Loading...
HomeMy WebLinkAboutExhibit B_225 N Mill_Approved Plans 225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0 June 18, 2020 Mr. Ben Anderson, Principal Planner City of Aspen Community Development Department 130 South Galena Street Aspen, Colorado 81611 RE: 225 NORTH MILL STREET INSUBSTANTIAL PD AMENDMENT AND COMMERCIAL DESIGN REVIEW Dear Ben, Please consider this letter to be an application for review of a planned addition to and internal remodel of the office building located at 225 North Mill Street in Aspen. The following changes are planned to the building, as illustrated in the attached drawing set: •Creation of a new enclosed glass entry along Mill Street, within which there will be a new elevator and stairway, providing ADA-compliant access to the entire building. •Full remodel of the basement level, including replacement of the outdated HVAC equipment with a new, high efficiency system, and remodel of the existing offices and tenant storage spaces into modern office spaces. •Limited remodel of the first and second floors, to create new hallway connections from the elevator and stairway to the existing offices and to make the bathrooms ADA-complaint. The subject property is located along North Mill Street between Bleeker Street and Puppy Smith Street (see attached vicinity map). The property’s Pitkin County Parcel ID number is 273707317004. The legal description of the property is Lots D, E, F, G, H, and I, Block 78, City and Townsite of Aspen, along with an adjoining triangular parcel of land which is part of Tract A of the Aspen Townsite Addition. The property is zoned Neighborhood Commercial (NC) with a Planned Development (PD) Overlay. Offices are a permitted use in the NC zone district. The property is owned by 225 North Mill Street, LLC (hereinafter, “the applicant”). Proof of the ownership of the property is provided by Exhibit #1, the attached letter from the applicant’s attorney. Authorization for Stryker Brown Architects to submit this application to the City of Aspen is provided in a letter from the property owner attached as Exhibit #2. You provided us a Pre-Application Conference Summary (see Exhibit #3) which states that the following land use review procedures apply to this proposal: Exhibit B- 225 N. Mill Approved Plans 225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0 Insubstantial PD Amendment, pursuant to Section 26.445.110.A; and Commercial Design Review, pursuant to Section 26.412. Responses to the standards applicable to these review procedures follow below. First, however, a brief description of the property and a summary of the property’s prior land use approvals are provided as background to this land use application. Property Description An Improvement and Topographic Survey prepared by High Country Engineering, dated 6/2/16, is included with this application. The survey depicts existing conditions on this property. The applicant is aware that this survey is more than 6 months old. However, because of the Stay-At Home orders which were in effect in Colorado and Pitkin County this spring, the surveyor has been unable to conduct a field update of the property. The applicant will provide an updated survey to the City as soon as is practical, prior to consideration of this application by the Planning and Zoning Commission. The applicant hereby certifies that the conditions shown on the survey are an accurate representation of current conditions on the property, with the exception of certain insubstantial changes which have been made to the property since the survey was last conducted. The survey states that the subject property is approximately 18,458 square feet in size (0.424 acres). The property is nearly rectangular in shape. It is improved with a two-story commercial building which is located along the North Mill Street property frontage. There is a paved driveway along the northern edge of the property, providing access to a paved parking lot behind the building. The parking lot contains twenty (20) marked parking spaces. There are a number of mature trees located around the building which will be added to the survey as part of the survey update. The property is surrounded by a wide range of land uses. Immediately to the north is the mixed-use complex which includes Clark’s Market and other commercial uses, the Post Office and several multi-family residential units. To the south is the new mixed-use building at 201 North Mill Street, which includes offices and residential units. A new duplex was recently completed to the south of the subject property, along Bleeker Street. Behind the building, to the west, is a single-family residential neighborhood, located along Monarch Street. Across Mill Street, to the east, is the construction site where the new City Hall offices are being built. Summary of Prior Land Use Approvals The existing building was constructed in 1978 to house the Aspen Savings and Loan Association. Because the property was then zoned Neighborhood Commercial with a Specially Planned Area Overlay (NC/SPA), development of the site required SPA review by the Planning and Zoning Commission and City Council. SPA approval was granted in 2 Exhibit B- 225 N. Mill Approved Plans 225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0 1977, but there is limited documentation available in the City’s files regarding that land use review process. Apparently, the City did not require a SPA Plan or a SPA Development Agreement to be recorded to document that approval, so it is not possible to determine whether any conditions were applied to the approval the City granted at that time. In 1989 the City approved two minor changes to the building, to allow a bank vault to be installed and to allow a small ground floor addition (approximately 320 square feet) to the building. Both of these improvements were subsequently constructed. By 1992 the property had passed out of the bank’s hands into another ownership group. The then-owner obtained approval from the City for a 324 square foot addition for an elevator. Approval was also obtained to condominiumize the building. At about this time the Moss family purchased the property and sought to move a radio station (KSPN) into the building. The City required an amendment to the original SPA approval to be processed to allow this use to occupy the building and to document the other minor land use actions which had been authorized for the property between 1989 and 1992. That amendment was granted by the Aspen City Council on September 14, 1992, pursuant to Ordinance 92-55 (attached hereto as Exhibit #4). As a condition of the approval, a Specially Planned Area Development Agreement was entered into between the owner and the City (Reception No. 351030, attached as Exhibit #5)) and a Final SPA Development Plan was recorded in Plat Book 30 @ Page 10 (Reception No. 351031). The Development Agreement and Final SPA Development Plan set forth the following approvals for this property: 1.Business/professional office uses and the radio station were expressly permitted. 