HomeMy WebLinkAboutExhibit B_225 N Mill_Approved Plans 225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0
June 18, 2020
Mr. Ben Anderson, Principal Planner
City of Aspen Community Development Department
130 South Galena Street
Aspen, Colorado 81611
RE: 225 NORTH MILL STREET INSUBSTANTIAL PD AMENDMENT AND
COMMERCIAL DESIGN REVIEW
Dear Ben,
Please consider this letter to be an application for review of a planned addition to and internal
remodel of the office building located at 225 North Mill Street in Aspen. The following
changes are planned to the building, as illustrated in the attached drawing set:
•Creation of a new enclosed glass entry along Mill Street, within which there will be a
new elevator and stairway, providing ADA-compliant access to the entire building.
•Full remodel of the basement level, including replacement of the outdated HVAC
equipment with a new, high efficiency system, and remodel of the existing offices and
tenant storage spaces into modern office spaces.
•Limited remodel of the first and second floors, to create new hallway connections
from the elevator and stairway to the existing offices and to make the bathrooms
ADA-complaint.
The subject property is located along North Mill Street between Bleeker Street and Puppy
Smith Street (see attached vicinity map). The property’s Pitkin County Parcel ID number is
273707317004. The legal description of the property is Lots D, E, F, G, H, and I, Block 78,
City and Townsite of Aspen, along with an adjoining triangular parcel of land which is part
of Tract A of the Aspen Townsite Addition.
The property is zoned Neighborhood Commercial (NC) with a Planned Development (PD)
Overlay. Offices are a permitted use in the NC zone district.
The property is owned by 225 North Mill Street, LLC (hereinafter, “the applicant”). Proof of
the ownership of the property is provided by Exhibit #1, the attached letter from the
applicant’s attorney. Authorization for Stryker Brown Architects to submit this application to
the City of Aspen is provided in a letter from the property owner attached as Exhibit #2.
You provided us a Pre-Application Conference Summary (see Exhibit #3) which states that
the following land use review procedures apply to this proposal:
Exhibit B- 225 N. Mill Approved Plans
225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0
Insubstantial PD Amendment, pursuant to Section 26.445.110.A; and
Commercial Design Review, pursuant to Section 26.412.
Responses to the standards applicable to these review procedures follow below. First,
however, a brief description of the property and a summary of the property’s prior land use
approvals are provided as background to this land use application.
Property Description
An Improvement and Topographic Survey prepared by High Country Engineering, dated
6/2/16, is included with this application. The survey depicts existing conditions on this
property. The applicant is aware that this survey is more than 6 months old. However,
because of the Stay-At Home orders which were in effect in Colorado and Pitkin County this
spring, the surveyor has been unable to conduct a field update of the property. The applicant
will provide an updated survey to the City as soon as is practical, prior to consideration of
this application by the Planning and Zoning Commission. The applicant hereby certifies that
the conditions shown on the survey are an accurate representation of current conditions on
the property, with the exception of certain insubstantial changes which have been made to
the property since the survey was last conducted.
The survey states that the subject property is approximately 18,458 square feet in size
(0.424 acres). The property is nearly rectangular in shape. It is improved with a two-story
commercial building which is located along the North Mill Street property frontage. There is
a paved driveway along the northern edge of the property, providing access to a paved
parking lot behind the building. The parking lot contains twenty (20) marked parking spaces.
There are a number of mature trees located around the building which will be added to the
survey as part of the survey update.
The property is surrounded by a wide range of land uses. Immediately to the north is the
mixed-use complex which includes Clark’s Market and other commercial uses, the Post
Office and several multi-family residential units. To the south is the new mixed-use building
at 201 North Mill Street, which includes offices and residential units. A new duplex was
recently completed to the south of the subject property, along Bleeker Street. Behind the
building, to the west, is a single-family residential neighborhood, located along Monarch
Street. Across Mill Street, to the east, is the construction site where the new City Hall offices
are being built.
Summary of Prior Land Use Approvals
The existing building was constructed in 1978 to house the Aspen Savings and Loan
Association. Because the property was then zoned Neighborhood Commercial with a
Specially Planned Area Overlay (NC/SPA), development of the site required SPA review
by the Planning and Zoning Commission and City Council. SPA approval was granted in
2
Exhibit B- 225 N. Mill Approved Plans
225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0
1977, but there is limited documentation available in the City’s files regarding that land use
review process. Apparently, the City did not require a SPA Plan or a SPA Development
Agreement to be recorded to document that approval, so it is not possible to determine
whether any conditions were applied to the approval the City granted at that time.
In 1989 the City approved two minor changes to the building, to allow a bank vault to be
installed and to allow a small ground floor addition (approximately 320 square feet) to the
building. Both of these improvements were subsequently constructed.
By 1992 the property had passed out of the bank’s hands into another ownership group.
The then-owner obtained approval from the City for a 324 square foot addition for an
elevator. Approval was also obtained to condominiumize the building. At about this time
the Moss family purchased the property and sought to move a radio station (KSPN) into the
building. The City required an amendment to the original SPA approval to be processed to
allow this use to occupy the building and to document the other minor land use actions which
had been authorized for the property between 1989 and 1992. That amendment was
granted by the Aspen City Council on September 14, 1992, pursuant to Ordinance 92-55
(attached hereto as Exhibit #4).
As a condition of the approval, a Specially Planned Area Development Agreement was
entered into between the owner and the City (Reception No. 351030, attached as Exhibit
#5)) and a Final SPA Development Plan was recorded in Plat Book 30 @ Page 10
(Reception No. 351031). The Development Agreement and Final SPA Development Plan
set forth the following approvals for this property:
1.Business/professional office uses and the radio station were expressly permitted.
2.The 324 square foot elevator addition was approved, subject to the elevator location
being depicted on the Final SPA Plan. However, the Final SPA Plan which was
signed and recorded did not show a location or configuration for the elevator.
3.The building was condominiumized, subject to filing of a condominium plat.
4.The City and Owner confirmed that the existing building contained 8,082 square
feet of floor area and 9,324 square feet of net leasable area. Section 8 of the SPA
Agreement reads as follows:
“The City and Moss hereby acknowledge that the Building contains 8,082 square
feet of existing floor area and 9,324 square feet of net leasable area. The
purpose of the foregoing recitations is to provide a baseline for review of any
applications for future expansion of the Building on the Property.”
The Final SPA Development Plan, which is recorded in Plat Book 30 @ Page 10, provides
further documentation for the area calculations stated in the SPA Agreement, by listing
the following floor-by-floor breakdowns of those square footage totals:
3
Exhibit B- 225 N. Mill Approved Plans
225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0
SPA Plan Verified Floor Area and Net Leasable Area for 225 North Mill Street
Floor Area Net Leasable Area
Lower None 2,580
Main 5,235 4,211
Upper 2,847 2,532
Total 8,082 square feet 9,323 square feet
The 1992 SPA application is the most recent land use file kept in the City’s records for this
property. More recently, the City adopted a Code Amendment combining the SPA and PUD
Overlays into a new PD Overlay. PD is the overlay designation currently applied to this
property on the City’s Official Zone District Map.
Insubstantial Amendment to Approved PD
The applicant proposes two insubstantial changes to the approved PD for this property:
•The previously-approved elevator and the existing stairway will be moved from the
north side of the building to the front side, along Mill Street.
•The floor plan of each of the three levels will be modified to connect the new elevator
and stairway to the offices.
An insubstantial amendment to an approved Project Review may be authorized by the
Community Development Director. An insubstantial amendment shall meet the following
review criteria:
1.The request does not change the use or character of the development.
Response: The use of the building for offices will be unchanged. There will be an
insubstantial change to the overall character of the building by the addition of the glass
enclosure at the front entry. This change will be a noticeable improvement to the building’s
entry image and will also provide for better circulation into the building, allowing for ADA-
compliant access to the lower and upper floors.
2.The request is consistent with the conditions and representations in the project's
original approval, or otherwise represents an insubstantial change.
Response: An elevator was part of the property’s 1992 SPA approval, although at that time
the elevator was to be located along the northern building façade. Moving the elevator and
stairway from the northern side of the building to the front will be an improvement from the
original design because it represents a more direct way for pedestrians to enter the building.
Today most persons who come to the building on foot are not even aware that there is a
stairway entry along the northern side of the building (the door does not appear to be a
4
Exhibit B- 225 N. Mill Approved Plans
225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0
public entry). As a result, they walk around to the parking lot at the rear where there is a
more obvious building entry and stair. Some even mistakenly walk into the existing front
entry, which only accesses the architect’s offices and not the rest of the building. Placing
the entry along the front will establish a more pedestrian-friendly, logical design for the
building.
