HomeMy WebLinkAboutApplication Design Plans R2.312 W Hyman AveMARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 1
A100
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Cover Sheet
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
SHEET INDEX
A100
C1
C2
Z001
Z002
Z003
Z004
Z005
Z006
A101
A102
A103
A104
A105
A106
A107
A108
A200
A201
A202
A203
A204
A210
A211
A300
A301
A400
A401
A402
A402
A500
A501
A600
Cover Sheet
Improvement Survey
Civil Site Grading and Drai…
Floor Area Calculations
Floor Area Calculations
Height Measurements
Wall Demolition Calculations
Site Coverage
Zoning Summary
Architectural Site Plan
Architectural Site Drainage…
Main Level Proposed Plan
Second Level Proposed Plan
Roof Plan Proposed
Main Level Existing Plan
Second Level Existing Plan
Roof Plan Existing
Elevations Proposed
Elevations Proposed
Elevations Guideline Update
Existing Elevations
Existing Elevations
Fence Layout
Garage Elevations
Transverse Sections
Longitudinal Sections
Interior Elevations
Interior Elevations
Interior Elevations
Interior Elevations
Schedules
Schedules
Assemblies
312 W
H
y
m
a
n
A.F.F.
ADJ.
ALT.
A.B.
&
ARCH.
@
BM.
BM. PKT.
BRG.
BLK'G.
BOT.
B.F.
BLDG.
B.O.
CAB.
CLG.
CL.
C.T.
CLR.
COL.
CONC.
CONN.
CONT.
DTL.
DBL.
DWL.
E.W.
ELEV. OR
EL.
EXIST'G
EXT.
F.F.
F.D.
FLR.
FTG.
FND.
GA.
G.L.
G.W.B.
G.S.
HB.
HT.
HK.
HORIZ.
HYD.
ABOVE FINISH FLOOR
ADJUSTABLE
ALTERNATE
ANCHOR BOLTS
AND
ARCHITECTURAL
AT
BEAM
BEAM POCKET
BEARING
BLOCKING
BOTTOM
BOTTOM OF FOOTING
BUILDING
BY OWNER
CABINET
CEILING
CENTER LINE
CERAMIC TILE
CLEAR
COLUMN
CONCRETE
CONNECTION
CONTINUOUS
DETAIL
DOUBLE
DOWEL
EACH WAY
ELEVATION
EXISTING
EXTERIOR
FINISHED FLOOR
FLOOR DRAIN
FLOOR
FOOTING
FOUNDATION
GAUGE
GLU-LAM
GYPSUM WALL BOARD
GAS STUB
HOSE BIB
HEIGHT
HOOK
HORIZONTAL
HYDRANT
INFO.
INSUL.
JST.
L.L.
LONGINT.
N.I.C.
O.C.
OPP.
O/
PTD.
PERF.
PL.
PLY.
PROP. LINE
REINF.
RDWD.
REQ'D.
RESIL.
REV.
S.M.
SIM.
S.F. OR SQ. FT.
STD.
STL.
STDS.
THK.
TLT.
T.F.
T.P.
T.L.
T.W.
TOT.
T.B.
TRANSV.
TYP.
U.N.O.
V.I.F.
VERT.
V.W.C.
W.C.
W.H.
W.P.
W.R.
WIN.
W/
WD.
INFORMATION
INSULATION
JOIST
LIVE LOAD
LONGITUDINAL
NOT IN CONTRACT
ON CENTER
OPPOSITE
OVER
PAINTED
PERFORATED
PLATE
PLYWOOD
PROPERTY LINE
REINFORCEMENT
REDWOOD
REQUIRED
RESILIENT
REVISED
SHEET METAL
SIMILAR
SQUARE FEET
STANDARD
STEEL
STUDS
THICK
TOILET
TOP OF FOOTING
TOP OF PLATE
TOP OF LEDGE
TOP OF WALL
TOTAL
TOWEL BAR
TRANSVERSE
TYPICAL
UNLESS NOTED OTHERWISE
VERIFY IN FIELD
VERTICAL
VINYL WALL COVERING
WATER CLOSET
WATER HEATER
WATERPROOF
WATER RESISTANT
WINDOW
WITH
WOOD
312 W Hyman Ave
Powder Day Skiiing, LLC, David A Tarrab Mees
312 W Hyman Ave Lots P+Q, Block 46 Aspen CO 81611 USA/Pitkin County UGB, City of Aspen
PROJECT: Renovation, Energy Upgrades and Historic Preservation
ADDRESS: 312 W Hyman Ave, Aspen, CO 81611
COUNTY: Pitkin County
PARCEL NUMBER: 73512464006
PROJECT DESCRIPTION: Interior Renovation and Energy Upgrades, IECC Compliance
ZONING: R6 Medium Density Residential
CONSTRUCTION TYPE: VB
OCCUPANCY GROUP: RESIDENTIAL
FIRE PROTECTION: Non-sprinklered
NUMBER OF STORIES: TWO
ELEVATION 100= 7901.36'
SITE 5976+- S.F.
1. CONTRACTOR TO COMPLY WITH CODES, LAWS, ORDINANCES, RULES, AND REGULATIONS OF
PUBLIC AUTHORITIES GOVERNING THE WORK.
2. CONTRACTOR TO REVIEW DOCUMENTS, VERIFY DIMENSIONS AND FIELD CONDITIONS AND
CONFIRM THAT WORK IS BUILDABLE AS SHOWN. CONTRACTOR TO REPORT ANY CONFLICTS OR
OMISSIONS TO THE ARCHITECT FOR CLARIFICATION PRIOR TO PERFORMING ANY WORK IN QUESTION.
