HomeMy WebLinkAboutTemporary Relocation Memo.134 E Bleeker St.20200807 Memorandum Page 1 of 2 KL&A, Inc. 215 N. 12th Street, Unit E Carbondale, Colorado 81623 Telephone: (970) 927-5174 Job Name: 134 East Bleeker Job Number: 20162.000 To: Email: Company: Hannah-Hunt Moeller hannahhunt@eigelberger.com Eigelberger From: Brett McElvain, P.E. Date: August 7, 2020 Pages Including Cover: 2 re: Existing house shoring and relocation process Cc: Comments: The general sequence that we discussed on site to get the new foundation poured and the existing building placed on it was as follows: 1. Survey the site 2. Clear and grub the perimeter of the site 3. Demolish all of the finishes on the interior including drywall and entry level floor framing 4. Protect existing wall framing with sheathing 5. Install LVL’s on each side of the bearing walls to help transfer the weight of the existing building on to temporary steel beams 6. Install a micropile shoring walls along the east, south, and west property lines including bearing points to support temporary steel beams which will support the existing building. Along the west side, the wall will only be located from grids 1 to 3 at this stage. 7. Build cribbing on west side between grids 3 and 5 of the addition at each temporary beam support location. 8. Place the temporary beams below the existing buildings. Per Bill Bailey, the beams will be pairs of W18x55’s that are welded together. The quantity of beam pairs and specific location will be determined in the field. 6x6 steel beams placed on top of and perpendicular to the pairs of W18 beams. The spacing of the 6x6 beams is to be determined in the field. 9. Separate the addition from the Victorian. Memorandum Page 2 of 2 10. Lift the addition and move it to the east as far as possible on site to allow for the micropile drilling rig to fit along the west side. Complete the shoring wall along the west side. 11. Transfer the support of the temporary beams for the addition on the west side from the cribbing on to the micropile shoring wall and remove cribbing 12. Lift the Victorian and garage buildings to approximately six feet above their current elevation. 13. Excavate the basement and crawlspace area, accessing from the north (alley) side of the property 14. Install footings 15. Install foundation walls 16. Install lower floor including slab on deck 17. Install entry level framing including slab on deck and curb 18. Partially backfill between shoring walls and new foundation walls 19. Move existing building back into original location and lower on to new structure. General Contractor: Brikor Briston Peterson (briston@brikor.com) 20 Sunset Drive #1 Basalt, CO 81621 970-923-3088 House Mover: Bill Bailey (baileyhousemover@gmail.com) 3149 B Rd. Grand Junction, CO 81503 970-434-9763 If you have any questions or need clarifications, please call. SE T B A C K 8 8 7 7 6 6 5 5 4 4 3 3 2 2 1 1 EE CC B B AA D D F F DN UP UP UP PR O P E R T Y L I N E SETBACK PROPERTY LINE PR O P E R T Y L I N E SETBACK PROPERTY LINE SE T B A C K EXISTING FENCE TO BE REMOVED AND REPLACED EXISTING FENCE TO REMAIN EXISTING FENCE TO BE REMOVED AND REPLACED Th e s e d o c u m e n t s a r e t h e p r o p e r t y o f EA D . A n y u n a u t h o r i z e d u s e w i t h o u t t h e wr i t t e n c o n s e n t o f E A D i s p r o h i b i t e d b y la w . E A D d i s c l a i m s r e s p o n s i b i l i t y f o r th e s e d o c u m e n t s i f t h e y a r e u s e d w h o l e or i n p a r t a t a n y o t h e r l o c a t i o n a n d f o r an y o t h e r a p p l i c a t i o n o t h e r t h a n t h e or i g i n a l i n t e n t . I f y o u a r e n o t t h e in t e n d e d r e c i p i e n t , y o u a r e h e r e b y no t i f i e d t h a t a n y d i s s e m i n a t i o n , di s t r i b u t i o n o r r e p r o d u c t i o n o f t h e s e do c u m e n t s i s p r o h i b i t e d b y l a w . 