Loading...
HomeMy WebLinkAboutApplication.ACES.100 Puppy Smith St.20210428Introduction ACES is seeking a stream margin review exemption for the construction of structures for drainage, flood control or water diversion and bank stabilization. As per the exemption we are complying with the stream margin review standards to the extent practical as detailed below. We are unable to comply with section 3 as vegetation will need to be removed to access the Hallam Lake earthen berm. Project Description The earthen berm that creates Hallam Lake was originally constructed in the 1880s by miners. At that time Hallam Lake was used for recreation,fisheries, and ice production. In the late 1980’s a repair of the berm was attempted. This work was partially successful but the contractor was not able to access the back portion of the berm. That area is now beginning to falil with many sections at water level and less than one foot thick. This project aims to repair the berm and replace the outflow structure. To do this we will be draining Hallam Lake and mobilizing heavy machinery to the lake. While none of the actual project is within the stream margin review boundary the access for machinery to the lake is. Collaboration with City Departments ACES is actively in collaboration and consultation with the City of Aspen Engineering Department through Stormwater Manager April Long as well as with the City of Aspen Parks Department through Open Space and Natural Resource Manager John Speiss. ACES is working with the Parks Department to develop a replanting and tree removal plan based on the specific needs of the nature preserve and the project. The Engineering Department has been kept abreast of all developments and is not requiring a study demonstrating the impacts of proposed work on the base flood elevation. For ease all of the items on the application checklist are numbered and detailed below. If they are fulfilled in another document the document is also numbered appropriately. 1.Completed Land Use Application and signed Fee Agreement. See 1-Land-Use-Application-Packet.pdf 2.Pre-application Conference Summary (this document). See 2-ACES_Hallam Lake Dam Replacement_Stream Margin Review.pdf 3.Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report,or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application. The purpose of this requirement is to show that the Applicant has the authority to apply for a Land Use Case. See 3-62012593_Property_Report.pdf 4.Applicant’s name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant. The applicant is representing themselves. 5.A site improvement survey (no older than a year from submittal) including topography, existing structures, and vegetation showing the current status of the parcel certified by a registered land surveyor by licensed in the State of Colorado. This survey also is required to depict the 100-year flood plain, the high-water mark of the roaring fork river, top of slope, building envelopes, and any ditch easement that cross the property. See 5-ACES Hallam Lake Site Improvement Survey.pdf 6.A written and visual description of the proposal and response to how the proposed development complies with the review standards relevant to the development application Section 26.435.040.C Stream Margin Review See above project description, for visual description see See 7-site plan.pdf, for compliance with review standards see 6-Stream Margin Review Compliance.pdf 7.Site plan and site section depicting the proposed scope of work. See 7-site plan.pdf 8.A landscaping plan showing all vegetation to be removed and the replanting plan. See 8-vegetation plan for visual details. This sheet was adapted from another submission for a different project. The trees being removed for that project are bolded and hashed as depicted in the sheet legend but they are outside of the stream margin review area and are not included in the list of vegetation being removed for this project. Trees being removed for the proposed project are marked in red, trees that will have their dripline being impacted are marked in blue. The only tree within the stream margin review area that will be impacted by both projects is tree number 38. For clarity I’ve included it in the list of trees to be removed below. ACES is currently working closely with City of Aspen Parks and Open Space staff to determine a comprehensive mitigation plan for both this project as well as the previous submittal. Tree Number Tree Species Tree Diameter Dripline Value 17 Cottonwood 24 100 $20,347.20 19 Cottonwood 12 28 $5,086.80 20 Spruce 4 6 $565.20 21 Cottonwood 8 16 $2,260.80 22 Cottonwood 14 20 $6,923.70 23 Cottonwood 20 100 $14,130.00 24 Cottonwood 22 40 $17,097.30 25 Cottonwood 22 40 $17,097.30 26 Cottonwood 30 44 $31,792.50 27 Cottonwood 6 12 $1,271.70 38 Spruce 8 12 $2,260.80 Total $118,833.30 9.HOA Compliance form (Attached to Application) See 1-Land-Use-Application-Packet.pdf 10.Proof of current 501(c)3 status. See 10-501c3 letter.pdf 11.All approvals and permits required by State and Federal Review Agencies with purview of the project. Approvals required by State and Federal Review Agencies are detailed in 6a-Stream Margin Review Narrative.pdf. The necessary permits applications are currently in review. While approvals are not yet in hand we are hoping to begin the Stream Margin Review process prior to receiving approvals. 12.An engineering study demonstrating the impacts of the proposed scope of work on the base flood elevation. The plan must be stamped and signed by an Engineer. We have been advised by April Long Stormwater Manager in the City of Aspen Engineering department that the proposed project does not require a stamped study on the impacts of base flood elevation. 13.Proof written notice has been provided to the Colorado Water Conservation Board prior to the alteration of the water course and proof that notice was submitted to the Federal Emergency Management Agency. No water course is being altered and therefore notice is not warranted. 14.The site plan shall depict all existing and proposed wetlands and riparian zones. Document See 7-site plan.pdf depicts existing and proposed wetlands and riparian zones None of the area we will be using for access within the stream margin review boundary is mapped wetland or riparian.. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 COMMUNITY DEVELOPMENT DEPARTMENT GENERAL LAND USE PACKET Attached is an Application for review of Development that requires Land Use Review pursuant to The City of Aspen Land Use Code: Included in this package are the following attachments: 1.Development Application Fee Policy, Fee Schedule and Agreement to Pay Application Fees Form 2.Land Use Application Form 3.Dimensional Requirements Form (if required) 4.HOA Compliance Form 5.Development Review Procedure All applications are reviewed based on the criteria established in Title 26 of the Aspen Municipal Code. Title 26 of the Aspen Municipal Code is available at the City Clerk’s Office on the second floor of City Hall and on the internet at https://library.municode.com/co/aspen/codes/municipal_code. We require all applicants to hold a Pre-Application Conference with a Planner in the Community Development Department so that the requirements for submitting a complete application can be fully described. This meeting can happen in person or by phone or email. Also, depending upon the complexity of the development proposed, submitting one copy of the development application to the Case Planner to determine accuracy, inefficiencies, or redundancies can reduce the overall cost of materials and staff time. Please recognize that review of these materials does not substitute for a complete review of the Aspen Land Use Regulations. While this application package attempts to summarize the key provisions of the Code as they apply to your type of development, it cannot possibly replicate the detail or the scope of the Code. If you have questions that are not answered by the materials in this package, we suggest that you contact the staff member assigned to your case, contact Planner of the Day (970-429-2764/planneroftheday@gmail.com), or consult the applicable sections of the Aspen Land Use Code. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 Land Use Review Fee Policy The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is collected for land use applications based on the type of application submitted. A flat fee is collected by Community Development for applications that normally take a minimal and predictable amount of staff time to process. Review fees for other City Departments reviewing the application (referral departments) also will be collected when necessary. Flat fees are cumulative, i.e., an application with multiple flat fees must pay the sum of those flat fees. Flat fees are not refundable. A review fee deposit is collected by Community Development when more extensive staff time is required. Actual staff time spent will be charged against the deposit. Various City staff also may charge their time spent on the case in addition to the Case Planner. The deposit amount may be reduced if, in the opinion of the Community Development Department Director, the project is expected to take significantly less time to process than the deposit indicates. A determination on the deposit amount shall be made during the pre-application conference by the Case Planner. Hourly billing shall still apply. All applications must include an Agreement to Pay Application Fees. One payment including the deposit for Planning and referral agency fees must be submitted with each land use application, made payable to the City of Aspen. Applications will not be accepted for processing without the required fee(s). The Community Development Department shall keep an accurate record of the actual time required to process a land use application requiring a deposit. The City can provide a summary report of fees due at the applicant’s request. The applicant will be billed for the additional costs incurred by the City when the processing of an application by the Community Development Department takes more time or expense than is covered by the deposit. Any direct costs attributable to a project review shall be billed to the applicant with no additional administrative charge. In the event the processing of an application takes less time than provided for by the deposit, the Department shall refund the unused portion of the deposited fee to the applicant. Fees shall be due regardless of whether an applicant receives approval. Unless otherwise combined by the Director for simplicity of billing, all applications for conceptual, final, and recordation of approval documents shall be handled as individual cases for the purpose of billing. Upon conceptual approval, all billing shall be reconciled, and past due invoices shall be paid prior to the Director accepting an application for final review. Final review shall require a new deposit at the rate in effect at the time of final submission. Upon final approval, all billing shall again be reconciled prior to the Director accepting an application for review of technical documents for recordation. The Community Development Director may cease processing of a land use application for which an unpaid invoice is 30 or more days past due. Unpaid invoices of 90 days or more past due may be assessed a late fee of 1.75% per month. An unpaid invoice of 120 days or more may be subject to additional actions as may be assigned by the Municipal Court judge. All payment information is public domain. All invoices shall be paid prior to issuance of a Development Order or recordation of development agreements and plats. The City will not accept a building permit for a property until all invoices are paid in full. For permits already accepted, any unpaid invoice of 90 or more days may result in cessation of building permit processing or issuance of a stop work order until full payment is made. The property owner of record is the party responsible for payment of all costs associated with a land use application for the property. Any secondary agreement between a property owner and an applicant representing the owner (e.g. a contract purchaser) regarding payment of fees is solely between those private parties. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 Agreement to Pay Application Fees An agreement between the City of Aspen (“City”) and Address of Property: Please type or print in all caps Property Owner Name: Representative Name (if different from Property Owner): Billing Name and Address - Send Bills to: Contact info for billing: e-mail: Phone: I understand that the City has adopted, via Ordinance No. 20, Series of 2020, review fees for Land Use applications, and payment of these fees is a condition precedent to determining application completeness. I understand that as the property owner, I am responsible for paying all fees for this development application. For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are non-refundable. $. flat fee for . $. flat fee for $. flat fee for . $. flat fee for For deposit cases only: The City and I understand that because of the size, nature, or scope of the proposed project, it is not possible at this time to know the full extent or total costs involved in processing the application. I understand that additional costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review, and presentation of sufficient information to enable legally required findings to be made for project consideration unless invoices are paid in full. The City and I understand and agree that invoices sent by the City to the above listed billing address and not returned to the City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice by the City for such services. I have read, understood, and agree to the Land Use Review Fee Policy, including consequences for non-payment. I agree to pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render an application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay additional monthly billings to the City to reimburse the City for processing my application at the hourly rates hereinafter stated. $ deposit for hours of Community Development Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. $ deposit for hours of Engineering Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. City of Aspen: Phillip Supino, AICP Community Development Director City Use: Fees Due: $ Received $ Case # Signature: PRINT Name: Title: CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 LAND USE APPLICATION APPLICANT: REPRESENTIVATIVE: Description: Existing and Proposed Conditions Review: Administrative or Board Review Required Land Use Review(s): Growth Management Quota System (GMQS) required fields: Net Leasable square footage Lodge Pillows Free Market dwelling units Affordable Housing dwelling units Essential Public Facility square footage Have you included the following? FEES DUE: $ Pre-Application Conference Summary Signed Fee Agreement HOA Compliance form All items listed in checklist on PreApplication Conference Summary Name: Address: Phone#: email: Address: Phone #: email: Name: Project Name and Address: Parcel ID # (REQUIRED) CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 DIMENSIONAL REQUIREMENTS FORM Complete only if required by the PreApplication checklist Project and Location Applicant: Zone District: Gross Lot Area: Net Lot Area: **Please refer to section 26.575.020 for information on how to calculate Net Lot Area Please fill out all relevant dimensions Single Family and Duplex Residential 1) Floor Area (square feet) 2) Maximum Height 3) Front Setback 4) Rear Setback 5) Side Setbacks 6) Combined Side Setbacks 7) % Site Coverage Existing Allowed Proposed Multi-family Residential 1)Number of Units 2)Parcel Density (see 26.710.090.C.10) 3)FAR (Floor Area Ratio) 4)Floor Area (square feet) Existing Allowed Proposed 8) Minimum distance between buildings Proposed % of demolition 5) Maximum Height 6) Front Setback 7) Rear Setback 8) Side Setbacks Proposed % of demolition Commercial Proposed Use(s) Existing Allowed Proposed 1) FAR (Floor Area Ratio) 2) Floor Area (square feet) 3) Maximum Height 4) Off-Street Parking Spaces 5) Second Tier (square feet) 6) Pedestrian Amenity (square feet) Proposed % of demolition Existing non-conformities or encroachments: Variations requested: Lodge Additional Use(s) 1)FAR (Floor Area Ratio) 2)Floor Area (square feet) 3)Maximum Height 4)Free Market Residential(square feet) 4)Front setback 5)Rear setback 6)Side setbacks 7)Off-Street Parking Spaces 8)Pedestrian Amenity (square feet) Proposed % of demolition Existing Allowed Proposed April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090 CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT Homeowner Association Compliance Policy All land use applications within the City of Aspen are required to include a Homeowner Association Compliance Form (this form) certifying that the scope of work included in the land use application complies with all applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. Property Owner (“I”): Name: Email: Phone No.: Address of Property: (subject of application) I certify as follows: (pick one) □This property is not subject to a homeowner association or other form of private c ovenant. □This property is subject to a homeowner association or private covenant, and the improvements proposed in this land use application do not require approval by the homeowners association or covenant beneficiary. □This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application have been approved by the homeowners a ssociation or covenant beneficiary. I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner signature: Date: Owner printed name: or, Attorney signature: Date: Attorney printed name: CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090 DEVELOPMENT REVIEW PROCEDURE 1.Attend pre-application conference. During this one-on-one meeting, staff will determine the review process applies to your development proposal and will identify the materials necessary to review your application. 