3. FOR SUBSTITUTIONS, REFER TO THE SPECIFICATIONS.
4. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ON
DRAWINGS, GENERAL CONTRACTOR SHALL VERIFY ALL DIMENSIONS, GRADES AND CONDITIONS AT SITE
PRIOR TO COMMENCING THE WORK.
5. MAINTAIN DIMENSIONS MARKED 'CLEAR'. ALLOW FOR THICKNESS OF FINISHES.
6. CEILING HEIGHT DIMENSIONS ARE TO FINISHED SURFACES.
7. CONTRACTOR TO COORDINATE AND PROVIDE BACKING FOR MILLWORK AND ITEMS ATTACHED OR
MOUNTED TO WALLS OR CEILINGS.
8. EXCEPT WHERE SHOWN IN DIMENSIONAL DETAIL, THE LOCATIONS OF PLUMBING, MECHANICAL
EQUIPMENT, DUCTS, PIPING AND FITTINGS ARE ONLY APPROXIMATE. THE EXACT LOCATIONS SHALL BE
DETERMINED BY THE CONTRACTOR, SUBJECT TO APPROVAL BY THE ARCHITECT.
9. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS, BRACING, BLOCKING, AND
SUPPORTING BRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK, TOILET ROOM
ACCESSORIES, FIXTURES AND PARTITIONS AND ALL WALL MOUNTED OR SUSPENDED MECHANICAL,
ELECTRICAL OR MISCELLANEOUS EQUIPMENT AND FURNISHINGS.
10. ALL WORK PERFORMED SHALL COMPLY WITH THE CONTRACT DOCUMENTS, DRAWINGS,
SPECIFICATIONS, AND GEOTECHNICAL INVESTIGATION AND PAVEMENT RECOMMENDATIONS.
11. SPECIFICATIONS, BOUND SEPARATELY, ARE PART OF THE CONTRACT DOCUMENTS.
12. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE DRAWINGS AND SPECIFICATIONS. IF
CONFLICT IS FOUND BETWEEN DRAWINGS, GENERAL NOTES AND SPECIFICATIONS, CONSULT THE
ARCHITECT BEFORE PROCEEDING WITH THE WORK.
13. THE STRUCTURAL, MECHANICAL AND ELECTRICAL DRAWINGS ARE SUPPLEMENTARY TO THE
ARCHITECTURAL DRAWINGS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CHECK WITH
THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OF STRUCTURAL, MECHANICAL AND
ELECTRICAL WORK. SHOULD THERE BE A DISCREPANCY BETWEEN THE ARCHITECTURAL DRAWINGS AND
THE CONSULTING ENGINEERS' DRAWINGS THAT WOULD CAUSE AN AWKWARD INSTALLATION, IT SHALL BE
BROUGHT TO THE ARCHITECT'S AND ENGINEERS' ATTENTION FOR CLARIFICATION PRIOR TO THE
INSTALLATION OF SAID WORK.
14. GENERAL NOTES ARE NOT A SUBSTITUTE NOR A REPLACEMENT FOR THE PROJECT
SPECIFICATIONS. THESE NOTES ARE INTENDED AS A GUIDE TO THE DESIGN AND/OR CONSTRUCTION
REQUIREMENTS ESTABLISHED FOR THIS PROJECT.
15. NO CONTRACTOR SHOULD ATTEMPT TO BID OR CONSTRUCT ANY PORTION OF THE WORK
WITHOUT CONSULTING THE PROJECT SPECIFICATIONS.
16. THE CONTRACTOR SHALL COORDINATE THE INTENT OF THE GENERAL NOTES WITH ALL TRADES
Snow-load: TBC PSF, Up to 8000' Elevation, Elevation is 7901.36'
100' as per Civil = 7901.36'
Roof Duration = 1.0
Seismic Design Category = B or C, as per Figure R301.2 (2) As per soil design category
Weathering probability for Concrete = Severe
Termite Infestation Probability = None to slight
Wind Speed = 115 mph (ultimate design)
Wind Exposure = B or C, Section R301.2.1.4
Frost Depth = 36", TBC (up to 8000' Elevation)
Air Freezing Index = TBC° F Days – Up to 8000 ft. elevation
Ice Barrier Underlayment = Required
Mean Annual Temp = variable
Insulation = as per Minimum R-Values per 2009 IECC, Table 402.1.1, Client chooses to utilize stricter
minimums as per 2018 IECC for thermal comfort and energy efficiency.
As per State House Bill 09-1091, CO alarms are required within 15 feet of all sleeping rooms
BUILDING
Pitkin County Currently Adopted Codes. The client will conform with 2018
IECC (Assemblies and Fenestration) and the updated land use code for
Energy Efficiency on Earth Day 2020.
2015 International Building Code
2015 International Residential Code
2015 International Mechanical Code
2015 International Plumbing Code
2015 International Fuel & Gas Code
2015 International Energy Conservation Code
Pitkin County Efficient Building Code
Most Current National Electrical Code
Project summary and aims, as per Land Use Code:
The historic building and the site remains key elements of the property and the new development does not
compromise the visual integrity of the historic property; and
The new construction is reflective of the proportional patterns found in the historic building's forms, materials and
openings, or the work removes later alterations and restores the historic building to its appearance during its period of
significance; and
The project is compatible with the character of the neighborhood in which it is located; and
Historic outbuildings site and landscape features are retained and stabilized and restored, as appropriate.
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 2
C1
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Improvement Survey
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
(S75°1
1
'
0
9
"
E
6
0
.
0
0
'
)
S75°14
'
5
8
"
E
5
8
.
