Loading...
HomeMy WebLinkAboutApplication Design Plans R2.312 W Hyman AveMARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 1 A100 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Cover Sheet 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 SHEET INDEX A100 C1 C2 Z001 Z002 Z003 Z004 Z005 Z006 A101 A102 A103 A104 A105 A106 A107 A108 A200 A201 A202 A203 A204 A210 A211 A300 A301 A400 A401 A402 A402 A500 A501 A600 Cover Sheet Improvement Survey Civil Site Grading and Drai… Floor Area Calculations Floor Area Calculations Height Measurements Wall Demolition Calculations Site Coverage Zoning Summary Architectural Site Plan Architectural Site Drainage… Main Level Proposed Plan Second Level Proposed Plan Roof Plan Proposed Main Level Existing Plan Second Level Existing Plan Roof Plan Existing Elevations Proposed Elevations Proposed Elevations Guideline Update Existing Elevations Existing Elevations Fence Layout Garage Elevations Transverse Sections Longitudinal Sections Interior Elevations Interior Elevations Interior Elevations Interior Elevations Schedules Schedules Assemblies 312 W H y m a n A.F.F. ADJ. ALT. A.B. & ARCH. @ BM. BM. PKT. BRG. BLK'G. BOT. B.F. BLDG. B.O. CAB. CLG. CL. C.T. CLR. COL. CONC. CONN. CONT. DTL. DBL. DWL. E.W. ELEV. OR EL. EXIST'G EXT. F.F. F.D. FLR. FTG. FND. GA. G.L. G.W.B. G.S. HB. HT. HK. HORIZ. HYD. ABOVE FINISH FLOOR ADJUSTABLE ALTERNATE ANCHOR BOLTS AND ARCHITECTURAL AT BEAM BEAM POCKET BEARING BLOCKING BOTTOM BOTTOM OF FOOTING BUILDING BY OWNER CABINET CEILING CENTER LINE CERAMIC TILE CLEAR COLUMN CONCRETE CONNECTION CONTINUOUS DETAIL DOUBLE DOWEL EACH WAY ELEVATION EXISTING EXTERIOR FINISHED FLOOR FLOOR DRAIN FLOOR FOOTING FOUNDATION GAUGE GLU-LAM GYPSUM WALL BOARD GAS STUB HOSE BIB HEIGHT HOOK HORIZONTAL HYDRANT INFO. INSUL. JST. L.L. LONGINT. N.I.C. O.C. OPP. O/ PTD. PERF. PL. PLY. PROP. LINE REINF. RDWD. REQ'D. RESIL. REV. S.M. SIM. S.F. OR SQ. FT. STD. STL. STDS. THK. TLT. T.F. T.P. T.L. T.W. TOT. T.B. TRANSV. TYP. U.N.O. V.I.F. VERT. V.W.C. W.C. W.H. W.P. W.R. WIN. W/ WD. INFORMATION INSULATION JOIST LIVE LOAD LONGITUDINAL NOT IN CONTRACT ON CENTER OPPOSITE OVER PAINTED PERFORATED PLATE PLYWOOD PROPERTY LINE REINFORCEMENT REDWOOD REQUIRED RESILIENT REVISED SHEET METAL SIMILAR SQUARE FEET STANDARD STEEL STUDS THICK TOILET TOP OF FOOTING TOP OF PLATE TOP OF LEDGE TOP OF WALL TOTAL TOWEL BAR TRANSVERSE TYPICAL UNLESS NOTED OTHERWISE VERIFY IN FIELD VERTICAL VINYL WALL COVERING WATER CLOSET WATER HEATER WATERPROOF WATER RESISTANT WINDOW WITH WOOD 312 W Hyman Ave Powder Day Skiiing, LLC, David A Tarrab Mees 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/Pitkin County UGB, City of Aspen PROJECT: Renovation, Energy Upgrades and Historic Preservation ADDRESS: 312 W Hyman Ave, Aspen, CO 81611 COUNTY: Pitkin County PARCEL NUMBER: 73512464006 PROJECT DESCRIPTION: Interior Renovation and Energy Upgrades, IECC Compliance ZONING: R6 Medium Density Residential CONSTRUCTION TYPE: VB OCCUPANCY GROUP: RESIDENTIAL FIRE PROTECTION: Non-sprinklered NUMBER OF STORIES: TWO ELEVATION 100= 7901.36' SITE 5976+- S.F. 1. CONTRACTOR TO COMPLY WITH CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF PUBLIC AUTHORITIES GOVERNING THE WORK. 2. CONTRACTOR TO REVIEW DOCUMENTS, VERIFY DIMENSIONS AND FIELD CONDITIONS AND CONFIRM THAT WORK IS BUILDABLE AS SHOWN. CONTRACTOR TO REPORT ANY CONFLICTS OR OMISSIONS TO THE ARCHITECT FOR CLARIFICATION PRIOR TO PERFORMING ANY WORK IN QUESTION. 3. FOR SUBSTITUTIONS, REFER TO THE SPECIFICATIONS. 4. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON DRAWINGS, GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS, GRADES AND CONDITIONS AT SITE PRIOR TO COMMENCING THE WORK. 5. MAINTAIN DIMENSIONS MARKED 'CLEAR'. ALLOW FOR THICKNESS OF FINISHES. 6. CEILING HEIGHT DIMENSIONS ARE TO FINISHED SURFACES. 7. CONTRACTOR TO COORDINATE AND PROVIDE BACKING FOR MILLWORK AND ITEMS ATTACHED OR MOUNTED TO WALLS OR CEILINGS. 8. EXCEPT WHERE SHOWN IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING, MECHANICAL EQUIPMENT, DUCTS, PIPING AND FITTINGS ARE ONLY APPROXIMATE. THE EXACT LOCATIONS SHALL BE DETERMINED BY THE CONTRACTOR, SUBJECT TO APPROVAL BY THE ARCHITECT. 9. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BLOCKING, AND SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK, TOILET ROOM ACCESSORIES, FIXTURES AND PARTITIONS AND ALL WALL MOUNTED OR SUSPENDED MECHANICAL, ELECTRICAL OR MISCELLANEOUS EQUIPMENT AND FURNISHINGS. 