƚŽďĞĂƉƉƌŽǀĞĚ͘
&ŝŶĂůĂƉƉƌŽǀĂůŽĨĂŶLJĞǀĞůŽƉŵĞŶƚƉƉůŝĐĂƚŝŽŶƚŚĂƚĂŵĞŶĚƐĂƌĞĐŽƌĚĞĚĚŽĐƵŵĞŶƚ͕ƐƵĐŚĂƐĂƉůĂƚ͕ĂŐƌĞĞŵĞŶƚ͕Žƌ
ĚĞĞĚƌĞƐƚƌŝĐƚŝŽŶ͕ǁŝůůƌĞƋƵŝƌĞƚŚĞĂƉƉůŝĐĂŶƚƚŽƉƌĞƉĂƌĞĂŶĂŵĞŶĚĞĚǀĞƌƐŝŽŶŽĨƚŚĂƚĚŽĐƵŵĞŶƚĨŽƌƌĞǀŝĞǁĂŶĚ
ĂƉƉƌŽǀĂůďLJƐƚĂĨĨ͘^ƚĂĨĨǁŝůůƉƌŽǀŝĚĞƚŚĞĂƉƉůŝĐĂŶƚǁŝƚŚƚŚĞĂƉƉůŝĐĂďůĞĐŽŶƚĞŶƚƐĨŽƌƚŚĞƌĞǀŝƐĞĚƉůĂƚ͘dŚĞŝƚLJ
ƚƚŽƌŶĞLJŝƐŶŽƌŵĂůůLJŝŶĐŚĂƌŐĞŽĨƚŚĞĨŽƌŵĨŽƌƌĞĐŽƌĚĞĚĂŐƌĞĞŵĞŶƚƐĂŶĚĚĞĞĚƌĞƐƚƌŝĐƚŝŽŶƐ͘tĞƐƵŐŐĞƐƚƚŚĂƚLJŽƵŶŽƚ
ŐŽƚŽƚŚĞƚƌŽƵďůĞŽƌĞdžƉĞŶƐĞŽĨƉƌĞƉĂƌŝŶŐƚŚĞƐĞĚŽĐƵŵĞŶƚƐƵŶƚŝůƚŚĞƐƚĂĨĨŚĂƐĚĞƚĞƌŵŝŶĞĚƚŚĂƚLJŽƵƌĂƉƉůŝĐĂƚŝŽŶŝƐ
ĞůŝŐŝďůĞĨŽƌƚŚĞƌĞƋƵĞƐƚĞĚĂŵĞŶĚŵĞŶƚŽƌĞdžĞŵƉƚŝŽŶ͘
5.Board Review of Application. /ĨĂƉƵďůŝĐŚĞĂƌŝŶŐŝƐƌĞƋƵŝƌĞĚĨŽƌƚŚĞůĂŶĚƵƐĞĂĐƚŝŽŶƚŚĂƚLJŽƵĂƌĞƌĞƋƵĞƐƚŝŶŐ͕ƚŚĞ
WůĂŶŶŝŶŐƐƚĂĨĨǁŝůůƐĐŚĞĚƵůĞĂŚĞĂƌŝŶŐĚĂƚĞĨŽƌƚŚĞĂƉƉůŝĐĂƚŝŽŶƵƉŽŶĚĞƚĞƌŵŝŶĂƚŝŽŶƚŚĂƚƚŚĞĂƉƉůŝĐĂƚŝŽŶŝƐĐŽŵƉůĞƚĞ͘
dŚĞŚĞĂƌŝŶŐ;ƐͿǁŝůůďĞƐĐŚĞĚƵůĞĚďĞĨŽƌĞƚŚĞĂƉƉƌŽƉƌŝĂƚĞƌĞǀŝĞǁŝŶŐďŽĂƌĚ;ƐͿ͘dŚĞĂƉƉůŝĐĂŶƚǁŝůůďĞƌĞƋƵŝƌĞĚƚŽŵĂŝů
ŶŽƚŝĐĞ;ŽŶĞĐŽƉLJƉƌŽǀŝĚĞĚďLJƚŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚĞƉĂƌƚŵĞŶƚͿƚŽƉƌŽƉĞƌƚLJŽǁŶĞƌƐǁŝƚŚŝŶϯϬĨĞĞƚŽĨƚŚĞ
ƐƵďũĞĐƚƉƌŽƉĞƌƚLJĂŶĚƉŽƐƚŶŽƚŝĐĞ;ƐŝŐŶĂǀĂŝůĂďůĞĂƚƚŚĞŽŵŵƵŶŝƚLJĞǀĞůŽƉŵĞŶƚĞƉĂƌƚŵĞŶƚͿŽĨƚŚĞƉƵďůŝĐŚĞĂƌŝŶŐ
ŽŶƚŚĞƐŝƚĞĂƚůĞĂƐƚĨŝĨƚĞĞŶ;ϭϱͿĚĂLJƐƉƌŝŽƌƚŽƚŚĞŚĞĂƌŝŶŐĚĂƚĞ͘;WůĞĂƐĞƐĞĞƚƚĂĐŚŵĞŶƚϲĨŽƌŝŶƐƚƌƵĐƚŝŽŶƐ͘ͿdŚĞ
WůĂŶŶŝŶŐƐƚĂĨĨǁŝůůƉƵďůŝƐŚŶŽƚŝĐĞŽĨƚŚĞŚĞĂƌŝŶŐŝŶƚŚĞƉĂƉĞƌĨŽƌůĂŶĚƵƐĞƌĞƋƵĞƐƚƐƚŚĂƚƌĞƋƵŝƌĞƉƵďůŝĐĂƚŝŽŶ͘
dŚĞWůĂŶŶŝŶŐƐƚĂĨĨǁŝůůƚŚĞŶĨŽƌŵƵůĂƚĞĂƌĞĐŽŵŵĞŶĚĂƚŝŽŶŽŶƚŚĞůĂŶĚƵƐĞƌĞƋƵĞƐƚĂŶĚĚƌĂĨƚĂŵĞŵŽƚŽƚŚĞ
ƌĞǀŝĞǁŝŶŐďŽĂƌĚ;ƐͿ͘^ƚĂĨĨǁŝůůƐƵƉƉůLJƚŚĞĂƉƉůŝĐĂŶƚǁŝƚŚĂĐŽƉLJŽĨƚŚĞWůĂŶŶŝŶŐƐƚĂĨĨ͛ƐŵĞŵŽ͕ĂƉƉƌŽdžŝŵĂƚĞůLJĨŝǀĞ;ϱͿ
ĚĂLJƐƉƌŝŽƌƚŽƚŚĞŚĞĂƌŝŶŐ͘dŚĞƉƵďůŝĐŚĞĂƌŝŶŐ;ƐͿǁŝůůƚĂŬĞƉůĂĐĞďĞĨŽƌĞƚŚĞĂƉƉƌŽƉƌŝĂƚĞƌĞǀŝĞǁďŽĂƌĚƐ͘WƵďůŝĐ
ŚĞĂƌŝŶŐƐŝŶĐůƵĚĞĂƉƌĞƐĞŶƚĂƚŝŽŶďLJƚŚĞWůĂŶŶŝŶŐƐƚĂĨĨ͕ĂƉƌĞƐĞŶƚĂƚŝŽŶďLJƚŚĞĂƉƉůŝĐĂŶƚ;ŽƉƚŝŽŶĂůͿ͕ĐŽŶƐŝĚĞƌĂƚŝŽŶŽĨ
ƉƵďůŝĐĐŽŵŵĞŶƚ͕ĂŶĚƚŚĞƌĞǀŝĞǁŝŶŐďŽĂƌĚ͛ƐƋƵĞƐƚŝŽŶƐĂŶĚĚĞĐŝƐŝŽŶ͘
(Continued on next page)
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
ϲ͘Issuance of Development Order. /ĨƚŚĞůĂŶĚƵƐĞƌĞǀŝĞǁŝƐĂƉƉƌŽǀĞĚ͕ƚŚĞŶƚŚĞWůĂŶŶŝŶŐƐƚĂĨĨǁŝůůŝƐƐƵĞĂ
ĞǀĞůŽƉŵĞŶƚKƌĚĞƌ͕ǁŚŝĐŚĂůůŽǁƐƚŚĞĂƉƉůŝĐĂŶƚƚŽƐƵďŵŝƚĂďƵŝůĚŝŶŐƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶ͘
ϳ͘Receipt of Building Permit. KŶĐĞLJŽƵŚĂǀĞƌĞĐĞŝǀĞĚĂĐŽƉLJŽĨƚŚĞƐŝŐŶĞĚƐƚĂĨĨĂƉƉƌŽǀĂů͕LJŽƵŵĂLJĂƉƉůLJĨŽƌĂ
ďƵŝůĚŝŶŐƉĞƌŵŝƚ͘ƵƌŝŶŐƚŚŝƐƚŝŵĞ͕LJŽƵƌƉƌŽũĞĐƚǁŝůůďĞĞdžĂŵŝŶĞĚĨŽƌŝƚƐĐŽŵƉůŝĂŶĐĞǁŝƚŚƚŚĞhŶŝĨŽƌŵƵŝůĚŝŶŐŽĚĞ͘
/ƚĂůƐŽǁŝůůďĞĐŚĞĐŬĞĚĨŽƌĐŽŵƉůŝĂŶĐĞǁŝƚŚĂƉƉůŝĐĂďůĞƉƌŽǀŝƐŝŽŶƐŽĨƚŚĞ>ĂŶĚhƐĞZĞŐƵůĂƚŝŽŶƐƚŚĂƚǁĞƌĞŶŽƚ
ƌĞǀŝĞǁĞĚŝŶĚĞƚĂŝůĚƵƌŝŶŐƚŚĞůĂŶĚƵƐĞĐĂƐĞƌĞǀŝĞǁ͘;dŚŝƐŵŝŐŚƚŝŶĐůƵĚĞĂĐŚĞĐŬŽĨĨůŽŽƌĂƌĞĂƌĂƚŝŽƐ͕ƐĞƚďĂĐŬƐ͕
ƉĂƌŬŝŶŐ͕ŽƉĞŶƐƉĂĐĞĂŶĚƚŚĞůŝŬĞͿ͘/ŵƉĂĐƚĨĞĞƐĨŽƌǁĂƚĞƌ͕ƐĞǁĞƌ͕ƉĂƌŬƐ͕ĂŶĚĞŵƉůŽLJĞĞŚŽƵƐŝŶŐǁŝůůďĞĐŽůůĞĐƚĞĚĂƐ
ƉĂƌƚŽĨƚŚĞƉĞƌŵŝƚƚŝŶŐƉƌŽĐĞƐƐ͘ŶLJĚŽĐƵŵĞŶƚƌĞƋƵŝƌĞĚƚŽďĞƌĞĐŽƌĚĞĚ͕ƐƵĐŚĂƐĂƉůĂƚ͕ĚĞĞĚƌĞƐƚƌŝĐƚŝŽŶ͕Žƌ
ĂŐƌĞĞŵĞŶƚ͕ǁŝůůďĞƌĞǀŝĞǁĞĚĂŶĚƌĞĐŽƌĚĞĚďĞĨŽƌĞĂďƵŝůĚŝŶŐƉĞƌŵŝƚĂƉƉůŝĐĂƚŝŽŶŝƐƐƵďŵŝƚƚĞĚ͘
20 September 2021
City of Aspen Community Development
130 South Galena Street
Aspen, Colorado 81611
(970) 920‐9000
Barry Gereb
BG Architecture & Design
111H Aspen Airport Business Center
Aspen, Colorado 81611
(970) 948‐6709
Re: 10‐70 Truscott Place
Aspen, Colorado 81611
Letter of Authorization
I, Evan Pletcher, applicant, authorize BG Architecture & Design to act on my behalf with regards to the 10‐70
Truscott Place exterior stair remodel project.
Applicant’s contact information:
Name: Evan Pletcher
Address: 130 South Galena Street
Aspen, Colorado 81611
Telephone: (970) 987‐0208
Authorized agent contact information:
Name: BG Architecture & Design
Address: 111H Aspen Airport Business Center
Aspen, Colorado 81611
Telephone: (970) 984‐6709
Contact: Barry Gereb
_________________________________ _____________
Applicant Signature Date
20 September 2021
City of Aspen Community Development
130 South Galena Street
Aspen, Colorado 81611
(970) 920‐9000
Barry Gereb
BG Architecture & Design
111H Aspen Airport Business Center
Aspen, Colorado 81611
(970) 948‐6709
Re: 10‐70 Truscott Place
Aspen, Colorado 81611
Project Narrative
Buildings 10 through 70 of the Truscott Phase II development is proposed to undergo a remodel of it’s exterior
egress stairs. The constructed solution that align with the purpose of the City of Aspen’s Land Use Regulations in
that is seeks to promote the health, safety and welfare of the building’s occupants via a design that respects the
historic, architectural, natural and environmental character of the city.
The remodel project’s scope is centered on four existing exterior egress stairs that serve as the primary
circulation route to/from the above grade dwelling units. The stairs are currently open on all sides that do not
abut a building, allowing them to collect snow, ice and rain. The concrete and steel treads, risers and landings of
the four existing egress stairs are also damaged from repeated exposure to outdoor elements. These conditions
create unsafe conditions for the building’s occupants. The proposed remodel seeks to correct these deficiencies
with the construction of roofs and screen walls around the stairs, and the replacement of the stair treads, risers
and landings.
The proposed roofs will cover the existing exterior stairs and match the existing buildings’ roofs in material,
construction and form. The roof coverage will lessen the amount of precipitation that will accumulate on the
stairs, resulting in a condition that is in favor of the health, safety and welfare of the building’s occupants. The
proposed shed roofs match the form of those found on site and commonly across the city on buildings of all
ages, are simple in form as to avoid visual distraction of the surrounding natural environment, and incorporate
drainage patterns that work with existing on‐site drainage methods as to have the least possible amount of
impact on the natural character of the site and surrounding environment.
The proposed screen walls will wrap around the existing stairs’ sides and consist of wood grained Trex Cladding,
perforated corten steel panels, and solid corten steel panels. The screen walls and roofs will significantly lessen
the amount of precipitation that accumulates on the stairs, resulting in a condition that is in favor of the health
safety and welfare of the building’s occupants. Additionally, the materials chosen are reflective of the
surrounding natural environment and mining history of Aspen. The simple form of the screen walls is consistent
with the language of the existing buildings on site, and the natural toned and textured materials will visually
blend in with the surrounding nature.
The existing concrete on steel pan construction stair treads, risers and landings are proposed to be removed and
replaced with galvanized, perforated steel panel tread and landings with solid steel riser panels. The new
material selection will resist the outdoor environment better than the existing concrete and steel construction
and permit precipitation to drain through, while not changing the configuration of structure of the stairs. This
portion of construction is also directly aimed at promoting the health, safety and welfare of the buildings’
inhabitants while having as minimal as possible of a visual impact on the overall development or surrounding
natural environment.
Residential Design Standards
Exemption Form
Exemption Applies Notes
Remodel of a structure where the alterations proposed
change the exterior of the building, but are not addressed
by any of the Residential Design Standards
Residential unit within a mixed-use building
Designated historic resource listed on the Aspen
Inventory of Historic Landmark Sites and Structures
Has already received a board design approval
Disclaimer: This exemption is only valid for the attached scope of work. If the project scope ex-
pands to include work subject to Residential Design Standards, the applicant shall be required
to apply for an Administrative Compliance Review.
Address:
Parcel ID:
Zone District/PD:
Representative:
Email:
Phone:
Scope of Work:
Reviewed by:
(Project plans/elevations attached)
PRE-APPLICATION CONFERENCE SUMMARY (PRE-21-019)
PLANNER: Sophie Varga, 429.2778, Sophie.Varga@CityofAspen.com
DATE: February 19th, 2021
PROJECT: Aspen Golf Course Subdivision – Insubstantial Planned Development Amendment
PARCEL NUMBER: 2735-111-09-703
REPRESENTATIVE: Kyle Donath, Kyle.Donath@bgadaspen.com; Evan Pletcher,
Evan.Pletcher@cityofaspen.com
DESCRIPTION: The applicant is proposing work at Truscott Phase II, Buildings 10-70; Lot 3 of the Aspen
Golf Course Subdivision, Building Envelope 1. The applicant is proposing to enclose the exterior
stairs on three sides with perforated screen walls and roofing with interior lighting. The applicant
also proposes to replace the existing concrete treads and landings with metal treads and landings.
The current conditions lead to the accumulation of snow and ice on the lower level of the stairs.
The proposed alterations require a Planned Development Amendment and compliance with the
Residential Design Standards (unless exempted in the approving documents).
In order to qualify for an Insubstantial Planned Development Amendment, the applicant must
comply with the following review criteria:
A. Insubstantial Amendments. An insubstantial amendment to an approved Project Review or an
approved Detailed Review may be authorized by the Community Development Director. An
insubstantial amendment shall meet the following criteria:
1. The request does not change the use or character of the development.
2. The request is consistent with the conditions and representations in the project's original
approval, or otherwise represents an insubstantial change.
3. The request does not require granting a variation from the project's allowed use(s) and does
not request an increase in the allowed height or floor area.
4. Any proposed changes to the approved dimensional requirements are limited to a technical
nature, respond to a design parameter that could not have been foreseen during the Project
Review approval, are within dimensional tolerances stated in the Project Review, or otherwise
represents an insubstantial change.
5. An applicant may not apply for Detailed Review if an amendment is pending.
RELEVANT LAND USE CODE SECTIONS:
Section Number Section Title
26.304 Common Development Review Procedures
26.410 Residential Design Standards
26.445.110.A Insubstantial Amendments
For your convenience – links to the Land Use Application and Land Use Code are below:
Land Use Application Land Use Code
REVIEW BY: Staff for complete application and decision
PUBLIC HEARING: No
PLANNING FEES: $0
REFERRAL FEES: None
TOTAL DEPOSIT: $0 - Planning review fees are waived for General Fund Departments
APPLICATION CHECKLIST:
Please submit a digital copy of the application to the planner listed on the preapplication.
Completed Land Use Application and signed Fee Agreement.
Pre-application Conference Summary(this document).
Fee Waiver
Street address and legal description of the parcel on which development is proposed to
occur, consisting of a current (no older than 6 months) certificate from a title insurance
company, an ownership and encumbrance report, or attorney licensed to practice in
the State of Colorado, listing the names of all owners of the property, and all mortgages,
judgments, liens, easements, contracts and agreements affecting the parcel, and
demonstrating the owner’s right to apply for the Development Application. The purpose
of this requirement is to show that the Applicant has the authority to apply for a Land Use
Case.
Applicant’s name, address and telephone number in a letter signed by the applicant
that states the name, address and telephone number of the representative authorized
to act on behalf of the applicant.
A site improvement survey (no older than a year from submittal) showing the current
status of the parcel certified by a registered land surveyor licensed in the State of
Colorado.
A written description of the proposal and an explanation in written, graphic, or model
form of how the proposed development complies with the review standards relevant to
the development application and relevant land use approvals associated with the
property.
Scaled plans depicting the proposed scope of work.
HOA Compliance form (Attached to Application)
Once the copy is deemed complete by staff, the following items will then need to be
submitted:
Total deposit for review of the application.
Disclaimer:
The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on
current zoning, which is subject to change in the future, and upon factual representations that may or may not
be accurate. The summary does not create a legal or vested right.
711 E. Valley Rd, Unit 201B
Basalt, CO 81621
Phone: 970-366-4111 Fax: 970-672-1576
www.titlecorockies.com
Commitment Ordered By:
Kyle Donath
BG Architecture & Design
111H Aspen Airport Business Center
Aspen, CO 81611
Phone: 860-681-8881 Fax:
email: kyle.donath@bdadaspen.com
Inquiries should be directed to:
Authorized Officer or Agent
Title Company of the Rockies
711 E. Valley Rd, Unit 201B
Basalt, CO 81621
Phone: 970-366-4111 Fax: 970-672-1576
Commitment Number:TBD 7000834
Buyer's Name(s):Purchaser with contractual rights under a purchaser agreement with the vested owner identified
at item 4 below
Seller's Name(s):Truscott Phase II LLLP
Property:22475 Hwy 82, Aspen, CO 81611
Aspen Golf Course, Lot 3, Pitkin County, CO
TITLE CHARGES
These charges are based on issuance of the policy or policies described in the attached Commitment for Title Insurance, and includes premiums
for the proposed coverage amount(s) and endorsement(s) referred to therein, and may also include additional work and/or third party charges
related thereto.
If applicable, the designation of “Buyer” and “Seller” shown below may be based on traditional settlement practices in Pitkin County, Colorado,
and/or certain terms of any contract, or other information provided with the Application for Title Insurance.
Owner’s Policy Premium:
Loan Policy Premium:
Additional Lender Charge(s):
Additional Other Charge(s):
Tax Certificate:
Total Endorsement Charge(s):
TBD Charge(s):
TOTAL CHARGES:
$0.00
$0.00
$250.00
$250.00
Service Beyond Expectation in Colorado for: Eagle, Garfield, Grand, Pitkin and Summit Counties. (Limited Coverage: Jackson, Lake, Park and Routt Counties)
Locations In: Avon/Beaver Creek, Basalt, Breckenridge, Grand Lake and Winter Park. (Closing Services available in Aspen and Glenwood Springs).
CM-2 (ALTA Commitment for Title Insurance (6-17-06)(WLTIC Edition (9/26/07)
ALTA Commitment For Title Insurance (Adopted 06-17-06) (Revised 08-01-2016)
COMMITMENT FOR TITLE INSURANCE
ISSUED BY
WESTCOR LAND TITLE INSURANCE COMPANY
NOTICE
IMPORTANT—READ CAREFULLY: THIS COMMITMENT IS AN OFFER TO ISSUE ONE OR MORE
TITLE INSURANCE POLICIES. ALL CLAIMS OR REMEDIES SOUGHT AGAINST THE COMPANY
INVOLVING THE CONTENT OF THIS COMMITMENT OR THE POLICY MUST BE BASED SOLELY IN
CONTRACT.
THIS COMMITMENT IS NOT AN ABSTRACT OF TITLE, REPORT OF THE CONDITION OF TITLE,
LEGAL OPINION, OPINION OF TITLE, OR OTHER REPRESENTATION OF THE STATUS OF TITLE.
