HomeMy WebLinkAboutEngineering CommentsEngineering1 - 205 W Main St - LPA-22-063_20220811 Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Provide a conceptual utilities plan. Most importantly show where a transformer to support the development will be placed. A single phase transformer with a 5x5 vault may be needed. Provide an easement to accommodate the transformer with 3' clear zones surrounding the sides and back of the transformer and 10' clear in the front. Alternatively work with COA Electric Dept to determine available capacity in the transformer in the alley to the west. 205 W. Main HPC Major Devel App 19-MAY-22.pdf (5) Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf A conceptual drainage plan and report is required to determine appropriate site mass and scale and demonstrate the site can still accommodate stormwater requirements onsite. A full conceptual draiange plan and report as outlined in the URMP will be required at HPC detailed review. However looking at the site there is limited space for drainage and stormwater and those aspects should be considered in the design early in the project planning. Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf A transportation Impact Analysis was not provided int he submittal. Please provide. Select meaningful and impactful mitigation measures to offset the anticipated additional vehicle trips created by this development. Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf The site is not in a sidewalk deferred zone and a sidewalk will be required on First St. 5 ft sidewalk with 5 ft landscape buffer. Provide a conceptual utilities plan. Most importantly show where a transformer to support the development will be placed. A single phase transformer with a 5x5 vault may be needed. Provide an easement to accommodate the transformer with 3' clear zones surrounding the sides and back of the transformer and 10' clear in the front. Alternatively work with COA Electric Dept to determine available capacity in the transformer in the alley to the west. A conceptual drainage plan and report is required to determine appropriate site mass and scale and demonstrate the site can still accommodate stormwater requirements onsite. A full conceptual draiange plan and report as outlined in the URMP will be required at HPC detailed review. However looking at the site there is limited space for drainage and stormwater and those aspects should be considered in the design early in the project planning. A transportation Impact Analysis was not provided int he submittal. Please provide. Select meaningful and impactful mitigation measures to offset the anticipated additional vehicle trips created by this development. PLANTING BED LAWN LAWN EXISTING PARKING -TO BE REMOVED S. F I R S T S T R E E T 75 .45 ' PU B L I C R.O.W. S 14 °50 '49 " W 10 0 .00 ' (R) SE T B A C K PR O P E R T Y L I N E The site is not in a sidewalk deferred zone and a sidewalk will be required on First St. 5 ft sidewalk with 5 ft landscape buffer. Page: 52 File Name: 205 W. Main HPC Major Devel App 19-MAY-22.pdf Existing head in parking is required to be removed and replaced with the COA standard street cross section with parallel parking. LAWN EXISTING PARKING -TO BE REMOVED Existing head in parking is required to be removed and replaced with the COA standard street cross section with parallel parking.