2.The 324 square foot elevator addition was approved, subject to the elevator location being depicted on the Final SPA Plan. However, the Final SPA Plan which was signed and recorded did not show a location or configuration for the elevator. 3.The building was condominiumized, subject to filing of a condominium plat. 4.The City and Owner confirmed that the existing building contained 8,082 square feet of floor area and 9,324 square feet of net leasable area. Section 8 of the SPA Agreement reads as follows: “The City and Moss hereby acknowledge that the Building contains 8,082 square feet of existing floor area and 9,324 square feet of net leasable area. The purpose of the foregoing recitations is to provide a baseline for review of any applications for future expansion of the Building on the Property.” The Final SPA Development Plan, which is recorded in Plat Book 30 @ Page 10, provides further documentation for the area calculations stated in the SPA Agreement, by listing the following floor-by-floor breakdowns of those square footage totals: 3 Exhibit B- 225 N. Mill Approved Plans 225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0 SPA Plan Verified Floor Area and Net Leasable Area for 225 North Mill Street Floor Area Net Leasable Area Lower None 2,580 Main 5,235 4,211 Upper 2,847 2,532 Total 8,082 square feet 9,323 square feet The 1992 SPA application is the most recent land use file kept in the City’s records for this property. More recently, the City adopted a Code Amendment combining the SPA and PUD Overlays into a new PD Overlay. PD is the overlay designation currently applied to this property on the City’s Official Zone District Map. Insubstantial Amendment to Approved PD The applicant proposes two insubstantial changes to the approved PD for this property: •The previously-approved elevator and the existing stairway will be moved from the north side of the building to the front side, along Mill Street. •The floor plan of each of the three levels will be modified to connect the new elevator and stairway to the offices. An insubstantial amendment to an approved Project Review may be authorized by the Community Development Director. An insubstantial amendment shall meet the following review criteria: 1.The request does not change the use or character of the development. Response: The use of the building for offices will be unchanged. There will be an insubstantial change to the overall character of the building by the addition of the glass enclosure at the front entry. This change will be a noticeable improvement to the building’s entry image and will also provide for better circulation into the building, allowing for ADA- compliant access to the lower and upper floors. 2.The request is consistent with the conditions and representations in the project's original approval, or otherwise represents an insubstantial change. Response: An elevator was part of the property’s 1992 SPA approval, although at that time the elevator was to be located along the northern building façade. Moving the elevator and stairway from the northern side of the building to the front will be an improvement from the original design because it represents a more direct way for pedestrians to enter the building. Today most persons who come to the building on foot are not even aware that there is a stairway entry along the northern side of the building (the door does not appear to be a 4 Exhibit B- 225 N. Mill Approved Plans 225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0 public entry). As a result, they walk around to the parking lot at the rear where there is a more obvious building entry and stair. Some even mistakenly walk into the existing front entry, which only accesses the architect’s offices and not the rest of the building. Placing the entry along the front will establish a more pedestrian-friendly, logical design for the building. The planned internal changes to the floor plan for each level within the building also represent an insubstantial change to the approved PD. All three floors will continue to be occupied by offices. The primary internal changes will be improved, ADA-compliant access to each of the floors and upgraded ADA-compliant bathrooms. 1.The request does not require granting a variation from the project's allowed use(s) and does not request an increase in the allowed height or floor area. Response: The entry element will be 2’ 2” taller than the height of the existing building, but will still be well below the maximum allowable 28’ height of the NC zone district, so no variation in height is required. The approved floor area of the building, as per the SPA Agreement and Final SPA Plan, is 8,082 square feet. The proposed floor area, as shown on Page A.1.21 of the architectural drawings, will be just 7,738 square feet. Therefore, there will be no increase to the allowed floor area from the total which was established in the 1992 SPA. 2.Any proposed changes to the approved dimensional requirements are limited to a technical nature, respond to a design parameter that could not have been foreseen during the Project Review approval, are within dimensional tolerances stated in the Project Review, or otherwise represents an insubstantial change. Response: The other key dimensional requirement established in the 1992 SPA was the building’s net leasable area. The building’s approved net leasable area, as per the SPA Agreement and Final SPA Plan, is 9,323 square feet. The proposed net leasable area of the building, as shown on Page A.1.21 of the architectural drawings, will be just 8,985.7 square feet. Therefore, there will be no increase to the allowed net leasable area for the building from the total which was established in the 1992 SPA. The combination of no increase in floor area and no increase in net leasable area explains why a Growth Management application is not required for this project. 