THE PROCEDURES USED BY THE COMPANY TO DETERMINE INSURABILITY OF THE TITLE,
INCLUDING ANY SEARCH AND EXAMINATION, ARE PROPRIETARY TO THE COMPANY, WERE
PERFORMED SOLELY FOR THE BENEFIT OF THE COMPANY, AND CREATE NO
EXTRACONTRACTUAL LIABILITY TO ANY PERSON, INCLUDING A PROPOSED INSURED.
THE COMPANY’S OBLIGATION UNDER THIS COMMITMENT IS TO ISSUE A POLICY TO A
PROPOSED INSURED IDENTIFIED IN SCHEDULE A IN ACCORDANCE WITH THE TERMS AND
PROVISIONS OF THIS COMMITMENT. THE COMPANY HAS NO LIABILITY OR OBLIGATION
INVOLVING THE CONTENT OF THIS COMMITMENT TO ANY OTHER PERSON.
COMMITMENT TO ISSUE POLICY
Subject to the Notice; Schedule B, Part I—Requirements; Schedule B, Part II—Exceptions; and the Commitment
Conditions, WESTCOR LAND TITLE INSURANCE COMPANY, a South Carolina Corporation (the
“Company”), commits to issue the Policy according to the terms and provisions of this Commitment. This
Commitment is effective as of the Commitment Date shown in Schedule A for each Policy described in Schedule
A, only when the Company has entered in Schedule A both the specified dollar amount as the Proposed Policy
Amount and the name of the Proposed Insured.
If all of the Schedule B, Part I—Requirements have not been met within six (6) months after the Commitment
Date, this Commitment terminates and the Company’s liability and obligation end.
IN WITNESS WHEREOF, WESTCOR LAND TITLE INSURANCE COMPANY has caused its corporate
name and seal to be hereunto affixed and by these presents to be signed in facsimile under authority of its
by-laws, effective as of the date of Commitment shown in Schedule A.
Issued By:
WESTCOR LAND TITLE INSURANCE COMPANY
Title Company of the Rockies, LLC
10 W Beaver Creek Blvd., Suite 221, PO Box
980
Avon, CO 81620-0980
Phone: (970) 949-9497
CONDITIONS
The term mortgage, when used herein, shall include deed of trust, trust deed, or other1.
security instrument.
If the proposed Insured has or acquired actual knowledge of any defect, lien,2.
encumbrance, adverse claim or other matter affecting the estate or interest or
mortgage thereon covered by this Commitment other than those shown in Schedule B
hereof, and shall fail to disclose such knowledge to the Company in writing, the
Company shall be relieved from liability for any loss or damage resulting from any
act of reliance hereon to the extent the Company is prejudiced by failure to so
disclose such knowledge. If the proposed Insured shall disclose such knowledge to
the Company, or if the Company otherwise acquires actual knowledge of any such
defect, lien, encumbrance, adverse claim or other matter, the Company at its option
may amend Schedule B of this Commitment accordingly, but such amendment shall
not relieve the Company from liability previously incurred pursuant to paragraph 3
of these Conditions and Stipulations.
Liability of the Company under this Commitment shall be only to the named3.
proposed Insured and such parties included under the definition of Insured in the
form of policy or policies committed for and only for actual loss incurred in reliance
hereon in undertaking in good faith (a) to comply with the requirements hereof, or
(b) to eliminate exceptions shown in Schedule B, or (c) to acquire or create the estate
or interest or mortgage thereon covered by this Commitment. In no event shall such
liability exceed the amount stated in Schedule A for the policy or policies committed
for and such liability is subject to the insuring provisions and Conditions and
Stipulations and the Exclusions from Coverage of the form of policy or policies
committed for in favor of the proposed Insured which are hereby incorporated by
reference and are made a part of this Commitment except as expressly modified
herein.
This Commitment is a contract to issue one or more title insurance policies and is not4.
an abstract of title or a report of the condition of title. Any action or actions or rights
of action that the proposed Insured may have or may bring against the Company
arising out of the status of the title to the estate or interest or the status of the
mortgage thereon covered by this Commitment must be based on and are subject to
the provisions of this Commitment.
The policy to be issued contains an arbitration clause. All arbitrable matters when5.
the Amount of Insurance is $2,000,000 or less shall be arbitrated at the option of
either the Company or the Insured as the exclusive remedy of the parties. You may
review a copy of the arbitration rules at< http://www.alta.org/>.
Westcor Land Title Insurance Company
Joint Notice of Privacy Policy
of
Westcor Land Title Insurance Company
and
Title Company of the Rockies, LLC
Westcor Land Title Insurance Company (“WLTIC”) and Title Company of the Rockies, LLC value their customers and are
committed to protecting the privacy of personal information. In keeping with that philosophy, we each have developed a Privacy
Policy, set out below, that will endure the continued protection of your nonpublic personal information and inform you about the
measures WLTIC and Title Company of the Rockies, LLC take to safeguard that information. This notice is issued jointly as a
means of paperwork reduction and is not intended to create a joint privacy policy. Each company’s privacy policy is separately
instituted, executed, and maintained.
Who is Covered
We provide our Privacy Policy to each customer when they purchase a WLTIC title insurance policy. Generally, this means that
the Privacy Policy is provided to the customer at the closing of the real estate transaction.
Information Collected
In the normal course of business and to provide the necessary services to our customers, we may obtain nonpublic personal
information directly from the customer, from customer-related transactions, or from third parties such as our title insurance agent,
lenders, appraisers, surveyors and other similar entities.
Access to Information
Access to all nonpublic personal information is limited to those employees who have a need to know in order to perform their
jobs. These employees include, but are not limited to, those in departments such as closing, legal, underwriting, claims and
administration and accounting.
Information Sharing
Generally, neither WLTIC nor Title Company of the Rockies, LLC shares nonpublic personal information that it collects with
anyone other than those individuals necessary needed to complete the real estate settlement services and issue its title insurance
policy as requested by the consumer. WLTIC or Title Company of the Rockies, LLC may share nonpublic personal
information as permitted by law with entities with whom WLTIC or Title Company of the Rockies, LLC has a joint marketing
agreement. Entities with whom WLTIC or Title Company of the Rockies, LLC have a joint marketing agreement have agreed
to protect the privacy of our customer’s nonpublic personal information by utilizing similar precautions and security measures as
WLTIC and Title Company of the Rockies, LLC use to protect this information and to use the information for lawful purposes.
WLTIC or Title Company of the Rockies, LLC, however, may share information as required by law in response to a subpoena,
to a government regulatory agency or to prevent fraud.
Information Security
WLTIC and Title Company of the Rockies, LLC, at all times, strive to maintain the confidentiality and integrity of the personal
information in its possession and has instituted measures to guard against its unauthorized access. We maintain physical,
electronic and procedural safeguards in compliance with federal standards to protect that information.
The WLTIC Privacy Policy can be found on WLTIC ’s website at www.wltic.com
COMMITMENT FOR TITLE INSURANCE
Issued by
as agent for
Westcor Land Title Insurance Company
SCHEDULE A
Reference:Commitment Number: TBD 7000834
1.Effective Date: May 14, 2021, 7:00 am Issue Date: May 26, 2021
2.Policy (or Policies) to be issued:
ALTA Owner's Policy (6-17-06)Policy Amount:Amount to be Determined
Premium:Amount to be Determined
Proposed Insured:Purchaser with contractual rights under a purchaser agreement with the vested
owner identified at item 4 below
3.The estate or interest in the land described or referred to in this Commitment is Fee Simple.
4.The Title is, at the Commitment Date, vested in:
Truscott Phase II LLLP
5.The land referred to in this Commitment is described as follows:
FOR LEGAL DESCRIPTION SEE SCHEDULE A CONTINUED ON NEXT PAGE
For Informational Purposes Only - APN: R018406
Countersigned
Title Company of the Rockies, LLC
By:
Susan Sarver
This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Westcor Land Title Insurance Company. This
Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B,
Part I-Requirements; and Schedule B, Part II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Reprinted under license from the American Land Title Association.
Commitment for Title Insurance (8-1-2016)
Technical Correction 4-2-2018
Schedule A
Page 1
Commitment No: TBD 7000834
SCHEDULE A (continued)
LEGAL DESCRIPTION
The Land referred to herein is located in the County of Pitkin, State of Colorado, and described as follows:
Lot 3,
THE ASPEN GOLF COURSE SUBDIVISION, according to the Plats thereof recorded June 20, 1985 in Plat Book
17 at Page 34 as Reception No. 269092 and as Amended by Plat recorded May 19, /994 in Plat Book 34 at Page 51
as Reception No. 370200 and Amended by Plat recorded April 29, 1998 in Plat Book 44 at Page 84 as Reception
No. 416226, and Third Amended Plat of the Aspen Golf Course Subdivision recorded February 23, 2001 in Plat
Book 56 at Page 72 as Reception No. 451795, Fourth Amended Plat of the Aspen Golf Course Subdivision recorded
December 5, 2002 in Plat Book 63 at page 62 as Reception No. 475669.
County of Pitkin, State of Colorado.
For each policy to be issued as identified in Schedule A, Item 2, the Company shall not be liable under
this commitment until it receives a specific designation of a Proposed Insured, and has revised this
commitment identifying that Proposed Insured by name. As provided in Commitment Condition 4, the
Company may amend this commitment to add, among other things, additional exceptions or
requirements after the designation of the Proposed Insured.
This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Westcor Land Title Insurance Company. This
Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B,
Part I-Requirements; and Schedule B, Part II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Reprinted under license from the American Land Title Association.
Commitment for Title Insurance (8-1-2016)
Technical Correction 4-2-2018
Schedule A
Page 2
Commitment No: TBD 7000834
COMMITMENT FOR TITLE INSURANCE
Issued by
Westcor Land Title Insurance Company
SCHEDULE B, PART I
Requirements
The following are the requirements to be complied with prior to the issuance of said policy or policies.
Any other instrument recorded subsequent to the effective date hereof may appear as an exception under
Schedule B of the policy to be issued. Unless otherwise noted, all documents must be recorded in the
office of the clerk and recorded of the county in which said property is located.
All of the following Requirements must be met:
1.The Proposed Insured must notify the Company in writing of the name of any party not referred
to in this Commitment who will obtain an interest in the Land or who will make a loan on the
Land. The Company may then make additional Requirements or Exceptions.
2.Pay the agreed amount for the estate or interest to be insured.
3.Pay the premiums, fees, and charges for the Policy to the Company.
4.Documents satisfactory to the Company that convey the Title or create the Mortgage to be
insured, or both, must be properly authorized, executed, delivered, and recorded in the Public
Records.
Evidence satisfactory to the Company or its duly authorized agent that all dues and/or5.
assessments levied by the Homeowners Association have been paid through the date of closing.
Evidence satisfactory to the Company or its duly authorized agent either (a) that the "real estate6.
transfer taxes" imposed by Ordinance No. 20 (Series of 1979), and by Ordinance No. 13, (Series
of 1990), of the City of Aspen, Colorado have been paid, and that the liens imposed thereby have
been fully satisfied, or (b) that Certificates of Exemption have been issued pursuant to the
provisions thereof.
Release by the Public Trustee of Pitkin County of the Deed of Trust from for the use of City of7.
Aspen, Colorado, to secure $2,900,000.00, dated September 6, 2001, and recorded September 14,
2001 as Reception No. 458648.
NOTE: First Amendment to Deed of Trust recorded March 28, 2002 as Reception No. 465561,
given in connection with the above Deed of Trust.
This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Westcor Land Title Insurance Company. This
Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B,
Part I-Requirements; and Schedule B, Part II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Reprinted under license from the American Land Title Association.
Commitment for Title Insurance (8-1-2016)
Technical Correction 4-2-2018
Schedule B - Part I
Page 3
Commitment No: TBD 7000834
NOTE: Subordination Agreement recorded May 21, 2003 as Reception No. 483066, given in
connection with the above Deed of Trust.
Release by the Public Trustee of Pitkin County of the Deed of Trust from for the use of Colorado8.
Housing and Finance Authority, to secure $5,650,000.00, dated May 1, 2003, and recorded May
21, 2003 as Reception No. 483063.
Deed from Truscott Phase II LLLP to Purchaser with contractual rights under a purchaser9.
agreement with the vested owner identified at item 4 below.
NOTE: Duly executed real property transfer declaration, executed by either the Grantor or
Grantee, to accompany the Deed mentioned above, pursuant to Article 14 of House Bill No.
1288-CRA 39-14-102.
NOTE: EXCEPTION NO. 5 UNDER SCHEDULE B, SECTION 2 OF THIS COMMITMENT
WILL NOT APPEAR IN THE POLICY OR POLICIES TO BE ISSUED PURSUANT HERETO,
PROVIDED THAT (A) THE DOCUMENTS CONTEMPLATED BY THE REQUIREMENTS
SET FORTH IN SCHEDULE B, SECTION 1 OF THIS COMMITMENT ARE SUBMITTED TO
AND APPROVED AND RECORDED BY THE COMPANY OR ITS DULY AUTHORIZED
AGENT, AND (B) AN EXAMINATION OF THE RECORDS IN THE OFFICE OF THE CLERK
AND RECORDER FOR PITKIN COUNTY, COLORADO BY THE COMPANY OR ITS DULY
AUTHORIZED AGENT DISCLOSES THAT NO DEFECTS, LIENS, ENCUMBRANCES,
ADVERSE CLAIMS OR OTHER MATTERS HAVE BEEN RECORDED IN SUCH RECORDS
SUBSEQUENT TO THE EFFECTIVE DATE HEREOF.
24-month Chain of Title: The only conveyance(s) affecting said land recorded within the 24
months preceding the date of this commitment is (are) as follows:
CORRECTION WARRANTY DEED recorded April 30, 2002 as Reception No. 466858.
WARRANTY DEED recorded September 14, 2001 as Reception No. 458647.
NOTE: If no conveyances were found in that 24 month period, the last recorded conveyance
is reported. If the subject land is a lot in a subdivision plat less than 24 months old, only the
conveyances subsequent to the plat are reported.
THE COMPANY RESERVES THE RIGHT TO CONDUCT AN ADDITIONAL SEARCH OF
THE RECORDS IN THE OFFICE OF THE CLERK AND RECORDER FOR PITKIN COUNTY,
COLORADO FOR JUDGMENT LIENS, TAX LIENS OR OTHER SIMILAR OR DISSIMILAR
INVOLUNTARY MATTERS AFFECTING THE GRANTEE OR GRANTEES, AND TO MAKE
SUCH ADDITIONAL REQUIREMENTS AS IT DEEMS NECESSARY, AFTER THE
IDENTITY OF THE GRANTEE OR GRANTEES HAS BEEN DISCLOSED TO THE
This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Westcor Land Title Insurance Company. This
Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B,
Part I-Requirements; and Schedule B, Part II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Reprinted under license from the American Land Title Association.
Commitment for Title Insurance (8-1-2016)
Technical Correction 4-2-2018
Schedule B - Part I - continued
Page 4
Commitment No: TBD 7000834
COMPANY.
NOTE: THIS COMMITMENT IS ISSUED UPON THE EXPRESS AGREEMENT AND
UNDERSTANDING THAT THE APPLICABLE PREMIUMS, CHARGES AND FEES SHALL
BE PAID BY THE APPLICANT IF THE APPLICANT AND/OR ITS DESIGNEE OR
NOMINEE CLOSES THE TRANSACTION CONTEMPLATED BY OR OTHERWISE RELIES
UPON THE COMMITMENT, ALL IN ACCORDANCE WITH THE RULES AND
SCHEDULES OF RATES ON FILE WITH THE COLORADO DEPARTMENT OF
INSURANCE.
This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Westcor Land Title Insurance Company. This
Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B,
Part I-Requirements; and Schedule B, Part II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Reprinted under license from the American Land Title Association.
Commitment for Title Insurance (8-1-2016)
Technical Correction 4-2-2018
Schedule B - Part I - continued
Page 5
Commitment No: TBD 7000834
SCHEDULE B, PART II
Exceptions
THIS COMMITMENT DOES NOT REPUBLISH ANY COVENANT, CONDITION, RESTRICTION,
OR LIMITATION CONTAINED IN ANY DOCUMENT REFERRED TO IN THIS COMMITMENT
TO THE EXTENT THAT THE SPECIFIC COVENANT, CONDITION, RESTRICTION, OR
LIMITATION VIOLATES STATE OR FEDERAL LAW BASED ON RACE, COLOR, RELIGION,
SEX, SEXUAL ORIENTATION, GENDER IDENTITY, HANDICAP, FAMILIAL STATUS, OR
NATIONAL ORIGIN.
Schedule B of the policy or policies to be issued will contain exceptions to the following matters unless
the same are disposed of to the satisfaction of the Company.
Any loss or damage, including attorney fees, by reason of the matters shown below:
Any facts, right, interests, or claims which are not shown by the Public Records but which could1.
be ascertained by an inspection of said Land or by making inquiry of persons in possession
thereof.
Easements or claims of easements, not shown by the Public Records.2.
Any encroachment, encumbrance, violation, variation, or adverse circumstance affecting the3.
Title that would be disclosed by an accurate and complete land survey of the Land.
4. Any lien, or right to a lien for services, labor or material heretofore or hereafter furnished,
imposed by law and not shown by the Public Records.
5. Defects, liens, encumbrances, adverse claims or other matters, if any created, first appearing in
the Public Records or attaching subsequent to the effective date hereof, but prior to the date of
the proposed insured acquires of record for value the estate or interest or mortgage thereon
covered by this Commitment.
6. (a) Taxes or assessments that are not shown as existing liens by the records of any taxing
authority that levies taxes or assessments on real property or by the Public Records; (b)
proceedings by a public agency that may result in taxes or assessments, or notices of such
proceedings, whether or not shown by the records of such agency or by the Public Records.
Right of the proprietor of a vein or lode to extract and remove his ore therefrom, should the same7.
be found to penetrate or intersect the premises hereby granted, as reserved in United States Patent
recorded October 27, 1892 in Book 55 at Page 31 as Reception No. 49766.
Right of the proprietor of a vein or lode to extract and remove his ore therefrom, should the same8.
This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Westcor Land Title Insurance Company. This
Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B,
Part I-Requirements; and Schedule B, Part II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Reprinted under license from the American Land Title Association.
Commitment for Title Insurance (8-1-2016)
Technical Correction 4-2-2018
Schedule B - Part II
Page 6
Commitment No: TBD 7000834
be found to penetrate or intersect the premises hereby granted, as reserved in United States Patent
recorded October 27, 1892 in Book 55 at Page 33 as Reception No. 49768.
Terms, conditions, obligations, provisions, easement and other matters as shown and contained9.
on Open Space Annexation No. 1 Plat recorded April 20, 1971 in Plat Book 4 at Page 191 as
Reception No. 145238.
Easements, rights of way and other matters as shown and contained on Plats of the subject10.
property recorded June 20, 1985 in Plat Book 17 at Page 34 as Reception No. 269092, and
recorded May 19, 1994 in Plat Book 34 at Page 51 as Reception No. 370200, and recorded April
29, 1998 in Plat Book 44 at Page 84 as Reception No. 416226, and recorded February 23, 2001 in
Plat Book 56 at Page 72 as Reception No. 451795, Fourth Amendment recorded December 5,
2002 in Plat Book 63 at Page 62 as Reception No. 475669.
Terms, conditions, obligations and provisions as set forth in Ordinance No. 34 (Series of 2000) of11.
the City Council of the City of Aspen, approving the Aspen Golf and Tennis Club/Truscott
Housing final planned unit development, subdivision, rezoning and exemptions from the scoring
and competition procedures of growth management quota system, recorded August 24, 2000 as
Reception No. 446258.
Terms, conditions, obligations and provisions as set forth in the Subdivision Improvement and12.
PUD Agreement, recorded February 23, 2001 as Reception No. 451796.
Terms, conditions, obligations, provisions and easements of Trench, Conduit, and Vault13.
Agreement as set forth in instrument recorded May 9, 2001 as Reception No. 454342.
Terms, conditions, obligations, provisions as set forth Resolution No. 11, Series of 2002,14.
recorded February 26, 2002 as Reception No. 464378, recorded March 18, 2002 as Reception
No. 465179, recorded March 28, 2002 as Reception No. 465558 and Reception No. 465559.
Terms, conditions, obligations, provisions as set forth Parking Easement, recorded March 28,15.
2002 as Reception No. 465894.
Terms, conditions, obligations, provisions as set forth Truscott Place Occupancy Deed16.
Restriction and Agreement, recorded April 30, 2002 as Reception No. 466859.
Terms, conditions, obligations, provisions as set forth Low-Income Housing Tax Credit Land Use17.
Restriction Agreement, recorded February 24, 2003 as Reception No. 479079, Partial
Subordination recorded February 24, 2003 as Reception No. 479080 and Reception No. 479081.
This page is only a part of a 2016 ALTA ® Commitment for Title Insurance issued by Westcor Land Title Insurance Company. This
Commitment is not valid without the Notice; the Commitment to Issue Policy; the Commitment Conditions; Schedule A; Schedule B,
Part I-Requirements; and Schedule B, Part II-Exceptions.
Copyright 2006-2016 American Land Title Association. All rights reserved.
The use of this Form (or any derivative thereof) is restricted to ALTA licensees and
ALTA members in good standing as of the date of use. All other uses are prohibited.
Reprinted under license from the American Land Title Association.
Commitment for Title Insurance (8-1-2016)
Technical Correction 4-2-2018
Schedule B - Part II - continued
Page 7
Commitment No: TBD 7000834
DISCLOSURE STATEMENTS
Note 1: Colorado Division of Insurance Regulations 3-5-1, Paragraph C of Article VII, requires that
"Every Title entity shall be responsible for all matters which appear of record prior to the time of recording
whenever the Title entity conducts the closing and is responsible for recording or filing of legal documents resulting
from the transaction which was closed.” (Gap Protection)
Note 2: Exception No. 4 of Schedule B, Section 2 of this Commitment may be deleted from the Owner's Policy to be
issued hereunder upon compliance with the following conditions:
The Land described in Schedule A of this commitment must be a single-family residence, which includes a1.
condominium or townhouse unit.
No labor or materials may have been furnished by mechanics or materialmen for purpose of construction on2.
the Land described in Schedule A of this Commitment within the past 13 months.
