Loading...
HomeMy WebLinkAbout2022.01.03_233 W Bleeker HPC Review_eng comments233 W Bleeker HPC Review || Engineering Dev || Round 1 – Application Date 11/1/21 Landuse Comments: To be addressed through the landuse approval process 1. Sidewalk is not required at this property per the Sidewalk Deferred Zones defined in the Engineering Standards, however Engineering supports the installation of a sidewalk in the ROW as proposed in this landuse application. 2. ADA compliant ramps need to be installed at the corner of Bleeker and 2nd St with the proposed sidewalk. Confirm layout and grading is achievable. Final grading can be determined at building permit. 3. What is the proposed stormwater treatments approach? The drainage design needs to be clearly communicated on these plans. Confirm detention is not required for this property. 4. What transformer serves the property and does the existing transformer have capacity for the increased use? Will this property require a new transformer? Work with the City Electric Department to determine available capacity. A Load Calc Form will be required at time of building permit. 5. Is the transformer in the SE corner a proposed transformer? Does this property connect to this transformer? Are adequate easements provided for this transformer? What size is this transformer? It appears that parking is proposed within the easement, this is not permitted in the easement so access to the transformer is maintained at all times. If this is a new transformer it needs to be replaced fully within the property boundary rather than bridging the property line. 6. A telephone pedestal is shown in the transformer easement, this is not permitted in easement. Please revise. 7. Access is only permitted off the alley per the Engineering Standards. Remove the access to the historic garage as shown on L.1.00. Building Permit Comments: To be addressed at time of building permit submittal 1. Complete the call outs that note the curb type and detail number shown on sheet C1. 2. Applicant will be required to follow the requirements of a major development within the URMP. Please follow the requirements outlined in Appendix A. 3. Provide excavation stabilization plans that meet the requirements outlined in the Engineering Standards. 4. Confirm water service line size and material, address how the water service line will reach the proposed location of the mechanical room, verify if the structure will require a fire suppression system, show abandonment of existing line, etc. If a 2" service line is required for fire suppression, a memo from a fire suppression company stating a smaller line size will not provide adequate flows is required.