350 MARKET STREET SUITE 309 BASALT, COLORADO 81621 PHONE: 970.300.3423 FAX: 415.358.5771 INFO@EIGELBERGER.COM N Co p y r i g h t c 2 0 1 8 b y E I G E L B E R G E R A R C H I T E C T U R E & D E S I GN SCALE: Plot Date Drawn By Checked By Project No. CLIENT REVIEW: REVIEWED AND APPROVED FOR DESIGN INTENT: CLIENT UNDERSTANDS THE DESIGN INTENT OF THE DOCUMENT. CLIENT APPROVES DESIGN INTENT. ARCHITECT WILL PROCEED WITH DETAILS AND COORDINATION WITH CONTRACTOR PER SIGN OFF ON DOCUMENT. NOTE: ANY CHANGES TO THE APPROVED DRAWINGS BY CLIENT ARE ADDITIONAL SERVICE PER CONTRACT. ARCHITECT TO PICKUP CORRETIONS AS NOTED CLIENT SIGNATURE: ___________________________ DATE OF APPROVAL: __________________________ Date Issue 1/4" = 1'-0" BI M 3 6 0 : / / 1 9 0 1 7 - 1 3 4 B l e e k e r / 1 9 0 1 7 _ 1 3 4 E B l e e k e r S t _C E N T R A L . r v t 8/7/2020 2:26:31 PM A.2.01 (E) MAIN FLOOR PLAN 13 4 E A S T B L E E K E R AS P E N , C O 19017 Author Checker SCALE : 1/4" = 1'-0"A.2.01 1 (E) MAIN LEVEL 7/10/2020 100% DD ■ Extension boom increases drilling pattern flexibility N ■ Design versatility allows for drilling either horizontally or vertically. ■ High -output compressor increases flushing air, provides faster drilling and decreases bit wear. ■ Upgraded dust collector has higher suction capacity than previous models. Dust collector includes an effective pre -cleaner to reduce escape of drilling dust. An optional dust suppression system is available for difficult drilling conditions. 0 ■ Low -emission; Tier II Caterpillar6engine offers low fuel consumption and meets major exhaust emissions regulations in Europe, the United States. ■ Hcavy-duty Caterpillar"undercarriage —featuring a pentagonal section design to reduce dirt build-up and track wear — ensures strength and durability. ■ HCR 900 ES20 is ideal when drilling requirements exceed 12'. Depths up to 18' can be drilled without changing rods. ■ Angle indicator for quick and easy drilling alignment. HCR 900 ES Shawn ;y ; Fllf{l1%AU]A i NCR 909 ES HCR 900 ES ES20 NCR 844 E5 A f n Weight & dimensions. 6pera:irlg weight, ft 11gj A Overall length, ft (mm) R Ground con-W length, ft (mm) C Overall width with pre -cleaner, R {mm) - 1)Transpod Width, It (mmj Width over tracks, ft (mm) Width of shoe, inch (mm) F Dverall transport Height, ft (mm) .2,066 (100'.0) 22,300 (10115) 32A- (9840) 33'-7" (10240) - —T T (2�) - - 10' T {322fl} K 91S' (2nfo) 7- 10- (2390) 12'(300) 87 If- (2720) Weight, Ibs (kg) 4M -%) Impact rate, per min - — 225[1- 2500: - N;"'.fiber r]` rotatlnn5, rr 11 0 250 IlnderGalriage:.,l rplllaia Pentagonal Ground clearance, it (mm; - --- ---- - — - - — --+ -----..... 0sciHaling.angler degrees +f- in° Travel speed, mph (km/h) 0 - 2.2 {0 - 3.5j Gradabiltty degrees M Engine: Caterpillar" 312511 Typo Water coalc•a ditcrt inlcrticn, 6 cylil&M f hirhn charged, Tier it diesel engine 0utpuVspeed, Hp 0 RPM (Kw G f9PM)- I 175 0 2200 (131 0 2200) No- of oindeTs - bore 1 stroke, inch mm 3 6 - 4.33.15" 1101 1 M Piston dispiacement, cubic inch (titers) 1 441.78' (7.24) Hydraulic pump type'. ydfaulic oumm Supply oil tof 1 batlr travel and driINiu.i-pray 111OR -�r aoc• it q and ilrSt.'.Cferin . ampressor: _ = P05265•S35A rep a • J; Iiv r:, CFM (rrlalmin) Ce:; ve rY a Pressure, PSI (MP zl L;f: angle, degrees up/down 45715 Swing angle, (trees rtghtlleft _ 3T'!43' Extension length, `fmml TV (1500) 4' 11' {159Q} Length. - (mm} 24, 9' (7485) 28' 9' (U Feed length, ft (mm) 1 14' 11' (455U) — _------ 10' 11'.