The Company must receive an appropriate affidavit indemnifying the Company against unfiled mechanic's3.
and materialmen's liens.
Any deviation from conditions A though C above is subject to such additional requirements or Information4.
as the Company may deem necessary, or, at its option, the Company may refuse to delete the exception.
Payment of the premium for said coverage.5.
Note 3: The following disclosures are hereby made pursuant to §10-11-122, C.R.S.:
The subject real property may be located in a special taxing district;(i)
A certificate of taxes due listing each taxing jurisdiction shall be obtained from the County Treasurer or the(ii)
County Treasurer's authorized agent; and
Information regarding special districts and the boundaries of such districts may be obtained from the(iii)
County Commissioners, the County Clerk and Recorder, or the County Assessor.
Note 4: If the sales price of the subject property exceeds $100,000.00, the seller shall be required to comply with the
disclosure or withholding provisions of C.R.S. §39-22-604.5 (Non-resident withholding).
Note 5: Pursuant to C.R.S. §10-11-123 Notice is hereby given:
(a)If there is recorded evidence that a mineral estate has been severed, leased or otherwise conveyed from the
surface estate then there is a substantial likelihood that a third party holds some or all interest in oil, gas,
other minerals, or geothermal energy in the property, and
(b)That such mineral estate may include the right to enter and use the property without the surface owner's
permission.
Note 6: Effective September 1, 1997, C.R.S. §30-10-406 requires that all documents received for recording or filing
in the clerk and recorder's office shall contain a top margin of at least one inch and a left, right and bottom margin of
at least one-half inch the clerk and recorder may refuse to record or file any document that does not conform.
Note 7: Our Privacy Policy:
We will not reveal nonpublic personal customer information to any external non-affiliated organization unless we
have been authorized by the customer, or are required by law.
Note 8: Records:
Regulation 3-5-1 Section 7 (N) provides that each title entity shall maintain adequate documentation and records
sufficient to show compliance with this regulation and Title 10 of the Colorado Revised Statutes for a period of not
less than seven (7) years, except as otherwise permitted by law.
Note 9: Pursuant Regulation 3-5-1 Section 9 (F) notice is hereby given that “A title entity shall not earn interest on
fiduciary funds unless disclosure is made to all necessary parties to a transaction that interest is or has been earned.
Said disclosure must offer the opportunity to receive payment of any interest earned on such funds beyond any
administrative fees as may be on file with the division. Said disclosure must be clear and conspicuous, and may be
made at any time up to and including closing.”
Be advised that the closing agent will or could charge an Administrative Fee for processing such an additional
services request and any resulting payee will also be subjected to a W-9 or other required tax documentation for such
Page 8
purpose(s).
Be further advised that, for many transactions, the imposed Administrative Fee associated with such an additional
service may exceed any such interest earned.
Therefore, you may have the right to some of the interest earned over and above the Administrative Fee, if applicable
(e.g., any money over any administrative fees involved in figuring the amounts earned).
Note 10: Pursuant to Regulation 3-5-1 Section 9 (G) notice is hereby given that “Until a title entity receives written
instructions pertaining to the holding of fiduciary funds, in a form agreeable to the title entity, it shall comply with
the following:
The title entity shall deposit funds into an escrow, trust, or other fiduciary account and hold them in a1.
fiduciary capacity.
The title entity shall use any funds designated as “earnest money” for the consummation of the transaction2.
as evidenced by the contract to buy and sell real estate applicable to said transaction, except as otherwise
provided in this section. If the transaction does not close, the title entity shall:
Release the earnest money funds as directed by written instructions signed by both the buyer and seller;(a)
or
If acceptable written instructions are not received, uncontested funds shall be held by the title entity for(b)
180 days from the scheduled date of closing, after which the title entity shall return said funds to the
payor.
In the event of any controversy regarding the funds held by the title entity (notwithstanding any termination3.
of the contract), the title entity shall not be required to take any action unless and until such controversy is
resolved. At its option and discretion, the title entity may:
Await any proceeding; or(a)
Interplead all parties and deposit such funds into a court of competent jurisdiction, and recover court(b)
costs and reasonable attorney and legal fees; or
Deliver written notice to the buyer and seller that unless the title entity receives a copy of a summons(c)
and complaint or claim (between buyer and seller), containing the case number of the lawsuit or
lawsuits, within 120 days of the title entity's written notice delivered to the parties, title entity shall
return the funds to the depositing party.”
Page 9
Commitment No: TBD 7000834
Title Company of the Rockies
Disclosures
All documents received for recording or filing in the Clerk and Recorder's office shall contain a top margin of at least
one inch and a left, right and bottom margin of at least one half of an inch. The Clerk and Recorder will refuse to
record or file any document that does not conform to the requirements of this section. Pursuant to C.R.S.
30-10-406(3)(a).
The company will not issue its policy or policies of title insurance contemplated by this commitment until it has been
provided a Certificate of Taxes due or other equivalent documentation from the County Treasurer or the County
Treasurer's authorized agent: or until the Proposed Insured has notified or instructed the company in writing to the
contrary. Pursuant to C.R.S. 10-11-122.
No person or entity that provides closing and settlement services for a real estate transaction shall disburse funds as a
part of such services until those funds have been received and are available for immediate withdrawals as a matter ofright. Pursuant to C.R.S. 38-35-125(2).
The Company hereby notifies the proposed buyer in the current transaction that there may be recorded evidence that
the mineral estate, or portion thereof, has been severed, leased, or otherwise conveyed from the surface estate. If so,
there is a substantial likelihood that a third party holds some or all interest in the oil, gas, other minerals, or
geothermal energy in the subject property. Such mineral estate may include the right to enter and use the property
without the surface owner's permission. Pursuant to C.R.S. 10-11-123.
If this transaction includes a sale of property and the sales price exceeds $100,000.00, the seller must comply with thedisclosure/withholding requirements of said section. (Nonresident withholding) Pursuant to C.R.S. 39-22-604.5.
Notice is hereby given that: The subject property may be located in a special taxing district. A Certificate of Taxes
due listing each taxing jurisdiction shall be obtained from the County Treasurer or the County Treasurer's authorizedagent. Information regarding special districts and the boundaries of such districts may be obtained from the Board of
County Commissioners, the County Clerk and Recorder, or the County Assessor. Pursuant to C.R.S. 10-11-122.
Notice is hereby given that: Pursuant to Colorado Division of Insurance Regulation 8-1-2;
"Gap Protection" -When this Company conducts the closing and is responsible for recording or filing the legal
documents resulting from the transaction, the Company shall be responsible for all matters which appear on the
record prior to such time or recording or filing; and
"Mechanic's Lien Protection" - If you are the buyer of a single family residence, you may request mechanic's lien
coverage to be issued on your policy of Insurance. If the property being purchased has not been the subject of
construction, improvements or repairs in the last six months prior to the date of this commitment, the
requirements will be payment of the appropriate premium and the completion of an Affidavit and Indemnity by
the seller. If the property being purchased was constructed, improved or repaired within six months prior to the
date of this commitment the requirements may involve disclosure of certain financial information, payment of
premiums, and indemnity, among others. The general requirements stated above are subject to revision and
approval by the Company. Pursuant to C.R.S. 10-11-122.
Notice is hereby given that an ALTA Closing Protection Letter is available, upon request, to certain parties to the
transaction as noted in the title commitment. Pursuant to Colorado Division of Insurance Regulation 8-1.
Nothing herein contained will be deemed to obligate the Company to provide any of the coverages referred to herein
unless the above conditions are fully satisfied.
Page 10
LOT 3
THE ASPEN GOLF COURSE
SUBDIVISION
PITKIN COUNTY, COLORADO
❑ 10 20 40
1" = 201
NOTES
1) LEGAL DESCRIPTION:
LOT 3, THE ASPEN GOLF COURSE SUBDIVISION, ACCORDING TO THE PLATS THEREOF
RECORDED JUNE 20, 1985 IN PLAT BOOK 17 AT PAGE 34 AS RECEPTION NO. 269092
AND AS AMENDED BY PLAT RECORDED MAY 19, 1994 IN PLAT BOOK 34 AT PAGE 51 AS
RECEPTION NO. 370200 AND AMENDED BY PLAT RECORDED APRIL 29, 1998 IN PLAT
BOOK 44 AT PAGE 84 AS RECEPTION NO. 416226, AND THIRD AMENDED PLAT OF THE
ASPEN GOLF COURSE SUBDIVISION RECORDED FEBRUARY 23, 2001 IN PLAT BOOK 56 AT
PAGE 72 AS RECEPTION NO. 451795, FOURTH AMENDED PLAT OF THE ASPEN GOLF
COURSE SUBDIVISION RECORDED DECEMBER 5, 2002 IN PLAT BOOK 63 AT PAGE 62 AS
RECEPTION NO. 475669. COUNTY OF PITKIN, STATE OF COLORADO.
2) BASIS OF BEARING:
A BEARING OF S56°14'49"E BETWEEN A FOUND #5 REBAR NO CAP AT THE N.W.
PROPERTY CORNER AND A FOUND #5 REBAR AND 11/" OPC LS# 28643 AT THE N.E.
PROPERTY CORNER.
3) THIS SURVEY DOES NOT CONSTITUTE A TITLE SEARCH BY THIS SURVEYOR. TITLE
INFORMATION RELIED UPON FOR THE PREPARATION OF THIS SURVEY FURNISHED BY TITLE
COMPANY OF THE ROCKIES, COMMITMENT NO. TBD70000834, DATED 05/26/2021.
4) UNIT OF MEASUREMENT FOR THIS SURVEY IS THE U.S. SURVEY FOOT.
LEGEND
O INDICATES FOUND MONUMENT AS DESCRIBED.
OPC 1%" ORANGE PLASTIC CAP ON #5 REBAR
WM
WATER METER
ELECTRIC TRANSFORMER
EM
ELECTRIC METER
0
DRY WELL
GM
GAS METER
QT
TELEPHONE RISER
RO
ROOF OVERHANG
�D
VENT
WW
WINDOW WELL
LIGHT POLE
OF
UPPER FLOOR
®
CURB STOP
EV
ELECTRIC VAULT
B
DOWN SPOUT
UD
UPPER DECK
SURVEYOR'S CERTIFICATE
I, MICHAEL P. LAFFERTY, HEREBY CERTIFY THAT THIS MAP ACCURATELY DEPICTS A SITE
SURVEY PERFORMED UNDER MY SUPERVISION ON 07/2021 OF THE ABOVE DESCRIBED
PARCEL OF LAND.
MICHAEL P. LAFFERTY PLS. # 37972
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
T1.0
PROJECT DATA
SHEET #TITLE
T1.0 PROJECT DATA
T1.1 IMPROVEMENT LOCATION CERTIFICATE / SITE SURVEY
CC1.0 CODE COMPLIANCE
CC1.1 FIRE RATED ASSEMBLIES
SURVEY:
SV1.0 SITE SURVEY
ARCHITECTURAL:
SP1.0 EXISTING/DEMO SITE SURVEY
SP1.1 SITE PLAN
D1.0 EXISTING / DEMO STAIR 10 PLANS
D1.1 EXISTING / DEMO STAIR 20 PLANS
D1.2 EXISTING / DEMO STAIR 40 PLANS
D1.3 EXISTING / DEMO STAIR 70 PLANS
D1.4 EXISTING / DEMO PHOTOS
A1.0 PARTIAL FLOOR AND ROOF PLANS BUILDING 10
A1.1 PARTIAL FLOOR AND ROOF PLANS BUILDINGS 10 & 20
A1.2 PARTIAL FLOOR AND ROOF PLANS BUILDINGS 40 & 50
A1.3 PARTIAL FLOOR AND ROOF PLANS BUILDING 70
A2.0 STAIR 10 ELEVATIONS
A2.1 STAIR 20 ELEVATIONS
A2.2 STAIR 40 ELEVATIONS
A2.3 STAIR 70 ELEVATIONS
A2.4 EXTERIOR MATERIALS
A3.0 STAIR & ROOF SECTIONS
A4.0 STAIR 10 STAIR PLANS & REFLECTED CEILING PLANS
A4.1 STAIR 20 STAIR PLANS & REFLECTED CEILING PLANS
A4.2 STAIR 40 STAIR PLANS & REFLECTED CEILING PLANS
A4.3 STAIR 70 STAIR PLANS & REFLECTED CEILING PLANS
A5.0 EXISTING/DEMOLITION CONSTRUCTION DETAILS
A5.1 STAIR / SIDING DETAILS
STRUCTURAL:
S.2.003 ROOF FRAMING PLAN
S.6.001 GENERAL NOTES AND DETAILS
TRUSCOT STAIRS
10-70 TRUSCOTT PLACE
ASPEN, COLORADO 81611
ARCHITECT:
BG ARCHITECTURE + DESIGN
111H ASPEN AIRPORT BUSINESS CENTER
ASPEN, COLORADO 81611
(970) 948 6709
BARRY.GEREB@BGADSPEN.COM
CONTACT: BARRY GEREB
OWNER:
TRUSCOTT PHASE II LLLP
530 EAST MAIN STREET
ASPEN, COLORADO 81611
JURISDICTION
ASPEN COMMUNITY DEVELOPMENT
130 SOUTH GALENA STREET
ASPEN, COLORADO 81611
(970) 920-5000
BUILDING CODE:
2015 INTERNATIONAL BUILDING CODE (2015 IBC)
2015 INTERNATIONAL EXISTING BUILDING CODE (2015 IEBC)
2015 INTERNATIONAL ENERGY CONSERVATION CODE (2015 IECC)
PROJECT CONTACTS:
N
SCALE: NOT TO SCALE
VICINITY MAP
PROJECT DATA:
-REMOVE EXISTING STAIR TREADS
-CONSTRUCTION OF NEW STAIR TREADS
-CONSTRUCTION OF NEW STAIR ROOFS
-CONSTRUCTION OF NEW SCREENING ON EXISTING AND NEW STAIR FRAMING
-CONSTRUCTION OF NEW STAIR LIGHTING
PROJECT SCOPE:
EXISTING THERMAL ENVELOPE TO REMAIN
ENERGY COMPLIANCE:
ORIGINALLY PERMITTED UNDER: 1997 UNIVERSAL BUILDING CODE
ORIGINAL CONSTRUCTION TYPE: V-1 HOUR
CLASSIFICATION OF WORK: LEVEL 2 ALTERATIONS
CONSTRUCTION TYPE:VB
OCCUPANCY GROUP:GROUP R-2 (APARTMENT UNITS)
FIRE PROTECTION:NON-SPRINKLERED
MAX ALLOWABLE PROPOSED
BUILDING FOOTPRINT:NO CHANGE NO CHANGE
FLOOR AREA:NO CHANGE NO CHANGE
STAIR ROOF HEIGHT:41'-4 1/2"34'-1"
CODE ANALYSIS:
SUBDIVISION: ASPEN GOLF COURSE
LOT 3
LEGAL DESCRIPTION:
10-70 TRUSCOTT PLACE
ASPEN, COLORADO 81611
PARCEL ID: 273511109703
PROJECT ADDRESS:
SURVEYOR:
ASPEN SURVEY
210 SOUTH GALENA STREET #22
ASPEN, COLORADO 81611
CONTACT: MICHAEL LAFFERTY PLS
CONTACT@ASPENSURVEY.COM
(970) 925-3816
SHEET INDEX:
PROJECT SITE:
10-70 TRUSCOTT PLACE
ASPEN, COLORADO 81611
MAIN
S
T
R
E
E
T
HI
G
H
W
A
Y
8
2
E
A
S
T
C
O
O
P
E
R
A
V
E
N
U
E
ASPEN
STRUCTURAL ENGINEER:
SILVER TOWN STRUCTURES
307N ASPEN AIRPORT BUSINESS CENTER
ASPEN, CO 81611
T. (970) 300 1003
CONTACT: HEIN BRUTSAERT
HEIN3@SOPRIS.NET
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
T1.1
GENERAL NOTES & LEGEND
D01
A
1
A3.0
1
A3.0
1
A3.0
1
A5.0
1
A2.0
4
1
2
3
CONCRETE
CONCRETE
MASONRY
STONE
FRAME WALL
TILE
STEEL
ALUMINUM OR
SHEET METAL
BATT INSULATION
GYP. WALL
BOARD/ STUCCO
/PLASTER
PLYWOOD
SOIL/
COMPLACTED
FILL
ROCK/
NON-COMPACTED
FILL/ GRAVEL
SAND/ GWB/
PLASTER
FINISHED WOOD
ROUGH FRAMING
OR ROUGH
SAWN TRIM
WOOD BLOCKING
GLU-LAM WOOD
PARTICAL BOARD
OR WOOD FIBER
BOARD
RIGID INSULATION
CARPET
1
BUILDING SECTION
CUT
WALL SECTION
CUT
DETAIL
DETAIL CUT
EXTERIOR
ELEVATION
ROOM NUMBER
DOOR MARK
GRID
REFERENCE
LINE
SPOT ELEVATION
DRAWING
REVISION
INTERIOR
ELEVATION
WINDOW MARK
SYMBOL LEGEND
MATERIALS LEGEND
ABBREVIATIONS
AAD ATTIC ACCESS DOOR
ADD ADDENDUM
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALT ALTERNATE
AOR AREA OF REFUGE
ARCH ARCHITECTURAL
ASS'Y ASSEMBLY
B/O BOTTOM OF
BD BOARD
BTW BETWEEN
BLDG BUILDING
BM BEAM
BRG BEARING
BS BOTH SIDES
CAB CABINET
CER CERAMIC
CJ CONSTRUCTION JOINT
CL CENTERLINE
CLST CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
D DRYER
DET DETAIL
DIA DIAMETER
DIM DIMESION
DN DOWN
DP DAMPPROOFING
DR DRAIN
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
EQ EQUAL
EXIST EXISTING
EXT EXTERIOR
FFA FINISH FLOOR
FDN FOUNDATION
FE CABT FIRE EXTINGUISHER
FIN FINISH
FL FLOOR
FOC FACE OF CONCRETE
FOS FACE OF STUD
FR FIREPROOFING
FTG FOOTING
GA GAUGE
GALV GALVINIZED
GC GENERAL CONTRACTOR
GLB GLU-LAM BEAM
GR GRADE
GWB GYPSUM
WALLBOARD
GYP GYPSUM
H.T.A.HEAVY TIMBER
HD HEAD
HDW HARDWARE
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING, VENTILATING, AND COOLING
HWY HIGHWAY
IBC INTERNATIONAL BUILDING CODE
ICP INTEGRATED COLOR PLASTER
ID INSIDE DIAMETER
IE THAT IS
INT INTERIOR
INS INSULATION
IRC INTERNATIONAL RESIDENTIAL CODE
JT JOINT
LAM LAMINATE
LAV LAVATORY
LH LEFT HAND
LHR LEFT HAND
REVERSE
MAX MAXIMUM
MC MEDICINE CABINET
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MTL MATERIAL
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMTER
OPG OPENING
OPH OPPOSITE HAND
OPP OPPOSITE
PERF PERFORATED
PFSM PREFINISHED SHEET METAL
PL PLATE
PLY PLYWOOD
PROD PRODUCT
PROJ PROJECT
PROP PROPERTY
R RADIUS / RISER
REF REFER
REFR REEFRIGERATOR
REQ'D REQUIRED
RH RIGHT HAND
RHR RIGHT HAND REVERSE
RHSM ROUND HEAD
SHEET METAL
RM ROOM
RO ROUGH OPENING
S.T.D.A.SLOPE TO DRAIN
SAN SANITARY
SECT SECTION
SEW SEWER
SG SAFETY GLAZING
SHLV SHELVES
SHT SHEET
SIM SIMILAR
SM/CO SMOKE / CO
DETECTOR
SPEC SPECIFICATION
SQ SQAURE
STC SOUND TRANSMISSION CLASS
STL STEEL
STRUCT STRUCTUR(AL)
SUB SUBSTITUTE
SUPPL SUPPLEMENT(AL)
SUSP SUSPEND(ED)
T TREAD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T/O TOP OF
TEL TELEPHONE
TEMP TEMPERED
THK THICK
TPH TOILET PAPER
HOLDER
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
U.N.O.UNLESS NOTED OTHERWISE
UBC UNIFORM BUILDING CODE
UG UNDERGROUND
UNFIN UNFINISHED
USG UNITED STATES GAUGE
V.I.F.A.VERIFY IN FIELD
VAR VARIABLE
VENT VENTILATE(D)
VG VERTICAL GRAIN
W WASHER
WD WOOD
EL. 100'-0"
MAIN LEVEL
GENERAL NOTES CODE NOTES
A9.0
1.ALL WORK SHALL COMPLY WITH ALL STATE AND LOCAL CODES AND ORDINANCES,
AND SHALL BE PERFORMED TO THE HIGHEST STANDARDS OF CRAFTSMANSHIP BY
JOURNEYMEN OF THE APPROPRIATE TRADES.
2.ALL DRAWINGS REPRESENTED, AND DIMENSIONS SHOWN, ARE TO BE FACE OF
STUD AT WALL, FACE OF CONCRETE, OR CENTER LINE OF COLUMNS UNLESS NOTED
OTHERWISE.
3.ALL DIMENSIONS NOTED TAKE PRECEDENCE OVER SCALED DIMENSIONS.
DIMENSIONS NOTED “N.T.S.” DENOTE NOT TO SCALE.
4.CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND DESCRIPTIONS, EXISTING AND
PROPOSED, AND JOB SITE CONDITIONS, PRIOR TO STARTING WORK.
5.IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BRING TO THE ATTENTION OF
THE ARCHITECT ANY CONDITIONS WHICH WILL NOT PERMIT CONSTRUCTION ACCORDING
TO THE INTENTIONS OF THESE DOCUMENTS. THE ARCHITECT MAY PROVIDE
SUPPLEMENTAL INFORMATION REGARDING DESIGN INTENT WHERE ACCOMMODATIONS
FOR EXISTING CONDITIONS, OR WHERE SUFFICIENT INFORMATION, IS ABSENT FROM THE
THESE DOCUMENTS.
6.SHOULD A DISCREPANCY OCCUR IN OR BETWEEN DRAWINGS AND SPECIFICATIONS,
CONSULT THE ARCHITECT IMMEDIATELY AND PRIOR TO COMMENCING WORK.