10. ALL WORK PERFORMED SHALL COMPLY WITH THE CONTRACT DOCUMENTS, DRAWINGS, SPECIFICATIONS, AND GEOTECHNICAL INVESTIGATION AND PAVEMENT RECOMMENDATIONS. 11. SPECIFICATIONS, BOUND SEPARATELY, ARE PART OF THE CONTRACT DOCUMENTS. 12. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE DRAWINGS AND SPECIFICATIONS. IF CONFLICT IS FOUND BETWEEN DRAWINGS, GENERAL NOTES AND SPECIFICATIONS, CONSULT THE ARCHITECT BEFORE PROCEEDING WITH THE WORK. 13. THE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS ARE SUPPLEMENTARY TO THE ARCHITECTURAL DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WITH THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF STRUCTURAL, MECHANICAL AND ELECTRICAL WORK. SHOULD THERE BE A DISCREPANCY BETWEEN THE ARCHITECTURAL DRAWINGS AND THE CONSULTING ENGINEERS' DRAWINGS THAT WOULD CAUSE AN AWKWARD INSTALLATION, IT SHALL BE BROUGHT TO THE ARCHITECT'S AND ENGINEERS' ATTENTION FOR CLARIFICATION PRIOR TO THE INSTALLATION OF SAID WORK. 14. GENERAL NOTES ARE NOT A SUBSTITUTE NOR A REPLACEMENT FOR THE PROJECT SPECIFICATIONS. THESE NOTES ARE INTENDED AS A GUIDE TO THE DESIGN AND/OR CONSTRUCTION REQUIREMENTS ESTABLISHED FOR THIS PROJECT. 15. NO CONTRACTOR SHOULD ATTEMPT TO BID OR CONSTRUCT ANY PORTION OF THE WORK WITHOUT CONSULTING THE PROJECT SPECIFICATIONS. 16. THE CONTRACTOR SHALL COORDINATE THE INTENT OF THE GENERAL NOTES WITH ALL TRADES Snow-load: TBC PSF, Up to 8000' Elevation, Elevation is 7901.36' 100' as per Civil = 7901.36' Roof Duration = 1.0 Seismic Design Category = B or C, as per Figure R301.2 (2) As per soil design category Weathering probability for Concrete = Severe Termite Infestation Probability = None to slight Wind Speed = 115 mph (ultimate design) Wind Exposure = B or C, Section R301.2.1.4 Frost Depth = 36", TBC (up to 8000' Elevation) Air Freezing Index = TBC° F Days – Up to 8000 ft. elevation Ice Barrier Underlayment = Required Mean Annual Temp = variable Insulation = as per Minimum R-Values per 2009 IECC, Table 402.1.1, Client chooses to utilize stricter minimums as per 2018 IECC for thermal comfort and energy efficiency. As per State House Bill 09-1091, CO alarms are required within 15 feet of all sleeping rooms BUILDING Pitkin County Currently Adopted Codes. The client will conform with 2018 IECC (Assemblies and Fenestration) and the updated land use code for Energy Efficiency on Earth Day 2020. 2015 International Building Code 2015 International Residential Code 2015 International Mechanical Code 2015 International Plumbing Code 2015 International Fuel & Gas Code 2015 International Energy Conservation Code Pitkin County Efficient Building Code Most Current National Electrical Code Project summary and aims, as per Land Use Code: The historic building and the site remains key elements of the property and the new development does not compromise the visual integrity of the historic property; and The new construction is reflective of the proportional patterns found in the historic building's forms, materials and openings, or the work removes later alterations and restores the historic building to its appearance during its period of significance; and The project is compatible with the character of the neighborhood in which it is located; and Historic outbuildings site and landscape features are retained and stabilized and restored, as appropriate. MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 2 C1 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Improvement Survey 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 (S75°1 1 ' 0 9 " E 6 0 . 0 0 ' ) S75°14 ' 5 8 " E 5 8 . 5 9 ' E E E G (N 1 4 ° 5 0 ' 4 9 " E 1 0 0 . 0 0 ' ) N1 5 ° 0 5 ' 1 2 " E 9 9 . 9 0 ' S 1 4 ° 5 0 ' 4 9 " W 1 0 0 . 0 0 ' N75°09 ' 1 1 " W 6 0 . 0 0 ' BASIS O F B E A R I N G S FOUND NO. 5 REBAR FOUND NO. 5 REBAR FOUND NO. 5 REBAR SET FOUND NO. 5 REBAR & 1-1/4" ORANGE PLASTIC CAP PROP CORNER TNC PLS38215 (20.90' W I D E ) GRAVE L A L L E Y ALLEY - B L O C K 4 6 LOT P LOT Q LOT O LOT N LOT R LOT S W. HY M A N A V E N U E (74.80' W I D E P U B L I C ) SE CORNER BLOCK 46 FOUND REBAR & 1-1/2" ALUMINUM CAP (NO STAMPING) N75°09 ' 1 1 " W 5 9 . 9 2 ' (60.00' ) 33.4' 4.0' 4.9' 8.3' 5.5' 11.5' 0.7' 0.7' 2 . 2 ' 0.8' 0.7' 0.7' 0 . 8 ' 2 . 2 ' 9 . 2 ' 0 . 8 ' 0 . 8 ' 3 8 . 4 ' 2 1 . 2 ' 7 . 2 ' 11.1' ( T I E ) 19 . 8 ' ( T I E ) 0.8' 2.4' (TIE) 13 . 