The planned internal changes to the floor plan for each level within the building also
represent an insubstantial change to the approved PD. All three floors will continue to be
occupied by offices. The primary internal changes will be improved, ADA-compliant access
to each of the floors and upgraded ADA-compliant bathrooms.
1.The request does not require granting a variation from the project's allowed use(s)
and does not request an increase in the allowed height or floor area.
Response: The entry element will be 2’ 2” taller than the height of the existing building, but
will still be well below the maximum allowable 28’ height of the NC zone district, so no
variation in height is required.
The approved floor area of the building, as per the SPA Agreement and Final SPA Plan, is
8,082 square feet. The proposed floor area, as shown on Page A.1.21 of the architectural
drawings, will be just 7,738 square feet. Therefore, there will be no increase to the allowed
floor area from the total which was established in the 1992 SPA.
2.Any proposed changes to the approved dimensional requirements are limited to a
technical nature, respond to a design parameter that could not have been foreseen
during the Project Review approval, are within dimensional tolerances stated in the
Project Review, or otherwise represents an insubstantial change.
Response: The other key dimensional requirement established in the 1992 SPA was the
building’s net leasable area. The building’s approved net leasable area, as per the SPA
Agreement and Final SPA Plan, is 9,323 square feet. The proposed net leasable area of
the building, as shown on Page A.1.21 of the architectural drawings, will be just 8,985.7
square feet. Therefore, there will be no increase to the allowed net leasable area for the
building from the total which was established in the 1992 SPA.
The combination of no increase in floor area and no increase in net leasable area explains
why a Growth Management application is not required for this project.
1.An applicant may not apply for Detailed Review if an amendment is pending.
2.Response: Detailed review is not applicable to this project.
Commercial Design Review
Section 26.412.010 of the Land Use Code states that
5
Exhibit B- 225 N. Mill Approved Plans
225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0
“The purpose of Commercial Design Review is to foster appropriate building design that
creates walkable neighborhoods and supports Aspen's unique heritage. The review
standards do not prescribe architectural style, but do require that certain building
elements contribute to the streetscape and neighborhood character.”
According to Section 26.412.020, Commercial Design Review applies to all commercial,
lodging and mixed-used development within the City which alters the exterior of a
building and which requires a building permit. Therefore, the proposed new entry
enclosure is subject to this review while the internal building remodel is not.
Section 26.412.060 of the Code sets forth the following guidelines and standards by which
the Commission may approve a Commercial Design Review:
1.The Commercial, Lodging and Historic District Design Standards and Guidelines are
met as determined by the appropriate Commission. The Standards and Guidelines
include design review criteria that are to be used to determine whether the application
is appropriate.
Response: Included in this application is the Commercial Design Review Context Study
which responds to each of the applicable Design Standards and Guidelines and
demonstrates that the proposed project will comply with those Standards and Guidelines.
2.All applicable standards in the Commercial, Lodging and Historic District Design
Standards and Guidelines shall be met unless granted a Variation pursuant to
Section 26.412.040(d), Variations.
Response: The applicant is not requesting any variations from the Design Standards and
Guidelines.
Not every guideline will apply to each project, and some balancing of the guidelines must
occur on a case-by-case basis. The applicable Commission must:
a. Determine that a sufficient number of the relevant guidelines are adequately
met in order to approve a project proposal; and
b.Weigh the applicable guidelines with the practicality of the measure.
Response: The applicant believes the relevant guidelines have been adequately met.
3.The proposed development shall meet the requirements of Section 26.412.070,
Pedestrian Amenity.
Response: The Commercial Design Review Context Study also demonstrates that the
proposed project will comply with the Pedestrian Amenity Standards.
6
Exhibit B- 225 N. Mill Approved Plans
Exhibit B- 225 N. Mill Approved Plans
E
E E E
E
I
H
G
E
D
ALLEY
-
B
L
O
C
K
7
8
MI
L
L
S
T
R
E
E
T
VACA
T
E
D
H
A
L
L
A
M
S
T
R
E
E
T
E
D
D
C
CO
N1
4
°
5
0
'
4
9
"
E
8
6
.
3
3
'
L
I
N
E
4
-
5
O
F
T
H
E
C
I
T
Y
O
F
A
S
P
E
N
1
8
5
'
±
R.R. TIE
RETAINING WALL
R.R. TIE
RETAINING WALL
S
R
Q
P
O
(UND
E
V
E
L
O
P
E
D
P
O
R
T
I
O
N
O
F
A
L
L
E
Y
)
ASPHA
L
T
CONC
R
E
T
E
R
E
T
A
I
N
I
N
G
W
A
L
L
CONC
R
E
T
E
R
E
T
A
I
N
I
N
G
W
A
L
L
STORM
GRATE
7877.56
STORM
GRATE
7877.24
CO
N
C
R
E
T
E
PAVED PARKING
AREA
PARKING
STRIPE
(TYPICAL)
WINDOW WELL
FENCED IN
MECHANICAL
AC UNIT
ENTRY
AREA
IN
T
E
R
I
O
R
ST
A
I
R
W
E
L
L
SI
G
N
MAIL
B
O
X
E
S
CONC
R
E
T
E
STEP
CON
C
R
E
T
E
SID
E
W
A
L
K
CO
N
C
R
E
T
E
SI
D
E
W
A
L
K
CO
N
C
R
E
T
E
C
U
R
B
&
G
U
T
T
E
R
COVER
E
D
ENTRY
COLUM
N
PAV
E
D
D
R
I
V
E
W
A
Y
CONCRETE
BOLLARD
(TYPICAL)
CONC
R
E
T
E
SIDEW
A
L
K
55.4'
7879.5
6
FFE
7879.
6
2
FFE
7879.5
3
FFE
FFE 78
7
9
.
6
0
27
.
3
'
8.9'
8.9
'
9.2'
37
.
3
'
73.2'
73
.
3
'
BUILDING CORNER IS 0.28'
NORTH OF PROPERTY LINE
BUILDING CORNER IS 0.41'
NORTH OF PROPERTY LINE
ADJ
A
C
E
N
T
B
U
I
L
D
I
N
G
(7
3
.
7
0
'
W
I
D
E
P
U
B
L
I
C
R
.
O
.
W
.
)
(20.6
9
'
W
I
D
E
)
BRIC
K
CO
CONC
R
E
T
E
C
U
R
B
ADJ
A
C
E
N
T
B
U
I
L
D
I
N
G
CONC
R
E
T
E
10'
W
I
D
E
T
R
A
I
L
E
A
S
E
M
E
N
T
REC
E
P
T
I
O
N
N
O
.
3
6
9
0
8
3
PER
P
E
T
U
A
L
N
O
N
-
E
X
C
L
U
S
I
V
E
E
A
S
E
M
E
N
T
& RI
G
H
T
-
O
F
-
W
A
Y
F
O
R
I
N
G
R
E
S
S
A
N
D
E
G
R
E
S
S
REC
E
P
T
I
O
N
N
O
.
3
6
9
0
8
3
2 - STORY COMMERCIAL
BUILDING WITH BASEMENT
225 N. MILL STREET
ASPEN, COLORADO
PROPERTY AREA
18,441± SQ.FT.
0.423± ACRES
N
788
0
7883
7
8
7
9
7
8
7
8
78
7
9
78
7
9
78
8
0
78
9
0
78
9
5
7
8
7
8
788
2
788
1
788
0
7878
7
8
8
0
78
7
9
7
8
8
1
7
8
8
5
7
8
8
5
7879
ELECTRIC
TRANSFORMERS
G
15
'
W
I
D
E
N
O
N
-
E
X
C
L
U
S
I
V
E
EA
S
E
M
E
N
T
F
O
R
U
N
D
E
R
G
R
O
U
N
D
EL
E
C
T
R
I
C
C
A
B
L
E
S
BO
O
K
3
5
4
P
A
G
E
7
10002
10005
10006
10007
10008
10009
10010
10011
10072
10073
10110
10112
10135
10136
10137
10138
10139
10140
10165
10166
10167
10168
10163
10164
FLAGSTONE
PATIO
BRONCO
STATUE
S74°1
2
'
3
2
"
E
189.4
3
'
S1
5
°
3
8
'
0
2
"
W
99
.
8
9
'
N74°1
1
'
5
4
"
W
180.8
3
'
S1
6
°
0
1
'
5
6
"
W
13
.
7
0
'
S2
1
°
1
6
'
1
9
"
W
86
.