7.CONTRACTOR WILL ASSUME RESPONSIBILITY FOR ITEMS REQUIRING
COORDINATION AND RESOLUTION DURING THE BIDDING PROCESS. THE CONTRACTOR
SHALL CONTACT THE ARCHITECT FOR ANY CLARIFICATIONS. THE CONTRACTOR SHALL
CONTACT THE ARCHITECT FOR PRIOR APPROVAL BEFORE EXCLUDING ANY ITEMS OR
PRODUCTS FROM THEIR BID.
8.CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFETY AND CARE OF ADJACENT
PROPERTIES DURING CONSTRUCTION, FOR COMPLIANCE WITH FEDERAL AND STATE
O.S.H.A. REGULATIONS, AND FOR THE PROTECTION OF ALL WORK UNTIL IT IS DELIVERED
COMPLETED TO THE OWNER.
9 ANY QUESTIONS REGARDING THE INTENT OF THE DRAWINGS OR SPECIFICATIONS ARE
TO BE CLARIFIED WITH THE ARCHITECT PRIOR TO ORDERING MATERIALS OR
PROCEEDING WITH THE RELATED WORK.
10.THESE DOCUMENTS REPRESENT THE COMPLETED PROJECT. CONTRACTOR IS
SOLELY RESPONSIBLE FOR THE MEANS AND METHODS OF CONSTRUCTION.
11.EACH MISCELLANEOUS ITEM OF CUTTING, PATCHING, OR FITTING IS NOT
NECESSARY INDIVIDUALLY DESCRIBED IN THESE DOCUMENTS. NO SPECIFIC
DESCRIPTION OF CUTTING, PATCHING, OR FITTING REQUIRED TO PROPERLY
ACCOMMODATE THE SCOPE OF WORK SHALL RELIEVE THE CONTRACTOR FROM THE
RESPONSIBILITY TO PERFORM SUCH WORK AS MAY BE REQUIRED TO COMPLETE THE
PROJECT.
12.ALL ITEMS ARE NEW UNLESS CALLED OUT AS “EXISTING”.
13.CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF ALL
NEW CONSTRUCTION.
14.CONTRACTOR SHALL VERIFY AND COORDINATE ALL OPENINGS THROUGH FLOORS,
CEILINGS, AND WALLS WITH ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL,
PLUMBING, ELECTRICAL, AND OTHER DISCIPLINE DRAWINGS, SPECIFICATIONS, AS WELL
AS EXISTING CONDITIONS.
15.ALL WORK SHALL BE ERECTED PLUMB AND TRUE-TO-LINE IN ACCORDANCE WITH
BEST PRACTICES OF THE TRADE, MANUFACTURER'S RECOMMENDATIONS FOR THE
PARTICULAR PRODUCT, AND IN ACCORDANCE WITH THE SPECIFICATIONS.
16.WHERE INSTALLED WORK IS DAMAGED OR EXISTING FINISHES ARE DISTURBED
DURING CONSTRUCTIONS, SUCH AREAS SHALL BE BE REFINISHED TO MATCH THE AREA
PRIOR TO BEING DAMAGED OR DISTURBED.
17.CONTRACTOR TO PROVIDE THERMAL INSULATION AT ALL EXTERIOR WALLS,
FLOORS AND CEILINGS. PROVIDE FIRE SEPARATIONS AS REQUIRED.
18.CONTRACTOR SHALL TAKE FULL RESPONSIBILITY TO FLASH, SEAL, AND
WATERPROOF THE ENTIRE BUILDING ENCLOSURE.
19.CONTRACTOR TO VERIFY AND PROVIDE ALL MECHANICAL AND PASSIVE VENTING
AND FRESH AIR SUPPLY AS REQUIRED.
20.CONTRACTOR SHALL DO ALL CUTTING, FITTING, PATCHING, EXCAVATION, OR
OTHER REQUIRED TASK OF THEIR WORK THAT MAY BE REQUIRED FOR ALL
SUBCONTRACTORS TO BE ABLE TO PERFORM THEIR WORK. THIS CUTTING, FITTING,
PATCHING, EXCAVATION, OR OTHER REQUIRED TASK SHALL NOT ENDANGER OTHER
WORK OR STRUCTURES. ALL PATCHING OR REPAIRING SHALL BE DONE WITH LIKE
MATERIALS SO THAT SURFACES REPLACED WILL MATCH SURROUNDING SURFACES UPON
COMPLETION.
21.THE JOB SITE SHALL BE MAINTAINED IN A CLEAN AND ORDERLY CONDITION. EACH
SUBCONTRACTOR, IMMEDIATELY UPON COMPLETION OF EACH PHASE OF WORK, SHALL
REMOVE ALL DEBRIS AS A RESULT OF THEIR WORK.
22.NO PORTION OF WORK REQUIRING SHOP DRAWINGS OR SAMPLE SUBMISSION
SHALL BE COMMENCED UNTIL THE SHOP DRAWING OR SAMPLE HAS BEEN REVIEWED BY
THE ARCHITECT AND/OR THE STRUCTURAL ENGINEER.
23.THE LOCAL GOVERNMENT AGENCIES SHALL BE NOTIFIED BY THE CONTRACTOR
WHEN THERE IS A NEED OF INSPECTION AS REQUIRED BY THE APPLICABLE CODE OR BY
ANY LOCAL CODE OR ORDINANCE.
24.ANY CHANGES TO THESE DOCUMENTS MADE BY ANYONE EXCEPT THE ARCHITECT
ARE THE RESPONSIBILITY OF THE PERSON MAKING, OR AUTHORIZING, THE CHANGE. THE
ARCHITECT SHALL NOT BE RESPONSIBLE FOR CHANGES OR DETAILS MADE BY OTHERS.
25.THE PRESENCE OF THE ARCHITECT ON THE JOB SITE DOES NOT IMPLY
CONCURRENCE OR APPROVAL OF THE WORK. THE CONTRACTOR SHALL CALL SPECIFIC
ITEMS TO THE ATTENTION OF THE ARCHITECT TO OBTAIN THE ARCHITECT'S REVIEW.
26.THE CONTRACT DOCUMENTS CONSIST OF THE AGREEMENT, THE GENERAL
CONDITIONS, SUPPLEMENTARY CONDITIONS, GENERAL PROVISIONS, DRAWINGS,
SPECIFICATIONS, ADDENDA, AND SUPPLEMENTARY DOCUMENTS AS ISSUED BY THE
ARCHITECT IN ACCORDANCE WITH THE GENERAL AND SUPPLEMENTARY CONDITIONS OF
THE CONTRACT. DRAWINGS AND SPECIFICATIONS ARE COOPERATIVE AND CONTINUOUS.
WORK INDICATED OR REASONABLY IMPLIED IN EITHER SHALL BE PROVIDED AS THOUGH
FULLY COVERED BY BOTH. ANY DISCREPANCY BETWEEN THE CONTRACT DOCUMENTS
SHOULD BE REPORTED TO THE ARCHITECT IMMEDIATELY.
1.MINIMUM INSULATION REQUIREMENTS:
AT NEW EXTERIOR WALLS: MINIMUM R-21 INSULATION.
AT NEW ROOFS: MINIMUM R-49 INSULATION.
EXTERIOR WALLS TO REMAIN EXISTING, U.N.O.
EXISTING ROOF INSULATION TO REMAIN EXISTING, U.N.O.
ALL EXTERIOR UNDER-FLOOR INSULATION TO REMAIN EXISTING, U.N.O.
2.POINTS OF INFILTRATION SHALL BE CAULKED, GASKETED, WEATHER-STRIPPED OR
SEALED.
3.STAIRS: MAXIMUM 7" RISE, MINIMUM 11" RUN
4.HARDWIRED SMOKE DETECTORS W/ A BATTERY BACK-UP ARE REQUIRED IN EACH
SLEEPING ROOM AND ADJOINING AREA. MINIMUM ONE DETECTOR PER STORY. SMOKE
DETECTORS MUST BE INTERCONNECTED AND AUDIBLE FROM ALL AREAS. G.C. TO
CONFIRM ALL REQUIRED LOCATIONS IN FIELD WITH CODE OFFICIAL.
5.CO DETECTORS: HARDWIRED CO DETECTOR WITH BATTERY BACK-UP CENTRALLY
LOCATED OUTSIDE OF EACH SEPARATE SLEEPING AREA IN THE IMMEDIATE VICINITY OF
THE BEDROOMS OR SLEEPING ROOMS. 70 DECIBEL MINIMUM. G.C. TO CONFIRM ALL
REQUIRED LOCATIONS IN FIELD WITH CODE OFFICIAL.
XXX
BA
S
E
M
E
N
T
S
T
O
R
A
G
E
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
S
-
1
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
1,
4
8
6
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
5
BASEMENT LAUNDRY & MECHANICAL
OCCUPANCY GROUP: S-1
GROSS FLOOR AREA: 712 SF
OCCUPANCY LOAD: 3
PHASE 1 (GREEN LINE):
COMMON PATH OF EGRESS: 90'-9"
EXIT ACCESS TRAVEL DISTANCE: 99'-11"
PORTION OF
STAIR TO BE
CLOSED DURING
PHASE 2
CONSTRUCTION
PORTION OF
STAIR TO BE
CLOSED DURING
PHASE 1 & 2
CONSTRUCTIONUP
UP
PORTION OF
BUILDING TO BE
CLOSED DURING
PHASE 1 & 2
CONSTRUCTION
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 565 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 576 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 388 SF
OCCUPANCY LOAD: 2
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 388 SF
OCCUPANCY LOAD: 2
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 389 SF
OCCUPANCY LOAD: 2
EXIT ACCESS TRAVEL DISTANCE: 69'-6"
EXIT ACCESS TRAVEL DISTANCE: 55'-8"
EX
I
T
A
C
C
E
S
S
T
R
A
V
E
L
D
I
S
T
A
N
C
E
:
3
6
'
-
9
"
EXIT ACCESS TRAVEL DISTANCE: 35'-9"
EXIT ACCESS TRAVEL DISTANCE: 73'-9"
TREE
TREE
TREE
TEMPORARY
EXTERIOR EXIT
STAIRWAY
TEMPORARY
WALKWAY, ABOVE
CO
N
C
R
E
T
E
WA
L
K
CO
N
C
R
E
T
E
W
A
L
K
CO
N
C
R
E
T
E
W
A
L
K
CO
N
C
R
E
T
E
W
A
L
K
YARD
EXTERIOR EXIT
STAIRWAY,
UNDERGOING
CONSTRUCTION
DURING PHASE 1
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
UPDN
UP
DN
UP
EXTERIOR EXIT STAIRWAY,
UNDERGOING CONSTRUCTION
DURING PHASE 2
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 773 SF
OCCUPANCY LOAD: 4
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 801 SF
OCCUPANCY LOAD: 5
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 776 SF
OCCUPANCY LOAD: 4
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 776 SF
OCCUPANCY LOAD: 4
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 801 SF
OCCUPANCY LOAD: 5
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 388 SF
OCCUPANCY LOAD: 2
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 776 SF
OCCUPANCY LOAD: 4
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 776 SF
OCCUPANCY LOAD: 4
PHASE 1 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
82'-5"
PHASE 2 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
79'-4"
PHASE 1 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
149'-8"
PHASE 2 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
103'-4"
PHASE 1 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
108'-1"
PHASE 2 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
108'-10"
PHASE 1 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
110'-8"
PHASE 2 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
109'-8"
PHASE 1 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
131'-5"
PHASE 2 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
119'-7"
PHASE 1 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
120'-3"
PHASE 2 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
112'-8"
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 388 SF
OCCUPANCY LOAD: 2
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 773 SF
OCCUPANCY LOAD: 4
4
2
'
-
8
"
M
A
X
.
O
V
E
R
A
L
L
D
I
A
G
O
N
A
L
22
'
-
9
"
E
X
I
T
S
E
P
A
R
A
T
I
O
N
5
4
'
-
7
"
E
X
I
T
S
E
P
A
R
A
T
I
O
N
ACCESSORY
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 408 SF
OCCUPANCY LOAD: 24
EXITS REQUIRED: 2
TREE
TREE
TREE
EXTERIOR EXIT
STAIRWAY,
UNDERGOING
CONSTRUCTION
DURING PHASE 1
CONCRETE
WALKWAY
DN
DN
DN
EXTERIOR EXIT STAIRWAY,
UNDERGOING CONSTRUCTION
DURING PHASE 2
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
CC1.0
TEMPORARY STAIR
EXITING DIAGRAM
EXITING DIAGRAM NOTE:
-BLACK DASHED LINE = EGRESS ROUTE FOR ALL PHASES
-GREEN DASHED LINE = PHASE 1 OR 3 EGRESS ROUTE
-BLUE DASHED LINE = PHASE 2 OR 4 EGRESS ROUTE
N BUILDINGS 10 & 20
BASEMENT LEVEL PLAN
SCALE:1"=1'-0"
N BUILDINGS 10 & 20
GROUND LEVEL PLAN
SCALE:1"=1'-0"
N BUILDINGS 10 & 20
SECOND LEVEL PLAN
SCALE:1"=1'-0"
N BUILDINGS 10 & 20
THIRD LEVEL PLAN
SCALE:1"=1'-0"
BASEMENT LAUNDRY,
STORAGE & MECHANICAL
OCCUPANCY GROUP: S-1
GROSS FLOOR AREA: 2,247 SF
OCCUPANCY LOAD: 8
PORTION OF
STAIR TO BE
CLOSED DURING
PHASE 3 & 4
CONSTRUCTION
PORTION OF STAIR
SERVING BASEMENT
LEVEL TO BE CLOSED
DURING PHASE 3 & 4
CONSTRUCTION
NOTE:
THIS STORY TO BE
CLOSED DURING PHASE 3
& 4 CONSTRUCTION
UP
UP
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 576 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 576 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 576 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 576 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 394 SF
OCCUPANCY LOAD: 2
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 596 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 571 SF
OCCUPANCY LOAD: 3
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
9
3
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
9
4
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
EXIT ACCESS TRAVEL DISTANCE: 40'-4"
EXIT ACCESS TRAVEL DISTANCE: 36'-5"
EX
I
T
A
C
C
E
S
S
T
R
A
V
E
L
D
I
S
T
A
N
C
E
:
6
4
'
-
1
"
EXIT ACCESS TRAVEL DISTANCE: 48'-3"
EX
I
T
A
C
C
E
S
S
T
R
A
V
E
L
D
I
S
T
A
N
C
E
:
4
5
'
-
6
"
EX
I
T
A
C
C
E
S
S
T
R
A
V
E
L
D
I
S
T
A
N
C
E
:
4
9
'
-
9
"
EXIT ACCESS TRAVEL DISTANCE: 60'-3"
EXIT ACCESS TRAVEL DISTANCE: 49'-9"
EXIT ACCESS TRAVEL DISTANCE: 35'-11"
CONCRETE
WALK
CONCRETE
WALK
TEMPORARY
EXTERIOR EXIT
STAIRWAY
YARD
EXTERIOR EXIT
STAIRWAY,
TO BE CLOSED
DURING PHASE 4
EXTERIOR EXIT
STAIRWAY,
TO BE CLOSED
DURING PHASE 3
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
EXIT
DISCHARGE
TREE
UP
DN
UP
DN
UP
EXIT
DISCHARGE
EXTERIOR EXIT
STAIRWAY,
TO BE CLOSED
DURING PHASE 3
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
8
8
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 354 SF
OCCUPANCY LOAD: 2 RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 393 SF
OCCUPANCY LOAD: 2
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 569 SF
OCCUPANCY LOAD: 3
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
9
3
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
9
4
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
8
7
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
8
8
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
65'-10"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
102'-10"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
117'-8"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
71'-2"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
91'-6"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
126'-10"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
85'-5"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
122'-3"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
66'-4"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
100'-1"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
100'-3"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
66'-10"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
104'-4"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
62'-6"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
114'-7"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
70'-5"
EXTERIOR EXIT
STAIRWAY,
TO BE CLOSED
DURING PHASE 4
CONCRETE
WALKWAY
DN
DN
TEMPORARY
EXTERIOR EXIT
STAIRWAY
UP DN
74'-8
"
M
A
X
I
M
U
M
O
V
E
R
A
L
L
D
I
A
G
O
N
A
L
42'-1" EXIT SEPARATION
26'-
0
"
E
X
I
T
S
E
P
A
R
A
T
I
O
N
TEMPORARY
EXTERIOR EXIT
STAIRWAY
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 543 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 592 SF
OCCUPANCY LOAD: 3
RESIDENTIAL
OCCUPANCY GROUP: R-2
GROSS FLOOR AREA: 394 SF
OCCUPANCY LOAD: 2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
8
8
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
8
8
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
8
1
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
8
9
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
8
9
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
9
3
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
9
4
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
RE
S
I
D
E
N
T
I
A
L
OC
C
U
P
A
N
C
Y
G
R
O
U
P
:
R
-
2
GR
O
S
S
F
L
O
O
R
A
R
E
A
:
3
9
2
S
F
OC
C
U
P
A
N
C
Y
L
O
A
D
:
2
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
91'-7"
PHASE 4 (BLUE LINE):
126'-10"
PHASE 3 (GREEN LINE):
85'-6"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
122'-3"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
76'-2"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
112'-10"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
66'-4"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
100'-1"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
100'-3"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
66'-10"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
104'-4"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
62'-6"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
114'-7"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
70'-8"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
130'-0"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
84'-4"
PHASE 3 (GREEN LINE):
EXIT ACCESS TRAVEL DISTANCE:
131'-7"
PHASE 4 (BLUE LINE):
EXIT ACCESS TRAVEL DISTANCE:
85'-1"
TREE
EXTERIOR EXIT
STAIRWAY,
TO BE CLOSED
DURING PHASE 4
EXTERIOR EXIT
STAIRWAY,
TO BE CLOSED
DURING PHASE 3
CONCRETE
WALKWAY
UP
DN
UP
DN
UP DN
74'-8
"
M
A
X
I
M
U
M
O
V
E
R
A
L
L
D
I
A
G
O
N
A
L
42'-1" EXIT SEPARATION
26'-
0
"
E
X
I
T
S
E
P
A
R
A
T
I
O
N
TEMPORARY
EXTERIOR EXIT
STAIRWAY
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
CC1.1
TEMPORARY STAIR
EXITING DIAGRAM
BUILDINGS 40, 50, 60 & 70
EXITING DIAGRAM NOTE:
-BLACK DASHED LINE = EGRESS ROUTE FOR ALL PHASES
-GREEN DASHED LINE = PHASE 1 OR 3 EGRESS ROUTE
-BLUE DASHED LINE = PHASE 2 OR 4 EGRESS ROUTE
N SCALE:1"=1'-0"
BASEMENT LEVEL PLAN
N SCALE:1"=1'-0"
BUILDINGS 40, 50, 60 & 70
GROUND LEVEL PLAN
N SCALE:1"=1'-0"
BUILDINGS 40, 50, 60 & 70
SECOND LEVEL PLAN
N SCALE:1"=1'-0"
BUILDINGS 40, 50, 60 & 70
THIRD LEVEL PLAN
LOT 3
THE ASPEN GOLF COURSE
SUBDIVISION
PITKIN COUNTY, COLORADO
❑ 10 20 40
1" = 201
NOTES
1) LEGAL DESCRIPTION:
LOT 3, THE ASPEN GOLF COURSE SUBDIVISION, ACCORDING TO THE PLATS THEREOF
RECORDED JUNE 20, 1985 IN PLAT BOOK 17 AT PAGE 34 AS RECEPTION NO. 269092
AND AS AMENDED BY PLAT RECORDED MAY 19, 1994 IN PLAT BOOK 34 AT PAGE 51 AS
RECEPTION NO. 370200 AND AMENDED BY PLAT RECORDED APRIL 29, 1998 IN PLAT
BOOK 44 AT PAGE 84 AS RECEPTION NO. 416226, AND THIRD AMENDED PLAT OF THE
ASPEN GOLF COURSE SUBDIVISION RECORDED FEBRUARY 23, 2001 IN PLAT BOOK 56 AT
PAGE 72 AS RECEPTION NO. 451795, FOURTH AMENDED PLAT OF THE ASPEN GOLF
COURSE SUBDIVISION RECORDED DECEMBER 5, 2002 IN PLAT BOOK 63 AT PAGE 62 AS
RECEPTION NO. 475669. COUNTY OF PITKIN, STATE OF COLORADO.
2) BASIS OF BEARING:
A BEARING OF S56°14'49"E BETWEEN A FOUND #5 REBAR NO CAP AT THE N.W.
PROPERTY CORNER AND A FOUND #5 REBAR AND 11/" OPC LS# 28643 AT THE N.E.
PROPERTY CORNER.
3) THIS SURVEY DOES NOT CONSTITUTE A TITLE SEARCH BY THIS SURVEYOR. TITLE
INFORMATION RELIED UPON FOR THE PREPARATION OF THIS SURVEY FURNISHED BY TITLE
COMPANY OF THE ROCKIES, COMMITMENT NO. TBD70000834, DATED 05/26/2021.
4) UNIT OF MEASUREMENT FOR THIS SURVEY IS THE U.S. SURVEY FOOT.
LEGEND
O INDICATES FOUND MONUMENT AS DESCRIBED.
OPC 1%" ORANGE PLASTIC CAP ON #5 REBAR
WM
WATER METER
ELECTRIC TRANSFORMER
EM
ELECTRIC METER
0
DRY WELL
GM
GAS METER
QT
TELEPHONE RISER
RO
ROOF OVERHANG
�D
VENT
WW
WINDOW WELL
LIGHT POLE
OF
UPPER FLOOR
®
CURB STOP
EV
ELECTRIC VAULT
B
DOWN SPOUT
UD
UPPER DECK
SURVEYOR'S CERTIFICATE
I, MICHAEL P. LAFFERTY, HEREBY CERTIFY THAT THIS MAP ACCURATELY DEPICTS A SITE
SURVEY PERFORMED UNDER MY SUPERVISION ON 07/2021 OF THE ABOVE DESCRIBED
PARCEL OF LAND.