4 ' 5.5' APPARENT ENCROACHMENT DRIVEWAY & WOOD RETAINING GRAVEL DRIVEWAY W O O D R E T A I N I N G W O O D R E T A I N I N G APPARENT ENCROACHMENT R.R.TIE WALL CONCRETE APRO N UPPER DECK STEPS FLAGSTONE PATIO SI D E W A L K 2 - STORY FRAME HOUSE 312 WEST HYMAN AVENUE 5976± SQ.FT. NE I G H B O R I N G R E S I D E N C E CONCR E T E C U R B & G U T T E R PAVED R O A D W A Y MAILB O X 4.4' APPARENT ENCROACHMENT WOOD RETAINING ELECTRIC PEDESTAL CATV PEDESTAL TELEPHONE PEDESTAL GAS METER ELECTRICAL METER G LEGEND E SURVEYOR'S CERTIFICATION SURVEY NOTES: LOTS P & Q - BLOCK 46, CITY AND TOWNSITE OF ASPEN SECTION 12, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6TH PM COUNTY OF PITKIN, STATE OF COLORADO IMPROVEMENT SURVEY PLAT TRUE NORTH COLORADO LLC. A LAND SURVEYING AND MAPPING COMPANY PO BOX 614 - 529 S. WILD HORSE DRIVE NEW CASTLE, COLORADO 81647 (970) 984-0474 www.truenorthcolorado.com PROJECT NO: 2019-104 DATE: JANUARY 18, 2019 DRAWN RPK SURVEYED LDV SHEET 1 OF 1 TRUENORTH A LAND SURVEYING AND MAPPING COMPANY 8'4'16' SCALE: 1" = 8' N PROPERTY DESCRIPTION:0 SCHEDULE B PART II TITLE EXCEPTIONS: MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 3 C2 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Civil Site Grading and Drainage 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 E E G WS O D 2 . 0 % 6 . 5 % 2.6 % 1 1 1 FF: 7901.31' FF: 7901.31' F F : 7 9 0 1 . 3 3 ' F F : 7 9 0 1 . 3 6 ' D #3000 7901.31' #3001 7899.35' #3002 7901.36' #3003 7901.37' #3004 7901.08' #3005 7900.88' #3006 7901.17' #3007 7901.15' #3008 7901.18' #3009 7901.13' 1 + 0 0 1 + 3 3 1+0 0 1 + 2 5 Point Table Point # 3000 3001 3002 3003 3004 3005 3006 3007 3008 3009 Raw Description EX. FG EX. FG EX. FG PR. FG PR. FG PR. FG PR. FG EX. FG EX. FG EX. FG Elevation 7901.31' 7899.35' 7901.36' 7901.37' 7901.08' 7900.88' 7901.17' 7901.15' 7901.18' 7901.13' Northing 14948.98 14947.21 14980.65 14986.35 15008.62 15002.86 14981.51 14979.33 14966.89 14951.93 Easting 14907.26 14889.23 14885.17 14887.05 14883.87 14932.86 14927.19 14913.62 14917.42 14922.28 79 0 4 79 0 3 7902 7901 7901 79 0 1 7901 79 0 2 7 9 0 3 7902 7901 7901 7 9 0 2 WQCV/DETENTION DRYWELL SYSTEM RIM: TBD (SEE DETAIL) 12"Ø DOME GRATE 5' OFF BUILDING, TYP. RIM: 6" LOWER THAN FG AT FOUNDATION AND 12"± BELOW FOUNDATION TOP OF WALL 12"Ø SQ.ADA AREADRAIN 12 LF TRENCH DRAIN WITH HEAT TAPERIM: 7901.08' CONNECT TO STORM DRAIN LINE 50 LF 6"Ø SOLID SCH.40 PVC @ 1.0% MIN.WITH HEAT TAPE 80 LF 6"Ø SOLID SCH.40 PVC @ 1.0% MIN.WITH HEAT TAPE SCALE: 1' = 1'-0" 1 Draft Civil Grading and Drainage, NFC C2 Civil Grading and Drainage will be provided at Final Review. This is for placement only, pending conceptual approval. MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 4 Z001 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Floor Area Calculations 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 5,976 sq ft 824 sq ft 41 sq ft 16 sq ft 269 sq ft A A B B C C D D E E 4 4 3 3 2 2 1 1 The Site is 5,976 Square Feet. The built environment is 1,091 Residence (Attached Garage Included in site square footage) 41 Square Feet Storage- East 16 Square Feet Storage- North The existing site coverage is 1,148/5,976 = 19.21%10' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G 5' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G U S E D A S G A R A G E & A C C E S S O R Y B U I L D I N G 5' M I N I M U M S I D E S E T B A C K 5' M I N I M U M S I D E S E T B A C K 10' F R O N T S E T B A C K PRI N C I P A L B U I L D I N G 15' F R O N T S E T B A C K ACC E S S O R Y B U I L D I N G 10' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G 5' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G U S E D A S G A R A G E & A C C E S S O R Y B U I L D I N G 880 sq ft A A B B C C D D E E 4 4 3 3 2 2 1 1 301 sq ft 60 sq ft Floor Area Calculations City of Aspen 312 W Hyman Zoning Submission Existing Main Level Floor Area Calculations Main Level Gross Floor Area (Sq Ft)824 Garage is 269 Sq Ft, attached Main Level Countable Floor Area (Sq Ft)1,091 Existing Deck/Porch Floor Area Calculations 301 Exempt per 26.575.020.D5, Structural Stairs 60 Sq Ft Front Porch Gross Floor Area (Sq Ft)301 Exempt per 15% of allowable, 15% of 3,240 = 486 Deck/Porch Countable Floor Area (Sq Ft)0 Total Existing Floor Area Calculations Sub-grade Floor Area (Sq Ft)0 Lower Level Floor Area (Sq Ft)880 Main Level Floor Area (Sq Ft)789 