HomeMy WebLinkAboutExhibit B Referral Comments.110 Neale Ave Exhibit B - Referral Comments HP Project: 110 Neale Avenue Engineering Department Comments: Hailey Guglielmo, hailey.guglielmo@cityofaspen.com Addressed with the HPC Review: 1. Adjacent to the house on Queen St there is 2 hour Park use parking. This head in parking needs to remain. Head in parking is supported instead of parallel parking because cars need the space to turn around. The applicant needs to propose a street section that allows head in parking, curb and gutter, a 5’ landscape buffer, and a 5’ sidewalk. If there is not available width to meet the standards the applicant will need to work with the Engineering Department on the street section. Resolved prior to Building Permit Submittal: 1. Engineering Standards require a detached sidewalk. Due to the existing vegetation the sidewalk on Neale Ave will be permitted to remain attached. On Queen St the sidewalk needs to be detached. 2. The condition of the sidewalk and curb and gutter adjacent to the property will be determined at building permit if it needs to be replaced. 3. All drywells need to be modified in some way to provide pretreatment to meet today’s standard. The two chamber standard drywell is an example of pretreatment. At building permit either the two chamber approach or some other pretreatment retrofit will need to be proposed. 4. The existing utilities show multiple water service lines. Maybe one to the main house and one to the ADU? As shown on the plans. At building permit all lines will need to be abandoned and just one service line will supply the building. 5. An easement will need to be put in place for the new transformer prior to building permit approval. There must be 3’ clear on the sides and back of the transformer. Zoning Department Comments: Jim Pomeroy, jim.pomeroy@cityofaspen.com Bob Narracci, bob.narracci@cityofaspen.com 1. New lightwell abutting the existing non-conforming basement not to exceed 15’ in depth. 2. Any expansion of the subgrade area must clearly be shown to conform with the maximum 15’ depth restriction. With the building permit application, detailed information will be required confirming that the proposed basement expansion area satisfies the maximum depth land use code language. 3. On the survey there is access easement across the property. This does not have square footage from the surveyor – it needs to have that. This area along with steep slopes will get reduced from gross FA. 4. Existing FA does not show the 15% deck exemption taken out of the total. Therefore, the total existing FA number is smaller than what is shown.