Exhibit A
Historic Preservation Design Guidelines Criteria
Staff Findings
NOTE: Staff responses begin on page 16 of this exhibit, following the list of applicable
guidelines.
26.415.070.D Major Development. No building, structure or landscape shall be
erected, constructed, enlarged, altered, repaired, relocated or improved involving
a designated historic property or a property located within a Historic District until
plans or sufficient information have been submitted to the Community
Development Director and approved in accordance with the procedures
established for their review. An application for a building permit cannot be
submitted without a development order.
3. Final Development Plan Review:
b) The procedures for the review of final development plans for major
development projects are as follows:
1) The Community Development Director shall review the application
materials submitted for final development plan approval. If they are
determined to be complete, the applicant will be notified in writing of
this and a public hearing before the HPC shall be scheduled. Notice
of the hearing shall be provided pursuant to Paragraphs
26.304.060.E.3.a, b and c.
2) Staff shall review the submittal material and prepare a report that
analyzes the project's conformance with the design guidelines and
other applicable Land Use Code sections. This report will be
transmitted to the HPC with relevant information on the proposed
project and a recommendation to continue, approve, disapprove or
approve with conditions and the reasons for the recommendation.
The HPC will review the application, the staff analysis report and the
evidence presented at the hearing to determine the project's
conformance with the City Historic Preservation Design Guidelines.
3) The HPC may approve, disapprove, approve with conditions or
continue the application to obtain additional information necessary to
make a decision to approve or deny. If the application is approved,
the HPC shall issue a certificate of appropriateness and the
Community Development Director shall issue a development order.
4) Before an application for a building permit can be submitted, a final
set of plans reflecting any or all required changes by the HPC or City
Council must be on file with the City. Any conditions of approval or
outstanding issues which must be addressed in the field or at a later
time shall be noted on the plans.
Page 2 of 19
Page 3 of 19
Chapter 1: Site Planning & Landscape Design MET NOT MET
1.1 All projects shall respect the historic development pattern or context of the block, neighborhood
or district.
1.2 Preserve the system and character of historic streets, alleys, and ditches.
1.4 Design a new driveway or improve an existing driveway in a manner that minimizes its visual
impact.
1.5 Maintain the historic hierarchy of spaces.
1.6 Provide a simple walkway running perpendicular from the street to the front entry on residential
projects.
1.7 Provide positive open space within a project site.
1.8 Consider stormwater quality needs early in the design process.
1.10 Built-in furnishings, such as water features, fire pits, grills, and hot tubs, that could interfere
with or block views of historic structures are inappropriate.
1.11 Preserve and maintain historically significant landscaping on site, particularly landmark trees
and shrubs.
1.12 Provide an appropriate context for historic structures. See diagram.
1.13 Additions of plant material to the landscape that could interfere with or block views of historic
structures are inappropriate.
1.14 Minimize the visual impacts of landscape lighting.
1.17 No fence in the front yard is often the most appropriate solution.
1.18 When building an entirely new fence, use materials that are appropriate to the building type
and style.
1.19 A new fence should have a transparent quality, allowing views into the yard from the street.
1.20 Any fence taller than 42” should be designed so that it avoids blocking public views of
important features of a designated building.
1.23 Re-grading the site in a manner that changes historic grade is generally not allowed and will
be reviewed on a case by case basis.
1.26 Preserve the historic circulation system.
1.27 Preserve and maintain significant landscaping on site.
Chapter 2: Rehabilitation - Building Materials MET NOT MET
2.1 Preserve original building materials.
2.2 The finish of materials should be as it would have existed historically.
2.3 Match the original material in composition, scale and finish when replacing materials on primary
surfaces.
2.4 Do not use synthetic materials as replacements for original building materials.
2.5 Covering original building materials with new materials is inappropriate.
2.6 Remove layers that cover the original material.
MET
MET
MET
MET
CONDITION
MET
MET
MET
CONDITION
MET
MET
MET
MET
MET
Historic Preservation Design Guidelines Review Criteria for 233 W. Bleeker
The applicant is requesting Final Major Development review for restoring the historic resource and construct
a new above grade addition. The proposed design must meet applicable Historic Preservation Design Guidelines.
MET
MET
MET
MET
MET
MET
MET
CONDITION
MET
MET
MET
Page 4 of 19
Chapter 3: Rehabilitation - Windows MET NOT MET
3.1 Preserve the functional and decorative features of a historic window.
3.2 Preserve the position, number, and arrangement of historic windows in a building wall.
3.3 Match a replacement window to the original in its design.
3.4 When replacing an original window, use materials that are the same as the original.
3.5 Preserve the size and proportion of a historic window opening.
3.6 Match, as closely as possible, the profile of the sash and its components to that of the original
window.