Subtracted Stairs at upper level Deck/Porch Floor Area (Sq Ft)0 Total Existing Floor Area (Sq Ft 1,669 1 N SCALE: 1/8" = 1'-0" 2 Existing Main Level Floor Area Z001 SCALE: 1/8" = 1'-0" 3 Existing Second Level Floor Area Z001 SCALE: 1' = 1'-0" 4 Floor Area Calculations.numbers Z001 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 5 Z002 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Floor Area Calculations 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 5,976 sq ft 29 sq ft 1,196 sq ft A A B B C C D D E E 4 4 3 3 2 2 1 1 308 sq ft 32 sq ft Garden Storage (Under Stairs) Stairs Sq Footage Counted on Second Floor Growth commensurate with converting garage to habitable space Wall @ 4'-6" height to add to bedroom/habitable space under stairs, counted at 100% Sq Ft. The Site is 5,976 Square Feet. The built environment is 1,196 Residence (For Square Footage Calculations: 1,196 + .5*58 Sq Ft) 29 Square Feet Storage, Exterior (Exempt) 32 Square Feet Trash Enclosure (Exempt) 308 Square Feet Garage (250 Sq Feet Exempt, 58 *.5 counts to Sq Ft. ) The new/proposed site coverage is 1,565/5,976 = 26.19% 5' Set Back 10' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G 5' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G U S E D A S G A R A G E & A C C E S S O R Y B U I L D I N G 5' M I N I M U M S I D E S E T B A C K 5' M I N I M U M S I D E S E T B A C K 10' F R O N T S E T B A C K PRI N C I P A L B U I L D I N G 15' F R O N T S E T B A C K ACC E S S O R Y B U I L D I N G 946 sq ft 52 sq ft 311 sq ft 59 sq ft A A B B C C D D E E 4 4 3 3 2 2 1 1 Exterior Structural Stairs Counted on 2nd Floor Exterior Deck (Extended to the North) New Exterior Deck (North East) Down Floor Area Calculations City of Aspen 312 W Hyman Zoning Submission Proposed Main Level Floor Area Calculations Main Level Gross Floor Area (Sq Ft)1,196 Garage converted to habitable Main Level Countable Floor Area (Sq Ft)1,196 Table 26.575.020-2,Size of Garage or Carport First 0 to 250 square feet Proposed Deck/Porch Floor Area Calculations Front Porch Gross Floor Area (Sq Ft)363 Exempt per 15% of allowable, 15% of 3,240 = 486, Front deck is 311 and Rear Deck is 52, so 311 + 52 = 363 Deck/Porch Countable Floor Area (Sq Ft)0 Exempt per 26.575.020.D5 Structural Steps Floor Area (Sq Ft)59 Exempt per 26.575.020.D5, as per Assessor, exterior steps Deck/Porch Countable Floor Area (Sq Ft)0 Exempt per 15% of allowable 3240 *.15 = 486, 363 < 486 Total Existing Floor Area Calculations Sub-grade Floor Area (Sq Ft)0 Lower Level Floor Area (Sq Ft)1,196 Garage converted to habitable, extend habitable to the N and E Main Level Floor Area (Sq Ft)946 Extend floor plate to the North Total Proposed Floor Area (Sq Ft)2,142 Allowed is 3,240 SF Garage above 250, Square footage as per Next 251 to 500 square feet, 70 SF counts last 35 SF to F 29 Garage is 308 SF, so .5(58) = 29 2,171 Max floor area = 3,240 1,069 Remaining floor area = 3,240 - 2,171 = 1,069, if exterior steps are included in floor area than 3,240 - 2,171 - 59 = 1,010 remaining floor area (will clarify in Land Use Code and through Final Review Stairs counted on the second floor (interior, but did not include exterior stairs in calculations- can they be included in deck calculations and therefore we are still under our 15% exemption for exterior, unconditioned space?) Trash container is exempt Storage under the stairs is exempt 1 N SCALE: 1/8" = 1'-0" 1 Proposed Main Level Floor Area Z002 SCALE: 1/8" = 1'-0" 2 Second Floor- Floor Area Z002 SCALE: 1' = 1'-0" 3 Floor Area Calculations.numbers Z002 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 6 Z003 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Height Measurements 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof 19'-3"11'-9"9'-0" 22'-1 5/16" 23'-10" 25'-0" 12'-3" Existing WoodNew Wood Existing Opening Existing Wood Existing CMU Existing CMU New Stucco New Standing Seam Existing Grade (Most Restrictive) Existing Chimney Cap, Match Height Ridge Detached Garage ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof 18'-3 1/ 2 " 19'-7 1/16" 19 ' - 7 1 / 1 6 " 25'-0"Existing Grade (Most Restrictive) SCALE: 1/4" = 1'-0" 2 West Elevation Height Z003 SCALE: 1/4" = 1'-0" 3 Existing South Elevation Z003 Zone District Height Limit Per 26.710.040 Medium Density Residential R-6 Maximum Height 25' Zoning Note: Height Measurement (Z002): since the ridge