Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NonSkid Entry.204 S Galena.SM.20220801
B A C D A.3 RESTROOM 110 A.3 B A C D WRAP + POS 108 STORAGE 107 STORAGE 112 ENTRY 101 SALES AREA 102 DISPLAY WINDOW 113 VESTIBULE 109 SALES AREA 103 SALES AREA (V.I.P.) 106 FITTING ROOM 105 FITTING ROOM 104 STORAGE 111 RUG-1F RUG-2F RUG-4F WO-ASPENF F BORDER LM-100F B-100B PT-101W LM-100F B-100B PT-101W CR-01F ST-01W C-10F C-10W C-10F C-10W C-10F C-10W C-10F C-10W ST.OPT 14F F BORDER LM-100F B-100B PT-101W LM-100F B-100B PT-101W 4 5 3 1 6 24 8 7 9 11 WO-ASPEN WO-ASPEN RUG-3F RUG-5F 4 8 8 8 5 12 12 12 12 12 12 12 13 13 14 TYP. 14 TYP. 15 16 16 16 16 16 16 16 16 9 ST-03F N 1 FIRST FLOOR PLAN FINISH PLAN SCALE: 1/4" = 1'-0" COPYRIGHT © 2022 CALLISONRTKL PROJECT INFORMATION 003-210127.00 204 S. GALENA STREET SPACE A-C ASPEN, CO 81611 ISSUED / REVISED DATEREV. TENANT ARCHITECT MEP ENGINEER STRUCTURAL ENGINEER LANDLORD CALLISONRTKL INC. 233 BROADWAY, 16TH FLOOR NEW YORK, NY 10279 CONTACT:MICHAEL ROSTKOWSKI PHONE:907.854.9975 E: michael.rostkowski@crtkl.com GUCCI 195 BROADWAY, 12TH FLOOR NEW YORK, NY 10007 CONTACT:MICHELLE CARRIERI PHONE:646.634.9651 E: michelle.carrieri@gucci.com GUCCI HISTORICAL BOARD SUBMISSION PACKAGE 03-07-2022 GENERAL CONTRACTOR TBD ROSINI ENGINEERING, PC 24-02 40TH AVENUE LONG ISLAND CITY, NY 11101 CONTACT: YUJIN GOH PHONE:646.747.7467 EMAIL: ygoh@rosiniengineering.com 204 SOUTH GALENA STREET, LLC CONTACT:LINDA MANNING PHONE:312-850-1680 EMAIL:lmanning@mdevco.com ARMOUR UNSDERFER ENGINEERING 202 WEST 40TH STREET, 14TH FLOOR NEW YORK, NY 10018 CONTACT: KATIA LARRAMENDI PHONE: 212.203.4574 EMAIL: katial@au-eng.com ISSUED FOR PERMIT 06-10-2022SYMBOLDESCRIPTION FLOOR TRANSITION OR WALL BASE DETAIL. REFER TO SHEETS A-174 AND A-175 RUG TAG FLOOR FINISH TAG BASE FINISH TAG WALL FINISH TAG 1 RUG-XF XXXXF XXXXB XXXXW DRAWING LEGEND 1.DO NOT PAINT FIRE ALARM SPEAKERS OR OTHER FIRE ALARM DEVICES. 2.DO NOT PAINT SPRINKLER CAPS OR HEADS 3.ALL INTERIOR FINISHES TO COMPLY WITH THE REQUIREMENTS OF THE BUILDING CODE, LATEST REVISION AND AUTHORITIES HAVING JURISDICTION. 4.THIS DRAWING TO BE READ IN CONJUNCTION WITH REFLECTED CEILING PLAN AND ELEVATIONS FOR LOCATION AND EXTENT OF FINISHES. 