NOTICE OF APPROVAL
AN ADMINISTRATIVE APPROVAL FOR THE UPGRADE OF AN EXISTING
WIRELESS TELECOMMUNICATION FACILITY AT THE PROPERTY LEGALLY
DESCRIBED AS: LOTS D, E, F, G, H, AND I, BLOCK 81
CITY AND TOWNSITE OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO,
COMMONLY KNOWN AS 205 S. MILL STREET.
Parcel ID: 2737-073-38-004
APPLICANT: Ashley Christensen, on behalf of Verizon Wireless
5935 S Zang St. STE 280
Littleton, CO 30127
PROPERTY OWNER: Mill Street Plaza Associates, LLC
602 E. Cooper Ave. Suite 202
Aspen, CO 81611
SUBJECT &
SITE OF APPROVAL: Upgrade and additions to an existing wireless communications
facility located at 205. S. Mill St.
LAND USE REQUEST AND REVIEW PROCEDURES:
26.505.080 - Wireless Communications Facilities and Equipment
If a proposed wireless communications equipment upgrade meets specific review criteria, the
application can be reviewed administratively. The Community Development Director is the final
review authority.
SUMMARY:
The applicant requests approval to upgrade an existing wireless telecommunications facility
located on the roof of the building at 205 S. Mill Street. The upgrade consists of:
• Removal of the existing antennas
• Installation of one new antenna to one of the existing rooftop ballast antenna frames
• Installation of two remote radio heads
• Relocation of an existing radio head
• New over voltage protector below the new antenna on the ballast frame
• Existing equipment will be moved to two new equipment cabinets on a new rooftop steel
platform
• A new rooftop ladder will be mounted to the south side of the building in the alley
The new proposed equipment will be confined to the currently leased area. All proposed
equipment complies with the applicable review criteria in the code.
Page 1 of 4
STAFF EVALUATION:
1) Wireless Regulations
Pursuant to Section 26.505.080, Wireless Communications Facilities and Equipment, proposed
equipment must comply with a number of review standards. The proposed upgrades to the
existing telecommunication equipment comply with all applicable review criteria of the Land Use
Code. The proposed upgrades to existing wireless equipment will continue to use areas on the
roof and within the building that have traditionally been used for wireless telecommunication and
mechanical equipment. While additional and different equipment is being installed on the roof,
the total height from point of attachment of the equipment is being reduced from 11 feet to 7
feet. The proposed equipment does not expand in massing from the existing antennas, the
proposed equipment and will be painted a color uniform with the accompanying rooftop
equipment as to reduce visual impacts.
2) Mountain View Planes
This facility is located in the Mid -Ground of Main Street View Plane. Mechanical and similar
equipment is exempt from view plane review if it complies with two requirements:
1) The equipment complies with height exceptions in 26.575.020.
2) The equipment is setback from the property line closest to the view plane origin — at
least 20 feet.
Staff Discussion: This facility meets these criteria with the equipment height being less than 10
feet from point of attachment and location set back more than 20 feet from the Hopkins St.
property line.
3) Commercial Design Review
The Community Development Director may approve a Commercial Design Review if it is
determined that the proposed work has no adverse effect on the physical appearance or
character defining features of a development. An application for administrative review may be
approved if it meets the following requirements:
It is deemed that the activity is an eligible work item and meets the Commercial, Lodging, and
Historic District Design Standards and Guidelines.
And
Any modifications to the proposed work requested by the Community Development Director are
agreed to by the owner/applicant.
The subject property is in Aspen's Commercial Core Historic District and is therefore subject to
review for the changes to the rooftop equipment.
Staff Discussion; This property falls within the Commercial Core Character Area. The
proposed changes to the rooftop wireless facility will not diminish the building's architectural
character or its relationship with the surrounding character area. The overall height of the
equipment will be decreased, and the new equipment will be painted to reduce visual impact.