line of the structure is below the height maximum, this works. MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 7 Z004 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Wall Demolition Calculations 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 467 sq ft39 sq ft 535 sq ft 7 sq ft±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof 25 sq ft 14 sq ft 14 sq ft 11 sq ft 5 sq ft 76 sq ft The existing wall is 535 Square Feet. The reduction for fenestration is 91 Square Feet The wall area is 444 Square Feet. Demolition on the North Elevation, net of fenestration, is 376 Square Feet. A B 22 sq ft 20 sq ft95 sq ft 84 sq ft389 sq ft 70 sq ft 35 sq ft 32 sq ft 10 sq ft 13 sq ft 95 sq ft456 sq ft 83 sq ft 20 sq ft 20 sq ft±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof The existing wall is 654 Square Feet. The reduction for fenestration is 90 Square Feet The wall area is 564 Square Feet. Demolition on the East Elevation is 84+20 = 104 Square Feet, net of fenestration. C D EF 404 sq ft 35 sq ft 35 sq ft 10 sq ft 56 sq ft 56 sq ft 598 sq ft ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof The existing wall is 598 Square Feet. The reduction for fenestration is 192 Square Feet The wall area is 406 Square Feet. No demolition on the South Facade 536 sq ft 22 sq ft 22 sq ft 10 sq ft 10 sq ft48 sq ft 647 sq ft 19 sq ft 48 sq ft ±0" 1 First Floor +9'-3" 2 Second Floor +18'-3" 3 Roof The existing wall is 647 Square Feet. The reduction for fenestration is 111 Square Feet The wall area is 536 Square Feet. The total demolition on the West Facade is 19 Square Feet. Demoltion Calculations City of Aspen 312 West Hyman Zoning Submission Wall Demolition Wall Label Individual Wall Area (Sq Ft) Area Reduced or Fenestration (Sq Ft) Area of Wall to be Removed (Sq Ft) A- North Wall 535 69 390 B- North Wall 39 24 15 C- East Wall 95 10 85 D- East Wall 20 0 20 E- East Wall 83 13 0 F- East Wall 456 67 0 G- South Wall 598 194 0 I- West Wall 647 111 67 Wall Surface Area Total (Sq Ft)2473 Area Reduced for Fenestration (Sq Ft)488 Area Used for Demo Calculation 577 Demolition Totals Roof and Wall Area Used for Demo Calculation (Sq Ft)577 Surface Area to be Removed (Sq Ft) Total 577 1 SCALE: 1/16" = 1'-0" 2 North Walls Wall A and Wall B Z004 SCALE: 1/16" = 1'-0" 3 East Walls Wall C and Wall D and Wall E Z004 SCALE: 1/16" = 1'-0" 4 South Walls F Z004 SCALE: 1/16" = 1'-0" 5 East Wall G Z004 Existing Wall to Remain Wall Area to be Removed Area Reduced for Fenestration Exposed Wall Legend MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 8 Z005 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Site Coverage 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 5,976 sq ft 29 sq ft 1,196 sq ft A A B B C C D D E E 4 4 3 3 2 2 1 1 308 sq ft 32 sq ft Garden Storage (Under Stairs) Stairs Sq Footage Counted on Second Floor Growth commensurate with converting garage to habitable space Wall @ 4'-6" height to add to bedroom/habitable space under stairs, counted at 100% Sq Ft. The Site is 5,976 Square Feet. The built environment is 1,196 Residence (For Square Footage Calculations: 1,196 + .5*58 Sq Ft) 29 Square Feet Storage, Exterior (Exempt) 32 Square Feet Trash Enclosure (Exempt) 308 Square Feet Garage (250 Sq Feet Exempt, 58 *.5 counts to Sq Ft. ) The new/proposed site coverage is 1,565/5,976 = 26.19% 5' Set Back 10' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G 5' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G U S E D A S G A R A G E & AC C E S S O R Y B U I L D I N G 5' M I N I M U M S I D E S E T B A C K 5' M I N I M U M S I D E S E T B A C K 10' F R O N T S E T B A C K PRI N C I P A L B U I L D I N G 15' F R O N T S E T B A C K ACC E S S O R Y B U I L D I N G 5,976 sq ft 789 sq ft 41 sq ft 16 sq ft 269 sq ft A A B B C C D D E E 4 4 3 3 2 2 1 1 Wall @ 4'-6" height to add to bedroom/habitable space under stairs, counted at 100% Sq Ft. The Site is 5,976 Square Feet. The built environment is 1,091 Residence (Attached Garage Included in site square footage) 41 Square Feet Storage- East 16 Square Feet Storage- North The existing site coverage is 1,148/5,976 = 19.21%10' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G 5' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G U S E D A S G A R A G E & AC C E S S O R Y B U I L D I N G 5' M I N I M U M S I D E S E T B A C K 5' M I N I M U M S I D E S E T B A C K 10' F R