5.CONTRACTOR TO REFER TO THE FINISHES SCHEDULE IN DRAWINGS AND APPLICABLE SECTIONS IN THE SPECIFICATION MANUAL FOR ALL FINISH SPECIFICATIONS. CONTRACTOR TO REFER TO THE SPECIFICATION MANUAL FOR INSTALLATION INSTRUCTIONS. ALL INTERIOR FINISHES TO BE INSTALLED AS PER MANUFACTURER'S WRITTEN INSTRUCTIONS SO AS TO OBTAIN FULL PRODUCT WARRANTY AVAILABLE. G.C. REQUIRED TO WARRANTY ALL MATERIAL SUPPLIED AND INSTALLED. 6.SAMPLES OF ALL FINISH MATERIALS TO BE SUBMITTED TO THE ARCHITECT FOR APPROVAL PRIOR TO INSTALLATION. NO SUBSTITUTIONS FOR ANY SPECIFIED FINISHES WILL BE ALLOWED UNLESS APPROVED IN WRITING BY ARCHITECT. REFER TO SUBSTITUTIONS PROCEDURE IN THE SPECIFICATION MANUAL. 7.REFER TO MILLWORK DETAIL DRAWINGS AND FINISHES SCHEDULE FOR SPECIFICATIONS RELATING TO MILLWORK CONSTRUCTION AND MATERIALS.. 8.UNLESS OTHERWISE NOTED FLOOR FINISHES TO BE INSTALLED BEFORE MILLWORK INSTALLATION. 9.CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING AND NEW FLOORING FINISHES WITH PLASTIC SHEETING, RAM BOARD & MDF AS REQUIRED UPON COMPLETION OF INSTALLATION AS REQUIRED FOR THE DURATION OF THE CONSTRUCTION PERIOD. 10.TYPICALLY, CHANGE IN FLOORING MATERIAL IS TO OCCUR AT MIDPOINT OF DOOR OPENING UNLESS OTHERWISE INDICATED. 11.WHERE A CHANGE OF MATERIAL THICKNESS OCCURS, PROVIDE FEATHER FLOOR AS REQUIRED. MAX SLOPE 1:25 12.CONTRACTOR TO REFER TO THE FINISHES SCHEDULE FOR COORDINATION BETWEEN FLOOR FINISH AND WALL BASE FINISH SPECIFICATIONS. 13.EXISTING BASE FINISH TO REMAIN AS BUILT IN ALL AREAS WHERE EXISTING FLOOR FINISH IS IDENTIFIED TO REMAIN (UNLESS NOTED OTHERWISE ON DEMOLITION PLAN}. PROVIDE NEW BASE TO MATCH EXISTING ON NEW PARTITIONS WITHIN THE AREA AND/OR ROOM - REUSE EXISTING MATERIAL FROM DEMOLITION IF IN GOOD CONDITION WHERE APPLICABLE. PROVIDE NEW BASE AS SPECIFIED ON ALL EXISTING WALLS AND COLUMNS IN ALL AREAS WHERE EXISTING BASE IS SHOWN TO BE REMOVED. 14.ALL NEW AND EXISTING GWB PARTITIONS, COLUMNS, INTERIOR CORE AND PERIMETER WALLS TO RECEIVE NEW PAINT FINISH T-1 AS SPECIFIED UNLESS NOTED OTHERWISE. 15.REFER TO DOOR SCHEDULE FOR DOOR AND FRAME FINISHES. 16.ALL EXPOSED DRYWALL ON PERIMETER WALLS AND COLUMNS AROUND WINDOW TO HAVE PAINT FINISH TO MATCH AREA IN HICH THEY OCCUR. 17.REVEALS ARE TO BE PAINTED TO MATCH ADJACENT WALL FINISHES. IN CASES OF AMBIGUITY, ARCHITECT TO BE CONSULTED. 18.ALL EXISTING PERIMETER GLAZING MULLIONS AND TRIM TO REMAIN AS IS - NO PAINT FINISH REQUIRED. 19.WHERE VALANCE OCCURS - VALANCE TO HAVE FINISH TO MATCH ADJACENT WALL FINISH. 