Chapter 4: Rehabilitation - Doors MET NOT MET
4.1 Preserve historically significant doors.
4.2 Maintain the original size of a door and its opening.
4.4 When replacing a door or screen door, use a design that has an appearance similar to the
original door or a door associated with the style of the building.
Chapter 5: Rehabilitation - Porches & Balconies MET NOT MET
5.1 Preserve an original porch or balcony.
5.2 Avoid removing or covering historic materials and details.
5.3 Enclosing a porch or balcony is not appropriate.
5.4 If reconstruction is necessary, match the original in form, character and detail.
5.5 If new steps are to be added, construct them out of the same primary materials used on the
original, and design them to be in scale with the porch or balcony
5.6 Avoid adding handrails or guardrails where they did not exist historically, particularly where
visible from the street.
Chapter 6: Rehabilitation - Architectural Details MET NOT MET
6.1 Preserve significant architectural features.
6.2 When disassembly of a historic element is necessary for its restoration, use methods that
minimize damage to the original material.
6.3 Remove only the portion of the detail that is deteriorated and must be replaced.
6.4 Repair or replacement of missing or deteriorated features are required to be based on original
designs.
6.5 Do not guess at “historic” designs for replacement parts.
Chapter 7: Rehabilitation - Roofs MET NOT MET
7.1 Preserve the original form of a roof.
7.2 Preserve the original eave depth.
7.4 New vents should be minimized, carefully, placed and painted a dark color.
7.5 Preserve original chimneys, even if they are made non-functional.
7.7 Preserve original roof materials.
7.8 New or replacement roof materials should convey a scale, color and texture similar to the
original.
7.9 Avoid using conjectural features on a roof.
7.10 Design gutters so that their visibility on the structure is minimized to the extent possible.
MET
MET
CONDITION
MET
MET
CONDITION
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
Page 5 of 19
Chapter 8: Rehabilitation - Secondary Structures MET NOT MET
8.1 If an existing secondary structure is historically significant, then it must be preserved.
8.2 Preserve a historic secondary building as a detached structure.
8.3 Do not add detailing or features to a secondary structure that are conjectural and not in
keeping with its original character as a utilitarian structure.
8.5 Preserve the original building materials, or match in kind when necessary.
8.6 Preserve original door and window openings and minimize new openings.
8.7 If a new garage door is added, it must be compatible with the character of the historic
structure.
8.8 Adaptation of an obsolete secondary structure to a functional use is encouraged.
Chapter 9: New Construction - Excavation, Building Relocation & Foundations MET NOT MET
9.1 Developing a basement by underpinning and excavating while the historic structure remains in
place may help to preserve the historic fabric.
9.3 Site a relocated structure in a position similar to its historic orientation.
9.4 Position a relocated structure at its historic elevation above grade.
9.7 All relocations of designated structures shall be performed by contractors who specialize in
moving historic buildings, or can document adequate experience in successfully relocating such
buildings.
Chapter 10: New Construction - Building Additions MET NOT MET
10.2 A more recent addition that is not historically significant may be removed.
10.3 Design a new addition such that one's ability to interpret the historic character of the primary
building is maintained.
10.4 The historic resource is to be the focus of the property, the entry point, and the predominant
structure as viewed from the street.
10.6 Design a new addition to be recognized as a product of its own time.
10.8 Design an addition to be compatible in size and scale with the main building.
10.9 If the addition is taller than a historic building, set it back from significant façades and use a
“connector” to link it to the historic building.
10.10 Place an addition at the rear of a primary building or set it back substantially from the front to
minimize the visual impact on the historic structure and to allow the original proportions and
character to remain prominent.
10.11 Roof forms shall be compatible with the historic building.
10.12 Design an addition to a historic structure that does not destroy or obscure historically
important architectural features.
Chapter 12: Accessibility, Lighting, Mech. Equipment, Services Areas & Signs MET NOT MET
12.2 Original light fixtures must be maintained. When there is evidence as to the appearance of
original fixtures that are no longer present, a replication is appropriate.
12.3 Exterior light fixtures should be simple in character.MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
MET
CONDITION
CONDITION
Page 6 of 19
Relevant Historic Preservation Design Guidelines:
1.1 All projects shall respect the historic development pattern or context of the block,
neighborhood or district.
• Building footprint and location should reinforce the traditional patterns of the
neighborhood.
