HomeMy WebLinkAboutLand Use ApplicationCITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
COMMUNITY DEVELOPMENT DEPARTMENT
GENERAL LAND USE PACKET
Attached is an Application for review of Development that requires Land Use Review pursuant to
The City of Aspen Land Use Code: Included in this package are the following attachments:
1.Development Application Fee Policy, Fee Schedule and Agreement
to Pay Application Fees Form
2.Land Use Application Form
3.Dimensional Requirements Form (if required)
4.HOA Compliance Form
5.Development Review Procedure
All applications are reviewed based on the criteria established in Title 26 of the Aspen Municipal Code. Title 26 of
the Aspen Municipal Code is available at the City Clerk’s Office on the second floor of City Hall and on the
internet at https://library.municode.com/co/aspen/codes/municipal_code.
We require all applicants to hold a Pre-Application Conference with a Planner in the Community Development
Department so that the requirements for submitting a complete application can be fully described. This
meeting can happen in person or by phone or email. Also, depending upon the complexity of the development
proposed, submitting one copy of the development application to the Case Planner to determine accuracy,
inefficiencies, or redundancies can reduce the overall cost of materials and staff time.
Please recognize that review of these materials does not substitute for a complete review of the Aspen Land Use
Regulations. While this application package attempts to summarize the key provisions of the Code as they apply
to your type of development, it cannot possibly replicate the detail or the scope of the Code. If you have
questions that are not answered by the materials in this package, we suggest that you contact the staff member
assigned to your case, contact Planner of the Day (970-429-2764/planneroftheday@gmail.com), or consult the
applicable sections of the Aspen Land Use Code.
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
Land Use Review Fee Policy
The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is
collected for land use applications based on the type of application submitted.
A flat fee is collected by Community Development for applications that normally take a minimal and predictable amount of staff
time to process. Review fees for other City Departments reviewing the application (referral departments) also will be collected
when necessary. Flat fees are cumulative, i.e., an application with multiple flat fees must pay the sum of those flat fees. Flat fees
are not refundable.
A review fee deposit is collected by Community Development when more extensive staff time is required. Actual staff time spent
will be charged against the deposit. Various City staff also may charge their time spent on the case in addition to the Case
Planner. The deposit amount may be reduced if, in the opinion of the Community Development Department Director, the project
is expected to take significantly less time to process than the deposit indicates. A determination on the deposit amount shall be
made during the pre-application conference by the Case Planner. Hourly billing shall still apply.
All applications must include an Agreement to Pay Application Fees. One payment including the deposit for Planning and referral
agency fees must be submitted with each land use application, made payable to the City of Aspen. Applications will not be
accepted for processing without the required fee(s).
The Community Development Department shall keep an accurate record of the actual time required to process a land use
application requiring a deposit. The City can provide a summary report of fees due at the applicant’s request. The applicant will
be billed for the additional costs incurred by the City when the processing of an application by the Community Development
Department takes more time or expense than is covered by the deposit. Any direct costs attributable to a project review shall be
billed to the applicant with no additional administrative charge. In the event the processing of an application takes less time than
provided for by the deposit, the Department shall refund the unused portion of the deposited fee to the applicant. Fees shall be
due regardless of whether an applicant receives approval.
Unless otherwise combined by the Director for simplicity of billing, all applications for conceptual, final, and recordation of
approval documents shall be handled as individual cases for the purpose of billing. Upon conceptual approval, all billing shall be
reconciled, and past due invoices shall be paid prior to the Director accepting an application for final review. Final review shall
require a new deposit at the rate in effect at the time of final submission. Upon final approval, all billing shall again be reconciled
prior to the Director accepting an application for review of technical documents for recordation.
The Community Development Director may cease processing of a land use application for which an unpaid invoice is 30 or more
days past due. Unpaid invoices of 90 days or more past due may be assessed a late fee of 1.75% per month. An unpaid invoice of
120 days or more may be subject to additional actions as may be assigned by the Municipal Court judge. All payment information
is public domain.
All invoices shall be paid prior to issuance of a Development Order or recordation of development agreements and plats. The City
will not accept a building permit for a property until all invoices are paid in full. For permits already accepted, any unpaid invoice
of 90 or more days may result in cessation of building permit processing or issuance of a stop work order until full payment is
made.