Page 2 of 4
4) Certificate of No Negative Effect
The subject property is not landmark designated but is located in the Commercial Core Historic
District. The scope of work qualifies for a Certificate of No Negative Effect according to Section
26.415.070.E of the Aspen Municipal Code in that the scope results in 1) Mechanical equipment
or accessory features that have no impact on the character -defining features of the building or
structure, and 2) alterations to a noncontributing building within a historic district that have no
adverse effect on its historic or architectural character. Similarly, Administrative approval for
compliance with Commercial Design Review is appropriate according to Section
26.412.090.A.3.
Based on a review of the applicable Commercial, Lodging and Historic District Design
Standards and Guidelines, staff finds that the proposal as submitted complies with the design
guidelines.
Staff Discussion: Mechanical equipment is an eligible work item to be considered under a
Certificate of No Negative Effect. The review criteria most applicable to the proposed work is the
following: "The proposed work will not diminish, eliminate, or adversely affect the significant
historic and or architectural character of the subject property or Historic District in which it is
located."
While the proposed improvements do not eliminate the visual impacts of this equipment, the
redesign consolidates the equipment into a more organized and compact roof plan — and from
Staff's view reduces the negative visual impacts of the equipment. A condition of approval will
require that the equipment be painted a uniform gray color, similar to existing conditions.
Additionally, safety tie offs and an access ladder, for utilization by maintenance and repair
personnel, are also approved as they are necessary for conformance with code.
Radio Frequency Emissions
This application is subject to the requirements in the Wireless Communications Facilities Design
Guidelines adopted in April 2020. The application included a NIER Report to accompany the
proposed changes to the rooftop facility. This radio frequency emissions analysis report stated
that certain compliance measures would need to be taken for the facility to be compliant with
FCC regulations. These measures include installing an additional barrier around the proposed
antenna to add further protection for any workers who would be accessing the roof against the
radio frequencies to be emitted. Additional noticing signage is also proposed at various
locations on the property.
DECISION:
The Community Development Director finds the Administrative Application for Wireless
Communication Equipment to be consistent with the review criteria (Exhibit B) and
thereby APPROVES the request. This document provides land use approval but the
project is also subject to review of a concurrent building permit, subject to the following
conditions:
1) The new equipment is required to be painted a matte, dark gray color
And,
2) The required access ladder and safety tie offs for maintenance personnel be
approved by the Historic Preservation Officer prior to installation
Page 3 of 4
APPROVED BY:
v
P;0mm
'' �I� o Date:
u�f evelopment Director
<7lu /03
Attachments:
Exhibit A — Select Plans showing the extent of approved changes (recorded)
Exhibit B — Review Criteria (not recorded)
Exhibit C —Application and Complete plans (not recorded)
Exhibit D — Radio Frequency Emissions Analysis Report (not recorded)
Page 4 of 4
F
RACK OUP 9SHAt
SHELTER
ELTERN
NEW ]W
(0)LOFd
SUP S
MAIN-1 TO RRH CONNECT%
NEW SSD FRFR nocRO%f
NEW
AWSIPCS
RACKOVP
HYBRID
MAIN OVP
1zI XYBRIO
gWS'
]DDT
L66
a (E)BSOD BBU PPIR OCOC WIq�
(APPRO% 6LF.)
RRo
SHELTER
CABLES
®
MENNg6
CABLE
PC6
RRH
gq
RRH
RRH
SECTOR
pTY,
LENG
OT'.
WEIGHT OTAL
TEIGH
Ott'
LENGT
W.
Ott,
pTy.
pN,
J C F ® NEW E NJ NEW 19RG _.
(PPPRO%.6 LFJ POU^ OVP P MAIN OW (Bj LOF4
NEW EDF q
APPflOX.ALFJ
®ANTENNA
NEN _
'ALPHA' b) 1W'-G' o) ]2d L. (t) ta'o ('Sj (t)
(E) fl)
z1.
US
Q§
w NEW qWS
1,RE:LOWFOR
RE:A NON OVA LOCATION$.