1.An applicant may not apply for Detailed Review if an amendment is pending. 2.Response: Detailed review is not applicable to this project. Commercial Design Review Section 26.412.010 of the Land Use Code states that 5 Exhibit B- 225 N. Mill Approved Plans 225 NORTH MILL STREET, STE 100 ASPEN, COLORADO, 81611 WWW.STRYKERBROWN.COM 9 7 0 . 9 2 5 . 2 1 0 0 “The purpose of Commercial Design Review is to foster appropriate building design that creates walkable neighborhoods and supports Aspen's unique heritage. The review standards do not prescribe architectural style, but do require that certain building elements contribute to the streetscape and neighborhood character.” According to Section 26.412.020, Commercial Design Review applies to all commercial, lodging and mixed-used development within the City which alters the exterior of a building and which requires a building permit. Therefore, the proposed new entry enclosure is subject to this review while the internal building remodel is not. Section 26.412.060 of the Code sets forth the following guidelines and standards by which the Commission may approve a Commercial Design Review: 1.The Commercial, Lodging and Historic District Design Standards and Guidelines are met as determined by the appropriate Commission. The Standards and Guidelines include design review criteria that are to be used to determine whether the application is appropriate. Response: Included in this application is the Commercial Design Review Context Study which responds to each of the applicable Design Standards and Guidelines and demonstrates that the proposed project will comply with those Standards and Guidelines. 2.All applicable standards in the Commercial, Lodging and Historic District Design Standards and Guidelines shall be met unless granted a Variation pursuant to Section 26.412.040(d), Variations. Response: The applicant is not requesting any variations from the Design Standards and Guidelines. Not every guideline will apply to each project, and some balancing of the guidelines must occur on a case-by-case basis. The applicable Commission must: a. Determine that a sufficient number of the relevant guidelines are adequately met in order to approve a project proposal; and b.Weigh the applicable guidelines with the practicality of the measure. Response: The applicant believes the relevant guidelines have been adequately met. 3.The proposed development shall meet the requirements of Section 26.412.070, Pedestrian Amenity. Response: The Commercial Design Review Context Study also demonstrates that the proposed project will comply with the Pedestrian Amenity Standards. 6 Exhibit B- 225 N. Mill Approved Plans Exhibit B- 225 N. Mill Approved Plans E E E E E I H G E D ALLEY - B L O C K 7 8 MI L L S T R E E T VACA T E D H A L L A M S T R E E T E D D C CO N1 4 ° 5 0 ' 4 9 " E 8 6 . 3 3 ' L I N E 4 - 5 O F T H E C I T Y O F A S P E N 1 8 5 ' ± R.R. TIE RETAINING WALL R.R. TIE RETAINING WALL S R Q P O (UND E V E L O P E D P O R T I O N O F A L L E Y ) ASPHA L T CONC R E T E R E T A I N I N G W A L L CONC R E T E R E T A I N I N G W A L L STORM GRATE 7877.56 STORM GRATE 7877.24 CO N C R E T E PAVED PARKING AREA PARKING STRIPE (TYPICAL) WINDOW WELL FENCED IN MECHANICAL AC UNIT ENTRY AREA IN T E R I O R ST A I R W E L L SI G N MAIL B O X E S CONC R E T E STEP CON C R E T E SID E W A L K CO N C R E T E SI D E W A L K CO N C R E T E C U R B & G U T T E R COVER E D ENTRY COLUM N PAV E D D R I V E W A Y CONCRETE BOLLARD (TYPICAL) CONC R E T E SIDEW A L K 55.4' 7879.5 6 FFE 7879. 6 2 FFE 7879.5 3 FFE FFE 78 7 9 . 6 0 27 . 3 ' 8.9' 8.9 ' 9.2' 37 . 3 ' 73.2' 73 . 3 ' BUILDING CORNER IS 0.28' NORTH OF PROPERTY LINE BUILDING CORNER IS 0.41' NORTH OF PROPERTY LINE ADJ A C E N T B U I L D I N G (7 3 . 7 0 ' W I D E P U B L I C R . O . W . ) (20.6 9 ' W I D E ) BRIC K CO CONC R E T E C U R B ADJ A C E N T B U I L D I N G CONC R E T E 10' W I D E T R A I L E A S E M E N T REC E P T I O N N O . 3 6 9 0 8 3 PER P E T U A L N O N - E X C L U S I V E E A S E M E N T & RI G H T - O F - W A Y F O R I N G R E S S A N D E G R E S S REC E P T I O N N O . 3 6 9 0 8 3 2 - STORY COMMERCIAL BUILDING WITH BASEMENT 225 N. MILL STREET ASPEN, COLORADO PROPERTY AREA 18,441± SQ.FT. 0.423± ACRES N 788 0 7883 7 8 7 9 7 8 7 8 78 7 9 78 7 9 78 8 0 78 9 0 78 9 5 7 8 7 8 788 2 788 1 788 0 7878 7 8 8 0 78 7 9 7 8 8 1 7 8 8 5 7 8 8 5 7879 ELECTRIC TRANSFORMERS G 15 ' W I D E N O N - E X C L U S I V E EA S E M E N T F O R U N D E R G R O U N D EL E C T R I C C A B L E S BO O K 3 5 4 P A G E 7 10002 10005 10006 10007 10008 10009 10010 10011 10072 10073 10110 10112 10135 10136 10137 10138 10139 10140 10165 10166 10167 10168 10163 10164 FLAGSTONE PATIO BRONCO STATUE S74°1 2 ' 3 2 " E 189.4 3 ' S1 5 ° 3 8 ' 0 2 " W 99 . 8 9 ' N74°1 1 ' 5 4 " W 180.8 3 ' S1 6 ° 0 1 ' 5 6 " W 13 . 7 0 ' S2 1 ° 1 6 ' 1 9 " W 86 . 6 2 ' (S75°1 9 ' 1 1 " E 1 8 9 . 1 2 ') (N1 4 ° 5 0 ' 4 9 " E 1 0 0 . 0 0 ') (N75°0 9 ' 1 1 " W 1 8 0 . 9 3 ') (S1 4 ° 5 0 ' 4 9 " W 1 3 . 6 7 ') (S2 0 ° 1 6 ' 0 0 " W 8 6 . 7 2 ') 8.19' FOUND #5 REBAR WITH 1.25" YELLOW PLASTIC CAP LS #38215 SITE BENCHMARK, ELV.=7881.94' FOUND #5 REBAR WITH 1.25" YELLOW PLASTIC CAP LS #38215 FOUND #5 REBAR WITH 1.25" YELLOW PLASTIC CAP LS #38215 FOUND #4 REBAR WITH 1" RED PLASTIC CAP LS #16129 FOUND #5 REBAR WITH 1.25" YELLOW PLASTIC CAP LS #38215 FOUND #5 REBAR WITH 1.25" YELLOW PLASTIC CAP LS #2376 RE F E R E N C E B E A R I N G 19. 4 ' 26 . 