HomeMy WebLinkAboutEngineering_Comments_02From:Hailey Guglielmo
To:Sarah Yoon
Cc:Wyatt Young
Subject:RE: HPC Referral Project: 227 E. Bleeker Street
Date:Monday, November 30, 2020 12:39:48 PM
Attachments:image001.png
image002.png
image003.png
image006.png
image007.png
Sarah,
Two additional comments to add based on this information.
1.The drainage letter states they intend to raise the existing first floor elevation to get positive
drainage. If I recall correctly there was an HPC issue with 203 N Monarch that due to it’s
historic nature the house could not be raised. I will defer to HPC on if altering the floor
elevation is permitted.
2.StormTech is not an approved BMP in the URMP. It does not meet the ten foot depth
requirement to get below frost depth. At building permit the applicability of this particular
BMP will need to be further vetted.
Thanks.
Hailey