20.COATS AND STORAGE CLOSETS TO HAVE WALL FINISH AS PER ADJACENT PARTITIONS UNLESS NOTED OTHERWISE ON THE PLAN. 21.PAINT ALL VISIBLE OBSTRUCTIONS ABOVE 1” CONTINUOUS AIR SLOTS BLACK. 22.ALL BASE BUILDING DOORS TO RECEIVE NEW PAINT FINISH TO MATCH ADJACENT WALL. CONTRACTOR TO CLEAN AND REMOVE ALL KICK PLATES AND SIGNAGE PRIOR TO PAINTING AND REINSTALL AFTERWARDS. 23.WHERE NEW FLOORING ABUTS EXISTING BASE BUILDING CORE ALL THRESHOLDS ARE TO REMAIN AS IS. WHERE THRESHOLD CANNOT BE REUSED IDENTIFY AREAS OF CONCERN TO ARCHITECT FOR FINAL DIRECTION. WALL 1.ALL MATERIAL TO MEET CODE REQUIRED FLAME SPREAD RATING FLOOR 1.G.C TO FLASH, PATCH AND FILL STRUCTURAL SLAB WITH LIGHT WEIGHT LEVELING COMPOUND TO RECEIVE NEW FLOOR FINISH. G.C TO CONFIRM FLOOR IS COMPLETELY LEVEL. G.C TO INSTALL NON-FRACTURE MEMBRANE PRIOR TO INSTALLING STONE / CERAMIC TILE FINISH. G.C TO VERIFY AND INCLUDE IN BID- LEVELING OF FLOOR TO MAX DEPTH REQ'D TO ACHIEVE LEVEL FLOOR 2.REMOVE CONCRETE FLOOR AS REQUIRED FOR RECESSED FLOOR OUTLETS. PREFER TO POWER AND DATA PLAN AND ELECTRICAL DRAWINGS FOR LOCATIONS. FLASH PATCH SLAB AS REQUIRED THROUGH OUT SPACE TO PROVIDE A LEVEL SURFACE. PREPARE EXISTING SLAB FOR NEW FLOORING. 3.FLASH PATCH SLAB AS REQUIRED THROUGHOUT SPACE TO PROVIDE A LEVEL SURFACE 4.± 3.175mm (18") AT FLOORING TRANSITION GENERAL FLOOR FINISH PLAN NOTES KEY NOTES TYP. BORDER 6" [152mm] U.N.O. POLISHED CONCRETE FLOOR BY G.C. TILE LAYING-OUT POINT, REFER TO SHEET A-175 FOR MORE INFORMATION ENTRY TO HAVE A SLIP-RESISTANT FLOOR SURFACE PER IBC 1003.4 1 2 3 4 2 1 3 3 7/5/2022 10:10:51 AMP:\Retail\NYC\Gucci\Gucci - Aspen\1.4 Architecture\2-CAD\Sheets\A-171 FINISH PLAN - FIRST FLOOR PLAN.dwg A-171 FINISH PLAN - FIRST FLOOR PLAN 4 T.O. EXISTING SLAB 0'-0" SECOND LEVEL 16'-10 3/4" WINDOW SILL 1'-2 3/4" T.O. SLAB INFILL ± 0'-5 1/2" B.O. STONE AT PORTAL +12'-6 3/4" T.O. EXISTING SLAB 0'-0" SECOND LEVEL 16'-10 3/4" WINDOW SILL 1'-2 3/4" T.O. SLAB INFILL ± 0'-5 1/2" B.O. MILLWORK PANELS AT PORTAL 11'-6 7/8" COPYRIGHT © 2022 CALLISONRTKL PROJECT INFORMATION 003-210127.00 204 S. GALENA STREET SPACE A-C ASPEN, CO 81611 ISSUED / REVISED DATEREV. TENANT ARCHITECT MEP ENGINEER STRUCTURAL ENGINEER LANDLORD CALLISONRTKL INC. 233 BROADWAY, 16TH FLOOR NEW YORK, NY 10279 CONTACT:MICHAEL ROSTKOWSKI PHONE:907.854.9975 