3 ' SIGN A B 225 NORTH MILL STREET SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH P.M. CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO PROPERTY DESCRIPTION SPECIAL WARRANTY DEED RECORDED AS RECEPTION NO. 369083. ALL OF LOTS D, E, F, G, H AND I IN BLOCK 78 OF THE CITY AND TOWNSITE OF ASPEN ACCORDING TO THE OFFICIAL PLAT RECORDED AS RECEPTION NO. 109023 IN DRAWER 3. TOGETHER WITH AN ADJOINING TRIANGULAR PARCEL OF LAND, BEING A PART OF TRACT A OF THE ASPEN TOWNSITE ADDITION IN SECTION 7; T. 10 S., R. 84 W. OF THE 6TH P.M. MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A POINT WHERE LINE 4-5 OF THE CITY AND TOWNSITE OF ASPEN INTERSECTS WITH THE EASTERLY LINE OF BLOCK 78 AS IT RUNS ALONG THE WESTERLY LINE OF MILL STREET; THENCE NORTHWESTERLY ALONG SAID LINE 4-5 OF ASPEN 185 FEET, MORE OR LESS, TO THE INTERSECTION OF LINE 4-5 WITH THE NORTHERLY LINE OF BLOCK 78 AS IT RUNS ALONG THE SOUTHERLY LINE OF HALLAM STREET; THENCE EASTERLY ALONG THE PROJECTED SAID NORTHERLY LINE OF BLOCK 78, 155 FEET, MORE OR LESS, TO THE PROJECTED NORTHEASTERLY CORNER OF BLOCK 78; THENCE SOUTHERLY ALONG THE EASTERLY LINE OF BLOCK 78 AS IT IS PROJECTED ALONG THE WESTERLY SIDE OF MILL STREET 100 FEET, MORE OR LESS, TO THE POINT OF BEGINNING. EXCEPT ANY PORTION OF SAID TRIANGULAR PARCEL LYING SOUTH OF THE SOUTHERLY BOUNDARY LINE OF LOTS A THROUGH I, BLOCK 78, EXTENDED EASTERLY TO MILL STREET. AND A PARCEL OF LAND SITUATED IN THE SW 1/4 OF SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH PRINCIPAL MERIDIAN, PITKIN COUNTY, COLORADO. SAID PARCEL IS MORE FULLY DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WESTERLY LINE OF THE MILL STREET RIGHT-OF-WAY WHENCE THE WEST 1/4 CORNER OF SAID SECTION 7 BEARS N 26° 39' 14" W 1724.04 FEET; THENCE S 20° 16' 00" W 86.72 FEET; THENCE N 14° 50' 49" E 86.33 FEET ALONG THE EASTERLY LINE OF BLOCK 78, CITY OF ASPEN; THENCE S 75° 09' 11" E 8.19 FEET TO THE POINT OF BEGINNING. EXCEPT ANY PORTION THEREOF BEING A PART OF THE RIGHT-OF-WAY FOR MILL STREET. AND A PERPETUAL NON-EXCLUSIVE EASEMENT AND RIGHT-OF-WAY FOR PURPOSES OF INGRESS AND EGRESS OVER THE FOLLOWING DESCRIBED REAL PROPERTY: A PARCEL OF LAND SITUATED IN THE SW 1/4 OF SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH PRINCIPAL MERIDIAN, PITKIN COUNTY, COLORADO. SAID PARCEL IS MORE FULLY DESCRIBED AS FOLLOWS: BEGINNING AT THE POINT OF INTERSECTION OF LINE 4-5 OF THE ASPEN TOWNSITE WITH THE NORTHERLY LINE OF BLOCK 78, CITY OF ASPEN, WHENCE THE WEST 1/4 COMER OF SAID SECTION 7 BEARS N 22° 15' 02" W 1618.85 FEET; THENCE S 75° 09' 11" E 157.76 FEET ALONG THE NORTHERLY LINE OF BLOCK 78, CITY OF ASPEN; THENCE N 69° 44' 00" W 157.05 FEET; THENCE S 20° 16' 00" W 14.90 FEET TO THE POINT OF BEGINNING. AND A TRAIL EASEMENT SITUATED IN THE SW1/4 SECTION 7, TOWNSHIP 10 SOUTH, RANGE 84 WEST OF THE 6TH PRINCIPAL MERIDIAN, PITKIN COUNTY, COLORADO, BEING 5 FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: BEGINNING AT A POINT ON THE LINE BETWEEN LOT 1 AND LOT 2 OF THE TRUEMAN NEIGHBORHOOD COMMERCIAL PROJECT, WHENCE THE WEST 1/4 CORNER OF SAID SECTION 7 BEARS N 24° 33' 28" W 1355.04 FEET; THENCE S 05° 00' 00" W 30.00 FEET; THENCE 82.61 FEET AROUND A CURVE TO THE LEFT HAVING A RADIUS OF 400.00 FEET; THENCE S 06° 50' 00" E 73.00 FEET; THENCE 54.02 FEET AROUND A CURVE TO THE LEFT HAVING A RADIUS OF 49.00 FEET; THENCE S 70° 00' 00" E 25.00 FEET; THENCE 15.71 FEET AROUND A CURVE TO THE RIGHT HAVING A RADIUS OF 15.00 FEET; THENCE S 10° 00' 00" E 28.48 FEET TO A POINT ON THE NORTH LINE OF BLOCK 78, CITY OF ASPEN, COLORADO. TOGETHER WITH ANY INTEREST THAT GRANTOR MAY HAVE IN ANY VACATED STREETS AND ALLEYS ADJACENT TO THE ABOVE DESCRIBED PROPERTY, AND TOGETHER WITH ALL EASEMENTS AND OTHER APPURTENANCES THERETO, AND ALL ATTACHED FIXTURES THEREON. COUNTY OF PITKIN, STATE OF COLORADO IMPROVEMENT & TOPOGRAPHIC SURVEY SANITARY CLEAN-OUT WATER VALVE TELEPHONE PEDESTAL CATV PEDESTAL D LIGHT POLE SIGN FIRE HYDRANT SANITARY MANHOLE STORM SEWER MANHOLE ELECTRIC MANHOLE WELL E GAS METER ELECTRICAL METER G /EGEN' STORM GRATE E BY NO . DA T E BY PROJECT NO. OR 5 3 4 - 0 6 7 0 0 I N M E T R O D E N V E R UN D E R G R O U N D M E M B E R U T I L I T I E S EX C A V A T E F O R T H E M A R K I N G O F BE F O R E Y O U D I G , G R A D E , O R CA L L 2 - B U S I N E S S D A Y S I N A D V A N C E 1- 8 0 0 - 9 2 2 - 1 9 8 7 CE N T E R O F C O L O R A D O CA L L U T I L I T Y N O T I F I C A T I O N RE V I S I O N HI G H C O U N T R Y E N G I N E E R I N G , I N C . PH O N E ( 9 7 0 ) 9 4 5 - 8 6 7 6 - F A X ( 9 7 0 ) 9 4 5 - 2 5 5 5 ww w . h c e n g . c o m dr a w n b y : ch e c k e d b y : da t e : fi l e : 15 1 7 B L A K E A V E N U E , S T E 1 0 1 , GL E N W O O D S P R I N G S , C O 8 1 6 0 1 2201652 2161685 1 OF 1 22 5 N . M I L L S T R E E T L L C AS P E N - C O L O R A D O IM P R O V E M E N T & T O P O G R A P H I C S U R V E Y 22 5 N . M I L L S T R E E T AS P E N - C O L O R A D O LD V RP K 06 - 0 2 - 1 6 16 8 5 . D W G 1 0 6 . 1 0 - 1 6 AD D I T I O N A L L A N G U A G E O N T H E E L E C T R I C E A S E M E N T RP K 2 7. 2 7 . 2 0 UP D A T E S U R V E Y W I T H T R E E S A N D A D D I T I O N A L I M P R O V E M E N T S . WJ N ORF REVI E W CO WOOD FENCE RECORD DATA(100.00') E ELECTRIC TRANSFORMER SURVEYOR S CERTI)ICATION I, BILL W.A. BAKER, A LICENSED PROFESSIONAL LAND SURVEYOR IN THE STATE OF COLORADO (#23875) DO BY THESE PRESENTS CERTIFY THAT THE DRAWING SHOWN HEREON, WITH NOTES ATTACHED HERETO AND MADE A PART HEREOF, REPRESENTS A MONUMENTED LAND SURVEY MADE UNDER MY DIRECT SUPERVISION AND THAT TO THE BEST OF MY KNOWLEDGE, INFORMATION AND BELIEF, AN ACCURATE DEPICTION OF SAID SURVEY IS RENDERED BY THIS PLAT. THIS SURVEY WAS CONDUCTED IN ACCORDANCE WITH APPLICABLE STANDARDS OF PRACTICE, IS NOT A GUARANTY OR WARRANTY, EITHER EXPRESSED OR IMPLIED. THIS SURVEY PLAT COMPLIES WITH TITLE 38-51-102, COLORADO REVISED STATUTES. BILL W.A. BAKER, COLORADO PROFESSIONAL LAND SURVEYOR #23875 CERTIFIED FEDERAL SURVEYOR #1699 NOTES 1. DATE OF FIELD SURVEY: MAY 26, 2016 & JULY 21, 2020. 