Sarah,
A few changes/additional comments based on the Engineering Drawings for 134 E Bleeker:
Change the comment about transformers to:
1. Has the applicant coordinated with the electric department to ensure the proposed upgrade
is feasible?
New comment:
2. At building permit submittal, the applicant must submit the following:
a. a soils report containing a percolation test
b. a letter from a structural engineer stating that the location of the drywell will not
compromise the integrity of the structure.
If the drywell is deemed not suitable based on either of these items, the applicant must
redesign the stormwater management plan for
the site, adhering to City Standards.
Thanks,
Carly McGowan, EIT
Project Manager I
Engineering Department
201 N Mill St. Ste 203
Aspen, CO 81611
p: 970.429.2738
www.cityofaspen.com
From: Sarah Yoon <sarah.yoon@cityofaspen.com>
Sent: Friday, February 28, 2020 3:30 PM
To: Carly McGowan <carly.mcgowan@cityofaspen.com>
Cc: Hailey Guglielmo <hailey.guglielmo@cityofaspen.com>
Subject: RE: 134 E Bleeker Engineering Comments
Hello Carly,
I just realized that the application file that I sent you did not include the Engineering drawings that
was in the hard-copy file of the application. Would you please take a look at these drawings and see
if you have additional comments?
Thank you and sorry for the inconvenience.
Sarah Yoon
Community Development Department
Historic Preservation Planner
130 S. Galena St.
Aspen, CO 81611
p: 970.920.5144
www.cityofaspen.com
www.aspencommunityvoice.com
www.aspenvictorian.com
www.aspenmod.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contained in the email are based on current zoning, which is subject to change in the future, and upon factual
representations that may or may not be accurate. The opinions and information contained herein do not create a legal or
vested right or any claim of detrimental reliance.
From: Carly McGowan <carly.mcgowan@cityofaspen.com>
Sent: Thursday, February 20, 2020 7:49 AM
To: Sarah Yoon <sarah.yoon@cityofaspen.com>
Cc: Hailey Guglielmo <hailey.guglielmo@cityofaspen.com>
Subject: RE: 134 E Bleeker Engineering Comments
Hi Sarah,
I have one more comment that I failed to mention in yesterday’s email:
What transformer will be tied into? If planning on tying into the existing transformer, does it
have adequate capacity?
Thanks,
Carly McGowan, EIT
Project Manager I
Engineering Department
201 N Mill St. Ste 203
Aspen, CO 81611
p: 970.429.2738
www.cityofaspen.com
From: Sarah Yoon <sarah.yoon@cityofaspen.com>
Sent: Wednesday, February 19, 2020 5:26 PM
To: Carly McGowan <carly.mcgowan@cityofaspen.com>
Cc: Hailey Guglielmo <hailey.guglielmo@cityofaspen.com>
Subject: RE: 134 E Bleeker Engineering Comments
Thanks for the comments Carly!
Have a great rest of the evening.
Sarah Yoon
Community Development Department
Historic Preservation Planner
130 S. Galena St.
Aspen, CO 81611
p: 970.920.5144
www.cityofaspen.com
www.aspencommunityvoice.com
www.aspenvictorian.com
www.aspenmod.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contained in the email are based on current zoning, which is subject to change in the future, and upon factual
representations that may or may not be accurate. The opinions and information contained herein do not create a legal or
vested right or any claim of detrimental reliance.
From: Carly McGowan <carly.mcgowan@cityofaspen.com>
Sent: Wednesday, February 19, 2020 5:24 PM
To: Sarah Yoon <sarah.yoon@cityofaspen.com>
Cc: Hailey Guglielmo <hailey.guglielmo@cityofaspen.com>
Subject: 134 E Bleeker Engineering Comments
Sarah,
The conceptual plan for 134 E Bleeker St appears to be feasible. The following items will need to be
addressed at time of building permit:
A COA compliant survey is required. See attached document for survey markups
The property is not in a sidewalk deferred zone. Therefore, sidewalks will be required on both
sides of the property
Curb and gutter will be inspected at time of building permit – if damaged, replacement will
be required
In civil plans and drainage report, an emergency overflow path for the drywell must be called
out
The large tree in the front yard creates a constrain for the water service line location. Ensure
the service line stays out of the dripline and Parks Dept approves of the alignment.