Loading...
HomeMy WebLinkAboutExhibit B_DRC Referral Comments1 LAND USE REFERRAL MEMORANDUM TO: Kevin Rayes, Community Development Department FROM: Cindy Christensen, Deputy Director - APCHA DATE: August 16, 2022 RE: 205 West Main – AH Credit Project – LPA 22-063 PROJECT The property is located at 205 West Main. The applicant is proposing to create a multi-family housing project with nine (9) deed-restricted units. The project is for the generation of the City of Aspen Affordable Housing Credits. Three of the units would be three-bedroom and the remaining six units would be two-bedroom units. DISCUSSION Four of the two-bedroom units proposed on the main/lower level are greater than 50% below grade (between 1% to 4%). In these four units, the bedrooms are located below grade with the living area on the main level. Although all of the units are below the minimum square footage requirement as stipulated in the APCHA Affordable Housing Development Policy, they are all within the allowable 20% reduction as long as they adhere to the criteria stipulated in this Policy and stated below. Based on the application, this project does fall within the criteria stated below. •Significant storage space located outside the unit; •Above average natural light, i.e., more windows than required by code; •Efficient, flexible layout with limited hall and staircase space; •Availability of site amenities, such as pool or proximity to park or open space; •Unit location within the development, i.e., above ground location versus ground level or below ground; and/or •Possibility that project can achieve higher density of deed-restricted units with a reduction variance. The development plans on providing seven parking spaces, of which one is the required ADA spot. There are a total of 22 bedrooms associated with this project with only six parking spaces. This is a concern for APCHA since each unit will also only be allowed ONE guest residential parking permit. RECOMMENDATION APCHA would recommend approval with the following conditions: 1.All bedrooms must contain a closet. 2.All units must contain kitchen appliances. Exhibit B | DRC Referral Comments 2 3. All units must include a washer and dryer. 4. If the units are to remain as rental units, all units must be sold to a qualified Pitkin County employer approved by APCHA prior to purchase. 5. An approved deed restriction provided by APCHA will need to be signed by each owner at the time of purchase and recorded. The deed restriction will require minimum occupancy (at least one person per bedroom). If the tenants are all adults, all must be working full time within Pitkin County as stipulated in the APCHA Regulations. 6. Reconsider adding additional parking spaces. Exhibit B | DRC Referral Comments Engineering1 - 205 W Main St - LPA-22-063_20220811 Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Provide a conceptual utilities plan. Most importantly show where a transformer to support the development will be placed. A single phase transformer with a 5x5 vault may be needed. Provide an easement to accommodate the transformer with 3' clear zones surrounding the sides and back of the transformer and 10' clear in the front. Alternatively work with COA Electric Dept to determine available capacity in the transformer in the alley to the west. 205 W. Main HPC Major Devel App 19-MAY-22.pdf (5) Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf A conceptual drainage plan and report is required to determine appropriate site mass and scale and demonstrate the site can still accommodate stormwater requirements onsite. A full conceptual draiange plan and report as outlined in the URMP will be required at HPC detailed review. However looking at the site there is limited space for drainage and stormwater and those aspects should be considered in the design early in the project planning. Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf A transportation Impact Analysis was not provided int he submittal. Please provide. Select meaningful and impactful mitigation measures to offset the anticipated additional vehicle trips created by this development. Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf The site is not in a sidewalk deferred zone and a sidewalk will be required on First St. 5 ft sidewalk with 5 ft landscape buffer. Provide a conceptual utilities plan. Most importantly show where a transformer to support the development will be placed. A single phase transformer with a 5x5 vault may be needed. Provide an easement to accommodate the transformer with 3' clear zones surrounding the sides and back of the transformer and 10' clear in the front. Alternatively work with COA Electric Dept to determine available capacity in the transformer in the alley to the west. A conceptual drainage plan and report is required to determine appropriate site mass and scale and demonstrate the site can still accommodate stormwater requirements onsite. A full conceptual draiange plan and report as outlined in the URMP will