E: michael.rostkowski@crtkl.com GUCCI 195 BROADWAY, 12TH FLOOR NEW YORK, NY 10007 CONTACT:MICHELLE CARRIERI PHONE:646.634.9651 E: michelle.carrieri@gucci.com GUCCI HISTORICAL BOARD SUBMISSION PACKAGE 03-07-2022 GENERAL CONTRACTOR TBD ROSINI ENGINEERING, PC 24-02 40TH AVENUE LONG ISLAND CITY, NY 11101 CONTACT: YUJIN GOH PHONE:646.747.7467 EMAIL: ygoh@rosiniengineering.com 204 SOUTH GALENA STREET, LLC CONTACT:LINDA MANNING PHONE:312-850-1680 EMAIL:lmanning@mdevco.com ARMOUR UNSDERFER ENGINEERING 202 WEST 40TH STREET, 14TH FLOOR NEW YORK, NY 10018 CONTACT: KATIA LARRAMENDI PHONE: 212.203.4574 EMAIL: katial@au-eng.com ISSUED FOR PERMIT 06-10-2022 2 SECTION SECTION THROUGH TYPICAL GLAZING SCALE: 1/2" = 1'-0" 1 SECTION SECTION THROUGH ENTRYWAY SCALE: 1/2" = 1'-0" LIGHTING BY G.C., G.C. TO COORDINATE INSTALLATION WITH GUCCI MILLWORK SHOP DRAWINGS. REFER TO ELECTRICAL DWGS, LIGHTING SCHEDULES AND RCP FOR DETAILS MT-01 PANEL 5/8" GWB CEILING GLASS CEILING LIGHTING BY G.C., G.C. TO COORDINATE INSTALLATION WITH GUCCI MILLWORK SHOP DRAWINGS. REFER TO ELECTRICAL DWGS, LIGHTING SCHEDULES AND RCP FOR DETAILS. WINDOW CURTAINS BY GUCCI, G.C. TO INSTALL TRACK. MT-07 INCLINED LOGO BEHIND GLASS BY GUCCI MWC, G.C. TO PROVIDE POWER, REFER TO ELEC. DWGS CEILING PANELS BY GUCCI MWC, G.C TO PROVIDE BLOCKING ABOVE, REFER TO RCP. MAIOLICA TILES BY GUCCI ON 1/2" CEMENT BOARD BY G.C. 7/7/2022 9:54:04 AMP:\Retail\NYC\Gucci\Gucci - Aspen\1.4 Architecture\2-CAD\Sheets\A-301 STOREFRONT SECTIONS.dwg A-301 STOREFRONT SECTIONS 1 A-302 1 A-302 3 A-302 2 A-302 EXISTING PARAPET BRACE CONNECTION TO EXISTING CONCRETE FILLED METAL DECK COPYRIGHT © 2022 CALLISONRTKL PROJECT INFORMATION 003-210127.00 204 S. GALENA STREET SPACE A-C ASPEN, CO 81611 ISSUED / REVISED DATEREV. TENANT ARCHITECT MEP ENGINEER STRUCTURAL ENGINEER LANDLORD CALLISONRTKL INC. 233 BROADWAY, 16TH FLOOR NEW YORK, NY 10279 CONTACT:MICHAEL ROSTKOWSKI PHONE:907.854.9975 E: michael.rostkowski@crtkl.com GUCCI 195 BROADWAY, 12TH FLOOR NEW YORK, NY 10007 CONTACT:MICHELLE CARRIERI PHONE:646.634.9651 E: michelle.carrieri@gucci.com GUCCI HISTORICAL BOARD SUBMISSION PACKAGE 03-07-2022 GENERAL CONTRACTOR TBD ROSINI ENGINEERING, PC 24-02 40TH AVENUE LONG ISLAND CITY, NY 11101 CONTACT: YUJIN GOH PHONE:646.747.7467 EMAIL: ygoh@rosiniengineering.com 204 SOUTH GALENA STREET, LLC CONTACT:LINDA