Loading...
HomeMy WebLinkAboutExhibit A - Application225 W SMUGGLER STREET Aspen CO, 81611 04.19.2021 Proposal The proposed design consists of two levels above grade at the street, with an attached one-story, two-car garage accessed from the back alley. Below grade is a large basement with attached subgrade garage accessed via a car lift from the street level garage. There will be a large, fully drained, and accessible light-well on the east side and an additional small light-well on the west side, which provide light and emergency egress to the basement bedrooms. The combined three levels will be connected by an open, sculptural stair and residential size elevator. An interior light- well, adjacent to the large exterior light well on the east, will connect the basement to an open living, dining, and kitchen space on the ground level. The second level contains the master suite, gym, and study, which is cantilevered at the front and rear to provide shade to the openings below and articulation on the facades. The proposed structure will have a concrete basement foundation with crawlspace and type V-B construction above grade with steel beams and moment frames where required. The roofs are designed to be low-slope flat roofs to accommodate photovoltaic panels at the back and stay under the required height limit of 25 ft. Standards for which variations are requested: Articulation of Building mass - 26.410.030.B.1 Along the west side of the house, a 5 ft. deep x 10 ft. long indentation is provided between the one-story garage and the two-story principal building. This makes the principal building wall less than 45 ft. long and therefore meets the intent of the code standard. On the east side of the house, the principal building is 50 ft. long on the first level with an approximate 12 ft. step-back in plan to the one-story garage beyond. The conditioned, occupiable space on the second level is also 50 ft in length, although it has un-enclosed, un-occupiable building extensions at the front and rear that provide shade and articulation to the front and rear facades. The second level is also differentiated by both a material change and a 1 ft. overhang along the east elevation. We believe that, although the 50 ft. east wall is longer than what is specified in the RDS, the proposed design achieves the intent of breaking down the overall mass of the building through materiality and articulation. Please see attached images showing the design. Window Placement - 26.410.030.E.2 On the north side of the stairwell facing the street, the glazing is designed to maximize light and thus extends from level 1 to level 2 with only a single horizontal mullion division. From the outside, these windows are obscured by a perforated metal screen. The screens will only be operable for maintenance and will otherwise be permanently covering the glazing and thus the scale will not be apparent from the street. Please see attached images showing the design. 225 W. SMUGGLER STREET 04.19.2021 OVERALL VIEW FROM NORTHEAST OVERALL VIEW FROM NORTHWEST 225 W. SMUGGLER STREET 04.19.2021 OVERALL VIEW FROM SOUTHEAST OVERALL VIEW FROM SOUTHWEST 225 W. SMUGGLER STREET 04.19.2021 VIEW OF EAST FACADE FROM NORTHEAST Articulation of Building Mass - Level 1 and Level 2 are expressed with different materials - Level 2 overhangs level 1 by 1 ft - The length of Level 2 is broken down by windows and a material change 225 W. SMUGGLER STREET 04.19.2021 VIEW OF EAST FACADE FROM SOUTHEAST Window Placement - At the rear yard, Level 2 has a 4 ft, un-enclosed and un-occupiable building extension to provide shade and weather protection to the glazing. 225 W. SMUGGLER STREET 04.19.2021 VIEW OF ENTRY AND STREET FACING STAIR GLAZING FROM NORTHWEST Window Placement - The 2 story street facing glazing at the stair is shrouded in a perforated metal screen. - The section of glazing is not easily distinguished behind the articulation of the foyer and adjacent vegetation. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 COMMUNITY DEVELOPMENT DEPARTMENT GENERAL LAND USE PACKET Attached is an Application for review of Development that requires Land Use Review pursuant to The City of Aspen Land Use Code: Included in this package are the following attachments: 1.Development Application Fee Policy, Fee Schedule and Agreement to Pay Application Fees Form 2.Land Use Application Form 3.Dimensional Requirements Form (if required) 4.HOA Compliance Form 5.Development Review Procedure All applications are reviewed based on the criteria established in Title 26 of the Aspen Municipal Code. Title 26 of the Aspen Municipal Code is available at the City Clerk’s Office on the second floor of City Hall and on the internet at https://library.municode.com/co/aspen/codes/municipal_code. We require all applicants to hold a Pre-Application Conference with a Planner in the Community Development Department so that the requirements for submitting a complete application can be fully described. This meeting can happen in person or by phone or email. Also, depending upon the complexity of the development proposed, submitting one copy of the development application to the Case Planner to determine accuracy, inefficiencies, or redundancies can reduce the overall cost of materials and staff time. Wlease recoŐninje that review of these materials does not substitute for a complete review of the Aspen >and hse ZeŐulations. thile this application packaŐe attempts to summarinje the key provisions of the Code as they apply to your type of development͕ it cannot possibly replicate the detail or the scope of the Code. /f you have Ƌuestions that are not answered by the materials in this packaŐe͕ we suŐŐest that you contact the staff member assiŐned to your case͕ contact Wlanner of the ay ;ϵϳϬͲϰ2ϵͲ2ϳ6ϰ/plannerofthedayΛŐmail.comͿ͕ or consult the applicable sections of the Aspen >and hse Code. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 Land Use Review Fee Policy The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is collected for land use applications based on the type of application submitted. A flat fee is collected by Community evelopment for applications that normally take a minimal and predictable amount of staff time to process. Zeview fees for other City epartments reviewinŐ the application ;referral departmentsͿ also will be collected when necessary. &lat fees are cumulative͕ i.e.