HomeMy WebLinkAboutExhibit A - Application225 W SMUGGLER STREET
Aspen CO, 81611
04.19.2021
Proposal
The proposed design consists of two levels above grade at the street, with an attached one-story,
two-car garage accessed from the back alley. Below grade is a large basement with attached
subgrade garage accessed via a car lift from the street level garage. There will be a large, fully
drained, and accessible light-well on the east side and an additional small light-well on the west
side, which provide light and emergency egress to the basement bedrooms. The combined three
levels will be connected by an open, sculptural stair and residential size elevator. An interior light-
well, adjacent to the large exterior light well on the east, will connect the basement to an open
living, dining, and kitchen space on the ground level. The second level contains the master suite,
gym, and study, which is cantilevered at the front and rear to provide shade to the openings below
and articulation on the facades. The proposed structure will have a concrete basement foundation
with crawlspace and type V-B construction above grade with steel beams and moment frames
where required. The roofs are designed to be low-slope flat roofs to accommodate photovoltaic
panels at the back and stay under the required height limit of 25 ft.
Standards for which variations are requested:
Articulation of Building mass - 26.410.030.B.1
Along the west side of the house, a 5 ft. deep x 10 ft. long indentation is provided between the
one-story garage and the two-story principal building. This makes the principal building wall less
than 45 ft. long and therefore meets the intent of the code standard. On the east side of the house,
the principal building is 50 ft. long on the first level with an approximate 12 ft. step-back in plan to
the one-story garage beyond. The conditioned, occupiable space on the second level is also 50 ft
in length, although it has un-enclosed, un-occupiable building extensions at the front and rear that
provide shade and articulation to the front and rear facades. The second level is also differentiated
by both a material change and a 1 ft. overhang along the east elevation. We believe that, although
the 50 ft. east wall is longer than what is specified in the RDS, the proposed design achieves the
intent of breaking down the overall mass of the building through materiality and articulation.
Please see attached images showing the design.
Window Placement - 26.410.030.E.2
On the north side of the stairwell facing the street, the glazing is designed to maximize light and
thus extends from level 1 to level 2 with only a single horizontal mullion division. From the outside,
these windows are obscured by a perforated metal screen. The screens will only be operable for
maintenance and will otherwise be permanently covering the glazing and thus the scale will not be
apparent from the street. Please see attached images showing the design.
225 W. SMUGGLER STREET
04.19.2021
OVERALL VIEW FROM NORTHEAST
OVERALL VIEW FROM NORTHWEST
225 W. SMUGGLER STREET
04.19.2021
OVERALL VIEW FROM SOUTHEAST
OVERALL VIEW FROM SOUTHWEST
225 W. SMUGGLER STREET
04.19.2021
VIEW OF EAST FACADE FROM NORTHEAST
Articulation of Building Mass
- Level 1 and Level 2 are expressed with different materials
- Level 2 overhangs level 1 by 1 ft
- The length of Level 2 is broken down by windows and a material change
225 W. SMUGGLER STREET
04.19.2021
VIEW OF EAST FACADE FROM SOUTHEAST
Window Placement
- At the rear yard, Level 2 has a 4 ft, un-enclosed and un-occupiable building extension to provide
shade and weather protection to the glazing.
225 W. SMUGGLER STREET
04.19.2021
VIEW OF ENTRY AND STREET FACING STAIR GLAZING FROM NORTHWEST
Window Placement
- The 2 story street facing glazing at the stair is shrouded in a perforated metal screen.
- The section of glazing is not easily distinguished behind the articulation of the foyer and adjacent
vegetation.
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
COMMUNITY DEVELOPMENT DEPARTMENT
GENERAL LAND USE PACKET
Attached is an Application for review of Development that requires Land Use Review pursuant to
The City of Aspen Land Use Code: Included in this package are the following attachments:
1.Development Application Fee Policy, Fee Schedule and Agreement
to Pay Application Fees Form
2.Land Use Application Form
3.Dimensional Requirements Form (if required)
4.HOA Compliance Form
5.Development Review Procedure
All applications are reviewed based on the criteria established in Title 26 of the Aspen Municipal Code. Title 26 of
the Aspen Municipal Code is available at the City Clerk’s Office on the second floor of City Hall and on the
internet at https://library.municode.com/co/aspen/codes/municipal_code.
We require all applicants to hold a Pre-Application Conference with a Planner in the Community Development
Department so that the requirements for submitting a complete application can be fully described. This
meeting can happen in person or by phone or email. Also, depending upon the complexity of the development
proposed, submitting one copy of the development application to the Case Planner to determine accuracy,
inefficiencies, or redundancies can reduce the overall cost of materials and staff time.
Wlease recoŐninje that review of these materials does not substitute for a complete review of the Aspen >and hse
ZeŐulations. thile this application packaŐe attempts to summarinje the key provisions of the Code as they apply
to your type of development͕ it cannot possibly replicate the detail or the scope of the Code. /f you have
Ƌuestions that are not answered by the materials in this packaŐe͕ we suŐŐest that you contact the staff member
assiŐned to your case͕ contact Wlanner of the ay ;ϵϳϬͲϰ2ϵͲ2ϳ6ϰ/plannerofthedayΛŐmail.comͿ͕ or consult the
applicable sections of the Aspen >and hse Code.
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
Land Use Review Fee Policy
The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is
collected for land use applications based on the type of application submitted.
A flat fee is collected by Community evelopment for applications that normally take a minimal and predictable amount of staff
time to process. Zeview fees for other City epartments reviewinŐ the application ;referral departmentsͿ also will be collected
when necessary. &lat fees are cumulative͕ i.e.͕ an application with multiple flat fees must pay the sum of those flat fees. &lat fees
are not refundable.
A review fee deposit is collected by Community evelopment when more edžtensive staff time is reƋuired. Actual staff time spent
will be charŐed aŐainst the deposit. sarious City staff also may charŐe their time spent on the case in addition to the Case
Wlanner. The deposit amount may be reduced if͕ in the opinion of the Community evelopment epartment irector͕ the proũect
is edžpected to take siŐnificantly less time to process than the deposit indicates. A determination on the deposit amount shall be
made durinŐ the preͲapplication conference by the Case Wlanner. Hourly billinŐ shall still apply.
All applications must include an AŐreement to Way Application &ees. One payment includinŐ the deposit for WlanninŐ and referral
aŐency fees must be submitted with each land use application͕ made payable to the City of Aspen. Applications will not be
accepted for processinŐ without the reƋuired fee;sͿ.
The Community evelopment epartment shall keep an accurate record of the actual time reƋuired to process a land use
application reƋuirinŐ a deposit. The City can provide a summary report of fees due at the applicant’s reƋuest. The applicant will
be billed for the additional costs incurred by the City when the processinŐ of an application by the Community evelopment
epartment takes more time or edžpense than is covered by the deposit. Any direct costs attributable to a proũect review shall be
billed to the applicant with no additional administrative charŐe. /n the event the processinŐ of an application takes less time than
provided for by the deposit͕ the epartment shall refund the unused portion of the deposited fee to the applicant. &ees shall be
due reŐardless of whether an applicant receives approval.
hnless otherwise combined by the irector for simplicity of billinŐ͕ all applications for conceptual͕ final͕ and recordation of
approval documents shall be handled as individual cases for the purpose of billinŐ. hpon conceptual approval͕ all billinŐ shall be
reconciled͕ and past due invoices shall be paid prior to the irector acceptinŐ an application for final review. &inal review shall
reƋuire a new deposit at the rate in effect at the time of final submission. hpon final approval͕ all billinŐ shall aŐain be reconciled
prior to the irector acceptinŐ an application for review of technical documents for recordation.
The Community evelopment irector may cease processinŐ of a land use application for which an unpaid invoice is ϯϬ or more
days past due. hnpaid invoices of ϵϬ days or more past due may be assessed a late fee of ϭ.ϳϱй per month. An unpaid invoice of
ϭ2Ϭ days or more may be subũect to additional actions as may be assiŐned by the Municipal Court ũudŐe. All payment information
is public domain.
All invoices shall be paid prior to issuance of a evelopment Order or recordation of development aŐreements and plats. The City
will not accept a buildinŐ permit for a property until all invoices are paid in full. &or permits already accepted͕ any unpaid invoice
of ϵϬ or more days may result in cessation of buildinŐ permit processinŐ or issuance of a stop work order until full payment is
made.
The property owner of record is the party responsible for payment of all costs associated with a land use application for the
property. Any secondary agreement between a property owner and an applicant representing the owner (e.g. a contract
purchaser) regarding payment of fees is solely between those private parties.