2. ALL BEARINGS ARE GRID BEARINGS OF THE COLORADO STATE PLANE COORDINATE SYSTEM, CENTRAL ZONE, NORTH AMERICAN DATUM 1983. THE REFERENCE BEARING BETWEEN "A" (A FOUND #5 REBAR WITH YELLOW PLASTIC CAP) AND "B" (A FOUND #5 REBAR WITH YELLOW PLASTIC CAP) IS S21°16'19"W. ALL DISTANCES ARE GROUND DISTANCES BASED ON A COMBINED SCALE FACTOR. 3. THIS SURVEY DOES NOT CONSTITUTE A TITLE SEARCH BY THIS SURVEYOR OF THE BOUNDARY SHOWN AND DESCRIBED HEREON TO DETERMINE: A) OWNERSHIP OF THE TRACT OF LAND B)COMPATIBILITY OF THIS DESCRIPTION WITH THOSE OF ADJOINERS C) RIGHTS-OF-WAY, EASEMENTS AND ENCUMBRANCES OF RECORD AFFECTING THIS PARCEL. 4. THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A CURRENT TITLE INSURANCE COMMITMENT. TITLE INFORMATION REFERENCED HEREON IS THE RESULT OF RESEARCH BY THIS SURVEYOR AND IS NOT NECESSARILY COMPLETE OR CONCLUSIVE. 5.THE CLIENT DID NOT REQUEST ANY ADDITIONAL EASEMENTS, RIGHTS-OF-WAY AND/OR IMPROVEMENTS BE RESEARCHED OR SHOWN ON THIS PLAT. 6. ALL DIMENSIONS AND COURSES ARE AS MEASURED IN THE FIELD UNLESS DENOTED IN PARENTHESES, WHICH DENOTE THE BOUNDARIES OF RECORD CONTAINED IN RECEPTION #369083 IN THE PUBLIC RECORDS OF PITKIN COUNTY, STATE OF COLORADO. 7. ELEVATIONS SHOWN HEREON ARE BASED ON GPS OBSERVATIONS UTILIZING THE CONTINUOUS OPERATING REFERENCE STATIONS (CORS) THROUGH THE MESA COUNTY RTVRN NETWORK BROAD CASTING NORTH AMERICAN VERTICAL DATUM (NAVD88). 8. CONTOUR INTERVAL EQUALS 1 FOOT. 9. BUILDING MEASUREMENTS ARE AT LOWEST PRACTICABLE POINT ON VENEER. 10. ANY PERSON WHO KNOWINGLY REMOVES, ALTERS OR DEFACES ANY PUBLIC LAND SURVEY MONUMENT OR LAND BOUNDARY MONUMENT OR ACCESSORY COMMITS A CLASS TWO (2) MISDEMEANOR PURSUANT TO SECTION 18-4-508 OF THE COLORADO REVISED STATUTES. 11. NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED ON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT, MAY ANY ACTION BASED ON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. 12. NOTICE: THIS PLAT AND THE INFORMATION SHOWN HEREON MAY NOT BE USED FOR ANY ADDITIONAL OR EXTENDED PURPOSE BEYOND THAT FOR WHICH IT WAS INTENDED AND MAY NOT BE USED BY ANY PARTIES OTHER THAN THOSE TO WHICH IT IS CERTIFIED. THIS DOCUMENT AND THE WORK IT REPRESENTS IS THE PROPERTY OF HIGH COUNTRY ENGINEERING, INC. NO PART OF THIS DOCUMENT MAY BE STORED, REPRODUCED, DISTRIBUTED OR USED TO PREPARE DERIVATIVE PRODUCTS WITHOUT PRIOR WRITTEN PERMISSION. AN ORIGINAL SEAL AND ORIGINAL SIGNATURE IS REQUIRED TO VALIDATE THIS DOCUMENT AND IS EXCLUSIVE TO HIGH COUNTRY ENGINEERING, INC. AND THE OWNER(S) OF RECORD AS OF THIS DATE, OF THE BOUNDARY DELINEATED HEREON AND THE SUBJECT OF THE SURVEY. THIS PLAT IS RESTRICTED TO THE INTENT OF TITLE 38, ARTICLE 50, §101, 5 (a) AND (b) C.R.S. 10002 Conifer Tree Diameter 1'Drip 12' 10005 Conifer Tree Diameter 1.8'Drip 10' 10006 Conifer Tree Diameter 1.3'Drip 14' 10007 Conifer Tree Diameter 1.3'Drip 9' 10008 Conifer Tree Diameter 1.3'Drip 9' 10009 Conifer Tree Diameter 1'Drip 10' 10010 Conifer Tree Diameter 1'Drip 9' 10011 Conifer Tree Diameter 1.8'Drip 16' 10072 Broadleaf Tree Diameter 0.7'Drip 10' 10073 Broadleaf Tree Diameter 1.8'Drip 16' 10110 Conifer Tree Diameter 1.3'Drip 10' 10112 Broadleaf Tree Diameter 0.6'Drip 4' 10135 Broadleaf Tree Diameter 0.5'Drip 4' 10136 Broadleaf Tree Diameter 0.5'Drip 4' 10137 Broadleaf Tree Diameter 0.9'Drip 8' 10138 Broadleaf Tree Diameter 0.8'Drip 10' 10139 Broadleaf Tree Diameter 0.8'Drip 10' 10140 Broadleaf Tree Diameter 0.8'Drip 10' 10163 Broadleaf Tree Diameter 0.8'Drip 14' 10164 Broadleaf Tree Diameter 0.5'Drip 14' 10165 Broadleaf Tree Diameter 0.3'Drip 8' 10166 Broadleaf Tree Diameter 0.4'Drip 13' 10167 Broadleaf Tree Diameter 1.7'Drip 14' 10168 Broadleaf Tree Diameter 1.5'Drip 15' TREE CHART Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.1.10 . NOT FOR C O N S T R U C T I O N EXISTING SITE PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O N 3 3 2 2 1 1 EXISTING WALK TO BE REMOVED EXISTING PLANTER EE 4 4 DD AA CC 5 5 BB SCALE: 1/8" = 1'-0"1 EXISTING SITE PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.1.11 . NOT FOR C O N S T R U C T I O N PROPOSED SITE PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O N NEW WOOD BENCHES OVER EXISTING PLANTER EXISTING WALK TO BE REMOVED NEW SIGN WITH HIDDEN LIGHT EXISTING PLANTER NEW PERVIOUS PAVER ENTRY WALK NEW ENTRY ENCLOSURE WITH ELEVATOR NEW OVERHANG RIVER ROCK XEROSCAPE RIVER ROCK XEROSCAPE NEW EVERGREEN SHRUBS TO MATCH EXISTING SCALE: 1/8" = 1'-0"1 PROPOSED SITE PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.1.20 . NOT FOR C O N S T R U C T I O N EXISTING PLAN FARS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O TOTAL AREA (to outside of stud/cmu wall) 2,590.4 sq ft STAIR #3 STAIR #1 DN ROOF WOMEN MEN OFFICE 8 OFFICE 6 OFFICE 5 OFFICE 4 OFFICE 3 OFFICE 1 OFFICE 7 OFFICE 2 ROOF TOTAL AREA (to outside of foundation wall) 4,729.8 sq ft UNISEX 2 UNISEX 1 STAIR #1SUMP PUMP RM PASSAGE WAY STAIR #2 EXISTING OFFICE UP EXISTING SAFE MECHANICAL ROOM BOILER ROOM 1 2 3 4 5 6 EXISTING OFFICE STORAGE STAIR NOT TO BE DEMO'D UNTIL NEW ENTRY STAIR COMPLETE 647.8 sq ft 329.8 sq ft 318.0 sq ft 647.8 sq ft 488.8 sq ft 159.0 sq ft 1 2 3 4 5 6 EXISTING FLOOR AREA CALCULATIONS 225 NORTH MILL STREET CITY OF ASPEN ZONING SUBMISSION LOT AREA: 18,458 - 1,480 ACCESS EASEMENT 16,978 SQ FT ALLOWABLE FLOOR AREA (1.5:1)25,467 SQ FT SUBGRADE LEVEL WALL LABEL TOTAL WALL AREA (SQ. FT.) EXPOSED WALL AREA (SQ. FT.) 1 647.8 0.0 2 329.8 0.0 3 159.0 0.0 4 318.0 0.0 5 488.8 0.0 6 647.8 0.0 OVERALL TOTAL WALL AREA (SQ. FT.)2,591.2 EXPOSED WALL AREA (SQ. FT.)0.0 % OF EXPOSED WALL (EXPOSED/TOTAL)0.0% SUBGRADE GROSS FLOOR AREA (SQ. FT.)4,729.8 SUBGRADE COUNTABLE FLOOR AREA (SQ. FT.)0.0 TOTAL EXISTING AREA CALCULATIONS GROSS AREA FLOOR AREA NET LEASABLE PER SPA BASEMENT LEVEL TOTAL FLOOR AREA 4,729.8 0.0 0.0 BASEMENT NET LEASABLE AREA (NLA)2,580.0 BASEMENT COMMON AREA (TOTAL - NLA) 1ST FLOOR TOTAL AREA 4,623.5 4,623.5 5,235.0 1ST FLOOR NET LEASABLE AREA (NLA)4,211.0 1ST FLOOR COMMON AREA (TOTAL - NLA) 2ND FLOOR TOTAL AREA 2,590.5 2,590.5 2,847.0 2ND FLOOR NET LEASABLE AREA (NLA)2,532.0 2ND FLOOR COMMON AREA (TOTAL - NLA) TOTAL NET LEASABLE AREA 9,323.0 TOTAL EXISTING FLOOR AREA (SQ. FT.)11,943.8 7,214.0 8,082.0 EXISTING SUBGRADE LEVEL EXPOSED WALL CALCULATIONS SCALE: 1/8" = 1'-0"3 EXISTING 2ND