͕ an application with multiple flat fees must pay the sum of those flat fees. &lat fees are not refundable. A review fee deposit is collected by Community evelopment when more edžtensive staff time is reƋuired. Actual staff time spent will be charŐed aŐainst the deposit. sarious City staff also may charŐe their time spent on the case in addition to the Case Wlanner. The deposit amount may be reduced if͕ in the opinion of the Community evelopment epartment irector͕ the proũect is edžpected to take siŐnificantly less time to process than the deposit indicates. A determination on the deposit amount shall be made durinŐ the preͲapplication conference by the Case Wlanner. Hourly billinŐ shall still apply. All applications must include an AŐreement to Way Application &ees. One payment includinŐ the deposit for WlanninŐ and referral aŐency fees must be submitted with each land use application͕ made payable to the City of Aspen. Applications will not be accepted for processinŐ without the reƋuired fee;sͿ. The Community evelopment epartment shall keep an accurate record of the actual time reƋuired to process a land use application reƋuirinŐ a deposit. The City can provide a summary report of fees due at the applicant’s reƋuest. The applicant will be billed for the additional costs incurred by the City when the processinŐ of an application by the Community evelopment epartment takes more time or edžpense than is covered by the deposit. Any direct costs attributable to a proũect review shall be billed to the applicant with no additional administrative charŐe. /n the event the processinŐ of an application takes less time than provided for by the deposit͕ the epartment shall refund the unused portion of the deposited fee to the applicant. &ees shall be due reŐardless of whether an applicant receives approval. hnless otherwise combined by the irector for simplicity of billinŐ͕ all applications for conceptual͕ final͕ and recordation of approval documents shall be handled as individual cases for the purpose of billinŐ. hpon conceptual approval͕ all billinŐ shall be reconciled͕ and past due invoices shall be paid prior to the irector acceptinŐ an application for final review. &inal review shall reƋuire a new deposit at the rate in effect at the time of final submission. hpon final approval͕ all billinŐ shall aŐain be reconciled prior to the irector acceptinŐ an application for review of technical documents for recordation. The Community evelopment irector may cease processinŐ of a land use application for which an unpaid invoice is ϯϬ or more days past due. hnpaid invoices of ϵϬ days or more past due may be assessed a late fee of ϭ.ϳϱй per month. An unpaid invoice of ϭ2Ϭ days or more may be subũect to additional actions as may be assiŐned by the Municipal Court ũudŐe. All payment information is public domain. All invoices shall be paid prior to issuance of a evelopment Order or recordation of development aŐreements and plats. The City will not accept a buildinŐ permit for a property until all invoices are paid in full. &or permits already accepted͕ any unpaid invoice of ϵϬ or more days may result in cessation of buildinŐ permit processinŐ or issuance of a stop work order until full payment is made. The property owner of record is the party responsible for payment of all costs associated with a land use application for the property. Any secondary agreement between a property owner and an applicant representing the owner (e.g. a contract purchaser) regarding payment of fees is solely between those private parties. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 Agreement to Pay Application Fees An agreement between the City of Aspen (“City”) and Address of Property: Please type or print in all caps Property Owner Name: Representative Name (if different from Property Owner): Billing Name and Address - Send Bills to: Contact info for billing: e-mail: Phone: / understand that the City has adopted͕ via Ordinance Eo. 2Ϭ͕ ^eries of 2Ϭ2Ϭ͕ review fees for >and hse applications͕ and payment of these fees is a condition precedent to determininŐ application completeness. / understand that as the property owner͕ / am responsible for payinŐ all fees for this development application. &or flat fees and referral fees͗ / aŐree to pay the followinŐ fees for the services indicated. / understand that these flat fees are nonͲrefundable. $. flat fee for . $. flat fee for $. flat fee for . $. flat fee for &or deposit cases only͗ The City and / understand that because of the sinje͕ nature͕ or scope of the proposed proũect͕ it is not possible at this time to know the full edžtent or total costs involved in processinŐ the application. / understand that additional costs over and above the deposit may accrue. / understand and aŐree that it is impracticable for City staff to complete processinŐ͕ review͕ and presentation of sufficient information to enable leŐally reƋuired findinŐs to be made for proũect consideration unless invoices are paid in full. The City and / understand and aŐree that invoices sent by the City to the above listed billinŐ address and not returned to the City shall be considered by the City as beinŐ received by me. / aŐree to remit payment within ϯϬ days of presentation of an invoice by the City for such services. / have read͕ understood͕ and aŐree to the >and hse Zeview &ee Wolicy͕ includinŐ conseƋuences for nonͲpayment. / aŐree to pay the followinŐ initial deposit amounts for the specified hours of staff time. / understand that payment of a deposit does not render an application complete or compliant with approval criteria. /f actual recorded costs edžceed the initial deposit͕ / aŐree to pay additional monthly billinŐs to the City to reimburse the City for processinŐ my application at the hourly rates hereinafter stated. $ deposit for hours of Community Development Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. $ deposit for hours of Engineering Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. City of Aspen: Phillip Supino, AICP Community Development Director City Use: Fees Due: $ Received $ Case # Signature: PRINT Name: Title: CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 LAND USE APPLICATION APPLICANT: REPRESENTIVATIVE: Description: Existing and Proposed Conditions Review: Administrative or Board Review Required Land Use Review(s): Growth Management Quota System (GMQS) required fields: Net Leasable square footage Lodge Pillows Free Market dwelling units Affordable Housing dwelling units Essential Public Facility square footage Have you included the following? FEES DUE: $ Pre-Application Conference Summary Signed Fee Agreement HOA Compliance form All items listed in checklist on PreApplication Conference Summary Name: Address: Phone#: email: Address: Phone #: email: Name: Project Name and Address: Parcel ID # (REQUIRED) This project involves the demolition of an existing, 3,528 SF non-historic Single family home and construction of a new, 6,252 SF Single Family home. The proposed new home will be comprised of a 2,644 SF Basement, 1,758 SF ground level with attached 569 SF Garage, and 1,281 SF 2nd Level. There will be a 333 SF front porch and 465 SF rear yard porch. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 DIMENSIONAL REQUIREMENTS FORM Complete only if required by the PreApplication checklist Project and Location Applicant: Zone District: Gross Lot Area: Net Lot Area: **Please refer to section 26.575.020 for information on how to calculate Net Lot Area Please fill out all relevant dimensions Single Family and Duplex Residential 1) Floor Area (square feet) 2) Maximum Height 3) Front Setback 4) Rear Setback 5) Side Setbacks 6) Combined Side Setbacks 7) % Site Coverage Existing Allowed Proposed Multi-family Residential 1)Number of Units 2)Parcel Density (see 26.710.090.C.10) 3)FAR (Floor Area Ratio) 4)Floor Area (square feet) Existing Allowed Proposed 8) Minimum distance between buildings Proposed % of demolition ϱͿ Maximum Height 6Ϳ Front Setback ϳͿ Rear Setback ϴͿ Side Setbacks Proposed % of demolition Commercial Proposed Use(s) Existing Allowed Proposed 1) FAR (Floor Area Ratio) 2) Floor Area (square feet) 3) Maximum Height 4) Off-Street Parking Spaces 5) Second Tier (square feet) 6) Pedestrian Amenity (square feet) Proposed % of demolition Existing non-conformities or encroachments: Variations requested: Lodge Additional Use(s) 1)FAR (Floor Area Ratio) 2)Floor Area (square feet) 3)Maximum Height 4)Free Market Residential(square feet) 4)Front setback 5)Rear setback 6)Side setbacks 7)Off-Street Parking Spaces 8)Pedestrian Amenity (square feet) Proposed % of demolition Existing Allowed Proposed 3,153 SF 3,490 SF 3,489 SF - 25'-0" 25'-0" 30'-0" 10' / 5' Garage 5' 15' 2,327 SF 10'100% - Articulation of Building Mass – Section 26.410.030.B.1 (Non-Flexible) - Window Placement - 26.410.030.E.2 None April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090 CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT Homeowner Association Compliance Policy All land use applications within the City of Aspen are required to include a Homeowner Association Compliance Form (this form) certifying that the scope of work included in the land use application complies with all applicable covenants and homeowner association policies. The certification must be signed by the property owner or Attorney representing the property owner. Property Owner (“I”): Name: Email: Phone No.: Address of Property: (subject of application) I certify as follows: (pick one) □This property is not subject to a homeowner association or other form of private c ovenant. □This property is subject to a homeowner association or private covenant, and the improvements proposed in this land use application do not require approval by the homeowners association or covenant beneficiary. □This property is subject to a homeowners association or private covenant and the improvements proposed in this land use application have been approved by the homeowners a ssociation or covenant beneficiary. I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner signature: Date: Owner printed name: or, Attorney signature: Date: Attorney printed name: 225 W. Smuggler Street Aspen, CO 81611 Continental Hotel Holdings, LLC aspen@goodbearco.com CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090 DEVELOPMENT REVIEW PROCEDURE ϭ.Attend pre-application conference. During this one-on-one meeting, staff will determine the review process applies to your development proposal and will identify the materials necessary to review your application. 2.Submit Development Application. Based on your pre-application meeting, you should complete to the application package and submit the requested number of copies of the complete application and the appropriate processing fee to the Community Development Department. ϯ.Determination of Completeness. Within five ;ϱͿ working days of the date of your submission, staff will review the application and notify you in writing whether the application is complete or if additional materials are required. Please be aware that the purpose of the completeness review is to determine whether or not the information you have submitted is adequate to review the request, and not whether the information is sufficient to obtain approval. ϰ.Staff Review of Development Application. Once your application is determined to be complete͕ it will be reviewed by the staff for compliance with the applicable standards of the Code. urinŐ the staff review staŐe͕ the application will be referred to other aŐencies for comments. The Wlanner assiŐned to your case or the aŐency may contact you if additional information is needed or if problems are identified. ^taff will draft a memo for siŐnature by the Community evelopment irector that edžplains whether your application complies with the Code͕ and will list any conditions that should apply if the application is to be approved. &inal approval of any evelopment Application that amends a recorded document͕ such as a plat͕ aŐreement͕ or deed restriction͕ will reƋuire the applicant to prepare an amended version of that document for review and approval by staff. ^taff will provide the applicant with the applicable contents for the revised plat. The City Attorney is normally in charŐe of the form for recorded aŐreements and deed restrictions. te suŐŐest that you not Őo to the trouble or edžpense of preparinŐ these documents until the staff has determined that your application is eliŐible for the reƋuested amendment or edžemption. 5. Board Review of Application. /f a public hearinŐ is reƋuired for the land use action that you are reƋuestinŐ͕ the WlanninŐ staff will schedule a hearinŐ date for the application upon determination that the application is complete. The hearinŐ;sͿ will be scheduled before the appropriate reviewinŐ board;sͿ. The applicant will be reƋuired to mail notice ;one copy provided by the Community evelopment epartmentͿ to property owners within ϯϬ feet of the subũect property and post notice ;siŐn available at the Community evelopment epartmentͿ of the public hearinŐ on the site at least fifteen ;ϭϱͿ days prior to the hearinŐ date. ;Wlease see Attachment 6 for instructions.Ϳ The WlanninŐ staff will publish notice of the hearinŐ in the paper for land use reƋuests that reƋuire publication. The WlanninŐ staff will then formulate a recommendation on the land use reƋuest and draft a memo to the reviewinŐ board;sͿ. ^taff will supply the applicant with a copy of the WlanninŐ staff’s memo͕ approdžimately five ;ϱͿ days prior to the hearinŐ. The public hearinŐ;sͿ will take place before the appropriate review boards. Wublic hearinŐs include a presentation by the WlanninŐ staff͕ a presentation by the applicant ;optionalͿ͕ consideration of public comment͕ and the reviewinŐ board’s Ƌuestions and decision. (Continued on next page) CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090 6.Issuance of Development Order. /f the land use review is approved͕ then the WlanninŐ staff will issue a evelopment Order͕ which allows the applicant to submit a buildinŐ permit application. ϳ.Receipt of Building Permit. Once you have received a copy of the siŐned staff approval͕ you may apply for a buildinŐ permit. urinŐ this time͕ your proũect will be edžamined for its compliance with the hniform uildinŐ Code. /t also will be checked for compliance with applicable provisions of the >and hse ZeŐulations that were not reviewed in detail durinŐ the land use case review. ;This miŐht include a check of floor area ratios͕ setbacks͕ parkinŐ͕ open space and the likeͿ. /mpact fees for water͕ sewer͕ parks͕ and employee housinŐ will be collected as part of the permittinŐ process. Any document reƋuired to be recorded͕ such as a plat͕ deed restriction͕ or aŐreement͕ will be reviewed and recorded before a buildinŐ permit application is submitted. SQUARE SEVEN April 15, 2021 LETTER OF AUTHORIZATION FOR AGENT CONCERNING CONTINENTAL HOTEL HOLDINGS LLC To Whom It May Concern: This letter shall confirm that Carson Davis of Ehrlich Yanai Rhee Chaney Architects is a duly authorized representative of Continental Hotel Holdings LLC, a