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
Agreement to Pay Application Fees
An agreement between the City of Aspen (“City”) and
Address of Property:
Please type or print in all caps
Property Owner Name: Representative Name (if different from Property Owner):
Billing Name and Address - Send Bills to:
Contact info for billing: e-mail: Phone:
/ understand that the City has adopted͕ via Ordinance Eo. 2Ϭ͕ ^eries of 2Ϭ2Ϭ͕ review fees for >and hse applications͕ and
payment of these fees is a condition precedent to determininŐ application completeness. / understand that as the property
owner͕ / am responsible for payinŐ all fees for this development application.
&or flat fees and referral fees͗ / aŐree to pay the followinŐ fees for the services indicated. / understand that these flat fees
are nonͲrefundable.
$. flat fee for . $. flat fee for
$. flat fee for . $. flat fee for
&or deposit cases only͗ The City and / understand that because of the sinje͕ nature͕ or scope of the proposed proũect͕ it is not
possible at this time to know the full edžtent or total costs involved in processinŐ the application. / understand that additional
costs over and above the deposit may accrue. / understand and aŐree that it is impracticable for City staff to complete
processinŐ͕ review͕ and presentation of sufficient information to enable leŐally reƋuired findinŐs to be made for proũect
consideration unless invoices are paid in full.
The City and / understand and aŐree that invoices sent by the City to the above listed billinŐ address and not returned to the
City shall be considered by the City as beinŐ received by me. / aŐree to remit payment within ϯϬ days of presentation of an
invoice by the City for such services.
/ have read͕ understood͕ and aŐree to the >and hse Zeview &ee Wolicy͕ includinŐ conseƋuences for nonͲpayment. / aŐree to
pay the followinŐ initial deposit amounts for the specified hours of staff time. / understand that payment of a deposit does
not render an application complete or compliant with approval criteria. /f actual recorded costs edžceed the initial deposit͕ /
aŐree to pay additional monthly billinŐs to the City to reimburse the City for processinŐ my application at the hourly rates
hereinafter stated.
$ deposit for hours of Community Development Department staff time. Additional time
above the deposit amount will be billed at $325.00 per hour.
$ deposit for hours of Engineering Department staff time. Additional time above the
deposit amount will be billed at $325.00 per hour.
City of Aspen:
Phillip Supino, AICP
Community Development Director
City Use:
Fees Due: $ Received $
Case #
Signature:
PRINT Name:
Title:
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
LAND USE APPLICATION
APPLICANT:
REPRESENTIVATIVE:
Description: Existing and Proposed Conditions
Review: Administrative or Board Review
Required Land Use Review(s):
Growth Management Quota System (GMQS) required fields:
Net Leasable square footage Lodge Pillows Free Market dwelling units
Affordable Housing dwelling units Essential Public Facility square footage
Have you included the following? FEES DUE: $
Pre-Application Conference Summary
Signed Fee Agreement
HOA Compliance form
All items listed in checklist on PreApplication Conference Summary
Name:
Address:
Phone#: email:
Address:
Phone #: email:
Name:
Project Name and Address:
Parcel ID # (REQUIRED)
This project involves the demolition of an existing, 3,528 SF non-historic Single family home and
construction of a new, 6,252 SF Single Family home. The proposed new home will be comprised
of a 2,644 SF Basement, 1,758 SF ground level with attached 569 SF Garage, and 1,281 SF 2nd
Level. There will be a 333 SF front porch and 465 SF rear yard porch.
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020
DIMENSIONAL REQUIREMENTS FORM
Complete only if required by the PreApplication checklist
Project and Location
Applicant:
Zone District: Gross Lot Area: Net Lot Area:
**Please refer to section 26.575.020 for information on how to calculate Net Lot Area
Please fill out all relevant dimensions
Single Family and Duplex Residential
1) Floor Area (square feet)
2) Maximum Height
3) Front Setback
4) Rear Setback
5) Side Setbacks
6) Combined Side Setbacks
7) % Site Coverage
Existing Allowed Proposed
Multi-family Residential
1)Number of Units
2)Parcel Density (see 26.710.090.C.10)
3)FAR (Floor Area Ratio)
4)Floor Area (square feet)
Existing Allowed Proposed
8) Minimum distance between buildings
Proposed % of demolition
ϱͿ Maximum Height
6Ϳ Front Setback
ϳͿ Rear Setback
ϴͿ Side Setbacks
Proposed % of demolition
Commercial
Proposed Use(s)
Existing Allowed Proposed
1) FAR (Floor Area Ratio)
2) Floor Area (square feet)
3) Maximum Height
4) Off-Street Parking Spaces
5) Second Tier (square feet)
6) Pedestrian Amenity (square feet)
Proposed % of demolition
Existing non-conformities or encroachments:
Variations requested:
Lodge
Additional Use(s)
1)FAR (Floor Area Ratio)
2)Floor Area (square feet)
3)Maximum Height
4)Free Market Residential(square feet)
4)Front setback
5)Rear setback
6)Side setbacks
7)Off-Street Parking Spaces
8)Pedestrian Amenity (square feet)
Proposed % of demolition
Existing Allowed Proposed
3,153 SF 3,490 SF 3,489 SF
- 25'-0" 25'-0"
30'-0"
10' / 5' Garage
5'
15'
2,327 SF
10'100%
- Articulation of Building Mass – Section 26.410.030.B.1 (Non-Flexible)
- Window Placement - 26.410.030.E.2
None
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
Homeowner Association Compliance Policy
All land use applications within the City of Aspen are required to include a Homeowner Association
Compliance Form (this form) certifying that the scope of work included in the land use application
complies with all applicable covenants and homeowner association policies. The certification must be
signed by the property owner or Attorney representing the property owner.
Property
Owner (“I”):
Name:
Email: Phone No.:
Address of
Property:
(subject of
application)
I certify as follows: (pick one)
□This property is not subject to a homeowner association or other form of private c ovenant.
□This property is subject to a homeowner association or private covenant, and the improvements
proposed in this land use application do not require approval by the homeowners association or
covenant beneficiary.
□This property is subject to a homeowners association or private covenant and the improvements
proposed in this land use application have been approved by the homeowners a ssociation or
covenant beneficiary.
I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the
applicability, meaning or effect of private covenants or homeowner association rules or bylaws. I
understand that this document is a public document.
Owner signature: Date:
Owner printed name:
or,
Attorney signature: Date:
Attorney printed name:
225 W. Smuggler Street
Aspen, CO 81611
Continental Hotel Holdings, LLC
aspen@goodbearco.com
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
DEVELOPMENT REVIEW PROCEDURE
ϭ.Attend pre-application conference. During this one-on-one meeting, staff will determine the review process
applies to your development proposal and will identify the materials necessary to review your application.
2.Submit Development Application. Based on your pre-application meeting, you should complete to the
application package and submit the requested number of copies of the complete application and the appropriate
processing fee to the Community Development Department.
ϯ.Determination of Completeness. Within five ;ϱͿ working days of the date of your submission, staff will review
the application and notify you in writing whether the application is complete or if additional materials are
required. Please be aware that the purpose of the completeness review is to determine whether or not the
information you have submitted is adequate to review the request, and not whether the information is sufficient
to obtain approval.
ϰ.Staff Review of Development Application. Once your application is determined to be complete͕ it will be
reviewed by the staff for compliance with the applicable standards of the Code. urinŐ the staff review staŐe͕ the
application will be referred to other aŐencies for comments. The Wlanner assiŐned to your case or the aŐency may
contact you if additional information is needed or if problems are identified. ^taff will draft a memo for siŐnature
by the Community evelopment irector that edžplains whether your application complies with the Code͕ and will
list any conditions that should apply if the application is to be approved.
&inal approval of any evelopment Application that amends a recorded document͕ such as a plat͕ aŐreement͕ or
deed restriction͕ will reƋuire the applicant to prepare an amended version of that document for review and
approval by staff. ^taff will provide the applicant with the applicable contents for the revised plat. The City
Attorney is normally in charŐe of the form for recorded aŐreements and deed restrictions. te suŐŐest that you not
Őo to the trouble or edžpense of preparinŐ these documents until the staff has determined that your application is
eliŐible for the reƋuested amendment or edžemption.
5. Board Review of Application. /f a public hearinŐ is reƋuired for the land use action that you are reƋuestinŐ͕ the
WlanninŐ staff will schedule a hearinŐ date for the application upon determination that the application is complete.