'd NEW PCS
(d)LDFd
2
MHAFFNAREWRTB4lVION,RRXb
R. USE LOW PIMHARDWARE EQUIPMENT OFTN ANTENNA
3.GC, TO VERIFY ANTENNP6 EQUIPMENT PPRTNUMBEg5VERIZON
( NEW L56 FIBER APPR0X 8LP
NEWB6IB BBU
GN.
XYBRID CABLE SUD
Tu
THROUGH PROVIDED
RF06,
�-� EOUIPMENTOURB �
RRH
�NNA SECTOR
2-HYBRID CABLE DIAGRAM
— —
— — — — — —
—
--
W11 �lEI FIX EO LADDER
IE1 BALCONY BELOW
�)STORY(E)
(2-1Q STORY(E)
®
ABJASF BUILDING
®
(E VER120NWIRELES6 EQUIPMENT
ROOM (BELOW) RE
fJ
G,A-S.
(Rl.MN7.1
REMOVGO)OMNIANTENNA
(EICOURTYARO
.-IMD
DUCTI'Y
RELOCATE RR BALLASTPI
L
'G
FRAME RE: AS.
\
�,
Ili
=O
O
A
MOVE(E EDCENTEREN NA
FRAME TO BCCENTERED ON (E)
RE W"B'T BIG E.ANDREMOVP& p
FRAME, AND gEMOVEB
(E)6TANDING CAM
l�
COLUMN BELOW
COLUMN
\
REPWCE (i)gMEN Nq RE gZJB
METAL ROOF
NEW
VERIZON
WIRELESS ILO
(E)... H(tt')
(
_
TO NEW SA e
ROOF(E ROOF DMN p P,
1
PC RM RE ELEC.
NEW ROOFOP CASLETRAY
�IMDD
(NON-PENETRATING)��
RE 3IM.00
II
O
O
i�
LEAVE(E)VERSQC
A/C UNR6
(E)VEM PIPE (IYo �� o
Er
NEW STL. PLATFORM W/
ON lELEBG
ON (E)CURB
\
6x13 XYBRIDL
VERIZM WIREI£65
e o
Q
(i)NEW
ROIREB INNEW CABLE TRAY
ERA
EQUIPMENT CABINETS
e Q
ON ROOFTOP
RE D. 6TRUCT, e
BE—�Y
I
_._
PPROX 1. LF /A1 R.
a 1
ANTENN(])(E)OMNI
PNTENNAB RE: P2ID
it
(E)SWUGHT P)
m
LJ_
®
hull
REMOVE IEI CONDUITS W/
-
jE 6XIF5.AXCAELEGb(L)
El UJF500AXCABEES
_ _ _ _ _
NEW G'0 FIBER CONDUIT
-(2I NGW ELEC. CONOUCNEW ELEC. CONDUCTOR. A BONOUIR
FIR CIA FIBER ENCLOSURE
NONVERIZONWIREL55
gE)LOWCONY
ROUTED UP ETWCOR WALL FROM HEN J-
BOX TO ROOFTOP (APPROX=
BELOW IN WSUFFY AREA TO
CAGEOLAGGER®,19-0'
-F.)
RE: ELEC.
NEW ROOFTOP CABLE TPAY
ABOVE GRADE RE! 104.00
1 -ENLARGED ROOF PLAN
verizon✓
QX
D Q.A w.. F, EM'
PROJECT INFORMATION
sUl..'
CO3ASPEN
185
multi 11 N
CONSULTANT D
Slav p�m
St E
1. YPE66VE BI(C
Itt REVIEM NRD ZO RENEW SSE
No Piv,J, AU,Y DS
LIrt.11F aCC W I
O�ADD LJCFN
G]�IJ��1 ✓
2;
.MAYD22023.'
gRCH17
ENLARGED ROOF PLAN
& HYBRID CABLE
DIAGRAM
A1.10
�z
NEW VERQON W I REIR.
