HomeMy WebLinkAboutPresentation.135 W Francis.20210623135 W. Francis Street
Aspen Historic Preservation Commission (HPC)
* Visual representations by Kim Raymond Architects + Interiors June 23, 2021
CURRENT CONDITIONS
135 W. Francis, 2021
REQUEST FOR APPROVAL
Land Use Approval Request:
•Major Development (Section 26.415.070.D)
•Relocation (Section 26.415.090)
•Setback Variation (Section 26.415.110.C)
•Floor Area Bonus (Section 26.415.110.F)
Description:
Lot A and the West One-Half of Lot B, Block 56,
City and Townsite of Aspen, Colorado (PID#
2735-124-21-001)
Current Zoning:
R-6 (Medium-Density Residential)
135
HISTORIC BACKGROUND
135 W. Francis, 1963Sanborn Map, 1904
SITE PLANNING / RELOCATION
Existing Site Plan Revised Site Plan
HISTORIC LANDMARK
Historic Preservation Design Guidelines
9.2 Proposals to relocate a building will be considered on a
case-by-case basis
•In some cases, the historic significance of the structure,
the context of the site, the construction technique, and
the architectural style may make on-site relocation too
impactful to be appropriate. It must be demonstrated
that on-site relocation is the best preservation
alternative in order for approval to be granted.West Elevation
Permit files: 123 W. Francis
NEW ADDITION
Proposed North Elevation
(Seen from W. Francis Street)
Historic Preservation Design Guidelines
10.9 If the addition is taller than a historic building, set it back from
significant facades and use a “connector” to link it to the historic
building.
•The connector shall be a minimum of 10 feet long between the
addition and the primary building.
•Minimize the width of the connector. Ideally, it is no more than a
passage between the historic resource and addition. The connector
may not be as wide as the historic resource.
Proposed West Elevation
(Seen from N. 1st Street)
Proposed South Elevation
(Seen from alley)
NEW ADDITION
Historic Preservation Design Guidelines
9.6 Minimize the visual impact of lightwells
•The size of any lightwell that faces a street should be
minimized.
•Lightwells must be placed so that they are not immediately
adjacent to character defining features, such as a front porch.
•Lightwells must be protected with a flat grate, rather than a
railing or may not be visible from a street.
•Lightwells that face a street must abut the building
foundation and generally may not “float” in the landscape
except where they are screened, or on a AspenModern site.
10.6 Design a new addition to be recognized as a product of its
own time
•Consider these three aspects of an addition; form, materials,
and fenestration. An addition must relate strongly to the
historic resource in at least two of these elements. Departing
from the historic resource in one of these categories allows
for creativity and a contemporary design response.
•Note that on a corner lot, departing from the form of the
historic resource may not be allowed.
Proposed Site Plan with skylight feature
BENEFITS REQUEST
Setback Variation Request
-5’-2” rear yard setback reduction for the
addition above and below grade, as
represented in the approved application
-Unclear about the request for side yard
setback variations for non-compliant light
wells in the setback.
Floor Area Bonus Request
-Floor area bonus request of 250 s.f. does not
meet the criteria with this proposed design.
Proposed West Elevation
Proposed Site Plan
STAFF RECOMMENDATION
Staff recommends approval with the following conditions:
1.Restudy the new addition to be more subordinate in scale to the historic resource and restudy
the form of the addition to be in compliance with Design Guideline 10.6 & 10.11.
2.Restudy the connecting element and the concept of reconstructing the rear portion of the
historic resource.
3.Restudy the proposed relocation of the historic resource, the basement excavation, lightwells
and the stormwater plan to address concerns with the integrity of the building location,
relationship to the nearby historic resource, tree preservation concerns and placement of the
new addition.
4.Reduce the skylight located in the patio directly behind the historic resource.
5.Provide clarification on demolition calculations to ensure that 40% demolition is not triggered.
If demolition is triggered, the applicant will need to provide for 2 code compliant parking
spaces on-site.
6.Provide responses after communicating with the relevant City Departments regarding the
preliminary stormwater and drainage plans for the site and clarify the anticipated visual
impacts for the plan.