Delaware limited liability company (“Owner”). Mr. Davis has full authority to act on behalf of the Owner. This authority includes, but is not limited to, acting as the main point of contact in regard to the redevelopment of the single-family residence at 225 W Smuggler Street. Applicant: Name: Continental Hotel Holdings LLC Address: 15 E 26th St. Ste 602 New York, NY 10010 Phone Number: (415) 967-2827 Representative: Name: Carson Davis of Ehrlich Yanai Rhee Chaney Architects Address: 10865 Washington Blvd Culver City, CA 90232 Phone Number: (310) 838-9700 Should you have any questions concerning the scope of this authorization, please contact the undersigned. Sincerely, Brian Caulin Authorized Individual, Square Seven Management, LLC Continental Hotel Holdings LLC DocuSign Envelope ID: 6FE93D16-A170-4268-9B61-79B7ADFCEB0E FirstAme�rican True"" Owner's Policy of Title Insurance ISSUED BY First American Title Insurance Company Schedule A POLICY NUMBER 5011408-0051205e Name and Address of Title Insurance Company: FIRST AMERICAN TITLE INSURANCE COMPANY, 600 S. Cherry Street, Suite 715, Denver, Colorado 80246 File No.: 20004565 Address Reference: 225 West Smuggler Street, Aspen, CO 81611 Premium: $18,270.00 1. Name of Insured: Continental Hotel Holdings LLC, a Delaware limited liability company 2. The estate or interest in the Land that is insured by this policy is: Fee simple 3. Title is vested in: Continental Hotel Holdings LLC, a Delaware limited liability company 4. The Land referred to in this policy is described as follows: SEE SCHEDULE C ATTACHED HERETO v Gary A. Wright, Authorized Agent (This Schedule A valid only when Schedule B is attached) Amount of Insurance: $12,000,000.00 Date of Policy: October 15, 2020 at 12:43 PM Form 5011400-A (7-1-14) Page 1 of 1 ALTA Owner's Policy of Title Insurance (6-17-06) Schedule A I'0 ""'° �. FirstAmercan Title Owner's Policy of Title Insurance ISSUED 6Y First American Title Insurance Company Schedule B POLICY NUMBER 5011408-0051205e File No.: 20004565 EXCEPTIONS FROM COVERAGE This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses) which arise by reason of: 1. Any facts, rights, interests, or claims that are not shown by the Public Records, but which could be ascertained by an inspection of the Land or by making inquiry of the persons in possession thereof. 2. Easements, or claims of easements, not shown by the Public Records. 3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey and inspection of the Land would disclose, and which are not shown by the Public Records. 4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not shown in the Public Records. 5. Unpatented mining claims; reservations or exceptions in patents or in Acts authorizing the issuance thereof. 6. Any water rights, claims or title to water, in, on or under the Land. 7. Taxes and assessments for the year 2020, and subsequent years, a lien not yet due or payable. 8. Terms, conditions, provisions, agreements and obligations specified under the Act authorizing the issuance of the Patent for the City and Townsite of Aspen, recorded March 1, 1897, in Book 139 at Page 216 as Reception No. 060156. 9. Terms, conditions, provisions, agreements and obligations specified under Ordinance No. 6 (series of 1959, An Ordinance Accepting a Map Entitled "Official Map of the City of Aspen, Pitkin County, State of Colorado," as the Official Map of the City of Aspen: Providing for Dedication of all Streets and Alleys, Except Such Streets and Alleys Heretofore Vacated; And Providing for the Filing of Said Map, Field Notes, and Supplemental Plats with the Clerk and Recorder for Pitkin County, dated November 2, 1959, and recorded December 18, 1959, in Book 189 at Page 354 as Reception No. 109043; and any and all notes, easements and recitals as disclosed on the Willets Map recorded November 12, 1969 in Plat Book 4 at Page 27 as Reception No. 137902. 10. Terms, conditions, provisions, agreements and obligations specified under the Statement of Exemption from the Definition of Subdivison dated August 26, 1977, and recorded August 30, 1977, in Book 334 at Page 239 as Reception No. 197023. 11. Any and all notes, encroachments, easements and recitals as disclosed on the recorded Lots D&E Block 48 Original Aspen Townsite Plat recorded August 10, 1993, in Plat Book 3 at Pape 4. 12. Terms, conditions, provisions, agreements and obligations specified under the City of Aspen Easement Agreement dated September 27, 2016, and recorded November 4, 2016, as Reception No. 633602. Form 5011408-B (7-1-14) Page 1 of 2 1 ALTA Owner's Policy of Title Insurance (6-17-06) Colorado - Schedule B SCHEDULE B (Continued) 13. Those matters as disclosed on the Improvement Survey Plat provided Tuttle Surveying Services, 225 Smuggler Street, dated October 15, 2020, including but not limited to the encroachment of Lot C's RR tie retaining wall onto the subject property. Form 5011408-B (7-1-14) Page 2 of 2 ALTA Owner's Policy of Title Insurance (6-17-06) Colorado - Schedule B +4S RMf hid. ' FirstAmerican Title Owner's Policy of Title Insurance ISSUED BY First American Title Insurance Company POLICY NUMBER Schedule C 1 5011408-0051205e File No.: 20004565 LEGAL DESCRIPTION The Land referred to in this policy is described as follows: Lots D and E, Block 48, City and Townsite of Aspen, Pitkin County, Colorado. Form 5000000-C (7-1-14) Page 1 of 1 1 Schedule C Residential Design Standards Administrative Compliance Review Staff Checklist - Single Family and Duplex Standard Complies Alternative Compliance Does Not Comply N/A Sheet #(s)/Notes B.1.Articulation of Building Mass (Non-flexible) B.2.Building Orientation (Flexible) B.3.Build-to Requirement (Flexible) B.4.One Story Element (Flexible) C.1.Garage Access (Non-flexible) C.2.Garage Placement (Non-flexible) C.3.Garage Dimensions (Flexible) Disclaimer: This application is only valid for the attached design. If any element of the design subject to Residential Design Standards changes prior to or during building permit review, the applicant shall be required to apply for a new Administrative Compliance Review. Address: Parcel ID: Zone District/PD: Representative: Email: Phone: Page 1 of 2 Approved: (Approved plans/elevations attached) Standard Complies Alternative Compliance Doesn’t Comply N/A Sheet #(s)/Notes C.4.Garage Door Design (Flexible) D.1.Entry Connection (Non-flexible) D.2.Door Height (Flexible) D.3.Entry Porch (Flexible) E.1.Principle Window (Flexible) E.2.Window Placement (Flexible) E.3.Nonorthogonal Window Limit (Flexible) E.4.Lightwell/Stairwell Location (Flexible) E.5.Materials (Flexible) Residential Design Standards Administrative Compliance Review Staff Checklist Disclaimer: This application is only valid for the attached design. If any element of the design subject to Residential Design Standards changes prior to or during building permit review, the applicant shall be required to apply for a new Administrative Compliance Review. Page 2 of 2 Approved: A3.011 A3.01 A3.02 A3.02 2 1 2 1 A4.01 6 5 1 1 A4.05 1 A4.02 1 A4.06 2 460 ' - 0 " 10' - 0" 100' - 0" 5' - 6 " 6' - 6 " 8' - 1 3 / 8 " 10 ' - 9 7 / 8 " 12 ' - 7 1 / 2 " 6' - 5 1 / 4 " 60 ' - 0 " PR