• Allow for some porosity on a site. In a residential project, setback to setback development
is typically uncharacteristic of the historic context. Do not design a project which leaves
no useful open space visible from the street.
1.2 Preserve the system and character of historic streets, alleys, and ditches.
When HPC input is requested, the following bullet points may be applicable.
• Retain and preserve the variety and character found in historic alleys, including retaining
historic ancillary buildings or constructing new ones.
• Retain and preserve the simple character of historic ditches. Do not plant flowers or add
landscape.
• Abandoning or re-routing a street in a historic area is generally discouraged.
• Consider the value of unpaved alleys in residential areas.
• Opening a platted right of way which was abandoned or never graded may be
encouraged on a case by case basis.
1.4 Design a new driveway or improve an existing driveway in a manner that minimizes
its visual impact.
• If an alley exists at the site, the new driveway must be located off it.
• Tracks, gravel, light grey concrete with minimal seams, or similar materials are
appropriate for driveways on Aspen Victorian properties.
1.5 Maintain the historic hierarchy of spaces.
• Reflect the established progression of public to private spaces from the public sidewalk
to a semi-public walkway, to a semi private entry feature, to private spaces.
1.6 Provide a simple walkway running perpendicular from the street to the front entry on
residential projects.
• Meandering walkways are not allowed, except where it is needed to avoid a tree or is
typical of the period of significance.
• Use paving materials that are similar to those used historically for the building style and
install them in the manner that they would have been used historically. For example on
an Aspen Victorian landmark set flagstone pavers in sand, rather than in concrete. Light
grey concrete, brick or red sandstone are appropriate private walkway materials for most
landmarks.
• The width of a new entry sidewalk should generally be three feet or less for residential
properties. A wider sidewalk may be appropriate for an AspenModern property.
1.7 Provide positive open space within a project site.
• Ensure that open space on site is meaningful and consolidated into a few large spaces
rather than many small unusable areas.
• Open space should be designed to support and complement the historic building.
Page 7 of 19
1.8 Consider stormwater quality needs early in the design process.
• When included in the initial planning for a project, stormwater quality facilities can be
better integrated into the proposal. All landscape plans presented for HPC review must
include at least a preliminary representation of the stormwater design. A more detailed
design must be reviewed and approved by Planning and Engineering prior to building
permit submittal.
• Site designs and stormwater management should provide positive drainage away from
the historic landmark, preserve the use of natural drainage and treatment systems of the
site, reduce the generation of additional stormwater runoff, and increase infiltration into
the ground. Stormwater facilities and conveyances located in front of a landmark should
have minimal visual impact when viewed from the public right of way.
• Refer to City Engineering for additional guidance and requirements.
1.10 Built-in furnishings, such as water features, fire pits, grills, and hot tubs, that could
interfere with or block views of historic structures are inappropriate.
• Site furnishings that are added to the historic property should not be intrusive or degrade
the integrity of the neighborhood patterns, site, or existing historic landscape.
• Consolidating and screening these elements is preferred.
1.11 Preserve and maintain historically significant landscaping on site, particularly
landmark trees and shrubs.
• Retaining historic planting beds and landscape features is encouraged.
• Protect historically significant vegetation during construction to avoid damage. Removal
of damaged, aged, or diseased trees must be approved by the Parks Department.
• If a significant tree must be removed, replace it with the same or similar species in
coordination with the Parks Department.
• The removal of non-historic planting schemes is encouraged.
• Consider restoring the original landscape if information is available, including original
plant materials.
1.12 Provide an appropriate context for historic structures. See diagram.
• Simplicity and restraint are required. Do not overplant a site, or install a landscape which
is overtextured or overly complex in relationship to the historic resource, particularly in
Zone A. In Zone A, new planting shall be species that were used historically or species
of similar attributes.
• In areas immediately adjacent to the landmark, Zone A and Zone B, plants up 42” in
height, sod, and low shrubs are often appropriate.
• Contemporary planting, walls and other features are not appropriate in Zone A. A more
contemporary landscape may surround new development or be located in the rear of the
property, in Zone C.
• Do not cover areas which were historically unpaved with hard surfaces, except for a
limited patio where appropriate.
• Where residential structures are being adapted to commercial use, proposals to alter the
landscape will be considered on a case-by-case basis. The residential nature of the
building must be honored.
• In the case of a historic landmark lot split, careful consideration should be given so as
not to over plant either property, or remove all evidence of the landscape characteristics
from before the property was divided.
Page 8 of 19
• Contemporary landscapes that highlight an AspenModern architectural style are
encouraged.
