Loading...
HomeMy WebLinkAbout1. Updated Signed Appliation_314 Riverside_APPLICATION Exemption from moratorium 2021_2022_314 Riverside_FINAL 051222CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 COMMUNITY DEVELOPMENT DEPARTMENT GENERAL LAND USE PACKET Attached is an Application for review of Development that requires Land Use Review pursuant to The City of Aspen Land Use Code: Included in this package are the following attachments: 1.Development Application Fee Policy, Fee Schedule and Agreement to Pay Application Fees Form 2.Land Use Application Form 3.Dimensional Requirements Form (if required) 4.HOA Compliance Form 5.Development Review Procedure All applications are reviewed based on the criteria established in Title 26 of the Aspen Municipal Code. Title 26 of the Aspen Municipal Code is available at the City Clerk’s Office on the second floor of City Hall and on the internet at https://library.municode.com/co/aspen/codes/municipal_code. We require all applicants to hold a Pre-Application Conference with a Planner in the Community Development Department so that the requirements for submitting a complete application can be fully described. This meeting can happen in person or by phone or email. Also, depending upon the complexity of the development proposed, submitting one copy of the development application to the Case Planner to determine accuracy, inefficiencies, or redundancies can reduce the overall cost of materials and staff time. Please recognize that review of these materials does not substitute for a complete review of the Aspen Land Use Regulations. While this application package attempts to summarize the key provisions of the Code as they apply to your type of development, it cannot possibly replicate the detail or the scope of the Code. If you have questions that are not answered by the materials in this package, we suggest that you contact the staff member assigned to your case, contact Planner of the Day (970-429-2764/planneroftheday@gmail.com), or consult the applicable sections of the Aspen Land Use Code. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 Land Use Review Fee Policy The City of Aspen has established a review fee policy for the processing of land use applications. A flat fee or deposit is collected for land use applications based on the type of application submitted. A flat fee is collected by Community Development for applications that normally take a minimal and predictable amount of staff time to process. Review fees for other City Departments reviewing the application (referral departments) also will be collected when necessary. Flat fees are cumulative, i.e., an application with multiple flat fees must pay the sum of those flat fees. Flat fees are not refundable. A review fee deposit is collected by Community Development when more extensive staff time is required. Actual staff time spent will be charged against the deposit. Various City staff also may charge their time spent on the case in addition to the Case Planner. The deposit amount may be reduced if, in the opinion of the Community Development Department Director, the project is expected to take significantly less time to process than the deposit indicates. A determination on the deposit amount shall be made during the pre-application conference by the Case Planner. Hourly billing shall still apply. All applications must include an Agreement to Pay Application Fees. One payment including the deposit for Planning and referral agency fees must be submitted with each land use application, made payable to the City of Aspen. Applications will not be accepted for processing without the required fee(s). The Community Development Department shall keep an accurate record of the actual time required to process a land use application requiring a deposit. The City can provide a summary report of fees due at the applicant’s request. The applicant will be billed for the additional costs incurred by the City when the processing of an application by the Community Development Department takes more time or expense than is covered by the deposit. Any direct costs attributable to a project review shall be billed to the applicant with no additional administrative charge. In the event the processing of an application takes less time than provided for by the deposit, the Department shall refund the unused portion of the deposited fee to the applicant. Fees shall be due regardless of whether an applicant receives approval. Unless otherwise combined by the Director for simplicity of billing, all applications for conceptual, final, and recordation of approval documents shall be handled as individual cases for the purpose of billing. Upon conceptual approval, all billing shall be reconciled, and past due invoices shall be paid prior to the Director accepting an application for final review. Final review shall require a new deposit at the rate in effect at the time of final submission. Upon final approval, all billing shall again be reconciled prior to the Director accepting an application for review of technical documents for recordation. The Community Development Director may cease processing of a land use application for which an unpaid invoice is 30 or more days past due. Unpaid invoices of 90 days or more past due may be assessed a late fee of 1.75% per month. An unpaid invoice of 120 days or more may be subject to additional actions as may be assigned by the Municipal Court judge. All payment information is public domain. All invoices shall be paid prior to issuance of a Development Order or recordation of development agreements and plats. The City will not accept a building permit for a property until all invoices are paid in full. For permits already accepted, any unpaid invoice of 90 or more days may result in cessation of building