6
2
'
(S75°1
9
'
1
1
"
E
1
8
9
.
1
2
')
(N1
4
°
5
0
'
4
9
"
E
1
0
0
.
0
0
')
(N75°0
9
'
1
1
"
W
1
8
0
.
9
3
')
(S1
4
°
5
0
'
4
9
"
W
1
3
.
6
7
')
(S2
0
°
1
6
'
0
0
"
W
8
6
.
7
2
')
8.19'
FOUND #5 REBAR WITH
1.25" YELLOW PLASTIC CAP
LS #38215
SITE BENCHMARK, ELV.=7881.94'
FOUND #5 REBAR WITH
1.25" YELLOW PLASTIC CAP
LS #38215
FOUND #5 REBAR WITH
1.25" YELLOW PLASTIC CAP
LS #38215
FOUND #4 REBAR WITH
1" RED PLASTIC CAP
LS #16129
FOUND #5 REBAR WITH
1.25" YELLOW PLASTIC CAP
LS #38215
FOUND #5 REBAR WITH
1.25" YELLOW PLASTIC CAP
LS #2376
RE
F
E
R
E
N
C
E
B
E
A
R
I
N
G
19.
4
'
26
.
3
'
SIGN
A
B
225 NORTH MILL STREET
SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH P.M.
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
PROPERTY DESCRIPTION
SPECIAL WARRANTY DEED RECORDED AS RECEPTION NO. 369083.
ALL OF LOTS D, E, F, G, H AND I IN BLOCK 78 OF THE CITY AND TOWNSITE OF ASPEN ACCORDING TO THE
OFFICIAL PLAT RECORDED AS RECEPTION NO. 109023 IN DRAWER 3. TOGETHER WITH AN ADJOINING
TRIANGULAR PARCEL OF LAND, BEING A PART OF TRACT A OF THE ASPEN TOWNSITE ADDITION IN SECTION
7; T. 10 S., R. 84 W. OF THE 6TH P.M. MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT A POINT WHERE LINE 4-5 OF THE CITY AND TOWNSITE OF ASPEN INTERSECTS WITH THE
EASTERLY LINE OF BLOCK 78 AS IT RUNS ALONG THE WESTERLY LINE OF MILL STREET;
THENCE NORTHWESTERLY ALONG SAID LINE 4-5 OF ASPEN 185 FEET, MORE OR LESS, TO THE
INTERSECTION OF LINE 4-5 WITH THE NORTHERLY LINE OF BLOCK 78 AS IT RUNS ALONG THE SOUTHERLY
LINE OF HALLAM STREET; THENCE EASTERLY ALONG THE PROJECTED SAID NORTHERLY LINE OF BLOCK 78,
155 FEET, MORE OR LESS, TO THE PROJECTED NORTHEASTERLY CORNER OF BLOCK 78; THENCE
SOUTHERLY ALONG THE EASTERLY LINE OF BLOCK 78 AS IT IS PROJECTED ALONG THE WESTERLY SIDE OF
MILL STREET 100 FEET, MORE OR LESS, TO THE POINT OF BEGINNING.
EXCEPT ANY PORTION OF SAID TRIANGULAR PARCEL LYING SOUTH OF THE SOUTHERLY BOUNDARY LINE
OF LOTS A THROUGH I, BLOCK 78, EXTENDED EASTERLY TO MILL STREET.
AND
A PARCEL OF LAND SITUATED IN THE SW 1/4 OF SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE
6TH PRINCIPAL MERIDIAN, PITKIN COUNTY, COLORADO. SAID PARCEL IS MORE FULLY DESCRIBED AS
FOLLOWS:
BEGINNING AT A POINT ON THE WESTERLY LINE OF THE MILL STREET RIGHT-OF-WAY WHENCE THE WEST
1/4 CORNER OF SAID SECTION 7 BEARS N 26° 39' 14" W 1724.04 FEET; THENCE S 20° 16' 00" W 86.72 FEET;
THENCE N 14° 50' 49" E 86.33 FEET ALONG THE EASTERLY LINE OF BLOCK 78, CITY OF ASPEN; THENCE S 75°
09' 11" E 8.19 FEET TO THE POINT OF BEGINNING.
EXCEPT ANY PORTION THEREOF BEING A PART OF THE RIGHT-OF-WAY FOR MILL STREET.
AND
A PERPETUAL NON-EXCLUSIVE EASEMENT AND RIGHT-OF-WAY FOR PURPOSES OF INGRESS AND EGRESS
OVER THE FOLLOWING DESCRIBED REAL PROPERTY:
A PARCEL OF LAND SITUATED IN THE SW 1/4 OF SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE
6TH PRINCIPAL MERIDIAN, PITKIN COUNTY, COLORADO. SAID PARCEL IS MORE FULLY DESCRIBED AS
FOLLOWS:
BEGINNING AT THE POINT OF INTERSECTION OF LINE 4-5 OF THE ASPEN TOWNSITE WITH THE NORTHERLY
LINE OF BLOCK 78, CITY OF ASPEN, WHENCE THE WEST 1/4 COMER OF SAID SECTION 7 BEARS N 22° 15' 02"
W 1618.85 FEET; THENCE S 75° 09' 11" E 157.76 FEET ALONG THE NORTHERLY LINE OF BLOCK 78, CITY OF
ASPEN; THENCE N 69° 44' 00" W 157.05 FEET; THENCE S 20° 16' 00" W 14.90 FEET TO THE POINT OF
BEGINNING.
AND
A TRAIL EASEMENT SITUATED IN THE SW1/4 SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH
PRINCIPAL MERIDIAN, PITKIN COUNTY, COLORADO, BEING 5 FEET ON EACH SIDE OF THE FOLLOWING
DESCRIBED CENTERLINE:
BEGINNING AT A POINT ON THE LINE BETWEEN LOT 1 AND LOT 2 OF THE TRUEMAN NEIGHBORHOOD
COMMERCIAL PROJECT, WHENCE THE WEST 1/4 CORNER OF SAID SECTION 7 BEARS N 24° 33' 28" W 1355.04
FEET; THENCE S 05° 00' 00" W 30.00 FEET; THENCE 82.61 FEET AROUND A CURVE TO THE LEFT HAVING A
RADIUS OF 400.00 FEET; THENCE S 06° 50' 00" E 73.00 FEET; THENCE 54.02 FEET AROUND A CURVE TO THE
LEFT HAVING A RADIUS OF 49.00 FEET; THENCE S 70° 00' 00" E 25.00 FEET; THENCE 15.71 FEET AROUND A
CURVE TO THE RIGHT HAVING A RADIUS OF 15.00 FEET; THENCE S 10° 00' 00" E 28.48 FEET TO A POINT ON
THE NORTH LINE OF BLOCK 78, CITY OF ASPEN, COLORADO.
TOGETHER WITH ANY INTEREST THAT GRANTOR MAY HAVE IN ANY VACATED STREETS AND ALLEYS
ADJACENT TO THE ABOVE DESCRIBED PROPERTY, AND TOGETHER WITH ALL EASEMENTS AND OTHER
APPURTENANCES THERETO, AND ALL ATTACHED FIXTURES THEREON.
COUNTY OF PITKIN, STATE OF COLORADO
IMPROVEMENT & TOPOGRAPHIC SURVEY
SANITARY CLEAN-OUT
WATER VALVE
TELEPHONE PEDESTAL
CATV PEDESTAL
D
LIGHT POLE
SIGN
FIRE HYDRANT
SANITARY MANHOLE
STORM SEWER MANHOLE
ELECTRIC MANHOLE
WELL
E
GAS METER
ELECTRICAL METER
G
/EGEN'
STORM GRATE
E
BY
NO
.
DA
T
E
BY
PROJECT NO.
OR
5
3
4
-
0
6
7
0
0
I
N
M
E
T
R
O
D
E
N
V
E
R
UN
D
E
R
G
R
O
U
N
D
M
E
M
B
E
R
U
T
I
L
I
T
I
E
S
EX
C
A
V
A
T
E
F
O
R
T
H
E
M
A
R
K
I
N
G
O
F
BE
F
O
R
E
Y
O
U
D
I
G
,
G
R
A
D
E
,
O
R
CA
L
L
2
-
B
U
S
I
N
E
S
S
D
A
Y
S
I
N
A
D
V
A
N
C
E
1-
8
0
0
-
9
2
2
-
1
9
8
7
CE
N
T
E
R
O
F
C
O
L
O
R
A
D
O
CA
L
L
U
T
I
L
I
T
Y
N
O
T
I
F
I
C
A
T
I
O
N
RE
V
I
S
I
O
N
HI
G
H
C
O
U
N
T
R
Y
E
N
G
I
N
E
E
R
I
N
G
,
I
N
C
.