1.13 Additions of plant material to the landscape that could interfere with or block
views of historic structures are inappropriate.
• Low plantings and ground covers are preferred.
• Do not place trees, shrubs, or hedgerows in locations that will obscure, damage, or block
significant architectural features or views to the building. Hedgerows are not allowed as
fences.
• Consider mature canopy size when planting new trees adjacent to historic resources.
Planting trees too close to a landmark may result in building deteriorate or blocked views
and is inappropriate.
• Climbing vines can damage historic structures and are not allowed.
1.14 Minimize the visual impacts of landscape lighting.
Page 9 of 19
• Landscape and pathway lighting is not permitted in Zone A (refer to diagram) on Aspen
Victorian properties unless an exception is approved by HPC based on safety
considerations.
• Landscape, driveway, and pathway lighting on AspenModern properties is addressed on
a case-by-case basis.
• Landscape light fixtures should be carefully selected so that they are compatible with the
building, yet recognizable as a product of their own time.
• Driveway lighting is not permitted on Aspen Victorian properties.
• Landscape uplighting is not allowed.
1.17 No fence in the front yard is often the most appropriate solution.
Reserve fences for back yards and behind street facing façades, as the best way to preserve the
character of a property.
1.18 When building an entirely new fence, use materials that are appropriate to
the building type and style.
• The new fence should use materials that were used on similar properties during the
period of significance.
• A wood fence is the appropriate solution in most locations.
• Ornate fences, including wrought iron, may create a false history are not appropriate for
Aspen Victorian landmarks unless there is evidence that a decorative fence historically
existed on the site.
• A modest wire fence was common locally in the early 1900s and is appropriate for Aspen
Victorian properties. This fence type has many desirable characteristics including
transparency, a low height, and a simple design. When this material is used, posts should
be simply detailed and not oversized.
1.19 A new fence should have a transparent quality, allowing views into the yard
from the street.
• A fence that defines a front yard must be low in height and transparent in nature.
• For a picket fence, spacing between the pickets must be a minimum of 1/2 the width of
the picket.
• For Post-WWII properties where a more solid type of fence may be historically
appropriate, proposals will be reviewed on a case-by-case basis.
• Fence columns or piers should be proportional to the fence segment.
1.20 Any fence taller than 42” should be designed so that it avoids blocking
public views of important features of a designated building.
• A privacy fence should incorporate transparent elements to minimize the possible visual
impacts. Consider staggering the fence boards on either side of the fence rail. This will
give the appearance of a solid plank fence when seen head on. Also consider using
lattice, or other transparent detailing on the upper portions of the fence.
• A privacy fence should allow the building corners and any important architectural features
that are visible from the street to continue to be viewed.
• All hedgerows (trees, shrub bushes, etc.) are prohibited in Zones A and B.
Page 10 of 19
1.23 Re-grading the site in a manner that changes historic grade is generally not
allowed and will be reviewed on a case by case basis.
1.26 Preserve the historic circulation system.
• Minimize the impact of new vehicular circulation.
• Minimize the visual impact of new parking.
• Maintain the separation of pedestrian and vehicle which occurred historically.
1.27 Preserve and maintain significant landscaping on site.
• Protect established vegetation during any construction.
• If any tree or shrub needs to be removed, replace it with the same or similar species.
• New planting should be of a species used historically or a similar species.
• Maintain and preserve any gardens and/or ornamental planting on the site.
• Maintain and preserve any historic landscape elements.
2.1 Preserve original building materials.
• Do not remove siding that is in good condition or that can be repaired in place.
• Masonry features that define the overall historic character, such as walls, cornices,
pediments, steps and foundations, should be preserved.
• Avoid rebuilding a major portion of an exterior wall that could be repaired in place.
Reconstruction may result in a building which no longer retains its historic integrity.
• Original AspenModern materials may be replaced in kind if it has been determined that
the weathering detracts from the original design intent or philosophy.
2.2 The finish of materials should be as it would have existed historically.
• Masonry naturally has a water-protective layer to protect it from the elements. Brick or
stone that was not historically painted shall not be painted.
• If masonry that was not painted historically was given a coat of paint at some more recent
time, consider removing it, using appropriate methods.
• Wood should be painted, stained or natural, as appropriate to the style and history of the
building.
2.3 Match the original material in composition, scale and finish when replacing materials
on primary surfaces.
• If the original material is wood clapboard for example, then the replacement material must
be wood as well. It should match the original in size, and the amount of exposed lap and
finish.