permit processing or issuance of a stop work order until full payment is made. The property owner of record is the party responsible for payment of all costs associated with a land use application for the property. Any secondary agreement between a property owner and an applicant representing the owner (e.g. a contract purchaser) regarding payment of fees is solely between those private parties. CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 Agreement to Pay Application Fees An agreement between the City of Aspen (“City”) and Address of Property: Please type or print in all caps Property Owner Name: Representative Name (if different from Property Owner): Billing Name and Address - Send Bills to: Contact info for billing: e-mail: Phone: I understand that the City has adopted, via Ordinance No. 20, Series of 2020, review fees for Land Use applications, and payment of these fees is a condition precedent to determining application completeness. I understand that as the property owner, I am responsible for paying all fees for this development application. For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are non-refundable. $. flat fee for . $. flat fee for $. flat fee for . $. flat fee for For deposit cases only: The City and I understand that because of the size, nature, or scope of the proposed project, it is not possible at this time to know the full extent or total costs involved in processing the application. I understand that additional costs over and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review, and presentation of sufficient information to enable legally required findings to be made for project consideration unless invoices are paid in full. The City and I understand and agree that invoices sent by the City to the above listed billing address and not returned to the City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice by the City for such services. I have read, understood, and agree to the Land Use Review Fee Policy, including consequences for non-payment. I agree to pay the following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render an application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay additional monthly billings to the City to reimburse the City for processing my application at the hourly rates hereinafter stated. $ deposit for hours of Community Development Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. $ deposit for hours of Engineering Department staff time. Additional time above the deposit amount will be billed at $325.00 per hour. City of Aspen: Phillip Supino, AICP Community Development Director City Use: Fees Due: $ Received $ Case # Signature: PRINT Name: Title: CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 LAND USE APPLICATION APPLICANT: REPRESENTIVATIVE: Description: Existing and Proposed Conditions Review: Administrative or Board Review Required Land Use Review(s): Growth Management Quota System (GMQS) required fields: Net Leasable square footage Lodge Pillows Free Market dwelling units Affordable Housing dwelling units Essential Public Facility square footage Have you included the following? FEES DUE: $ Pre-Application Conference Summary Signed Fee Agreement HOA Compliance form All items listed in checklist on PreApplication Conference Summary Name: Address: Phone#: email: Address: Phone #: email: Name: Project Name and Address: Parcel ID # (REQUIRED) The proposed landscape improvements to 314 Riverside are keeping with the aesthetic of the neighborhood and do not change the already existing topography and structures as approved previously. The site plan proposes to add an inground irrigation system as per the City of Aspen WELLS program. Replace an existing flagstone pathway with a sandset rectangular flagstone paver. Addition of a small sand set patio off existing wooden deck with a small gravel maintenance edge along North and east side of residence. Upon installation of irrigation system, the existing lawn will be sodded with Enviro Turf CITY OF ASPEN COMMUNITY DEVELOPMENT DEPARTMENT City of Aspen|130 S. Galena St.|(970) 920 5090 April 2020 DIMENSIONAL REQUIREMENTS FORM Complete only if required by the PreApplication checklist Project and Location Applicant: Zone District: Gross Lot Area: Net Lot Area: **Please refer to section 26.575.020 for information on how to calculate Net Lot Area Please fill out all relevant dimensions Single Family and Duplex Residential 1) Floor Area (square feet) 2) Maximum Height 3) Front Setback 4) Rear Setback 5) Side Setbacks 6) Combined Side Setbacks 7) % Site Coverage Existing Allowed Proposed Multi-family Residential 1)Number of Units 2)Parcel Density (see 26.710.090.C.10) 3)FAR (Floor Area Ratio) 4)Floor Area (square feet) Existing Allowed Proposed 8) Minimum distance between buildings Proposed % of demolition 5)Maximum Height 6)Front Setback 7) Rear Setback 8)Side Setbacks Proposed % of demolition Commercial Proposed Use(s) Existing Allowed Proposed 1) FAR (Floor Area Ratio) 2) Floor Area (square feet) 3) Maximum Height 4) Off-Street Parking Spaces 5) Second Tier (square feet) 6) Pedestrian Amenity (square feet) Proposed % of demolition Existing non-conformities or encroachments: Variations requested: Lodge Additional Use(s) 1)FAR (Floor Area Ratio) 2)Floor Area (square feet) 3)Maximum Height 4)Free Market Residential(square feet) 4)Front setback 5)Rear setback 6)Side setbacks 7)Off-Street Parking Spaces 8)Pedestrian Amenity (square feet) Proposed % of demolition Existing Allowed Proposed 314 Riverside Ave Aspen CO 81611 LISA TAITELMAN & BARRY COEN REV LIV TRUST COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ___________________________________ _________ ___________________________ I, the property owner, certify as follows: (pick one) This property is not subject to a homeowners