5
9
'
E
E E
G
(N
1
4
°
5
0
'
4
9
"
E
1
0
0
.
0
0
'
)
N1
5
°
0
5
'
1
2
"
E
9
9
.
9
0
'
S
1
4
°
5
0
'
4
9
"
W
1
0
0
.
0
0
'
N75°09
'
1
1
"
W
6
0
.
0
0
'
BASIS
O
F
B
E
A
R
I
N
G
S
FOUND NO. 5 REBAR
FOUND NO. 5 REBAR
FOUND NO. 5 REBAR
SET FOUND NO. 5 REBAR &
1-1/4" ORANGE PLASTIC CAP
PROP CORNER TNC PLS38215
(20.90'
W
I
D
E
)
GRAVE
L
A
L
L
E
Y
ALLEY
-
B
L
O
C
K
4
6
LOT P
LOT Q
LOT O
LOT N
LOT R
LOT S
W. HY
M
A
N
A
V
E
N
U
E
(74.80'
W
I
D
E
P
U
B
L
I
C
)
SE CORNER
BLOCK 46
FOUND REBAR & 1-1/2"
ALUMINUM CAP
(NO STAMPING)
N75°09
'
1
1
"
W
5
9
.
9
2
'
(60.00'
)
33.4'
4.0'
4.9'
8.3'
5.5'
11.5'
0.7'
0.7'
2
.
2
'
0.8'
0.7'
0.7'
0
.
8
'
2
.
2
'
9
.
2
'
0
.
8
'
0
.
8
'
3
8
.
4
'
2
1
.
2
'
7
.
2
'
11.1'
(
T
I
E
)
19
.
8
'
(
T
I
E
)
0.8'
2.4'
(TIE)
13
.
4
'
5.5'
APPARENT
ENCROACHMENT
DRIVEWAY &
WOOD RETAINING
GRAVEL
DRIVEWAY
W
O
O
D
R
E
T
A
I
N
I
N
G
W
O
O
D
R
E
T
A
I
N
I
N
G
APPARENT
ENCROACHMENT
R.R.TIE WALL
CONCRETE APRO
N
UPPER
DECK
STEPS
FLAGSTONE
PATIO
SI
D
E
W
A
L
K
2 - STORY
FRAME HOUSE
312 WEST HYMAN AVENUE
5976± SQ.FT.
NE
I
G
H
B
O
R
I
N
G
R
E
S
I
D
E
N
C
E
CONCR
E
T
E
C
U
R
B
&
G
U
T
T
E
R
PAVED
R
O
A
D
W
A
Y
MAILB
O
X
4.4'
APPARENT
ENCROACHMENT
WOOD RETAINING
ELECTRIC PEDESTAL
CATV PEDESTAL
TELEPHONE PEDESTAL
GAS METER
ELECTRICAL METER
G
LEGEND
E
SURVEYOR'S CERTIFICATION
SURVEY NOTES:
LOTS P & Q - BLOCK 46, CITY AND TOWNSITE OF ASPEN
SECTION 12, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6TH PM
COUNTY OF PITKIN, STATE OF COLORADO
IMPROVEMENT SURVEY PLAT
TRUE NORTH COLORADO LLC.
A LAND SURVEYING AND MAPPING COMPANY
PO BOX 614 - 529 S. WILD HORSE DRIVE
NEW CASTLE, COLORADO 81647
(970) 984-0474
www.truenorthcolorado.com
PROJECT NO: 2019-104
DATE: JANUARY 18, 2019
DRAWN
RPK
SURVEYED
LDV
SHEET
1 OF 1
TRUENORTH
A LAND SURVEYING AND MAPPING COMPANY
8'4'16'
SCALE: 1" = 8'
N
PROPERTY DESCRIPTION:0
SCHEDULE B PART II TITLE EXCEPTIONS:
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 3
C2
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Civil Site Grading and
Drainage
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
E
E
G
WS
O
D
2
.
0
%
6
.
5
%
2.6
%
1
1
1
FF:
7901.31'
FF:
7901.31'
F
F
:
7
9
0
1
.
3
3
'
F
F
:
7
9
0
1
.
3
6
'
D
#3000
7901.31'
#3001
7899.35'
#3002
7901.36'
#3003
7901.37'
#3004
7901.08'
#3005
7900.88'
#3006
7901.17'
#3007
7901.15'
#3008
7901.18'
#3009
7901.13'
1
+
0
0
1
+
3
3
1+0
0
1
+
2
5
Point Table
Point #
3000
3001
3002
3003
3004
3005
3006
3007
3008
3009
Raw Description
EX. FG
EX. FG
EX. FG
PR. FG
PR. FG
PR. FG
PR. FG
EX. FG
EX. FG
EX. FG
Elevation
7901.31'
7899.35'
7901.36'
7901.37'
7901.08'
7900.88'
7901.17'
7901.15'
7901.18'
7901.13'
Northing
14948.98
14947.21
14980.65
14986.35
15008.62
15002.86
14981.51
14979.33
14966.89
14951.93
Easting
14907.26
14889.23
14885.17
14887.05
14883.87
14932.86
14927.19
14913.62
14917.42
14922.28
79
0
4
79
0
3
7902
7901
7901
79
0
1
7901
79
0
2
7
9
0
3
7902
7901
7901
7
9
0
2
WQCV/DETENTION
DRYWELL
SYSTEM
RIM: TBD
(SEE DETAIL)
12"Ø DOME
GRATE 5' OFF
BUILDING, TYP.
