Loading...
HomeMy WebLinkAboutEngineering_Parks Comments Engineering Comments 1. The patio area shall not be increased to accommodate the infiltration bed, it must be installed within the existing footprint. 2. The location of the infiltration bed shall not extend into the 100-year flood plain. 3. Describe or show how runoff is routed to the proposed pipe. Are there inlets in the flagstone patio/walkway or are roof drains directly connected? Parks Comments 1. Dripline excavation permit is required. 2. Hand excavation only. 3. Piping needs to be as close to existing foundation as possible to minimize impacts to tree root zones. 4. Will the 3x3x3 vault be constructed on site or delivered? 5. No roots over 2 inches can be cut without written approval of City Forester. 6. Parks preference for location of SED vault would be up by the front door, which would keep it out of the stream margin.