O P E R T Y L I N E GA R A G E S E T B A C K HO U S E S E T B A C K 5' - 0 " PROPERTY LINE SETBACK LINE PROPERTY LINE SETBACK LINE PR O P E R T Y L I N E SE T B A C K 451 SF LOUNGE 179 SF BED 3 93 SF LAUNDRY 98 SF MECHANICAL 272 SF GARAGE (LOWER)STAIR 164 SF BEDROOM 1 59 SF BATH 1 62 SF BATH 2 185 SF BEDROOM 2 119 SF HALL HALL HALL LIGHT WELL UP ELEV. WD-01 WD-01 TL-02 WD-01 TL-02 WD-01 TL-02 C-02 C-02 T-02 3 1 A4.04 UP 5' - 0" ADGFCBE 6'X10' ELECTRICAL EASEMENT; LOCATION TO BE CONFIRMED 1 A4.07 1 A4.03 50' - 4" 24' - 6"4' - 2"6' - 10"8' - 6 7/8"19' - 8 1/2"15' - 2 5/8" 44 ' - 6 " 7' - 6" 10 ' - 9 7 / 8 " 13 ' - 9 3 / 8 " 19' - 6 7/8"34' - 11 1/8" 18' - 0" OPEN TO ABOVE 2.28 F.F. 88' - 9" F.F. 88' - 9" 61 018 60 010 007 011 004 005 001 006 E00 014 2.29 6' - 9 1 / 2 " 7' - 9 " A5.01 13 2 6' - 0 " A5.04 9 4 3' - 6 " 6' - 9 1 / 2 " 11' - 8 3/8" 1 A4.10 2 A4.10 A6.10 1 1' - 2 3 / 8 " 1 A4.12 CRAWL SPACE 012 015 009008 016 013 3' - 7 5/8" 1 A4.13 3.01 1.27 1.27 1.29 D W 2.28 AV 3.06 3.01 3.01 3.01 BATH 3 WC 3.01 3.18 3.17 3.01 3.01 1.27 3.19 1.27 LIGHT WELL 3.01 3.06 4' - 5 1 / 8 " 2' - 1 1 7 / 8 " 4' - 3 1/4" 1' - 3 1/2" 1' - 8 3 / 4 " 3.01 1.29 7' - 2 7/8" LIN. 4' - 4 1 / 8 " 3' - 0" 2X6 WALL 1-HOUR WALL SEPARATION SETBACK LINE PROPERTY LINE FLOOR LEVEL TRANSITION + H" 1. THE PANEL OR SUBPANEL SHALL PROVIDE CAPACITY TO INSTALL A 40-AMP MIN. DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE. 2. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL BE PERMANENT AND VISIBLY MARKED EV CAPABLE. 3. THE ELECTRICAL SYSTEM SHALL HAVE SUFFICIENT CAPACITY TO SIMULTANEOUSLY CHARGE ALL DESIGNATED EV SPACES AT THE FULL RATED AMPERAGE OF THE EVSE. PLAN DESIGN SHALL BE BASED UPON A 40-AMP MIN. BRANCH CIRCUIT. A SEPARATE ELECTRICAL PERMIT IS REQUIRED. 4. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE EV CHARGING PURPOSES AS EV CAPABLE IN ACCORDANCE WITH THE LA ELECT. CODE. 5. THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO ALLOW FOR INSTALLATION OF A DOUBLE-POLE CIRCUIT BREAKER FOR A FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED AS "FOR FUTURE SOLAR ELECTRIC." NOT FOR CONSTRUCTION KEYNOTESLEGEND JOB NUMBER: DATE: The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from unauthorized modification, reuse and/or release under California Business & Professions Code section 5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316. 4/ 1 9 / 2 0 2 1 8 : 0 3 : 2 4 P M BI M 3 6 0 : / / 7 0 9 _ S m u g g l e r S t r e e t / 7 0 9 _ S m u g g l e r _ S t _ 2 0 2 0 . rv t A2.01 BASEMENT PLAN SMUGGLER 225 W. Smuggler St. Aspen, CO 81611 000 SCALE:1/4" = 1'-0"1 BASEMENT PLAN NOTES N N 3.06 BENCH, BUILT-IN, SEE ELEV. 3.08 GUARDRAIL, FRAMELESS GLASS 3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL 3.17 CASEWORK W/ POCKETING DOORS AND WET BAR 3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW 3.19 BUILT-IN NIGHT STAND 1.26 DRIVEWAY, SNOW MELTED 1.27 MECHANICAL CHASE 1.29 CRAWL SPACE ACCESS HATCH 2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE 2.02 BRAKE METAL FASCIA, FIN PER SCHED 2.04 GFRC CLADDING 2.07 STONE CLADDING 2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING 2.09 PERFORATED METAL SCREEN, FIXED 2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A) 2.11 ROOF, STONE BALLAST, SEE SPEC. 2.13 ROOF MOUNTED ELECTRIC PV SYSTEM 2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED. 2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED. 2.25 METAL AWNING 2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING 2.28 SUBTERRANEAN CAR LIFT; SEE SPEC. 2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC. 3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD 3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION 3.03 COAT CLOSET, SEE ELEV. 0.01 (E) STRUCTURE TO BE DEMOLISHED 0.02 (E) DRIVEWAY TO BE DEMOLISHED 0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT 0.04 (E) STAIR TO BE DEMOLISHED 0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED 0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED 0.07 (E) TREE TO REMAIN 0.08 (E) GATE TO BE DEMOLISHED 0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED 0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN 1.07 GAS METER 1.08 ELECTRIC METER 1.16 MECHANICAL / ELEC. CONC. PAD 1.17 ELEC. TRANSFORMER 1.18 TRASH BIN COMPARTMENT 1.19 FRONT PORCH, SNOW MELTED 1.20 CONCRETE TILE PATIO, SNOW MELTED 1.21 FENCE/RAILING 1.22 SITE WALL 1.23 FRONT PATH, SNOW MELTED 1.25 NATURAL GRADE ISSUE DATES NO. DATE REVISION 2X6 WALL 1-HOUR WALL SEPARATION SETBACK LINE PROPERTY LINE FLOOR LEVEL TRANSITION + H" 1. THE PANEL OR SUBPANEL SHALL PROVIDE CAPACITY TO INSTALL A 40-AMP MIN. DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE. 2. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL BE PERMANENT AND VISIBLY MARKED EV CAPABLE. 3. THE ELECTRICAL SYSTEM SHALL HAVE SUFFICIENT CAPACITY TO SIMULTANEOUSLY CHARGE ALL DESIGNATED EV SPACES AT THE FULL RATED AMPERAGE OF THE EVSE. PLAN DESIGN SHALL BE BASED UPON A 40-AMP MIN. BRANCH CIRCUIT. A SEPARATE ELECTRICAL PERMIT IS REQUIRED. 4. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE EV CHARGING PURPOSES AS EV CAPABLE IN ACCORDANCE WITH THE LA ELECT. CODE. 5. THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO ALLOW FOR INSTALLATION OF A DOUBLE-POLE CIRCUIT BREAKER FOR A FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED AS "FOR FUTURE SOLAR ELECTRIC." A3.011 A3.01 A3.02 A3.02 2 1 2 1 A4.01 6 5 1 1 A4.05 1 A4.02 1 A4.06 5' - 0" 60 ' - 0 " 10 ' - 0 " 100' - 0" 10' - 0" 10' - 0" 5' - 6 " 6' - 6 " 8' - 1 3 / 8 " 10 ' - 9 7 / 8 " 12 ' - 7 1 / 2 " 6' - 5 1 / 4 " 437 SF LIVING ROOM 244 SF KITCHEN 101 SF MUD RM 162 SF FOYER 521 SF GARAGE 32 SF PWDR PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E 60 ' - 0 " PROPERTY LINE 2 4 SETBACK LINE SETBACK LINE 11 " 5' - 0 " GA R A G E S E T B A C K HO U S E S E T B A C K SE T B A C K OPEN TO BELOW T-01 T-01 T-01 T-01 T-01 T-01 C-02 1.22 1.22 ABOVE ABOVE 3 01 09 A5.11 3 9 12 LIGHT WELL BELOW 260 SF DINING 1 A4.04 T-02 6'X10' ELECTRICAL EASEMENT; LOCATION TO BE CONFIRMED DN OPEN TO BELOW 17' - 10" 8' - 1 0 " ADGFCBE UP 1 A4.07 1 A4.03 24' - 6"4' - 2"6' - 10"8' - 6 7/8"19' - 8 1/2"15' - 2 5/8" 5' - 1 0 1 / 2 " 29 ' - 1 1 / 2 " 7' - 5 1 / 8 " 24' - 10 3/4"11' - 0 1/4"7' - 6 3/8"1' - 0 1/2"10"18' - 10 1/2"0"2' - 8 3/4"9' - 8 1/8"2' - 9 3/4" T-02 11 ' - 1 1 1 / 2 " ABOVE 14 12 13 11 10 8 7 6 5 2 3 4 1.23 1.19 2.04 2.20 2.21 2.07 2.092.20 LIGHT WELL 1.17 F.F. 100' - 0" F.F. 100' - 0" F.F. 100' - 0" 101 102 103 104 108 105 107 2.01 2.01 2.01 1.20 1.21 G02 G03 G01 1.16 1.26 2.27 2.28 2.29 1.08 1.07 1.21 16' - 6" 6' - 7 " A5.14 1 3.06 DOG WASH A5.14 4 1' - 8 7 / 8 " A5.11 1 A5.12 1 1 A4.10 2 A4.10 A6.10 2 1 A4.12 69 SF PANTRY 1 A4.133.02 3.02 3.01 1.27 3.06 1.27 T-01 FRIDGE COFFEE STATION 3.03 3.03ELEV. 3' - 9 3/4" 50' - 0" NOT FOR CONSTRUCTION KEYNOTESLEGEND JOB NUMBER: DATE: The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from unauthorized modification, reuse and/or release under California Business & Professions Code section 5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316. 