The property owner of record is the party responsible for payment of all costs associated with a land use application for the
property. Any secondary agreement between a property owner and an applicant representing the owner (e.g. a contract
purchaser) regarding payment of fees is solely between those private parties.
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
Agreement to Pay Application Fees
An agreement between the City of Aspen (“City”) and
Address of Property:
Please type or print in all caps
Property Owner Name: Representative Name (if different from Property Owner):
Billing Name and Address - Send Bills to:
Contact info for billing: e-mail: Phone:
I understand that the City has adopted, via Ordinance No. 20, Series of 2020, review fees for Land Use applications, and
payment of these fees is a condition precedent to determining application completeness. I understand that as the property
owner, I am responsible for paying all fees for this development application.
For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees
are non-refundable.
$. flat fee for . $. flat fee for
$. flat fee for . $. flat fee for
For deposit cases only: The City and I understand that because of the size, nature, or scope of the proposed project, it is not
possible at this time to know the full extent or total costs involved in processing the application. I understand that additional
costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete
processing, review, and presentation of sufficient information to enable legally required findings to be made for project
consideration unless invoices are paid in full.
The City and I understand and agree that invoices sent by the City to the above listed billing address and not returned to the
City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an
invoice by the City for such services.
I have read, understood, and agree to the Land Use Review Fee Policy, including consequences for non-payment. I agree to
pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does
not render an application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I
agree to pay additional monthly billings to the City to reimburse the City for processing my application at the hourly rates
hereinafter stated.
$ deposit for hours of Community Development Department staff time. Additional time
above the deposit amount will be billed at $325.00 per hour.
$ deposit for hours of Engineering Department staff time. Additional time above the
deposit amount will be billed at $325.00 per hour.
City of Aspen:
Phillip Supino, AICP
Community Development Director
City Use:
Fees Due: $ Received $
Case #
Signature:
PRINT Name:
Title:
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
LAND USE APPLICATION
APPLICANT:
REPRESENTIVATIVE:
Description: Existing and Proposed Conditions
Review: Administrative or Board Review
Required Land Use Review(s):
Growth Management Quota System (GMQS) required fields:
Net Leasable square footage Lodge Pillows Free Market dwelling units
Affordable Housing dwelling units Essential Public Facility square footage
Have you included the following? FEES DUE: $
Pre-Application Conference Summary
Signed Fee Agreement
HOA Compliance form
All items listed in checklist on PreApplication Conference Summary
Name:
Address:
Phone#: email:
Address:
Phone #: email:
Name:
Project Name and Address:
Parcel ID # (REQUIRED)
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
DIMENSIONAL REQUIREMENTS FORM
Complete only if required by the PreApplication checklist
Project and Location
Applicant:
Zone District: Gross Lot Area: Net Lot Area:
**Please refer to section 26.575.020 for information on how to calculate Net Lot Area
Please fill out all relevant dimensions
Single Family and Duplex Residential
1) Floor Area (square feet)
2) Maximum Height
3) Front Setback
4) Rear Setback
5) Side Setbacks
6) Combined Side Setbacks
7) % Site Coverage
Existing Allowed Proposed Multi-family Residential
1)Number of Units
2)Parcel Density (see 26.710.090.C.10)
3)FAR (Floor Area Ratio)
4)Floor Area (square feet)
Existing Allowed Proposed
8) Minimum distance between buildings
Proposed % of demolition
5) Maximum Height
6) Front Setback
7) Rear Setback
8) Side Setbacks
Proposed % of demolition
Commercial
Proposed Use(s)
Existing Allowed Proposed
1) FAR (Floor Area Ratio)
2) Floor Area (square feet)
3) Maximum Height
4) Off-Street Parking Spaces
5) Second Tier (square feet)
6) Pedestrian Amenity (square feet)
Proposed % of demolition
Existing non-conformities or encroachments:
Variations requested:
Lodge
Additional Use(s)
1)FAR (Floor Area Ratio)
2)Floor Area (square feet)
3)Maximum Height
4)Free Market Residential(square feet)
4)Front setback
5)Rear setback
6)Side setbacks
7)Off-Street Parking Spaces
8)Pedestrian Amenity (square feet)
Proposed % of demolition
Existing Allowed Proposed
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
Homeowner Association Compliance Policy
All land use applications within the City of Aspen are required to include a Homeowner Association
Compliance Form (this form) certifying that the scope of work included in the land use application
complies with all applicable covenants and homeowner association policies. The certification must be
signed by the property owner or Attorney representing the property owner.