PH
O
N
E
(
9
7
0
)
9
4
5
-
8
6
7
6
-
F
A
X
(
9
7
0
)
9
4
5
-
2
5
5
5
ww
w
.
h
c
e
n
g
.
c
o
m
dr
a
w
n
b
y
:
ch
e
c
k
e
d
b
y
:
da
t
e
:
fi
l
e
:
15
1
7
B
L
A
K
E
A
V
E
N
U
E
,
S
T
E
1
0
1
,
GL
E
N
W
O
O
D
S
P
R
I
N
G
S
,
C
O
8
1
6
0
1
2201652
2161685
1 OF 1
22
5
N
.
M
I
L
L
S
T
R
E
E
T
L
L
C
AS
P
E
N
-
C
O
L
O
R
A
D
O
IM
P
R
O
V
E
M
E
N
T
&
T
O
P
O
G
R
A
P
H
I
C
S
U
R
V
E
Y
22
5
N
.
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
-
C
O
L
O
R
A
D
O
LD
V
RP
K
06
-
0
2
-
1
6
16
8
5
.
D
W
G
1
0
6
.
1
0
-
1
6
AD
D
I
T
I
O
N
A
L
L
A
N
G
U
A
G
E
O
N
T
H
E
E
L
E
C
T
R
I
C
E
A
S
E
M
E
N
T
RP
K
2
7.
2
7
.
2
0
UP
D
A
T
E
S
U
R
V
E
Y
W
I
T
H
T
R
E
E
S
A
N
D
A
D
D
I
T
I
O
N
A
L
I
M
P
R
O
V
E
M
E
N
T
S
.
WJ
N
ORF
REVI E W
CO
WOOD FENCE
RECORD DATA(100.00')
E ELECTRIC TRANSFORMER
SURVEYOR
S CERTI)ICATION
I, BILL W.A. BAKER, A LICENSED PROFESSIONAL LAND SURVEYOR IN THE STATE OF
COLORADO (#23875) DO BY THESE PRESENTS CERTIFY THAT THE DRAWING SHOWN
HEREON, WITH NOTES ATTACHED HERETO AND MADE A PART HEREOF, REPRESENTS A
MONUMENTED LAND SURVEY MADE UNDER MY DIRECT SUPERVISION AND THAT TO THE
BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF, AN ACCURATE DEPICTION OF
SAID SURVEY IS RENDERED BY THIS PLAT. THIS SURVEY WAS CONDUCTED IN
ACCORDANCE WITH APPLICABLE STANDARDS OF PRACTICE, IS NOT A GUARANTY OR
WARRANTY, EITHER EXPRESSED OR IMPLIED. THIS SURVEY PLAT COMPLIES WITH TITLE
38-51-102, COLORADO REVISED STATUTES.
BILL W.A. BAKER, COLORADO PROFESSIONAL LAND SURVEYOR #23875
CERTIFIED FEDERAL SURVEYOR #1699
NOTES
1. DATE OF FIELD SURVEY: MAY 26, 2016 & JULY 21, 2020.
2. ALL BEARINGS ARE GRID BEARINGS OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE,
NORTH AMERICAN DATUM 1983. THE REFERENCE BEARING BETWEEN "A" (A FOUND #5 REBAR WITH YELLOW
PLASTIC CAP) AND "B" (A FOUND #5 REBAR WITH YELLOW PLASTIC CAP) IS S21°16'19"W. ALL DISTANCES ARE
GROUND DISTANCES BASED ON A COMBINED SCALE FACTOR.
3. THIS SURVEY DOES NOT CONSTITUTE A TITLE SEARCH BY THIS SURVEYOR OF THE BOUNDARY SHOWN AND
DESCRIBED HEREON TO DETERMINE:
A) OWNERSHIP OF THE TRACT OF LAND
B)COMPATIBILITY OF THIS DESCRIPTION WITH THOSE OF ADJOINERS
C) RIGHTS-OF-WAY, EASEMENTS AND ENCUMBRANCES OF RECORD AFFECTING THIS PARCEL.
4. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A CURRENT TITLE INSURANCE COMMITMENT. TITLE
INFORMATION REFERENCED HEREON IS THE RESULT OF RESEARCH BY THIS SURVEYOR AND IS NOT
NECESSARILY COMPLETE OR CONCLUSIVE.
5.THE CLIENT DID NOT REQUEST ANY ADDITIONAL EASEMENTS, RIGHTS-OF-WAY AND/OR IMPROVEMENTS BE
RESEARCHED OR SHOWN ON THIS PLAT.
6. ALL DIMENSIONS AND COURSES ARE AS MEASURED IN THE FIELD UNLESS DENOTED IN PARENTHESES, WHICH
DENOTE THE BOUNDARIES OF RECORD CONTAINED IN RECEPTION #369083 IN THE PUBLIC RECORDS OF PITKIN
COUNTY, STATE OF COLORADO.
7. ELEVATIONS SHOWN HEREON ARE BASED ON GPS OBSERVATIONS UTILIZING THE CONTINUOUS OPERATING
REFERENCE STATIONS (CORS) THROUGH THE MESA COUNTY RTVRN NETWORK BROAD CASTING NORTH
AMERICAN VERTICAL DATUM (NAVD88).
8. CONTOUR INTERVAL EQUALS 1 FOOT.
9. BUILDING MEASUREMENTS ARE AT LOWEST PRACTICABLE POINT ON VENEER.
10. ANY PERSON WHO KNOWINGLY REMOVES, ALTERS OR DEFACES ANY PUBLIC LAND SURVEY MONUMENT OR
LAND BOUNDARY MONUMENT OR ACCESSORY COMMITS A CLASS TWO (2) MISDEMEANOR PURSUANT TO
SECTION 18-4-508 OF THE COLORADO REVISED STATUTES.
11. NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED ON ANY DEFECT IN
THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT, MAY ANY ACTION
BASED ON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF
CERTIFICATION SHOWN HEREON.
12. NOTICE: THIS PLAT AND THE INFORMATION SHOWN HEREON MAY NOT BE USED FOR ANY ADDITIONAL OR
EXTENDED PURPOSE BEYOND THAT FOR WHICH IT WAS INTENDED AND MAY NOT BE USED BY ANY PARTIES
OTHER THAN THOSE TO WHICH IT IS CERTIFIED. THIS DOCUMENT AND THE WORK IT REPRESENTS IS THE
PROPERTY OF HIGH COUNTRY ENGINEERING, INC. NO PART OF THIS DOCUMENT MAY BE STORED,
REPRODUCED, DISTRIBUTED OR USED TO PREPARE DERIVATIVE PRODUCTS WITHOUT PRIOR WRITTEN
PERMISSION. AN ORIGINAL SEAL AND ORIGINAL SIGNATURE IS REQUIRED TO VALIDATE THIS DOCUMENT AND IS
EXCLUSIVE TO HIGH COUNTRY ENGINEERING, INC. AND THE OWNER(S) OF RECORD AS OF THIS DATE, OF THE
BOUNDARY DELINEATED HEREON AND THE SUBJECT OF THE SURVEY. THIS PLAT IS RESTRICTED TO THE INTENT
OF TITLE 38, ARTICLE 50, §101, 5 (a) AND (b) C.R.S.