4/ 1 9 / 2 0 2 1 8 : 0 3 : 2 6 P M BI M 3 6 0 : / / 7 0 9 _ S m u g g l e r S t r e e t / 7 0 9 _ S m u g g l e r _ S t _ 2 0 2 0 . rv t A2.02 LEVEL 1 FLOOR PLAN SMUGGLER 225 W. Smuggler St. Aspen, CO 81611 000 SCALE: 1/4" = 1'-0" 1 LEVEL 1 PLAN NOTES 3.06 BENCH, BUILT-IN, SEE ELEV. 3.08 GUARDRAIL, FRAMELESS GLASS 3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL 3.17 CASEWORK W/ POCKETING DOORS AND WET BAR 3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW 3.19 BUILT-IN NIGHT STAND 1.26 DRIVEWAY, SNOW MELTED 1.27 MECHANICAL CHASE 1.29 CRAWL SPACE ACCESS HATCH 2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE 2.02 BRAKE METAL FASCIA, FIN PER SCHED 2.04 GFRC CLADDING 2.07 STONE CLADDING 2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING 2.09 PERFORATED METAL SCREEN, FIXED 2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A) 2.11 ROOF, STONE BALLAST, SEE SPEC. 2.13 ROOF MOUNTED ELECTRIC PV SYSTEM 2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED. 2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED. 2.25 METAL AWNING 2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING 2.28 SUBTERRANEAN CAR LIFT; SEE SPEC. 2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC. 3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD 3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION 3.03 COAT CLOSET, SEE ELEV. 0.01 (E) STRUCTURE TO BE DEMOLISHED 0.02 (E) DRIVEWAY TO BE DEMOLISHED 0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT 0.04 (E) STAIR TO BE DEMOLISHED 0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED 0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED 0.07 (E) TREE TO REMAIN 0.08 (E) GATE TO BE DEMOLISHED 0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED 0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN 1.07 GAS METER 1.08 ELECTRIC METER 1.16 MECHANICAL / ELEC. CONC. PAD 1.17 ELEC. TRANSFORMER 1.18 TRASH BIN COMPARTMENT 1.19 FRONT PORCH, SNOW MELTED 1.20 CONCRETE TILE PATIO, SNOW MELTED 1.21 FENCE/RAILING 1.22 SITE WALL 1.23 FRONT PATH, SNOW MELTED 1.25 NATURAL GRADE N N ISSUE DATES NO. DATE REVISION A3.011 A3.01 A3.02 A3.02 2 1 2 1 A4.01 6 5 1 1 A4.05 1 A4.02 1 A4.06 317 SF MASTER BEDROOM 304 SF GYM 206 SF HALL / STUDY 105 SF CLOSET 152 SF MASTER BATH 2 4 5' - 0" 60 ' - 0 " 10 ' - 0 " 100' - 0" 10' - 0" 10' - 0" 5' - 6 " 6' - 6 " 8' - 1 3 / 8 " 10 ' - 9 7 / 8 " 12 ' - 7 1 / 2 " 6' - 5 1 / 4 " 60 ' - 0 " 6" 5' - 0 " T-01 RB-01 T-01 ST-02 3 PR O P E R T Y L I N E PR O P E R T Y L I N E GA R A G E S E T B A C K HO U S E S E T B A C K SE T B A C K W/D 1 A4.04 A OPEN TO BELOW DN ST-02 DGF C BE 1 A4.07 1 A4.03 F.F. 113' - 0" F.F. 113' - 0" F.F. 113' - 0" GC-01 GC-01 24' - 6"4' - 2"6' - 10"8' - 6 7/8"19' - 8 1/2"15' - 2 5/8" 37 ' - 5 1 / 8 " 2' - 0 7 / 8 " 13 ' - 1 0 1 / 2 " 21 ' - 6 " 13 ' - 7 7 / 8 " 8' - 8 3 / 4 " 5' - 4 1 / 2 " 4' - 6 1 / 2 " 2.09 2.09 76 75 74 73 FS08 FS07 FS06 FS02FS03FS04FS05 2.11 2.11 2.13 82 71 72 207 79 208 3' - 9 1/8"20' - 9 5/8"12' - 9 7/8" 2.29 A5.22 1 1 A4.10 2 A4.10 A6.10 3 1 A4.12 2.11 A8.01 7 A8.01 10 A8.01 3 A8.01 8 A8.01 6 A6.20 1 A8.01 5 10 A8.02 FCU 1 A4.13 3.01 3.01 3.14 3.01 STAIR ELEV. 6' - 8 3/4" 4' - 0"49' - 7 1/2"6' - 4 1/4" 21 ' - 6 " 2X6 WALL 1-HOUR WALL SEPARATION SETBACK LINE PROPERTY LINE FLOOR LEVEL TRANSITION + H" 1. THE PANEL OR SUBPANEL SHALL PROVIDE CAPACITY TO INSTALL A 40-AMP MIN. DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE. 2. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL BE PERMANENT AND VISIBLY MARKED EV CAPABLE. 3. THE ELECTRICAL SYSTEM SHALL HAVE SUFFICIENT CAPACITY TO SIMULTANEOUSLY CHARGE ALL DESIGNATED EV SPACES AT THE FULL RATED AMPERAGE OF THE EVSE. PLAN DESIGN SHALL BE BASED UPON A 40-AMP MIN. BRANCH CIRCUIT. A SEPARATE ELECTRICAL PERMIT IS REQUIRED. 4. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE EV CHARGING PURPOSES AS EV CAPABLE IN ACCORDANCE WITH THE LA ELECT. CODE. 5. THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO ALLOW FOR INSTALLATION OF A DOUBLE-POLE CIRCUIT BREAKER FOR A FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED AS "FOR FUTURE SOLAR ELECTRIC." NOT FOR CONSTRUCTION KEYNOTESLEGEND JOB NUMBER: DATE: The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from unauthorized modification, reuse and/or release under California Business & Professions Code section 5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316. 4/ 1 9 / 2 0 2 1 8 : 0 3 : 2 7 P M BI M 3 6 0 : / / 7 0 9 _ S m u g g l e r S t r e e t / 7 0 9 _ S m u g g l e r _ S t _ 2 0 2 0 . rv t A2.03 LEVEL 2 FLOOR PLAN SMUGGLER 225 W. Smuggler St. Aspen, CO 81611 000 SCALE: 1/4" = 1'-0" 1 LEVEL 2 PLAN NOTES N N 3.06 BENCH, BUILT-IN, SEE ELEV. 3.08 GUARDRAIL, FRAMELESS GLASS 3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL 3.17 CASEWORK W/ POCKETING DOORS AND WET BAR 3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW 3.19 BUILT-IN NIGHT STAND 1.26 DRIVEWAY, SNOW MELTED 1.27 MECHANICAL CHASE 1.29 CRAWL SPACE ACCESS HATCH 2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE 2.02 BRAKE METAL FASCIA, FIN PER SCHED 2.04 GFRC CLADDING 2.07 STONE CLADDING 2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING 2.09 PERFORATED METAL SCREEN, FIXED 2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A) 2.11 ROOF, STONE BALLAST, SEE SPEC. 2.13 ROOF MOUNTED ELECTRIC PV SYSTEM 2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED. 2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED. 2.25 METAL AWNING 2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING 2.28 SUBTERRANEAN CAR LIFT; SEE SPEC. 2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC. 3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD 3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION 3.03 COAT CLOSET, SEE ELEV. 0.01 (E) STRUCTURE TO BE DEMOLISHED 0.02 (E) DRIVEWAY TO BE DEMOLISHED 0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT 0.04 (E) STAIR TO BE DEMOLISHED 0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED 0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED 0.07 (E) TREE TO REMAIN 0.08 (E) GATE TO BE DEMOLISHED 0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED 0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN 1.07 GAS METER 1.08 ELECTRIC METER 1.16 MECHANICAL / ELEC. CONC. PAD 1.17 ELEC. TRANSFORMER 1.18 TRASH BIN COMPARTMENT 1.19 FRONT PORCH, SNOW MELTED 1.20 CONCRETE TILE PATIO, SNOW MELTED 1.21 FENCE/RAILING 1.22 SITE WALL 1.23 FRONT PATH, SNOW MELTED 1.25 NATURAL GRADE ISSUE DATES NO. DATE REVISION T12 2X6 WALL 1-HOUR WALL SEPARATION SETBACK LINE PROPERTY LINE FLOOR LEVEL TRANSITION + H" 1. THE PANEL OR SUBPANEL SHALL PROVIDE CAPACITY TO INSTALL A 40-AMP MIN. DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE. 2. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL BE PERMANENT AND VISIBLY MARKED EV CAPABLE. 3. THE ELECTRICAL SYSTEM SHALL HAVE SUFFICIENT CAPACITY TO SIMULTANEOUSLY CHARGE ALL DESIGNATED EV SPACES AT THE FULL RATED AMPERAGE OF THE EVSE. PLAN DESIGN SHALL BE BASED UPON A 40-AMP MIN. BRANCH CIRCUIT. A SEPARATE ELECTRICAL PERMIT IS REQUIRED. 4. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE EV CHARGING PURPOSES AS EV CAPABLE IN ACCORDANCE WITH THE LA ELECT. CODE. 5. THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO ALLOW FOR INSTALLATION OF A DOUBLE-POLE CIRCUIT BREAKER FOR A FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED AS "FOR FUTURE SOLAR ELECTRIC." A3.011 A3.01 A3.02 A3.02 2 1 2 1 A4.01 6 5 1 1 A4.05 1 A4.02 1 A4.06 2 4 3 PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E PROPERTY LINE SETBACK LINE SETBACK LINE GA R A G E S E T B A C K HO U S E S E T B A C K SE T B A C K 5' - 0"5' - 0"90' - 0" 60 ' - 0 " 0" LIGHT WELL LIGHT WELL 1 A4.04 ADGFCBE 1 A4.07 1 A4.03 2.25 2.10 2.10 2.11 2.10 2.11 59' - 11 3/4" 124' - 6" 113' - 0" 113' - 0" 111' - 0" 108' - 2" 100' - 0" 123' - 10" 100' - 0"90' - 1" 99' - 6" 2.11 2.10 21 ' - 6 " 2.13 POTENTIAL PV ARRAY; TBD 15 ' - 1 1 1 / 8 " 21' - 8 5/8"12' - 3 1/4" 25' - 4"10' - 2" 24 ' - 7 3 / 4 " 18 ' - 4 " 15 ' - 0 " NOT FOR CONSTRUCTION KEYNOTESLEGEND JOB NUMBER: DATE: The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from unauthorized modification, reuse and/or release under California Business & Professions Code section 5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316. 4/ 1 9 / 2 0 2 1 8 : 0 3 : 2 8 P M BI M 3 6 0 : / / 7 0 9 _ S m u g g l e r S t r e e t / 7 0 9 _ S m u g g l e r _ S t _ 2 0 2 0 . rv t A2.04 ROOF PLAN SMUGGLER 225 W. Smuggler St. Aspen, CO 81611 000 N N NOTES SCALE: 1/4" = 1'-0" 1 ROOF PLAN 3.06 BENCH, BUILT-IN, SEE ELEV. 3.08 GUARDRAIL, FRAMELESS GLASS 3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL 3.17 CASEWORK W/ POCKETING DOORS AND WET BAR 3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW 3.19 BUILT-IN NIGHT STAND 1.26 DRIVEWAY, SNOW MELTED 1.27 MECHANICAL CHASE 1.29 CRAWL SPACE ACCESS HATCH 2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE 2.02 BRAKE METAL FASCIA, FIN PER SCHED 2.04 GFRC CLADDING 2.07 STONE CLADDING 2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING 2.09 PERFORATED METAL SCREEN, FIXED 2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A) 2.11 ROOF, STONE BALLAST, SEE SPEC. 2.13 ROOF MOUNTED ELECTRIC PV SYSTEM 2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED. 2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED. 2.25 METAL AWNING 2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING 2.28 SUBTERRANEAN CAR LIFT; SEE SPEC. 2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC. 3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD 3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION 3.03 COAT CLOSET, SEE ELEV. 0.01 (E) STRUCTURE TO BE DEMOLISHED 0.02 (E) DRIVEWAY TO BE DEMOLISHED 0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT 0.04 (E) STAIR TO BE DEMOLISHED 0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED 0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED 0.07 (E) TREE TO REMAIN 0.08 (E) GATE TO BE DEMOLISHED 0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED 0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN 1.07 GAS METER 1.08 ELECTRIC METER 1.16 MECHANICAL / ELEC. CONC. PAD 1.17 ELEC. TRANSFORMER 1.18 TRASH BIN COMPARTMENT 1.19 FRONT PORCH, SNOW MELTED 1.20 CONCRETE TILE PATIO, SNOW MELTED 1.21 FENCE/RAILING 1.22 SITE WALL 1.23 FRONT PATH, SNOW MELTED 1.25 NATURAL GRADE ISSUE DATES NO. DATE REVISION LEVEL 1 100' - 0" LEVEL 2 - FF 113' - 0" T.O. ROOF 124' - 6" BASEMENT - FF 88' - 9" LEVEL 1 - FC 111' - 3" LEVEL 2 - FC 122' - 9" 1 A4.05 BASEMENT - FC 97' - 9" LEVEL 1 - FC DROP 109' - 0" 1 A4.06 1' - 9 " 9' - 9 " 1' - 9 " 11 ' - 3 " 2' - 3 " 9' - 0 " 9' - 0 " LIGHT WELL ST-01 ST-01 ST-01 GC-01 GC-01 MT-01 1 A4.04 ADGFCBE1 A4.07 12 14 107 11 018 727182 2.25 5' - 7 1/2" 1.25 1.21 G03 5' - 1 1 1 / 2 " 2.02 2.02 MT-01 11 ' - 9 " 21' - 6 3/8"23' - 2 3/8"15' - 3" LEVEL 1 100' - 0" LEVEL 2 - FF 113' - 0" T.O. ROOF 124' - 6" 1 A4.01 6 5 1 LEVEL 1 - FC 111' - 3" LEVEL 2 - FC 122' - 9" 1 A4.02 LEVEL 1 - FC DROP 109' - 0" 24 1' - 9 " 9' - 9 " 1' - 9 " 11 ' - 3 " 9' - 0 " 3 ST-01 GC-01 MT-03 MT-03 1 A4.03 1 101 1312 207 7574 BEHIND SCREEN BEHIND SCREEN 73 BEHIND SCREEN 3 BEHIND SCREEN C-01 25 ' - 0 " 1.253' - 6 " 6' - 0 " 1.21 3.08 2.20 2.08 4' - 6" 8' - 0 " 2.25 MT-01 MT-02 NOT FOR CONSTRUCTION KEYNOTES LEGEND JOB NUMBER: DATE: The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from unauthorized modification, reuse and/or release under California Business & Professions Code section 5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316. 4/ 1 9 / 2 0 2 1 8 : 0 3 : 2 9 P M BI M 3 6 0 : / / 7 0 9 _ S m u g g l e r S t r e e t / 7 0 9 _ S m u g g l e r _ S t _ 2 0 2 0 . rv t A3.01 EXTERIOR ELEVATIONS SMUGGLER 225 W. Smuggler St. Aspen, CO 81611 000 SCALE: 1/4" = 1'-0" 2 EAST SCALE: 1/4" = 1'-0" 1 NORTH 0.01 (E) STRUCTURE TO BE DEMOLISHED 0.02 (E) DRIVEWAY TO BE DEMOLISHED 0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT 0.04 (E) STAIR TO BE DEMOLISHED 0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED 0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED 0.07 (E) TREE TO REMAIN 0.08 (E) GATE TO BE DEMOLISHED 0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED 0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN 1.07 GAS METER 1.08 ELECTRIC METER 1.16 MECHANICAL / ELEC. CONC. PAD 1.17 ELEC. TRANSFORMER 1.18 TRASH BIN COMPARTMENT 1.19 FRONT PORCH, SNOW MELTED 1.20 CONCRETE TILE PATIO, SNOW MELTED 1.21 FENCE/RAILING 1.22 SITE WALL 1.23 FRONT PATH, SNOW MELTED 1.25 NATURAL GRADE 1.26 DRIVEWAY, SNOW MELTED 1.27 MECHANICAL CHASE 1.29 CRAWL SPACE ACCESS HATCH 2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE 2.02 BRAKE METAL FASCIA, FIN PER SCHED 2.04 GFRC CLADDING 2.07 STONE CLADDING 2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING 2.09 PERFORATED METAL SCREEN, FIXED 2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A) 2.11 ROOF, STONE BALLAST, SEE SPEC. 2.13 ROOF MOUNTED ELECTRIC PV SYSTEM 2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED. 2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED. 2.25 METAL AWNING 2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING 2.28 SUBTERRANEAN CAR LIFT; SEE SPEC. 2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC. 3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD 3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION 3.03 COAT CLOSET, SEE ELEV. 3.06 BENCH, BUILT-IN, SEE ELEV. 3.08 GUARDRAIL, FRAMELESS GLASS 3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL 3.17 CASEWORK W/ POCKETING DOORS AND WET BAR 3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW 3.19 BUILT-IN NIGHT STAND ISSUE DATES NO. DATE REVISION LEVEL 1 100' - 0" LEVEL 2 - FF 113' - 0" T.O. ROOF 124' - 6" 1' - 9 " 9' - 9 " 1' - 9 " 11 ' - 3 " 1 A4.01 651 LEVEL 1 - FC 111' - 3" LEVEL 2 - FC 122' - 9" 1 A4.02 LEVEL 1 - FC DROP 109' - 0" 2 4 9' - 0 " 31 A4.03 20879 10105 9 MT-01 MT-01 MT-01 GC-01 ST-01 ST-01 5' - 8 " 1.17 25 ' - 0 " 2.20 3.08 MT-02 109108 1' - 0" 18' - 0" LEVEL 1 100' - 0" LEVEL 2 - FF 113' - 0" T.O. ROOF 124' - 6" BASEMENT - FF 88' - 9" LEVEL 1 - FC 111' - 3" LEVEL 2 - FC 122' - 9" 1 A4.05 BASEMENT - FC 97' - 9" LEVEL 1 - FC DROP 109' - 0" 1 A4.06 11 ' - 3 " 11 ' - 3 " 1' - 9 " 9' - 9 " 1' - 9 " 9' - 0 " LIGHT WELL GC-01 GC-01 9' - 0 " 1 A4.04 A D GFCBE1 A4.07 62 8765 4 BEHIND SCREEN 76 BEHIND SCREEN MT-03 2 MT-01 MT-01 MT-01 MT-01 ST-01 2.25 11 ' - 9 " 25 ' - 0 " FS02 FS03 FS04 FS05 1.08 1.07 2.13 SCALE: 1/4" = 1'-0" 1 SOUTH SCALE: 1/4" = 1'-0" 2 WEST NOT FOR CONSTRUCTION KEYNOTES LEGEND JOB NUMBER: DATE: The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from unauthorized modification, reuse and/or release under California Business & Professions Code section 5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316. 