2.Submit Development Application. Based on your pre-application meeting, you should complete to the application package and submit the requested number of copies of the complete application and the appropriate processing fee to the Community Development Department. 3.Determination of Completeness. Within five (5) working days of the date of your submission, staff will review the application and notify you in writing whether the application is complete or if additional materials are required. Please be aware that the purpose of the completeness review is to determine whether or not the information you have submitted is adequate to review the request, and not whether the information is sufficient to obtain approval. 4.Staff Review of Development Application. Once your application is determined to be complete, it will be reviewed by the staff for compliance with the applicable standards of the Code. During the staff review stage, the application will be referred to other agencies for comments. The Planner assigned to your case or the agency may contact you if additional information is needed or if problems are identified. Staff will draft a memo for signature by the Community Development Director that explains whether your application complies with the Code, and will list any conditions that should apply if the application is to be approved. Final approval of any Development Application that amends a recorded document, such as a plat, agreement, or deed restriction, will require the applicant to prepare an amended version of that document for review and approval by staff. Staff will provide the applicant with the applicable contents for the revised plat. The City Attorney is normally in charge of the form for recorded agreements and deed restrictions. We suggest that you not go to the trouble or expense of preparing these documents until the staff has determined that your application is eligible for the requested amendment or exemption. 5. Board Review of Application. If a public hearing is required for the land use action that you are requesting, the Planning staff will schedule a hearing date for the application upon determination that the application is complete. The hearing(s) will be scheduled before the appropriate reviewing board(s). The applicant will be required to mail notice (one copy provided by the Community Development Department) to property owners within 30 feet of the subject property and post notice (sign available at the Community Development Department) of the public hearing on the site at least fifteen (15) days prior to the hearing date. (Please see Attachment 6 for instructions.) The Planning staff will publish notice of the hearing in the paper for land use requests that require publication. The Planning staff will then formulate a recommendation on the land use request and draft a memo to the reviewing board(s). Staff will supply the applicant with a copy of the Planning staff’s memo, approximately five (5) days prior to the hearing. The public hearing(s) will take place before the appropriate review boards. Public hearings include a presentation by the Planning staff, a presentation by the applicant (optional), consideration of public comment, and the reviewing board’s questions and decision. (Continued on next page) CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090 6.Issuance of Development Order. If the land use review is approved, then the Planning staff will issue a Development Order, which allows the applicant to submit a building permit application. 7.Receipt of Building Permit. Once you have received a copy of the signed staff approval, you may apply for a building permit. During this time, your project will be examined for its compliance with the Uniform Building Code. It also will be checked for compliance with applicable provisions of the Land Use Regulations that were not reviewed in detail during the land use case review. (This might include a check of floor area ratios, setbacks, parking, open space and the like). Impact fees for water, sewer, parks, and employee housing will be collected as part of the permitting process. Any document required to be recorded, such as a plat, deed restriction, or agreement, will be reviewed and recorded before a building permit application is submitted. PRE-APPLICATION CONFERENCE SUMMARY (PRE-20-132) PLANNER: Garrett Larimer, 970-319-6950, garrett.larimer@cityofaspen.com DATE: November 16th, 2020 PROJECT LOCATION: Aspen Center for Environmental Studies, Hallam Lake REPRESENTATIVE: Adam McCurdy, amccurdy@aspennature.org , 413.214.5211 REQUEST: Stream Margin Review DESCRIPTION: The subject property contains Hallam Lake and is located within the Stream Margin Review Area adjacent to the Roaring Fork River. The existing earthen dam creating Hallam Lake is in need of replacement. In order to replace the dam, heavy machinery will be used to excavate the dam material and redistribute the fill around the site. Hallam Lake will be drained, and the dam replaced. After completion of the dam work Hallam Lake will be refilled and the site will be revegetated. This site work will result in additional wetlands. The proposed scope of work is subject to consideration and permitting requirements from State and Federal review agencies. The application will need to show all necessary permits or approvals have been received prior to Stream Margin Review Approval. Referral reviews on project will be conducted as part of the Land Use Review by the City of Aspen Engineering and Parks Department. The referral review and comments from these departments will be important part of the Land Use Review process. The application should include responses to Section 26.435.040.C – Stream Margin Review Standards. ACES is a 501(c)3 Non-Profit and is exempt from all fees under $2,500. Proof of current status as a 501(c)3 must be included in the application to be eligible for this fee waiver. RELEVANT LAND USE CODE SECTIONS: Section Number Section Title 26.304 Common Development Review Procedures 26.435.040.C Stream Margin Review Standards For your convenience – links to the Land Use Application and Land Use Code are below: Land Use Application Land Use Code REVIEW BY: Staff for complete application and administrative review PUBLIC HEARING: No PLANNING FEES: $1,300 for 4 hours of staff time REFERRAL FEES: Engineering Department: $325/hour Parks Department: $650 flat fee TOTAL DEPOSIT: $0 (Pursuant to Section 26.104.070 – Land Use Application Fees, all 501(c)3 Non-Profit Originations are eligible for a fee waiver of all fees up to $2,500) APPLICATION CHECKLIST: (Please submit a digital copy of the application to the planner listed on the preapplication.)  Completed Land Use Application and signed Fee Agreement.  Pre-application Conference Summary (this document).  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application. The purpose of this requirement is to show that the Applicant has the authority to apply for a Land Use Case.  Applicant’s name, address and telephone number in a letter signed by the applicant that states the name, address and telephone number of the representative authorized to act on behalf of the applicant.  A site improvement survey (no older than a year from submittal) including topography, existing structures, and vegetation showing the current status of the parcel certified by a registered land surveyor by licensed in the State of Colorado. This survey also is required to depict the 100-year flood plain, the high-water mark of the roaring fork river, top of slope, building envelopes, and any ditch easement that cross the property.  A written and visual description of the proposal and response to how the proposed development complies with the review standards relevant to the development application Section 26.435.040.C Stream Margin Review  Site plan and site section depicting the proposed scope of work.  A landscaping plan showing all vegetation to be removed and the replanting plan.  HOA Compliance form (Attached to Application)  Proof of current 501(c)3 status.  All approvals and permits required by State and Federal Review Agencies with purview of the project.  An engineering study demonstrating the impacts of the proposed scope of work on the base flood elevation. The plan must be stamped and signed by an Engineer.  Proof written notice has been provided to the Colorado Water Conservation Board prior to the alteration of the water course and proof that notice was submitted to the Federal Emergency Management Agency.  The site plan shall depict all existing and proposed wetlands and riparian zones. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. Land Title Guarantee Company Customer Distribution PREVENT FRAUD - Please remember to call a member of our closing team when initiating a wire transfer or providing wiring instructions. Order Number:BANA62012593 Date: 03/26/2021 Property Address:100 PUPPY SMITH ST, ASPEN, CO 81611 PLEASE CONTACT YOUR CLOSER OR CLOSER'S ASSISTANT FOR WIRE TRANSFER INSTRUCTIONS For Closing Assistance For Title Assistance Land Title Roaring Fork Valley Title Team 200 BASALT CENTER CIRCLE BASALT, CO 81621 PO BOX 3440 (970) 927-0405 (Work) (970) 925-0610 (Work Fax) valleyresponse@ltgc.com Buyer/Borrower ASPEN CENTER FOR ENVIRONMENTAL STUDIES Attention: ADAM MCCURDY Delivered via: Electronic Mail This Report is based on a limited search of the county real property records and provides the name(s) of the vested owner(s), the legal description, tax information (taken from information provided by the county treasurer on its website) and encumbrances, which, for the purposes of this report, means deed of trust and mortgages, and liens recorded against the property and the owner(s) in the records of the clerk and recorder for the county in which the subject is located. This Report does not constitute any form of warranty or guarantee of title or title insurance. The liability of Land Title Guarantee Company is strictly limited to (1) the recipient of the Report, and no other person, and (2) the amount paid for the report.. Lender: ASPEN CENTER FOR ENVIRONMENTAL STUDIES Effective Date: 03/12/2021 at 5:00 P.M. Vesting: ASPEN CENTER FOR ENVIRONMENTAL STUDIES, A COLORADO NON-PROFIT CORPORATION Property Address: 100 PUPPY SMITH ST, ASPEN, CO 81611 Legal Description: ASPEN CENTER FOR ENVIRONMENTAL STUDIES SPECIALLY PLANNED AREA FINAL DEVELOPMENT PLAN,​ ACCORDING TO THE PLAT THEREOF RECORDED JANUARY 26, 2010 IN PLAT BOOK 93 AT PAGE 1 AND ACCORDING TO THE FIRST ADDENDUM RECORDED JULY 8, 2011 IN PLAT BOOK 97 AT PAGE 31.​ COUNTY OF PITKIN,​ STATE OF COLORADO We find the following documents of record affecting subject property: 1.DEED RECORDED DECEMBER 30, 1969 IN BOOK 245 AT PAGE 481. 2.DEED RECORDED DECEMBER 30, 1970 IN BOOK 252 AT PAGE 784. 3.DEED RECORDED DECEMBER 31, 1973 IN BOOK 282 AT PAGE 979. 4.DEED RECORDED JUNE 09, 1975 IN BOOK 299 AT PAGE 597. 5.DEED RECORDED DECEMBER 20, 1983 IN BOOK 457 AT PAGE 661. 6.DEED RECORDED JANUARY 21, 1985 IN BOOK 480 AT PAGE 223. 7.DEED RECORDED DECEMBER 27, 1985 IN BOOK 502 AT PAGE 245. 8.DEED RECORDED DECEMBER 23, 1988 IN BOOK 581 AT PAGE 885. 9.QUIT CLAIM DEED RECORDED NOVEMBER 13, 1990 IN BOOK 633 AT PAGE 993. 10.DEED RECORDED DECEMBER 18, 1990 IN BOOK 636 AT PAGE 135. 11.QUIT CLAIM DEED RECORDED NOVEMBER 01, 1995 IN BOOK 798 AT PAGE 367. 12.QUIT CLAIM DEED RECORDED NOVEMBER 01, 1995 IN BOOK 798 AT PAGE 369. Land Title Guarantee Company Property Report Order Number:BANA62012593 13.QUIT CLAIM DEED RECORDED NOVEMBER 01, 1995 IN BOOK 798 AT PAGE 371. 14.BARGAIN & SALE DEED RECORDED NOVEMBER 01, 1995 AS RECEPTION NO. 386966. 15.BARGAIN & SALE DEED RECORDED OCTOBER 19, 1999 UNDER RECEPTION NO. 436774. ***************** PROPERTY TAX INFORMATION ********************** Parcel No.: 273707300801 2020 Land Assessed Value $701,960.00 2020 Improvements Assessed Value $194,920.00 2020 real property taxes EXEMPT in the amount of $0.00. **************************************************************** Land Title Guarantee Company Property Report Order Number:BANA62012593 D D D D 15 ' W I D E S T O R M SE W E R E A S E M E N T QUARTER CORNER FOUND BLM 3-1/4" 1954 BRASS CAP SE C T I O N 7 SE C T I O N 1 2 1 2 3 4 5 6 7 8 9 10 11 1 2 1 3 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2 9 30 31 32 3 3 34 35 3 6 3 7 3 8 3 9 4 0 4 1 4 2 4 3 44 45 46 47 4 8 49 50 51 5 2 53 54 55 56 5 7 58 5 9 6 0 6 1 62 63 64 65 C1 6 6 67 6 8 69 7 0 7 1 72 73 7 4 7 5 POINT OF BEGINNING A B C D E F G H I J K L N O P Q R S T UV W X Y Z AA BB CC DD EE GG M FF NORTH 1/16 CORNER FOUND BLM 3-1/4" 1978 BRASS CAP N0 0 ° 5 9 ' 0 2 " E 1 2 9 3 . 1 2 ' BA S I S O F B E A R I N G S S2 3 ° 3 2 ' 3 8 " W 6 3 3 . 7 9 ' DE E D = S 2 2 ° 4 1 ' 1 8 " W 6 3 2 . 6 7 ' HUNTER C R E E K SHED DIRT PATH (TYPICAL) BOARD WALK HALLAM LAKE ROARING FORK RIVER PUPPY R O A D S M I T H SEE SHEET 3 IMPROVEMENT AREA DETAIL OBSERVATION DECK OBSERVATION DECK FOOT BRIDGE OBSERVATION DECK FOOT BRIDGE RETAINING WALL APPARENT ENCROACHMENT RETAINING WALL APPARENT ENCROACHMENT ROAR I N G F O R K D R I V E WIER BOX & PIPE HEADWALL & PIPE HH OBSERVATION DECKS CHAIN-LINK PERIMETER FENCE (TYPICAL) OVERLAP AREA AS SHOWN ON ERDMAN PARTNERSHIP LOT SPLIT PLAT PLAT BOOK 25 PAGE 42 II JJ 15' T R A I L & U T I L I T Y E A S E M E N T PLA T B O O K 5 P A G E 7 0 TRUEMAN NEIGHBORHOOD COMMERCIAL PROJECT PLAT BOOK 5 PAGE 70 OWNER JAMMB LLC REC. NO. 580131 SHAW AND THE WPW JOINT VENTURE SUBDIVISION EXEMPTION PLAT BOOK 5 PAGE 91 HARMON GROUP-TOMLINSON PLAT BOOK 23 PAGE 77 OWNER JONATHAN D LEWIS TRUST REC. NO. 396036 FIRST AMENDED WOGAN LOT SPLIT PLAT BOOK 23 PAGE 69 L A K E A V E N U E GILLESPIE STREET MARSHALL LOT SPLIT PLAT BOOK 20 PAGE 54 HUME LOT SPLIT PLAT BOOK 29 PAGE 55 ERDMAN PARTNERSHIP LOT SPLIT PLAT BOOK 25 PAGE 42 AMENDED MOORES LOT SPLIT-II PLAT BOOK 39 PAGE 87 OWNER WOOD DUCK ASPEN LLC REC. NO. 643096 OWNER HALLAM SANCTUARY LLC REC. NO. 623931 OWNER 844 ROARING FORK LLC REC. NO. 631435 MERRIAM SUBDIVISION PLAT BOOK 25 PAGE 39 HINES-DUNCAN LOT SPLIT PLAT BOOK 20 PAGE 89 OWNER ROARING FORK I, LLC REC. NO. 463751 OWNER HINES ISSUE TRUST FBO T HINES REC. NO. 204516 OWNER MUSTANG HOLDINGS II LLC REC. NO. 575507 100-YEAR FLOODPLAIN FEMA MAP NUMBER 08097C0354E DATED: AUGUST 15, 2019 SPECIAL FLOOD ZONE X AREAS OF 0.2% ANNUAL CHANCE FLOOD FEMA MAP NUMBER 08097C0354E DATED: AUGUST 15, 2019 OWNER CITY OF ASPEN OWNER CITY OF ASPEN OWNER CITY OF ASPEN 42.0' WITNESS CORNER SET REBAR & 1-1/4" BLUE CAP WC TNC PLS38215 1.0' WITNESS CORNER SET REBAR & 1-1/4" BLUE CAP WC TNC PLS38215 25.624± ACRES (AS SURVEYED) FOUND PROPERTY CORNER AS DESCRIBED LEGEND ASPEN CENTER FOR ENVIRONMENTAL STUDIES SECTIONS 7 & 12, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH PM CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO IMPROVEMENT & TOPOGRAPHIC SURVEY TRUE NORTH COLORADO LLC. A LAND SURVEYING AND MAPPING COMPANY P.O. BOX 614 - 386 MAIN STREET UNIT 3 NEW CASTLE, COLORADO 81647 (970) 984-0474 www.truenorthcolorado.com PROJECT NO: 2020-168 DATE: July 30, 2020 DRAWN RPK SURVEYED DJB-MAN SHEET 1 OF 2 TRUENORTH A LAND SURVEYING AND MAPPING COMPANY 80' 40'160' SCALE: 1" = 80' N FURNISHED PROPERTY DESCRIPTION: THIS DESCRIPTION IS SHOWN ON THE FIRST ADDENDUM TO ASPEN CENTER FOR ENVIRONMENTAL STUDIES SPECIALLY PLANNED AREA FINAL DEVELOPMENT PLAN RECORDED IN PLAT BOOK 91 AT PAGES 31-33. A TRACT OF LAND SITUATED IN THE EAST HALF OF SECTION 12, TOWNSHIP 10 SOUTH, RANGE 85 WEST AND IN THE WEST HALF OF SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE SIXTH PRINCIPAL MERIDAN, PITKIN COUNTY, COLORADO, MORE PARTICULARLY DESCRIBED AS FOLLOWS; BEGINNING AT A POINT ON THE SOUTHERLY BOUNDARY OF LANDS BELONGING TO THE ASPEN CENTER FOR ENVIRONMENTAL STUDIES (A.C.E.S.) WHENCE THE QUARTER CORNER BETWEEN SAID SECTIONS 7 AND 12 BEARS NORTH 22°41'18” EAST 632.67 FEET; THENCE ALONG SAID A.C.E.S. BOUNDARY THE FOLLOWING COURSES AND DISTANCES; SOUTH 34°55'17” EAST 38.09 FEET, SOUTH 82°05'40” EAST 178.19 FEET, SOUTH 74°18'00” EAST 25.73 FEET, AND SOUTH 62°39'00” EAST 165.75 FEET TO THE INTERSECTION WITH THE NORTHERLY BOUNDARY OF THE GIVEN INSTITUTE; THENCE SOUTH 70°18'15” EAST 26.99 FEET ALONG SAID BOUNDARY OF THE GIVEN INSTITUTE TO THE SOUTHWEST CORNER OF THAT PORTION OF PUPPY SMITH STREET (FORMERLY SMUGGLER STREET LAKEVIEW ADDITION) VACTED BY ORDINANCE 13, SERIES OF 1997; THENCE NORTH 02°00'00” WEST 18.555 FEET ALONG THE WESTERLY LINE OF SAID VACATED PUPPY SMITH STREET; THENCE ALONG SAID CENTERLINE THE FOLLOWING COURSES AND DISTANCES; SOUTH 72°18'08” EAST 44.16 FEET, AND SOUTH 79°11'00” EAST 7.90 FEET; THENCE DEPARTING SAID CENTERLINE SOUTH 15°15'22” WEST 20.06 FEET TO THE NORTHEAST CORNER OF SAID BOUNDARY OF THE GIVEN INSTITUTE; THENCE ALONG SAID BOUNDARY OF THE GIVEN INSTITUTE THE FOLLOWING COURSES AND DISTANCES; SOUTH 06°14'58” WEST 103.34 FEET, SOUTH 18°05'59”WEST 108.86 FEET, SOUTH 09°32'30” WEST 51.93 FEET, AND SOUTH 23°13'11” EAST 83.15 FEET TO THE EASTERLY EXTENSION OF THE SOUTH LINE OF FRANCIS STREET; THENCE SOUTH 75°09'11” EAST 41.12 FEET ALONG SAID EXTENSION TO THE INTERSECTION WITH THE WESTERLY LINE OF THE TRUEMAN NEIGHBORHOOD COMMERCIAL PROJECT; THENCE NORTH 43°04'11” WEST 6.28 FEET ALONG THE SOUTHEASTERLY LINE EXTENDED OF BLOCKS 1 AND 2, LAKEVIEW ADDITION; THENCE ALONG SAID EXTENSION NORTH 81°19'30” EAST 1.66 FEET TO THE SOUTH CORNER OF LAKEVIEW ADDITION; THENCE ALONG SAID SOUTHEASTERLY LINE EXTENDED OF BLOCK 1 AND 2 THE FOLLOWING COURSES AND DISTANCES; NORTH 81°19'30” EAST 84.30 FEET, AND NORTH 40°53'00” EAST 7.15 FEET TO THE INTERSECTION WITH SAID WESTERLY BOUNDARY OF THE TRUEMAN NEIGHBORHOOD COMMERCIAL PROJECT; THENCE ALONG SAID WESTERLY BOUNDARY THE FOLLOWING COURSES AND DISTANCES; NORTH 85°09'15” EAST 20.17 FEET, NORTH 42°46'12” 101.79 FEET, AND NORTH 40°27'13” EAST 117.88 FEET TO THE INTERSECTION WITH THE EASTERLY EXTENSION OF THE NORTHERLY LINE OF LOT 6, BLOCK 1, LAKEVIEW ADDITION; THENCE NORTH 79°11'00” WEST 19.12 FEET ALONG SAID NORTHERLY LINE OF LOT 6 TO THE CORNER COMMON TO LOTS 6 AND 5 OF SAID BLOCK 1; THENCE NORTH 20°21'30” EAST 100.00 FEET ALONG THE WEST LINE OF LOT 5 TO THE NORTHWEST CORNER OF LOT 5 ON THE SOUTH LINE OF PUPPY SMITH STREET; THENCE NORTH 79°11'00” WEST 19.21 FEET TO THE INTERSECTION WITH A LINE THAT IS