MICHAEL P. LAFFERTY PLS. # 37972
STAIR 10
AREA OF
PROPOSED
WORK
STAIR 20
AREA OF
PROPOSED
WORK
STAIR 40
AREA OF
PROPOSED
WORK
STAIR 70
AREA OF
PROPOSED
WORK
EXISTING CONCRETE
WALK TO REMAIN
EXISTING CONCRETE
WALK TO REMAIN
EXIS
T
I
N
G
C
O
N
C
R
E
T
E
WAL
K
T
O
R
E
M
A
I
N
EXISTING
C
O
N
C
R
E
T
E
WALK TO
R
E
M
A
I
N
ASPHALT PARKING
BUILDING 10
BUILDING 20
BUILDING 30 BUILDING 40
BUILDING 50
BUILDING 60
BUILDING 70
GA
R
A
G
E
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
PROP
E
R
T
Y
L
I
N
E
ACTIVITY
ENVELOPE
ACTIVITY
ENVELOPE
ACTIVITY
ENVELOPE
ACTIVITY
ENVELOPE20
'
-
0
"
C
O
N
S
T
R
U
C
T
I
O
N
&
MA
I
N
T
E
N
A
N
C
E
E
A
S
E
M
E
N
T
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
TRUSCOTT PHASE II
BUILDINGS 10-70
EXISTING MULTIFAMILY HOUSING
SUBDIVISION: ASPEN GOLF COURSE
PARCEL ID: 273511109703
SITE AREA: 88,703.2 SF
TRUS
C
O
T
T
P
L
A
C
E
ASPH
A
L
T
(E) ELEV
7878.88
(E) ELEV
7882.74
(E) ELEV
7885.81
(E) ELEV
7886.03
(E) ELEV
7886.29
(E) ELEV
7886.07
(E) ELEV
7886.47
(E) ELEV
7886.29
(E) ELEV
7886.54
(E) ELEV
7887.01
(E) ELEV
7887.01
(E) ELEV
7886.37
(E) ELEV
7887.15
(E) ELEV
7887.39
(E) ELEV
7887.27
(E) ELEV
7886.70
(E) ELEV
7886.85
(E) ELEV
7886.09
(E) ELEV
7885.99
(E) ELEV
7885.95
(E) ELEV
7886.11
(E) ELEV
7886.09
(E) ELEV
7887.58
(E) ELEV
7887.02
(E) ELEV
7886.48
(E) ELEV
7889.52
(E) ELEV
7890.11
(E) ELEV
7888.46 (E) ELEV
7885.67
(E) ELEV
7884.90
LANDSCAPE
(E) ELEV
7887.31
(E) ELEV
7886.16 EXISTING
DRYWELL
(E) ELEV
7887.20
(E) ELEV
7887.11
LANDSCAPE
LANDSCAPE
(E) ELEV
7887.01
(E) ELEV
7886.28
(E) ELEV
7885.98
(E) ELEV
7886.17
(E) ELEV
7886.32
AREA OF LANDSCAPE
AFFECTED BY NEW
ROOF SHEET FLOW
DRAINAGE
(E
)
S
L
O
P
E
(E
)
S
L
O
P
E
(E
)
S
L
O
P
E
(E
)
S
L
O
P
E
(E
)
S
L
O
P
E
DATUM:
100'-0" ARCH = 7,886.51 SURVEY
SITE PLAN DEMO NOTES:
ALL EXISTING FLATWORK, LANDSCAPE, DRAINAGE
ELEMENTS AND STRUCTURES ARE TO REMAIN UNLESS
NOTED OTHERWISE, RE: DEMO STAIR PLANS
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
SP1.0
EXISTING/DEMO SITE PLAN
NSITE PLAN
SCALE 1" = 10'-0"
1
SP1.0
EXISTING/DEMO
STAIR 10
AREA OF
PROPOSED
WORK
STAIR 20
AREA OF
PROPOSED
WORK
STAIR 40
AREA OF
PROPOSED
WORK
STAIR 70
AREA OF
PROPOSED
WORK
EXISTING CONCRETE
WALK TO REMAIN
EXISTING CONCRET
E
WALK TO REMAIN
EXIS
T
I
N
G
C
O
N
C
R
E
T
E
WAL
K
T
O
R
E
M
A
I
N
EXISTING
C
O
N
C
R
E
T
E
WALK TO
R
E
M
A
I
N
ASPHALT PARKING
BUILDING 10
BUILDING 20
BUILDING 30 BUILDING 40
BUILDING 50
BUILDING 60
BUILDING 70
GA
R
A
G
E
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
PROP
E
R
T
Y
L
I
N
E
ACTIVITY
ENVELOPE
ACTIVITY
ENVELOPE
ACTIVITY
ENVELOPE
ACTIVITY
ENVELOPE20
'
-
0
"
C
O
N
S
T
R
U
C
T
I
O
N
&
MA
I
N
T
E
N
A
N
C
E
E
A
S
E
M
E
N
T
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
TRUSCOTT PHASE II
BUILDINGS 10-70
EXISTING MULTIFAMILY HOUSING
SUBDIVISION: ASPEN GOLF COURSE
PARCEL ID: 273511109703
SITE AREA: 88,703.2 SF
TRUS
C
O
T
T
P
L
A
C
E
ASPH
A
L
T
(E) ELEV
7878.88
(E) ELEV
7882.74
(E) ELEV
7885.81
(E) ELEV
7886.03
(E) ELEV
7886.29
(E) ELEV
7886.07
(E) ELEV
7886.47
(E) ELEV
7886.29
(E) ELEV
7886.54
(E) ELEV
7887.01
(E) ELEV
7887.01
(E) ELEV
7886.37
(E) ELEV
7887.15
(E) ELEV
7887.39
(E) ELEV
7887.27
(E) ELEV
7886.70
(E) ELEV
7886.85
(E) ELEV
7886.09
(E) ELEV
7885.99
(E) ELEV
7885.95
(E) ELEV
7886.11
(E) ELEV
7886.09
(E) ELEV
7887.58
(E) ELEV
7887.02
(E) ELEV
7886.48
DR
A
I
N
A
G
E
(E) ELEV
7889.52
(E) ELEV
7890.11
(E) ELEV
7888.46 (E) ELEV
7885.67
(E) ELEV
7884.90
DRAINAGE
LANDSCAPE
(E) ELEV
7887.31
(E) ELEV
7886.16 EXISTING
DRYWELL
(E) ELEV
7887.20
(E) ELEV
7887.11
LANDSCAPE
LANDSCAPE
(E) ELEV
7887.01
DR
A
I
N
A
G
E
(E) ELEV
7886.28
(E) ELEV
7885.98
(E) ELEV
7886.17
(E) ELEV
7886.32
AREA OF LANDSCAPE
AFFECTED BY NEW
ROOF SHEET FLOW
DRAINAGE
R
O
O
F
S
H
E
E
T
F
L
O
W
D
I
R
E
C
T
I
O
N
RO
O
F
S
H
E
E
T
FL
O
W
DI
R
E
C
T
I
O
N
AREA OF LANDSCAPE
AFFECTED BY NEW
ROOF SHEET FLOW
DRAINAGE
DRAINAGE NOTES:
ALL NEW ROOFS SHEET FLOW STORMWATER ONTO
EXISTING LANDSCAPED AREAS. ALL STORMWATER TO
PERCOLATE INTO EXISTING LANDSCAPE AREAS
STRAW SWADDLE TO BE PROVIDED AT STAIR 40 ONLY.
NO LAND DISTURBANCE TO TAKE PLACE AT STAIRS 10,
20 OR 70.
ESTIMATED CONSTRUCTION START/END DATES:
JUNE 1, 2022 TO OCTOBER 1, 2022
STRAW SWADDLE,
INDICATED BY THIN
DASHED LINE
AREA OF LANDSCAPE
AFFECTED BY NEW
ROOF SHEET FLOW
DRAINAGE
(E
)
S
L
O
P
E
(E
)
S
L
O
P
E
(E
)
S
L
O
P
E
(E
)
S
L
O
P
E
(E
)
S
L
O
P
E
DATUM:
100'-0" ARCH = 7,886.51 SURVEY
RO
O
F
S
H
E
E
T
FL
O
W
DI
R
E
C
T
I
O
N
ROOF
S
H
E
E
T
FLOW
DIREC
T
I
O
N
AREA OF LANDSCAPE
AFFECTED BY NEW
ROOF SHEET FLOW
DRAINAGE (LOW POINT)
SITE PLAN NOTES:
ALL EXISTING FLATWORK, LANDSCAPE, DRAINAGE
ELEMENTS AND STRUCTURES ARE TO REMAIN
UNLESS NOTED OTHERWISE, RE: STAIR DEMO PLANS
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
SP1.1
SITE PLAN
NSITE PLAN
SCALE 1" = 10'-0"
1
SP1.1
6
A5.0
6
A5.0
2
A5.0
1
A5.0
4
A5.0
2
A5.0
1
A5.0
2
A5.0
DN
EXISTING CONCRETE
WALK TO REMAIN
EXISTING CONCRETE
WALKWAY AND GUARDS
TO REMAIN
EXISTING CONCRETE
SLAB TO REMAIN
EXISTING CONCRETE
FOUNDATION WALL TO
REMAIN, TYP.
EXISTING POST
TO REMAIN,TYP.
EXISTING POST
TO REMAIN,TYP.
DN
UP
UP
3
A5.0
4
A5.0
4
A5.0
5
A5.0
6 SIM
A5.0
EXISTING GROUND
LEVEL GUARD TO BE
REMOVED
BUILDING 10
BUILDING 10
BUILDING 10
EXISTING WALL TO
REMAIN, TYP.
REMOVE RUST FROM ALL STRUCTURAL STEEL MEMBERS TO
REMAIN. CONTACT STRUCTURAL ENGINEER FOR FIELD INSPECTION
OF AREAS OF STRUCTURAL DEFICIENCY CAUSED BY RUST.
1
FLOOR PLAN DEMOLITION NOTES
EXISTING GUARDS & HAND RAILS TO REMAIN UNLESS NOTED
OTHERWISE, NOT SHOWN FOR CLARITY.
2
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
D1.0
STAIR 10 EXISTING/
DEMOLITION PLANS
N
STAIR 10 EXISTING/ DEMOLITION
BASEMENT LEVEL PLANS
SCALE 1/4" = 1'-0"
N
STAIR 10 EXISTING/ DEMOLITION
GROUND LEVEL PLANS
SCALE 1/4" = 1'-0"
2
D1.0
1
D1.0
N
STAIR 10 EXISTING/ DEMOLITION
SECOND LEVEL PLANS
SCALE 1/4" = 1'-0"
3
D1.0
REMOVE RUST FROM ALL STRUCTURAL STEEL MEMBERS TO
REMAIN. CONTACT STRUCTURAL ENGINEER FOR FIELD INSPECTION
OF AREAS OF STRUCTURAL DEFICIENCY CAUSED BY RUST.
1
FLOOR PLAN DEMOLITION NOTES
EXISTING GUARDS & HAND RAILS TO REMAIN UNLESS NOTED
OTHERWISE, NOT SHOWN FOR CLARITY.
2
EXISTING CONCRETE
WALK TO REMAIN
EXISTING CONCRETE
WALKWAY AND GUARDS
TO REMAIN
EXISTING CONCRETE
FOUNDATION WALL TO
REMAIN, TYP.
EXISTING CONCRETE
WALL TO REMAIN, TYP.
EXISTING CONCRETE
SLAB TO REMAIN, TYP.
BUILDING 10 BUILDING 20
BUILDING 10 BUILDING 20
BUILDING 10 BUILDING 20
UP
UPDN
DN
3
A5.0
2
A5.0
4
A5.0
6 SIM
A5.0
6
A5.0
2
A5.0
1
A5.0
4
A5.0
5
A5.0
6
A5.0
1
A5.0
2
A5.0
4
A5.0
EXISTING GUARD @
LANDING TO BE
REMOVED,
GUARD & HANDRAIL @
STAIR TO REMAIN,
EXISTING STEEL
CHANNEL @ LANDING
TO REMAIN
N
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
D1.1
STAIR 20 EXISTING/
DEMOLITION PLANS
STAIR 20 EXISTING/ DEMOLITION
BASEMENT LEVEL PLANS
SCALE 1/4" = 1'-0"
N
STAIR 20 EXISTING/ DEMOLITION
GROUND LEVEL PLANS
SCALE 1/4" = 1'-0"
2
D1.1
1
D1.1
N
STAIR 20 EXISTING/ DEMOLITION
SECOND LEVEL PLANS
SCALE 1/4" = 1'-0"
3
D1.1
6
A5.0
6
A5.0
6
A5.0
1
A5.0
2
A5.0
2
A5.0
2
A5.0
2
A5.0
EXISTING CONCRETE
WALK TO REMAINEXISTING CONCRETE
WALKWAY AND GUARDS
TO REMAIN
EXISTING CONCRETE
WALKWAY AND GUARDS
TO REMAIN
EXISTING CONCRETE
SLAB TO REMAIN
EXISTING CONCRETE
FOUNDATION WALL TO
REMAIN, TYP.
EXISTING WALL
TO REMAIN
EXISTING POST
TO REMAIN,TYP.
EXISTING POST
TO REMAIN,TYP.
DNUP
DN
UP
DNUP
1
A5.0
1
A5.0
3
A5.0
4
A5.0
4
A5.0
4
A5.0
4
A5.0
5
A5.0
5
A5.0
6 SIM
A5.0
MODIFY EXISTING
GUARD AS REQUIRED
TO EXTEND STEEL POST
EXISTING GROUND
LEVEL GUARD TO
BE REMOVED
BUILDING 40 BUILDING 50
BUILDING 40 BUILDING 50
BUILDING 40 BUILDING 50
BU
I
L
D
I
N
G
5
0
EXISTING GUARD @
LANDING TO BE
REMOVED,
GUARD & HANDRAIL @
STAIR TO REMAIN,
EXISTING STEEL
CHANNEL @ LANDING
TO REMAIN
REMOVE RUST FROM ALL STRUCTURAL STEEL MEMBERS TO
REMAIN. CONTACT STRUCTURAL ENGINEER FOR FIELD INSPECTION
OF AREAS OF STRUCTURAL DEFICIENCY CAUSED BY RUST.
1
FLOOR PLAN DEMOLITION NOTES
EXISTING GUARDS & HAND RAILS TO REMAIN UNLESS NOTED
OTHERWISE, NOT SHOWN FOR CLARITY.
2
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
D1.2
STAIR 40 EXISTING/
DEMOLITION PLANS
N
STAIR 40 EXISTING/
DEMOLITION BASEMENT LEVEL PLANS
SCALE 1/4" = 1'-0"
1
D1.2
N
STAIR 40 EXISTING/
DEMOLITION GROUND LEVEL PLANS
SCALE 1/4" = 1'-0"
2
D1.2
N
STAIR 40 EXISTING/
DEMOLITION SECOND LEVEL PLANS
SCALE 1/4" = 1'-0"
3
D1.2
N
STAIR 40 EXISTING/
DEMOLITION THIRD LEVEL PLANS
SCALE 1/4" = 1'-0"
4
D1.2
6 SIM
A5.0
6
A5.0
6
A5.0
6
A5.0
2
A5.0
2
A5.0
2
A5.0
1
A5.0
EXISTING CONCRETE
SLAB TO REMAIN
EXISTING CONCRETE
FOUNDATION WALL TO
REMAIN, TYP.
EXISTING CONCRETE
WALKWAY AND GUARDS
TO REMAIN
EXISTING CONCRETE
WALKWAY AND GUARDS
TO REMAIN
EXISTING CONCRETE
WALK TO REMAIN
EXISTING POST
TO REMAIN,TYP.
EXISTING POST
TO REMAIN,TYP.
EXISTING POST
TO REMAIN,TYP.
UP DN
UPDN DN
UP
1
A5.01
A5.0
1
A5.0
3
A5.0
4
A5.0
5
A5.0
4
A5.0
4
A5.0
4
A5.0
5
A5.0
MODIFY EXISTING
GUARD AS REQUIRED
TO EXTEND STEEL POST
MODIFY EXISTING
GUARD AS REQUIRED
TO EXTEND STEEL POST
EXISTING GROUND
LEVEL GUARD TO BE
REMOVED
BUILDING 70
BUILDING 60
BUILDING 70
BUILDING 60
BUILDING 70
BUILDING 60
BUILDING 70
REMOVE RUST FROM ALL STRUCTURAL STEEL MEMBERS TO
REMAIN. CONTACT STRUCTURAL ENGINEER FOR FIELD INSPECTION
OF AREAS OF STRUCTURAL DEFICIENCY CAUSED BY RUST.
1
FLOOR PLAN DEMOLITION NOTES
EXISTING GUARDS & HAND RAILS TO REMAIN UNLESS NOTED
OTHERWISE, NOT SHOWN FOR CLARITY.
2
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
D1.3
STAIR 70 EXISTING/
DEMOLITION PLANS
N
STAIR 70 EXISTING/
DEMOLITION BASEMENT LEVEL PLANS
SCALE 1/4" = 1'-0"
1
D1.3
N
STAIR 70 EXISTING/
DEMOLITION GROUND LEVEL PLANS
SCALE 1/4" = 1'-0"
2
D1.3
N
STAIR 70 EXISTING/
DEMOLITION SECOND LEVEL PLANS
SCALE 1/4" = 1'-0"
3
D1.3
N
STAIR 70 EXISTING/
DEMOLITION THIRD LEVEL PLANS
SCALE 1/4" = 1'-0"
4
D1.3
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
D1.4
EXISTING/DEMO PHOTOS
STAIR 10 EXISTING/
DEMOLITION PHOTO
NOT TO SCALE
1
D1.4
STAIR 20 EXISTING/
DEMOLITION PHOTO
NOT TO SCALE
2
D1.4
STAIR 40 EXISTING/
DEMOLITION PHOTO
NOT TO SCALE
3
D1.4
STAIR 70 EXISTING/
DEMOLITION PHOTO
NOT TO SCALE
4
D1.4
EXISTING STAIR STRUCTURE
TO REMAIN, TYP.
EXISTING MESH GUARDS &
HANDRAILS TO REMAIN, TYP.
GROUND LEVEL GUARD
TO BE REMOVED
EXISTING STAIR STRUCTURE
TO REMAIN, TYP.
EXISTING MESH GUARDS &
HANDRAILS TO REMAIN, TYP.
GROUND LEVEL GUARD
TO BE REMOVED
EXISTING STAIR STRUCTURE
TO REMAIN, TYP.
EXISTING MESH GUARDS &
HANDRAILS TO REMAIN, TYP.
GROUND LEVEL GUARD
TO BE REMOVED
EXISTING STAIR STRUCTURE
TO REMAIN, TYP.
EXISTING MESH GUARDS &
HANDRAILS TO REMAIN, TYP.
GROUND LEVEL GUARD
TO BE REMOVED
EXISTING BUILDING WALLS, ROOFS,
FENESTRATION TO REMAIN, TYP.
EXISTING BUILDING WALLS, ROOFS,
FENESTRATION TO REMAIN, TYP.
EXISTING BUILDING WALLS, ROOFS,
FENESTRATION TO REMAIN, TYP.
EXISTING BUILDING WALLS, ROOFS,
FENESTRATION TO REMAIN, TYP.
1
A4.0
3
A4.0
5
A4.0
A2.0
3
A2.0
1
A2
.
0
2
A2.0
3
A2.0
1
A2
.
0
2
A2.0
3
A2.0
1
A2
.
0
2
A2.0
3
A2.0
1
A2
.
0
2
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
SNOW FENCE,
TO MATCH EXISTING
2:12 SLOPE
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
STEEL POST WELDED
TO TOP OF EXISTING STEEL POST,
RE: STRUCTURAL
STEEL POST WELDED TO
TOP OF EXISTING STEEL POST,
RE: STRUCTURAL
ROOF AREA:
149 SF
DN
UP
DN
UP
DN
BU
I
L
D
I
N
G
1
0
BU
I
L
D
I
N
G
1
0
BU
I
L
D
I
N
G
1
0
BU
I
L
D
I
N
G
1
0
RE: SHEET
4.0 FOR
STAIR PLANS
RE: SHEET
4.0 FOR
STAIR PLANS
RE: SHEET
4.0 FOR
STAIR PLANS
EXISTING ROOF
TO REMAIN, TYP.
EXISTING CANOPY,
TO REMAIN TYP.
EXISTING GUARD
TO REMAIN, BELOW TYP.
LINE OF STAIR
ROOF FRAMING
2'-02'-0"
8"
8"
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
EQ
.
EQ
.
3'
-
9
"
EQ
.
EQ
.
3'
-
9
"
EXISTING CONCRETE
FOUNDATION
WALL TO REMAIN, TYP.
EXISTING CONCRETE
BALCONY AND STEEL
GUARD TO REMAIN, TYP,
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
EXISTING STEEL POST
TO REMAIN,
RE: STRUCTURAL
EXISTING STEEL POST
TO REMAIN,
RE: STRUCTURAL
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
EXISTING CONCRETE
WALK TO REMAIN, TYP,
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
CL CL
CL
CL
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING ROOF
EXISTING ROOF
POST BELOW,
RE: STRUCTURAL, TYP
BEAM BELOW,
RE: STRCUTRAL, TYP
LINE OF
WALL, BELOW
LINE OF
WALL, BELOW
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
1
A3.0
EXISTING BALCONY
GREATER THAN
50% OPEN
CONNECTING
2 REMOTE EXTERIOR
EXIT STAIRS
A2
.
0
4
A2
.
0
4
A2
.
0
4
A2
.
0
4
5" FACE OF FLANGE
TO C POSTL
5" FACE OF FLANGE
TO C POSTL
STAIR 10
2
A1.0
SIM 1, 3, 4
STAIR 20
2
A1.1
SIM 1, 3, 4
BUILDING 10 BUILDING 20
MAINTAIN EXISTING FIRE RATED
ASSEMBLIES AT ALL PENETRATIONS OF
EXISTING BUILDING
ALL EXPOSED STEEL EDGES SHALL BE
FINISHED SMOOTH TO THE TOUCH
HANDRAILS & GUARDS ARE EXISTING TO
REMAIN, NOT SHOWN FOR CLARITY,
RE: 8/A3.0
FLOOR PLAN NOTES:
2.
3.