be required at HPC detailed review. However looking at the site there is limited space for drainage and stormwater and those aspects should be considered in the design early in the project planning. A transportation Impact Analysis was not provided int he submittal. Please provide. Select meaningful and impactful mitigation measures to offset the anticipated additional vehicle trips created by this development. PLANTING BED LAWN LAWN EXISTING PARKING -TO BE REMOVED S. F I R S T S T R E E T 75 .45 ' PU B L I C R.O.W. S 14 °50 '49 " W 10 0 .00 ' (R) SE T B A C K PR O P E R T Y L I N E The site is not in a sidewalk deferred zone and a sidewalk will be required on First St. 5 ft sidewalk with 5 ft landscape buffer. Exhibit B | DRC Referral Comments Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Existing head in parking is required to be removed and replaced with the COA standard street cross section with parallel parking. LAWN EXISTING PARKING -TO BE REMOVED Existing head in parking is required to be removed and replaced with the COA standard street cross section with parallel parking. Exhibit B | DRC Referral Comments = input = calculation DATE: PROJECT NAME: PROJECT ADDRESS: APPLICANT CONTACT INFORMATION: NAME, COMPANY, ADDRESS, PHONE, EMAIL Minor Entering Exiting Total Entering Exiting Total Commercial (sf)0.0 sf 0.00 0.00 0.00 0.00 0.00 0.00 Free-Market Housing (Units)-1 Units -0.19 -0.48 -0.67 -0.46 -0.36 -0.82 Affordable Housing (Units)9 Units 3.24 3.51 6.75 4.41 3.60 8.01 Lodging (Units)0 Units 0.00 0.00 0.00 0.00 0.00 0.00 Essential Public Facility (sf)0.0 sf 0.00 0.00 0.00 0.00 0.00 0.00 3.05 3.03 6.08 3.95 3.24 7.19 Land Use Trip Rate %Entering %Exiting Trip Rate %Entering %Exiting Commercial 2.27 0.69 0.31 4.14 0.4 0.6 Free-Market Housing 0.67 0.29 0.71 0.82 0.56 0.44 Affordable Housing 0.75 0.48 0.52 0.89 0.55 0.45 Lodging 0.25 0.57 0.43 0.31 0.52 0.48 Essential Public Facility 0.86 0.62 0.38 1.66 0.4 0.6 AM Peak Average PM Peak Average Trips Generated AM Peak-Hour PM Peak-Hour TOTAL NEW TRIPS ASSUMPTIONS ASPEN TRIP GENERATION Is this a major or minor project? 205 W Main Street, Aspen 205 W Main Affordable Housing Net New Units/Square Feet of the Proposed ProjectProposed Land Use *For mixed-use (at least two of the established land uses) sites, a 4% reduction for AM Peak-Hour and a 14% reduction for PM Peak-Hour is applied to the trip generation. Name Company Address Phone Email Trip Generation 8/26/2022 Instructions: IMPORTANT: Turn on Macros: In order for code to run correctly the security settings need to be altered. Click "File" and then click "Excel Options." In the "Trust Center" category, click "Trust Center Settings", and then click the "Macro Settings" category. Beneath "Macro Settings" select "Enable all Macros." Sheet 1. Trip Generation: Enter the project's square footage and/or unit counts under Proposed Land Use. The numbers should reflect the net change in land use between existing and proposed conditions. If a landuse is to be reduced put a negative number of units or square feet. Sheet 2. MMLOS: Answer Yes, No, or Not Applicable under each of the Pedestrian, Bike and Transit sections. Points are only awarded for proposed (not existing) and confirmed aspects of the project. Sheet 3. TDM: Choose the mitigation measures that are appropriate for your project. Sheet 4. Summary and Narrative: Review the summary of the project's mitigated trips and provide a narrative which explains the measures selected for the project. Click on "Generate Narrative" and individually explain each measure that was chosen and how it enhances the site or mitigates vehicle traffic. Ensure each selected measure make sense Minor Development - Inside the Roundabout Major Development - Outside the Roundabout Helpful Hints: 1. Refer to the Transportation Impact Analysis Guidelines for information on the use of this tool. 2. Refer to TIA Frequently Asked Questions for a quick overview. 2. Hover over red corner tags for additional information on individual measures. 3. Proposed TDM or MMLOS measures should be new and/or an improvement of existing conditions. A project will not receive credit for measures already in place. Proposed TDM or MMLOS measures should also make sense in the context of project location and future use. Transportation Impact Analysis TIA Frequently Asked Questions Exhibit B | DRC Referral Comments = input = calculation 28 Category Sub.Measure Number Question Answer Points 1 Does the project propose a detached sidewalk where an attached sidewalk currently exists? Does the proposed sidewalk and buffer meet standard minimum widths? Yes 5 2 Is the proposed effective sidewalk width greater than the standard minimum width?0 3 Does the project propose a landscape buffer greater than the standard minimum width?0 5 4 Does the project propose a detached sidewalk on an adjacent block? Does the proposed sidewalk and buffer meet standard minimum widths? No 0 5 Is the proposed effective sidewalk width on an adjacent block greater