• Replace only the amount required. If a few boards are damaged beyond repair, then only
those should be replaced, not the entire wall. For AspenModern buildings, sometimes
the replacement of a larger area is required to preserve the integrity of the design intent.
2.4 Do not use synthetic materials as replacements for original building materials.
• Original building materials such as wood siding and brick should not be replaced with
synthetic materials.
2.5 Covering original building materials with new materials is inappropriate.
Page 11 of 19
• Regardless of their character, new materials obscure the original, historically significant
material.
• Any material that covers historic materials may also trap moisture between the two layers.
This will cause accelerated deterioration to the historic material which may go unnoticed.
2.6 Remove layers that cover the original material.
• Once the non-historic siding is removed, repair the original, underlying material.
3.1 Preserve the functional and decorative features of a historic window.
• Features important to the character of a window include its frame, sash, muntins/mullions,
sills, heads, jambs, moldings, operations, and groupings of windows.
• Repair frames and sashes rather than replacing them.
• Preserve the original glass. If original Victorian era glass is broken, consider using
restoration glass for the repair.
3.2 Preserve the position, number, and arrangement of historic windows in a building
wall.
• Enclosing a historic window is inappropriate.
• Do not change the size of an original window opening.
3.3 Match a replacement window to the original in its design.
• If the original is double-hung, then the replacement window must also be double-hung.
If the sash have divided lights, match that characteristic as well.
3.4 When replacing an original window, use materials that are the same as the original.
3.5 Preserve the size and proportion of a historic window opening.
• Changing the window opening is not permitted.
• Consider restoring an original window opening that was enclosed in the past.
3.6 Match, as closely as possible, the profile of the sash and its components to that of
the original window.
• A historic window often has a complex profile. Within the window’s casing, the sash steps
back to the plane of the glazing (glass) in several increments. These increments, which
individually only measure in eighths or quarters of inches, are important details. They
distinguish the actual window from the surrounding plane of the wall.
• The historic profile on AspenModern properties is typically minimal.
4.1 Preserve historically significant doors.
• Maintain features important to the character of a historic doorway. These include the
door, door frame, screen door, threshold, glass panes, paneling, hardware, detailing,
transoms and flanking sidelights.
• Do not change the position and function of original front doors and primary entrances.
• If a secondary entrance must be sealed shut, any work that is done must be reversible
so that the door can be used at a later time, if necessary. Also, keep the door in place, in
its historic position.
• Previously enclosed original doors should be reopened when possible.
Page 12 of 19
4.2 Maintain the original size of a door and its opening.
• Altering its size and shape is inappropriate. It should not be widened or raised in height.
4.4 When replacing a door or screen door, use a design that has an appearance similar
to the original door or a door associated with the style of the building.
• A replica of the original, if evidence exists, is the preferred replacement.
• A historic door or screen door from a similar building also may be considered.
• Simple paneled doors were typical for Aspen Victorian properties.
• Very ornate doors, including stained or leaded glass, are discouraged, unless
photographic evidence can support their use.
5.1 Preserve an original porch or balcony.
• Replace missing posts and railings when necessary. Match the original proportions,
material and spacing of balusters.
• Expanding the size of a historic porch or balcony is inappropriate.
5.2 Avoid removing or covering historic materials and details.
• Removing an original balustrade, for example, is inappropriate.
5.3 Enclosing a porch or balcony is not appropriate.
• Reopening an enclosed porch or balcony is appropriate.
5.4 If reconstruction is necessary, match the original in form, character and detail.
• Match original materials.
• When reconstructing an original porch or balcony without historic photographs, use
dimensions and characteristics found on comparable buildings. Keep style and form
simple with minimal, if any, decorative elements.
5.5 If new steps are to be added, construct them out of the same primary materials used
on the original, and design them to be in scale with the porch or balcony
• Steps should be located in the original location.
• Step width should relate to the scale of entry doors, spacing between posts, depth of deck,
etc.
• Brick, red sandstone, grey concrete, or wood are appropriate materials for steps.
5.6 Avoid adding handrails or guardrails where they did not exist historically, particularly
where visible from the street.
• If handrails or guardrails are needed according to building code, keep their design simple
in character and different from the historic detailing on the porch or balcony.
6.1 Preserve significant architectural features.
• Repair only those features that are deteriorated.
• Patch, piece-in, splice, or consolidate to repair the existing materials, using recognized
preservation methods whenever possible.
• On AspenModern properties, repair is preferred, however, it may be more important to
preserve the integrity of the original design intent, such as crisp edges, rather than to
retain heavily deteriorated material.
Page 13 of 19
6.2 When disassembly of a historic element is necessary for its restoration, use methods
that minimize damage to the original material.