RIM: 6" LOWER
THAN FG AT
FOUNDATION
AND 12"± BELOW
FOUNDATION
TOP OF WALL
12"Ø SQ.ADA AREADRAIN
12 LF TRENCH
DRAIN WITH
HEAT TAPERIM: 7901.08'
CONNECT TO
STORM DRAIN
LINE
50 LF 6"Ø SOLID SCH.40 PVC @ 1.0% MIN.WITH HEAT TAPE
80 LF 6"Ø SOLID SCH.40 PVC @ 1.0% MIN.WITH HEAT TAPE
SCALE: 1' = 1'-0"
1 Draft Civil Grading and Drainage, NFC
C2
Civil Grading and Drainage will be provided at
Final Review. This is for placement only,
pending conceptual approval.
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 4
Z001
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Floor Area Calculations
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
5,976 sq ft
824 sq ft 41 sq ft
16 sq ft
269 sq ft
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
The Site is 5,976 Square Feet.
The built environment is
1,091 Residence (Attached Garage Included in site
square footage)
41 Square Feet Storage- East
16 Square Feet Storage- North
The existing site coverage is
1,148/5,976 =
19.21%10'
R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
5' R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
U
S
E
D
A
S
G
A
R
A
G
E
& A
C
C
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
5'
M
I
N
I
M
U
M
S
I
D
E
S
E
T
B
A
C
K
5'
M
I
N
I
M
U
M
S
I
D
E
S
E
T
B
A
C
K
10'
F
R
O
N
T
S
E
T
B
A
C
K
PRI
N
C
I
P
A
L
B
U
I
L
D
I
N
G
15'
F
R
O
N
T
S
E
T
B
A
C
K
ACC
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
10'
R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
5' R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
U
S
E
D
A
S
G
A
R
A
G
E
& A
C
C
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
880 sq ft
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
301 sq ft
60 sq ft
Floor Area Calculations
City of Aspen 312 W Hyman Zoning Submission
Existing Main Level Floor Area Calculations
Main Level Gross Floor Area (Sq Ft)824 Garage is 269 Sq Ft, attached
Main Level Countable Floor Area (Sq Ft)1,091
Existing Deck/Porch Floor Area Calculations 301 Exempt per 26.575.020.D5, Structural Stairs 60 Sq Ft
Front Porch Gross Floor Area (Sq Ft)301 Exempt per 15% of allowable, 15% of 3,240 = 486
Deck/Porch Countable Floor Area (Sq Ft)0
Total Existing Floor Area Calculations
Sub-grade Floor Area (Sq Ft)0
Lower Level Floor Area (Sq Ft)880
Main Level Floor Area (Sq Ft)789 Subtracted Stairs at upper level
Deck/Porch Floor Area (Sq Ft)0
Total Existing Floor Area (Sq Ft 1,669
1
N
SCALE: 1/8" = 1'-0"
2 Existing Main Level Floor Area
Z001 SCALE: 1/8" = 1'-0"
3 Existing Second Level Floor Area
Z001
SCALE: 1' = 1'-0"
4 Floor Area Calculations.numbers
Z001
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 5
Z002
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Floor Area Calculations
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
5,976 sq ft
29 sq ft
1,196 sq ft
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
308 sq ft
32 sq ft
Garden Storage (Under Stairs)
Stairs Sq Footage Counted on Second Floor
Growth commensurate with
converting garage to habitable space
Wall @ 4'-6" height to add to bedroom/habitable
space under stairs, counted at 100% Sq Ft.
The Site is 5,976 Square Feet.
The built environment is
1,196 Residence (For Square Footage Calculations: 1,196 + .5*58 Sq Ft)
29 Square Feet Storage, Exterior (Exempt)
32 Square Feet Trash Enclosure (Exempt)
308 Square Feet Garage (250 Sq Feet Exempt, 58 *.5 counts to Sq Ft. )
The new/proposed site coverage is
1,565/5,976 =
26.19%
5' Set Back
10'
R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
5' R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
U
S
E
D
A
S
G
A
R
A
G
E
& A
C
C
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
5'
M
I
N
I
M
U
M
S
I
D
E
S
E
T
B
A
C
K
5'
M
I
N
I
M
U
M
S
I
D
E
S
E
T
B
A
C
K
10'
F
R
O
N
T
S
E
T
B
A
C
K
PRI
N
C
I
P
A
L
B
U
I
L
D
I
N
G
15'
F
R
O
N
T
S
E
T
B
A
C
K
ACC
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
946 sq ft
52 sq ft
311 sq ft
59 sq ft
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
Exterior Structural
Stairs Counted on 2nd Floor
Exterior Deck (Extended to the North)
New Exterior Deck (North East)
Down
Floor Area Calculations
City of Aspen 312 W Hyman Zoning Submission
Proposed Main Level Floor Area Calculations
Main Level Gross Floor Area (Sq Ft)1,196 Garage converted to habitable
Main Level Countable Floor Area (Sq Ft)1,196
Table 26.575.020-2,Size of Garage or Carport
First 0 to 250 square feet
Proposed Deck/Porch Floor Area Calculations
Front Porch Gross Floor Area (Sq Ft)363 Exempt per 15% of allowable, 15% of 3,240 = 486, Front deck
is 311 and Rear Deck is 52, so 311 + 52 = 363
Deck/Porch Countable Floor Area (Sq Ft)0 Exempt per 26.575.020.D5
Structural Steps Floor Area (Sq Ft)59 Exempt per 26.575.020.D5, as per Assessor, exterior steps
Deck/Porch Countable Floor Area (Sq Ft)0 Exempt per 15% of allowable 3240 *.15 = 486, 363 < 486
Total Existing Floor Area Calculations
Sub-grade Floor Area (Sq Ft)0
Lower Level Floor Area (Sq Ft)1,196 Garage converted to habitable, extend habitable to the N and E
Main Level Floor Area (Sq Ft)946 Extend floor plate to the North
Total Proposed Floor Area (Sq Ft)2,142 Allowed is 3,240 SF
Garage above 250, Square footage as per Next
251 to 500 square feet, 70 SF counts last 35 SF
to F
29 Garage is 308 SF, so .5(58) = 29
2,171 Max floor area = 3,240
1,069 Remaining floor area = 3,240 - 2,171 = 1,069, if exterior steps
are included in floor area than 3,240 - 2,171 - 59 = 1,010
remaining floor area (will clarify in Land Use Code and through
Final Review
Stairs counted on the second floor (interior, but did not include
exterior stairs in calculations- can they be included in deck
calculations and therefore we are still under our 15%
exemption for exterior, unconditioned space?)