1.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A1.0
PARTIAL BUILDING 10
FLOOR AND ROOF PLANS
N
BUILDING 10
PARTIAL BASEMENT LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
1
A1.0
N
BUILDING 10
PARTIAL GROUND LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
2
A1.0
N BUILDING 10 & 20 KEY PLAN
SCALE 1/16" = 1'-0"
NBUILDING 10 PARTIAL SECOND PLAN
SCALE 1/4" = 1'-0"
3
A1.0
NBUILDING 10 PARTIAL ROOF PLAN
SCALE 1/4" = 1'-0"
4
A1.0
UP
A2.1
1
A2.1
1
A2.1
1
BU
I
L
D
I
N
G
1
0
BU
I
L
D
I
N
G
2
0
BU
I
L
D
I
N
G
1
0
BU
I
L
D
I
N
G
2
0
BU
I
L
D
I
N
G
1
0
BUILDING 20
BU
I
L
D
I
N
G
1
0
BU
I
L
D
I
N
G
2
0
2:
1
2
S
L
O
P
E
RO
O
F
A
R
E
A
:
2
1
2
S
F
SNOW FENCE,
TO MATCH EXISTING
3
A4.1
1
A4.1
5
A4.1
DN UP
DN
BEAM, BELOW,
ALIGN FLUSH WITH
FACE OF WALL FRAMINGLINE OF
STAIR ROOF
FRAMING
2'
-
0
"
EA
V
E
LINE OF WALL,
BELOW
LINE OF
WALL, BELOW
FACE OF KNEE
WALL BELOW
RE: STRUCTURAL
LINE OF WALL,
BELOW
EXTERIOR FACE OF
EXISTING BUILDING
WALL FRAMING, BELOW
8 1/2"
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
RE: SHEET
4.1 FOR
STAIR PLANS
RE: SHEET
4.1 FOR
STAIR PLANS
RE: SHEET
4.1 FOR
STAIR PLANS
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING CONCRETE
FOUNDATION
WALL TO REMAIN, TYP.
EQ.3'-9"EQ.
V.I.F.
EQ.3'-9"EQ.
V.I.F.3 1/2"3 1/2"
CL
EXISTING ROOF
EXISTING ROOF
EXISTING ROOF
EXISTING ROOF
POST BELOW,
RE: STRUCTURAL, TYP
BEAM BELOW,
RE: STRCUTRAL, TYP
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
2
A3
.
0
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
E.
Q
.
E.
Q
.
7'-3"
EXISTING BALCONY
GREATER THAN 50% OPEN
CONNECTING 2 REMOTE
EXTERIOR EXIT STAIRS
A2.1
4
A2.1
4
A2.1
4
A2.1
4
LINE OF ROOF
FRAMING
FACE OF KNEE
WALL BELOW
RE: STRUCTURAL
EXTERIOR FACE
OF EXISTING
BUILDING WALL
FRAMING, BELOW
LINE OF ROOF
FRAMING
7
A5.1
8 1/2"
7
A5.1
3 1/2"3 1/2"
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS
RE: STRUCTURAL
12"
TUBE STEEL POSTS,
WELDED TO FACE OF STEEL
CHANNEL @ LANDING,
& ANCHORED TO ROOF ABOVE,
PROVIDE BLOCKING AS NECESSARY
RE: STRUCTURAL
MATCH EAVE
DEPTH
L
5"
F
A
C
E
O
F
F
L
A
N
G
E
TO
C
P
O
S
T
L
5"
F
A
C
E
O
F
F
L
A
N
G
E
TO
C
P
O
S
T
STAIR 10
2
A1.0
SIM 1, 3, 4
STAIR 20
2
A1.1
SIM 1, 3, 4
BUILDING 10 BUILDING 20
MAINTAIN EXISTING FIRE RATED
ASSEMBLIES AT ALL PENETRATIONS OF
EXISTING BUILDING
ALL EXPOSED STEEL EDGES SHALL BE
FINISHED SMOOTH TO THE TOUCH
HANDRAILS & GUARDS ARE EXISTING TO
REMAIN, NOT SHOWN FOR CLARITY,
RE: 8/A3.0
FLOOR PLAN NOTES:
2.
3.
1.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A1.1
PARTIAL BUILDING 10 & 20
FLOOR AND ROOF PLANS
N
BUILDING 10 & 20
PARTIAL BASEMENT LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
1
A1.1
N
BUILDING 10 & 20
PARTIAL GROUND LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
2
A1.1
N BUILDING 10 & 20 KEY PLAN
SCALE 1/16" = 1'-0"
NBUILDING 10 & 20 PARTIAL SECOND PLAN
SCALE 1/4" = 1'-0"
3
A1.1
NBUILDING 10 & 20 PARTIAL ROOF PLAN
SCALE 1/4" = 1'-0"
4
A1.1
1
A4.2
5
A4.2
7
A4.2
2
A4.2
DNUP
DN
UP
DNUP
A2.2
2
A2
.
2
3
A2
.
2
1
A2.2
2
A2
.
2
3
A2
.
2
1
A2.2
2
A2
.
2
3
A2
.
2
1
A2.2
2
A2
.
2
3
A2
.
2
1
EXISTING ROOF
EXISTING ROOF
2:
1
2
S
L
O
P
E
ROOF AREA:
244 SF
BUILDING 40 BUILDING 50
BUILDING 40 BUILDING 50
BUILDING 40
BUILDING 50
BUILDING 40 BUILDING 50
BUILDING 50
RE: SHEET
4.2 FOR
STAIR PLANS
RE: SHEET
4.2 FOR
STAIR PLANS
RE: SHEET
4.2 FOR
STAIR PLANS
RE: SHEET
4.2 FOR
STAIR PLANS
EXISTING GUARD
& BALCONY
TO REMAIN, TYP.
1'
-
6
"
CL
2'
-
0
"
CL
8 1/2"
14'-10" V.I.F.
5'-9"4'-0"CL
14'-10", V.I.F.
1'-11 1/2"5'-9"3'-1 1/2"4'-0"CL
3-
1
/
2
"
14'-10", V.I.F.
5'-9"4'-0"CL
1'-11 1/2"3'-1 1/2"
1'-11 1/2"3'-1 1/2"
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING GUARD
& BALCONY
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING CONCRETE
FOUNDATION
WALL TO REMAIN, TYP.
EXISTING ROOF EXISTING ROOF
EXISTING ROOF
SNOW FENCE,
TO MATCH EXISTING
LINE OF STAIR
ROOF FRAMING
LINE OF
WALL, BELOW
LINE OF
WALL, BELOW
EXISTING RAILING
TO REMAIN,
BELOW TYP.
POST BELOW,
RE: STRUCTURAL, TYP
BEAM BELOW,
RE: STRCUTRAL, TYP
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY
WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
STEEL POST WELDED TO
TOP OF EXISTING STEEL POST,
RE: STRUCTURAL
TUBE STEEL POST,
RE: STRUCTURAL
TUBE STEEL POST,
RE: STRUCTURAL
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
STEEL POST WELDED TO
TOP OF EXISTING STEEL POST,
RE: STRUCTURAL
EXISTING
STEEL POST,
RE: STRUCTURAL
EX
I
S
T
I
N
G
R
O
O
F
TUBE STEEL POST,
ON CONCRETE
FOUNDATION WALL BELOW,
FIELD VERIFY EXISTING
FOUNDATION CONDITIONS
& COORDINATE WITH
ARCHITECT PRIOR TO
CONSTRUCTION OR DEMOLITION
RE: STRUCTURAL
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY
WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY
WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
3
A3
.
0
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
EXISTING BALCONY
GREATER THAN
50% OPEN
CONNECTING
2 REMOTE EXTERIOR
EXIT STAIRS
EXISTING BALCONY
GREATER THAN
50% OPEN
CONNECTING
2 REMOTE EXTERIOR
EXIT STAIRS
A2.2
4
A2.2
4
A2.2
4
A2.2
4
A2.2
4
3-
1
/
2
"
V.
I
.
F
.
V.
I
.
F
.
3-
1
/
2
"
V.
I
.
F
.
3-
1
/
2
"
V.
I
.
F
.
3-
1
/
2
"
V.
I
.
F
.
3-
1
/
2
"
V.
I
.
F
.
7
A5.1
8 1/2"
FACE OF KNEE
WALL BELOW
RE: STRUCTURAL
EXTERIOR FACE
OF EXISTING
BUILDING WALL
FRAMING, BELOW
LINE OF ROOF
FRAMING
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS
RE: STRUCTURAL
TUBE STEEL POSTS,
WELDED TO FACE OF STEEL
CHANNEL @ LANDING,
& ANCHORED TO ROOF ABOVE,
PROVIDE BLOCKING AS NECESSARY
RE: STRUCTURAL
L
5"
F
A
C
E
O
F
FL
A
N
G
E
TO
C
P
O
S
T
L
5"
F
A
C
E
O
F
FL
A
N
G
E
TO
C
P
O
S
T
L
5"
F
A
C
E
O
F
FL
A
N
G
E
TO
C
P
O
S
T
STAIR 40
2
A1.2
SIM 1, 3, 4, 5
BUILDING 40
BUILDING 50
BUILDING 60
BUILDING 70
STAIR 70
2
A1.3
SIM 1, 3, 4, 5
MAINTAIN EXISTING FIRE RATED
ASSEMBLIES AT ALL PENETRATIONS OF
EXISTING BUILDING
ALL EXPOSED STEEL EDGES SHALL BE
FINISHED SMOOTH TO THE TOUCH
HANDRAILS & GUARDS ARE EXISTING TO
REMAIN, NOT SHOWN FOR CLARITY,
RE: 8/A3.0
FLOOR PLAN NOTES:
2.
3.
1.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A1.2
PARTIAL BUILDING 40 & 50
FLOOR AND ROOF PLANS
N
BUILDING 40 & 50
PARTIAL BASEMENT LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
1
A1.2
N
BUILDING 40 & 50
PARTIAL GROUND LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
2
A1.2
N BUILDING 40 - 70 KEY PLAN
SCALE 1/16" = 1'-0"
N
BUILDING 40 & 50
PARTIAL SECOND LEVEL PLAN
SCALE 1/4" = 1'-0"
3
A1.2
N
BUILDING 40 & 50
PARTIAL THIRD LEVEL PLAN
SCALE 1/4" = 1'-0"
4
A1.2
N
BUILDING 40 & 50
PARTIAL ROOF PLAN
SCALE 1/4" = 1'-0"
5
A1.2
1
A4.3
5
A4.3
7
A4.3
2
A4.3
DNUP
DN
UP
DNUP
A2
.
3
1 A2
.
3
3
A2.3
2
A2
.
3
1
A2
.
3
3
A2.3
2
A2
.
3
1
A2
.
3
3
A2.3
2
2:
1
2
S
L
O
P
E
ROOF AREA:
173 SF
BUILDING 70
BU
I
L
D
I
N
G
6
0
BUILDING 70
BU
I
L
D
I
N
G
6
0
BUILDING 70
BU
I
L
D
I
N
G
6
0
BUILDING 70
BU
I
L
D
I
N
G
6
0
BUILDING 70
A2
.
3
1 A2
.
3
3
A2.3
2
RE: SHEET
4.3 FOR
STAIR PLANS
RE: SHEET
4.3 FOR
STAIR PLANS
RE: SHEET
4.3 FOR
STAIR PLANS
RE: SHEET
4.3 FOR
STAIR PLANS
8"8"
8"
2'
-
0
"
CL
CL
CL
EQ.3'-9"EQ.
EQ.3'-9"EQ.
EQ.3'-9"EQ.
EXISTING CONCRETE
FOUNDATION
WALL TO REMAIN, TYP.
EXISTING ROOF
EX
I
S
T
I
N
G
R
O
O
F
EXISTING ROOF
SNOW FENCE,
TO MATCH EXISTING
LINE OF STAIR
ROOF FRAMING
LINE OF
WALL, BELOW
LINE OF
WALL, BELOW
CL
EXISTING CANOPY,
TO REMAIN TYP.
EXISTING GUARD
TO REMAIN,
BELOW TYP.
EXISTING GUARD
& BALCONY
TO REMAIN, TYP.
EXISTING BALCONY
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
EXISTING
EXTERIOR WALL
TO REMAIN, TYP.
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY
WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
EXISTING GUARD
TO BE MODIFIED TO
ALLOW EXTENSION OF POSTS
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
STEEL POST WELDED TO
TOP OF EXISTING STEEL POST,
RE: STRUCTURAL
STEEL POST WELDED
TO TOP OF EXISTING
STEEL POST,
RE: STRUCTURAL
EXISTING BALCONY
TO REMAIN, TYP.
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
EXISTING STEEL POST,
RE: STRUCTURAL
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY
WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
EXISTING
STEEL POST,
RE: STRUCTURAL
EXISTING WALK
TO REMAIN, TYP.
EXISTING BALCONY
TO REMAIN, TYP.
VERTICAL TREX CLADDING,
SPACE EVENLY WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
EXISTING STEEL POST,
RE: STRUCTURAL
PERFORATED CORTEN
STEEL PANELS
ON STEEL FRAMING,
ANCHOR TO STEEL POSTS,
RE: STRUCTURAL
VERTICAL TREX CLADDING,
SPACE EVENLY
WITH 4"± GAPS,
ON STEEL FRAME
WELDED TO STEEL POSTS,
RE: STRUCTURAL
TUBE STEEL POSTS
WELDED TO PLATE STEEL
WELDED TO STEEL
CHANNEL STRINGER, ALIGN
WITH WEB, TYP. (2) POSTS,
RE: STRUCTURAL
EXISTING
STEEL POST,
RE: STRUCTURAL
4
A3
.
0
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
STAIR 100% OPEN
THIS SIDE
EXISTING BALCONY
GREATER THAN 50%
OPEN CONNECTING
2 REMOTE EXTERIOR
EXIT STAIRS
EXISTING BALCONY
GREATER THAN 50%
OPEN CONNECTING
2 REMOTE EXTERIOR
EXIT STAIRS
A2.3
4
A2.3
4
A2.3
4
A2.3
4
A2.3
4
EXISTING GUARD
& BALCONY
TO REMAIN, TYP.
5"
F
A
C
E
O
F
FL
A
N
G
E
TO
C
P
O
S
T
L
5"
F
A
C
E
O
F
FL
A
N
G
E
TO
C
P
O
S
T
L
5"
F
A
C
E
O
F
FL
A
N
G
E
TO
C
P
O
S
T
L
STAIR 70
2
A1.3
SIM 1, 3, 4, 5
STAIR 40
2
A1.2
SIM 1, 3, 4, 5
BUILDING 40
BUILDING 50
BUILDING 60
BUILDING 70
MAINTAIN EXISTING FIRE RATED
ASSEMBLIES AT ALL PENETRATIONS OF
EXISTING BUILDING
ALL EXPOSED STEEL EDGES SHALL BE
FINISHED SMOOTH TO THE TOUCH
HANDRAILS & GUARDS ARE EXISTING TO
REMAIN, NOT SHOWN FOR CLARITY,
RE: 8/A3.0
FLOOR PLAN NOTES:
2.
3.
1.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A1.3
PARTIAL BUILDING 60 & 70
FLOOR AND ROOF PLANS
N
BUILDING 60 & 70
PARTIAL BASEMENT LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
1
A1.3
N
BUILDING 60 & 70
PARTIAL GROUND LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
2
A1.3
N BUILDING 40 - 70 KEY PLAN
SCALE 1/4" = 1'-0"
N
BUILDING 60 & 70
PARTIAL THIRD LEVEL PLAN
SCALE 1/16" = 1'-0"
3
A1.3
N
BUILDING 60 & 70
PARTIAL ROOF PLAN
SCALE 1/4" = 1'-0"
4
A1.3
N
BUILDING 60 & 70
PARTIAL ROOF PLAN
SCALE 1/4" = 1'-0"
5
A1.3
TREX CLADDING,
FASTEN TO STEEL
FRAMING,
RE: STRUCTURAL
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES, TYP.
EXISTING BUILDING
EXISTING CONCRETE
BALCONY CONNECTING
REMOTE EXTERIOR
EXIT STAIRS, GREATER
THAN 50% OPEN
EXISTING CONCRETE
WALK
BUILDING 10
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
EXISTING BALCONY
GUARDS, NOT A PART
OF SCOPE
3'
-
1
0
1
/
2
"
EQ.EQ.
1X WOOD FASCIA,
PAINT TO MATCH EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
LOCATE TOP OF
FRAMING 6" BELOW
UNDERSIDE OF
BEAM, VIF
CL
CL
CL
12
2
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
1
9
'
-
3
1
/
4
"
100'-1" ARCH
T.O. WALK
7,886.60 SURVEY
109'-3 1/4" ARCH
T.O. WALK
7,895.78 SURVEY
119'-4 3/4" ARCH
T.O. ROOF
7,905.86 SURVEY
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
BUILDING 10
4'
-
0
"
3'
-
1
0
1
/
2
"
EQ.EQ.
EQ.4'-0"
CORTEN STEEL PANEL WITH
1/2"Ø STAGGERED
PERFORATIONS, 50% OPENING ,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
2X3 STEEL FRAMING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES,
TYP.
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
1X WOOD FASCIA,
PAINT TO MATCH EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
OPEN
LOCATE TOP OF
SILL FRAMING
42" ABOVE
INTERMEDIATE
LANDING, V.I.F.
LOCATE TOP OF
FRAMING 6" BELOW
UNDERSIDE OF
BEAM, V.I.F.
CL
CL
CL
CL
CL
CL CL
EQ.
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
1
9
'
-
3
1
/
4
"
100'-1" ARCH
T.O. WALK
7,886.60 SURVEY
109'-3 1/4" ARCH
T.O. WALK
7,895.78 SURVEY
119'-4 3/4" ARCH
T.O. ROOF
7,905.86 SURVEY
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
BUILDING 10
TREX CLADDING,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
2X3 STEEL FRAMING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES,
TYP.
EXISTING BUILDING
EXISTING CONCRETE
BALCONY CONNECTING
REMOTE EXTERIOR
EXIT STAIRS, GREATER
THAN 50% OPEN
EXISTING
CONCRETE WALK
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
EXISTING BALCONY
GUARDS, NOT A PART
OF SCOPE
3'
-
1
0
1
/
2
"
EQ.EQ.
1X WOOD FASCIA,
PAINT TO MATCH EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
LOCATE TOP OF
FRAMING 6" BELOW
UNDERSIDE OF
BEAM, VIF
CL
CL
CL
12
2
EXISTING &
FINISHED GRADE
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
1
9
'
-
3
1
/
4
"
100'-1" ARCH
T.O. WALK
7,886.60 SURVEY
109'-3 1/4" ARCH
T.O. WALK
7,895.78 SURVEY
119'-4 3/4" ARCH
T.O. ROOF
7,905.86 SURVEY
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
3'
-
6
"
3'
-
6
"
3'
-
6
"
5'
-
1
1
/
2
"
4'
-
7
1
/
4
"
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
7.88' X 4.90' = 38.6 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
7.88' X 4.60' = 36.2 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
7.75' X 5.12' = 39.68 SF
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
1
9
'
-
3
1
/
4
"
4'
-
1
0
3
/
4
"
7'-10 1/2"
100'-1" ARCH
T.O. WALK
7,886.60 SURVEY
109'-3 1/4" ARCH
T.O. WALK
7,895.78 SURVEY
119'-4 3/4" ARCH
T.O. ROOF
7,905.86 SURVEY
7'-9"
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
NOTE:
CONTRACTOR TO FIELD VERIFY PROPOSED
ROOFS CONSTRUCTED AT THE INDICATED HEIGHTS
DO NOT CONFLICT WITH EXISTING STRUCTURES
PRIOR TO ORDERING MATERIALS.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A2.0
STAIR 10
ELEVATIONS
SCALE: 1/4 = 1'-0"
STAIR 10 - NORTH ELEVATION1
A2.0SCALE: 1/4 = 1'-0"
STAIR 10 - EAST ELEVATION2
A2.0
SCALE: 1/4 = 1'-0"
STAIR 10 - SOUTH ELEVATION3
A2.0SCALE: 1/4 = 1'-0"
STAIR 10 - WEST ELEVATION4
A2.0
OPEN
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES, TYP.
EXISTING BUILDING
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
1X WOOD FASCIA,
PAINT TO MATCH
EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING
FOUNDATION, TYP.
3'
-
1
0
1
/
2
"
CORTEN STEEL PANEL WITH
1/2"Ø STAGGERED
PERFORATIONS, 50% OPENING ,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
4'
-
0
"
CL
CL
CL
CL
EQ.
V.I.F.4'-0"
EQ.
V.I.F.
CL CL
EQ.EQ.
CL
3 1
2"3 1
2"
LOCATE TOP OF
FRAMING 3" BELOW
UNDERSIDE OF BEAM, V.I.F.
LOCATE TOP OF SILL
FRAMING 42" ABOVE
INTERMEDIATE LANDING, VIF.
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
2
3
'
-
8
1
/
2
"
100'-0" ARCH
T.O. WALK
109'-3 1/4" ARCH
T.O. WALK
123'-8 1/2" ARCH
T.O. ROOF
7,886.51 SURVEY
7,895.78 SURVEY
7,910.22 SURVEY
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
3'
-
6
"
3'
-
6
"
3'
-
6
"
5'
-
1
1
/
2
"
4'
-
8
1
/
4
"
9'-9 1/2"
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
2
3
'
-
8
1
/
2
"
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
4.68' X 9.27' = 43.38 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
9.79' X 4.69' = 45.9 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
10.00' X 5.12' = 51.2 SF
100'-0" ARCH
T.O. WALK
7,886.51 SURVEY
109'-3 1/4" ARCH
T.O. WALK
7,895.78 SURVEY
123'-8 1/2" ARCH
T.O. ROOF
7,910.22 SURVEY
9'
-
3
1
/
4
"
10'-0"
TREX CLADDING,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES, TYP.
4'-8 1/4"
4X4 STEEL POSTS WELDED TO
FACE OF CHANNEL @ LANDING
& ANCHORED TO ROOF ABOVE,
PROVIDE BLOCKING AS REQUIRED
INDICATED BY DASHED LINES, TYP.