than the standard minimum width?0 6 Is the proposed landscape buffer on an adjacent block greater than the standard minimum width?0 0 7 Are slopes between back of curb and sidewalk equal to or less than 5%?Yes 0 8 Are curbs equal to (or less than) 6 inches?Yes 0 9 Is new large-scale landscaping proposed that improves the pedestrian experience? Properties within the Core do not have ample area to provide the level of landscaping required to receive credit in this category. NA 0 10 Does the project propose an improved crosswalk? This measure must get City approval before receiving credit. No 0 0 11 Are existing driveways removed from the street?Yes 5 12 Is pedestrian and/or vehicle visibility unchanged by new structure or column?Yes 0 13 Is the grade (where pedestrians cross) on cross-slope of driveway 2% or less?Yes 0 14 Does the project propose enhanced pedestrian access points from the ROW? This includes improvements to ADA ramps or creating new access points which prevent pedestrians from crossing a street. Yes 5 15 Does the project propose enhanced pedestrian or bicyclist interaction with vehicles at driveway areas?No 0 10 16 Is the project's pedestrian directness factor less than 1.5?Yes 0 17 Does the project propose new improvements which reduce the pedestrian directness factor to less than 1.2? A site which has an existing pedestrian directness factor less than 1.2 cannot receive credit in this category. Yes 5 18 Is the project proposing an off site improvement that results in a pedestrian directness factor below 1.2?* No 0 19 Are traffic calming features proposed that are part of an approved plan (speed humps, rapid flash)?*No 0 5 20 Are additional minor improvements proposed which benefit the pedestrian experience and have been agreed upon with City of Aspen staff? Yes 3 21 Are additional major improvements proposed which benefit the pedestrian experience and have been agreed upon with City of Aspen staff? No 0 3 23 Pe d e s t r i a n s Subtotal Ad d i t i o n a l Pr o p o s e d Im p r o v e m e n t s TOTAL NUMBER OF TRIPS MITIGATED: Pe d e s t r i a n R o u t e s Tr a f f i c C a l m i n g a n d Pe d e s t r i a n N e t w o r k Dr i v e w a y s , P a r k i n g , a n d A c c e s s Co n s i d e r a t i o n s MMLOS Input Page Subtotal Subtotal Si d e w a l k C o n d i t i o n on A d j a c e n t B l o c k s Si d e w a l k C o n d i t i o n on P r o j e c t F r o n t a g e Subtotal Instructions: Answer Yes, No, or Not Applicable to each measure under the Pedestrian, Bike and Transit sections. Subtotal Subtotal Pedestrian Total* Exhibit B | DRC Referral Comments Category Sub.Measure Number Question Answer Points 22 Is a new bicycle path being implemented with City approved design? No 0 23 Do new bike paths allow access without crossing a street or driveway?No 0 24 Is there proposed landscaping, striping, or signage improvements to an existing bicycle path?No 0 25 Does the project propose additional minor bicycle improvements which have been agreed upon with City of Aspen staff?No 0 26 Does the project propose additional major bicycle improvements which have been agreed upon with City of Aspen staff?No 0 0 Bi c y c l e Pa r k i n g 27 Is the project providing bicycle parking?Yes 5 5 5 Category Sub.Measure Number Question Answer Points 28 Is seating/bench proposed?NA 0 29 Is a trash receptacle proposed?No 0 30 Is transit system information (signage) proposed?No 0 31 Is shelter/shade proposed?No 0 32 Is enhanced pedestrian-scale lighting proposed?No 0 33 Is real-time transit information proposed?No 0 34 Is bicycle parking/storage proposed specifically for bus stop use? No 0 35 Are ADA improvements proposed?No 0 0 36 Is a bus pull-out proposed at an existing stop?No 0 37 Is relocation of a bus stop to improve transit accessibility or roadway operations proposed?No 0 38 Is a new bus stop proposed (with minimum of two basic amenities)? No 0 0 0 Tr a n s i t Ba s i c A m e n i t i e s Subtotal Subtotal En h a n c e d Am e n i t i e s Subtotal Subtotal Bicycles Total* Transit Total* Bi c y c l e s Mo d i f i c a t i o n s t o E x i s t i n g Bic y c l e P a t h s Exhibit B | DRC Referral Comments Category Measure Number Sub. Question Answer Strategy VMT Reductions Will an onsite ammenities strategy be implemented? Which onsite ammenities will be implemented? Will a shared shuttle service strategy be implemented? What is the degree of implementation? What is the company size? What percentage of customers are eligible? 