10002 Conifer Tree Diameter 1'Drip 12'
10005 Conifer Tree Diameter 1.8'Drip 10'
10006 Conifer Tree Diameter 1.3'Drip 14'
10007 Conifer Tree Diameter 1.3'Drip 9'
10008 Conifer Tree Diameter 1.3'Drip 9'
10009 Conifer Tree Diameter 1'Drip 10'
10010 Conifer Tree Diameter 1'Drip 9'
10011 Conifer Tree Diameter 1.8'Drip 16'
10072 Broadleaf Tree Diameter 0.7'Drip 10'
10073 Broadleaf Tree Diameter 1.8'Drip 16'
10110 Conifer Tree Diameter 1.3'Drip 10'
10112 Broadleaf Tree Diameter 0.6'Drip 4'
10135 Broadleaf Tree Diameter 0.5'Drip 4'
10136 Broadleaf Tree Diameter 0.5'Drip 4'
10137 Broadleaf Tree Diameter 0.9'Drip 8'
10138 Broadleaf Tree Diameter 0.8'Drip 10'
10139 Broadleaf Tree Diameter 0.8'Drip 10'
10140 Broadleaf Tree Diameter 0.8'Drip 10'
10163 Broadleaf Tree Diameter 0.8'Drip 14'
10164 Broadleaf Tree Diameter 0.5'Drip 14'
10165 Broadleaf Tree Diameter 0.3'Drip 8'
10166 Broadleaf Tree Diameter 0.4'Drip 13'
10167 Broadleaf Tree Diameter 1.7'Drip 14'
10168 Broadleaf Tree Diameter 1.5'Drip 15'
TREE CHART
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.1.10
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
EXISTING SITE
PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
N
3
3
2
2
1
1
EXISTING
WALK TO BE
REMOVED EXISTING
PLANTER
EE
4
4
DD
AA
CC
5
5
BB
SCALE: 1/8" = 1'-0"1 EXISTING SITE PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.1.11
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED SITE
PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
N
NEW WOOD
BENCHES OVER
EXISTING PLANTER
EXISTING
WALK TO BE
REMOVED
NEW SIGN
WITH HIDDEN
LIGHT
EXISTING
PLANTER
NEW PERVIOUS
PAVER ENTRY
WALK
NEW ENTRY
ENCLOSURE WITH
ELEVATOR
NEW
OVERHANG
RIVER ROCK
XEROSCAPE
RIVER ROCK
XEROSCAPE
NEW EVERGREEN
SHRUBS TO
MATCH EXISTING
SCALE: 1/8" = 1'-0"1 PROPOSED SITE PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.1.20
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
EXISTING PLAN
FARS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
TOTAL AREA
(to outside of stud/cmu wall)
2,590.4 sq ft
STAIR
#3
STAIR #1
DN
ROOF
WOMEN MEN
OFFICE 8
OFFICE 6
OFFICE 5
OFFICE 4 OFFICE 3 OFFICE 1
OFFICE 7
OFFICE 2
ROOF
TOTAL AREA
(to outside of foundation wall)
4,729.8 sq ft
UNISEX 2
UNISEX 1
STAIR #1SUMP PUMP RM PASSAGE WAY
STAIR
#2
EXISTING OFFICE
UP
EXISTING
SAFE
MECHANICAL
ROOM
BOILER
ROOM
1
2
3
4
5
6
EXISTING OFFICE
STORAGE
STAIR NOT TO BE DEMO'D UNTIL
NEW ENTRY STAIR COMPLETE
647.8 sq ft
329.8 sq ft 318.0 sq ft
647.8 sq ft
488.8 sq ft
159.0 sq ft
1
2 3 4
5
6
EXISTING FLOOR AREA CALCULATIONS 225 NORTH MILL STREET
CITY OF ASPEN ZONING SUBMISSION
LOT AREA: 18,458 - 1,480 ACCESS EASEMENT 16,978 SQ FT
ALLOWABLE FLOOR AREA (1.5:1)25,467 SQ FT
SUBGRADE LEVEL WALL LABEL TOTAL WALL
AREA (SQ. FT.)
EXPOSED WALL
AREA (SQ. FT.)
1 647.8 0.0
2 329.8 0.0
3 159.0 0.0
4 318.0 0.0
5 488.8 0.0
6 647.8 0.0
OVERALL TOTAL WALL AREA (SQ. FT.)2,591.2
EXPOSED WALL AREA (SQ. FT.)0.0
% OF EXPOSED WALL (EXPOSED/TOTAL)0.0%
SUBGRADE GROSS FLOOR AREA (SQ. FT.)4,729.8
SUBGRADE COUNTABLE FLOOR AREA (SQ. FT.)0.0
TOTAL EXISTING AREA CALCULATIONS GROSS AREA FLOOR AREA NET LEASABLE PER SPA
BASEMENT LEVEL TOTAL FLOOR AREA 4,729.8 0.0 0.0
BASEMENT NET LEASABLE AREA (NLA)2,580.0
BASEMENT COMMON AREA (TOTAL - NLA)
1ST FLOOR TOTAL AREA 4,623.5 4,623.5 5,235.0
1ST FLOOR NET LEASABLE AREA (NLA)4,211.0
1ST FLOOR COMMON AREA (TOTAL - NLA)
2ND FLOOR TOTAL AREA 2,590.5 2,590.5 2,847.0
2ND FLOOR NET LEASABLE AREA (NLA)2,532.0
2ND FLOOR COMMON AREA (TOTAL - NLA)
TOTAL NET LEASABLE AREA 9,323.0
TOTAL EXISTING FLOOR AREA (SQ. FT.)11,943.8 7,214.0 8,082.0
EXISTING SUBGRADE LEVEL EXPOSED WALL CALCULATIONS
SCALE: 1/8" = 1'-0"3 EXISTING 2ND FLOOR FAR
SCALE: 1/8" = 1'-0"1 EXISTING LOWER LEVEL FAR
SCALE: 1/8" = 1'-0"4 SUBGRADE WALL AREAS 5 EXISTING FLOOR AREA CALCS
WALL LEGEND
EXISTING WALL
WALL TO BE REMOVED
NEW WALL
AREA LEGEND
TOTAL AREA TO OUTSIDE OF STRUCTURE PER FAR
NET LEASABLE AREA
SUBGRADE WALL AREA
4,622.7 sq ft
TOTAL AREA
(to outside of stud/CMU wall)
4,623.5 sq ft
OFFICE 4
OFFICE 5
STAIR #1
EXISTING
HALLWAY
STAIR
#2
STAIR
#3
RESTRM #2
RESTROOM #1
OFFICE 3
DN
OFFICE 2
OFFICE 1
EXISTING
PUBLIC
RESTROOM
SCALE: 1/8" = 1'-0"2 EXISTING 1ST FLOOR FAR
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.1.21
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED PLAN
FARs
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
TOTAL AREA
(to outside of stud/CMU wall)
4,856.8 sq ft
OFFICE 4
OFFICE 5
STAIR
#2
STAIR
#3
ELEVATOR
RESTRM #2
RESTROOM #1
OFFICE 3
NEW
ENTRY
UPDN
DN
TOTAL NET LEASABLE AREA
3,750.6 sq ft
OFFICE 2
OFFICE 1
OFFICE 6
UNISEX
RESTROOM 1
UNISEX
RESTROOM 2
1,479.3 sq ft
2,271.3 sq ft
FUTURE CORRIDOR
TOTAL AREA
(to outside of foundation wall)
5,058.1 sq ft
CO
R
R
I
D
O
R
UNISEX 2
UNISEX 1
SUMP PUMP RM
STAIR
#2
CORRIDOR
VESTIBULE
ELEVATOR
UP
UP
EXISTING
SAFE
MECHANICAL
ROOM
BOILER
ROOM
OFFICE 3
OFFICE 2 ELEV.
EQUIP
TOTAL NET LEASABLE AREA
3,077.5 sq ft
1
2
3
4
5
6
OFFICE 1
STORAGE
2,271.8 sq ft
805.7 sq ft
647.8 sq ft
490.3 sq ft 157.5 sq ft
647.8 sq ft
488.8 sq ft
160.5 sq ft
8'
-
1
0
"
8'
-
1
0
"
8'
-
1
0
"
8'
-
1
0
"
1
2 3 4
5
6
PROPOSED FLOOR AREA CALCULATIONS 225 NORTH MILL STREET
CITY OF ASPEN ZONING SUBMISSION
LOT AREA: 18,458 - 1,480 ACCESS EASEMENT 16,978 SQ FT
ALLOWABLE FLOOR AREA (1.5:1)25,467 SQ FT
SUBGRADE LEVEL WALL LABEL TOTAL WALL
AREA (SQ. FT.)
EXPOSED WALL
AREA (SQ. FT.)