PARALLEL WITH AND TEN FEET FROM TWO STONE GATE POSTS; THENCE NORTH 10°49'00” EAST 40.00 FEET ALONG SAID LINE ACROSS PUPPY SMITH STREET TO THE NORTH LINE OF PUPPY SMITH STREET; THENCE SOUTH 79°11'00” EAST 11O.20 FEET ALONG SAID NORTH LINE TO THE SOUTHEAST CORNER OF LOT 4, BLOCK 4, LAKEVIEW ADDITION; THENCE NORTH 10°49'00” EAST 100.00 FEET ALONG THE EAST LINE OF LOT 4 TO THE SOUTH LINE OF LOT 7; THENCE SOUTH 79°11'00” EAST 95.61 FEET ALONG THE SOUTH LINE OF LOTS 7 AND 11 TO THE INTERSECTION WITH SAID WESTERLY BOUNDARY OF THE TRUEMAN NEIGHBORHOOD COMMERCIAL PROJECT; THENCE NORTH 07°58'20” WEST 126.75 FEET ALONG SAID WESTERLY LINE TO THE INTERSECTION WITH THE NORTHERLY LINE OF BLOCKS 3 AND 4, LAKEVIEW ADDITION; THENCE NORTH 79°11'00” WEST 389.23 FEET TO THE ORIGINAL EASTERLY BOUNDARY OF THE PROPERTY OF THE ASPEN CENTER FOR ENVIRONMENTAL STUDIES (A.C.E.S.) THENCE NORTH 02°00'00” EAST 101.37 FEET ALONG SAID A.C.E.S. BOUNDARY TO A POINT IN THE CENTERLINE OF THE ROARING FORK RIVER; THENCE ALONG SAID A.C.E.S. BOUNDARY AND ALONG THE CENTERLINE OF THE ROARING FORK RIVER THE FOLLOWING COURSES AND DISTANCES; NORTH 64°27'00” WEST 115.50 FEET, NORTH 05°27'00” WEST 63.32 FEET, NORTH 40°30'00” EAST 144.50 FEET, NORTH 20°25'00” EAST 164.75 FEET, NORTH 14°11'00” WEST 24.64 FEET, NORTH 38°13'00” WEST 123.19 FEET, NORTH 34°06'00” WEST 105.54 FEET, NORTH 27°30'00” WEST 136.58 FEET, NORTH 13°26'00” WEST 106.82 FEET, NORTH 20°00'00” WEST 56.00 FEET, NORTH 26°20'00” WEST 317.00 FEET, NORTH 06°22'00” WEST 125.65 FEET AND NORTH 65°53'20” WEST 15.51 FEET TO AP 55 OF THE NORTH ANNEXATION TO THE CITY OF ASPEN; THENCE NORTH 05°10'00” EAST 168.87 FEET ALONG LINE 55-54 OF SAID NORTH ANNEXATION TO THE SOUTHEAST CORNER OF LOT 1 OF THE MERRIAM SUBDIVISION; THENCE ALONG THE SOUTH LINE OF SAID LOT 1 THE FOLLOWING COURSES AND DISTANCES; NORTH 86°16'00” WEST 65.00 FEET AND SOUTH 43°07'41” WEST 145.00 FEET TO THE ORIGINAL A.C.E.S. BOUNDARY; THENCE ALONG SAID BOUNDARY THE FOLLOWING COURSES AND DISTANCES; SOUTH 43°07'41” WEST 133.08 FEET, SOUTH 28°08'00” EAST 53.41 FEET, SOUTH 62°48'00” WEST 45.50 FEET, SOUTH 80°28'00” WEST 159.76 FEET, SOUTH 50°04'00” WEST 86.70 FEET, SOUTH 03°45'00” EAST 101.63 FEET, SOUTH 07°45'00” EAST 121.86 FEET, SOUTH 89°11'00” WEST 37.85 FEET, SOUTH 29°07'00” EAST 115.56 FEET, SOUTH 37°06'00” EAST 81.60 FEET, SOUTH 07°00'00” EAST 40.30 FEET, SOUTH 19°08'00” WEST 63.50 FEET, SOUTH 30°50'00” WEST 116.43 FEET, SOUTH 05°09'00” WEST 124.93 FEET, SOUTH 77°55'00” WEST 33.89 FEET, SOUTH 17°25'00” EAST 88.84 FEET, SOUTH 49°55'00” EAST 127.22 FEET, SOUTH 44°34'00” WEST 21.54 FEET, SOUTH 54°47'12” EAST 87.66 FEET, NORTH 79°05'00” EAST 46.45 FEET, SOUTH 49°41'00” EAST 49.80 FEET, SOUTH 34°25'00” EAST 78.60 FEET, NORTH 55°35'00” EAST 49.93 FEET, SOUTH 40°36'53” EAST 5.17 FEET, SOUTH 09°26'25” EAST 210.13 FEET AND SOUTH 34°55'17” EAST 92.50 FEET TO THE POINT OF BEGINNING; CONTAINING 25.5 ACRES. ALSO TRACT OF LAND SITUATED IN THE SE1/4 OF THE NE1/4 OF SECTION 12, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6TH P.M., CITY OF ASPEN, STATE OF COLORADO, MORE FULLY DESCRIBED AS FOLLOWS: BEGINNING AT A POINT WHENCE A U.S. BRASS CAP DATED 1954 AND MARKED AS THE EAST QUARTER CORNER OF SAID SECTION 12, BEARS S48°2'12"E 979.30 FEET; THENCE N89°22'17"E 98.76 FEET; S03°45'00"E 38.04 FEET; S07°45'00"E 69.62 FEET; N89°52'00"W 94.26 FEET; S89°15'15"W 16.37 FEET; THENCE NORTH 105.85 TO THE POINT OF BEGINNING. 0 CURVE RADIUS ARC LENGTH CHORD LENGTH CHORD BEARING DELTA ANGLE C1 358.05'89.07'88.84'S 16°50'56" E 14°15'11" LINE BEARING DISTANCE 1 S 34°11'36" E 38.09' BOUNDARY LINE - MEASURED BOUNDARY LINE CURVE DATA NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. 2 S 81°24'30" E 178.19' 3 S 73°36'50" E 25.73' 4 S 61°53'37" E 165.72' 5 S 70°20'09" E 26.99' 6 N 01°27'09" W 18.50' 7 S 71°34'11" E 44.17' 8 S 76°43'16" E 7.87' 9 S 16°00'13" W 19.88' 10 S 07°11'34" W 103.17' 11 S 18°59'41" W 109.01' 12 S 08°37'00" E 51.87' 13 S 23°12'59"E 83.84' 14 S 74°28'00" E 41.12' 15 N 42°23'00" W 6.28' 16 N 82°00'40" E 1.66' 17 N 82°06'51" E 82.82' 18 N 47°21'50" E 8.42' 19 N 85°50'25" E 20.17' 20 N 43°27'22" E 101.79' 21 N 41°08'23" E 116.91' 22 N 78°29'50" W 133.05' 23 N 21°02'40" E 100.00' 24 N 78°29'50" W 19.21' 25 N 11°30'10" E 40.00' 26 S 78°29'50" E 110.20' 27 N 11°30'10" E 100.00' 28 S 78°29'50" E 95.61' 29 N 06°44'42" W 125.85' 30 N 78°20'39" W 389.84' 31 N 02°52'07" E 101.37' 32 N 64°33'12" W 113.88' 33 N 04°39'41" W 63.32' 34 N 41°17'19" E 144.50' 35 N 21°12'19" E 164.75' 36 N 13°23'41" W 24.64' 37 N 37°25'41" W 123.19' 38 N 33°18'41" W 105.54' 39 N 26°42'41" W 136.58' 40 N 12°38'41" W 106.82' 41 N 19°12'41" W 56.00' 42 N 25°32'41" W 317.00' 43 N 05°34'41" W 133.62' 44 N 65°06'03" W 6.86' 45 N 05°57'19" E 170.80' 46 N 85°28'41" W 65.00' 47 S 43°55'06" W 286.96' 48 S 28°57'58" E 53.40' 49 S 65°10'21" W 45.50' 50 S 80°06'46" W 143.25' 52 S 02°53'03" E 63.68' 53 N 89°37'08" W 98.87' 54 S 01°00'16" W 106.00' 55 N 89°56'25" E 16.37' 56 S 89°32'43" E 75.22' 57 S 07°39'04" E 47.96' 58 S 88°32'09" W 37.33' 59 S 28°45'12" E 115.35' 60 S 36°44'12" E 81.89' 61 S 06°18'50" E 43.42' 62 S 19°49'10" W 63.50' 63 S 31°51'17" W 116.43' 64 S 06°10'17" W 124.31' 65 S 77°53'00" W 34.86' 66 S 49°25'35" E 129.01' 67 S 45°28'00" W 21.21' 68 S 55°11'43" E 88.46' 69 N 80°46'30" E 44.74' 70 S 49°06'10" E 50.25' 71 S 30°16'55" E 77.77' 72 N 56°22'44" E 49.92' 73 S 38°28'44" E 5.09' 74 S 08°47'19" E 210.06' 75 S 34°11'36" E 92.68' LINE BEARING DISTANCE 1 S 34°55'17" E 38.09' BOUNDARY LINE - RECORD 2 S 82°05'40" E 178.19' 3 S 74°18'00" E 25.73' 4 S 62°39'00" E 165.75' 5 S 70°18'15" E 26.99' 6 N 02°00'00" W 18.555' 7 S 72°18'08" E 44.16' 8 S 79°11'00" E 7.90' 9 S 15°15'22" W 20.06' 10 S 06°14'58" W 103.34' 11 S 18°05'59" W 108.86' 12 S 09°32'30" E 51.93' 13 S 23°13'11" E 83.15' 14 S 75°09'11" E 41.12' 15 N43°04'11" W 6.28' 16 N 81°19'30" E 1.66' 17 N 81°19'30" E 84.30' 18 N 40°53'00" E 7.15' 19 N 85°09'15" E 20.17' 20 N 42°46'12" E 101.79' 21 N 40°27'13" E 117.88' 22 N 79°11'00" W 133.18' 23 N 20°21'30" E 100.00' 24 N 79°11'00" W 19.21' 25 N 10°49'00" E 40.00' 26 S 79°11'00" E 110.20' 27 N 10°49'00" E 100.00' 28 S 79°11'00" E 95.61' 29 N 07°58'20" W 126.75' 30 N 79°11'00" W 389.23' 31 N 02°00'00" E 101.37' 32 N 64°27'00" W 115.50' 33 N 05°27'00" W 63.32' 34 N 40°30'00" E 144.50' 35 N 20°25'00" E 164.75' 36 N 14°11'00" W 24.64' 37 N 38°13'00" W 123.19' 38 N 34°06'00" W 105.54' 39 N 27°30'00" W 136.58' 40 N 13°26'00" W 106.82' 41 N 20°00'00" W 56.00' 42 N 26°20'00" W 317.00' 43 N 06°22'00" W 125.65' 44 N 65°53'20" W 15.51' 45 N 05°10'00" E 168.87' 46 N 86°16'00" W 65.00' 47 S 43°07'41" W 278.08' 48 S 28°08'00" E 53.41' 49 S 62°48'00" W 45.50' 50 S 80°28'00" W 159.76' 52 S 03°45'00" E 63.59' 53 S 89°22'17" W 98.76' 54 SOUTH 105.85' 55 N 89°15'15" E 16.37' 56 S 89°52'00" E 94.26' 57 S 07°45'00" E 52.24' 58 S 89°11'00" W 37.85' 59 S 29°07'00" E 115.46' 60 S 37°06'00" E 81.60' 61 S 07°00'00" E 40.30' 62 S 19°08'00" W 63.50' 63 S 30°50'00" W 116.43' 64 S 05°09'00" W 124.93' 65 S 77°55'00" W 33.89' 66 S 49°55'00" E 127.22' 67 S 44°34'00" W 21.54' 68 S 54°47'12" E 87.66' 69 N 79°05'00" E 46.45' 70 S 49°41'00" E 49.80' 71 S 34°25'00" E 78.60' 72 N 55°35'00" E 49.93' 73 S 40°36'53" E 5.17' 74 S 09°26'25" E 210.13' 75 S 34°55'17" E 92.50' 51 S 50°04'00" W 86.70'51 S 51°01'47" W 86.35' PROPERTY CORNER MONUMENTATION CHART NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 FOUND MONUMENT DESCRIPTION LETTER NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9018 NO. 5 REBAR NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS-ILLEGIBLE NO. 5 REBAR & 1-1/2" ALUMINUM CAP LS2376 35.0' W.C. FOUND T-POST WITH TAG LS2376 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9184 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS-ILLEGIBLE NO. 5 REBAR NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9018 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9018 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS20151 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9184 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP LS25947 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS-ILLEGIBLE 3.5' W.C. NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9184 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9184 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9184 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9184 NO. 5 REBAR & 1-1/2" ALUMINUM CAP LS-ILLEGIBLE NO. 5 REBAR & 1-1/2" ALUMINUM CAP LS2376 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP LS25947 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS20151 NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS20151 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/4" RED PLASTIC CAP SGM LS20133 NO. 5 REBAR & 1-1/2" ALUMINUM CAP LS2376 NO. 5 REBAR & 1-1/2" ALUMINUM CAP LS-ILLEGIBLE NO. 5 REBAR & 1-1/4" YELLOW PLASTIC CAP LS9184 SET NO. 5 REBAR & 1-1/4" ORANGE PLASTIC CAP PROP CORNER TNC PLS38215 (UNLESS OTHERWISE NOTED) E E E E E E E W E DYH W E E DIRECTOR HOUSING FFE:7842.4 FFE:7842.7 FFE:7843.4 FF E : 7 8 4 3 . 