3 Nonmotorized Zones Will a nonmotorized zones strategy be implemented?0.00% 0.00% Category Measure Number Sub. Question Answer Strategy VMT Reductions Will a network expansion stragtegy be implemented? What is the percentage increase of transit network coverage? What is the existing transit mode share as a % of total daily trips? Will a service frequency/speed strategy be implemented? What is the percentage reduction in headways (increase in frequency)? What is the existing transit mode share as a % of total daily trips? What is the level of implementation? Will a transit access improvement strategy be implemented?Yes What is the extent of access improvements? Within Project Only 7 Intercept Lot Will an intercept lot strategy be implemented?0.00% 1.00% Category Measure Number Sub. Question Answer Strategy VMT Reductions Will there be participation in TOP? What percentage of employees are eligible? Is a transit fare subsidy strategy implemented? What percentage of employees are eligible? What is the amount of transit subsidy per passenger (daily equivalent)? Is an employee parking cash-out strategy being implemented? What percentage of employees are eligible? Is a workplace parking pricing strategy implemented? What is the daily parking charge? What percentage of employees are subject to priced parking? Is a compressed work weeks strategy implemented? What percentage of employees are participating? What is the workweek schedule? Is an employer sponsered shuttle program implemented? What is the employer size? What percentage of employees are eligible? Is a carpool matching strategy implemented? What percentage of employees are eligble? Is carshare participation being implemented? How many employee memberships have been purchased? What percentage of employees are eligble? Is participation in the bikeshare program WE-cycle being implemented? How many memberships have been purchased? What percentage of employees/guests are eligble? Is an end of trip facilities strategy being implemented?Yes What is the degree of implementation? Low What is the employer size? Small Is a self-funded emergency ride home strategy being implemented? What percentage of employees are eligible? Is a carpool/vanpool priority parking strategy being implemented? What is the employer size? What number of parking spots are available for the program? Is a private employer shuttle strategy being implemented? What is the employer size? What percentage of employees are eligible? Is a trip reduction marketing/incentive program implemented? What percentage of employees/guests are eligible? 0.22% 1.00% 1.22% 1. 22% work trips represents a mixed-used site (SF Bay Area Travel Survey). See Assumptions Tab for more detail. 21 16 17 18 19 20 11 12 13 14 15 Participation in TOP Transit Fare Subsidy Employee Parking Cash-Out Workplace Parking Pricing Compressed Work Weeks Employer Sponsored Vanpool Carpool Matching Carshare Program Self-funded Emergency Ride Home Carpool/Vanpool Priority Parking Private Employer Shuttle Trip Reduction Marketing/Incentive Program End of Trip Facilities Cross Category Maximum Reduction, Neighborhood and Transit Global Maximum VMT Reductions TDM Input Page 0.00% 1.00% 0.00% Co m m u t e T r i p R e d u c t i o n P r o g r a m s S t r a t e g i e s Onsite Servicing Shared Shuttle Service Ne i g h b o r h o o d / S i t e En h a n c e m e n t s S t r a t e g i e s 0.00% 0.00% Network Expansion Service Frequency/Speed Transit Access Improvement Maximum Reduction Allowed in Category 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% Bikeshare Program 0.00% 0.00% 0.00% 0.00% 0.00% 1.00% 0.00% Maximum Reduction Allowed in Category Maximum Reduction Allowed in CategoryTr a n s i t S y s t e m I m p r o v e m e n t s St r a t e g i e s 1 2 4 5 6 8 9 10 Instructions TDM: Choose the mitigation measures that are appropriate for your project. Proposed TDM or MMLOS measures should be new and/or an improvement of existing conditions. A project will not receive credit for measures already in place. Proposed TDM or MMLOS measures should also make sense in the context of project location and future use. Exhibit B | DRC Referral Comments DATE: PROJECT NAME: PROJECT ADDRESS: APPLICANT CONTACT INFORMATION: NAME, COMPANY, ADDRESS, PHONE, EMAIL Stan Clauson, FAICP, ASLA Stan Clauson Associates, Inc. 200 W. Main St., Ste. 203, Aspen 970-274-3265 stan@scaplanning.com Peak Hour Max Trips Generated MMLOS TDM Total Trips Mitigated PM 7.2 28 0.09 28.09 0.00 Click on the "Generate Narrative" Button to the right. Respond to each of the prompts in the space provided. Each response should cover the following: 1. Explain the selected measure. 2. Call out where the measure is located. 3. Demonstrate how the selected measure is appropriate to enhance the project site and reduce traffic impacts. 4. Explain the Enforcement and Financing Plan for the selected measure. 5. Explain the scheduling and implementation responsibility of the mitigation measure. 