4/ 1 9 / 2 0 2 1 8 : 0 3 : 3 0 P M BI M 3 6 0 : / / 7 0 9 _ S m u g g l e r S t r e e t / 7 0 9 _ S m u g g l e r _ S t _ 2 0 2 0 . rv t A3.02 EXTERIOR ELEVATIONS SMUGGLER 225 W. Smuggler St. Aspen, CO 81611 000 0.01 (E) STRUCTURE TO BE DEMOLISHED 0.02 (E) DRIVEWAY TO BE DEMOLISHED 0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT 0.04 (E) STAIR TO BE DEMOLISHED 0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED 0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED 0.07 (E) TREE TO REMAIN 0.08 (E) GATE TO BE DEMOLISHED 0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED 0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN 1.07 GAS METER 1.08 ELECTRIC METER 1.16 MECHANICAL / ELEC. CONC. PAD 1.17 ELEC. TRANSFORMER 1.18 TRASH BIN COMPARTMENT 1.19 FRONT PORCH, SNOW MELTED 1.20 CONCRETE TILE PATIO, SNOW MELTED 1.21 FENCE/RAILING 1.22 SITE WALL 1.23 FRONT PATH, SNOW MELTED 1.25 NATURAL GRADE 1.26 DRIVEWAY, SNOW MELTED 1.27 MECHANICAL CHASE 1.29 CRAWL SPACE ACCESS HATCH 2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE 2.02 BRAKE METAL FASCIA, FIN PER SCHED 2.04 GFRC CLADDING 2.07 STONE CLADDING 2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING 2.09 PERFORATED METAL SCREEN, FIXED 2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A) 2.11 ROOF, STONE BALLAST, SEE SPEC. 2.13 ROOF MOUNTED ELECTRIC PV SYSTEM 2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED. 2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED. 2.25 METAL AWNING 2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING 2.28 SUBTERRANEAN CAR LIFT; SEE SPEC. 2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC. 3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD 3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION 3.03 COAT CLOSET, SEE ELEV. 3.06 BENCH, BUILT-IN, SEE ELEV. 3.08 GUARDRAIL, FRAMELESS GLASS 3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL 3.17 CASEWORK W/ POCKETING DOORS AND WET BAR 3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW 3.19 BUILT-IN NIGHT STAND ISSUE DATES NO. DATE REVISION PRE-APPLICATION CONFERENCE SUMMARY DATE: March 1, 2021 PLANNER: Garrett Larimer, 970-319-6950 PROJECT ADDRESS: 225 Smuggler St. REPRESENTATIVE: Carson Davis, Ehrlich Yanai Rhee Chaney Architects (cdavis@eyrc.com) DESCRIPTION: The potential Applicant is requesting Residential Design Standard variations to redevelop the site with a single family residence at 225 Smuggler St. This property is located in the Aspen Infill Area and is zoned R-6. The proposed design requires a variation to four standards: - Articulation of Building Mass – Section 26.410.030.B.1 (Non-Flexible) - Window Placement – 26.410.030.E.2 (Flexible) The Residential Design Standards chapter provides direction for reviewing variations to the standards when the proposed design does not meet the standard. Per Code Section 26.410.020, if an application is found to be inconsistent with any of the Non-Flexible Standards, variations to those standards must be reviewed by the Planning and Zoning Commission. Flexible standards may be reviewed administratively for Alternative Compliance by the Community Development Director. All variations requested will be combined for review by the Planning and Zoning Commission for efficiency. The review for variations will determine if the design meets the intent of the specific standard as well as the general intent statements in Section 26.410.010.A.1-3. Please include written responses or graphics that demonstrate how the design meets the intent statement of the standard in which variations are requested, and general intent statements in Section 26.410.010.A.1-3. An initial administrative review of the proposed design has been completed for the other RDS standards. If any additional standards are found to be not met during the review of the application, those may be added to the variation review request. That process will be finalized during the review of a land use application. Once the application is ready to be submitted, please email the completed application packet to Garrett Larimer at garrett.larimer@cityofaspen.com. Once the application is deemed complete, we will contact you to provide payment for the land use application fee. RELEVANT LAND USE CODE SECTIONS: 26.304 Common Development Review Procedures 26.410 Residential Design Standards 26.410.010.A RDS General Intent Statements 26.410.020.D RDS Variation Review Standards 26.410.030.B.1 Articulation of Building Mass (Non-Flexible) 26.410.030.E.2 Window Placement (Flexible) For your convenience – links to the Land Use Application and Land Use Code are below: Land Use Application Land Use Code REVIEW BY: Community Development Staff for complete application and recommendation to P&Z. Planning and Zoning Commission for Decision PUBLIC HEARING: Yes, Planning and Zoning Commission PLANNING FEES: $3,250 deposit for 10 hours of staff time (Additional/lesser time will be billed or refunded at a rate of $325/hr.) REFERRAL FEES: None. TOTAL DEPOSIT: $3,250 APPLICATION CHECKLIST – These items should be emailed to Garrett.Larimer@cityofaspen.com:  Completed Land Use Application, HOA Compliance Policy, and signed Fee Agreement.  Pre-application Conference Summary (this document).  Applicant’s name, address and telephone number, contained within a letter signed by the applicant stating the name, address, and telephone number of the representative authorized to action on behalf of the applicant.  Street address and legal description of the parcel on which development is proposed to occur, consisting of a current (no older than 6 months) certificate from a title insurance company, an ownership and encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.  An 8 1/2” by 11” vicinity map locating the parcel within the City of Aspen.  A written description of the proposal and an explanation in written, graphic, or model form of how the proposed development complies with the intent statement and review standards associated with the request.  Completed copy of the Residential Design Standard Checklist: https://www.cityofaspen.com/DocumentCenter/View/1697  Written responses to all applicable review criteria. If the copy is deemed complete by staff, the following items will then need to be submitted:  Total fee for review of the application. Depending on further review of the case, additional items may be requested of the application. Once the application is deemed complete by staff, the applicant/applicant’s representative will receive an e-mail requesting submission of an electronic copy of the complete application and the deposit. Once the deposit is received, the case will be assigned to a planner and the land use review will begin. Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The summary does not create a legal or vested right. 225 W. SMUGGLER STREET 04.19.2021 PROPERTY VICINITY MAP 225 W. SMUGGLER ST.