association or other form of private covenant. This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature ____________________________ Date _________________ Owner Printed Name ________________________ OR Owner’s Attorney Signature ___________________________ Date _________________ Owner’s Attorney Printed Name _______________________ ADDRESS UNIT #PARCEL ID # ADDRESS: ____________________________PERMIT NUMBER: _______________________________ January 2018 & BARRY COHEN M REV LIV TRUST 2-3-2022 LISA TAITELMAN COHEN REV LIV TRUST x 2 273718159002314 N Riverside 314 N Riverside DocuSign Envelope ID: 3EB11D79-3242-436C-AE0A-15F432F200A4 427 Rio Grande Place, Aspen, CO 81611 (970) 920.5090 www.aspen.gov NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND USE/BUILDING PERMITS DURING THE EFFECTIVE TERM OF ORDINANCE #27, SERIES OF 2021 Property Address: Parcel ID Number: Property Owner: Representative/email: Scope o f Work (Provide narrative here and a separate pdf which is a succinct and clear set of supporting documents, to be attached to this form as Exhibit A, such as Letters of Completeness, Resolutions, Development Orders, Land Use Case numbers, Building Permit numbers etc. If the representation being made is that the work does not involve dimensional changes prohibited by the moratorium provide existing and proposed calculations, f loor Plans and and elevations to be attached: ___________________________________________________________________ ___________________________________________________________________ Due to the circumstances noted below, the above referenced project as defined by the Scope o f Work is exempt from the application of Ordinance #27, Series of 2021, and is authorized to pursue a land use review and/or building permit review during the effective term o f Ordinance #27, Series of 2021, an ordinance which generally places a moratorium on residential development. This authorization does not guarantee issuance o f a building permit or approval of any land use application. The applicant must submit complete information and pursue all authorized approvals in a timely fashion, adhering to all deadlines for submission, terms of Vested Rights, response times required to maintain an active building permit, and all other Land Use Code and Building Code requirements in effect as of December 8, 2021. Any amendments and or additional approvals not addressed or identified in the application, may be subject to Ordinance #27, Series of 2021. The project described above is permitted to proceed with land use review because (check all that apply): LISA TAITELMAN & BARRY COEN REV LIV TRUST □A land use application for a Development Order or Notice of Approval was submitted to the Community Development Department prior to final passage of the ordinance on December 8, 2021, and was subsequently deemed to be c omplete by the Community Development Department Director. □The land use application is seeking a Development Order or Notice of Approval for a project consisting of 100% Af fordable Housing as that term is defined at §26.104.100 of the Aspen Municipal Code, or as may be deemed necessary for the issuance of C ertificates of Affordable Housing for a 100% Affordable Housing project, or as determined by the Community Development Director . □The land use application involves Voluntar y AspenModern designation processes that meet the requirements of Section 26.415.025.C and 26.415.030. □The land use application or administrative request may be necessary to issue exempt building per mits as described below , and as determined by the Comm unity Development Director . The project described above is permitted to submit for building permit review bec ause (check all that apply ): □A building permit application was submitted to the Community Development Department prior to final passage of the ordinance on December 8, 2021, and was subsequently deemed to be c omplete by the Chief Building Official. □It is a building permit for a project that will not increase the gross square footage of development, Net leasable area, or Net livable area of any building and does not m eet the definition of demolition. □It is a building permit for a project that will not increase the Height of any building. This includes additions to or replacement of mechanical equipment or energy eff iciency systems pursuant to height exemptions as set f orth at §26.575.020 of the Aspen Municipal Code, or as determined by the Community Development Director. □It is a building permit for commercial and lodge development as stand-alone uses on a parcel or property . □The project has received or is eligible to receive a Development Order or Notice of Approval on the effective date of this ordinance. □It is a building perm it for 100% affordable housing projects as that term is defined at §26.104.100 of the Aspen Municipal Code. □It is a building permit for demolition or repair of non-habitable str uctures. Issued on ___________________, 20___, this certificate is valid through the effective date of Ordinance #27, Series of 2021, or any Ordinance which supersedes a provision of Ordinance #27, Series of 2021 in a manner which is relevant to the Scope of Work. A copy of this certificate is required when applying for any land use review or building permit. This Notice is not a Development Or der or Administrative Determination that is subject to appeal. ___________________________________ Phillip Supino Community Development Director Disclaimer: This exemption is given based on the information provided by the applicant. If changes are made, o r the scope, after a more detailed review, is found to be subject to Ordinance 27, 2021, the exemption may be revoked. Exhibit A: Floor plans and elevations representing scope of work Planning Director, for EXHIBIT A