[5765� Slide length, It (mm) — _ 3' 11 (1200) Swing angle, degrees righllleft W/40- Tift arlple, degrees T80 Suction capacity, CFM (ma/min) T05 (20) Number of Filters 1 4 Type Rail Numbers of rod 4 1 3 Bit diameter, inch (mm) 2h' - 31k' (64-99) 1 s-- 4- n2} -- Rod size T38 & T45 Rod length, It (mm) 124 (3657) ------------ ----........... Starter and length, ft (mm) 16' (4877) 20, fon9Gj ------ - ------- FerUkawd$ poitoy is One of w t ual improvgm4nt. Specifications may change between printing, fURUKAWA A14MM\61. ROCK DRILL 805 Lake Street • Kent, OH 44240-0017 • Tel: 800.358.4476 • Fax: 330.673-8504 www.furukawarockdrill.com r. ■ ■ NCF[nOCI-lAA{15 - 4A I llhame°!-4 T43 •' cu -= I'll u -cC ; I'll Ul -a en 't: I» iii = cu.= u -u ·= -·-I'll= -= :E '-u u ~'~~cu t!! = u- MOTORE DIESEL SILENZIATO SILENCED DIESEL ENGINE tipo type HATZ 4L41C potenza power 47 Kw -2500 rpm 64 HP CARRO CINGDLATD CRAWLERS ve locita speed D-3 kmlh D -1,86 mph pendenza massima superabile max gradeability 55% 55% pressione specifics al suolo ground bearing pressure 3,3 N/cm2 4,7 PSI larghezza pattini shoe width 235 mm 9,25 in aperture variabile carro opening varyng crawlers 700-1000 mm 27,56 -39,37 in SLITTA MAST Tipo 1 Tipo 2 Tipo 3 Type 1 Type 2 Type 3 lung hezza slitta mast lenght 2368 mm 2868 mm 3368 mm 93,22 in 112,91 in 132,60 in corsa carrello testa rotazione stroke of rotary head 1200 mm 1700 mm 2200 mm 47,24 in 66,90 in 86,61 in tiro-spinta massimo motoridu tto re ratiomor pull-push 40 KN 40 KN 40 KN 88181b 88181b 88181b TESTA RDTAZIONE STANDARD STANDARD ROTARY HEAD coppia massima -PARALLELO max torque -PARALLEL 6,20 KNm 4493 lb ft giri -PARALLELO speed -PARALLEL 0-55 rpm D-55 rpm coppia massima -SERlE ma x torque-SERIES 3,10 KNm 2246 lb ft giri-SERlE speed -SERIES 0-11Drpm D -110 rpm numero marce speed number 2 2 corsa spostamento laterale sideways travel stroke 365 mm 14,37 in nota: a richiesta si possono avere other performances upon request diverse coppie e numeri di giri MDRSA SEMPLICE -OPTIONAL SIMPLE CLAMP -OPTIONAL diametri bloccaggio blocking diameter 50-219mm 1,96-8,62 in forza di chiusura clamping force 140 KN 308641b MDRSA DDPPIA -OPTIONAL DOUBLE CLAMP -OPTIONAL diametri blo ccaggio blocking diameter 50-219mm 1 ,96 -8,62 in forza di chiusura clamping force 140 KN 308641b coppia di svitamento break-out torque 19 KNm 137681b ft ARGAND -OPTIONAL WINCH -OPTIONAL diametro tune rope diameter 7 mm 0,275 in capacita tune rope capacity 50 m 164ft tiro massimo max line pull &DO Kg 13221b ALTRI OPTIONALS OTHER DPTIONALS pampa dell'acqua water pump pampa fango a vite screw mud pump pampa cementa concrete mud pump pampa scarota t rice sample ejection pump IMPIANTD IORAULICO HYDRAULIC SYSTEM pompe a ingranaggi standard standard gear pumps nr. 3 P1=62 1/min nr. 3 P1=16,38 gal/min P2=461/min P2=12,15 gal/min P3=20 1/mi P3=5,28 /allmin pampa ingranaggi optional optional gear pump nr. 1 P4=461/m"n nr. 1 P4=12,1 gal/min pressione massima max pressure 200 BAR 2845 PSI PESO PERFORATRICE HYDRAULIC DRILLING WEIGHT 2000 Kg 44091b PESO CENTRALINA POWER UNIT WEIGHT 800 Kg 17641b BERETTA migliora costantemente i suoi prodotti riservandosi il diritto di apportare qualsiasi modifica senza preawiso ne responsabilita BERETTA continuosly improves its products reservong the right to modify data w ithout advance notice decling any responsability Revisione Oepliant N. 3 -Settembre 2CXJ6 / Brochure revision N. 3 -September 2aJ6 A\ Beretta Alfredo s.r.l.