2 FFE:7844.0 BIRDS OF PREY BUILDING EDUCATION CENTER & PUBLIC AREA PULL BARN YURT PROFESSOR HOUSE STR A W B A L E HO U S E TR E E HO U S E SH E D PUPPY S M I T H STREET WATER FEATURE R O A R I N G F O R K R I V E R 78 3 5 78 3 2 7835 784 0 784 5 7841 7850 78 5 0 78 4 5 78 5 0784 5 78 5 0 78 5 0 7850 785 5 7 8 5 8 7 8 5 7 FFE: 7 8 5 5 . 4 785 3 . 0 785 3 . 5 785 5 . 0 FFE: 7 8 5 5 . 5 785 5 . 1 785 6 . 8 785 6 . 9 7857 . 0 FFE BASEMENT 7849.9 FFE BASEMENT 7852.6 UPPER LEVEL 7862.16 7856.3 7856.2 7856.17858.3 7859.1 7859.0 785 6 . 9 785 6 . 4 785 7 . 0 785 9 . 0 FFE 7839.8 7840.3 WO O D DE C K 7840.6 7840.8 7841.0 7840.9 7841.1 7840.4 7840.67840.6 7841.5 7841.5 T T T T T T D D D D 1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 18 19 20 21 22 23 2425 26 27 28 29 30 31 32 33 34 35 36 37 383940 41 42 43 44 45 46 47 48 4950 5152 53 54 55 56 57 58 59 60 61 62 63 64 65 6667 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 9091 92 939495 9697 9899 100101 102 103 104 105 106 107 108 109 110 111 112 78 5 8 7 8 6 0 7863 78 5 8 78 5 7 EASEMENT FOR PRETREATMENT SEDIMENTION BASIN (50' X 50') 15 ' W I D E S T O R M SE W E R E A S E M E N T 15 ' W I D E S T O R M SE W E R E A S E M E N T CONCRETE BURIED TREATMENT TANKS STREAM MARGIN REVIEW BOUNDAR Y TOP OF BANK AS LOCATED 113114115 116 117 118 119 120 121 O S W EG G E FLOOD ZONE BOUNDARY AE (100-YEAR FLOOD ZONE) GRAVEL PARKING PAV E D P A T H 9. 5 ' 47. 3 ' 7.6' 48.4' DE C K DE C K D SIGN STORM SEWER VAULT ELECTRIC VAULT WATER MANHOLE E TANK LIDT W WATER LINE TELEPHONE LINE FIBER OPTIC LINE GAS LINE ELECTRIC LINE TELEPHONE PEDESTAL DYH FIRE HYDRANT ELECTRICAL TRANSFORMER GAS METER ELECTRICAL METER G LEGEND E SURVEYOR'S CERTIFICATION SURVEY NOTES: 5.THIS PROPERTY IS SUBJECT TO RESERVATIONS, RESTRICTIONS, COVENANTS AND EASEMENTS OF RECORD OR IN PLACE. 6.THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE COMMITMENT, THEREFORE, ANY EXCEPTIONS TO TITLE THAT MAY AFFECT THE SUBJECT PROPERTY HAVE NOT BEEN REVIEWED BY TRUE NORTH COLORADO, LLC. 7.ELEVATIONS SHOWN HEREON ARE BASED ON NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88) REFERENCED FROM NATIONAL GEODETIC SURVEY (NGS) STATION S 159 HAVING AN ELEVATION OF 7720.88. 8.CONTOUR INTERVAL EQUALS 1 FOOT. 9.UNDERGROUND UTILITIES SHOWN HEREON WERE LOCATED BY ROARING FORK UTILITY LOCATORS LLC. UTILITIES SHOWN HEREON ARE FOR PLANNING PURPOSES ONLY. PLEASE CALL 811 PRIOR TO ANY DIGGING OR EARTHWORK CONSTRUCTION FOR UTILITY VERIFICATION. IMPROVEMENT & TOPOGRAPHIC DETAIL AREA TRUE NORTH COLORADO LLC. A LAND SURVEYING AND MAPPING COMPANY P.O. BOX 614 - 386 MAIN STREET UNIT 3 NEW CASTLE, COLORADO 81647 (970) 984-0474 www.truenorthcolorado.com PROJECT NO: 2020-168 DATE: JULY 30, 2020 DRAWN RPK SURVEYED DJB-MAN SHEET 2 OF 2 TRUENORTH A LAND SURVEYING AND MAPPING COMPANY 25' 12.5'50' SCALE: 1" = 25' N 0 TREE TYPE SIZE DRIP TREE CHART 1 2 22"40' SPRUCE 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 CLEAN-OUT WATER VALVE BOX NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. WOOD FENCE CHAIN-LINK FENCE WIRE FENCE 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 WILLOW 18"40' 6"20' 14"32' 8"16' 14"32' 4"12' 6"12' 16"48' 22"48' 16"100' WILLOW WILLOW WILLOW WILLOW WILLOW WILLOW WILLOW WILLOW WILLOW 24"68'WILLOW 20"48'WILLOW 12"12'WILLOW 26"52'WILLOW 20"32'WILLOW 24"100'WILLOW 6"12'WILLOW 12"28'WILLOW SPRUCE 4"6' 8"16'WILLOW 14"20'WILLOW 20"100'WILLOW 22"40'WILLOW 22"40'WILLOW 30"44'WILLOW 6"12'WILLOW SPRUCE 6"12' SPRUCE 8"16' 10"28'WILLOW 4"16'LOCUST 18"36'WILLOW SPRUCE 10"16' 24"48'WILLOW SPRUCE 8"16' 4"28'MAPLE 3"24'MAPLE SPRUCE 8"12' SPRUCE 6"12' 3"20'LOCUST SPRUCE 4"12' 3"12'LOCUST 4"20'MAPLE 4"20'MAPLE SPRUCE 12"32' 4"16'MAPLE 4"16'MAPLE 4"12'MAPLE 26"40'WILLOW 22"44'WILLOW 20"32'WILLOW 18"32'WILLOW 16"24'WILLOW 26"52'WILLOW 26"52'WILLOW 20"40'WILLOW 18"44'WILLOW 20"44'WILLOW 22"52'WILLOW 22"24'WILLOW 26"52'WILLOW 20"36'WILLOW 4"16'LOCUST 6"16'LOCUST 6"16'LOCUST 4"8'WILLOW 3"12'MAPLE 14"16'WILLOW 26"52'WILLOW 26"44'WILLOW 34"48'WILLOW SPRUCE 6"10' 3"16'LOCUST 24"16'WILLOW 6"28'WILLOW 20"20'WILLOW 30"20'WILLOW 12"16'WILLOW 12"20'WILLOW 18"12'WILLOW 18"16'WILLOW 18"16'WILLOW 14"28'WILLOW 30"60'WILLOW 12"28'WILLOW 6"40'WILLOW 6"40'WILLOW 6"40'WILLOW 12"28'WILLOW 6"12'WILLOW 6"12'WILLOW SPRUCE 4"12' 14"32'WILLOW 14"32'WILLOW 26"52'WILLOW 14"20'WILLOW 10"8'WILLOW 14"12'WILLOW 16"20'WILLOW 14"28'WILLOW SPRUCE 6"12' 44"40'WILLOW 12"52'WILLOW 50"60'WILLOW 10"16'WILLOW 8"12'WILLOW 10"12'WILLOW 8"12'WILLOW 109 WILLOW 110 WILLOW 111 WILLOW 112 WILLOW 10"-DEAD 4' 10"-DEAD 4' 12"16' 14"24' 113 SPRUCE 10"12' 114 WILLOW 36"52' 115 SPRUCE 6"12' 116 SPRUCE 8"12' 117 SPRUCE 6"12' 118 SPRUCE 6"12' 119 8"28' 120 28"96' WILLOW WILLOW 121 42"28'WILLOW 1.It can be demonstrated that any proposed development which is in the Special Flood Hazard Area will not increase the base flood elevation on the parcel proposed for development. This shall be demonstrated by an engineering study prepared by a professional engineer registered to practice in the State which shows that the base flood elevation will not be raised, including, but not limited to, proposing mitigation techniques on or off-site which compensate for any base flood elevation increase caused by the development; and No development is proposed within the Special Flood Hazard Area and henceforth there will be no change to the base flood elevation. A temporary haul road will be utilized to access Hallam Lake but upon completion this access will be restored and revegetated per U.S. Army Corps of Engineers regulations. 2.The adopted regulatory plans of the Open Space and Trails Board and the Roaring Fork River Greenway Plan are implemented in the proposed plan for development, to the greatest extent practicable. Areas of historic public use or access shall be dedicated via a recorded easement for public use. A fisherman's easement granting public fishing access within the high water boundaries of the river course shall be granted via a recorded "Fisherman's Easement;" and The riparian area along the banks of the Roaring Fork in Hallam Lake is historically part of the “wildlife only” areas of Hallam Lake. These areas are maintained as a nature preserve and public access is not permitted. Most of Hallam Lake is open to the public during winter, spring and fall Monday-Friday 9 am - 5 pm, and Monday-Saturday 9 am - 5 pm in the summer. As a nature preserve no fishing is permitted in Hallam Lake. 3.There is no vegetation removed or damaged or slope grade changes (cut or fill) made outside of a specifically defined building envelope.A building envelope shall be designated by this review and said envelope shall be designated by this review and said envelope shall be recorded on a plat pursuant to Subsection 26.435.040(f)(1); and To access Hallam Lake with machinery necessary to repair the earthen dam some vegetation as detailed in the landscaping plan will need to be removed. 4.The proposed development does not pollute or interfere with the natural changes of the river, stream or other tributary, including erosion and/or sedimentation during construction. Increased on-site drainage shall be accommodated within the parcel to prevent entry into the river or onto its banks. Pools or hot tubs cannot be drained outside of the designated building envelope; and The only disturbance within the stream margin review areas is an access path for heavy equipment. The area was previously used as a haul road when sediment was removed from Hallam Lake in the 1980s. The area is grasses and a few forbs and the soils include older unconsolidated fill material over mineral soils. No grading occurs on the access route, but equipment traffic will create ruts and some soil disturbance.As the track hoe leaves the site, ruts will be restored to the original grade, and any disturbed areas will be seeded with a native seed mix. The seeded areas will be covered with erosion control fabric (NA Green SC 125 BN or equivalent) and staked properly. The erosion control logs installed along the access routes are left in place until the route revegetates. 5.Written notice is given to the Colorado Water Conservation Board prior to any alteration or relocation of a water course and a copy of said notice is submitted to the Federal Emergency Management Agency; and No water course will be altered therefore notice is not warranted. 6.A guarantee is provided in the event a water course is altered or relocated, that applies to the developer and his heirs, successors and assigns that ensures that the flood carrying capacity on the parcel is not diminished;and No water course will be altered and flood carrying capacity will not be affected. 7.Copies are provided of all necessary federal and state permits relating to work within the 100-year flood plain; and The proposed work requires a permit from the Army Corps of Engineers which is being reviewed under Nationwide Permit 27. As part of this review a letter from the State Historic Preservation Office is required certifying no cultural resources will be damaged. Additionally, a dewatering permit will be acquired prior to the start of work from the Colorado Department of Public Health and Environmental. Per Colorado Rules and Regulations for Dam Safety and Dam Construction the earthen berm at Hallam Lake is considered a low hazard (rule 4.13.3) non-jurisdictional dam (rule 4.6.2) as such no permit is required for the repair of an existing structure (rule 10.3). 