FLOOR FAR SCALE: 1/8" = 1'-0"1 EXISTING LOWER LEVEL FAR SCALE: 1/8" = 1'-0"4 SUBGRADE WALL AREAS 5 EXISTING FLOOR AREA CALCS WALL LEGEND EXISTING WALL WALL TO BE REMOVED NEW WALL AREA LEGEND TOTAL AREA TO OUTSIDE OF STRUCTURE PER FAR NET LEASABLE AREA SUBGRADE WALL AREA 4,622.7 sq ft TOTAL AREA (to outside of stud/CMU wall) 4,623.5 sq ft OFFICE 4 OFFICE 5 STAIR #1 EXISTING HALLWAY STAIR #2 STAIR #3 RESTRM #2 RESTROOM #1 OFFICE 3 DN OFFICE 2 OFFICE 1 EXISTING PUBLIC RESTROOM SCALE: 1/8" = 1'-0"2 EXISTING 1ST FLOOR FAR Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.1.21 . NOT FOR C O N S T R U C T I O N PROPOSED PLAN FARs 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O TOTAL AREA (to outside of stud/CMU wall) 4,856.8 sq ft OFFICE 4 OFFICE 5 STAIR #2 STAIR #3 ELEVATOR RESTRM #2 RESTROOM #1 OFFICE 3 NEW ENTRY UPDN DN TOTAL NET LEASABLE AREA 3,750.6 sq ft OFFICE 2 OFFICE 1 OFFICE 6 UNISEX RESTROOM 1 UNISEX RESTROOM 2 1,479.3 sq ft 2,271.3 sq ft FUTURE CORRIDOR TOTAL AREA (to outside of foundation wall) 5,058.1 sq ft CO R R I D O R UNISEX 2 UNISEX 1 SUMP PUMP RM STAIR #2 CORRIDOR VESTIBULE ELEVATOR UP UP EXISTING SAFE MECHANICAL ROOM BOILER ROOM OFFICE 3 OFFICE 2 ELEV. EQUIP TOTAL NET LEASABLE AREA 3,077.5 sq ft 1 2 3 4 5 6 OFFICE 1 STORAGE 2,271.8 sq ft 805.7 sq ft 647.8 sq ft 490.3 sq ft 157.5 sq ft 647.8 sq ft 488.8 sq ft 160.5 sq ft 8' - 1 0 " 8' - 1 0 " 8' - 1 0 " 8' - 1 0 " 1 2 3 4 5 6 PROPOSED FLOOR AREA CALCULATIONS 225 NORTH MILL STREET CITY OF ASPEN ZONING SUBMISSION LOT AREA: 18,458 - 1,480 ACCESS EASEMENT 16,978 SQ FT ALLOWABLE FLOOR AREA (1.5:1)25,467 SQ FT SUBGRADE LEVEL WALL LABEL TOTAL WALL AREA (SQ. FT.) EXPOSED WALL AREA (SQ. FT.) 1 647.8 0.0 2 490.2 0.0 3 160.5 0.0 4 157.5 0.0 5 488.8 0.0 6 648.8 0.0 OVERALL TOTAL WALL AREA (SQ. FT.)2,593.6 EXPOSED WALL AREA (SQ. FT.)0.0 % OF EXPOSED WALL (EXPOSED/TOTAL)0.0% SUBGRADE GROSS FLOOR AREA (SQ. FT.)5,058.1 SUBGRADE COUNTABLE FLOOR AREA (SQ. FT.)0.0 TOTAL PROPOSED AREA CALCULATIONS GROSS AREA FLOOR AREA NET LEASABLE PER SPA BASEMENT LEVEL TOTAL FLOOR AREA 5,058.1 0.0 0.0 BASEMENT NET LEASABLE AREA (NLA)3,077.5 2,580.0 BASEMENT COMMON AREA (TOTAL - NLA)1,980.6 1ST FLOOR TOTAL AREA 4,856.8 4,856.8 5,235.0 1ST FLOOR NET LEASABLE AREA (NLA)3,750.6 4,211.0 1ST FLOOR COMMON AREA (TOTAL - NLA)1,106.2 2ND FLOOR TOTAL AREA 2,881.5 2,881.5 2,847.0 2ND FLOOR NET LEASABLE AREA (NLA)2,157.6 2,532.0 2ND FLOOR COMMON AREA (TOTAL - NLA)723.9 TOTAL NET LEASABLE AREA 8,985.7 9,323.0 TOTAL PROPOSED FLOOR AREA (SQ. FT.)12,796.4 7,738.3 8,082.0 PROPOSED SUBGRADE LEVEL EXPOSED WALL CALCULATIONS TOTAL AREA (to outside of stud/cmu wall) 2,881.5 sq ft STAIR #3 VESTIBULE ELEVATOR NEW CORRIDOR DNDN ROOF UNISEX #2UNISEX #1 TOTAL NET LEASABLE AREA 2,157.6 sq ft OFFICE 8 OFFICE 6 OFFICE 5 OFFICE 4 OFFICE 3 OFFICE 1 OFFICE 7 OFFICE 2 ROOF JAN. CLO. 954.0 sq ft 1,203.6 sq ft EXISTING FLOOR AREA CALCULATIONS 225 NORTH MILL STREET CITY OF ASPEN ZONING SUBMISSION LOT AREA: 18,458 - 1,480 ACCESS EASEMENT 16,978 SQ FT ALLOWABLE FLOOR AREA (1.5:1)25,467 SQ FT SUBGRADE LEVEL WALL LABEL TOTAL WALL AREA (SQ. FT.) EXPOSED WALL AREA (SQ. FT.) 1 647.8 0.0 2 329.8 0.0 3 159.0 0.0 4 318.0 0.0 5 488.8 0.0 6 647.8 0.0 OVERALL TOTAL WALL AREA (SQ. FT.)2,591.2 EXPOSED WALL AREA (SQ. FT.)0.0 % OF EXPOSED WALL (EXPOSED/TOTAL)0.0% SUBGRADE GROSS FLOOR AREA (SQ. FT.)4,729.8 SUBGRADE COUNTABLE FLOOR AREA (SQ. FT.)0.0 TOTAL EXISTING AREA CALCULATIONS GROSS AREA FLOOR AREA NET LEASABLE PER SPA BASEMENT LEVEL TOTAL FLOOR AREA 4,729.8 0.0 0.0 BASEMENT NET LEASABLE AREA (NLA)2,580.0 BASEMENT COMMON AREA (TOTAL - NLA) 1ST FLOOR TOTAL AREA 4,623.5 4,623.5 5,235.0 1ST FLOOR NET LEASABLE AREA (NLA)4,211.0 1ST FLOOR COMMON AREA (TOTAL - NLA) 2ND FLOOR TOTAL AREA 2,590.5 2,590.5 2,847.0 2ND FLOOR NET LEASABLE AREA (NLA)2,532.0 2ND FLOOR COMMON AREA (TOTAL - NLA) TOTAL NET LEASABLE AREA 9,323.0 TOTAL EXISTING FLOOR AREA (SQ. FT.)11,943.8 7,214.0 8,082.0 EXISTING SUBGRADE LEVEL EXPOSED WALL CALCULATIONS SCALE: 1/8" = 1'-0"2 PROPOSED 1ST FLOOR FAR SCALE: 1/8" = 1'-0"1 PROPOSED LOWER LEVEL FAR SCALE: 1/8" = 1'-0"4 SUBGRADE WALL AREAS 6 PROPOSED FLOOR AREA CALCULATIONS SCALE: 1/8" = 1'-0"3 PROPOSED 2ND FLOOR FAR 5 EXISTING FLOOR AREA CALCULATIONS WALL LEGEND EXISTING WALL WALL TO BE REMOVED NEW WALL AREA LEGEND TOTAL AREA TO OUTSIDE OF STRUCTURE PER FAR NET LEASABLE AREA SUBGRADE WALL AREA Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.1.30 . NOT FOR C O N S T R U C T I O N WALL DEMOLITION CALCULATIONS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 1,602.5 sq ft 22.9 sq ft 64.5 sq ft 20.5 sq ft 20.5 sq ft 20.5 sq ft 23.5 sq ft 1,615.0 sq ft 70.0 sq ft 120.1 sq ft 28.2 sq ft 119.6 sq ft 28.1 sq ft 25.1 sq ft 25.1 sq ft 424.1 sq ft 25.8 sq ft 25.3 sq ft 25.3 sq ft 1,627.6 sq ft 60.2 sq ft 60.0 sq ft 120.1 sq ft 28.2 sq ft 120.1 sq ft 28.2 sq ft 28.2 sq ft 120.1 sq ft 120.1 sq ft 28.2 sq ft +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK 1,633.7 sq ft 106.8 sq ft 22.9 sq ft 22.9 sq ft 56.7 sq ft 75.5 sq ft 75.5 sq ft75.5 sq ft37.9 sq ft +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK 283.5 sq ft WALL LABEL INDIVIDUAL WALL AREA (SQ. FT.) AREA REDUCED FOR FENESTRATION (SQ. FT.) AREA OF WALL TO BE REMOVED (SQ. FT.) 1 - EAST 1,615.0 416.0 500.5 2 - NORTH 1,633.7 435.8 321.4 3 - WEST 1,602.5 110.9 61.5 4 - SOUTH 1,627.6 713.6 0.0 WALL SURFACE TOTAL (SQ. FT.)6,478.8 AREA REDUCED FOR FENESTRATION (SQ. FT.)1,676.3 AREA USED FOR DEMO CALCULATIONS 4,802.5 WALL SURFACE AREA TO BE REMOVED (SQ. FT.)883.4 WALL + ROOF AREA USED FOR DEMO CALCULATION (SQ. FT.)4802.5+5,028.7 9,831.2 SURFACE AREA TO BE REMOVED (SQ. FT.)883.4+335 1,218.4 TOTAL (AREA TO BE REMOVED/TOTAL)12.4% DEMOLITION TOTALS WALL DEMOLITION WALL DEMOLITION CALCULATIONS 225 NORTH MILL CITY OF ASPEN ZONING SUBMISSION SCALE: 3/16" = 1'-0"3 WEST ELEVATION DEMOLITION SCALE: 3/16" = 1'-0"1 EAST ELEVATION DEMOLITION SCALE: 3/16" = 1'-0"4 SOUTH ELEVATION DEMOLITION SCALE: 3/16" = 1'-0"2 NORTH ELEVATION DEMOLITION SCALE: 1' = 1'-0"5 225 N MILL WALL DEMO CALCS WALL LEGEND INDIVIDUAL WALL AREA (SQ FT) AREA REDUCED FOR FENESTRATION (SQ FT) AREA OF WALL TO BE REMOVED (SQ FT) TOTAL DEMOLITION: 