• Document its location so it may be repositioned accurately. Always devise methods of
replacing the disassembled material in its original configuration.
6.3 Remove only the portion of the detail that is deteriorated and must be replaced.
• Match the original in composition, scale, and finish when replacing materials or features.
• If the original detail was made of wood, for example, then the replacement material should
be wood, when feasible. It should match the original in size and finish.
6.4 Repair or replacement of missing or deteriorated features are required to be based
on original designs.
• The design should be substantiated by physical or pictorial evidence to avoid creating a
misrepresentation of the building’s heritage.
• When reconstruction of an element is impossible because there is no historical evidence,
develop a compatible new design that is a simplified interpretation of the original, and
maintains similar scale, proportion and material.
6.5 Do not guess at “historic” designs for replacement parts.
• Where scars on the exterior suggest that architectural features existed, but there is no
other physical or photographic evidence, then new features may be designed that are
similar in character to related buildings.
• Using ornate materials on a building or adding new conjectural detailing for which there
is no documentation is inappropriate.
7.1 Preserve the original form of a roof.
• Do not alter the angle of a historic roof. Preserve the orientation and slope of the roof as
seen from the street.
• Retain and repair original and decorative roof detailing.
• Where the original roof form has been altered, consider restoration.
7.2 Preserve the original eave depth.
• Overhangs contribute to the scale and detailing of a historic resource.
• AspenModern properties typically have very deep or extremely minimal overhangs that are
key character defining features of the architectural style.
7.4 New vents should be minimized, carefully, placed and painted a dark color.
• Direct vents for fireplaces are generally not permitted to be added on historic structures.
• Locate vents on non-street facing facades.
• Use historic chimneys as chases for new flues when possible.
7.5 Preserve original chimneys, even if they are made non-functional.
• Reconstruct a missing chimney when documentation exists.
7.7 Preserve original roof materials.
Page 14 of 19
• Avoid removing historic roofing material that is in good condition. When replacement is
necessary, use a material that is similar to the original in both style as well as physical
qualities and use a color that is similar to that seen historically.
7.8 New or replacement roof materials should convey a scale, color and texture similar
to the original.
• If a substitute is used, such as composition shingle, the roof material should be earth tone
and have a matte, non-reflective finish.
• Flashing should be in scale with the roof material.
• Flashing should be tin, lead coated copper, galvanized or painted metal and have a
matte, non-reflective finish.
• Design flashing, such as drip edges, so that architectural details are not obscured.
• A metal roof is inappropriate for an Aspen Victorian primary home but may be appropriate
for a secondary structure from that time period.
• A metal roof material should have a matte, non-reflective finish and match the original
seaming.
7.9 Avoid using conjectural features on a roof.
• Adding ornamental cresting, for example, where there is no evidence that it existed,
creates a false impression of the building’s original appearance, and is inappropriate.
7.10 Design gutters so that their visibility on the structure is minimized to the extent
possible.
• Downspouts should be placed in locations that are not visible from the street if possible,
or in locations that do not obscure architectural detailing on the building.
• The material used for the gutters should be in character with the style of the building.
8.1 If an existing secondary structure is historically significant, then it must be
preserved.
• When treating a historic secondary building, respect its character-defining features.
These include its materials, roof form, windows, doors, and architectural details.
• If a secondary structure is not historically significant, then its preservation is optional. The
determination of significance is based on documentation of the construction date of the
outbuilding and/or physical inspection. A secondary structure that is related to the period
of significance of the primary structure will likely require preservation.
8.2 Preserve a historic secondary building as a detached structure.
• Any proposal to attach a secondary structure is reviewed on a case-by-case basis.
• The position and orientation of the structure
• should be maintained except when HPC finds that an alternative is the best preservation
option.
• Some AspenModern properties incorporated garages and carports into the architecture.
This pattern should be maintained.
8.3 Do not add detailing or features to a secondary structure that are conjectural
and not in keeping with its original character as a utilitarian structure.
Page 15 of 19
• Most secondary structures are basic rectangular solids, with simple finishes and no
ornamentation.
8.5 Preserve the original building materials, or match in kind when necessary.
8.6 Preserve original door and window openings and minimize new openings.
• If an original carriage door exists, and can be made to function for automobile use, this
is preferred.
8.7 If a new garage door is added, it must be compatible with the character of the
historic structure.
• The materials and detailing should be simple.
8.8 Adaptation of an obsolete secondary structure to a functional use is
encouraged.
• The reuse of any secondary structure should be sensitive so that its character is not lost.