MANNING PHONE:312-850-1680 EMAIL:lmanning@mdevco.com ARMOUR UNSDERFER ENGINEERING 202 WEST 40TH STREET, 14TH FLOOR NEW YORK, NY 10018 CONTACT: KATIA LARRAMENDI PHONE: 212.203.4574 EMAIL: katial@au-eng.com ISSUED FOR PERMIT 06-10-2022 1 STOREFRONT SECTION ENLARGED DETAIL SCALE: 1 1/2" = 1'-0" 7/7/2022 9:56:32 AMP:\Retail\NYC\Gucci\Gucci - Aspen\1.4 Architecture\2-CAD\Sheets\A-302 STOREFRONT ENLARGED DETAILS.dwg A-302 STOREFRONT ENLARGED DETAILS MT-01/FE-03 METAL PANEL 3/4" F.R.T. PLYWOOD BY G.C. WATER PROOFING BY G.C. METAL STUD AND BATT INSULATION BY G.C. 5/8" DENSGLASS BY G.C. NEW STOREFRONT GLAZING SYSTEM: GLAZING: SEDAK ISOTHERM SPEC BUILD UP: -(2) LAYER INSULATED GLASS LAMINATE P7B W/ CERTIFICATION EN 356 (TOTAL THICKNESS APPROX. 22mm), EDGE TREATMENT ON ALL EDGES, SMOOTH GRINDED -16mm CAVITY W/ ARGON -(2) LAYER LAMINATED GLASS LOW IRON, FULLY TEMPERED, HEAT SOAK TESTED. INTERLAYER 1.52mm PVB. (TOTAL THICKNESS APPROX. 10mm) EDGE TREATMENT ON ALL EDGES, SMOOTH GRINDED -APPLY 3M PRESTIGE 70 SOLAR CONTROL WINDOW FILM TO EXTERIOR LAYER OF GLAZING. EXIST. RELIEVING ANGLE, V.I.F. SOFFIT TOP CONNECTION TO EXISTING BEAM SIKADUR NEW CONCRETE SLAB AT ENTRY EXISTING CONC. SIDEWALK ST-03. NOTE: BEVELED GROOVES IN STONE FOR ANTI-SLIP SURFACE UNISTRUT P1001 SYSTEM @ 48" O.C. DIODE LED LIGHT GUIDE PANEL, REFER TO ELECTRICAL DRAWINGS 6mm VETRO BELGA CALDAIE GLASS CEILING BR-WOOD ASPEN WOOD FRAME STRUCTURE BY M.W.C. 5/8" TYPE X GYPSUM BOARD CEILING, BY G.C. THREADED ROD SUPPORTS TO PUNCTURE GYP CEILING AT ALL SUPPORT LOCATIONS. GC TO CAREFULLY PRE-COORDINATE THREADED LOCATIONS PRIOR TO LIFTING GYP CEILING IN PLACE SANDSTONE PANEL SIMILAR TO ADJACENT ON CLIPPING SYSTEM BY G.C. 3/4" F.R.T. PLYWOOD BY G.C. WATER PROOFING BY G.C. 1/2" JOINT SEALANT AND BACKER ROD RELIEVING ANGLE WT CUT TO FIT LIGHTING BY G.C., G.C. TO COORDINATE INSTALLATION WITH GUCCI MILLWORK SHOP DRAWINGS. REFER TO ELECTRICAL DWGS, LIGHTING SCHEDULES AND RCP FOR DETAILS. WINDOW CURTAINS BY GUCCI, G.C. TO INSTALL TRACK. CEILING PANELS BY GUCCI MWC, G.C TO PROVIDE BLOCKING ABOVE, REFER TO RCP. MAIOLICA TILES BY GUCCI ON 1/2" CEMENT BOARD BY G.C. 5/8" DENSGLASS BY G.C. MT-01 CLADDING 2 STOREFRONT SECTION ENLARGED DETAIL SCALE: 1 1/2" = 1'-0" 3 STOREFRONT SECTION ENLARGED DETAIL SCALE: 1 1/2" = 1'-0" ST-03 STONE PANEL ON CLIPPING SYSTEM BY G.C.