Trash container is exempt
Storage under the stairs is exempt
1
N
SCALE: 1/8" = 1'-0"
1 Proposed Main Level Floor Area
Z002 SCALE: 1/8" = 1'-0"
2 Second Floor- Floor Area
Z002
SCALE: 1' = 1'-0"
3 Floor Area Calculations.numbers
Z002
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 6
Z003
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Height Measurements
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
19'-3"11'-9"9'-0"
22'-1 5/16"
23'-10"
25'-0"
12'-3"
Existing WoodNew Wood
Existing
Opening
Existing Wood
Existing CMU Existing CMU
New Stucco
New Standing
Seam
Existing Grade (Most Restrictive)
Existing Chimney Cap, Match Height
Ridge
Detached Garage
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
18'-3 1/
2
"
19'-7 1/16"
19
'
-
7
1
/
1
6
"
25'-0"Existing Grade (Most Restrictive)
SCALE: 1/4" = 1'-0"
2 West Elevation Height
Z003
SCALE: 1/4" = 1'-0"
3 Existing South Elevation
Z003
Zone District Height Limit
Per 26.710.040 Medium Density Residential R-6
Maximum Height 25'
Zoning Note:
Height Measurement (Z002): since the ridge line of the structure is
below the height maximum, this works.
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 7
Z004
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Wall Demolition
Calculations
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
467 sq ft39 sq ft
535 sq ft
7 sq ft±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
25 sq ft
14 sq ft
14 sq ft 11 sq ft
5 sq ft
76 sq ft
The existing wall is 535 Square Feet.
The reduction for fenestration is 91
Square Feet
The wall area is 444 Square Feet.
Demolition on the North Elevation, net
of fenestration, is 376 Square Feet.
A
B
22 sq ft
20 sq ft95 sq ft
84 sq ft389 sq ft
70 sq ft
35 sq ft
32 sq ft
10 sq ft
13 sq ft
95 sq ft456 sq ft
83 sq ft
20 sq ft
20 sq ft±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
The existing wall is 654 Square Feet.
The reduction for fenestration is 90
Square Feet
The wall area is 564 Square Feet.
Demolition on the East Elevation is
84+20 = 104 Square Feet, net of
fenestration.
C D
EF
404 sq ft
35 sq ft 35 sq ft
10 sq ft
56 sq ft 56 sq ft
598 sq ft
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
The existing wall is 598 Square Feet.
The reduction for fenestration is 192
Square Feet
The wall area is 406 Square Feet.
No demolition on the South Facade
536 sq ft
22 sq ft 22 sq ft
10 sq ft 10 sq ft48 sq ft
647 sq ft
19 sq ft 48 sq ft
±0"
1 First Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
The existing wall is 647 Square Feet.
The reduction for fenestration is 111
Square Feet
The wall area is 536 Square Feet.
The total demolition on the West Facade
is 19 Square Feet.
Demoltion Calculations
City of Aspen 312 West Hyman Zoning Submission
Wall Demolition
Wall Label Individual Wall Area
(Sq Ft)
Area Reduced or
Fenestration (Sq Ft)
Area of Wall to be
Removed (Sq Ft)
A- North Wall 535 69 390
B- North Wall 39 24 15
C- East Wall 95 10 85
D- East Wall 20 0 20
E- East Wall 83 13 0
F- East Wall 456 67 0
G- South Wall 598 194 0
I- West Wall 647 111 67
Wall Surface Area Total (Sq Ft)2473
Area Reduced for Fenestration (Sq Ft)488
Area Used for Demo Calculation 577
Demolition Totals
Roof and Wall Area Used for Demo Calculation (Sq Ft)577
Surface Area to be Removed (Sq Ft)
Total 577
1
SCALE: 1/16" = 1'-0"
2 North Walls Wall A and Wall B
Z004
SCALE: 1/16" = 1'-0"
3 East Walls Wall C and Wall D and Wall E
Z004
SCALE: 1/16" = 1'-0"
4 South Walls F
Z004
SCALE: 1/16" = 1'-0"
5 East Wall G
Z004
Existing Wall to Remain
Wall Area to be Removed
Area Reduced for Fenestration
Exposed Wall Legend
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 8
Z005
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Site Coverage
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
5,976 sq ft
29 sq ft
1,196 sq ft
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
308 sq ft
32 sq ft
Garden Storage (Under Stairs)
Stairs Sq Footage Counted on Second Floor
Growth commensurate with
converting garage to habitable space
Wall @ 4'-6" height to add to bedroom/habitable
space under stairs, counted at 100% Sq Ft.
The Site is 5,976 Square Feet.