The hearinŐ;sͿ will be scheduled before the appropriate reviewinŐ board;sͿ. The applicant will be reƋuired to mail
notice ;one copy provided by the Community evelopment epartmentͿ to property owners within ϯϬ feet of the
subũect property and post notice ;siŐn available at the Community evelopment epartmentͿ of the public hearinŐ
on the site at least fifteen ;ϭϱͿ days prior to the hearinŐ date. ;Wlease see Attachment 6 for instructions.Ϳ The
WlanninŐ staff will publish notice of the hearinŐ in the paper for land use reƋuests that reƋuire publication.
The WlanninŐ staff will then formulate a recommendation on the land use reƋuest and draft a memo to the
reviewinŐ board;sͿ. ^taff will supply the applicant with a copy of the WlanninŐ staff’s memo͕ approdžimately five ;ϱͿ
days prior to the hearinŐ. The public hearinŐ;sͿ will take place before the appropriate review boards. Wublic
hearinŐs include a presentation by the WlanninŐ staff͕ a presentation by the applicant ;optionalͿ͕ consideration of
public comment͕ and the reviewinŐ board’s Ƌuestions and decision.
(Continued on next page)
CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT
April 2020 City of Aspen|130 S. Galena St.|(970) 920 5090
6.Issuance of Development Order. /f the land use review is approved͕ then the WlanninŐ staff will issue a
evelopment Order͕ which allows the applicant to submit a buildinŐ permit application.
ϳ.Receipt of Building Permit. Once you have received a copy of the siŐned staff approval͕ you may apply for a
buildinŐ permit. urinŐ this time͕ your proũect will be edžamined for its compliance with the hniform uildinŐ Code.
/t also will be checked for compliance with applicable provisions of the >and hse ZeŐulations that were not
reviewed in detail durinŐ the land use case review. ;This miŐht include a check of floor area ratios͕ setbacks͕
parkinŐ͕ open space and the likeͿ. /mpact fees for water͕ sewer͕ parks͕ and employee housinŐ will be collected as
part of the permittinŐ process. Any document reƋuired to be recorded͕ such as a plat͕ deed restriction͕ or
aŐreement͕ will be reviewed and recorded before a buildinŐ permit application is submitted.
SQUARE SEVEN
April 15, 2021
LETTER OF AUTHORIZATION FOR AGENT
CONCERNING CONTINENTAL HOTEL HOLDINGS LLC
To Whom It May Concern:
This letter shall confirm that Carson Davis of Ehrlich Yanai Rhee Chaney Architects is a duly
authorized representative of Continental Hotel Holdings LLC, a Delaware limited liability
company (“Owner”). Mr. Davis has full authority to act on behalf of the Owner. This authority
includes, but is not limited to, acting as the main point of contact in regard to the redevelopment
of the single-family residence at 225 W Smuggler Street.
Applicant:
Name: Continental Hotel Holdings LLC
Address: 15 E 26th St. Ste 602
New York, NY 10010
Phone Number: (415) 967-2827
Representative:
Name: Carson Davis of Ehrlich Yanai Rhee Chaney Architects
Address: 10865 Washington Blvd
Culver City, CA 90232
Phone Number: (310) 838-9700
Should you have any questions concerning the scope of this authorization, please contact the
undersigned.
Sincerely,
Brian Caulin
Authorized Individual, Square Seven Management, LLC
Continental Hotel Holdings LLC
DocuSign Envelope ID: 6FE93D16-A170-4268-9B61-79B7ADFCEB0E
FirstAme�rican True""
Owner's Policy of Title Insurance
ISSUED BY
First American Title Insurance Company
Schedule A
POLICY NUMBER
5011408-0051205e
Name and Address of Title Insurance Company:
FIRST AMERICAN TITLE INSURANCE COMPANY, 600 S. Cherry Street, Suite 715, Denver, Colorado 80246
File No.: 20004565
Address Reference: 225 West Smuggler Street, Aspen, CO 81611
Premium: $18,270.00
1. Name of Insured:
Continental Hotel Holdings LLC, a Delaware limited liability company
2. The estate or interest in the Land that is insured by this policy is:
Fee simple
3. Title is vested in:
Continental Hotel Holdings LLC, a Delaware limited liability company
4. The Land referred to in this policy is described as follows:
SEE SCHEDULE C ATTACHED HERETO
v
Gary A. Wright, Authorized Agent
(This Schedule A valid only when Schedule B is attached)
Amount of Insurance: $12,000,000.00
Date of Policy: October 15, 2020 at 12:43 PM
Form 5011400-A (7-1-14) Page 1 of 1 ALTA Owner's Policy of Title Insurance (6-17-06)
Schedule A
I'0 ""'° �.
FirstAmercan Title
Owner's Policy of Title Insurance
ISSUED 6Y
First American Title Insurance Company
Schedule B
POLICY NUMBER
5011408-0051205e
File No.: 20004565
EXCEPTIONS FROM COVERAGE
This policy does not insure against loss or damage (and the Company will not pay costs, attorneys' fees or expenses)
which arise by reason of:
1. Any facts, rights, interests, or claims that are not shown by the Public Records, but which could be ascertained by
an inspection of the Land or by making inquiry of the persons in possession thereof.
2. Easements, or claims of easements, not shown by the Public Records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey
and inspection of the Land would disclose, and which are not shown by the Public Records.
4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and not
shown in the Public Records.
5. Unpatented mining claims; reservations or exceptions in patents or in Acts authorizing the issuance thereof.
6. Any water rights, claims or title to water, in, on or under the Land.
7. Taxes and assessments for the year 2020, and subsequent years, a lien not yet due or payable.
8. Terms, conditions, provisions, agreements and obligations specified under the Act authorizing the issuance of the
Patent for the City and Townsite of Aspen, recorded March 1, 1897, in Book 139 at Page 216 as Reception No.
060156.
9. Terms, conditions, provisions, agreements and obligations specified under Ordinance No. 6 (series of 1959, An
Ordinance Accepting a Map Entitled "Official Map of the City of Aspen, Pitkin County, State of Colorado," as the
Official Map of the City of Aspen: Providing for Dedication of all Streets and Alleys, Except Such Streets and
Alleys Heretofore Vacated; And Providing for the Filing of Said Map, Field Notes, and Supplemental Plats with the
Clerk and Recorder for Pitkin County, dated November 2, 1959, and recorded December 18, 1959, in Book 189 at
Page 354 as Reception No. 109043; and any and all notes, easements and recitals as disclosed on the Willets
Map recorded November 12, 1969 in Plat Book 4 at Page 27 as Reception No. 137902.
10. Terms, conditions, provisions, agreements and obligations specified under the Statement of Exemption from the
Definition of Subdivison dated August 26, 1977, and recorded August 30, 1977, in Book 334 at Page 239 as
Reception No. 197023.
11. Any and all notes, encroachments, easements and recitals as disclosed on the recorded Lots D&E Block 48
Original Aspen Townsite Plat recorded August 10, 1993, in Plat Book 3 at Pape 4.
12. Terms, conditions, provisions, agreements and obligations specified under the City of Aspen Easement
Agreement dated September 27, 2016, and recorded November 4, 2016, as Reception No. 633602.
Form 5011408-B (7-1-14) Page 1 of 2 1 ALTA Owner's Policy of Title Insurance (6-17-06)
Colorado - Schedule B
SCHEDULE B
(Continued)
13. Those matters as disclosed on the Improvement Survey Plat provided Tuttle Surveying Services, 225 Smuggler
Street, dated October 15, 2020, including but not limited to the encroachment of Lot C's RR tie retaining wall onto
the subject property.
Form 5011408-B (7-1-14) Page 2 of 2
ALTA Owner's Policy of Title Insurance (6-17-06)
Colorado - Schedule B
+4S RMf hid.
' FirstAmerican Title
Owner's Policy of Title Insurance
ISSUED BY
First American Title Insurance Company
POLICY NUMBER
Schedule C 1 5011408-0051205e
File No.: 20004565
LEGAL DESCRIPTION
The Land referred to in this policy is described as follows:
Lots D and E, Block 48, City and Townsite of Aspen, Pitkin County, Colorado.
Form 5000000-C (7-1-14) Page 1 of 1 1 Schedule C
Residential Design Standards
Administrative Compliance Review Staff Checklist - Single Family and Duplex
Standard Complies Alternative
Compliance
Does Not
Comply N/A Sheet #(s)/Notes
B.1.Articulation of Building Mass
(Non-flexible)
B.2.Building Orientation
(Flexible)
B.3.Build-to Requirement
(Flexible)
B.4.One Story Element
(Flexible)
C.1.Garage Access
(Non-flexible)
C.2.Garage Placement
(Non-flexible)
C.3.Garage Dimensions
(Flexible)
Disclaimer: This application is only valid for the attached design. If any element of the design subject to Residential Design Standards changes prior to or during building permit review, the
applicant shall be required to apply for a new Administrative Compliance Review.