8.There is no development other than approved native vegetation planting taking place below the top of slope or within fifteen (15) feet of the top of slope or the high waterline, whichever is most restrictive. This is an effort to protect the existing riparian vegetation and bank stability. New plantings (including trees,shrubs, flowers and grasses) outside of the designated building envelope on the river side shall be native riparian vegetation as approved by the City. A landscape plan will be submitted with all development applications. The top of slope and 100-year flood plain elevation of the Roaring Fork River shall be determined by the Stream Margin Map located in the Community Development Department and filed at the City Engineering Department; and No development is occurring within 15 feet of the top of slope or high waterline. (9) 9.All development outside the fifteen (15) foot setback from the top of slope does not exceed a height delineated by a line drawn at a forty-five (45) degree angle from ground level at the top of slope. Height shall be measured and determined by the Community Development Director using the definition for height set forth at Section 26.04.100 and method of calculating height set forth at Section 26.575.020 as shown in Figure "A"; and No new development is proposed in this application. 10.All exterior lighting is low and downcast with no light(s) directed toward the river or located down the slope and shall be in compliance with Section 26.575.150. A lighting plan will be submitted with all development applications;and No new lighting is proposed in this application. 11.There has been accurate identification of wetlands and riparian zones. Wetland and riparian areas are identified in the application materials. W R O A R I N G F O R K R I V E R HALLAM LAKE WATER SURFACE ELEVATION: 7831± 18"PVC INV:7829.0 FOO T P A T H BRI D G E WATER SURFACE ELEVATION: 7828.5± OVERFLOW AREA FOOT PATH BRIDGE WATER SURFACE ELEVATION: 7833± WIER 7841.2 LOG FOOT BRIDGE WATER SURFACE ELEVATION: 7841.5±WATER SURFACE ELEVATION: 7840± 18"PVC INV:7829.1 12" PVC INV:7839.1 12" PVC INV:7835.5 6" PVC INV:7834.6 WATER VAULT RIM:7841.0 6"PVC INV:7835.3 WATER SURFACE ELEVATION: 7834.5± WIER 7834.3 WATER SURFACE ELEVATION: 7825± 7 8 3 0 78 3 1 7 8 2 6 7 8 2 6 7830 7831 78 2 7 78 2 7 78 2 7 78 3 1 7 8 3 0 7 8 3 1 7 8 3 0 7 8 2 8 7 8 3 1 7 8 3 0 7 8 2 9 SHED 15" ADS INV:7828.5 SITE BOUNDARY/ PROPERTY LINE EXISTING SITE ACCESS ROAD TO PUPPY SMITH STREET LA K E A V E 100 PUPPY SMITH STREET WETLANDS CONTINUE BEYOND SURVEYED AREA LEGEND EXISTING MAJOR CONTOUR (5 FT) EXISTING MINOR CONTOUR (1 FT) OPEN WATER SITE BOUNDARY/ PROPERTY LINE EXISTING ACCESS ROUTE EXISTING WETLANDS EXISTING FEN UPLAND EXISTING PIPE 0 25 50 100 SCALE: 1" = 50' FEET 2855 TELEGRAPH AVENUE, SUITE 400 BERKELEY, CA 94705 P: (510) 848-8098 DESIGN: DRAWN: CHECKED: APPROVED: SHEET OF PROJECT NUMBER: SCALE: AS NOTED DATE: PREPARED FOR: X 03/17/2021 RBM/MC RBM JEA ---- 1 5 EXISTING CONDITIONS PLAN HALLAM LAKE IMPROVEMENTS PROJECT: CONCEPT PLANS FOR PERMITTING ASPEN, CO SITE BOUNDARY/ PROPERTY LINE EXISTING SITE ACCESS ROAD TO PUPPY SMITH STREET LA K E A V E 100 PUPPY SMITH STREET WETLANDS CONTINUE BEYOND SURVEYED AREA W R O A R I N G F O R K R I V E R HALLAM LAKE WATER SURFACE ELEVATION: 7831± 18"PVC INV:7829.0 FOO T P A T H BRI D G E WATER SURFACE ELEVATION: 7828.5± OVERFLOW AREA FOOT PATH BRIDGE WATER SURFACE ELEVATION: 7833± WIER 7841.2 LOG FOOT BRIDGE WATER SURFACE ELEVATION: 7841.5±WATER SURFACE ELEVATION: 7840± 18"PVC INV:7829.1 12" PVC INV:7839.1 12" PVC INV:7835.5 6" PVC INV:7834.6 WATER VAULT RIM:7841.0 6"PVC INV:7835.3 WATER SURFACE ELEVATION: 7834.5± WIER 7834.3 WATER SURFACE ELEVATION: 7825± 7 8 3 0 78 3 1 7 8 2 6 7 8 2 6 7830 7831 78 2 7 78 2 7 78 2 7 78 3 1 7 8 3 0 7 8 3 1 7 8 3 0 7 8 2 8 7 8 3 1 7 8 3 0 7 8 2 9 SHED 15" ADS INV:7828.5 IMPROVE EXISTING ACCESS ROUTE 14FT WIDE; GRADE TO MAINTAIN SEDIMENT WITHIN 5 FEET OF EDGE OF ROAD CREATE NEW ACCESS ROUTE TO LAKE SEDIMENT BAG DEWATERING PUMP INSTALL VEHICLE TRACKING CONTROL INSTALL EROSION CONTROL LOGS ON DOWNSLOPE SIDE OF ACCESS ROUTES CERTIFIED WEED-FREE STRAW OR HAY BALES INSTALLED ON SURFACE TO MINIMIZE WETLAND DISTURBANCE (STAKED; NO TOE-IN) EQUIPMENT STAGING (NO MATERIALS STAGING IN WETLANDS) MATERIALS STAGING AREA ALONG EDGES OF LAKE, LOCATIONS TBD (TYP.) CREATE ACCESS ROUTE TO UPPER LAKES AREA NOTES: 1.EXPECTED CONSTRUCTION DATES SEPTEMBER 15, 2021 THROUGH NOVEMBER 1, 2021. 2.HALLAM LAKE TO BE DEWATERED PRIOR TO START OF CONSTRUCTION. DEWATERING OPERATIONS SHALL START NO EARLIER THAN SEPTEMBER 7, 2021. 3.MATERIALS STAGING IN UPLAND AREA INDICATED OR IN AREAS ALONG THE EDGE OF THE LAKE. NO MATERIALS STAGING IN EXISTING WETLAND AREAS. 4.CONTRACTOR TO BUILD TEMPORARY ACCESS ROUTES ACROSS LAKE (NOT SHOWN). 5.WETLAND DELINEATION SHOWN COVERS PROPOSED WORK AREAS, BUT IS NOT COMPREHENSIVE FOR THE SITE. 6.EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS) SHALL BE INSTALLED AT BEGINNING OF CONSTRUCTION, BEFORE EARTHWORK AND EQUIPMENT STAGING BEGINS. REFER TO STANDARD PLAN M-208-1 FOR ESCP DETAIL DRAWINGS. 7.SENSITIVE AREAS AND AREAS WHERE EXISTING VEGETATION IS BEING PRESERVED SHALL BE FLAGGED BY THE VEGETATION SPECIALIST OR STREAM RESTORATION SPECIALIST BEFORE CONSTRUCTION BEGINS. 8.ALL AREAS DISTURBED DURING GRADING, STAGING AND ACCESS ACTIVITIES SHALL BE REVEGETATED. 9.ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED THROUGHOUT UNTIL CONSTRUCTION AND UNTIL CONTRACTOR IS APPROVED FOR RELEASE AND DEMOBILIZATION BY ACES OR AS REQUIRED BY APPLICABLE PERMITS. PROTECT SPRUCE TREES IN PLACE TEMPORARY DISPOSAL/STORAGE OF DREDGED LAKE MATERIAL (MAXIMUM 1200 CY EACH AREA) TO BE REMOVED WITHIN APPROXIMATELY 2 MONTHS WHEN FROZEN (TYP.) LEGEND EXISTING MAJOR CONTOUR (5 FT) EXISTING MINOR CONTOUR (1 FT) OPEN WATER SITE BOUNDARY/ PROPERTY LINE EXISTING ACCESS ROUTE EXISTING WETLANDS EXISTING FEN UPLAND EXISTING PIPE IMPROVED ACCESS ROUTE NEW ACCESS ROUTE EROSION CONTROL LOG CERTIFIED WEED-FREE STRAW/HAY BALES VEHICLE TRACKING CONTROL STAGING AREA ESTIMATED DRAINAGE DIRECTION LIMIT OF DISTURBED AREA (5.5 ACRES) TEMPORARY DISPOSAL AREA (MAX 1200 CY EACH) 0 25 50 100 SCALE: 1" = 50' FEET 2855 TELEGRAPH AVENUE, SUITE 400 BERKELEY, CA 94705 P: (510) 848-8098 DESIGN: DRAWN: CHECKED: APPROVED: SHEET OF PROJECT NUMBER: SCALE: AS NOTED DATE: PREPARED FOR: X 03/17/2021 RBM/MC RBM JEA ---- 2 5 EROSION AND SEDIMENT CONTROL PLAN HALLAM LAKE IMPROVEMENTS PROJECT: CONCEPT PLANS FOR PERMITTING ASPEN, CO NOTE: REFER TO SHEET 5 FOR DETAILED IMPACT ASSESMENT W R O A R I N G F O R K R I V E R HALLAM LAKE WATER SURFACE ELEVATION: 7831± 18"PVC INV:7829.0 FOO T P A T H BRI D G E WATER SURFACE ELEVATION: 7828.5± OVERFLOW AREA FOOT PATH BRIDGE WATER SURFACE ELEVATION: 7833± WIER 7841.2 LOG FOOT BRIDGE WATER SURFACE ELEVATION: 7841.5±WATER SURFACE ELEVATION: 7840± 18"PVC INV:7829.1 12" PVC INV:7839.1 12" PVC INV:7835.5 6" PVC INV:7834.6 WATER VAULT RIM:7841.0 6"PVC INV:7835.3 WATER SURFACE ELEVATION: 7834.5± WIER 7834.3 WATER SURFACE ELEVATION: 7825± 7 8 3 0 78 3 1 7 8 2 6 7 8 2 6 7830 7831 78 2 7 78 2 7 78 2 7 78 3 1 7 8 3 0 7 8 3 1 7 8 3 0 7 8 2 8 7 8 3 1 7 8 3 0 7 8 2 9 SHED 15" ADS INV:7828.5 SITE BOUNDARY/ PROPERTY LINE EXISTING SITE ACCESS ROAD TO PUPPY SMITH STREET LA K E A V E 100 PUPPY SMITH STREET WETLANDS CONTINUE BEYOND SURVEYED AREA REMOVE EXISTING PIPE AND HEADGATE AND INSTALL NEW OUTLET WORKS (REFER TO SHEET 4) INSTALL BEAVER DECEIVER DEVICE AT OUTLET PLACE SALVAGED COARSE MATERIAL ON LAKE SIDE OF BERM SLOPE FOR MAINTENANCE AND REVEGETATE CONSTRUCT WETLAND AREAS ALONG TOE OF BERM WITH DREDGED LAKE SEDIMENTS AND REVEGETATE WITH NATIVE WETLAND SPECIES EXCAVATION AREA: REMOVE SUFFICIENT MATERIAL TO ACHIEVE STRUCTURAL DIVERSITY IN HALLAM LAKE TO BENEFIT AQUATIC HABITAT AND GENERATE FILL MATERIAL (VOLUME TBD). ANY EXCESS CUT TO BE STAGED ON SITE IN UPLANDS AND OFFHAULED WHILE FROZEN WITHIN APPROXIMATELY 2 MONTHS. APPROXIMATE MAXIMUM EXTENTS OF EXCAVATION AREA SHOWN. SALVAGE LAKE SEDIMENTS AS FOLLOWS: 1) APPROXIMATELY 1.5FT THICK LAYER OF FINE LAKE SEDIMENTS; SALVAGE FOR WETLAND CONSTRUCTION. 2) SALVAGE 1 TO 3FT LAYER OF NATIVE COBBLE AND GRAVEL LAYER FOR BERM IMPROVEMENTS AND WETLAND SUBGRADE CONSTRUCTION. 