HomeMy WebLinkAbout2021.07.22_1411 Crystal Lake Stream Margin Exemption Review_EngineeringStream Margin Exemption Review | 1411 Crystal Lake Road | LPA-21-053 | 07/22/21
Engineering Department Comments
General Comments
What special design considerations have been taken to ensure the pool is not impacted by
fluctuating groundwater levels. What is the groundwater depth in this area?
How is stormwater runoff accommodated so that the pool doesn’t overtop to the river? What
happens during a larger storm event? Is there a drain to prevent overtopping and where does
the drain connect to?
How will the pool and the rock wall be constructed without impacting the 15’ setback? Provide
the means and methods for installation.
When the building permit is submitted, clearly show how any leaks to the pillow bladder
wouldn’t drain to the river but would drain back to the pool. Provide spot
elevations/contours/drainage arrows to prove this will not drain to the river.
Will this pool have a hard cover? If so, where does the runoff for this new impervious area
drain? Is there capacity in the property’s stormwater system for WQCV treatment and/or
detention if required? If there is no hard cover, how is drainage accommodated in the summer
and the winter?