12.4% ROOF AND WALL Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.1.31 . NOT FOR C O N S T R U C T I O N ROOF DEMOLITION CALCULATION 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 335.0 sq ft1 2 3 3,042.5 sq ft 1,651.2 sq ft ROOF LABEL INDIVIDUAL ROOF AREA (SQ. FT.) AS FLAT PLANE AREA OF ROOF TO BE REMOVED (SQ. FT.) 1 3,042.5 0.0 2 1,651.2 0.0 3 335.0 335.0 ROOF SURFACE TOTAL (SQ. FT.)5,028.7 ROOF SURFACE AREA TO BE REMOVED (SQ. FT.)335.0 ROOF + WALL AREA USED FOR DEMO CALCULATION (SQ. FT.)5,028.7+4,802.5 =9,831.2 SURFACE AREA TO BE REMOVED (SQ. FT.)335 + 883.4 1,218.4 TOTAL (AREA TO BE REMOVED/TOTAL)12.4% DEMOLITION TOTALS ROOF DEMOLITION ROOF DEMOLITION CALCULATIONS FLAT PLANE METHOD CITY OF ASPEN ZONING SUBMISSION SCALE: 3/16" = 1'-0"1 ROOF DEMOLITION SCALE: 1:1.092225 N MILL ROOF DEMO CALCS ROOF LEGEND EXISTING ROOF TO REMAIN (SQ FT) AREA OF ROOF TO BE REMOVED (SQ FT) TOTAL DEMOLITION: 12.4% ROOF AND WALL Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.2.10 . NOT FOR C O N S T R U C T I O N EXISTING AND DEMOLITION LOWER LEVEL PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 3 3 2 2 1 1 18'-0"18'-0"18'-0" 72 ' - 0 " 54 ' - 0 " 18 ' - 0 " 72 ' - 0 " 54'-0" 89'-4" 4 A.1.30 UNISEX 2 UNISEX 1 STAIR #1 SUMP PUMP RM PASSAGE WAY STAIR #2 EXISTING OFFICE UP UP EXISTING SAFE MECHANICAL ROOM BOILER ROOM ELECT. ELECT. EXISTING OFFICE WALL LEGEND EXISTING WALL WALL TO BE REMOVED NEW WALL AREA AFFECTING EXISTING TENANT STORAGE STAIR NOT TO BE DEMO'D UNTIL NEW ENTRY STAIR COMPLETE 2 A.1.30 EE 4 4 DD AA CC 1 A.1.30 3 A.1.30 5 5 BB SCALE: 1/4" = 1'-0"1 EXISTING LOWER LEVEL PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.2.11 . NOT FOR C O N S T R U C T I O N EXISTING AND DEMOLITION 1ST FLOOR PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 3 3 2 2 1 1 4 A.1.30 72 ' - 0 " 18'-0"18'-0"18'-0"18'-0" 2 A.1.30 FIRE HYDRANT STANDPIPE REMOVE WINDOWS AND FUR-IN OPENINGS TO MATCH ADJOINING WALLS UP OFFICE 4 OFFICE 5 STAIR #1 EXISTING HALLWAY STAIR #2 STAIR #3 RESTRM #2 RESTROOM #1 OFFICE 3 DN UP DN SK Y L I G H T AB O V E EXISTING FOYER TO BE REMOVED OFFICE 2 OFFICE 1 EXISTING PUBLIC RESTROOM WALL LEGEND EXISTING WALL WALL TO BE REMOVED NEW WALL AREA AFFECTING EXISTING TENANT STAIR NOT TO BE DEMO'D UNTIL NEW ENTRY STAIR COMPLETE EE 4 4 DD AA CC 1 A.1.30 3 A.1.30 5 5 BB SCALE: 1/4" = 1'-0"1 EXISTING 1ST FLOOR PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.2.12 . NOT FOR C O N S T R U C T I O N EXISTING AND DEMOLITION 2ND FLOOR PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 3 3 2 2 1 1 4 A.1.30 2 A.1.30 72 ' - 0 " 18'-0" 54 ' - 0 " 18 ' - 0 " 72 ' - 0 " 18'-0"18'-0"18'-0" STAIR #3 DN STAIR #1 F.E. SKYLIGHT BELOW DN ROOF ELECT. WOMEN MEN OFFICE 8 OFFICE 6 OFFICE 5 OFFICE 4 OFFICE 3 OFFICE 1 OFFICE 7 OFFICE 2 ROOF EXIST. CHASE V.I.F. WALL LEGEND EXISTING WALL WALL TO BE REMOVED NEW WALL AREA AFFECTING EXISTING TENANT EE 4 4 DD AA CC 1 A.1.30 3 A.1.30 5 5 BB SCALE: 1/4" = 1'-0"1 EXISTING 2ND FLOOR PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.2.13 . NOT FOR C O N S T R U C T I O N EXISTING AND DEMOLITION ROOF PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 3 3 2 2 1 1 4 A.1.30 2 A.1.30 18'-0" 72 ' - 0 " 54 ' - 0 " 18 ' - 0 " 72 ' - 0 " AREA OF NEW ENTRY EE 4 4 DD AA CC 1 A.1.30 3 A.1.30 5 5 BB SCALE: 1/4" = 1'-0"01 EXISTING ROOF PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.2.20 . NOT FOR C O N S T R U C T I O N PROPOSED LOWER LEVEL PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 3 3 2 2 1 1 18'-0"18'-0"18'-0" 72 ' - 0 " 54 ' - 0 " 18 ' - 0 " 72 ' - 0 " 54'-0" 10 " 6' - 9 2 9 / 3 2 " 5' - 1 0 " 5' - 6 3 / 3 2 " 89'-4" 91'-8 7/16" 89'-4" 97'-7 7/16" 4 A.1.30 CO R R I D O R UNISEX 2 UNISEX 1 SUMP PUMP RM STAIR #2 AUTO DOSING SINK RELOCATE PHONE SWITCHES, CABLE, ELEC. FROM OFFICE 3 CORRIDOR VESTIBULE ELEVATOR install new flooring UP UP EXISTING SAFE MECHANICAL ROOM BOILER ROOM OFFICE 3 OFFICE 2 ADA COMPLIANT ELEV. EQUIP NEW BOTTLE- FILL STATION ADA COMPLIANT OFFICE 1 AIR-LOCK 1 A.2.24 EXISTING MOP SINK RELOCATE ELECT. PANELS WALL LEGEND EXISTING WALL WALL TO BE REMOVED NEW WALL AREA AFFECTING EXISTING TENANT STORAGE 1 A.4.11 1 A.4.11 1 A.4.10 1 A.4.10 2 A.4.10 2 A.4.10 2 A.4.11 2 A.4.11 1 A.4.12 1 A.4.12 2 A.1.30 8"3'-11 29/32"4"8'-4 3/32"4"5'-2" EE 4 4 DD AA CC 1 A.1.30 3 A.1.30 5 5 BB SCALE: 1/4" = 1'-0"1 PROPOSED LOWER LEVEL Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.2.21 . NOT FOR C O N S T R U C T I O N PROPOSED 1ST FLOOR PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O W02 W03 W04 W09 W10W08W06W07W05 W01 W14 W11 W15 W16 W12 W13 W17 3 3 2 2 1 1 4 A.1.30 36 ' - 0 " 36 ' - 0 " 18'-0"18'-0"18'-0" 18 ' - 0 " 18 ' - 0 " 1 1 / 2 " 35 ' - 1 0 1 / 2 " 72 ' - 0 " 18'-0"18'-0"18'-0"18'-0" 5' - 1 " 7'-0" 5' - 1 0 " 4'-4 9/32"9'-3/32"4'-2 1/2" 1'-6" 100'-0" 103'108'-11 13/16" 97'-7 7/16" 1 A.4.11 1 A.4.11 1 A.4.10 1 A.4.10 2 A.4.10 2 A.4.10 2 A.4.11 2 A.4.11 1 A.4.12 1 A.4.12 2 A.1.30 TILE AT ELEVATOR SHAFT AND EAST AND NORTH WALL CANOPY ABOVE FIRE HYDRANT STANDPIPE OFFICE 4 OFFICE 5 AIR-LOCK STAIR #2 STAIR #3 ELEVATOR RESTRM #2 RESTROOM #1 OFFICE 3 NEW ENTRY UP DN EXIST. 3 5/8" CMU WALL (VERIFY) Remove Brick veneer on exterior. Replace with Tile HSS4X2 handrails +36" TENANT SIGNAGE 4X4 TS OR W8X8 HSS 6 X 6 C O L U M N w/ C 6 X 1 3 C H A N N E L S aboveabove below UP DN SK Y L I G H T AB O V E pivot door HSS4X2 HS S 4 X 2 HS S 4 X 2 HS S 4 X 2 OFFICE 2 OFFICE 1 2 A.2.24 HSS4X2 OFFICE 6 WALL LEGEND EXISTING WALL WALL TO BE REMOVED NEW WALL AREA AFFECTING EXISTING TENANT NEW BOTTLE- FILL STATION UNISEX RESTROOM 1 ADA compliant UNISEX RESTROOM 2 ADA compliant EE 4 4 DD AA CC W01 1 A.1.30 3 A.1.30 NEW WALLS & ENTRY DOOR FUTURE CORRIDOR 5 5 BB SCALE: 1/4" = 1'-0"1 PROPOSED 1ST FLOOR PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.2.22 . NOT FOR C O N S T R U C T I O N PROPOSED 2ND FLOOR PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O W34 W37 W38 W39 W35 W36 W31 W32 W33 W40W42W44W45W43W41 W20 W21 W30W29W28W27W26W25W24W23W22 3 3 2 2 1 1 4 A.1.30 1 A.4.11 1 A.4.11 1 A.4.10 1 A.4.10 2 A.4.10 2 A.4.10 2 A.4.11 2 A.4.11 1 A.4.12 1 A.4.12 2 A.1.30 72 ' - 0 " 18'-0" 54 ' - 0 " 18 ' - 0 " 72 ' - 0 " 18'-0"18'-0"18'-0" 4' - 2 " 4" 5' - 1 0 " 4" +/ - 6 ' - 8 " 1'-6" 108'-11 13/16" 112'-0" 103' AREA OF REFUGE STAIR #3 VESTIBULE ELEVATOR NEW CORRIDOR DN C1 2 X 2 0 . 