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
NOTE:
CONTRACTOR TO FIELD VERIFY PROPOSED
ROOFS CONSTRUCTED AT THE INDICATED HEIGHTS
DO NOT CONFLICT WITH EXISTING STRUCTURES
PRIOR TO ORDERING MATERIALS.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A2.1
STAIR 20
ELEVATIONS
SCALE: 1/4 = 1'-0"
STAIR 20 - NORTH ELEVATION1
A2.1SCALE: 1/4 = 1'-0"
STAIR 20 - SOUTH ELEVATION2
A2.1
BUILDING 40
TREX CLADDING,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES,
TYP.
EXISTING BUILDING
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
3-1/2"
1X WOOD FASCIA,
PAINT TO MATCH
EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
LOCATE TOP OF
FRAMING 6" BELOW
UNDERSIDE OF
BEAM, V.I.F.
3'
-
1
0
1
/
2
"
V.I.F.
CL
ALUMINUM FLASHING
OVER ROOF MEMBRANE
ON 2X WOOD
FRAMED KNEE WALL
CL
12
2
1'
-
4
"
7,905.97 SURVEY
135'-2" ARCH
T.O. ROOF
7,921.68 SURVEY
110'-3" ARCH
T.O. WALK
7,896.78 SURVEY
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
3
4
'
-
1
"
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
119'-5" ARCH
T.O. WALK
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
NORTH
PROPERTY LINE
1 3/4" FACE OF EAVE
BUILDING 50 BUILDING 40
OPEN
OPEN
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES,
TYP.
EXISTING BUILDING
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
EQ.EQ.
1X WOOD FASCIA,
PAINT TO MATCH EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
LOCATE TOP OF
FRAMING 6" BELOW
UNDERSIDE OF BEAM, V.I.F.
3'
-
1
0
1
/
2
"
CORTEN STEEL PANEL WITH
1/2"Ø STAGGERED
PERFORATIONS, 50% OPENING ,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
4'
-
0
"
LOCATE TOP OF SILL
FRAMING 42" ABOVE
INTERMEDIATE LANDING, V.I.F.
LOCATE TOP OF SILL
FRAMING 42" ABOVE
INTERMEDIATE LANDING, V.I.F.
4'
-
0
"
3'-0"3'-0"3'-0"1'-10"4'-0"
CLCLCLCL
CL
CL
CL
CL
CL
CL
CL
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
7,905.97 SURVEY
135'-2" ARCH
T.O. ROOF
7,921.68 SURVEY
110'-3" ARCH
T.O. WALK
7,896.78 SURVEY
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
3
4
'
-
1
"
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
119'-5" ARCH
T.O. WALK
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
BUILDING 50
TREX CLADDING,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES,
TYP.
EXISTING
BUILDING
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
3-1/2"
1X WOOD FASCIA,
PAINT TO MATCH EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
LOCATE TOP OF
FRAMING 12"
BELOW UNDERSIDE
OF BEAM, VIF
3'
-
1
0
1
/
2
"
V.I.F.
CL
CL
12
2
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
7,905.97 SURVEY
135'-2" ARCH
T.O. ROOF
7,921.68 SURVEY
110'-3" ARCH
T.O. WALK
7,896.78 SURVEY
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
3
4
'
-
1
"
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
119'-5" ARCH
T.O. WALK
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
NO
R
T
H
PR
O
P
E
R
T
Y
L
I
N
E
1 3/4" FACE OF EAVE
3'
-
6
"
3'
-
6
"
3'
-
6
"
5'
-
1
1
/
2
"
4'
-
7
"
8'-0 3/4"
3'
-
6
"
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
14.00' X 4.58' = 64.1 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
14.00' X 4.58' = 64.1 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
9.92' X 5.12' = 50.8 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
8.06' X 7.85' = 63.3 SF
7,905.97 SURVEY
135'-2" ARCH
T.O. ROOF
7,921.68 SURVEY
110'-3" ARCH
T.O. WALK
7,896.78 SURVEY
9'-11"
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
3
4
'
-
1
"
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
119'-5" ARCH
T.O. WALK
4'
-
7
"
7'
-
1
0
1
/
4
"
TREX CLADDING,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES, TYP.
4X4 STEEL POSTS WELDED TO
FACE OF CHANNEL @ LANDING
& ANCHORED TO ROOF ABOVE,
PROVIDE BLOCKING AS REQUIRED
INDICATED BY DASHED LINES, TYP.
EXISTING
BUILDING
EXISTING BUILDING
BUILDING 50BUILDING 40
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
EXISTING &
FINISHED GRADE
NOTE:
CONTRACTOR TO FIELD VERIFY PROPOSED
ROOFS CONSTRUCTED AT THE INDICATED HEIGHTS
DO NOT CONFLICT WITH EXISTING STRUCTURES
PRIOR TO ORDERING MATERIALS.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A2.2
STAIR 40
ELEVATIONS
SCALE: 1/4 = 1'-0"
STAIR 40 -WEST ELEVATION1
A2.2SCALE: 1/4 = 1'-0"
STAIR 40 - NORTH ELEVATION2
A2.2SCALE: 1/4 = 1'-0"
STAIR 40 - EAST ELEVATION3
A2.2
SCALE: 1/4 = 1'-0"
STAIR 40 - SOUTH ELEVATION4
A2.2
BUILDING 70
TREX CLADDING,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES,
TYP.
EXISTING BUILDING
EXISTING CONCRETE
BALCONY CONNECTING
REMOTE EXTERIOR
EXIT STAIRS, GREATER
THAN 50% OPEN
EXISTING
CONCRETE WALK
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
EXISTING BALCONY
GUARDS, NOT A PART
OF SCOPE, TYP.
EQ.EQ.
1X WOOD FASCIA,
PAINT TO MATCH
EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
LOCATE TOP OF
FRAMING 6" BELOW
UNDERSIDE OF
BEAM, VIF
3'
-
1
0
1
/
2
"
8'
-
4
"
CL
12
2
EXISTING &
FINISHED GRADE
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
2
8
'
-
1
3
/
4
"
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
119'-5 1/2" ARCH
T.O. WALK
7,906.07 SURVEY
129'-3" ARCH
T.O. ROOF
7,915.75 SURVEY
110'-3 3/4" ARCH
T.O. WALK
7,896.83 SURVEY
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
BUILDING 70BUILDING 60
OPEN
OPEN
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES,
TYP.
EXISTING BUILDING
EXISTING CONCRETE
BALCONY CONNECTING
REMOTE EXTERIOR
EXIT STAIRS, GREATER
THAN 50% OPEN
EXISTING
CONCRETE WALK
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
EXISTING BALCONY
GUARDS, NOT A PART
OF SCOPE, TYP.
EQ.EQ.
1X WOOD FASCIA,
PAINT TO MATCH
EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
LOCATE TOP OF
FRAMING 6" BELOW
UNDERSIDE OF BEAM, V.I.F.
3'
-
1
0
1
/
2
"
8'
-
4
"
CORTEN STEEL PANEL WITH
1/2"Ø STAGGERED
PERFORATIONS, 50% OPENING ,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
4'
-
0
"
EQ.EQ.4'-0"
LOCATE TOP OF SILL
FRAMING 42" ABOVE
INTERMEDIATE LANDING, V.I.F.
LOCATE TOP OF SILL
FRAMING 42" ABOVE
INTERMEDIATE LANDING, V.I.F.
4'
-
0
"
CL
CL
CL
CL
CL
CL
CL
CL CL
EXISTING &
FINISHED GRADE
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
2
8
'
-
1
3
/
4
"
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
119'-5 1/2" ARCH
T.O. WALK
7,906.07 SURVEY
129'-3" ARCH
T.O. ROOF
7,915.75 SURVEY
110'-3 3/4" ARCH
T.O. WALK
7,896.83 SURVEY
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
BUILDING 70
TREX CLADDING,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
2X3 STEEL FURRING @ 24" O.C.
UNLESS NOTED OTHERWISE,
WELDED TO STEEL POSTS
INDICATED BY DASHED LINES,
TYP.
EXISTING BUILDING
EXISTING CONCRETE
BALCONY CONNECTING
REMOTE EXTERIOR
EXIT STAIRS, GREATER
THAN 50% OPEN
EXISTING
CONCRETE WALK
CLASS-A ROOF ASSEMBLY
CORRUGATED METAL
ROOF PANELS,
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON WOOD FRAMING,
RE: STRUCTURAL
EXISTING BALCONY
GUARDS, NOT A PART
OF SCOPE, TYP.
EQ.EQ.
1X WOOD FASCIA,
PAINT TO MATCH
EXISTING
1/4" CORTEN STEEL PANEL,
FASTEN TO STEEL FRAMING,
RE: STRUCTURAL
BOTTOM OF STEEL FRAMING
& BOTTOM OF STEEL PANEL
1" ABOVE EXISTING FOUNDATION, TYP.
LOCATE TOP OF
FRAMING 6" BELOW
UNDERSIDE OF
BEAM, VIF
3'
-
1
0
1
/
2
"
8'
-
4
"
CL
CL
CL
12
2
EXISTING &
FINISHED GRADE
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
2
8
'
-
1
3
/
4
"
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
119'-5 1/2" ARCH
T.O. WALK
7,906.07 SURVEY
129'-3" ARCH
T.O. ROOF
7,915.75 SURVEY
110'-3 3/4" ARCH
T.O. WALK
7,896.83 SURVEY
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
3'
-
6
"
3'
-
6
"
3'
-
6
"
5'
-
1
1
/
2
"
4'
-
8
"
10'-0"
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
10.00' X 4.83' = 48.30 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
10.00' X 4.83' = 48.30 SF
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
9.92' X 5.12' = 50.79 SF
3'
-
6
"
4'
-
8
1
/
2
"
OPEN SIDE CALCULATION,
RE: 2015 IBC SECTION 1027.3
MINIMUM REQUIRED
OPEN AREA: 35 SF
PROVIDED OPEN AREA:
10.00' X 4.70' = 47.0 SF
RO
O
F
H
E
I
G
H
T
A
B
O
V
E
F
I
N
I
S
H
E
D
/
E
X
I
S
T
I
N
G
G
R
A
D
E
2
8
'
-
1
3
/
4
"
101'-1" ARCH
T.O. WALK
7,887.60 SURVEY
119'-5 1/2" ARCH
T.O. WALK
7,906.07 SURVEY
129'-3" ARCH
T.O. ROOF
7,915.75 SURVEY
110'-3 3/4" ARCH
T.O. WALK
7,896.83 SURVEY
9'-11"
4'
-
8
"
EXISTING &
FINISHED GRADE
41
'
-
4
1
/
2
"
M
A
X
I
M
U
M
B
U
I
L
D
I
N
G
H
E
I
G
H
T
NOTE:
CONTRACTOR TO FIELD VERIFY PROPOSED
ROOFS CONSTRUCTED AT THE INDICATED HEIGHTS
DO NOT CONFLICT WITH EXISTING STRUCTURES
PRIOR TO ORDERING MATERIALS.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A2.3
STAIR 70
ELEVATIONS
SCALE: 1/4 = 1'-0"
STAIR 70 - WEST ELEVATION1
A2.3SCALE: 1/4 = 1'-0"
STAIR 70 - NORTH ELEVATON2
A2.3
SCALE: 1/4 = 1'-0"
STAIR 70 - EAST ELEVATION3
A2.3SCALE: 1/4 = 1'-0"
STAIR 70 - SOUTH ELEVATION4
A2.3
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A2.4
EXTERIOR MATERIALS
NOT TO SCALE
TYPICAL EXTRIOR MATERIAL EXAMPLE1
A2.4
PERFORATED CORTEN STEEL PANEL
RE: STRUCTURAL
TREX CLADDING
IN "TIKI TORCH" COLORWAY
RE: STRUCTURAL
P.T. WOOD 2X FASCIA
PAINTED TO MATCH EXISTING FASCIAS
DRIP EDGE FLASHING TO MATCH
EXISTING BUILDING FASCIA FLASHING
EXISTING BUILDING
TO REMAIN, TYP.
EXISTING WALKWAY
TO REMAIN, TYP.
SOLID CORTEN STEEL PANEL
RE: STRUCTURAL
6
A5.1
6
A5.1
FIBER CEMENT PANEL SOFFIT,
PAINT TO MATCH EXISTING
WOOD BEAM,
RE: STRUCTURAL, TYP.
STEEL POST & SADDLE,
RE: STRUCTURAL, TYP.
CLASS-A ROOF ASSEMBLY:
CORRUGATED METAL PANEL
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON 2X WOOD FRAMING
RE: STRUCTURAL
2'-0"
2'-0"
12
2
116'-9" ARCH
T.O. BEAM
117'-4 1/4" ARCH
T.O. BEAM
118'-5 1/4" ARCH
T.O. BEAM
SNOW GUARD TO MATCH
EXISTING, PROVIDE BLOCKING
PER MANUFACTURER'S
NSSTRUCTIONS
6
A5.1
6
A5.1
SNOW GUARD TO MATCH
EXISTING, PROVIDE BLOCKING
PER MANUFACTURER'S
NSSTRUCTIONS
FIBER CEMENT PANEL SOFFIT,
PAINT TO MATCH EXISTING
WOOD BEAM,
RE: STRUCTURAL, TYP.
STEEL POST & SADDLE,
RE: STRUCTURAL, TYP.
CLASS-A ROOF ASSEMBLY:
CORRUGATED METAL PANEL
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON 2X WOOD FRAMING
RE: STRUCTURAL
2'-0"
MATCH EXISTING
ADJACENT EAVE
DEPTH
12
2
120'-3 1/4" ARCH
T.O. BEAM
121'-6 1/2" ARCH
T.O. BEAM
122'-9 1/2" ARCH
T.O. BEAM
6
A5.1
6
A5.1
FIBER CEMENT PANEL SOFFIT,
PAINT TO MATCH EXISTING
WOOD BEAM,
RE: STRUCTURAL, TYP.
STEEL POST & SADDLE,
RE: STRUCTURAL, TYP.
CLASS-A ROOF ASSEMBLY:
CORRUGATED METAL PANEL
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON 2X WOOD FRAMING
RE: STRUCTURAL
2'-0"
8"
12
2
SNOW GUARD TO MATCH
EXISTING, PROVIDE BLOCKING
PER MANUFACTURER'S
NSSTRUCTIONS
126'-8 3/4" ARCH
T.O. BEAM
127'-5 1/2" ARCH
T.O. BEAM
128'-6" ARCH
T.O. BEAM
6
A5.1
6
A5.1
FIBER CEMENT PANEL SOFFIT,
PAINT TO MATCH EXISTING
WOOD BEAM,
RE: STRUCTURAL, TYP.
STEEL POST & SADDLE,
RE: STRUCTURAL, TYP.
CLASS-A ROOF ASSEMBLY:
CORRUGATED METAL PANEL
ON CLASS-A UNDERLAYMENT
ON 5/8" PLYWOOD SHEATHING
ON 2X WOOD FRAMING
RE: STRUCTURAL
1'-6"
2'-0"
12
2
SNOW GUARD TO MATCH
EXISTING, PROVIDE BLOCKING
PER MANUFACTURER'S
NSSTRUCTIONS
132'-5 1/4" ARCH
T.O. BEAM
133'-2 1/4" ARCH
T.O. BEAM
134'-3 1/4" ARCH
T.O. BEAM
EXISTING CONCRETE LANDING/
STEEL LANDING, VARIES BY
LOCATION, RE: STAIR PLANS
3/5
A5.1
1/2
A5.1
1
1
/
2
"
,
T
Y
P
.
EXISTING CONCRETE LANDING/
STEEL LANDING, VARIES BY
LOCATION, RE: STAIR PLANS
STEEL TREAD & RISER,
RE: 1,2,3 & 5/A5.1
EXISTING STEEL STRINGER TO
REMAIN, STRIP OF RUST &
REPAINT
EXISTING STEEL GUARD RAILS,
POSTS & STEEL MESH TO REMAIN,
STRIP OF RUST & REPAINT
EXISTING STEEL HANDRAIL
TO REMAIN, STRIP OF RUST
& REPAINT
EXISTING STEEL TOP GUARD
RAIL (BEHIND HAND RAIL)
TO REMAIN, STRIP OF RUST
& REPAINT
WELD TUBE STEEL GUARD RAIL
EXTENSION TO TOP OF EXISTING
GUARD TOP RAIL, PAINT TO MATCH,
INDICATED BY SOLID HATCH
3'
-
6
"
M
I
N
.
T
Y
P
.
4" SPHERE SHALL NOT PASS,
FILL OPENING WITH WELDED
STEEL MESH TO MATCH
EXISTING IS NECESSARY,
MAX OPENING 3-7/8"
VARIES, RE: STAIR PLANS
VA
R
I
E
S
,
R
E
:
S
T
A
I
R
P
L
A
N
S
TREAD DEPTH
TO MATCH EXISTING
MIN 11"
RI
S
E
R
H
E
I
G
H
T
S
TO
M
A
T
C
H
E
X
I
S
T
I
N
G
MI
N
4
"
,
M
A
X
7
"
,
T
Y
P
.
NOTE:
CONTRACTOR TO FIELD VERIFY PROPOSED
ROOFS CONSTRUCTED AT THE INDICATED HEIGHTS
DO NOT CONFLICT WITH EXISTING STRUCTURES
PRIOR TO ORDERING MATERIALS.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A3.0
STAIR & ROOF SECTIONS
SCALE: 3/4 = 1'-0"
STAIR 10 ROOF SECTION1
A3.0
SCALE: 3/4 = 1'-0"
STAIR 20 ROOF SECTION2
A3.0
SCALE: 3/4 = 1'-0"
STAIR 40 ROOF SECTION3
A3.0
SCALE: 3/4 = 1'-0"
STAIR 70 ROOF SECTION4
A3.0
EXISTING HANDRAIL TO
REMAIN, STRIP OF RUST &
REPAINT AS NECESSARY, TYP.
EXISTING GUARD POSTS,
RAILS & MESH TO REMAIN,
STRIP OF RUST & REPAINT AS
NECESSARY, TYP.
EXISTING STRINGERS TO
REMAIN, STRIP OF RUST &
REPAINT AS NECESSARY, TYP.
EXISTING CONCRETE TREADS
& STEEL RISERS TO BE
REPLACED WITH STEEL TREADS
& RISERS, RE: 8/A4.0 &
1,2,3,5/A5.1, TYP.
TYPICAL STAIR, GUARD & HANDRAIL PHOTO
NOT TO SCALE
7
A4.0
EXTEND GUARDS TO MIN. 42"
ABOVE TREAD NOSINGS,
RE: 8/A3.0, TYP
TYPICAL STAIR, GUARD & HANDRAIL PHOTO
NOT TO SCALE
8
A3.0
STAIR ROOF
SECOND LEVEL
LANDING
FIRST
LANDING
GROUND LEVEL
LANDING
P
S1
S1
S1S1
S1
S1
S1
S1
S1
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS AT 11"
=6'-5"
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS AT 11"
=6'-5"
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
1
A5.1
1
A5.1
2
A5.1
2
A5.1
3
A5.1
3
A5.1
5
A5.1
5
A5.1
6
A5.1
6
A5.1
EXISTING HANDRAILS & GUARDS
ARE TO REMAIN, EXTEND GUARDS
TO 42" ABOVE TREAD NOSINGS
MEASURED VERTICALLY PER 8/A3.0
STAIR PLAN NOTES:
1.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A4.0
STAIR 10 STAIR PLANS
& REFLECTED CEILING PLANS
N
STAIR 10
BASEMENT LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
1
A4.0
N
STAIR 10
GROUND LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
3
A4.0
N
STAIR 10
BASEMENT LEVEL RCP
SCALE 1/4" = 1'-0"A4.0
N
STAIR 10
GROUND LEVEL RCP
SCALE 1/4" = 1'-0"A4.0
N
STAIR 10
SECOND LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
5
A4.0
N
STAIR 10
SECOND LEVEL RCP
SCALE 1/4" = 1'-0"
6
A4.0
SURFACE MOUNTED OUTDOOR RATED LED LIGHT FIXTURE, 3000K, FULL CUTOFF, DARK SKY COMPLIANT
LIGHTING FIXTURES (EXTERIOR)
S1
S2
QTY.HIGH EFFICACY
YES
SURFACE MOUNTED OUTDOOR RATED LED LIGHT FIXTURE, 3000K, FULL CUTOFF, DARK SKY COMPLIANT YES
(SEE FIXTURE CUT SHEETS FOR MANUFACTURER INFO.)
PHOTOCELL SWITCH
ELECTRICAL & LOW VOLTAGE NOTES ELECTRICAL LEGEND
ALL ELECTRICAL WORK SHALL COMPLY WITH PART VIII - ELECTRICAL OF THE 2015 INTERNATIONAL
RESIDENTIAL CODE. IN THE EVENT OF CONFLICT BETWEEN THE DESIGN DOCUMENTS AND THE 2015
INTERNATIONAL RESIDENTIAL CODE, THE CODE SHALL PREVAIL. ELECTRICAL CONTRACTOR SHALL NOTIFY
ARCHITECT OF AND CONDITIONS THAT DO NOT COMPLY WITH SUCH CODES.
ELECTRICAL FIXTURES AND DEVICES AS GRAPHICALLY INDICATED ON PLANS ARE INTENDED TO
ILLUSTRATE LAYOUT ONLY. LAYOUT OF RECESSED AND SURFACE MOUNTED CEILING FIXTURES ARE
GENERALLY CENTERED, ALIGNED, AND EQUALLY SPACED AS INDICATED ON PLANS. EXACT DIMENSIONS
ARE AVAILABLE UPON REQUEST FROM LIGHTING DESIGNER.
CONTRACTOR TO CONFIRM LIGHTING QUANTITIES PRIOR TO ORDERING.
1.
2.
3
DESCRIPTIONTAG
SURFACE MOUNTED LIGHT FIXTURE
SURFACE MOUNTED LINEAR LIGHT FIXTURE
44
1
HIGH EFFICACY LIGHTING CALCULATION
MINIMUM REQUIRED PERCENTAGE OF
HIGH EFFICACY LIGHT FIXTURES:
TOTAL PROVIDED LIGHT FIXTURES:
TOTAL PROVIDED HIGH EFFICACY
LIGHT FIXTURES:
PERCENTAGE OF HIGH EFFICACY
LIGHT FIXTURES:
50%
45
45
45/45 = 100%
NEW/MODIFIED FIXTURES ONLY
P
STAIR TREAD
SCALE 1/4" = 1'-0"
7
A4.0
STAIR SURFACE NOTE:
-STAIR TREAD AND LANDINGS TO BE GALVANIZED
STEEL PANELS WITH MAX 1/8" PERFORATIONS
LIGHT FIXTURE S1
NOT TO SCALE
8
A4.0
LIGHT FIXTURE S2
NOT TO SCALE
9
A4.0
4
2
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN W/
EXISTING
NOSING HT.