rw RELOCATE(E) MULST FRAME AND: G PE ANTENNA RE: SIA<.W
REMDYE' S REPLACE (1) (E) VER60N
£ WIRELEBG ANTENNA B ADD NEJJ AND
Z RETAINED EDUIPMR,TRE:AR.30 EOQUIP EMCABINETS REOP210 RELESC
E 5 NEW VEREON WIRELFSB
REMOVE (I)(E) YERQON CAGED LADDER RE VM.W
N U WIFELE.. OMNIAMENNAS
NEWREERCONDVITFROMM
A AM ) r FIBER ENCLOSURE 6ElAWIN
Qa II IIIII 1 II II II /— NEW F.G.... EARRIERm (TYP) UTILIttpp FA
III L II II I' RE: A1.10BEME REPORT
L
(E BRICK VENEERFj ONC VN1i5 —
9UILOING
— TO LONG Il 9N5]'-D�1
n3ad C3O)NNNEGLeCDENDOUPCNl
WALL FROM NEW J-SO%TO ROO
FTOP
D (MPRO%2ID LF) TO ROO6G I\
{ff f I \
2i
(E) FlBER ENCLOSURE O` O'
NOTE,.
1. COLOR OF FUCTJR LCALCUANTENNATIONSGREY
2, RE STRUCK RAL CALCULATIONS
BC OTEGVI STRUONRAL SEWERS,
ILC. DATED: M'.
3, RE ETRUCTI RALAMA
SY. OTEGUI STRUCTURAL SEWCES,
LLC DATED'iZ11122
1-NEW SOUTH WEST ELEVATION 1]15=1'V'
verizon,/
g3FA�M33
,o owgE;a�O�Jgowz�E�o
PROJECT INFORMATION
CO3ASPEN
135
APFF
CONSULTANT Bll0
D FEN= TD
04i06y ED 15NE p1R
o6�my EPEE q.UE pNF
o�`Noo u�Fy
'.hNY 022023i
gRCHITEC�
NEW SOUTH WEST
ELEVATION
A3.20
r NEJJ VER60N WIRELESS
CAG-DIA00ER RE: 11AACD
NEW VERIEON WIRELESS
6PS ANTENNq REElA4.m
REMOVE T (E) VERIZON
RELOCATE (E) BALLAST FRAME AND;
WIR..N.MNI ANTENNAL
REMOVE B REPLACE (1) M VER20N
WIRELESS ANTENNA B ADD NEW ANO
T A(E U. MtlfBMF.NNB$—(l
99-P V
II
11
RETAINED EOUIPMEM (BEYOND) RE; A2}D
{g II NEIN PLATFORM WI VEPI ON
11
II
? 11 WIRELEBB EGUIPMEM
11
II
TO gMENNq I�
CABINETS RE AP.ID
LEAVE (E)VERIZON
WIRELESS NCUNITS
q.w
1(
NEWF.G. EMEBARR (N%
RE: Af,108EME REPOA.RT
_c.GR ANTENNg
ON (E)CURB
Ij
(E)BRIVENEER
BUILDINGN.
rz
lA
_T011UQ!IC
3T-V V
y
T.P. WgLL/BE30ND �
AOIACENT (1)(E) STORY
1
I�
BUILDING
-
TO n
—
NEW 6O FlBER CONDUIT
FROM E) FlBER ENCLOSURE
-S
INU IJDY AREATO NEW
ROOFTOP PLATFORM
a
8
-, LADDER Bali tl
fsv� v
e
�
I
1
1. COLOR OP NEW ANTENNAS;
1. COL
_
3. RE: ONGREY
OTRUCISTRUCTURA4STI0N5
BY:. STRULiIIflgLSERNCES
ENTOD
LLC.DATED: RAI-A
]. RE: TRUCTIRALAMA
BY: OTEGUI STRUCK NLL S'cRVICES
LLc. pATEC:IZU1Ri
1 -NEW SOUTHEAST ELEVATION
va•=nD'
verizoW
PROJECT INFORMATION
IT ME
CO3 ASPEN
Cl, Ll
185
CONSULTANT
m
DB o EW oRR
1A
1 OSN COpE}SSUE ' BI(C
fat REVIEW UPC 3dRENEW SOP
-�7 _ t I
5OKSO-7HCANOSTREET
NEW SOUTH EAST
ELEVATION
A3.30