6. Attach any additional information and a site map to the narrative report. Narrative: 8/26/2022 Conservation Housing Partners LLC (200 W Main Affordable Housing) 205 W Main Street, Aspen Trip Generation SUMMARY Trip Mitigation NET TRIPS TO BE MITIGATED Project Description In the space below provide a description of the proposed project. This project involves the redevelopment of a property containing a historic single-family home with ADU into a nine (9) unit 100% deed- restricted affordable housing development. Right-of-way improvements include removal of an informal gravel head-in parking area accessed off of First Street and the installation of curb and gutter, landscaped parkway, and sidewalk adjacent to the property where none currently exists along First Street. Bicycle parking will be provided as an amenity on site. The property meets the 1.2 directness criteria owing to its proximity to the Commercial Core and transit options. MMLOS In the space provided call out the effective sidewalk width and the percentage of the site which meets or exceeds the minimum standard width. Explain the site constraints for areas which do not meet the minimum width. Curb and gutter, landscaped parkway, and sidewalk will be installed along First Street adjacent to the property where none currently exists. These elements will meet all current City Engineering standards. Explain what driveways are removed and how this benefits the pedestrian experience. Head in parking will be removed along Frist Street increasing safety for cyclists and allowing the installation of sidewalks for pedestrian safety. Describe the enhanced pedestrian access point(s). This measure is to improve pedestrian access to the site from the ROW. It includes adding additional access points which prevent pedestrians and bicyclists from crossing a street, improvements to the project's ADA ramps in the ROW, and improvements to existing access points. Exhibit B | DRC Referral Comments New sidewalk along First Street will enhance pedestrian access. Explain any additional minor improvements which benefit the pedestrian experience and have been agreed upon with City of Aspen staff. Not applicable. Include any additional information that pertains to the MMLOS plan in the space provided below. Not applicable. TDM Include any additional information that pertains to the TDM plan in the space provided below. Specific TDM measures will include transit access improvements owing to the newly installed sidewalks (#6), as well as bicycle parking and outdoor storage for bicycles (#17). MMLOS Site Plan Requirements Include the following on a site plan. Clearly call out and label each measure. Attach the site plan to the TIA submittal. Sidewalk Width and Buffer Width Slopes Between Back of Curb and Sidewalk Removed Driveway(s) 2% Slope at Pedestrian Driveway Crossings Enhanced Pedestrian Access Point Pedestrian Directness Factor (See callout number 9 on the MMLOS sheet for an example) Additional Minor Pedestrian Improvement Bicycle Parking Enforcement and Financing Provide an overview of the Enforcement and Financing plan for the proposed transportation mitigation measures. ROW improvements will be required prior to issuance of a Certificate of Occupancy. Scheduling and Implementation Responsibility of Mitigation Measures Provide an overview of the scheduling and implementation responsibility for the proposed transportation mitigation measures. Not applicable. Monitoring and Reporting Provide a monitoring and reporting plan. Refer to page 17 in the Transportation Analysis Guidelines for a list of monitoring plan requirements. Components of a Monitoring and Reporting Plan should include (1) Assessment of compliance with guidelines, (2) Results and effectiveness of implemented measures, (3) Identification of additional strategies, and (4) Surveys and other supporting data. Exhibit B | DRC Referral Comments Not applicable. Exhibit B | DRC Referral Comments Parks 1 Page: 31 Author: davidr Date: 8/2/2022 10:59:32 AM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Parks Department recommends that the Parks Development Fee not be waived in this instance. The proposed units are family oriented and in our experience this unit type shows higher park usage. 31 (1) Page: 48 Author: davidr Date: 8/2/2022 1:10:41 PM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf These 4 healthy mature trees have mitigation value of $38,000. The City Forester has determined that they do have value as part of the community forest. Plan on submitting for a Tree removal permit at Building permit stage. 48 (2) Page: 48 Author: davidr Date: 8/2/2022 1:15:07 PM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Verify that these trees still exist and if so, confirm that activity on 205 W Main property will not impact their roots. City Forester may require air-spading to expose roots.... Page: 51 Author: davidr Date: 8/2/2022 1:07:55 PM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Remove crab apple trees & plan on planting back species as directed by City Forester. Possibly 5 or 6 total. 51 (5) Page: 51 Author: davidr Date: 8/2/2022 12:50:14 PM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Check on viability of planting trees here. HPC Major Development ) Page | 30 s may not exceed the Impact Fee and a developer shall not be reimbursed by the City for pment which is smaller than the previous development. 