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS AT 11"
=6'-5"
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS AT 11"
=6'-5"
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN W/
EXISTING
NOSING HT.
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN W/
EXISTING
NOSING HT.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
1
A5.1
1
A5.1
2
A5.1
2
A5.1
3
A5.1
3
A5.1
5
A5.1
5
A5.1
6
A5.1
6
A5.1
STAIR ROOF
GROUND LEVEL
LANDING
SECOND LEVEL
LANDING
FIRST
LANDING
P
S1
S1
S1
S1
S1
S1S1
S1 S1
S1
EXISTING HANDRAILS & GUARDS
ARE TO REMAIN, EXTEND GUARDS
TO 42" ABOVE TREAD NOSINGS
MEASURED VERTICALLY PER 8/A3.0
STAIR PLAN NOTES:
1.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A4.1
STAIR 20 STAIR PLANS
& REFLECTED CEILING PLANS
N
STAIR 20
BASEMENT LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
1
A4.1
N
STAIR 20
GROUND LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
3
A4.1
N
STAIR 20
BASEMENT LEVEL RCP
SCALE 1/4" = 1'-0"
2
A4.1
N
STAIR 20
GROUND LEVEL RCP
SCALE 1/4" = 1'-0"
4
A4.1
N
STAIR 20
SECOND LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
5
A4.1
N
STAIR 20
SECOND LEVEL RCP
SCALE 1/4" = 1'-0"
6
A4.1
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS AT 11"
=6'-5"
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS AT 11"
=6'-5"
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
1
A5.1
1
A5.1
2
A5.1
2
A5.1
2
A5.1
3
A5.1
3
A5.1
3
A5.1
5
A5.1
5
A5.1
5
A5.1
6
A5.1
6
A5.1
6
A5.1
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS AT 11"
=6'-5"
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
1
A5.1
SECOND LEVEL
LANDING
FIRST
LANDING
THIRD LEVEL
LANDING
SECOND
LANDING
GROUND LEVEL
LANDING
S1
S1
S1 S1
S1
S1
S1 S1
S1
STAIR ROOF
P
S1
S1
S1
S1
EXISTING HANDRAILS & GUARDS
ARE TO REMAIN, EXTEND GUARDS
TO 42" ABOVE TREAD NOSINGS
MEASURED VERTICALLY PER 8/A3.0
STAIR PLAN NOTES:
1.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A4.2
STAIR 40 STAIR PLANS
& REFLECTED CEILING PLANS
N
STAIR 40
BASEMENT LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
1
A4.2
N
STAIR 40
GROUND LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
5
A4.2
N
STAIR 40
THIRD LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
2
A4.2
N
STAIR 40
FIRST LEVEL RCP
SCALE 1/4" = 1'-0"
6
A4.2
N
STAIR 40
SECOND LEVEL STAIR PLAN
SCALE 1/4" = 1'-0"
7
A4.2
N
STAIR 40
SECOND LEVEL RCP
SCALE 1/4" = 1'-0"
8
A4.2
N
STAIR 40
BASEMENT LEVEL RCP
SCALE 1/4" = 1'-0"
3
A4.2
N
STAIR 40
THIRD LEVEL RCP
SCALE 1/4" = 1'-0"
4
A4.2
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS AT 11"
=6'-5"
UP
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
UP
8 RISERS @
~7" = 4'-7 1/2"
7 TREADS @
11" = 6'-5"
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
1
A5.1
1
A5.1
2
A5.1
2
A5.1
2
A5.1
3
A5.1
3
A5.1
3
A5.1
5
A5.1
5
A5.1
5
A5.1
6
A5.1
6
A5.1
6
A5.1
DN
8 RISERS @ ~7"
= 4'-7 1/2"
7 TREADS @ 11"
=6'-5"
METAL PANEL
SYSTEM
CONTRACTOR TO
SUBMIT
SHOP DRAWINGS
OF LAYOUT
METAL PANEL TO
ALIGN
W/ EXISTING
NOSING HT.
EXISTING STEEL
CHANNEL
STRINGER TO
REMAIN, TYP.
1
A5.1
SECOND LEVEL
LANDING
FIRST
LANDING
THIRD LEVEL
LANDING
SECOND
LANDING
GROUND
LEVEL
LANDING
S1
S1 S1
S1
S1
S1 S1
S1
S1
STAIR ROOF
P
S1
S1
S1
S2
EXISTING HANDRAILS & GUARDS
ARE TO REMAIN, EXTEND GUARDS
TO 42" ABOVE TREAD NOSINGS
MEASURED VERTICALLY PER 8/A3.0
STAIR PLAN NOTES:
1.
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A4.3
STAIR 70 STAIR PLANS
& REFLECTED CEILING PLANS
N
STAIR 70
BASEMENT LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
1
A4.3
N
STAIR 70
GROUND LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
5
A4.3
N
STAIR 70
THIRD LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
2
A4.3
N
STAIR 70
FIRST LEVEL RCP
SCALE 1/4" = 1'-0"
6
A4.3
N
STAIR 70
SECOND LEVEL FLOOR PLAN
SCALE 1/4" = 1'-0"
7
A4.3
N
STAIR 70
SECOND LEVEL RCP
SCALE 1/4" = 1'-0"
8
A4.3
N
STAIR 70
BASEMENT LEVEL RCP
SCALE 1/4" = 1'-0"
3
A4.3
N
STAIR 70
THIRD LEVEL RCP
SCALE 1/4" = 1'-0"
4
A4.3
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A5.0
EXISTING / DEMOLITION
DETAILS
4
A5.1
TR
U
S
C
O
T
T
S
T
A
I
R
S
10
-
7
0
T
R
U
S
C
O
T
T
P
L
A
C
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
8
1
6
1
1
11
1
H
A
A
B
C
As
p
e
n
,
C
O
8
1
6
1
1
97
0
.
9
4
8
.
6
7
0
9
ba
r
r
y
.
g
e
r
e
b
@
b
g
a
d
a
s
p
e
n
.
c
o
m
bg
AR
C
H
I
T
E
C
T
U
R
E
&
D
E
S
I
G
N
CD SET
9/28/21
A5.1
STAIR / SIDING
DETAILS
DRAWING NUMBER
CHECKED BY
DRAWN BY
DATE
JOB NUMBER
Truscott Stair Roofs
Aspen, CO
HLB
REVISIONS
307N AABC
(970) 300-1003
Aspen, CO 81611
09/08/21 PERMIT R1
20-10
StructureS
Silver Town
06/10/21 PERMIT
21 3
1 2 3
A
BB
A
6 x 10 DF#1
6 x 10 DF#1
6 x 10 DF#1
2 x 6
@ 16" O.C.
1
S6.1
TYP.
4"Ø DOUBLE EXTRA STRONG.
3/S6.1 BASE DETAIL PLATE B
4"Ø DOUBLE EXTRA
STRONG. 3/S6.1 BASE
DETAIL PLATE B
EXISTINGEXISTING
EXISTING EXISTING
1
S6.1
TYP.
8
S6.1
7
S6.1
8
S6.1
TYP.
2:12
!""#$%&'()*+$,-'*
S.2.003
E E
F F
7
7
8
8
9
9
3 - 2 x 6
6 x 10 DF #1
6 x 10 DF #1
EXISTING
TO REMAIN
6 x 10 DF #1
3 - 2 x 6
4"Ø DOUBLE EXTRA
STRONG. . 3/S6.1
BASE DETAIL PLATE B
4"Ø DOUBLE EXTRA
STRONG. 3/S6.1
BASE DETAIL PLATE B
1
S6.1 TYP.
S6.1
2
S6.1
2
8
S6.1
8
S6.1
CLADDING
AND FRAME
DETAIL 7/S6.1
9
S6.1
9
S6.1
2:12
CLADDING
AND FRAME
DETAIL 7/S6.1
4
4
C C
D D
5
5
6
6
6 x 10 DF #1
2 x 6
@ 16" O.C.
EXISTING EXISTING
EXISTING EXISTING
4"Ø DOUBLE EXTRA
STRONG. 3/S6.1 BASE
DETAIL PLATE B
4"Ø DOUBLE EXTRA
STRONG. 3/S6.1
BASE DETAIL PLATE B
6 x 10 DF #1
6 x 10 DF #1
1
S6.1
TYP.
1
S6.1
TYP.
8
S6.1
TYP.
1
S6.1
TYP.
2:12
CLADDING
AND FRAME
DETAIL 7/S6.1
G G
H H
10
10
11
11
12
12
6 x 10 DF#16 x 10 DF#1
6 x 10 DF#1
3 - 2 x 6
3 - 2 x 6
2 x 6
@ 16" O.C.
EXISTINGEXISTING
4"Ø DOUBLE EXTRA
STRONG. 3/S6.1
BASE DETAIL PLATE B
4"Ø DOUBLE EXTRA
STRONG. 3/S6.1
BASE DETAIL PLATE B
4"Ø DOUBLE EXTRA
STRONG. 3/S6.1 BASE
DETAIL PLATE A
1
S6.1 TYP.
1
S6.1 TYP.
S6.1
2
S6.1
2
12'-2"4'-6"
9'-0"
4'-0"
V.I.F.
V.I.F.
8
S6.1
7
S6.1
7
S6.1
TYP.
TYP.
S6.1
2
2:12
CLADDING
AND FRAME
DETAIL 7/S6.1
CLADDING
AND FRAME
DETAIL 7/S6.1
9
S6.1
9
S6.1
Building 20 Stair Roof Framing
1/4" = 1'-0"3
Building 10 Stair Roof Framing
1/4" = 1'-0"1
Building 70 Stair Roof Framing
1/4" = 1'-0"4
Building 40 Stair Roof Framing
1/4" = 1'-0"2
!"#$%#&'()*+,-+,.+)/&%)0+)1223)45/6#&')7$/&
DRAWING NUMBER
CHECKED BY
DRAWN BY
DATE
JOB NUMBER
Truscott Stair Roofs
Aspen, CO
HLB
REVISIONS
307N AABC
(970) 300-1003
Aspen, CO 81611
09/08/21 PERMIT R1
20-10
StructureS
Silver Town
06/10/21 PERMIT
1/4 !"#$%&%'($%&%()*'($
1 1/2"1 1/2"
10"
!"#$%
10"
1 1/2"5"5"
!"#$%&%'$%&%()$!"#$%
8"
1 1/2"
5"
5"
5"
1 1/2"
1/4
2 1/2"
!"!#$%&'()#&!*
2 1/2"
1 1/2"
16"2 1/2"
3/4"Ø EXP BOLTS PLATE A
8"
EMBED 7" MIN.
2 1/2"
HIGH STRENGTH GROUT
3"
Typ.
1/2"Ø EXP BOLTS ALL OTHER PLATES
2'-0"3" CLR.
16"Ø PIER
TOP FTNG.
SEE PLAN
10"
3'-6" MIN.
#9 WIRE TIES
5-#4 VERTICAL
CLR.
1 1/2"
@ 10" O.C.
FINISHED GRADE
6"
STEEL POST ABOVE
#5 @ 12" O.C.
EACH WAY
PLATE A (DETAIL 3/S6.1)
Truscott Roofs
STRUCTURAL GENERAL NOTES & SPECIFICATIONS
STRUCTURAL WOOD FRAMING:
A. DIMENSIONAL LUMBER
All wood members shall be as described in the 2001 edition of the "National design Specifications for Wood
Construction" by the National Forest Products Association and the WWPAW.
1. Unless otherwise noted on the drawings, wood framing members shall be Douglas Fir/Larch, Grade #2 or
better. Redwood members shall be construction grade.
2. Sizes shown are nominal, except when noted as RC (Rough Cut) they are full dimensions.
3. All wood members attached to concrete or masonry shall be redwood or pressure treated lumber.
4. Block all joists and rafters per the I.R.C.
B. FASTENERS AND CONNECTORS
Alternate fasteners and connectors to those listed below, which have I.C.B.O. approval, may be used with
approval by the Engineer.
1. Connectors shown on the plans are manufactured by the Simpson Strong-Tie Company, Inc. Connectors
by other manufactures shall be deemed as equivalent if their rated capacity is equal to or greater than that
of the connector specified. Follow manufacturer's recommendations for installation of connectors.
2. All timber nailing and connections shall conform to the IRC and AITC.
3. Bolts for wood member connections shall be 3/4" diameter, ASTM A307 with a minimum 1 1/2" washer
at each end (unless noted otherwise).
4. Self-drilling fasteners for the attachment to structural steel shall be "Teks" fasteners as manufactured
by Buildex.
C. PLYWOOD SHEATHING
Plywood sheathing for roofs, floors and exterior shear walls shall be APA Grade-Trademarked C-D, Exposure
1, unless otherwise noted.
1. Roof Diaphragms (240 plf) shall be 5/8", APA rated sheathing, 40/20 place with 8'-0" dimension
perpendicular to the joist, rafter or truss span. End joists shall be staggered. Attach plywood at edges
with 8d nails at 6" O.C. and at intermediate supports with 8d nails at 12" O.C.
2. Floor Diaphragms (250 plf) shall be 3/4", APA rated Sturdi-I-Floor, 24 O.C. place with 8'-0" dimension
perpendicular to the joist span. End joints shall be staggered. Attach plywood with APA glue and at edges
nail with 8d nails at 6" O.C. and at intermediate supports with 8d nails at 10" O.C. Sheathing shall be
T&G.
3. Shear Wall Diaphragms (180 plf, 380 plf wind) shall be 1/2", APA rated sheathing, 24/0 with 8"-0"
dimension vertical. End joints shall be staggered. Studs shall be 16" O.C. Attach plywood at edges with
10d nails at 4" O.C. and at intermediate supports with 8d nails at 6" O.C. Sheath all exterior walls full
height with 1/2" plywood. At all corners, min. 4'-0" each direction, block plywood edges and nail as noted
above.
D. GLUE LAMINATED BEAMS Laminated member shall be designed and fabricated in accordance with "The
Standard Specifications for the Design and Fabrication of Structural Glue Laminated Lumber" published by the
AITC and the appropriate Lumber Producers' Association.
1. Use exterior glue for all exposed laminated members.
2. All members exposed to weather shall receive one coat of end sealer at trimmed ends. Seal all
exposed surfaces with sealer coat as soon as practical after erection.
3. Appearance grade shall be in accordance with the architectural drawings.
4. If beam is cantilevered and the cantilever is greater than one-third of the back span, install beam
"TOP" down.
5. Allowable unit stresses for dry conditions of use required shall be as follows:
Members stressed principally in bending such as beams & girders (AITC 24F-V4) unless otherwise
noted on drawings.
Fb=2400 psi Fv=165 psi Fc(perp)=650 psi E=1.8E6 psi
Members stressed principally in compression or tension such as columns & truss members (AITC
24F-V8) Unless otherwise noted on drawings.
Fc(parallel)=1650 psi E=1.6E6 psi
E. MICRO-LAM BEAMS
Micro-laminated members shall be designed and fabricated in accordance with the "National Research Board"
and the "National Design Specifications for Wood".
1. Allowable unit stresses for dry conditions of use required shall be as follows:
Fb=2600 psi Fv=285 psi Fc(perp)= 750 psi E=1.8E6 psi
2. Install micro-laminated members in accordance with the manufacturer's recommendation.
3. Holes, cuts, or notches not previously approved by the engineer or the manufacturer shall not be made.
4. Micro-laminated lumber is marked on the drawings as "ML" and shall be 1 3/4" wide, unless noted
otherwise.
F. FABRICATED WOOD JOISTS (I-Series)
I-series fabricated joists with structural wood flanges and plywood webs called for on the drawings (TJI/210,
TJI/360, TJI/560) are as manufactured by the Trus-Joist Corp.. Joists by other manufacturers may be used
if the depth and deflection is equal to or less than that of the joist specified for the particular span and
spacing and when authorized by the Architect/Engineer.
1. Fabricated wood joists shall be in accordance with the manufacturer's recommendations.
2. Supply all plates, blocking, bridging, bracing, stiffeners and other related items as recommended by the
manufacturer.
GENERAL:
1. Any changes to the contract drawings shall be submitted to the structural engineer for approval.
2. All dimensions and details on structural drawings shall be verified against the architectural drawings and any discrepancies
shall be brought to the attention of the architect prior to fabrication or construction. Details on the structural drawings are typical.
DO NOT SCALE DRAWINGS.
3. All openings through the structural system shall be approved by the Engineer.
4. Contractor shall provide all necessary temporary bracing, shoring, guying or other means to prevent excessive stresses and to
hold the structural elements in place during construction.
5. The contract structural drawings and specifications represent the finished structure. They do not indicate the method of
construction. The contractor shall provide all measures necessary to protect the structure during construction. Such measures
shall include, but are not limited to bracing, shoring for loads due to construction equipment and protection of existing structures.
Observation visits to the site by the structural engineer shall not include inspection of the above items nor will the structural
engineer be responsible for the contractor's means, methods, techniques, sequences for procedure of construction, or the safety
precautions and programs incident there to.
6. Options are for the convenience of the contractor. He shall be responsible for all changes necessary if he chooses an option
and shall coordinate all details. The cost of additional engineering work necessitated by selection of an option shall be borne by
the contractor.
7. Any engineering design provided by others and submitted for review shall bear the seal and signature of an engineer registered
in Colorado.
8. Dimensions on the structural drawings are exact with the exception of masonry and sawn lumber dimensions which are
nominal. Verify all dimensions with the architectural drawings.
9. Where required construction details are not shown or noted on these plans the contractor shall notify the engineer and the
engineer shall provide sufficient details for the work to proceed.
10. Construction materials shall be spread out if placed on framed construction. Load shall not exceed the design live load per
square foot.
11. Shop drawings shall be submitted to the architect for all structural items. The Engineers review is intended only as an aid to
the contractor for obtaining correct shop drawings. Responsibility for correctness shall rest with the contractor. The contractor
shall review all shop drawings prior to submittal. Items not in accordance with the contract documents shall be flagged upon his
review. The shop drawings do not replace the original contract drawings. It is the contractors responsibility to make sure items are
constructed to the original drawings. The adequacy of engineering designs and layout performed by others rests with the
designing or submitting authority.
A. DESIGN LIVE LOADS
1. Basic Ground Snow 75 PSF 4. Garage 40 PSF
2. Residential Floors 40 PSF 5. Wind 89 mph, Exposure B
3. Decks 40 PSF 6. Seismic Zone C
B. DESIGN CODES
International Residential Code, (IRC), 2015
with the International Building Code, (IBC), 2015 for Special Inspection
American Concrete Institute Building Code (ACI 318-11)
American Institute of Steel Construction, Manual of Steel Construction (AISC 9th Edition)
American Institute of Timber Construction, Timber Construction Manual (AITC 5th Edition)
National Design Specifications for Wood Construction (NDS2012)
DESIGN DATA:
1
2
3
4
w/ 2- 3/4"Ø BOLTS
PL 1/4 x 4 x 8"
2"
SEE PLAN
TS COLUMN,
1/4
3"
3"
PL 1/4 1/4
SEE PLAN
WOOD BEAM,2"2"
NEW 1/2" PLYWOOD
(SEE GENERAL NOTES)
WOOD BEAM
(SEE PLAN)
RAFTER
(SEE PLAN)
EXISTING FRAMING
TO REMAIN
EXISTING PLYWOOD
WOOD PACKOUT.
MATCH BEAM WIDTH
PLYWOOD SHEATHING
(SEE GENERAL NOTES)
ALIGN PONY WALL WITH
EXISTING WALL BELOW
WOOD PLATE
(2) - 10d NAILS @ 16" O.C.
WOOD BEAM
(SEE PLAN)
1/4
1/4
1/4
1/4
STEEL COLUMN
SEE PLAN. ALIGN WITH
CENTER OF EXISTING
CONCRETE WALL.
EXISTING LANDING BEAM
PL 1/2" x 8" SHEAR TAB.
FIELD ADJUST WIDTH TO
COLUMN ALIGNMENT
NEW STEEL COLUMN
EXTENSION
ADD 2 HALF PIPE
STEEL SLEEVES
USE:1/4" FILLET WELD
ALL AROUND
REMOVE ALL RUST,
SCALE AND PAINT AT
WELD SITES
MATCH INNER SLEAVE DIA TO EXISTING OUTER DIA.
REPAINT PER ORIGINAL SPECS
1'-6" CENTER ON
SPLICE
1/4
TYP.
1/4
TYP.
AA
5
EXISTING STEEL
COLUMN
6
(2) - #3 TIES IN THE TOP 5"T.O.PIER
V.I.F.
8
3/16
HSS 2 x 3 x 3/16
STEEL LAYOUT PER ARCH.
SPACING FOR HORIZONTAL
MEMBERS 4'-0" O.C. MAX.
HSS 2 x 3 x 3/16
PIPE COLUMN
(SEE PLAN)
3/16
TWO
SIDES
HSS 2 x 3 x 3/16
VERTICAL
HSS 2 x 3 x 3/16
HORIZONTAL
3/16
3/16
BLOCKING V.I.F.
COLUMN ENDS AT SIMILAR
CONDITION.
3"
9
7
Cladding Fasteners
Cladding Type Fasteners
1 1/4" Trex decking (3) - Simpson TB1460 at each horizontal beam
22 Guage Perforated Panel Simpson Strong Drive X1S1214 @ 6" O.C at all
support beams and columns.
CLADDING NOT SHOWN
PLYWOOD SHEATHING
(SEE GENERAL NOTES)
RAFTER
(SEE PLANS)
BEVELED 2x BLOCKING W/
(4) - 0.148 x 3 1/2" ENDNAILS
EACH END.
(2) - 1/2"Ø BOLTS
3"
8d NAILS @ 4" O.C.
!"#"$%&'()*"+'%#,'-"*%.&+
S.6.001
!"#"$%&'()*"+
!"#$%&'!()*