PLANNER: Ben Anderson, 970.429.2765
PROJECT NAME AND ADDRESS: 75 Prospector Rd., Aspen Highlands Condominium Association
PARCEL ID# 2735-142-13-802
REPRESENTATIVE: Loralei Foronda, MD7 – on behalf of AT&T; 858.754.2151; lforonda@md7.com
DESCRIPTION:
The applicant is interested in modifying an existing wireless telecommunication installation on the roof of the
building at 75 Prospector Rd. As described, the proposed project is replacing/upgrading existing equipment: 3
antennas, 3 radio unit heads and adding diplexers and 3 additional radio heads. Assuming the new equipment
meets the wireless design review criteria – this will be an administrative review of an “eligible facility” – subject
to a 60-day shot clock from receipt of a complete application.
Two issues will be evaluated as part of this review:
1) Compliance with design guidelines and other requirements for wireless communications facilities
2) Meeting the criteria for issuance of building permit for the proposed project. A building permit will
be required to be submitted simultaneously to the Land Use Application (attached).
RELEVANT LAND USE CODE SECTIONS:
Section Number Section Title
26.304 Common Development Review Procedures
26.505 Wireless Telecommunication Services Facilities and Equipment (attached to email)
For your convenience –The following links may be helpful: Wireless Facilities Design Guidelines
26.505 Wireless Facilities – Land Use Code
REVIEW BY:
Staff for Complete Application
Community Development Director for Approval
REQUIRED LAND USE REVIEW(S):
Wireless Communications Facilities – Administrative Review
Historic Preservation – Certificate of No Negative Effect
PUBLIC HEARING: No, Administrative
PLANNING FEES: $1300 Deposit for 4 hours of staff time (hours will be billed/refunded at $325/hr)
REFERRAL FEES: No
TOTAL DEPOSIT: $1300.00 (Land Use) Building Permit Fees will be calculated at the time of submittal.
Building Permit fees will be submitted separately during the permit review process.
APPLICATION CHECKLIST – These items should first be submitted in a PDF; sent to:
ben.anderson@cityofaspen.com
⇒ Completed Land Use Application and signed Fee Agreement (attached in email)
⇒ Pre-application Conference Summary (this document)
⇒ Street address and legal description of the parcel on which development is proposed to occur, consisting of
a current (no older than 6 months) certificate from a title insurance company, an ownership and
encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all
owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting
the parcel, and demonstrating the owner’s right to apply for the Development Application.
⇒ Applicant’s name, address and telephone number in a letter signed by the applicant that states the name,
address and telephone number of the representative authorized to act on behalf of the applicant.
⇒ Letter from property owner providing consent to the application.
⇒ HOA Compliance form (Attached to Application – contained in email)
⇒ Provision of project specific submissions as outlined in the Land Use Application – this includes, but is not
limited to visual depictions of the existing and proposed equipment – at elevation and plan view – and
photo simulations of existing and proposed equipment.
⇒ Building and Permit Form (see attachment to email) – so that land use and permit review can happen in
parallel fashion and importantly meet 60-day shot clock requirements for complete review. The contractor
for the work must be submitted with the application. Contractor should contact
buildingadmins@cityofaspen.com to initiate building permit process.
⇒ NIER/EME report or equivalent, stamped by a Colorado Licensed Engineer, that includes the following
information: identifies and describes the specific RF emitting equipment and presents in tabular and
graphic form the RF type, extent, and power that is emitted from the facility specific equipment and in
relation to FCC rules related to maximum permissible exposure (MPE).
⇒ Depending on further review of the case, additional items may be requested of the application.
⇒ Once the application is deemed complete by staff, the applicant/applicant’s representative will receive an e-
mail requesting submission of an electronic copy of the complete application and the deposit. Once the
deposit is received, the case will be assigned to a planner and the land use review will begin.
Disclaimer:
The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on
current zoning, which is subject to change in the future, and upon factual representations that may or may
not be accurate. The summary does not create a legal or vested right.