The built environment is
1,196 Residence (For Square Footage Calculations: 1,196 + .5*58 Sq Ft)
29 Square Feet Storage, Exterior (Exempt)
32 Square Feet Trash Enclosure (Exempt)
308 Square Feet Garage (250 Sq Feet Exempt, 58 *.5 counts to Sq Ft. )
The new/proposed site coverage is
1,565/5,976 =
26.19%
5' Set Back
10'
R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
5' R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
U
S
E
D
A
S
G
A
R
A
G
E
& AC
C
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
5'
M
I
N
I
M
U
M
S
I
D
E
S
E
T
B
A
C
K
5'
M
I
N
I
M
U
M
S
I
D
E
S
E
T
B
A
C
K
10'
F
R
O
N
T
S
E
T
B
A
C
K
PRI
N
C
I
P
A
L
B
U
I
L
D
I
N
G
15'
F
R
O
N
T
S
E
T
B
A
C
K
ACC
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
5,976 sq ft
789 sq ft 41 sq ft
16 sq ft
269 sq ft
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
Wall @ 4'-6" height to add to bedroom/habitable
space under stairs, counted at 100% Sq Ft.
The Site is 5,976 Square Feet.
The built environment is
1,091 Residence (Attached Garage Included in site
square footage)
41 Square Feet Storage- East
16 Square Feet Storage- North
The existing site coverage is
1,148/5,976 =
19.21%10'
R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
5' R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
U
S
E
D
A
S
G
A
R
A
G
E
& AC
C
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
5'
M
I
N
I
M
U
M
S
I
D
E
S
E
T
B
A
C
K
5'
M
I
N
I
M
U
M
S
I
D
E
S
E
T
B
A
C
K
10'
F
R
O
N
T
S
E
T
B
A
C
K
PRI
N
C
I
P
A
L
B
U
I
L
D
I
N
G
15'
F
R
O
N
T
S
E
T
B
A
C
K
ACC
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
10'
R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
5' R
E
A
R
S
E
T
B
A
C
K
-
P
R
I
N
C
I
P
A
L
B
U
I
L
D
I
N
G
U
S
E
D
A
S
G
A
R
A
G
E
& AC
C
E
S
S
O
R
Y
B
U
I
L
D
I
N
G
N
SCALE: 1/8" = 1'-0"
2 Proposed Site Coverage
Z005 SCALE: 1/8" = 1'-0"
3 Existing Site Coverage
Z005
Site is 5976 sq ft as per survey. Site Coverage is not triggered as per LUC.
Maximum site coverage: No Limitation
Site notes from LUC:
Sheds, Storage Areas, and similar Accessory Structures. Sheds, storage areas, greenhouses, and similar uninhabitable accessory structures,
not within a garage, are exempt from floor area limitations up to a maximum exemption of thirty-two (32) square feet per residence.
Storage areas within a garage shall be treated as garage space eligible for the garage exemption only. Accessory structures thirty-six (36)
inches or less in height, as measured from finished grade, shall be exempt from Floor Area calculations (also see setback limitations).
Accessory structures that are both larger than thirty-two (32) square feet per primary residence and more than thirty-six (36) inches in
height shall be included in their entirety in the calculation of Floor Area. Properties which do not contain residential units are not eligible
for this Floor Area exemption.
If the property adjoins an alleyway, the trash and recycle service area shall be along and accessed from the alleyway
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 9
Z006
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Zoning Summary
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
Proposed Development
Zoning Allowance and Project Summary
City of Aspen 312 W Hyman Zoning Submission
Proposed Development Single Family | Remodel Addition
Parcel #273512464006
Zone District R6
Existing Allowed (Principal)Allowed
(Accessory)
Proposed
(Principal)
Proposed
Accessory
LUC Reference
Setbacks 26.710.060
Front 19’-7”25’25’19’-7”n/a 26.710.060
Rear 33’-6”10’5’33’-6”5’26.710.060
Combined Front/Rear 26.710.060
East Side 2’-4”5’5’2’-4”5’26.710.060
West Side 11 2/3’10’10’11 2/3’5’26.710.040
Medium-Density
Residential (R-6).
Combined Side 15’15’15’7’-4”, No change
to West Principal
5’, Variance
Required for the
West Garage
D 4 is Minimum
combined 10’
Distance between Buildings N/A N/A 11.07’, between the
garage and the
principal
N/A 11.07’, between the
garage and the
principal
26.710.060
Corner Lot No No n/a No na/26.710.060
Floor Area (Square Feet)1,669 3,240 2,171
Supplemental Breakdown Info Existing Required Proposed LUC Reference
Net Leasable/Comm (Sq Ft)Not Req for
Residential
N/A 26.575.020.I.
Open Space %80.79%Not Req for R-6 73.81%26.710.060
Site Coverage 19.21%Not Req for R-6 26.19%26.710.060
On-Site Parking 2 2 2 26.515.030
Site Coverage Existing LUC Reference
Gross Lot Area (Sq Ft)5,976 5,976 Z-007
Area of Building Footprint (Sq Ft)1148 1091+41+16 1,565 1196+29+32+308 26.575.020.G.
Site Coverage 19.21%26.19%
Land Value Summary Actual Value
Land $3,200,000
Improvements $718,000
Total $3,918,000
1
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 10
A101
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Architectural Site Plan
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
1.55
5
'
2.40
6
'
5.00'
5'
11.6
8
'
8.167'10.167'10'4.25'
9'
11
.
7
4
9
'
19
.
2
5
'
11
.
1
0
7
'
Proposed fence and shrubs, see landscaping plan
E
EG
OS
W
79
0
4
7903
790
2
7901
7901
7901
79
0
1
79
0
2
7902
7
9
0
3
79
0
3
7
9
0
4
N
SCALE: 1/8" = 1'-0"
1 Architectural Site Plan
A101
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 11
A102
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Architectural Site
Drainage Plan
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
100'
100'
1
A301
2
A301
4
Z004
potential tree removal (2) to NW
trees protected (3) to NE
Plaster covered
CMU wall with two
layers of 5/8" Type
X Gypsum,
1 hour fire wall
Garage and
enclosure meet rear
and side setbacks.
