Provide a conceptual utilities
plan. Most importantly show
where a transformer to support
the development will be placed.
A single phase transformer with
a 5x5 vault may be needed.
Provide an easement to
accommodate the transformer
with 3' clear zones surrounding
the sides and back of the
transformer and 10' clear in the
front.
Alternatively work with COA
Electric Dept to determine
available capacity in the
transformer in the alley to the
west.
205 W. Main HPC Major Devel App 19-MAY-22.pdf (5)
Page: 52
File Name: 205 W. Main HPC Major Devel App
19-MAY-22.pdf
A conceptual drainage plan and
report is required to determine
appropriate site mass and scale
and demonstrate the site can still
accommodate stormwater
requirements onsite. A full
conceptual draiange plan and
report as outlined in the URMP
will be required at HPC detailed
review. However looking at the
site there is limited space for
drainage and stormwater and
those aspects should be
considered in the design early in
the project planning.
Page: 52
File Name: 205 W. Main HPC Major Devel App
19-MAY-22.pdf
A transportation Impact Analysis
was not provided int he
submittal. Please provide. Select
meaningful and impactful
mitigation measures to offset the
anticipated additional vehicle
trips created by this
development.
Page: 52
File Name: 205 W. Main HPC Major Devel App
19-MAY-22.pdf
The site is not in a sidewalk
deferred zone and a sidewalk
will be required on First St. 5 ft
sidewalk with 5 ft landscape
buffer.
Provide a conceptual utilities plan. Most importantly show where a transformer to
support the development will be placed. A single phase transformer with a 5x5 vault
may be needed. Provide an easement to accommodate the transformer with 3' clear
zones surrounding the sides and back of the transformer and 10' clear in the front.
Alternatively work with COA Electric Dept to determine available capacity in the
transformer in the alley to the west.
A conceptual drainage plan and report is required to determine appropriate site mass
and scale and demonstrate the site can still accommodate stormwater requirements
onsite. A full conceptual draiange plan and report as outlined in the URMP will be
required at HPC detailed review. However looking at the site there is limited space for
drainage and stormwater and those aspects should be considered in the design early
in the project planning.
A transportation Impact Analysis was not provided int he submittal. Please provide.
Select meaningful and impactful mitigation measures to offset the anticipated
additional vehicle trips created by this development.
PLANTING
BED
LAWN
LAWN
EXISTING PARKING
-TO BE REMOVED
S.
F
I
R
S
T
S
T
R
E
E
T
75
.45
'
PU
B
L
I
C
R.O.W.
S
14
°50
'49
"
W
10
0
.00
'
(R)
SE
T
B
A
C
K
PR
O
P
E
R
T
Y
L
I
N
E
The site is not in a
sidewalk deferred zone
and a sidewalk will be
required on First St. 5 ft
sidewalk with 5 ft
landscape buffer.
Page: 52
File Name: 205 W. Main HPC Major Devel App
19-MAY-22.pdf
Existing head in parking is
required to be removed and
replaced with the COA standard
street cross section with parallel
parking.
LAWN
EXISTING PARKING
-TO BE REMOVED
Existing head in parking
is required to be removed
and replaced with the
COA standard street
cross section with parallel
parking.