Loading...
HomeMy WebLinkAboutEngineeringCommentsFrom:Hailey Guglielmo To:Sarah Yoon Subject:RE: HPC Referral Project: 202 E. Main Street Date:Thursday, June 27, 2019 4:22:55 PM Attachments:image001.png image002.png image003.png image004.png image005.png Sarah, Engineering comments are as follows: 1.Stormwater - The application makes no reference to how onsite runoff will be captured and treated for water quality. The proposed plan does not leave much room for stormwater treatment. Prior to HPC approval the applicant shall provide information on a conceptual level of how rainwater will be treated. 2.Excavation Stabilization - The proposed excavation stabilization plan is very constrained. If any work or layback is proposed to be done on neighboring properties, an agreement between the property owners must be submitted to the City along with the building permit. Micropile walls cannot have any impact on neighboring properties. 3.Water service line – at building permit, the applicant shall work with the Parks and Engineering Departments to determine the best alignment of the new water service line. Any plan shall minimize impacts to the street trees. The application mentioned removing the tree in the front yard so it is my understanding there will be no onsite utility tree conflicts. 4.Public improvements – at the time of building permit a 6’ sidewalk will be required. The sidewalk shall follow the COA “floating sidewalk” detail to avoid tree roots. New curb and gutter will be required. A one sided pour on the back will be required to protect the existing tree roots. A 2’ asphalt t-top patch will be required. Thanks, Hailey Guglielmo, PE Development Engineer Engineering Department 201 N Mill St. Ste 203 Aspen, CO 81611 p: 970.429.2751 www.cityofaspen.com