1 647.8 0.0
2 490.2 0.0
3 160.5 0.0
4 157.5 0.0
5 488.8 0.0
6 648.8 0.0
OVERALL TOTAL WALL AREA (SQ. FT.)2,593.6
EXPOSED WALL AREA (SQ. FT.)0.0
% OF EXPOSED WALL (EXPOSED/TOTAL)0.0%
SUBGRADE GROSS FLOOR AREA (SQ. FT.)5,058.1
SUBGRADE COUNTABLE FLOOR AREA (SQ. FT.)0.0
TOTAL PROPOSED AREA CALCULATIONS GROSS AREA FLOOR AREA NET LEASABLE PER SPA
BASEMENT LEVEL TOTAL FLOOR AREA 5,058.1 0.0 0.0
BASEMENT NET LEASABLE AREA (NLA)3,077.5 2,580.0
BASEMENT COMMON AREA (TOTAL - NLA)1,980.6
1ST FLOOR TOTAL AREA 4,856.8 4,856.8 5,235.0
1ST FLOOR NET LEASABLE AREA (NLA)3,750.6 4,211.0
1ST FLOOR COMMON AREA (TOTAL - NLA)1,106.2
2ND FLOOR TOTAL AREA 2,881.5 2,881.5 2,847.0
2ND FLOOR NET LEASABLE AREA (NLA)2,157.6 2,532.0
2ND FLOOR COMMON AREA (TOTAL - NLA)723.9
TOTAL NET LEASABLE AREA 8,985.7 9,323.0
TOTAL PROPOSED FLOOR AREA (SQ. FT.)12,796.4 7,738.3 8,082.0
PROPOSED SUBGRADE LEVEL EXPOSED WALL CALCULATIONS
TOTAL AREA
(to outside of stud/cmu wall)
2,881.5 sq ft
STAIR
#3
VESTIBULE
ELEVATOR
NEW CORRIDOR
DNDN
ROOF
UNISEX #2UNISEX #1
TOTAL NET LEASABLE AREA
2,157.6 sq ft
OFFICE 8
OFFICE 6
OFFICE 5
OFFICE 4 OFFICE 3 OFFICE 1
OFFICE 7
OFFICE 2
ROOF
JAN.
CLO.
954.0 sq ft
1,203.6 sq ft
EXISTING FLOOR AREA CALCULATIONS 225 NORTH MILL STREET
CITY OF ASPEN ZONING SUBMISSION
LOT AREA: 18,458 - 1,480 ACCESS EASEMENT 16,978 SQ FT
ALLOWABLE FLOOR AREA (1.5:1)25,467 SQ FT
SUBGRADE LEVEL WALL LABEL TOTAL WALL
AREA (SQ. FT.)
EXPOSED WALL
AREA (SQ. FT.)
1 647.8 0.0
2 329.8 0.0
3 159.0 0.0
4 318.0 0.0
5 488.8 0.0
6 647.8 0.0
OVERALL TOTAL WALL AREA (SQ. FT.)2,591.2
EXPOSED WALL AREA (SQ. FT.)0.0
% OF EXPOSED WALL (EXPOSED/TOTAL)0.0%
SUBGRADE GROSS FLOOR AREA (SQ. FT.)4,729.8
SUBGRADE COUNTABLE FLOOR AREA (SQ. FT.)0.0
TOTAL EXISTING AREA CALCULATIONS GROSS AREA FLOOR AREA NET LEASABLE PER SPA
BASEMENT LEVEL TOTAL FLOOR AREA 4,729.8 0.0 0.0
BASEMENT NET LEASABLE AREA (NLA)2,580.0
BASEMENT COMMON AREA (TOTAL - NLA)
1ST FLOOR TOTAL AREA 4,623.5 4,623.5 5,235.0
1ST FLOOR NET LEASABLE AREA (NLA)4,211.0
1ST FLOOR COMMON AREA (TOTAL - NLA)
2ND FLOOR TOTAL AREA 2,590.5 2,590.5 2,847.0
2ND FLOOR NET LEASABLE AREA (NLA)2,532.0
2ND FLOOR COMMON AREA (TOTAL - NLA)
TOTAL NET LEASABLE AREA 9,323.0
TOTAL EXISTING FLOOR AREA (SQ. FT.)11,943.8 7,214.0 8,082.0
EXISTING SUBGRADE LEVEL EXPOSED WALL CALCULATIONS
SCALE: 1/8" = 1'-0"2 PROPOSED 1ST FLOOR FAR
SCALE: 1/8" = 1'-0"1 PROPOSED LOWER LEVEL FAR
SCALE: 1/8" = 1'-0"4 SUBGRADE WALL AREAS 6 PROPOSED FLOOR AREA CALCULATIONS
SCALE: 1/8" = 1'-0"3 PROPOSED 2ND FLOOR FAR
5 EXISTING FLOOR AREA CALCULATIONS
WALL LEGEND
EXISTING WALL
WALL TO BE REMOVED
NEW WALL
AREA LEGEND
TOTAL AREA TO OUTSIDE OF STRUCTURE PER FAR
NET LEASABLE AREA
SUBGRADE WALL AREA
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.1.30
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
WALL DEMOLITION
CALCULATIONS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
1,602.5 sq ft
22.9 sq ft 64.5 sq ft
20.5 sq ft 20.5 sq ft
20.5 sq ft
23.5 sq ft
1,615.0 sq ft
70.0 sq ft
120.1 sq ft
28.2 sq ft
119.6 sq ft
28.1 sq ft
25.1 sq ft 25.1 sq ft
424.1 sq ft
25.8 sq ft 25.3 sq ft
25.3 sq ft
1,627.6 sq ft
60.2 sq ft 60.0 sq ft
120.1 sq ft
28.2 sq ft
120.1 sq ft
28.2 sq ft 28.2 sq ft
120.1 sq ft 120.1 sq ft
28.2 sq ft
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
1,633.7 sq ft
106.8 sq ft
22.9 sq ft
22.9 sq ft
56.7 sq ft 75.5 sq ft
75.5 sq ft75.5 sq ft37.9 sq ft
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
283.5 sq ft
WALL LABEL INDIVIDUAL WALL
AREA (SQ. FT.)
AREA REDUCED FOR
FENESTRATION (SQ. FT.)
AREA OF WALL TO
BE REMOVED (SQ.
FT.)
1 - EAST 1,615.0 416.0 500.5
2 - NORTH 1,633.7 435.8 321.4
3 - WEST 1,602.5 110.9 61.5
4 - SOUTH 1,627.6 713.6 0.0
WALL SURFACE TOTAL (SQ. FT.)6,478.8
AREA REDUCED FOR FENESTRATION (SQ. FT.)1,676.3
AREA USED FOR DEMO CALCULATIONS 4,802.5
WALL SURFACE AREA TO BE REMOVED (SQ. FT.)883.4
WALL + ROOF AREA USED FOR DEMO
CALCULATION (SQ. FT.)4802.5+5,028.7 9,831.2
SURFACE AREA TO BE REMOVED (SQ. FT.)883.4+335 1,218.4
TOTAL (AREA TO BE REMOVED/TOTAL)12.4%
DEMOLITION TOTALS
WALL DEMOLITION
WALL DEMOLITION CALCULATIONS 225 NORTH MILL
CITY OF ASPEN ZONING SUBMISSION
SCALE: 3/16" = 1'-0"3 WEST ELEVATION DEMOLITION
SCALE: 3/16" = 1'-0"1 EAST ELEVATION DEMOLITION
SCALE: 3/16" = 1'-0"4 SOUTH ELEVATION DEMOLITION
SCALE: 3/16" = 1'-0"2 NORTH ELEVATION DEMOLITION
SCALE: 1' = 1'-0"5 225 N MILL WALL DEMO CALCS
WALL LEGEND
INDIVIDUAL WALL AREA (SQ FT)
AREA REDUCED FOR FENESTRATION (SQ FT)
AREA OF WALL TO BE REMOVED (SQ FT)
TOTAL DEMOLITION: 12.4%
ROOF AND WALL
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.1.31
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
ROOF DEMOLITION
CALCULATION
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
335.0 sq ft1
2
3
3,042.5 sq ft
1,651.2 sq ft
ROOF LABEL
INDIVIDUAL ROOF
AREA (SQ. FT.) AS
FLAT PLANE
AREA OF ROOF TO BE
REMOVED (SQ. FT.)
1 3,042.5 0.0
2 1,651.2 0.0
3 335.0 335.0
ROOF SURFACE TOTAL (SQ. FT.)5,028.7
ROOF SURFACE AREA TO BE REMOVED (SQ. FT.)335.0
ROOF + WALL AREA USED FOR DEMO
CALCULATION (SQ. FT.)5,028.7+4,802.5 =9,831.2
SURFACE AREA TO BE REMOVED (SQ. FT.)335 + 883.4 1,218.4
TOTAL (AREA TO BE REMOVED/TOTAL)12.4%
DEMOLITION TOTALS
ROOF DEMOLITION
ROOF DEMOLITION CALCULATIONS FLAT PLANE METHOD
CITY OF ASPEN ZONING SUBMISSION
SCALE: 3/16" = 1'-0"1 ROOF DEMOLITION
SCALE: 1:1.092225 N MILL ROOF DEMO CALCS
ROOF LEGEND
EXISTING ROOF TO REMAIN (SQ FT)
AREA OF ROOF TO BE REMOVED (SQ FT)
TOTAL DEMOLITION: 12.4%
ROOF AND WALL
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.2.10
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
EXISTING AND
DEMOLITION
LOWER LEVEL
PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
3
3
2
2
1
1
18'-0"18'-0"18'-0"
72
'
-
0
"
54
'
-
0
"
18
'
-
0
"
72
'
-
0
"
54'-0"
89'-4"
4
A.1.30
UNISEX 2
UNISEX 1
STAIR #1
SUMP PUMP RM PASSAGE WAY
STAIR
#2
EXISTING OFFICE
UP
UP
EXISTING
SAFE
MECHANICAL
ROOM
BOILER
ROOM
ELECT.