9.1 Developing a basement by underpinning and excavating while the historic structure
remains in place may help to preserve the historic fabric.
• This activity will require the same level of documentation, structural assessment, and
posting of financial assurances as a building relocation.
9.3 Site a relocated structure in a position similar to its historic orientation.
• It must face the same direction and have a relatively similar setback. In general, a forward
movement, rather than a lateral movement is preferred. HPC will consider setback
variations where appropriate.
• A primary structure may not be moved to the rear of the parcel to accommodate a new
building in front of it.
• Be aware of potential restrictions against locating buildings too close to mature trees.
Consult with the City Forester early in the design process. Do not relocate a building so
that it becomes obscured by trees.
9.4 Position a relocated structure at its historic elevation above grade.
• Raising the finished floor of the building slightly above its original elevation is acceptable if
needed to address drainage issues. A substantial change in position relative to grade is
inappropriate.
• Avoid making design decisions that require code related alterations which could have been
avoided. In particular, consider how the relationship to grade could result in non-historic
guardrails, etc.
9.7 All relocations of designated structures shall be performed by contractors who
specialize in moving historic buildings, or can document adequate experience in
successfully relocating such buildings.
• The specific methodology to be used in relocating the structure must be approved by
the HPC.
• During the relocation process, panels must be mounted on the exterior of the building to
protect existing openings and historic glass. Special care shall be taken to keep from
Page 16 of 19
damaging door and window frames and sashes in the process of covering the openings.
Significant architectural details may need to be removed and securely stored until
restoration.
• The structure is expected to be stored on its original site during the construction process.
Proposals for temporary storage on a different parcel will be considered on a case by
case basis and may require special conditions of approval.
• A historic resource may not be relocated outside of the City of Aspen.
10.2 A more recent addition that is not historically significant may be removed.
• For Aspen Victorian properties, HPC generally relies on the 1904 Sanborn Fire Insurance
maps to determine which portions of a building are historically significant and must be
preserved.
• HPC may insist on the removal of non-historic construction that is considered to be
detrimental to the historic resource in any case when preservation benefits or variations
are being approved.
10.3 Design a new addition such that one’s ability to interpret the historic character of
the primary building is maintained.
• A new addition must be compatible with the historic character of the primary building.
• An addition must be subordinate, deferential, modest, and secondary in comparison to
the architectural character of the primary building.
• An addition that imitates the primary building’s historic style is not allowed. For example,
a new faux Victorian detailed addition is inappropriate on an Aspen Victorian home.
• An addition that covers historically significant features is inappropriate.
• Proposals on corner lots require particular attention to creating compatibility.
10.4 The historic resource is to be the focus of the property, the entry point, and the
predominant structure as viewed from the street.
• The historic resource must be visually dominant on the site and must be distinguishable
against the addition.
• The total above grade floor area of an addition may be no more than 100% of the above
grade floor area of the original historic resource. All other above grade development must
be completely detached. HPC may consider exceptions to this policy if two or more of the
following are met:
o The proposed addition is all one story
o The footprint of the new addition is closely related to the footprint of the historic
resource and the proposed design is particularly sensitive to the scale and
proportions of the historic resource
o The project involves the demolition and replacement of an older addition that is
considered to have been particularly detrimental to the historic resource
o The interior of the resource is fully utilized, containing the same number of usable
floors as existed historically
o The project is on a large lot, allowing the addition to have a significant setback
from the street
o There are no variance requests in the application other than those related to
historic conditions that aren’t being changed
o The project is proposed as part of a voluntary AspenModern designation, or
Page 17 of 19
o The property is affected by non-preservation related site specific constraints such
as trees that must be preserved, Environmentally Sensitive Areas review, etc.
10.6 Design a new addition to be recognized as a product of its own time.
• An addition shall be distinguishable from the historic building and still be visually
compatible with historic features.
• A change in setbacks of the addition from the historic building, a subtle change in
material, or a modern interpretation of a historic style are all techniques that may be
considered to help define a change from historic construction to new construction.
• Do not reference historic styles that have no basis in Aspen.
• Consider these three aspects of an addition; form, materials, and fenestration. An
addition must relate strongly to the historic resource in at least two of these elements.
Departing from the historic resource in one of these categories allows for creativity and a
contemporary design response.
• Note that on a corner lot, departing from the form of the historic resource may not be
allowed.
• There is a spectrum of appropriate solutions to distinguishing new from old portions of a
development. Some resources of particularly high significance or integrity may not be
the right instance for a contrasting addition.