100% affordable housing project, the applicant is requesting a waiver of all of -referenced impact fees. mpact fees t fees are the result of the "City of Aspen Impact Fee Study and Update of School Lands which was sponsored by the City of Aspen and completed by BBC Research and ust 7, 2006. This study is available at the Community Development Department. On , the Impact Fees were amended by the City of Aspen in order to make floor area the instead of bedrooms. RRC Associates assisted with this effort. Impact fees are hereby ws: act Fee Schedule t Fee Parks Department recommends that the Parks Development Fee not be waived in this instance. The proposed units are family oriented and in our experience this unit type shows higher park usage. = 1'-0" E PLAN | EXISTING | 1:10 These 4 healthy mature trees have mitigation value of $38,000. The City Forester has determined that they do have value as part of the community forest. Plan on submitting for a Tree removal permit at Building permit stage. Verify that these trees still exist and if so, confirm that activity on 205 W Main property will not impact their roots. City Forester may require air-spading to expose roots.... DN DN DN DN UP PLANTING BED PLANTING BED PLANTING BED PLANTING BED LAWN LAWN LAWN LAWN W. MAIN STREET 100.00' PUBLIC R.O.W. S. F I R S T S T R E E T 75 .45 ' PU B L I C R.O.W. S 75°09'11" E 75.00' (R) 0'49 " W 10 0 .00 ' (R) ss LIGHT WELL LIGHT WELL LIGHT WELL LIGHT WELL UNIT 101 UNIT 102 UNIT 103 UNIT 104PR O P E R T Y L I N E SE T B A C K SE T B A C K CONCRETE SIDEWALK PROPERTY LINE PR O P E R T Y L I N E SETBACK Remove crab apple trees & plan on planting back species as directed by City Forester. Possibly 5 or 6 total. DNDNUP DN DN DN PROPOSED TRASH ENCLOSURE FOOTPRINT UTILITY METERS PLANTING BED PLANTING BED LAWN LAWN W. MAIN STREET 100.00' PUBLIC R.O.W. S 75°09'11" E 75.00' (R) LIGHT WELL LIGHT WELL LIGHT WELL LIGHT WELL TRASH ELEV. UNIT 103 UNIT 104 UN 10 PR O P E R T Y L I N E SE T B A C K CONCRETE S PROPERTY LINE BBQ SETBACK Check on viability of planting trees here. Exhibit B | DRC Referral Comments Page: 51 Author: davidr Date: 8/2/2022 1:07:10 PM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Add at least two trees to this area, maybe 3 Page: 51 Author: davidr Date: 8/2/2022 1:09:14 PM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf If sidewalk, curb and gutter will be replaced plan on root barrier at edges of curb and north side of walk. Page: 51 Author: davidr Date: 8/2/2022 8:40:40 AM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Tree Protection Fencing in this entire area. Page: 67 Author: davidr Date: 8/2/2022 12:58:57 PM File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf 12'-0" 67 (1) DN 19 ' - 0 " LAWN EXISTING PARKING -TO BE REMOVED S. F I R 75 .4 S 14 °50 '49 " W 10 0 .00 ' (R) LIGHT WELL IT 2 S -0"9'-0" CH BENCH Add at least two trees to this area, maybe 3 DN DN DN DN UP PLANTING BED PLANTING BED PLANTING BED PLANTING BED LAWN LAWN LAWN LAWN W. MAIN STREET 100.00' PUBLIC R.O.W. S. F I R S T S T R E E T 75 .45 ' PU B L I C R.O.W. S 75°09'11" E 75.00' (R) °50 '49 " W 10 0 .00 ' (R) ss LIGHT WELL LIGHT WELL LIGHT WELL LIGHT WELL UNIT 101 UNIT 102 UNIT 103 UNIT 104 PR O P E R T Y L I N E SE T B A C K SE T B A C K CONCRETE SIDEWALK PROPERTY LINE PR O P E R T Y L I N E SETBACK If sidewalk, curb and gutter will be replaced plan on root barrier at edges of curb and north side of walk. T M A I N All ideas, design indicated or repowned by and are Architects, PC an conjunction with of the ideas, des shall be used bywhatsoever witho of David Johnsto DN DN UP PLANTING BED PLANTING BED LAWN LAWN S. F I R S T S T R E E T 75 .45 ' PU B L I C R.O.W. S 14 °50 '49 " W 10 0 .00 ' (R) ss LIGHT WELL UNIT 101 UNIT 102 SE T B A C K ALK PR O P E R T Y L I N E BENCH BENCH Tree Protection Fencing in this entire area. 0'3' 6' 12' SCALE: 1"= 6'-0"H ONE STEPPERS & ONE PATIO12'-0" Exhibit B | DRC Referral Comments MEMORANDUM TO: Natalie Feinberg Lopez, Historic Preservation Officer FROM: Bob Narracci, Zoning Administrator DATE: August 1, 2022 RE: LPA-22-063 / 205 W. Main Street Thank you for the opportunity to review this land use application and provide comments prior to the land use entitlement process. Following and attached are comments and observations from the Community Development Department, Zoning Division: 1) On-Site Parking. The application indicates on pages 11, 14 and 15 that via the Special Review process, the applicant is requesting a reduction in required on-site parking from nine parking units to seven parking units. On page 13, the application indicates that the proposal provides sufficient parking to meet the requirements of the Land Use Code for multi-family housing in the Mixed-Use Zone District. This statement is a bit unclear, when the application contemplates requesting relief for the two additional on-site parking units. 2) School Land Cash-in-Lieu. On pages 35, 36 and 37, the application requests a School Land Cash-in-Lieu waiver, and that the applicant will provide the calculations for fee-in-lieu if City Council does not approve the exemption. It is suggested that City Council will want to know how much money they are being asked to waive. The fee in lieu calculations should be provided prior to hearing and consideration by City Council. 