HomeMy WebLinkAboutEngineering Comments.423 N Second StFrom:Sarah Yoon
To:Amy Simon
Subject:FW: HPC Referral Project: 423 N. Second Street
Date:Friday, December 4, 2020 12:17:46 PM
Attachments:image003.png
image004.png
image005.png
423_N_Second_Application_2020_11_20.pdf
image006.png
image002.png
From: Wyatt Young <wyatt.young@cityofaspen.com>
Sent: Friday, December 4, 2020 12:04 PM
To: Sarah Yoon <sarah.yoon@cityofaspen.com>
Cc: Hailey Guglielmo <hailey.guglielmo@cityofaspen.com>
Subject: FW: HPC Referral Project: 423 N. Second Street
Sarah,
Below are Engineering’s comments,
Prior to HPC approval the following comments need to be addressed:
1. There is an existing transformer on the property that is shown on the survey but not in the
proposed drawings. Please show this transformer on the drawings or explain where it is being
relocated. Does the existing transformer have capacity for the addition and increased use?
Work with the City Electric Department to determine available capacity.
2. An easement must be established for the existing transformer. 3’ must be clear on the sides
of the transformer vault and 10’ clear at the front. If it is a 5’ vault this means the easement
must be 11’ wide by 8’ deep with the 10’ in the front remaining clear in the alley ROW.
The following is a heads up for requirements at building permit:
1. Applicant will be required to follow the requirements of a major development within the
Urban Runoff Management Plan. The conceptual HPC plan shows the installation of a drywell
which demonstrate there is a path forward to meet stormwater requirements. Per URMP
standards the drywell lid should be at finished grade. Defer to HPC for variance on drywell lid
coverage.
2. All utilities will need to be shown at building permit. If fire suppression is provided calculations
or a memo needs to be submitted verifying water service line size. There does not appear to
be major utility/tree conflicts so the project can move forward through HPC approval.
3. The project is in the sidewalk deferred zone. A sidewalk is not required.
4. There is no curb and gutter on smuggler street. At building permit the project needs to show
there is conveyance for runoff from roadway.
5. A compliant stabilization plan needs to be put in place to account for the micropiles close to
the tree locations
Wyatt Young
Project Manager I
Engineering Department
201 N Mill St. Ste 203
Aspen, CO 81611
c: 970.404.6046
www.cityofaspen.com
From: Hailey Guglielmo <hailey.guglielmo@cityofaspen.com>
Sent: Monday, November 30, 2020 12:53 PM
To: Wyatt Young <wyatt.young@cityofaspen.com>
Subject: FW: HPC Referral Project: 423 N. Second Street
Take a look at this referral and let’s talk about it this afternoon.
From: Sarah Yoon <sarah.yoon@cityofaspen.com>
Sent: Wednesday, November 25, 2020 10:11 AM
To: Amy Simon <amy.simon@cityofaspen.com>; Bob Narracci <bob.narracci@cityofaspen.com>;
Bonnie Muhigirwa <bonnie.muhigirwa@cityofaspen.com>; David Coon
<david.coon@cityofaspen.com>; David Radeck <david.radeck@cityofaspen.com>; Denis Murray
<denis.murray@cityofaspen.com>; Hailey Guglielmo <hailey.guglielmo@cityofaspen.com>; Jack
Danneberg <jack.danneberg@cityofaspen.com>; Jim Pomeroy <jim.pomeroy@cityofaspen.com>;
Mike Horvath <mike.horvath@cityofaspen.com>; Nick Thompson
<nick.thompson@cityofaspen.com>; PJ Murray <pj.murray@cityofaspen.com>; Trish Aragon
<Trish.Aragon@cityofaspen.com>
Subject: HPC Referral Project: 423 N. Second Street
Hello All,
The attached application is for Conceptual Major Development with requests for Setback Variations.
The applicant plans to relocate the historic home onto a new basement and construct a new
addition.
If you have any comments, please email them to Amy Simon by Friday, December 4th.
Thank you!
-Sarah-
Sarah Yoon
Community Development Department
Historic Preservation Planner
130 S. Galena St.
Aspen, CO 81611
Office: 970.920.5144
Cell: 970.319.0720
www.cityofaspen.com
www.aspencommunityvoice.com
www.aspenvictorian.com
www.aspenmod.com
To promote the health and safety of our staff and community and to minimize the spread of
COVID-19, Community Development staff are conducting business by email and phone and are
only available in person by appointment. Contact information for our entire staff and how best to
get the services you need can be found on our website: cityofaspen.com/177/Community-
Development. Thank you for your understanding.
Pitkin County’s Recovery Plan for COVID-19 to make Aspen safer and healthier means we all must
follow the five commitments of containment:
1. I will maintain six feet of distance from anyone not in my household
2. I will wash my hands often
3. I will cover my face in public
4. I will stay home when I’m sick
5. I will seek testing immediately and self-report if I experience symptoms
More at https://covid19.pitkincounty.com/
Notice and Disclaimer:
This message is intended only for the individual or entity to which it is addressed and may contain information that is
confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the
sender that you have received the message in error and then delete it. Further, the information or opinions contained in this
email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions
contained in the email are based on current zoning, which is subject to change in the future, and upon factual
representations that may or may not be accurate. The opinions and information contained herein do not create a legal or
vested right or any claim of detrimental reliance.