Building review comments
1)| The IECBC allows historic existing openings to remain. The east side of the historic resource has
two that may remain. It is policy to protect to the property line with a double layer drywall system
on the interior wall in conjunction with a fire sprinkler system.
2) The IRC requires a one hour rated wall with no openings in the wall located from 0 to 3’ from a
property line. The openings proposed in the addition from grid line F to J with a fire separation
distance 1’11” from the property line are not permitted.
3) A class A roof with snow stops along the west side will be required. The roof drainage is required
to be addressed on the subject property.
3$ Access to maintain the building Is almost impossible in 1’11”
Thanks
Denis Murray
Plans Examination Manager
Community Development
130 South Galena St.
Aspen, CO 81611
p: 970.429.2761
c: Cell 970.309.6283
f: Fax 970.920.5440
www.cityofaspen.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contain in the email are based on current zoning, which is subject to change in the future, and upon factual representations
that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any
claim of detrimental reliance.
From: Amy Simon <amy.simon@cityofaspen.com>
Sent: Tuesday, February 11, 2020 2:39 PM
To: Bonnie Muhigirwa <bonnie.muhigirwa@cityofaspen.com>; Denis Murray
<denis.murray@cityofaspen.com>; Nick Thompson <nick.thompson@cityofaspen.com>
Subject: RE: Referral comments needed for HPC project: 227 E. Main
Hi- i didn’t get referral comments from Building on the attached project. This goes to HPC for
review tomorrow night. We are recommending continuation due to concerns listed below (and
some design issues). Anyone want to send me some comments asap?
1. The architect is to provide additional information on how the resource will betemporarily stored on site or suspended above the basement excavation. 2. The architect is to preliminarily address the constructability of the project given thesite conditions and proposed setbacks, and is to address future maintenance of thestructure along the side lot lines.3. It is not clear from the plans that all drainage will be retained on the site. A gutter onthe west side of the cabin appears to cross the property line and the garage eavesreach the lot lines with no gutters (unless they are internal and not clearly depicted.) Clarification is needed.4. The architect must work with Engineering to advance the stormwater plan, and mustdepict green roofs for HPC review if this becomes the solution.5. Investigate whether a transformer will be needed on the site.6. Continue to review the impact of trees on the adjacent properties relative to theplanned basement excavation.
From: Amy Simon
Sent: Monday, January 27, 2020 4:10 PM
To: Ben Carlsen <ben.carlsen@cityofaspen.com>; Bob Narracci <bob.narracci@cityofaspen.com>;
Bonnie Muhigirwa <bonnie.muhigirwa@cityofaspen.com>; David Coon
<david.coon@cityofaspen.com>; David Radeck <david.radeck@cityofaspen.com>; Denis Murray
<denis.murray@cityofaspen.com>; Hailey Guglielmo <hailey.guglielmo@cityofaspen.com>; Jack
Danneberg <jack.danneberg@cityofaspen.com>; Jim Pomeroy <jim.pomeroy@cityofaspen.com>;
Mike Horvath <mike.horvath@cityofaspen.com>; Nick Thompson
<nick.thompson@cityofaspen.com>; PJ Murray <pj.murray@cityofaspen.com>; Trish Aragon
<Trish.Aragon@cityofaspen.com>
Subject: Referral comments needed for HPC project: 227 E. Main
Hello,
The attached application for Conceptual Major Development, On-site Relocation and Setback
Variations at 227 E. Main Street will be reviewed by HPC on February 12th. This is a miner’s cottage
on a 3,000 square foot lot. It has been essentially unoccupied for a while after being the long-time
home of a store called Gypsy Woman. The historic structure is in poor condition.
The new owner plans to restore the miner’s cottage and construct a full basement and addition. The
only variation requests are related to setbacks.
If you have any comments, please email them to me by Monday, February 3rd. Thank you!
Sarah Yoon
Community Development Department
Historic Preservation Planner
130 S. Galena St.
Aspen, CO 81611
p: 970.920.5144
www.cityofaspen.com
www.aspencommunityvoice.com
www.aspenvictorian.com
www.aspenmod.com
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contained in the email are based on current zoning, which is subject to change in the future, and upon factual
representations that may or may not be accurate. The opinions and information contained herein do not create a legal or
vested right or any claim of detrimental reliance.