3) On plan sheet A1.02, the proposed site plan, the proposed BBQ, if built in with a hard gas line, cannot be located between a street and a structure. There must be structure between the street and the BBQ. Please reference Land Use Code section 26.575.020.(e).(5).m. 4) On plan sheet A1.02, the proposed site plan, Wildlife-resistant trash and recycling enclosures located in commercial, mixed-use, or lodging zone districts are not exempt from setback requirements and shall comply with zone district requirements for Utility/Trash/Recycle areas. Reference 26.575.020.(e).(5).t. Wildlife Resistant Trash and Recycling Enclosures. The minimum side yard setback is five feet. If the trash enclosure area has a roof on it, then it will count as FA and will need to meet setbacks. If it is a fenced area (max 6 foot tall fence), then will not count as FA and can be in setback. Exhibit B | DRC Referral Comments Could also have an electric metal mesh roof to keep wildlife out. HPC could grant a setback variance. 5) On plan sheet A1.03, Elevators count as floor area on every level except the topmost level that the elevator serves. Reference section 26.575.020.(d).(2). Vertical Circulation. 6) Please reference the attached marked-up copy of plan sheet A1.03 regarding subgrade calculations, floor area, deck area and non-unit space. 7) On plan sheet A1.04, add up the Net Livable area for the total storage areas and then divide by nine to split evenly between each unit. 8) On plan sheet A1.05, Roof, please provide height over topography height points and a height over topography table. Reference Section 26.575.020.(f).(3).b. Measuring height within the footprint of the building. Also reference, COA Height Measurement Example located at https://www.cityofaspen.com/DocumentCenter/View/3012/COA-Height- Measurement_Example Please contact Bob Narracci with any questions you may have. (970) 429-2754, or bob.narracci@aspen.gov. Exhibit B | DRC Referral Comments DRAWING ISSUE DRAWN BY: PROJECT No:2125 CPF DUE DILIGENCE 2021-08-26 CONCEPTUAL 2021-10-21 HPC APPLICATION 2022-05-12 20 5 W E S T M A I N | A S P E N C O 20 5 W E S T M A I N All ideas, designs, arrangements and plans indicated or represented by this drawing are owned by and are the property of David Johnston Architects, PC and developed for use and in conjunction with the specified project. None of the ideas, designs, arrangements or plans shall be used by or disclosed for any purposewhatsoever without the written authorization of David Johnston Architects, PC. 119 South Spring St. Suite 203 Aspen, CO 81611 970-925-3444 970-920-2186 TEL FAX A1.03 FAR AF F O R D A B L E H O U S I N G Sheet No. UP DNUP DN DECK 34.10 sq ft DECK 34.10 sq ft DN DNDNPP #201-3 BED AH UNIT 1,157.15 sq ft #202-3 BED AH UNIT 1,251.39 sq ft #101-3 BED AH UNIT 383.23 sq ft DECK 236.65 sq ft STORAGE 20.49 sq ft STORAGE 21.61 sq ft DECK 69.19 sq ft UP DECK 34.26 sq ft DECK 34.26 sq ft DECK 37.61 sq ft #302-3 BED AH UNIT 1,118.28 sq ft #301-2 BED AH UNIT 964.02 sq ft STORAGE 23.18 sq ft STORAGE 23.19 sq ft DECK 136.49 sq ft DNUP DN UP DN UP 12 13 14 15 16 1718 19 23 9 1 4 7 2 3 5 6 11 10 8 20 21 22 DECK 34.68 sq ft UP NNNN DNNN UP DNUP t #105-2 BED AH UNIT 546.17 sq ft #103-2 BED AH UNIT 533.91 sq ft #104-2 BED AH UNIT 544.02 sq ft #101-3 BED AH UNIT 555.07 sq ft #102-2 BED AH UNIT 496.02 sq ft DECK 58.98 sq ft STORAGE 15.07 sq ft MECH. 66.80 sq ft EGRESS 93.44 sq ft STORAGE 14.95 sq ft STORAGE 15.75 sq ft DNDNUP DN DN DN DN UP DECK 27.07 sq ft DN DN DN P DN #105-2 BED AH UNIT 525.60 sq ft #103-2 BED AH UNIT 514.42 sq ft #104-2 BED AH UNIT 505.72 sq ft DECK 64.81 sq ft #101-3 BED AH UNIT 445.59 sq ft #102-2 BED AH UNIT 479.67 sq ft STORAGE 18.24 sq ft STORAGE 18.24 sq ft F.A.R. SCHEDULE UNIT# 101 102 103 104 105 201 202 301 302 DECK EGRESS MECH. LEVEL LOWER MAIN LEVEL MAIN LEVEL SECOND LEVEL LOWER MAIN LEVEL MAIN LEVEL LOWER LOWER MAIN LEVEL LOWER LOWER MAIN LEVEL LOWER LOWER MAIN LEVEL SECOND LEVEL SECOND LEVEL SECOND LEVEL SECOND LEVEL THIRD LEVEL THIRD LEVEL THIRD LEVEL THIRD LEVEL LOWER MAIN LEVEL SECOND LEVEL THIRD LEVEL LOWER LOWER USE #101-3 BED AH UNIT #101-3 BED AH UNIT STORAGE #101-3 BED AH UNIT #102-2 BED AH UNIT #102-2 BED AH UNIT STORAGE #103-2 BED AH UNIT STORAGE #103-2 BED AH UNIT #104-2 BED AH UNIT STORAGE #104-2 BED AH UNIT #105-2 BED AH UNIT STORAGE #105-2 BED AH UNIT #201-3 BED AH UNIT STORAGE #202-3 BED AH UNIT STORAGE #301-2 BED AH UNIT STORAGE #302-3 BED AH UNIT STORAGE DECK DECK DECK DECK EGRESS MECH. TOTAL AREA 555.07 445.59 18.24 383.23 496.02 479.67 18.24 533.91 14.95 514.42 544.02 15.07 505.72 546.17 15.75 525.60 1,157.15 21.61 1,251.39 20.49 964.02 23.19 1,118.28 23.18 93.66 91.88 374.04 242.62 93.44 66.80 11,153.42 ft² 114.02 sq ft 57.01 sq ft 57.01 sq ft 121.15 sq ft 114.02 sq ft 114.02 sq ft 9' - 6 " 9' - 6 " 195.79 sq