Address:
Parcel ID:
Zone District/PD:
Representative:
Email:
Phone:
Page 1 of 2
Approved:
(Approved plans/elevations attached)
Standard Complies Alternative
Compliance
Doesn’t
Comply N/A Sheet #(s)/Notes
C.4.Garage Door Design
(Flexible)
D.1.Entry Connection
(Non-flexible)
D.2.Door Height
(Flexible)
D.3.Entry Porch
(Flexible)
E.1.Principle Window
(Flexible)
E.2.Window Placement
(Flexible)
E.3.Nonorthogonal Window Limit
(Flexible)
E.4.Lightwell/Stairwell Location
(Flexible)
E.5.Materials
(Flexible)
Residential Design Standards
Administrative Compliance Review Staff Checklist
Disclaimer: This application is only valid for the attached design. If any element of the design subject to Residential Design Standards changes prior to or during building permit review, the
applicant shall be required to apply for a new Administrative Compliance Review.
Page 2 of 2
Approved:
A3.011
A3.01
A3.02
A3.02
2
1
2
1
A4.01
6
5
1
1
A4.05
1
A4.02
1
A4.06
2
460
'
-
0
"
10' - 0"
100' - 0"
5'
-
6
"
6'
-
6
"
8'
-
1
3
/
8
"
10
'
-
9
7
/
8
"
12
'
-
7
1
/
2
"
6'
-
5
1
/
4
"
60
'
-
0
"
PR
O
P
E
R
T
Y
L
I
N
E
GA
R
A
G
E
S
E
T
B
A
C
K
HO
U
S
E
S
E
T
B
A
C
K
5'
-
0
"
PROPERTY LINE
SETBACK LINE
PROPERTY LINE
SETBACK LINE
PR
O
P
E
R
T
Y
L
I
N
E
SE
T
B
A
C
K
451 SF
LOUNGE
179 SF
BED 3
93 SF
LAUNDRY
98 SF
MECHANICAL
272 SF
GARAGE
(LOWER)STAIR
164 SF
BEDROOM 1
59 SF
BATH 1
62 SF
BATH 2
185 SF
BEDROOM 2
119 SF
HALL
HALL
HALL
LIGHT WELL
UP
ELEV.
WD-01
WD-01
TL-02
WD-01
TL-02
WD-01
TL-02
C-02
C-02
T-02
3
1
A4.04
UP
5' - 0"
ADGFCBE
6'X10' ELECTRICAL EASEMENT;
LOCATION TO BE CONFIRMED
1
A4.07
1
A4.03
50' - 4"
24' - 6"4' - 2"6' - 10"8' - 6 7/8"19' - 8 1/2"15' - 2 5/8"
44
'
-
6
"
7' - 6"
10
'
-
9
7
/
8
"
13
'
-
9
3
/
8
"
19' - 6 7/8"34' - 11 1/8"
18' - 0"
OPEN TO ABOVE
2.28 F.F. 88' - 9"
F.F. 88' - 9"
61
018
60
010
007
011
004
005
001
006
E00
014
2.29
6'
-
9
1
/
2
"
7'
-
9
"
A5.01 13
2
6'
-
0
"
A5.04
9
4
3'
-
6
"
6'
-
9
1
/
2
"
11' - 8 3/8"
1
A4.10
2
A4.10
A6.10
1
1'
-
2
3
/
8
"
1
A4.12
CRAWL SPACE
012
015
009008
016
013 3' - 7 5/8"
1
A4.13
3.01
1.27
1.27
1.29
D
W
2.28
AV
3.06
3.01
3.01
3.01
BATH 3
WC
3.01
3.18
3.17
3.01
3.01
1.27
3.19
1.27
LIGHT
WELL
3.01
3.06
4'
-
5
1
/
8
"
2'
-
1
1
7
/
8
"
4' - 3 1/4"
1' - 3 1/2"
1'
-
8
3
/
4
"
3.01
1.29
7' - 2 7/8"
LIN.
4'
-
4
1
/
8
"
3' - 0"
2X6 WALL
1-HOUR WALL
SEPARATION
SETBACK LINE
PROPERTY LINE
FLOOR LEVEL
TRANSITION
+ H"
1. THE PANEL OR SUBPANEL SHALL PROVIDE CAPACITY TO INSTALL A 40-AMP
MIN. DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT
INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE.
2. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY
THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE
EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL
BE PERMANENT AND VISIBLY MARKED EV CAPABLE.
3. THE ELECTRICAL SYSTEM SHALL HAVE SUFFICIENT CAPACITY TO
SIMULTANEOUSLY CHARGE ALL DESIGNATED EV SPACES AT THE FULL RATED
AMPERAGE OF THE EVSE. PLAN DESIGN SHALL BE BASED UPON A 40-AMP MIN.
BRANCH CIRCUIT. A SEPARATE ELECTRICAL PERMIT IS REQUIRED.
4. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY
THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE
EV CHARGING PURPOSES AS EV CAPABLE IN ACCORDANCE WITH THE LA
ELECT. CODE.
5. THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO
ALLOW FOR INSTALLATION OF A DOUBLE-POLE CIRCUIT BREAKER FOR A
FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE
POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER
LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED
AS "FOR FUTURE SOLAR ELECTRIC."
NOT FOR CONSTRUCTION
KEYNOTESLEGEND
JOB NUMBER:
DATE:
The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from
unauthorized modification, reuse and/or release under California Business & Professions Code section
5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316.
4/
1
9
/
2
0
2
1
8
:
0
3
:
2
4
P
M
BI
M
3
6
0
:
/
/
7
0
9
_
S
m
u
g
g
l
e
r
S
t
r
e
e
t
/
7
0
9
_
S
m
u
g
g
l
e
r
_
S
t
_
2
0
2
0
.
rv
t
A2.01
BASEMENT PLAN
SMUGGLER
225 W. Smuggler St.
Aspen, CO 81611
000
SCALE:1/4" = 1'-0"1 BASEMENT PLAN
NOTES
N N
3.06 BENCH, BUILT-IN, SEE ELEV.
3.08 GUARDRAIL, FRAMELESS GLASS
3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL
3.17 CASEWORK W/ POCKETING DOORS AND WET BAR
3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW
3.19 BUILT-IN NIGHT STAND
1.26 DRIVEWAY, SNOW MELTED
1.27 MECHANICAL CHASE
1.29 CRAWL SPACE ACCESS HATCH
2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE
2.02 BRAKE METAL FASCIA, FIN PER SCHED
2.04 GFRC CLADDING
2.07 STONE CLADDING
2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING
2.09 PERFORATED METAL SCREEN, FIXED
2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A)
2.11 ROOF, STONE BALLAST, SEE SPEC.
2.13 ROOF MOUNTED ELECTRIC PV SYSTEM
2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED.
2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED.
2.25 METAL AWNING
2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING
2.28 SUBTERRANEAN CAR LIFT; SEE SPEC.
2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC.
3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD
3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION
3.03 COAT CLOSET, SEE ELEV.
0.01 (E) STRUCTURE TO BE DEMOLISHED
0.02 (E) DRIVEWAY TO BE DEMOLISHED
0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT
0.04 (E) STAIR TO BE DEMOLISHED
0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED
0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED
0.07 (E) TREE TO REMAIN
0.08 (E) GATE TO BE DEMOLISHED
0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED
0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN
1.07 GAS METER
1.08 ELECTRIC METER
1.16 MECHANICAL / ELEC. CONC. PAD
1.17 ELEC. TRANSFORMER
1.18 TRASH BIN COMPARTMENT
1.19 FRONT PORCH, SNOW MELTED
1.20 CONCRETE TILE PATIO, SNOW MELTED
1.21 FENCE/RAILING
1.22 SITE WALL
1.23 FRONT PATH, SNOW MELTED
1.25 NATURAL GRADE
ISSUE DATES
NO. DATE REVISION
2X6 WALL
1-HOUR WALL
SEPARATION
SETBACK LINE
PROPERTY LINE
FLOOR LEVEL
TRANSITION
+ H"
1. THE PANEL OR SUBPANEL SHALL PROVIDE CAPACITY TO INSTALL A 40-AMP
MIN. DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT
INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE.
2. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY
THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE
EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL
BE PERMANENT AND VISIBLY MARKED EV CAPABLE.
3. THE ELECTRICAL SYSTEM SHALL HAVE SUFFICIENT CAPACITY TO
SIMULTANEOUSLY CHARGE ALL DESIGNATED EV SPACES AT THE FULL RATED
AMPERAGE OF THE EVSE. PLAN DESIGN SHALL BE BASED UPON A 40-AMP MIN.