0 + 0 0 1 + 0 0 2 + 0 0 3 + 0 0 4+0 0 5+00 6+00 7+ 0 0 8 + 0 0 9 + 0 0 9 + 0 7 4+ 8 3 APPROX. TOP OF BERM ALIGNMENT 2+6 0 78 2 8 78 2 6 7 8 2 8 REFER TO SHEET 4 FOR ADDITIONAL PROPOSED WORK ON BERM NEAR OUTLET WORKS LEGEND EXISTING MAJOR CONTOUR (5 FT) EXISTING MINOR CONTOUR (1 FT) OPEN WATER SITE BOUNDARY/ PROPERTY LINE EXISTING ACCESS ROUTE EXISTING WETLANDS EXISTING FEN UPLAND EXISTING PIPE PROPOSED WETLAND ESTABLISHMENT PROPOSED EXCAVATION AREA PROPOSED SPAWNING CHANNEL CONSTRUCTION LIMIT OF DISTURBED AREA (5.7 ACRE) PROPOSED COARSE FILL / BERM IMPROVEMENT El e v a t i o n ( F e e t ) El e v a t i o n ( F e e t ) Offset (Feet) 2+60 7800 7810 7820 7830 7840 7850 7860 7800 7810 7820 7830 7840 7850 7860 010203040500 -10 -20 -30 -40 -50 BUILD WETLAND 6:1 50:1 EAST WEST/HALLAM LAKE EC GRADE TYPICAL SECTION: WETLAND CONSTRUCTION ALONG BERM 0 25 50 100 SCALE: 1" = 50' FEET 2855 TELEGRAPH AVENUE, SUITE 400 BERKELEY, CA 94705 P: (510) 848-8098 DESIGN: DRAWN: CHECKED: APPROVED: SHEET OF PROJECT NUMBER: SCALE: AS NOTED DATE: PREPARED FOR: X 03/17/2021 RBM/MC RBM JEA ---- 3 5 PROPOSED CONDITIONS PLAN HALLAM LAKE IMPROVEMENTS PROJECT: CONCEPT PLANS FOR PERMITTING ASPEN, CO WATER SURFACE ELEVATION: 7825± 7 8 3 0 78 3 1 7 8 2 6 7 8 2 6 7830 7831 78 2 7 78 2 7 78 2 7 78 3 1 7 8 3 0 7 8 2 8 15" ADS INV:7828.5 EXCAVATE BERM IN GRADING AREA SHOWN TO REMOVE LESS COMPETENT MATERIALS (E.G. SOIL, VEGETATION) REPLACE WITH COBBLE-GRAVEL FILL AND BENTAMAT LAYER TO REPAIR DAMAGED PORTION OF DAM; BERM HEIGHT TO BE RESTORED (REFER TO TYPICAL SECTION AND PROFILE THIS SHEET) INSTALL BEAVER DECEIVER DEVICE AT OUTLET 3 + 0 0 4+ 0 0 5+00 6+00 7+ 0 0 8 + 0 0 4+ 8 3 APPROX. TOP OF BERM ALIGNMENT 78 2 8 78 2 6 7 8 2 8 PROPOSED SLIDE GATE PROPOSED INLINE WATER CONTROL STRUCTURE TO REPLACE EXISTING OUTLET WORKS PROPOSED NEW PIPE; SIZE AND EXTENTS TO BE DETERMINED REMOVE EXISTING OUTLET WORKS PROPOSED BERM GRADING; REFER TO TYPICAL SECTION PROPOSED WETLAND GRADING; REFER TO TYPICAL SECTION LEGEND EXISTING MAJOR CONTOUR (5 FT) EXISTING MINOR CONTOUR (1 FT) OPEN WATER SITE BOUNDARY/ PROPERTY LINE EXISTING ACCESS ROUTE EXISTING WETLANDS EXISTING FEN UPLAND EXISTING PIPE PROPOSED WETLAND ESTABLISHMENT PROPOSED EXCAVATION AREA PROPOSED SPAWNING CHANNEL CONSTRUCTION LIMIT OF DISTURBED AREA (5.7 ACRE) PROPOSED COARSE FILL / BERM IMPROVEMENT El e v a t i o n ( F e e t ) El e v a t i o n ( F e e t ) Offset (Feet) 4+83 7800 7810 7820 7830 7840 7850 7860 7800 7810 7820 7830 7840 7850 7860 010203040500 -10 -20 -30 -40 -50 2:1 BUILD WETLAND 6:1 50:1 TYPICAL SECTION: BERM IMPROVEMENTS AT OUTLET WORKS AREA EC GRADE INCREASE BERM THICKNESS NORTH SOUTH/HALLAM LAKE EL E V A T I O N I N F E E T ( L O C A L D A T U M ) EL E V A T I O N I N F E E T ( L O C A L D A T U M ) STATION BERM TOP PROFILE 7825 7830 7825 7830 5+005+506+006+20 EXISTING GRADE PROPOSED GRADE 7831 FT 0 10 20 40 SCALE: 1" = 20' FEET 2855 TELEGRAPH AVENUE, SUITE 400 BERKELEY, CA 94705 P: (510) 848-8098 DESIGN: DRAWN: CHECKED: APPROVED: SHEET OF PROJECT NUMBER: SCALE: AS NOTED DATE: PREPARED FOR: X 03/17/2021 RBM/MC RBM JEA ---- 4 5 OUTLET WORKS AREA DETAIL HALLAM LAKE IMPROVEMENTS PROJECT: CONCEPT PLANS FOR PERMITTING ASPEN, CO El e v a t i o n ( F e e t ) El e v a t i o n ( F e e t ) Offset (Feet) 4+83 7800 7810 7820 7830 7840 7850 7860 7800 7810 7820 7830 7840 7850 7860 010203040500 -10 -20 -30 -40 -50 2:1 6:1 50:1 BERM REPAIR NEAR OUTLET (EXISTING WETLAND->PROPOSED WETLAND) BERM IMPROVEMENT (EXISTING WETLAND->PROPOSED WETLAND) WETLAND ESTABLISHMENT (EXISTING OPEN WATER-> PROPOSED WETLAND) AND BERM IMPROVEMENT (SUBGRADE) BERM IMPROVEMENT (EXISTING OPEN WATER ->PROPOSED OPEN WATER) 2855 TELEGRAPH AVENUE, SUITE 400 BERKELEY, CA 94705 P: (510) 848-8098 DESIGN: DRAWN: CHECKED: APPROVED: SHEET OF PROJECT NUMBER: SCALE: AS NOTED DATE: PREPARED FOR: X 03/17/2021 RBM/MC RBM JEA ---- 5 5 IMPACT ASSESSMENT FOR PERMITTING HALLAM LAKE IMPROVEMENTS PROJECT: CONCEPT PLANS FOR PERMITTING ASPEN, CO \7 _7‘’e ',-7 7'~f ,'Existing Trees ‘'_',,.'100 PUPPYSMITH ST-ACES TOPOGRAPHY LEGEND KEYNOTES \_Tree Number Type Size Drip \'N L _7 ,f 1 ‘INlllow 22"40' ’5:L _.,,.'f e WIHOW 18"40-————EXISTING 1'CONTOUR 1 EXISTING GRADE ‘INlllow 6"20' wIIIow 14"32' Spruce 8"16' ‘INIIIOW 14"32' WOW 4"'2'—PROPOSED 5'CONTOUR ‘INlllow 6"12' ‘Nlllow 16"48' ‘INlllow 22"48' wIIIow 16"100'WIIOW 24"ea-SITE PLAN LEGEND 5 NEW DECK ad,I ,,_--,'''7 :‘INlllow 20"48' \‘3','5‘-7 EXISTING SKYLIGHTTO BE REMOVED PROPOSED 1'CONTOUR [\ 3 PROPOSED GRADE __——EXISTING 5'CONTOUR EXISTING PATIO NEW PATIO / .4 1 1 lII‘Dmflmmhwm01.1:onEXISTING DECK/IfIS/|lIS:.f‘Nlllow12"12'Vc3"‘3I;I‘INlllow26"52'“a.\’R\7Wow20..32.8NEWSKYLIGHTRH-\c,,R'“"'.,,-’’tlow24.,100,NEWDECIDUOUSTREE“4x-''7\,,,WW6..12.9LINEOFWALLBELOW-‘INlllow12"28'Spruce4"6'tlow8"'6'NEWCONIFEROUSTREE11‘INlllow14"20'‘INIIIOW20"100'12NEWROOF‘INlllow22"40'W'“°W22"40'13NEWOPENTREADSTEELSTAIRSWIIIow30"44-EXISTINGDECIDUOUSTREETOREMAINWlllow6"12'14BUILT-INMILLWORKSpruce6"12'Spruce8"16'15EXISTINGLAPSIDING‘INIIIOW10"28'Locust4..16'EXISTINGCONIFEROUSTREETOREMAIN16NEWLAPSIDING‘INIIIOW18"36'Spruce10"16'17GUTTER‘NIIIOW24"48'16'28'24'12'12'20'12'12'20'20'32'BODYOFWATER_L0')If6511'4Ir10LINEOFROOFABOVEMON_.LINEOFDECKANDSTAIRSABOVEMMMNAwNU1N0')N\INCOM(DmDonA//Lo(43(.0h18DOWNSPOUT(,0U1SpruceEXISTINGDECIDUOUSTREETOBEREMOVEDon0')Mapb19SNOWSTOPSISNOWFENCE(,0\IMapbmonSpruce20EXISTINGELECTRICMETER(,0(DSpruce.nOEXISTINGCONIFEROUSTREETOBEREMOVED21NEWELECTRICMETERLocustA_.SpruceI|I4:.MLocust22EXISTINGELECTRICVAULT3:.(A)MapbEEQ‘EUEUEOQUEEOE’43hM|ape23NEWELECTRICVAULTLm.1."2Spruce,,,__.Map"4"'6'24EXISTINGELECTRICTRANSFORMER,,,Maple4"16'Ih0')II.p\l4s00Maple4"12'WM26"40-EXISTINGUNPAVEDROAD/WALKINGPATH25NEWELECTR'CTRANSFORMER|4:.(DII()1O,7-7,,7,W'"°"’22"44'26NEWSTONEPAVERS,,.'INIIIOW20"32'U1_.IU1NVVIIIOW18"32'Wow16..24.NEWUNPAVEDROADNVALKINGPATH27EX'ST'NGGUARDToREMA'NVVIIIow26"52'‘INlllow26"52'VWIOW20"40'‘Nlllow18"44'‘INlllow20"44'‘Nlllow22"52'‘INlllow22"24'VVIIIow26"52'‘INlllow20"36'16'4516'EXTERIORDECKLocust6"16'43U1(A)U1hU1U1U10')EXISTINGASPHALT/PAVEMENTU10109VU1(D0')DNEWASPHALT/PAVEMENTm_.0'3I\)U)(A)Locust0'1hLocust0'!U10'10')WIIIow0‘!\I12'W'IIOW14"15'EXISTINGTOREMAIN‘INIIIOW26"52'WIIIow26"44'‘INIIIOW34"48'I.../Spruce6"10'—CW—WATERLINEI\~-..__._.--‘-Locust3"16'II15II“~—-————-"‘—‘-xwmow24"to+TELE P H O N E LINE.II,FLOO D zcIMapb0'1oo0')(D\lOBIRDOFPREY\l_.(—.d-I\I‘JNN(71-tWIIIow6"28'WIIIow20"20'—C—ELECTRICLINEWIIIow30"20'‘INtllow12"16-—+—CABLETVLINE‘INlllow12"20'Wow18..12-—07CHAINLINKFENCE.‘INIIIOW18"16''‘INIIIOW18"15-—II—WOODFENCE‘INIIIOW14"28'‘Nlllow30"60'‘INIIIOW12"28'VWIOW6"40'‘INIIIOW6"40'‘INlllow6"40'‘INIIIOW12"28'‘INIIIOW6"12'‘INIIIOW6"12'Spruce4"12'VVIIIOW14"32'‘INIIIOW14"32'VVIIIOW26"52'‘INIIIOW14"20'‘INlllow10"8'‘INIIIOW14"12'‘INIIIOW16"20'100‘INIIIOW14"28'101Spruce6"12'102VVIIIOW44"40'103‘INIIIOW12"52'104VVIIIow50"60'105‘INIIIOW10"16'106VWIOW8"12'107‘INIIIOW10"12'108‘INIIIOW8"12'109‘Nlllow10"—DEAD4'110‘INIIIOW10"-DEAD4'111VVIIIOW12"16'112‘INIIIOW14"24'113Spruce10"12'\22114‘INIIIOW36"52'‘‘I115Spruce612'\-24I'-"'---__118Spruce812'h--11?Spruce6"12'681744RR_4L0300\l\I\I\J_.o(Don\Im1800000000(11t——_——————LDLDODODOOOD—-O(DOD\|O')EINI'IAiHEIdOHdI_‘i4—_L;RRZ4<I—L‘—44‘!Lo00LQLDLOLDLDLD\ImmhwmLO(Q2019STREAMMARGINREVIEWBOUNDARY\21~——”",__L-118Spruce12'~'V119‘INlllow28'\39-I63.'120wIIIow23"96'\,26121‘INlllow42"28'x122Cottonwood14"26'1\I123Cottonwood10"24'133xfI.—I124BlueSpruce5"7'\/'II.125Cottonwood10"19'yI29'Rr_I126Cottonwood6"12'-...El73..7841’‘127Fir5"11'/3331-128Fir10"17'e.../\30.7.i129Spruce10'““-.I2?IJ130Spruce15'.''---\‘'-7'I132F'(5%_,‘Ir1'?)7.\H.‘133Cottonwood14'\‘134Fir10'I."‘7‘7135Spruce29"28'5049I.x'f,'‘~.'1_I136Aspen7"11'.__——-~""’I35\‘a.137Cottonwood13"17'.,7I138Cottonwood16"18'/7/5h|--.\kEf7,I\1391917Cottonwood.'.'.’l.,/‘//I:.',"//T-.,',/////RS"a.I..,1S..IQZZ'I[R-"R314”36x.7131Spruce6"11'593\i_140Cottonwood9"11':,141Spruce7"13')4]'142Cottonwood10"17'3143Cottonwood10"11'144Cottonwood9"12'145Cottonwood13"20'-..,146Spruce7"13'RR“-147Cottonwood11"15'H“.__148Cottonwood7"13'RR“-'149Cottonwood11"13'R150Spruce7"13'"RH--151Cottonwood13"25'HT“-..__152Spruce3734°48F\(«<\R\\\.A<\\\\:\\S\\r~——-+2E33.\\X#5?-‘<\\X-::t<\\)T21-K\V2ai\"'-..~_153Spruce155Spruce10'SHED156Spruce15?Cottonwood12"17'158Cottonwood14"18'159Cottonwood13"23'160Spruce4"9‘54‘-.______154Spruce5"11'44O5'10‘20'®?—SCALE:1"=100' 022054 ��Q Department of the 'Creasury AJ Internal Revenue Service In reply refer to: 0441958642 OGDEN UT 84201-0038 June 05, 2009 LTR 4168C EO 23-7042291 000000 00 000 00023924 BODC: TE ASPEN CENTER FOR ENVIRONMENTAi STUDIES 100 PUPPY SMITH ST ASPEN CO 81611-1451 Employer Identification Number: 23-7042291 Person to Contact: L Reed Toll Free Telephone Number: 1-877-829-5500 Dear Taxpayer: This is in response to your request of May 27, 2009, regarding your tax-exempt status. Our records indicate that a determination letter was issued in October 1969, that recognized you as exempt from Federal income tax, and discloses that you are currently exempt under section 501(c)(3) of the Internal Revenue Code. Our records also indicate you are not a private foundation within the meaning of section 509(a) of the Code because you are described in section(s) 509(a)(1) and 170(b)(1)(A)(vi). Donors may deduct contributions to you as provided in section 170 of the Code. Bequests, legacies, devises, transfers, or gifts to you or for your use are deductible for Federal estate and gift tax purposes if they meet the applicable provisions of sections 2055, 2106, and 2522 of the Code. If you have any questions, please call us at the telephone number shown in the heading of this letter. Sincerely yours, KM_0_'*tT' Rita A. Leete Accounts Management II