ft 52.06 sq ft 20.59 sq ft 174.99 sq ft 11.09 sq ft 194.39 sq ft 222.11 sq ft 200.73 sq ft 168.66 sq ft 21.97 sq ft 52.06 sq ft 239.92 sq ft 456.89 sq ft 342.07 sq ft 112.44 sq ft 451.34 sq ft 13.86 sq ft 116.40 sq ft 95.42 sq ft 35.63 sq ft 58.99 sq ft 21.38 sq ft 401.06 sq ft 3659.84 SF TOTAL BELOW GRADE WALL AREA -577.23 SF TOTAL EXPOSED BELOW GRADE WALL AREA 3082.61 SF TOTAL BURIED BELOW GRADE WALL AREA 84.2% BURIED 15.8% EXPOSED 123456 7891011 12 13 14 15 16 17 18 19 20 21 22 23 HISTORIC STRUCTURE PROPOSED STRUCTURE 1314.44 SF 2345.40 SF SCALE: 1/8" = 1'-0"2 SECOND LEVEL AREA PLAN SCALE: 1/8" = 1'-0"3 THRID LEVEL AREA PLAN SCALE: 1/8" = 1'-0"-1.LOWER LEVEL AREA PLAN SCALE: 1/8" = 1'-0"1 MAIN FLOOR AREA PLAN SCALE: 1/8" = 1'-0"-1.LOWER LEVEL BURIED WALL CALCS Elevators count as FA on every level except the top most level. Elevators count as FA on every level except top most level. Third Elevator exempt from FA on top most floor Exhibit B | DRC Referral Comments DRAWING ISSUE DRAWN BY: PROJECT No:2125 CPF DUE DILIGENCE 2021-08-26 CONCEPTUAL 2021-10-21 HPC APPLICATION 2022-05-12 20 5 W E S T M A I N | A S P E N C O 20 5 W E S T M A I N All ideas, designs, arrangements and plans indicated or represented by this drawing are owned by and are the property of David Johnston Architects, PC and developed for use and in conjunction with the specified project. None of the ideas, designs, arrangements or plans shall be used by or disclosed for any purposewhatsoever without the written authorization of David Johnston Architects, PC. 119 South Spring St. Suite 203 Aspen, CO 81611 970-925-3444 970-920-2186 TEL FAX A1.04 NET LIVABLE AF F O R D A B L E H O U S I N G Sheet No. UP DNUP DNDN #202-3 BED AH UNIT 1,176.27 sq ft #201-3 BED AH UNIT 1,089.24 sq ft #101-3 BED AH UNIT 275.58 sq ft STORAGE 17.25 sq ft STORAGE 17.25 sq ft UP #302-3 BED AH UNIT 1,048.43 sq ft #301-2 BED AH UNIT 866.22 sq ft STORAGE 20.36 sq ft STORAGE 20.36 sq ft DNUP DN UP UP DN UP UP STORAGE 10.58 sq ft STORAGE 10.58 sq ft STORAGE 10.58 sq ft UP UP DNNN UP UP DN #104-2 BED AH UNIT 492.09 sq ft #103-2 BED AH UNIT 465.07 sq ft #102-2 BED AH UNIT 428.11 sq ft #101-3 BED AH UNIT 481.83 sq ft #105-2 BED AH UNIT 441.66 sq ft DNDNUP DN DN DN DN STORAGE 13.15 sq ft #105-2 BED AH UNIT 421.61 sq ftSTORAGE 13.15 sq ft DN DN DN #103-2 BED AH UNIT 430.94 sq ft #104-2 BED AH UNIT 422.87 sq ft #102-2 BED AH UNIT 393.89 sq ft #101-3 BED AH UNIT 415.11 sq ft N.L.A. SCHEDULE UNIT# 101 102 103 104 105 201 202 301 302 #101-3 BED AH UNIT #101-3 BED AH UNIT #101-3 BED AH UNIT STORAGE #102-2 BED AH UNIT #102-2 BED AH UNIT STORAGE #103-2 BED AH UNIT #103-2 BED AH UNIT STORAGE #104-2 BED AH UNIT #104-2 BED AH UNIT STORAGE #105-2 BED AH UNIT #105-2 BED AH UNIT STORAGE #201-3 BED AH UNIT STORAGE #202-3 BED AH UNIT STORAGE #301-2 BED AH UNIT STORAGE #302-3 BED AH UNIT STORAGE LEVEL LOWER MAIN LEVEL SECOND LEVEL MAIN LEVEL LOWER MAIN LEVEL MAIN LEVEL MAIN LEVEL LOWER LOWER LOWER MAIN LEVEL LOWER LOWER MAIN LEVEL LOWER SECOND LEVEL SECOND LEVEL SECOND LEVEL SECOND LEVEL THIRD LEVEL THIRD LEVEL THIRD LEVEL THIRD LEVEL AREA 481.83 415.11 275.58 13.15 428.11 393.89 13.15 430.94 465.07 10.58 492.09 422.87 10.58 441.66 421.61 10.58 1,089.24 17.25 1,176.27 17.25 866.22 20.36 1,048.43 20.36 8,982.18 ft² SCALE: 1/8" = 1'-0"2 SECOND LEVEL N.L.A. PLAN SCALE: 1/8" = 1'-0"3 THIRD LEVEL N.L.A. PLAN SCALE: 1/8" = 1'-0"-1.LOWER LEVEL N.L.A. PLAN SCALE: 1/8" = 1'-0"1 MAIN FLOOR N.L.A. PLAN Exhibit B | DRC Referral Comments DRAWING ISSUE DRAWN BY: PROJECT No:2125 CPF DUE DILIGENCE 2021-08-26 CONCEPTUAL 2021-10-21 HPC APPLICATION 2022-05-12 20 5 W E S T M A I N | A S P E N C O 20 5 W E S T M A I N All ideas, designs, arrangements and plans indicated or represented by this drawing are owned by and are the property of David Johnston Architects, PC and developed for use and in conjunction with the specified project. None of the ideas, designs, arrangements or plans shall be used by or disclosed for any purposewhatsoever without the written authorization of David Johnston Architects, PC. 119 South Spring St. Suite 203 Aspen, CO 81611 970-925-3444 970-920-2186 TEL FAX A2.01 ELEVATIONS AF F O R D A B L E H O U S I N G Sheet No. 11 10 9 8 7 6 5 3 2 1H6H5H4H3H2H14 100'-0" MAIN LEVEL 100'-0" MAIN LEVEL 108'-10" SECOND LEVEL 108'-10" SECOND LEVEL 118'-4" THIRD LEVEL 118'-4" THIRD LEVEL 26 ' - 0 " 24 ' - 1 " ASPHALT SHINGLE METAL SHINGLE 4" LAP SIDING 6" LAP SDING 8" LAP SIDING VERTICAL SIDING METAL GUSSET PLATE ASPHALT SHINGLE 6" LAP SDING SCALLOPED SHINGLE SCALLOPED SHINGLE N M L K J H G HD F E D HC C B HB A HA 100'-0" MAIN LEVEL 100'-0" MAIN LEVEL 108'-10" SECOND LEVEL 108'-10" SECOND LEVEL 118'-4" THIRD LEVEL 118'-4" THIRD LEVEL 21 ' - 1 0 " 27 ' - 6 " ASPHALT SHINGLE METAL SHINGLE 6" LAP SDING 8" LAP SIDING VERTICAL SIDING ASPHALT SHINGLE 6" LAP SDING 6" LAP SIDING WITH COLOR GRADIENT SCALLOPED SHINGLE SCALE: 1/4" = 1'-0"1 NORTH ELEVATION 02'4'8' SCALE: 1/4" = 1'-0"2 EAST ELEVATION 02'4' 8' Exhibit B | DRC Referral Comments