HomeMy WebLinkAboutRio Crandall written descriptionTuesday, February 22, 2022 at 14:32:08 Mountain Standard Time
Page 1 of 1
Subject:#7 Narra've
Date:Tuesday, February 22, 2022 at 1:14:40 PM Mountain Standard Time
From:Rio Crandall
To:Alex George
Hi Alex,
Below is the written narrative of the proposal/project scope.
"The proposed landscape improvements to 314 Riverside are keeping with the aesthetic of the neighborhood and do not
change the already existing topography and structures as approved previously. The site plan proposes to add an in-
ground irrigation system as per the City of Aspen WELLS program. Replace an existing flagstone pathway with a
sandset rectangular flagstone paver. Addition of a small sand set patio off existing wooden deck with a small gravel
maintenance edge along North and east side of residence. Upon installation of irrigation system, the existing lawn will
be sodded with Enviro Turf."
Let me know if you need any more. I did not include any info on the fence but can add if needed.
Thanks!
rio crandall
bluegreen BLD
300 south spring street | suite 202
aspen, colorado 81611
studio 970 429 7499 | direct 970 379 5634
www.bluegreenaspen.com