Property
Owner (“I”):
Name:
Email: Phone No.:
Address of
Property:
(subject of
application)
I certify as follows: (pick one)
□This property is not subject to a homeowner association or other form of private c ovenant.
□This property is subject to a homeowner association or private covenant, and the improvements proposed in this land use application do not require approval by the homeowners association or covenant beneficiary.
□This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application have been approved by the homeowners a ssociation or covenant beneficiary.
I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the
applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I
understand that this document is a public document.
Owner signature: Date:
Owner printed name:
or,
Attorney signature: Date:
Attorney printed name:
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
DEVELOPMENT REVIEW PROCEDURE
1.Attend pre-application conference. During this one-on-one meeting, staff will determine the review process
applies to your development proposal and will identify the materials necessary to review your application.
2.Submit Development Application. Based on your pre-application meeting, you should complete to the
application package and submit the requested number of copies of the complete application and the appropriate
processing fee to the Community Development Department.
3.Determination of Completeness. Within five (5) working days of the date of your submission, staff will review
the application and notify you in writing whether the application is complete or if additional materials are
required. Please be aware that the purpose of the completeness review is to determine whether or not the
information you have submitted is adequate to review the request, and not whether the information is sufficient
to obtain approval.
4.Staff Review of Development Application. Once your application is determined to be complete, it will be
reviewed by the staff for compliance with the applicable standards of the Code. During the staff review stage, the
application will be referred to other agencies for comments. The Planner assigned to your case or the agency may
contact you if additional information is needed or if problems are identified. Staff will draft a memo for signature
by the Community Development Director that explains whether your application complies with the Code, and will
list any conditions that should apply if the application is to be approved.
Final approval of any Development Application that amends a recorded document, such as a plat, agreement, or
deed restriction, will require the applicant to prepare an amended version of that document for review and
approval by staff. Staff will provide the applicant with the applicable contents for the revised plat. The City
Attorney is normally in charge of the form for recorded agreements and deed restrictions. We suggest that you not
go to the trouble or expense of preparing these documents until the staff has determined that your application is
eligible for the requested amendment or exemption.
5. Board Review of Application. If a public hearing is required for the land use action that you are requesting, the
Planning staff will schedule a hearing date for the application upon determination that the application is complete.
The hearing(s) will be scheduled before the appropriate reviewing board(s). The applicant will be required to mail
notice (one copy provided by the Community Development Department) to property owners within 30 feet of the
subject property and post notice (sign available at the Community Development Department) of the public hearing
on the site at least fifteen (15) days prior to the hearing date. (Please see Attachment 6 for instructions.) The
Planning staff will publish notice of the hearing in the paper for land use requests that require publication.
The Planning staff will then formulate a recommendation on the land use request and draft a memo to the
reviewing board(s). Staff will supply the applicant with a copy of the Planning staff’s memo, approximately five (5)
days prior to the hearing. The public hearing(s) will take place before the appropriate review boards. Public
hearings include a presentation by the Planning staff, a presentation by the applicant (optional), consideration of
public comment, and the reviewing board’s questions and decision.
(Continued on next page)
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
6.Issuance of Development Order. If the land use review is approved, then the Planning staff will issue a
Development Order, which allows the applicant to submit a building permit application.
7.Receipt of Building Permit. Once you have received a copy of the signed staff approval, you may apply for a
building permit. During this time, your project will be examined for its compliance with the Uniform Building Code.
It also will be checked for compliance with applicable provisions of the Land Use Regulations that were not
reviewed in detail during the land use case review. (This might include a check of floor area ratios, setbacks,
parking, open space and the like). Impact fees for water, sewer, parks, and employee housing will be collected as
part of the permitting process. Any document required to be recorded, such as a plat, deed restriction, or
agreement, will be reviewed and recorded before a building permit application is submitted.