10.8 Design an addition to be compatible in size and scale with the main building.
• An addition that is lower than, or similar to the height of the primary building, is preferred.
10.9 If the addition is taller than a historic building, set it back from significant façades
and use a “connector” to link it to the historic building.
• Only a one-story connector is allowed.
• Usable space, including decks, is not allowed on top of connectors unless the connector
has limited visibility and the deck is shielded with a solid parapet wall.
• In all cases, the connector must attach to the historic resource underneath the eave.
• The connector shall be a minimum of 10 feet long between the addition and the primary
building.
• Minimize the width of the connector. Ideally, it is no more than a passage between the
historic resource and addition. The connector must reveal the original building corners.
The connector may not be as wide as the historic resource.
• Any street-facing doors installed in the connector must be minimized in height and width
and accessed by a secondary pathway. See guideline 4.1 for further information.
10.10 Place an addition at the rear of a primary building or set it back substantially from
the front to minimize the visual impact on the historic structure and to allow the original
proportions and character to remain prominent.
• Locating an addition at the front of a primary building is inappropriate.
• Additions to the side of a primary building are handled on a case-by-case basis and are
approved based on site specific constraints that restrict rear additions.
• Additional floor area may also be located under the building in a basement which will not
alter the exterior mass of a building.
10.11 Roof forms shall be compatible with the historic building.
• A simple roof form that does not compete with the historic building is appropriate.
Page 18 of 19
• On Aspen Victorian properties, a flat roof may only be used on an addition to a gable
roofed structure if the addition is entirely one story in height, or if the flat roofed areas are
limited, but the addition is primarily a pitched roof.
10.12 Design an addition to a historic structure that does not destroy or obscure
historically important architectural features.
• Loss or alteration of architectural details, cornices, and eavelines must be avoided.
12.2 Original light fixtures must be maintained. When there is evidence as to the
appearance of original fixtures that are no longer present, a replication is
appropriate.
12.3 Exterior light fixtures should be simple in character.
• The design of a new fixture should be appropriate in form, finish, and scale with the
structure.
• New fixtures should not reflect a different period of history than that of the affected
building, or be associated with a different architectural style.
• Lighting should be placed in a manner that is consistent with the period of the building,
and should not provide a level of illumination that is out of character.
• One light adjacent to each entry is appropriate on an Aspen Victorian residential
structure. A recessed fixture, surface mounted light, pendant or sconce will be
considered if suited to the building type or style.
• On commercial structures and AspenModern properties, recessed lights and concealed
lights are often most appropriate.
Staff Finding: The applicable sections of the design guidelines are as follows: site
planning, building materials, windows, doors, roofs, porches, secondary structure,
building additions, and lighting. All relevant Design Guidelines in Chapter 2, 3, 4, 5, 6, 7,
and 8 related to the preservation plan need to be reviewed in detail as part of the permit
submittal for further historic evidence and/or investigative demolition in order to ensure
no historic fabric is being removed.
Design Guidelines 1.8, 1.23, and 9.4 address the importance of site design as it relates
to stormwater mitigation and drainage. Stormwater mitigation features such as manhole
covers and grates can be visually impactful when viewing a resource from the public right-
of-way. The guidelines call for these features to be located in areas away from the
foreground of the resource. Re-grading for the purposes of drainage is supported but this
needs to be done in a way that closely resembles the historic relationship to grade. Staff
supports the customized grate detail with a sod cover in areas around the foreground of
the resource. Any changes that create visual impacts to the historic resources must be
reviewed and approved by staff & monitor prior to the submission of the building permit.
Design Guideline 1.27 deals with the preservation of significant landscaping on the site,
such as trees. The applicant team must coordinate with relevant City Departments to
protect significant trees and driplines throughout the duration of the project.
Page 19 of 19
Design Guidelines 7.4 and 7.9 deal with the restoration of historic roofs. Any new vents,
penetrations, and snow clips, need to be reviewed and approved by staff & monitor prior
to building permit submission. Details of the proposed ridge vent on the historic carriage
house need staff & monitor review prior to building permit submission. If the ridge vent is
deemed inappropriate, an alternative solution must be proposed.
Design Guideline 9.7 deals with relocation requirements for historic structures. The two-
story Victorian home is to be temporarily relocated on site while the basement is being
excavated. Relocation of a historic resources requires specialized contractors for the
move and a financial assurance of $30,000. A letter from a structural engineer may be
necessary to confirm the structural integrity of the structures prior to the move. This is a
standard requirement for all projects that trigger relocation.
In summary, staff recommends approval with conditions listed in the draft
resolution.