O N T S E T B A C K PRI N C I P A L B U I L D I N G 15' F R O N T S E T B A C K ACC E S S O R Y B U I L D I N G 10' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G 5' R E A R S E T B A C K - P R I N C I P A L B U I L D I N G U S E D A S G A R A G E & AC C E S S O R Y B U I L D I N G N SCALE: 1/8" = 1'-0" 2 Proposed Site Coverage Z005 SCALE: 1/8" = 1'-0" 3 Existing Site Coverage Z005 Site is 5976 sq ft as per survey. Site Coverage is not triggered as per LUC. Maximum site coverage: No Limitation Site notes from LUC: Sheds, Storage Areas, and similar Accessory Structures. Sheds, storage areas, greenhouses, and similar uninhabitable accessory structures, not within a garage, are exempt from floor area limitations up to a maximum exemption of thirty-two (32) square feet per residence. Storage areas within a garage shall be treated as garage space eligible for the garage exemption only. Accessory structures thirty-six (36) inches or less in height, as measured from finished grade, shall be exempt from Floor Area calculations (also see setback limitations). Accessory structures that are both larger than thirty-two (32) square feet per primary residence and more than thirty-six (36) inches in height shall be included in their entirety in the calculation of Floor Area. Properties which do not contain residential units are not eligible for this Floor Area exemption. If the property adjoins an alleyway, the trash and recycle service area shall be along and accessed from the alleyway MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 9 Z006 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Zoning Summary 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 Proposed Development Zoning Allowance and Project Summary City of Aspen 312 W Hyman Zoning Submission Proposed Development Single Family | Remodel Addition Parcel #273512464006 Zone District R6 Existing Allowed (Principal)Allowed (Accessory) Proposed (Principal) Proposed Accessory LUC Reference Setbacks 26.710.060 Front 19’-7”25’25’19’-7”n/a 26.710.060 Rear 33’-6”10’5’33’-6”5’26.710.060 Combined Front/Rear 26.710.060 East Side 2’-4”5’5’2’-4”5’26.710.060 West Side 11 2/3’10’10’11 2/3’5’26.710.040 Medium-Density Residential (R-6). Combined Side 15’15’15’7’-4”, No change to West Principal 5’, Variance Required for the West Garage D 4 is Minimum combined 10’ Distance between Buildings N/A N/A 11.07’, between the garage and the principal N/A 11.07’, between the garage and the principal 26.710.060 Corner Lot No No n/a No na/26.710.060 Floor Area (Square Feet)1,669 3,240 2,171 Supplemental Breakdown Info Existing Required Proposed LUC Reference Net Leasable/Comm (Sq Ft)Not Req for Residential N/A 26.575.020.I. Open Space %80.79%Not Req for R-6 73.81%26.710.060 Site Coverage 19.21%Not Req for R-6 26.19%26.710.060 On-Site Parking 2 2 2 26.515.030 Site Coverage Existing LUC Reference Gross Lot Area (Sq Ft)5,976 5,976 Z-007 Area of Building Footprint (Sq Ft)1148 1091+41+16 1,565 1196+29+32+308 26.575.020.G. Site Coverage 19.21%26.19% Land Value Summary Actual Value Land $3,200,000 Improvements $718,000 Total $3,918,000 1 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 10 A101 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Architectural Site Plan 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 A A B B C C D D E E 4 4 3 3 2 2 1 1 1.55 5 ' 2.40 6 ' 5.00' 5' 11.6 8 ' 8.167'10.167'10'4.25' 9' 11 . 7 4 9 ' 19 . 2 5 ' 11 . 1 0 7 ' Proposed fence and shrubs, see landscaping plan E EG OS W 79 0 4 7903 790 2 7901 7901 7901 79 0 1 79 0 2 7902 7 9 0 3 79 0 3 7 9 0 4 N SCALE: 1/8" = 1'-0" 1 Architectural Site Plan A101 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 11 A102 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Architectural Site Drainage Plan 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 A A B B C C D D E E 4 4 3 3 2 2 1 1 100' 100' 1 A301 2 A301 4 Z004 potential tree removal (2) to NW trees protected (3) to NE Plaster covered CMU wall with two layers of 5/8" Type X Gypsum, 1 hour fire wall Garage and enclosure meet rear and side setbacks. Existing rail ties are not plumb. Avoid current hazard. UP bedroom #2 table bathe #3 mechanical 7 M x 5 M, room for storage 5' from alley set back, 5' from side set back (no variance) boot c u b b i e s trash & r e c y c l i n g e n c l o s u r e bathe #2 buried dry- well, storm water run-off onsite collection