Existing rail ties are
not plumb. Avoid
current hazard.
UP
bedroom #2
table
bathe #3
mechanical
7 M x 5 M,
room for
storage
5' from alley
set back, 5'
from side set
back (no
variance)
boot
c
u
b
b
i
e
s
trash
&
r
e
c
y
c
l
i
n
g
e
n
c
l
o
s
u
r
e
bathe #2
buried dry-
well, storm
water run-off
onsite
collection
new perf-
pipe
surrounding
single car
garage
disturbance,
drains to dry
well in the
North-East of
the lot
provide tree protection zone
(TPZ) for existing trees to
the North East of the site
closet
boot
c
u
b
b
i
e
s
& be
n
c
h
bedroom #3
main entry
heat pumps (2)electric meters (2)gas & radon egress
egress egress
entry/mud
be
n
c
h
/
s
t
o
r
a
g
e
1/
2
b
a
t
h
e
w/
d
ba
r
ca
s
e
w
o
r
k
/
fe
l
t
spruce, globe
viburnum
carlessi
viburnum
carlessi
spruce, globe
owner cl
garden storage
1
A300
2
A300
1
A200
2
A2002
Z003
N
SCALE: 1/8" = 1'-0"
1 Site Plan Draft Drainage
A102
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 12
A103
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Main Level Proposed
Plan
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
A B C D E
4 4
3 3
2 2
1 1
16'-4
5
/
8
"
20
'
-
4
"
10"
7'-1
7
/
8
"
2'-11 15/64"21'-5 27/64"3'-11 11/32"
29'-3 7/64"
26
'
-
1
0
4
1
/
6
4
"
13
'
-
1
3
/
8
"
3'
-
0
7
/
6
4
"
43
'
-
0
9
/
6
4
"
32'-7"
24
'
-
0
9
/
6
4
"
15
'
-
1
1
5
7
/
6
4
"
7/
6
4
"
40
'
-
0
9
/
6
4
"
4'
-
6
"
2'
-
1
3
1
/
6
4
"
4'
-
6
"
6'-8"
100'
100'
1
A301 2
A301
4
Z004
potential tree removal (2) to NW
trees protected (3) to NE
Plaster covered
CMU wall with two
layers of 5/8" Type
X Gypsum,
1 hour fire wall
Garage and
enclosure meet rear
and side setbacks.
Existing rail ties are
not plumb. Avoid
current hazard.
UP
bedroom #2
table
bathe #3
mechanical
boot
c
u
b
b
i
e
s
trash
&
r
e
c
y
c
l
i
n
g
e
n
c
l
o
s
u
r
e
bathe #2
closet
boot
c
u
b
b
i
e
s
& be
n
c
h
bedroom #3
main entry
heat pumps (2)
electric meters (2)
gas & radon
egress
egress egress
entry/mud
be
n
c
h
/
s
t
o
r
a
g
e
1/
2
b
a
t
h
e
w/
d
ba
r
ca
s
e
w
o
r
k
/
fe
l
t
spruce, globe
viburnum
carlessi
viburnum
carlessi
spruce, globe
owner cl
garden storage
1
A300
2
A300
1
A200
2
A200
2
Z003
N
SCALE: 1/4" = 1'-0"
1 First Floor
A103
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 13
A104
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Second Level Proposed
Plan
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
F
DW
RE
1
A301 2
A301
4
Z004
9'-3"
9'-3"
1
A300
2
A300
1
A200
2
A200
2
Z003
kitchen
bathe #1
living room
down
deck
deck
fireplace
bedroom 1
cl
o
s
e
t
egress
down
N
SCALE: 1/4" = 1'-0"
1 Second Floor
A104
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 14
A105
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Roof Plan Proposed
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22SK
0
2
6'-0"
3'-6"
Si
l
l
1
'
-
3
3
9
/
6
4
"
SK
0
1
6'-0"
3'-6"
Si
l
l
1
'
-
3
3
9
/
6
4
"
SK
0
1
6'-0"
3'-6"
Si
l
l
1
'
-
3
3
9
/
6
4
"
A B C D E
4 4
3 3
2 2
1 1
1
A301
2
A301
4
Z004
1
A300
2
A300
1
A200
2
A200
2
Z003
1' Overhang, typ.
Protected entry
4:12
4:12
3.5:12 3.5:12
3.5:12 3.5:12
N
SCALE: 1/4" = 1'-0"
1 Roof Plan
A105
Note:
Today this is a cold roof with attic vents. The
current attic vents and screens are in disrepair
(upon viewing from the attic)
We are proposing removing the dropped ceiling,
removing the attic vents and exposing the rafters,
adding insulation and updating the light and vent in
a Chalet style.
The only exterior change, will be converting the
attic vents to the same size rough opening, but
installing hopper fenestration for light and vent.
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 15
A106
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Main Level Existing Plan
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
35 sq ft
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
W/D W/D
6'-10"
3
Z003
2
Z004
3
Z004
2
A204
KITCHEN BATHROOM BEDROOM
LIVING ROOM
F.P.
STORAGE
BEDROOM
CLOSET
STORAGE GARAGE
MECHANICAL
STORAGE GARAGE
UP
N
SCALE: 1/4" = 1'-0"
1 First Floor
A106
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 16
A107
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Second Level Existing
Plan
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
3
Z003
2
Z004
3
Z004
2
A204
11'-5 1/16"
KITCHEN BATH BEDROOM
LIVING ROOM
F.P.