ELECT.
EXISTING OFFICE
WALL LEGEND
EXISTING WALL
WALL TO BE REMOVED
NEW WALL
AREA AFFECTING EXISTING TENANT
STORAGE
STAIR NOT TO BE DEMO'D UNTIL
NEW ENTRY STAIR COMPLETE
2
A.1.30
EE
4
4
DD
AA
CC
1
A.1.30
3
A.1.30
5
5
BB
SCALE: 1/4" = 1'-0"1 EXISTING LOWER LEVEL PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.2.11
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
EXISTING AND
DEMOLITION 1ST
FLOOR PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
3
3
2
2
1
1
4
A.1.30
72
'
-
0
"
18'-0"18'-0"18'-0"18'-0"
2
A.1.30
FIRE HYDRANT STANDPIPE
REMOVE WINDOWS AND
FUR-IN OPENINGS TO
MATCH ADJOINING
WALLS
UP
OFFICE 4
OFFICE 5
STAIR #1
EXISTING
HALLWAY
STAIR
#2
STAIR
#3
RESTRM #2
RESTROOM #1
OFFICE 3
DN
UP
DN
SK
Y
L
I
G
H
T
AB
O
V
E
EXISTING FOYER
TO BE REMOVED
OFFICE 2
OFFICE 1
EXISTING
PUBLIC
RESTROOM
WALL LEGEND
EXISTING WALL
WALL TO BE REMOVED
NEW WALL
AREA AFFECTING EXISTING TENANT
STAIR NOT TO BE DEMO'D UNTIL
NEW ENTRY STAIR COMPLETE
EE
4
4
DD
AA
CC
1
A.1.30
3
A.1.30
5
5
BB
SCALE: 1/4" = 1'-0"1 EXISTING 1ST FLOOR PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.2.12
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
EXISTING AND
DEMOLITION 2ND
FLOOR PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
3
3
2
2
1
1
4
A.1.30
2
A.1.30
72
'
-
0
"
18'-0"
54
'
-
0
"
18
'
-
0
"
72
'
-
0
"
18'-0"18'-0"18'-0"
STAIR
#3
DN
STAIR #1
F.E.
SKYLIGHT
BELOW
DN
ROOF
ELECT.
WOMEN MEN
OFFICE 8
OFFICE 6
OFFICE 5
OFFICE 4 OFFICE 3 OFFICE 1
OFFICE 7
OFFICE 2
ROOF
EXIST.
CHASE
V.I.F.
WALL LEGEND
EXISTING WALL
WALL TO BE REMOVED
NEW WALL
AREA AFFECTING EXISTING TENANT
EE
4
4
DD
AA
CC
1
A.1.30
3
A.1.30
5
5
BB
SCALE: 1/4" = 1'-0"1 EXISTING 2ND FLOOR PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.2.13
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
EXISTING AND
DEMOLITION ROOF
PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
3
3
2
2
1
1
4
A.1.30
2
A.1.30
18'-0"
72
'
-
0
"
54
'
-
0
"
18
'
-
0
"
72
'
-
0
"
AREA OF NEW ENTRY
EE
4
4
DD
AA
CC
1
A.1.30
3
A.1.30
5
5
BB
SCALE: 1/4" = 1'-0"01 EXISTING ROOF PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.2.20
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED LOWER
LEVEL PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
3
3
2
2
1
1
18'-0"18'-0"18'-0"
72
'
-
0
"
54
'
-
0
"
18
'
-
0
"
72
'
-
0
"
54'-0"
10
"
6'
-
9
2
9
/
3
2
"
5'
-
1
0
"
5'
-
6
3
/
3
2
"
89'-4"
91'-8 7/16"
89'-4"
97'-7 7/16"
4
A.1.30
CO
R
R
I
D
O
R
UNISEX 2
UNISEX 1
SUMP PUMP RM
STAIR
#2
AUTO DOSING SINK
RELOCATE PHONE
SWITCHES, CABLE,
ELEC. FROM OFFICE 3
CORRIDOR
VESTIBULE
ELEVATOR
install new flooring
UP
UP
EXISTING
SAFE
MECHANICAL
ROOM
BOILER
ROOM
OFFICE 3
OFFICE 2
ADA COMPLIANT
ELEV.
EQUIP
NEW BOTTLE-
FILL STATION
ADA COMPLIANT
OFFICE 1
AIR-LOCK
1
A.2.24
EXISTING MOP SINK
RELOCATE
ELECT. PANELS
WALL LEGEND
EXISTING WALL
WALL TO BE REMOVED
NEW WALL
AREA AFFECTING EXISTING TENANT
STORAGE
1
A.4.11
1
A.4.11
1
A.4.10
1
A.4.10
2
A.4.10
2
A.4.10
2
A.4.11
2
A.4.11
1
A.4.12
1
A.4.12
2
A.1.30
8"3'-11 29/32"4"8'-4 3/32"4"5'-2"
EE
4
4
DD
AA
CC
1
A.1.30
3
A.1.30
5
5
BB
SCALE: 1/4" = 1'-0"1 PROPOSED LOWER LEVEL
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.2.21
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED 1ST
FLOOR PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
W02 W03 W04 W09 W10W08W06W07W05
W01
W14
W11
W15
W16
W12
W13
W17
3
3
2
2
1
1
4
A.1.30
36
'
-
0
"
36
'
-
0
"
18'-0"18'-0"18'-0"
18
'
-
0
"
18
'
-
0
"
1
1
/
2
"
35
'
-
1
0
1
/
2
"
72
'
-
0
"
18'-0"18'-0"18'-0"18'-0"
5'
-
1
"
7'-0"
5'
-
1
0
"
4'-4 9/32"9'-3/32"4'-2 1/2"
1'-6"
100'-0"
103'108'-11 13/16"
97'-7 7/16" 1
A.4.11
1
A.4.11
1
A.4.10
1
A.4.10
2
A.4.10
2
A.4.10
2
A.4.11
2
A.4.11
1
A.4.12
1
A.4.12
2
A.1.30
TILE AT ELEVATOR
SHAFT AND EAST
AND NORTH WALL
CANOPY
ABOVE
FIRE HYDRANT STANDPIPE
OFFICE 4
OFFICE 5
AIR-LOCK
STAIR
#2
STAIR
#3
ELEVATOR
RESTRM #2
RESTROOM #1
OFFICE 3
NEW
ENTRY
UP
DN
EXIST. 3 5/8" CMU
WALL (VERIFY)
Remove Brick veneer on
exterior. Replace with Tile
HSS4X2
handrails +36"
TENANT
SIGNAGE
4X4 TS OR W8X8
HSS
6
X
6
C
O
L
U
M
N
w/ C
6
X
1
3
C
H
A
N
N
E
L
S
aboveabove
below
UP
DN
SK
Y
L
I
G
H
T
AB
O
V
E
pivot door
HSS4X2
HS
S
4
X
2
HS
S
4
X
2
HS
S
4
X
2
OFFICE 2
OFFICE 1
2
A.2.24
HSS4X2
OFFICE 6
WALL LEGEND
EXISTING WALL
WALL TO BE REMOVED
NEW WALL
AREA AFFECTING EXISTING TENANT
NEW BOTTLE-
FILL STATION
UNISEX
RESTROOM 1
ADA compliant
UNISEX
RESTROOM 2
ADA compliant
EE
4
4
DD
AA
CC
W01
1
A.1.30
3
A.1.30
NEW WALLS &
ENTRY DOOR
FUTURE CORRIDOR
5
5
BB
SCALE: 1/4" = 1'-0"1 PROPOSED 1ST FLOOR PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.2.22
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED 2ND
FLOOR PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
W34
W37
W38
W39
W35
W36
W31
W32
W33
W40W42W44W45W43W41
W20
W21
W30W29W28W27W26W25W24W23W22
3
3
2
2
1
1
4
A.1.30
1
A.4.11
1
A.4.11
1
A.4.10
1
A.4.10
2
A.4.10
2
A.4.10
2
A.4.11
2
A.4.11
1
A.4.12
1
A.4.12
2
A.1.30
72
'
-
0
"
18'-0"
54
'
-
0
"
18
'
-
0
"
72
'
-
0
"
18'-0"18'-0"18'-0"
4'
-
2
"
4"
5'
-
1
0
"
4"
+/
-
6
'
-
8
"
1'-6"
108'-11 13/16"
112'-0"
103'
AREA OF REFUGE
STAIR
#3
VESTIBULE
ELEVATOR
NEW CORRIDOR
DN
C1
2
X
2
0
.