new perf- pipe surrounding single car garage disturbance, drains to dry well in the North-East of the lot provide tree protection zone (TPZ) for existing trees to the North East of the site closet boot c u b b i e s & be n c h bedroom #3 main entry heat pumps (2)electric meters (2)gas & radon egress egress egress entry/mud be n c h / s t o r a g e 1/ 2 b a t h e w/ d ba r ca s e w o r k / fe l t spruce, globe viburnum carlessi viburnum carlessi spruce, globe owner cl garden storage 1 A300 2 A300 1 A200 2 A2002 Z003 N SCALE: 1/8" = 1'-0" 1 Site Plan Draft Drainage A102 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 12 A103 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Main Level Proposed Plan 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 A B C D E 4 4 3 3 2 2 1 1 16'-4 5 / 8 " 20 ' - 4 " 10" 7'-1 7 / 8 " 2'-11 15/64"21'-5 27/64"3'-11 11/32" 29'-3 7/64" 26 ' - 1 0 4 1 / 6 4 " 13 ' - 1 3 / 8 " 3' - 0 7 / 6 4 " 43 ' - 0 9 / 6 4 " 32'-7" 24 ' - 0 9 / 6 4 " 15 ' - 1 1 5 7 / 6 4 " 7/ 6 4 " 40 ' - 0 9 / 6 4 " 4' - 6 " 2' - 1 3 1 / 6 4 " 4' - 6 " 6'-8" 100' 100' 1 A301 2 A301 4 Z004 potential tree removal (2) to NW trees protected (3) to NE Plaster covered CMU wall with two layers of 5/8" Type X Gypsum, 1 hour fire wall Garage and enclosure meet rear and side setbacks. Existing rail ties are not plumb. Avoid current hazard. UP bedroom #2 table bathe #3 mechanical boot c u b b i e s trash & r e c y c l i n g e n c l o s u r e bathe #2 closet boot c u b b i e s & be n c h bedroom #3 main entry heat pumps (2) electric meters (2) gas & radon egress egress egress entry/mud be n c h / s t o r a g e 1/ 2 b a t h e w/ d ba r ca s e w o r k / fe l t spruce, globe viburnum carlessi viburnum carlessi spruce, globe owner cl garden storage 1 A300 2 A300 1 A200 2 A200 2 Z003 N SCALE: 1/4" = 1'-0" 1 First Floor A103 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 13 A104 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Second Level Proposed Plan 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 A A B B C C D D E E 4 4 3 3 2 2 1 1 F DW RE 1 A301 2 A301 4 Z004 9'-3" 9'-3" 1 A300 2 A300 1 A200 2 A200 2 Z003 kitchen bathe #1 living room down deck deck fireplace bedroom 1 cl o s e t egress down N SCALE: 1/4" = 1'-0" 1 Second Floor A104 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 14 A105 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Roof Plan Proposed 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22SK 0 2 6'-0" 3'-6" Si l l 1 ' - 3 3 9 / 6 4 " SK 0 1 6'-0" 3'-6" Si l l 1 ' - 3 3 9 / 6 4 " SK 0 1 6'-0" 3'-6" Si l l 1 ' - 3 3 9 / 6 4 " A B C D E 4 4 3 3 2 2 1 1 1 A301 2 A301 4 Z004 1 A300 2 A300 1 A200 2 A200 2 Z003 1' Overhang, typ. Protected entry 4:12 4:12 3.5:12 3.5:12 3.5:12 3.5:12 N SCALE: 1/4" = 1'-0" 1 Roof Plan A105 Note: Today this is a cold roof with attic vents. The current attic vents and screens are in disrepair (upon viewing from the attic) We are proposing removing the dropped ceiling, removing the attic vents and exposing the rafters, adding insulation and updating the light and vent in a Chalet style. The only exterior change, will be converting the attic vents to the same size rough opening, but installing hopper fenestration for light and vent. MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 15 A106 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Main Level Existing Plan 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 35 sq ft A A B B C C D D E E 4 4 3 3 2 2 1 1 W/D W/D 6'-10" 3 Z003 2 Z004 3 Z004 2 A204 KITCHEN BATHROOM BEDROOM LIVING ROOM F.P. STORAGE BEDROOM CLOSET STORAGE GARAGE MECHANICAL STORAGE GARAGE UP N SCALE: 1/4" = 1'-0" 1 First Floor A106 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 16 A107 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Second Level Existing Plan 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 A A B B C C D D E E 4 4 3 3 2 2 1 1 3 Z003 2 Z004 3 Z004 2 A204 11'-5 1/16" KITCHEN BATH BEDROOM LIVING ROOM F.P. BEDROOM CLOSET DOWN DOWN N SCALE: 1/4" = 1'-0" 1 Second Floor A107 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 17 A108 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Roof Plan Existing 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 A A B B C C D D E E 4 4 3 3 2 2 1 1 3 Z003 2 Z004 3 Z004 2 A204 SCALE: 1/4" = 1'-0" 1 Roof A108 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 