BRANCH CIRCUIT. A SEPARATE ELECTRICAL PERMIT IS REQUIRED.
4. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY
THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE
EV CHARGING PURPOSES AS EV CAPABLE IN ACCORDANCE WITH THE LA
ELECT. CODE.
5. THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO
ALLOW FOR INSTALLATION OF A DOUBLE-POLE CIRCUIT BREAKER FOR A
FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE
POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER
LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED
AS "FOR FUTURE SOLAR ELECTRIC."
A3.011
A3.01
A3.02
A3.02
2
1
2
1
A4.01
6
5
1
1
A4.05
1
A4.02
1
A4.06
5' - 0"
60
'
-
0
"
10
'
-
0
"
100' - 0"
10' - 0"
10' - 0"
5'
-
6
"
6'
-
6
"
8'
-
1
3
/
8
"
10
'
-
9
7
/
8
"
12
'
-
7
1
/
2
"
6'
-
5
1
/
4
"
437 SF
LIVING ROOM
244 SF
KITCHEN
101 SF
MUD RM
162 SF
FOYER
521 SF
GARAGE
32 SF
PWDR
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
60
'
-
0
"
PROPERTY LINE
2
4
SETBACK LINE
SETBACK LINE
11
"
5'
-
0
"
GA
R
A
G
E
S
E
T
B
A
C
K
HO
U
S
E
S
E
T
B
A
C
K
SE
T
B
A
C
K
OPEN TO BELOW
T-01
T-01
T-01
T-01
T-01
T-01
C-02
1.22
1.22
ABOVE
ABOVE
3
01
09
A5.11
3
9
12
LIGHT WELL BELOW
260 SF
DINING
1
A4.04
T-02
6'X10' ELECTRICAL EASEMENT;
LOCATION TO BE CONFIRMED
DN
OPEN TO BELOW
17' - 10"
8'
-
1
0
"
ADGFCBE
UP
1
A4.07
1
A4.03
24' - 6"4' - 2"6' - 10"8' - 6 7/8"19' - 8 1/2"15' - 2 5/8"
5'
-
1
0
1
/
2
"
29
'
-
1
1
/
2
"
7'
-
5
1
/
8
"
24' - 10 3/4"11' - 0 1/4"7' - 6 3/8"1' - 0 1/2"10"18' - 10 1/2"0"2' - 8 3/4"9' - 8 1/8"2' - 9 3/4"
T-02
11
'
-
1
1
1
/
2
"
ABOVE
14 12
13
11
10
8
7 6
5
2
3
4
1.23
1.19
2.04
2.20
2.21
2.07
2.092.20
LIGHT WELL
1.17
F.F. 100' - 0"
F.F. 100' - 0"
F.F. 100' - 0"
101
102
103
104
108
105
107
2.01
2.01
2.01
1.20
1.21
G02
G03
G01
1.16
1.26
2.27
2.28
2.29
1.08 1.07
1.21
16' - 6"
6'
-
7
"
A5.14
1
3.06
DOG WASH
A5.14
4
1'
-
8
7
/
8
"
A5.11
1
A5.12
1
1
A4.10
2
A4.10
A6.10
2
1
A4.12
69 SF
PANTRY
1
A4.133.02
3.02
3.01
1.27
3.06
1.27
T-01
FRIDGE
COFFEE
STATION
3.03
3.03ELEV.
3' - 9 3/4"
50' - 0"
NOT FOR CONSTRUCTION
KEYNOTESLEGEND
JOB NUMBER:
DATE:
The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from
unauthorized modification, reuse and/or release under California Business & Professions Code section
5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316.
4/
1
9
/
2
0
2
1
8
:
0
3
:
2
6
P
M
BI
M
3
6
0
:
/
/
7
0
9
_
S
m
u
g
g
l
e
r
S
t
r
e
e
t
/
7
0
9
_
S
m
u
g
g
l
e
r
_
S
t
_
2
0
2
0
.
rv
t
A2.02
LEVEL 1 FLOOR PLAN
SMUGGLER
225 W. Smuggler St.
Aspen, CO 81611
000
SCALE: 1/4" = 1'-0"
1 LEVEL 1 PLAN
NOTES
3.06 BENCH, BUILT-IN, SEE ELEV.
3.08 GUARDRAIL, FRAMELESS GLASS
3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL
3.17 CASEWORK W/ POCKETING DOORS AND WET BAR
3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW
3.19 BUILT-IN NIGHT STAND
1.26 DRIVEWAY, SNOW MELTED
1.27 MECHANICAL CHASE
1.29 CRAWL SPACE ACCESS HATCH
2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE
2.02 BRAKE METAL FASCIA, FIN PER SCHED
2.04 GFRC CLADDING
2.07 STONE CLADDING
2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING
2.09 PERFORATED METAL SCREEN, FIXED
2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A)
2.11 ROOF, STONE BALLAST, SEE SPEC.
2.13 ROOF MOUNTED ELECTRIC PV SYSTEM
2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED.
2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED.
2.25 METAL AWNING
2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING
2.28 SUBTERRANEAN CAR LIFT; SEE SPEC.
2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC.
3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD
3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION
3.03 COAT CLOSET, SEE ELEV.
0.01 (E) STRUCTURE TO BE DEMOLISHED
0.02 (E) DRIVEWAY TO BE DEMOLISHED
0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT
0.04 (E) STAIR TO BE DEMOLISHED
0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED
0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED
0.07 (E) TREE TO REMAIN
0.08 (E) GATE TO BE DEMOLISHED
0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED
0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN
1.07 GAS METER
1.08 ELECTRIC METER
1.16 MECHANICAL / ELEC. CONC. PAD
1.17 ELEC. TRANSFORMER
1.18 TRASH BIN COMPARTMENT
1.19 FRONT PORCH, SNOW MELTED
1.20 CONCRETE TILE PATIO, SNOW MELTED
1.21 FENCE/RAILING
1.22 SITE WALL
1.23 FRONT PATH, SNOW MELTED
1.25 NATURAL GRADE
N N
ISSUE DATES
NO. DATE REVISION
A3.011
A3.01
A3.02
A3.02
2
1
2
1
A4.01
6
5
1
1
A4.05
1
A4.02
1
A4.06
317 SF
MASTER
BEDROOM
304 SF
GYM
206 SF
HALL / STUDY
105 SF
CLOSET
152 SF
MASTER BATH
2
4
5' - 0"
60
'
-
0
"
10
'
-
0
"
100' - 0"
10' - 0"
10' - 0"
5'
-
6
"
6'
-
6
"
8'
-
1
3
/
8
"
10
'
-
9
7
/
8
"
12
'
-
7
1
/
2
"
6'
-
5
1
/
4
"
60
'
-
0
"
6"
5'
-
0
"
T-01
RB-01
T-01
ST-02
3
PR
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
GA
R
A
G
E
S
E
T
B
A
C
K
HO
U
S
E
S
E
T
B
A
C
K
SE
T
B
A
C
K
W/D
1
A4.04 A
OPEN TO BELOW
DN
ST-02
DGF C BE
1
A4.07
1
A4.03
F.F. 113' - 0"
F.F. 113' - 0"
F.F. 113' - 0"
GC-01
GC-01
24' - 6"4' - 2"6' - 10"8' - 6 7/8"19' - 8 1/2"15' - 2 5/8"
37
'
-
5
1
/
8
"
2'
-
0
7
/
8
"
13
'
-
1
0
1
/
2
"
21
'
-
6
"
13
'
-
7
7
/
8
"
8'
-
8
3
/
4
"
5'
-
4
1
/
2
"
4'
-
6
1
/
2
"
2.09
2.09
76
75
74
73
FS08
FS07
FS06
FS02FS03FS04FS05
2.11
2.11
2.13
82 71 72
207
79
208
3' - 9 1/8"20' - 9 5/8"12' - 9 7/8"
2.29
A5.22
1
1
A4.10
2
A4.10
A6.10
3
1
A4.12
2.11
A8.01
7
A8.01
10
A8.01
3
A8.01
8
A8.01
6
A6.20
1
A8.01
5
10
A8.02
FCU
1
A4.13
3.01
3.01
3.14
3.01
STAIR
ELEV.
6' - 8 3/4"
4' - 0"49' - 7 1/2"6' - 4 1/4"
21
'
-
6
"
2X6 WALL
1-HOUR WALL
SEPARATION
SETBACK LINE
PROPERTY LINE
FLOOR LEVEL
TRANSITION
+ H"
1. THE PANEL OR SUBPANEL SHALL PROVIDE CAPACITY TO INSTALL A 40-AMP
MIN. DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT
INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE.
2. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY
THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE
EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL
BE PERMANENT AND VISIBLY MARKED EV CAPABLE.
3. THE ELECTRICAL SYSTEM SHALL HAVE SUFFICIENT CAPACITY TO
SIMULTANEOUSLY CHARGE ALL DESIGNATED EV SPACES AT THE FULL RATED
AMPERAGE OF THE EVSE. PLAN DESIGN SHALL BE BASED UPON A 40-AMP MIN.
BRANCH CIRCUIT. A SEPARATE ELECTRICAL PERMIT IS REQUIRED.
4. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY
THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE
EV CHARGING PURPOSES AS EV CAPABLE IN ACCORDANCE WITH THE LA
ELECT. CODE.
5. THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO
ALLOW FOR INSTALLATION OF A DOUBLE-POLE CIRCUIT BREAKER FOR A
FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE
POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER
LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED
AS "FOR FUTURE SOLAR ELECTRIC."
NOT FOR CONSTRUCTION
KEYNOTESLEGEND
JOB NUMBER:
DATE:
The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from
unauthorized modification, reuse and/or release under California Business & Professions Code section
5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316.
4/
1
9
/
2
0
2
1
8
:
0
3
:
2
7
P
M
BI
M
3
6
0
:
/
/
7
0
9
_
S
m
u
g
g
l
e
r
S
t
r
e
e
t
/
7
0
9
_
S
m
u
g
g
l
e
r
_
S
t
_
2
0
2
0
.
rv
t
A2.03
LEVEL 2 FLOOR PLAN
SMUGGLER
225 W. Smuggler St.
Aspen, CO 81611
000
SCALE: 1/4" = 1'-0"
1 LEVEL 2 PLAN
NOTES
N N
3.06 BENCH, BUILT-IN, SEE ELEV.
3.08 GUARDRAIL, FRAMELESS GLASS
3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL
3.17 CASEWORK W/ POCKETING DOORS AND WET BAR
3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW
3.19 BUILT-IN NIGHT STAND
1.26 DRIVEWAY, SNOW MELTED
1.27 MECHANICAL CHASE
1.29 CRAWL SPACE ACCESS HATCH
2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE
2.02 BRAKE METAL FASCIA, FIN PER SCHED
2.04 GFRC CLADDING
2.07 STONE CLADDING
2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING
2.09 PERFORATED METAL SCREEN, FIXED
2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A)
2.11 ROOF, STONE BALLAST, SEE SPEC.
2.13 ROOF MOUNTED ELECTRIC PV SYSTEM
2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED.
2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED.
2.25 METAL AWNING
2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING
2.28 SUBTERRANEAN CAR LIFT; SEE SPEC.
2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC.
3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD
3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION
3.03 COAT CLOSET, SEE ELEV.
0.01 (E) STRUCTURE TO BE DEMOLISHED
0.02 (E) DRIVEWAY TO BE DEMOLISHED
0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT
0.04 (E) STAIR TO BE DEMOLISHED
0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED
0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED
0.07 (E) TREE TO REMAIN
0.08 (E) GATE TO BE DEMOLISHED
0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED
0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN
1.07 GAS METER
1.08 ELECTRIC METER
1.16 MECHANICAL / ELEC. CONC. PAD
1.17 ELEC. TRANSFORMER
1.18 TRASH BIN COMPARTMENT
1.19 FRONT PORCH, SNOW MELTED
1.20 CONCRETE TILE PATIO, SNOW MELTED
1.21 FENCE/RAILING
1.22 SITE WALL
1.23 FRONT PATH, SNOW MELTED
1.25 NATURAL GRADE
ISSUE DATES
NO. DATE REVISION
T12
2X6 WALL
1-HOUR WALL
SEPARATION
SETBACK LINE
PROPERTY LINE
FLOOR LEVEL
TRANSITION
+ H"
1. THE PANEL OR SUBPANEL SHALL PROVIDE CAPACITY TO INSTALL A 40-AMP
MIN. DEDICATED BRANCH CIRCUIT AND SPACE(S) RESERVED TO PERMIT
INSTALLATION OF A BRANCH CIRCUIT OVERCURRENT PROTECTIVE DEVICE.
2. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY
THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE
EV CHARGING AS EV CAPABLE. THE RACEWAY TERMINATION LOCATION SHALL
BE PERMANENT AND VISIBLY MARKED EV CAPABLE.
3. THE ELECTRICAL SYSTEM SHALL HAVE SUFFICIENT CAPACITY TO
SIMULTANEOUSLY CHARGE ALL DESIGNATED EV SPACES AT THE FULL RATED
AMPERAGE OF THE EVSE. PLAN DESIGN SHALL BE BASED UPON A 40-AMP MIN.
BRANCH CIRCUIT. A SEPARATE ELECTRICAL PERMIT IS REQUIRED.
4. THE SERVICE PANEL OR SUBPANEL CIRCUIT DIRECTORY SHALL IDENTIFY
THE OVERCURRENT PROTECTIVE DEVICE SPACE(S) RESERVED FOR FUTURE
EV CHARGING PURPOSES AS EV CAPABLE IN ACCORDANCE WITH THE LA
ELECT. CODE.
5. THE MAIN ELECTRICAL SERVICE PANEL SHALL HAVE A RESERVED SPACE TO
ALLOW FOR INSTALLATION OF A DOUBLE-POLE CIRCUIT BREAKER FOR A
FUTURE SOLAR ELECTRIC INSTALLATION. THE RESERVED SPACE SHALL BE
POSITIONED AT THE OPPOSITE (LOAD) END FROM THE INPUT FEEDER
LOCATION OR MAIN CIRCUIT LOCATION AND SHALL BE PERMANENTLY MARKED
AS "FOR FUTURE SOLAR ELECTRIC."
A3.011
A3.01
A3.02
A3.02
2
1
2
1
A4.01
6
5
1
1
A4.05
1
A4.02
1
A4.06
2
4
3
PROPERTY LINE
PR
O
P
E
R
T
Y
L
I
N
E
PR
O
P
E
R
T
Y
L
I
N
E
PROPERTY LINE
SETBACK LINE
SETBACK LINE
GA
R
A
G
E
S
E
T
B
A
C
K
HO
U
S
E
S
E
T
B
A
C
K
SE
T
B
A
C
K
5' - 0"5' - 0"90' - 0"
60
'
-
0
"
0"
LIGHT WELL
LIGHT
WELL
1
A4.04 ADGFCBE
1
A4.07
1
A4.03
2.25
2.10
2.10
2.11
2.10
2.11
59' - 11 3/4"
124' - 6"
113' - 0"
113' - 0"
111' - 0"
108' - 2"
100' - 0"
123' - 10"
100' - 0"90' - 1"
99' - 6"
2.11
2.10
21
'
-
6
"
2.13
POTENTIAL PV ARRAY; TBD
15
'
-
1
1
1
/
8
"
21' - 8 5/8"12' - 3 1/4"
25' - 4"10' - 2"
24
'
-
7
3
/
4
"
18
'
-
4
"
15
'
-
0
"
NOT FOR CONSTRUCTION
KEYNOTESLEGEND
JOB NUMBER:
DATE:
The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from
unauthorized modification, reuse and/or release under California Business & Professions Code section
5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316.
4/
1
9
/
2
0
2
1
8
:
0
3
:
2
8
P
M
BI
M
3
6
0
:
/
/
7
0
9
_
S
m
u
g
g
l
e
r
S
t
r
e
e
t
/
7
0
9
_
S
m
u
g
g
l
e
r
_
S
t
_
2
0
2
0
.
rv
t
A2.04
ROOF PLAN
SMUGGLER
225 W. Smuggler St.
Aspen, CO 81611
000
N N
NOTES
SCALE: 1/4" = 1'-0"
1 ROOF PLAN
3.06 BENCH, BUILT-IN, SEE ELEV.
3.08 GUARDRAIL, FRAMELESS GLASS
3.14 BUILT-IN DESK; FINISHED WOOD AND BLACKENED STEEL
3.17 CASEWORK W/ POCKETING DOORS AND WET BAR
3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW
3.19 BUILT-IN NIGHT STAND
1.26 DRIVEWAY, SNOW MELTED
1.27 MECHANICAL CHASE
1.29 CRAWL SPACE ACCESS HATCH
2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE
2.02 BRAKE METAL FASCIA, FIN PER SCHED
2.04 GFRC CLADDING
2.07 STONE CLADDING
2.08 PERFORATED METAL SCREEN, OPERABLE , POCKETING
2.09 PERFORATED METAL SCREEN, FIXED
2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING (CLASS A)
2.11 ROOF, STONE BALLAST, SEE SPEC.
2.13 ROOF MOUNTED ELECTRIC PV SYSTEM
2.20 THERMALLY BROKEN ALUM. FRAME WINDOW SYSTEM, SEE SCHED.
2.21 THERMALLY BROKEN ALUM. FRAME BUTT GLAZED WINDOWS, SEE SCHED.
2.25 METAL AWNING
2.27 GARAGE DOOR; STEEL PANEL TO MATCH CLADDING
2.28 SUBTERRANEAN CAR LIFT; SEE SPEC.
2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE SPEC.