7
st
e
e
l
p
a
n
sl
o
p
e
t
o
d
r
a
i
n
CANOPY
BELOW
open to
below
SKYLIGHT
BELOW
DN
ROOF
F.E.
UNISEX #2UNISEX #1
3
A.2.24
HSS4X2
HSS4X2
HS
S
4
X
2
HS
S
4
X
2
HS
S
4
X
2
HS
S
4
X
2
HS
S
4
X
2
HS
S
4
X
2
HSS
6
X
6
C
O
L
U
M
N
w/ C
6
X
1
3
C
H
A
N
N
E
L
S
AIR-LOCK
OFFICE 8
OFFICE 6
OFFICE 5
OFFICE 4 OFFICE 3 OFFICE 1
OFFICE 7
OFFICE 2
ROOF
ADA compliantADA compliant JAN.
CLO.
WALL LEGEND
EXISTING WALL
WALL TO BE REMOVED
NEW WALL
AREA AFFECTING EXISTING TENANT
NEW BOTTLE-
FILL STATION
EE
4
4
DD
AA
CC
1
A.1.30
3
A.1.30
5
5
42" GLASS
GUARDRAIL
BB
SCALE: 1/4" = 1'-0"1 PROPOSED 2ND FLOOR PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.2.23
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED ROOF
PLAN
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
3
3
2
2
1
1
4
A.1.30
1
A.4.11
1
A.4.11
1
A.4.10
1
A.4.10
2
A.4.10
2
A.4.10
2
A.4.11
2
A.4.11
1
A.4.12
1
A.4.12
2
A.1.30
NEW LOW WALL
CLAD IN SHEET
METAL
14" C CHANNEL CORNICE
ROOF BELOW
NEW ENTRY
TOWER ROOF
CANOPY ROOF
BELOW
DRAIN
EE
4
4
DD
AA
CC
1
A.1.30
3
A.1.30
5
5
BB
SCALE: 1/4" = 1'-0"1 PROPOSED ROOF PLAN
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.3.10
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
EXISTING BUILDING
ELEVATIONS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
E D AB
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
REMOVE LT. FIXT
AND RELOCATE
J-BOX NEW LIGHT FIXTURE
4 3 2 15
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
SCALE: 1/4" = 1'-0"2 EXISTING EAST ELEVATION
SCALE: 1/4" = 1'-0"1 EXISTING NORTH ELEVATION
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.3.11
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
EXISTING BUILDING
ELEVATIONS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
A D EB
+89'-4"
-1 LOWER LEVEL
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
+124'-0"
3 T.O. BRICK
REMOVE LT.
FIXTURE
1 2 3 4 5
+89'-4"
-1 LOWER LEVEL
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
+124'-0"
3 T.O. BRICK
SCALE: 1/4" = 1'-0"2 EXISTING WEST ELEVATION
SCALE: 1/4" = 1'-0"1 EXISTING SOUTH ELEVATION
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
01 - WIP
Change
Change
Work in Progress
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.3.20
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED
BUILDING
ELEVATIONS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
E D AB
+89'-4"
-1 LOWER LEVEL
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
+124'-0"
3 T.O. BRICK
12" C CHANNEL
CANOPY
14" STEEL CHANNEL
CORNICE
HSS2X4 COLUMN
AND BEAM FRAME
NEW LIGHT FIXTURE
PIVOT ENTRY
DOOR
NEW
WINDOW
NEW
WINDOW
NEW
WINDOW
EXISTING
WINDOW
2"X2 1/4" KAWNEER
THERMAL WINDOWS,
TYP.
AREA OF NEW WORK
4 3 2 15
+89'-4"
-1 LOWER LEVEL
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
+124'-0"
3 T.O. BRICK
26
'
-
7
"
2'
-
2
"
4' ENTRY CANOPY
WITH 12" C CHANNEL
6" TUBE STEEL WITH
C CHANNEL CORNER
COLUMNS, TYP.
14" STEEL
CHANNEL CORNICE
HSS2X4 COLUMN
AND BEAM FRAME
NEW LIGHT FIXTURES
2"X2 1/4" KAWNEER
THERMAL WINDOWS,
TYP.NEW WINDOWS
AREA OF NEW WORK
SCALE: 1/4" = 1'-0"2 PROPOSED EAST ELEVATION
SCALE: 1/4" = 1'-0"1 PROPOSED NORTH ELEVATION
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
01 - WIP
Change
Change
Work in Progress
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.3.21
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED
BUILDING
ELEVATIONS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
A D EB
+89'-4"
-1 LOWER LEVEL
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
+124'-0"
3 T.O. BRICK
14" STEEL CORNICE
SHEET METAL CRIB WALL
6" TUBE STEEL WITH
C CHANNEL CORNER
COLUMNS, TYP.
NEW LIGHT FIXTURE
NEW WINDOW
NEW WINDOW
AREA OF NEW WORK
1 2 3 4 5
+89'-4"
-1 LOWER LEVEL
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
+124'-0"
3 T.O. BRICK
2"X2 1/4" KAWNEER
THERMAL WINDOWS,
TYP.
AREA OF NEW WORK
SCALE: 1/4" = 1'-0"2 PROPOSED WEST ELEVATION
SCALE: 1/4" = 1'-0"1 PROPOSED SOUTH ELEVATION
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
01 - WIP Change Work in Progress
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.3.22
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED
COLORED
ELEVATIONS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
1 NORTH ELEVATION RENDERING
2 EAST ELEVATION RENDERING
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
01 - WIP Change Work in Progress
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.3.23
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED
COLORED
ELEVATION AND
STREETSCAPE
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
1 WEST ELEVATION RENDERING
2 STREETSCAPE FROM NORTH MILL
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.4.10
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED
BUILDING
SECTIONS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
1 2 3 5
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
STAIR
#3
VESTIBULENEW HALLWAYOFFICEOFFICE
STAIR
#2 NEW HALLWAY NEW
ENTRY
CORRIDOR VESTIBULEMECHANICAL
ROOM
OFFICE
E D C B A
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
VESTIBULE
NEW
ENTRYOFFICE
VESTIBULEOFFICE
SCALE: 1/4" = 1'-0"1 E/W BUILDING SECTION
SCALE: 1/4" = 1'-0"2 N/S BUILDING SECTION
Exhibit B- 225 N. Mill Approved Plans
Issue Name Issue Date
RevID ISSUE NAME DATE
PROJECT NO:
DRAWN BY:
COPYRIGHT
DATE PRINTED:
SHEET TITLE
A.4.11
.
NOT FOR
C
O
N
S
T
R
U
C
T
I
O
N
PROPOSED
BUILDING
SECTIONS
6/18/20
COMM. DESIGN REVIEW
INITIAL SET-UP
.
C.E.
PROGRESS SET
10/16/19
6/8/20
6/19/20
2 2 5 N M I L L S T R E E T S T E 1 0 0
A S P E N C O L O R A D O 8 1 6 1 1
BO
W
T
I
E
R
E
M
O
D
E
L
22
5
N
O
R
T
H
M
I
L
L
S
T
R
E
E
T
AS
P
E
N
,
C
O
L
O
R
A
D
O
B C D E
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
ELEV.
EQUIP CORRIDORVESTIBULE OFFICE
NEW
ENTRY
OFFICE OFFICE
VESTIBULE
5 3 2 1
+89'-4"
-1 LOWER LEVEL
+100'-0"
1 1ST FLOOR
+112'-0"
2 2ND FLOOR
+124'-0"
3 T.O. BRICK
WOMENCORRIDORMECHANICAL
ROOM OFFICEELEV.
EQUIP
UNISEX
BATHRMOFFICECHASEBATHROOM
NEW HALLWAY UNISEX #2 UNISEX #1OFFICEOFFICE
SCALE: 1/4" = 1'-0"2 N/S BUILDING SECTION
SCALE: 1/4" = 1'-0"1 E/W BUILDING SECTION
Exhibit B- 225 N. Mill Approved Plans