18 A200 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Elevations Proposed 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof New Wood New Wood Existing Wood New CMU Existing Wood Existing Plastic Treads Existing Deco Wood ±0" 1 First Floor +9'-3" 2 Second Floor +18'-3" 3 Roof Existing Wood Existing CMU New CMU New Wood Balcony Existing Standing Seam New Wood New WoodNew Stucco New Skylights New Masonry New CMU New Storage SCALE: 1/4" = 1'-0" 1 North Elevation A200 SCALE: 1/4" = 1'-0" 2 East Elevation A200 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 19 A201 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Elevations Proposed 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof Existing CMU Existing Wood ±0" 1 First Floor +9'-3" 2 Second Floor +18'-3" 3 Roof 22'-1 5/16" 23'-10" 25'-0" 12'-3" Existing WoodNew Wood Existing Opening Existing Wood Existing CMU Existing CMU New Stucco New Standing Seam SCALE: 1/4" = 1'-0" 1 South Elevation A201 SCALE: 1/4" = 1'-0" 2 West Elevation A201 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 21 A203 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Existing Elevations 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof SCALE: 1/4" = 1'-0" 1 Existing North Elevation A203 SCALE: 1/4" = 1'-0" 2 Existing East Elevation A203 SCALE: 1:0.33 3 312wHyman_WEB303 A203 SCALE: 1:0.33 4 312wHyman_WEB304 A203 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 22 A204 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Existing Elevations 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof 18'-3 1 / 2 " 19'-7 1/16" 19 ' - 7 1 / 1 6 " 25'-0"Existing Grade (Most Restrictive) 1 2 3 4 546 sq ft ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof SCALE: 1/4" = 1'-0" 1 Existing South Elevation A204 SCALE: 1/4" = 1'-0" 2 Existing West Elevation A204 SCALE: 1:0.27 3 312wHyman_WEB301 A204 SCALE: 1:0.26 4 312wHyman_WEB302 A204 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 23 A210 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Fence Layout 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 A A B B C C D D E E 4 4 3 3 2 2 1 1 1.55 5 ' 2.40 6 ' 5.00' 5' 11.6 8 ' 8.167'10.167'10'4.25' 9' 11 . 7 4 9 ' 19 . 2 5 ' 11 . 1 0 7 ' Proposed fence at the 5' side setback and 5' rear setback, lined on the South with shrubs, see landscaping plan St Moritz R e t a i n i n g w a l l ( e x i s t i n g and under r e h a b i l i t a t i o n ) E EG OS W 79 0 4 7903 790 2 7901 7901 7901 79 0 1 79 0 2 7902 7 9 0 3 79 0 3 7 9 0 4 ±0" 1 First Floor ±0" 1 First Floor +9'-3" 2 Second Floor +9'-3" 2 Second Floor +18'-3" 3 Roof +18'-3" 3 Roof 6' - 0 " 30'-5" New 6" WoodNew Stucco N SCALE: 1/16" = 1'-0" 1 Architectural Site Plan A210 SCALE: 1/8" = 1'-0" 2 Garage South Elevation A210 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 24 A211 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Garage Elevations 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 25 A300 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Transverse Sections 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 E D C B A ±0" 1 First Floor E D C B A ±0" 1 First Floor SCALE: 1/4" = 1'-0" 1 transverse at Stairs A300SCALE: 1/4" = 1'-0" 2 transverse at Bedroom #2 A300 MARK DATE DESCRIPTION SHEET TITLE INTEGRATED DESIGN TEAM PROJECT NO: MODEL FILE: DRAWN BY: COPYRIGHT: SHEET 26 A301 Jeffrey H Woodruff 312_W_Hyman_03112022_a.pln Project No. 116 /U s e r s / j e f f r e y w / D o c u m e n t s / C l o u d H i l l D e s i g n / 3 1 2 W H y m a n / 3 1 2 _ W _ H y m a n _ 0 3 1 1 2 0 2 2 _ a . p l n Powder Day Skiiing, LLC, David A Tarrab Mees Longitudinal Sections 312 W Hyman Ave 312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/ Pitkin County UGB, City of Aspen 312 W Hyman Ave Aspen CO 81611 USA Account # R000145 Parcel ID # 273512464006 Landscape Architect (At Final) Contractor Structural Engineer As per contractor Civil Grading and Drainage Boundaries Unlimited (At Final) COA- HPO Site Visit08/22/21 Cloud Hill Design, LLC Snowmass CO 81654 USA COA- HPC Conceptual02/26/22 COA- HPC Approval03/23/22 ±0" 1 First Floor +9'-3" 2 Second Floor +18'-3" 3 Roof 4 3 2 1 ±0" 1 First Floor +9'-3" 2 Second Floor +18'-3" 3 Roof 4' - 4 " 5'-0" garden storage bedroom # 2 casework SCALE: 1/4" = 1'-0" 1 Longitudinal at Stairs A301 SCALE: 1/4" = 1'-0" 2 longitudinal at Bedroom #2 and Garden Storage A301