BEDROOM
CLOSET
DOWN
DOWN
N
SCALE: 1/4" = 1'-0"
1 Second Floor
A107
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 17
A108
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Roof Plan Existing
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
3
Z003
2
Z004
3
Z004
2
A204
SCALE: 1/4" = 1'-0"
1 Roof
A108
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 18
A200
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Elevations Proposed
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
New Wood New Wood Existing Wood
New CMU
Existing Wood
Existing Plastic
Treads
Existing Deco
Wood
±0"
1 First Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
Existing Wood
Existing CMU New CMU
New Wood Balcony
Existing
Standing Seam
New Wood
New WoodNew Stucco
New Skylights
New Masonry
New CMU New Storage
SCALE: 1/4" = 1'-0"
1 North Elevation
A200
SCALE: 1/4" = 1'-0"
2 East Elevation
A200
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 19
A201
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Elevations Proposed
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
Existing CMU
Existing Wood
±0"
1 First Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
22'-1 5/16"
23'-10"
25'-0"
12'-3"
Existing WoodNew Wood
Existing
Opening
Existing Wood
Existing CMU Existing CMU
New Stucco
New Standing
Seam
SCALE: 1/4" = 1'-0"
1 South Elevation
A201
SCALE: 1/4" = 1'-0"
2 West Elevation
A201
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 21
A203
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Existing Elevations
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
SCALE: 1/4" = 1'-0"
1 Existing North Elevation
A203
SCALE: 1/4" = 1'-0"
2 Existing East Elevation
A203
SCALE: 1:0.33
3 312wHyman_WEB303
A203
SCALE: 1:0.33
4 312wHyman_WEB304
A203
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 22
A204
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Existing Elevations
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
18'-3 1
/
2
"
19'-7 1/16"
19
'
-
7
1
/
1
6
"
25'-0"Existing Grade (Most Restrictive)
1 2 3 4
546 sq ft
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
SCALE: 1/4" = 1'-0"
1 Existing South Elevation
A204
SCALE: 1/4" = 1'-0"
2 Existing West Elevation
A204
SCALE: 1:0.27
3 312wHyman_WEB301
A204
SCALE: 1:0.26
4 312wHyman_WEB302
A204
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 23
A210
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Fence Layout
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
A
A
B
B
C
C
D
D
E
E
4 4
3 3
2 2
1 1
1.55
5
'
2.40
6
'
5.00'
5'
11.6
8
'
8.167'10.167'10'4.25'
9'
11
.
7
4
9
'
19
.
2
5
'
11
.
1
0
7
'
Proposed fence at the 5' side
setback and 5' rear setback,
lined on the South with shrubs,
see landscaping plan
St Moritz
R
e
t
a
i
n
i
n
g
w
a
l
l
(
e
x
i
s
t
i
n
g
and under
r
e
h
a
b
i
l
i
t
a
t
i
o
n
)
E
EG
OS
W
79
0
4
7903
790
2
7901
7901
7901
79
0
1
79
0
2
7902
7
9
0
3
79
0
3
7
9
0
4
±0"
1 First Floor
±0"
1 First Floor
+9'-3"
2 Second Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
+18'-3"
3 Roof
6'
-
0
"
30'-5"
New 6" WoodNew Stucco
N
SCALE: 1/16" = 1'-0"
1 Architectural Site Plan
A210
SCALE: 1/8" = 1'-0"
2 Garage South Elevation
A210
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 24
A211
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Garage Elevations
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 25
A300
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Transverse Sections
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
E D C B A
±0"
1 First Floor
E D C B A
±0"
1 First Floor
SCALE: 1/4" = 1'-0"
1 transverse at Stairs
A300SCALE: 1/4" = 1'-0"
2 transverse at Bedroom #2
A300
MARK DATE DESCRIPTION
SHEET TITLE
INTEGRATED DESIGN TEAM
PROJECT NO:
MODEL FILE:
DRAWN BY:
COPYRIGHT:
SHEET 26
A301
Jeffrey H Woodruff
312_W_Hyman_03112022_a.pln
Project No. 116
/U
s
e
r
s
/
j
e
f
f
r
e
y
w
/
D
o
c
u
m
e
n
t
s
/
C
l
o
u
d
H
i
l
l
D
e
s
i
g
n
/
3
1
2
W
H
y
m
a
n
/
3
1
2
_
W
_
H
y
m
a
n
_
0
3
1
1
2
0
2
2
_
a
.
p
l
n
Powder Day Skiiing, LLC, David A
Tarrab Mees
Longitudinal Sections
312 W Hyman Ave
312 W Hyman Ave Lots P+Q,
Block 46 Aspen CO 81611 USA/
Pitkin County UGB, City of Aspen
312 W Hyman Ave Aspen CO
81611 USA
Account # R000145
Parcel ID # 273512464006
Landscape Architect (At Final)
Contractor
Structural Engineer
As per contractor
Civil Grading and Drainage
Boundaries Unlimited (At Final)
COA- HPO Site Visit08/22/21
Cloud Hill Design, LLC
Snowmass CO 81654 USA
COA- HPC Conceptual02/26/22
COA- HPC Approval03/23/22
±0"
1 First Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
4 3 2 1
±0"
1 First Floor
+9'-3"
2 Second Floor
+18'-3"
3 Roof
4'
-
4
"
5'-0"
garden storage
bedroom # 2
casework
SCALE: 1/4" = 1'-0"
1 Longitudinal at Stairs
A301
SCALE: 1/4" = 1'-0"
2 longitudinal at Bedroom #2 and Garden Storage
A301