3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP. TBD
3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION
3.03 COAT CLOSET, SEE ELEV.
0.01 (E) STRUCTURE TO BE DEMOLISHED
0.02 (E) DRIVEWAY TO BE DEMOLISHED
0.03 (E) TREE TO BE REMOVED; SEE ARBORIST REPORT
0.04 (E) STAIR TO BE DEMOLISHED
0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED
0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED
0.07 (E) TREE TO REMAIN
0.08 (E) GATE TO BE DEMOLISHED
0.09 (E) MECHANICAL EQUIPMENT TO BE REMOVED
0.10 (E) TRANSFORMER AND CONC. PAD TO REMAIN
1.07 GAS METER
1.08 ELECTRIC METER
1.16 MECHANICAL / ELEC. CONC. PAD
1.17 ELEC. TRANSFORMER
1.18 TRASH BIN COMPARTMENT
1.19 FRONT PORCH, SNOW MELTED
1.20 CONCRETE TILE PATIO, SNOW MELTED
1.21 FENCE/RAILING
1.22 SITE WALL
1.23 FRONT PATH, SNOW MELTED
1.25 NATURAL GRADE
ISSUE DATES
NO. DATE REVISION
LEVEL 1
100' - 0"
LEVEL 2 - FF
113' - 0"
T.O. ROOF
124' - 6"
BASEMENT - FF
88' - 9"
LEVEL 1 - FC
111' - 3"
LEVEL 2 - FC
122' - 9"
1
A4.05
BASEMENT - FC
97' - 9"
LEVEL 1 - FC DROP
109' - 0"
1
A4.06
1'
-
9
"
9'
-
9
"
1'
-
9
"
11
'
-
3
"
2'
-
3
"
9'
-
0
"
9'
-
0
"
LIGHT WELL
ST-01
ST-01
ST-01
GC-01
GC-01 MT-01
1
A4.04
ADGFCBE1
A4.07
12
14
107 11
018
727182
2.25
5' - 7 1/2"
1.25
1.21
G03
5'
-
1
1
1
/
2
"
2.02
2.02
MT-01
11
'
-
9
"
21' - 6 3/8"23' - 2 3/8"15' - 3"
LEVEL 1
100' - 0"
LEVEL 2 - FF
113' - 0"
T.O. ROOF
124' - 6"
1
A4.01
6 5 1
LEVEL 1 - FC
111' - 3"
LEVEL 2 - FC
122' - 9"
1
A4.02
LEVEL 1 - FC DROP
109' - 0"
24
1'
-
9
"
9'
-
9
"
1'
-
9
"
11
'
-
3
"
9'
-
0
"
3
ST-01
GC-01
MT-03
MT-03
1
A4.03
1
101
1312
207
7574
BEHIND
SCREEN
BEHIND
SCREEN
73
BEHIND
SCREEN
3 BEHIND
SCREEN
C-01
25
'
-
0
"
1.253'
-
6
"
6'
-
0
"
1.21
3.08
2.20
2.08
4' - 6"
8'
-
0
"
2.25
MT-01
MT-02
NOT FOR CONSTRUCTION
KEYNOTES
LEGEND
JOB NUMBER:
DATE:
The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from
unauthorized modification, reuse and/or release under California Business & Professions Code section
5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316.
4/
1
9
/
2
0
2
1
8
:
0
3
:
2
9
P
M
BI
M
3
6
0
:
/
/
7
0
9
_
S
m
u
g
g
l
e
r
S
t
r
e
e
t
/
7
0
9
_
S
m
u
g
g
l
e
r
_
S
t
_
2
0
2
0
.
rv
t
A3.01
EXTERIOR ELEVATIONS
SMUGGLER
225 W. Smuggler St.
Aspen, CO 81611
000
SCALE: 1/4" = 1'-0"
2 EAST
SCALE: 1/4" = 1'-0"
1 NORTH
0.01 (E) STRUCTURE TO BE DEMOLISHED
0.02 (E) DRIVEWAY TO BE DEMOLISHED
0.03 (E) TREE TO BE REMOVED; SEE ARBORIST
REPORT
0.04 (E) STAIR TO BE DEMOLISHED
0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED
0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED
0.07 (E) TREE TO REMAIN
0.08 (E) GATE TO BE DEMOLISHED
0.09 (E) MECHANICAL EQUIPMENT TO BE
REMOVED
0.10 (E) TRANSFORMER AND CONC. PAD TO
REMAIN
1.07 GAS METER
1.08 ELECTRIC METER
1.16 MECHANICAL / ELEC. CONC. PAD
1.17 ELEC. TRANSFORMER
1.18 TRASH BIN COMPARTMENT
1.19 FRONT PORCH, SNOW MELTED
1.20 CONCRETE TILE PATIO, SNOW MELTED
1.21 FENCE/RAILING
1.22 SITE WALL
1.23 FRONT PATH, SNOW MELTED
1.25 NATURAL GRADE
1.26 DRIVEWAY, SNOW MELTED
1.27 MECHANICAL CHASE
1.29 CRAWL SPACE ACCESS HATCH
2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE
2.02 BRAKE METAL FASCIA, FIN PER SCHED
2.04 GFRC CLADDING
2.07 STONE CLADDING
2.08 PERFORATED METAL SCREEN, OPERABLE ,
POCKETING
2.09 PERFORATED METAL SCREEN, FIXED
2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING
(CLASS A)
2.11 ROOF, STONE BALLAST, SEE SPEC.
2.13 ROOF MOUNTED ELECTRIC PV SYSTEM
2.20 THERMALLY BROKEN ALUM. FRAME WINDOW
SYSTEM, SEE SCHED.
2.21 THERMALLY BROKEN ALUM. FRAME BUTT
GLAZED WINDOWS, SEE SCHED.
2.25 METAL AWNING
2.27 GARAGE DOOR; STEEL PANEL TO MATCH
CLADDING
2.28 SUBTERRANEAN CAR LIFT; SEE SPEC.
2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE
SPEC.
3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP.
TBD
3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION
3.03 COAT CLOSET, SEE ELEV.
3.06 BENCH, BUILT-IN, SEE ELEV.
3.08 GUARDRAIL, FRAMELESS GLASS
3.14 BUILT-IN DESK; FINISHED WOOD AND
BLACKENED STEEL
3.17 CASEWORK W/ POCKETING DOORS AND WET
BAR
3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW
3.19 BUILT-IN NIGHT STAND
ISSUE DATES
NO. DATE REVISION
LEVEL 1
100' - 0"
LEVEL 2 - FF
113' - 0"
T.O. ROOF
124' - 6"
1'
-
9
"
9'
-
9
"
1'
-
9
"
11
'
-
3
"
1
A4.01
651
LEVEL 1 - FC
111' - 3"
LEVEL 2 - FC
122' - 9"
1
A4.02
LEVEL 1 - FC DROP
109' - 0"
2 4
9'
-
0
"
31
A4.03
20879
10105
9
MT-01 MT-01
MT-01
GC-01
ST-01
ST-01
5'
-
8
"
1.17
25
'
-
0
"
2.20
3.08
MT-02
109108
1' - 0"
18' - 0"
LEVEL 1
100' - 0"
LEVEL 2 - FF
113' - 0"
T.O. ROOF
124' - 6"
BASEMENT - FF
88' - 9"
LEVEL 1 - FC
111' - 3"
LEVEL 2 - FC
122' - 9"
1
A4.05
BASEMENT - FC
97' - 9"
LEVEL 1 - FC DROP
109' - 0"
1
A4.06
11
'
-
3
"
11
'
-
3
"
1'
-
9
"
9'
-
9
"
1'
-
9
"
9'
-
0
"
LIGHT
WELL
GC-01 GC-01
9'
-
0
"
1
A4.04
A D GFCBE1
A4.07
62
8765
4 BEHIND
SCREEN
76 BEHIND
SCREEN
MT-03
2
MT-01 MT-01 MT-01
MT-01
ST-01
2.25
11
'
-
9
"
25
'
-
0
"
FS02 FS03 FS04 FS05
1.08
1.07
2.13
SCALE: 1/4" = 1'-0"
1 SOUTH
SCALE: 1/4" = 1'-0"
2 WEST
NOT FOR CONSTRUCTION
KEYNOTES
LEGEND
JOB NUMBER:
DATE:
The plans and specifications prepared by Ehrlich Yanai Rhee Chaney Architects, LLP are protected from
unauthorized modification, reuse and/or release under California Business & Professions Code section
5536.4, Health & Safety Code Section 19851(a), and Education Code Section 17316.