7 st e e l p a n sl o p e t o d r a i n CANOPY BELOW open to below SKYLIGHT BELOW DN ROOF F.E. UNISEX #2UNISEX #1 3 A.2.24 HSS4X2 HSS4X2 HS S 4 X 2 HS S 4 X 2 HS S 4 X 2 HS S 4 X 2 HS S 4 X 2 HS S 4 X 2 HSS 6 X 6 C O L U M N w/ C 6 X 1 3 C H A N N E L S AIR-LOCK OFFICE 8 OFFICE 6 OFFICE 5 OFFICE 4 OFFICE 3 OFFICE 1 OFFICE 7 OFFICE 2 ROOF ADA compliantADA compliant JAN. CLO. WALL LEGEND EXISTING WALL WALL TO BE REMOVED NEW WALL AREA AFFECTING EXISTING TENANT NEW BOTTLE- FILL STATION EE 4 4 DD AA CC 1 A.1.30 3 A.1.30 5 5 42" GLASS GUARDRAIL BB SCALE: 1/4" = 1'-0"1 PROPOSED 2ND FLOOR PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.2.23 . NOT FOR C O N S T R U C T I O N PROPOSED ROOF PLAN 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 3 3 2 2 1 1 4 A.1.30 1 A.4.11 1 A.4.11 1 A.4.10 1 A.4.10 2 A.4.10 2 A.4.10 2 A.4.11 2 A.4.11 1 A.4.12 1 A.4.12 2 A.1.30 NEW LOW WALL CLAD IN SHEET METAL 14" C CHANNEL CORNICE ROOF BELOW NEW ENTRY TOWER ROOF CANOPY ROOF BELOW DRAIN EE 4 4 DD AA CC 1 A.1.30 3 A.1.30 5 5 BB SCALE: 1/4" = 1'-0"1 PROPOSED ROOF PLAN Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.3.10 . NOT FOR C O N S T R U C T I O N EXISTING BUILDING ELEVATIONS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O E D AB +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK REMOVE LT. FIXT AND RELOCATE J-BOX NEW LIGHT FIXTURE 4 3 2 15 +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK SCALE: 1/4" = 1'-0"2 EXISTING EAST ELEVATION SCALE: 1/4" = 1'-0"1 EXISTING NORTH ELEVATION Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.3.11 . NOT FOR C O N S T R U C T I O N EXISTING BUILDING ELEVATIONS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O A D EB +89'-4" -1 LOWER LEVEL +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK +124'-0" 3 T.O. BRICK REMOVE LT. FIXTURE 1 2 3 4 5 +89'-4" -1 LOWER LEVEL +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK +124'-0" 3 T.O. BRICK SCALE: 1/4" = 1'-0"2 EXISTING WEST ELEVATION SCALE: 1/4" = 1'-0"1 EXISTING SOUTH ELEVATION Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE 01 - WIP Change Change Work in Progress PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.3.20 . NOT FOR C O N S T R U C T I O N PROPOSED BUILDING ELEVATIONS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O E D AB +89'-4" -1 LOWER LEVEL +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK +124'-0" 3 T.O. BRICK 12" C CHANNEL CANOPY 14" STEEL CHANNEL CORNICE HSS2X4 COLUMN AND BEAM FRAME NEW LIGHT FIXTURE PIVOT ENTRY DOOR NEW WINDOW NEW WINDOW NEW WINDOW EXISTING WINDOW 2"X2 1/4" KAWNEER THERMAL WINDOWS, TYP. AREA OF NEW WORK 4 3 2 15 +89'-4" -1 LOWER LEVEL +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK +124'-0" 3 T.O. BRICK 26 ' - 7 " 2' - 2 " 4' ENTRY CANOPY WITH 12" C CHANNEL 6" TUBE STEEL WITH C CHANNEL CORNER COLUMNS, TYP. 14" STEEL CHANNEL CORNICE HSS2X4 COLUMN AND BEAM FRAME NEW LIGHT FIXTURES 2"X2 1/4" KAWNEER THERMAL WINDOWS, TYP.NEW WINDOWS AREA OF NEW WORK SCALE: 1/4" = 1'-0"2 PROPOSED EAST ELEVATION SCALE: 1/4" = 1'-0"1 PROPOSED NORTH ELEVATION Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE 01 - WIP Change Change Work in Progress PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.3.21 . NOT FOR C O N S T R U C T I O N PROPOSED BUILDING ELEVATIONS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O A D EB +89'-4" -1 LOWER LEVEL +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK +124'-0" 3 T.O. BRICK 14" STEEL CORNICE SHEET METAL CRIB WALL 6" TUBE STEEL WITH C CHANNEL CORNER COLUMNS, TYP. NEW LIGHT FIXTURE NEW WINDOW NEW WINDOW AREA OF NEW WORK 1 2 3 4 5 +89'-4" -1 LOWER LEVEL +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK +124'-0" 3 T.O. BRICK 2"X2 1/4" KAWNEER THERMAL WINDOWS, TYP. AREA OF NEW WORK SCALE: 1/4" = 1'-0"2 PROPOSED WEST ELEVATION SCALE: 1/4" = 1'-0"1 PROPOSED SOUTH ELEVATION Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE 01 - WIP Change Work in Progress PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.3.22 . NOT FOR C O N S T R U C T I O N PROPOSED COLORED ELEVATIONS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 1 NORTH ELEVATION RENDERING 2 EAST ELEVATION RENDERING Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE 01 - WIP Change Work in Progress PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.3.23 . NOT FOR C O N S T R U C T I O N PROPOSED COLORED ELEVATION AND STREETSCAPE 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 1 WEST ELEVATION RENDERING 2 STREETSCAPE FROM NORTH MILL Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.4.10 . NOT FOR C O N S T R U C T I O N PROPOSED BUILDING SECTIONS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O 1 2 3 5 +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK STAIR #3 VESTIBULENEW HALLWAYOFFICEOFFICE STAIR #2 NEW HALLWAY NEW ENTRY CORRIDOR VESTIBULEMECHANICAL ROOM OFFICE E D C B A +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK VESTIBULE NEW ENTRYOFFICE VESTIBULEOFFICE SCALE: 1/4" = 1'-0"1 E/W BUILDING SECTION SCALE: 1/4" = 1'-0"2 N/S BUILDING SECTION Exhibit B- 225 N. Mill Approved Plans Issue Name Issue Date RevID ISSUE NAME DATE PROJECT NO: DRAWN BY: COPYRIGHT DATE PRINTED: SHEET TITLE A.4.11 . NOT FOR C O N S T R U C T I O N PROPOSED BUILDING SECTIONS 6/18/20 COMM. DESIGN REVIEW INITIAL SET-UP . C.E. PROGRESS SET 10/16/19 6/8/20 6/19/20 2 2 5 N M I L L S T R E E T S T E 1 0 0 A S P E N C O L O R A D O 8 1 6 1 1 BO W T I E R E M O D E L 22 5 N O R T H M I L L S T R E E T AS P E N , C O L O R A D O B C D E +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK ELEV. EQUIP CORRIDORVESTIBULE OFFICE NEW ENTRY OFFICE OFFICE VESTIBULE 5 3 2 1 +89'-4" -1 LOWER LEVEL +100'-0" 1 1ST FLOOR +112'-0" 2 2ND FLOOR +124'-0" 3 T.O. BRICK WOMENCORRIDORMECHANICAL ROOM OFFICEELEV. EQUIP UNISEX BATHRMOFFICECHASEBATHROOM NEW HALLWAY UNISEX #2 UNISEX #1OFFICEOFFICE SCALE: 1/4" = 1'-0"2 N/S BUILDING SECTION SCALE: 1/4" = 1'-0"1 E/W BUILDING SECTION Exhibit B- 225 N. Mill Approved Plans