4/
1
9
/
2
0
2
1
8
:
0
3
:
3
0
P
M
BI
M
3
6
0
:
/
/
7
0
9
_
S
m
u
g
g
l
e
r
S
t
r
e
e
t
/
7
0
9
_
S
m
u
g
g
l
e
r
_
S
t
_
2
0
2
0
.
rv
t
A3.02
EXTERIOR ELEVATIONS
SMUGGLER
225 W. Smuggler St.
Aspen, CO 81611
000
0.01 (E) STRUCTURE TO BE DEMOLISHED
0.02 (E) DRIVEWAY TO BE DEMOLISHED
0.03 (E) TREE TO BE REMOVED; SEE ARBORIST
REPORT
0.04 (E) STAIR TO BE DEMOLISHED
0.05 (E) SITE WALL/FENCE TO BE DEMOLISHED
0.06 (E) PATHWAY/PATIO TO BE DEMOLISHED
0.07 (E) TREE TO REMAIN
0.08 (E) GATE TO BE DEMOLISHED
0.09 (E) MECHANICAL EQUIPMENT TO BE
REMOVED
0.10 (E) TRANSFORMER AND CONC. PAD TO
REMAIN
1.07 GAS METER
1.08 ELECTRIC METER
1.16 MECHANICAL / ELEC. CONC. PAD
1.17 ELEC. TRANSFORMER
1.18 TRASH BIN COMPARTMENT
1.19 FRONT PORCH, SNOW MELTED
1.20 CONCRETE TILE PATIO, SNOW MELTED
1.21 FENCE/RAILING
1.22 SITE WALL
1.23 FRONT PATH, SNOW MELTED
1.25 NATURAL GRADE
1.26 DRIVEWAY, SNOW MELTED
1.27 MECHANICAL CHASE
1.29 CRAWL SPACE ACCESS HATCH
2.01 EDGE OF LEVEL/ROOF/OVERHANG ABOVE
2.02 BRAKE METAL FASCIA, FIN PER SCHED
2.04 GFRC CLADDING
2.07 STONE CLADDING
2.08 PERFORATED METAL SCREEN, OPERABLE ,
POCKETING
2.09 PERFORATED METAL SCREEN, FIXED
2.10 ROOF, SINGLE-PLY TPO MEMBRANE ROOFING
(CLASS A)
2.11 ROOF, STONE BALLAST, SEE SPEC.
2.13 ROOF MOUNTED ELECTRIC PV SYSTEM
2.20 THERMALLY BROKEN ALUM. FRAME WINDOW
SYSTEM, SEE SCHED.
2.21 THERMALLY BROKEN ALUM. FRAME BUTT
GLAZED WINDOWS, SEE SCHED.
2.25 METAL AWNING
2.27 GARAGE DOOR; STEEL PANEL TO MATCH
CLADDING
2.28 SUBTERRANEAN CAR LIFT; SEE SPEC.
2.29 ELEVATOR, ELECTRIC MRL TRACTION, SEE
SPEC.
3.01 FINISHED WOOD/LAMINATE MILLWORK, TYP.
TBD
3.02 BUILT-IN SHELVING SYSTEM, SEE ELEVATION
3.03 COAT CLOSET, SEE ELEV.
3.06 BENCH, BUILT-IN, SEE ELEV.
3.08 GUARDRAIL, FRAMELESS GLASS
3.14 BUILT-IN DESK; FINISHED WOOD AND
BLACKENED STEEL
3.17 CASEWORK W/ POCKETING DOORS AND WET
BAR
3.18 BUILT-IN BANQUETTE WITH STORAGE BELOW
3.19 BUILT-IN NIGHT STAND
ISSUE DATES
NO. DATE REVISION
PRE-APPLICATION CONFERENCE SUMMARY
DATE: March 1, 2021
PLANNER: Garrett Larimer, 970-319-6950
PROJECT ADDRESS: 225 Smuggler St.
REPRESENTATIVE: Carson Davis, Ehrlich Yanai Rhee Chaney Architects (cdavis@eyrc.com)
DESCRIPTION: The potential Applicant is requesting Residential Design Standard variations to redevelop the site
with a single family residence at 225 Smuggler St. This property is located in the Aspen Infill Area and is zoned R-6.
The proposed design requires a variation to four standards:
- Articulation of Building Mass – Section 26.410.030.B.1 (Non-Flexible)
- Window Placement – 26.410.030.E.2 (Flexible)
The Residential Design Standards chapter provides direction for reviewing variations to the standards when the
proposed design does not meet the standard. Per Code Section 26.410.020, if an application is found to be
inconsistent with any of the Non-Flexible Standards, variations to those standards must be reviewed by the
Planning and Zoning Commission. Flexible standards may be reviewed administratively for Alternative
Compliance by the Community Development Director. All variations requested will be combined for review by
the Planning and Zoning Commission for efficiency. The review for variations will determine if the design meets
the intent of the specific standard as well as the general intent statements in Section 26.410.010.A.1-3.
Please include written responses or graphics that demonstrate how the design meets the intent statement of the
standard in which variations are requested, and general intent statements in Section 26.410.010.A.1-3.
An initial administrative review of the proposed design has been completed for the other RDS standards. If any
additional standards are found to be not met during the review of the application, those may be added to the variation
review request. That process will be finalized during the review of a land use application.
Once the application is ready to be submitted, please email the completed application packet to Garrett Larimer at
garrett.larimer@cityofaspen.com. Once the application is deemed complete, we will contact you to provide payment
for the land use application fee.
RELEVANT LAND USE CODE SECTIONS:
26.304 Common Development Review Procedures
26.410 Residential Design Standards
26.410.010.A RDS General Intent Statements
26.410.020.D RDS Variation Review Standards
26.410.030.B.1 Articulation of Building Mass (Non-Flexible)
26.410.030.E.2 Window Placement (Flexible)
For your convenience – links to the Land Use Application and Land Use Code are below:
Land Use Application Land Use Code
REVIEW BY: Community Development Staff for complete application and recommendation to P&Z.
Planning and Zoning Commission for Decision
PUBLIC HEARING: Yes, Planning and Zoning Commission
PLANNING FEES: $3,250 deposit for 10 hours of staff time (Additional/lesser time will be billed or
refunded at a rate of $325/hr.)
REFERRAL FEES: None.
TOTAL DEPOSIT: $3,250
APPLICATION CHECKLIST – These items should be emailed to Garrett.Larimer@cityofaspen.com:
Completed Land Use Application, HOA Compliance Policy, and signed Fee Agreement.
Pre-application Conference Summary (this document).
Applicant’s name, address and telephone number, contained within a letter signed by the applicant stating
the name, address, and telephone number of the representative authorized to action on behalf of the
applicant.
Street address and legal description of the parcel on which development is proposed to occur, consisting
of a current (no older than 6 months) certificate from a title insurance company, an ownership and
encumbrance report, or attorney licensed to practice in the State of Colorado, listing the names of all
owners of the property, and all mortgages, judgments, liens, easements, contracts and agreements
affecting the parcel, and demonstrating the owner’s right to apply for the Development Application.
An 8 1/2” by 11” vicinity map locating the parcel within the City of Aspen.
A written description of the proposal and an explanation in written, graphic, or model form of how the
proposed development complies with the intent statement and review standards associated with the
request.
Completed copy of the Residential Design Standard Checklist:
https://www.cityofaspen.com/DocumentCenter/View/1697
Written responses to all applicable review criteria.
If the copy is deemed complete by staff, the following items will then need to be submitted:
Total fee for review of the application.
Depending on further review of the case, additional items may be requested of the application. Once the
application is deemed complete by staff, the applicant/applicant’s representative will receive an e-mail
requesting submission of an electronic copy of the complete application and the deposit. Once the deposit is
received, the case will be assigned to a planner and the land use review will begin.
Disclaimer:
The foregoing summary is advisory in nature only and is not binding on the City. The summary is based on current
zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate.
The summary does not create a legal or vested right.
225 W. SMUGGLER STREET
04.19.2021
PROPERTY VICINITY MAP
225 W. SMUGGLER ST.