HomeMy WebLinkAboutExhibit A - Schematic Landscape Plan (Recorded).docx7
7
1
7
7
7
1
8
7
7
1
9
7
7
1
6
7
7
1
8
7
7
1
7
7
7
1
8
7
7
1
9
7
7
2
0
7
7
2
0
77
2
1
7
7
2
3
77
2
2
772
4
7
7
2
1
7
7
2
0
7
7
2
3
7
7
2
2
7
7
2
1
772
4
7724
77
2
3
7723
7724
F
F
=
7
7
2
6
.
5
9
'
G
S
=
7
7
2
2
.
2
3
'
77
2
5
77
2
5
7
7
2
3
77
2
4
7725
772
6
772
6
7
7
2
5
7
7
2
7
S
2
9
°
2
7
'
1
2
"
E
8
7
.
1
2
'
(
R
)
S
1
3
°
1
2
'
0
0
"
E
2
4
.
0
6
'
(
R
)
N 51
°
0
0
'
0
0
"
E
2
6
6
.
5
0
'
(
R
)
5
1
9
.
5
9
S 67°2
5
'
0
0
"
W
2
6
3
.
5
6
'
(
R
)
S
4
5
°
5
2
'
0
0
"
E
3
8
.
5
2
'
(
R
)
W
F
F
=
7
7
2
5
.
5
9
'
F
F
=
7
7
2
6
.
5
9
'
77
2
2
77
2
3
7
7
2
4
7
7
2
5
7726
7721
7
7
2
0
7
7
2
1
7
7
2
2
7726
7727
7
7
2
8
77
2
3
7
7
2
4
0'10'
Scale: 1"=10'
N
piñon sage
landscape architects
carbondale, CO, 81623
devin@pinonsage.com
(970) 379.0816
14
4
0
R
E
D
B
U
T
T
E
R
E
S
I
D
E
N
C
E
14
4
1
0
R
E
D
B
U
T
T
E
D
R
I
V
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
PS job# - 227
drawn - MV/DG ckd - DG
revisions
description#date
L1.0
SCHEMATIC
LANDSCAPE
PLAN
ISSUE DATE - 12/13/22
STREAM
MARGIN
REVIEW
20'
PROPOSED GARAGE
ACCESS FOR BELOW GRADE
STOARGE
PERMEABLE PAVER DRIVE
COLOR TBD
PAVER PATH AROUND
HOUSE. PLANTED GAPS
WITH GROUND COVERS
NEW HARDSCAPE ENTRY WALKWAY.
STONE OR PERMEABLE PAVERS
REMOVE ISLAND TO
INCREASE PARKING AND
BETTER CIRCULATION
PLANTING PLAN KEY LANDSCAPE KEY
PROPOSED EVERGREEN TREE
PROPOSED SHRUBS
MORTAR SET STONE/TILE
LOW GROW NATIVE GRASS
LAWN GRASS
PERENNIAL BEDS
SETB
A
C
K
2
5
'
S
E
T
B
A
C
K
STONE SLAB STEPS AND STEPPERS FOR
MAINTENANCE ACCESS AROUND HOUSE.
STONE OR WOOD MULCH GAPS. HEAVILY
SHADED AREA
EXISTING SPA TO BE PLACE IN AN 18"
VAULT. 18" WIDE STONE OR WOOD
COPING FOR SEATING AND ACCESS.
TERRACE FINISH TO MATCH
OTHER OUTDOOR TERRACES
NO CONSTRUCTION BEYOND
15' TOP OF SLOPE SETBACK
T
O
P
O
F
S
L
O
P
E
1
5
'
T
O
P
O
F
S
L
O
P
E
S
E
T
B
A
C
K
PERMEABLE PARKING AREA -
SPOTS FOR 2 VEHICLES
UNDERSTORY GARDENS TO REMAIN
AND ENHANCED BY SHADE LOVING
GROUND COVER AND PERENNIAL
PLANTS
ACCENT PLANTING AND BOULDERS
TO MATCH EXISTING CONCEPT
GRASS
GRASS
OUTDOOR KITCHEN - LAYOUT
OF AMENITIES BY OTHERS
PERGOLA STRUCTURE OVER
DINING TABLE
PRE-FAB PLANTER BOXES.
COLOR TBD
SEEDED AND HAND-DUG
REVEGETATION APPROVED BY
CITY OF ASPEN WITHIN 15' TOP OR
SLOPE SETBACK
PROPOSED ASPEN TREE
PROPOSED EVERGREEN TREE
EXISTING TREE
3
0
'
S
E
T
B
A
C
K
SET
B
A
C
K
STORM WATER TREATMENT
1. REFER TO CIVIL ENGINEER'S UTILITY AND PRECISE GRADING PLANS FOR UTILITY LOCATION AND FINAL GRADING. IF ACTUAL
SITE CONDITIONS VARY FROM WHAT IS SHOWN ON THE PLANS, CONTACT THE LANDSCAPE ARCHITECT FOR DIRECTION AS TO HOW
TO PROCEED.
2. VERIFY PLANT COUNTS AND SQUARE FOOTAGES: QUANTITIES ARE PROVIDED AS OWNER INFORMATION ONLY. IF QUANTITIES
ON PLANT LIST DIFFER FROM GRAPHIC INDICATIONS, THEN GRAPHICS SHALL PREVAIL.
3. CONTACT THE LOCAL UNDERGROUND UTILITY SERVICES FOR UTILITY LOCATION AND IDENTIFICATION.
4. PERFORM EXCAVATION IN THE VICINITY OF UNDERGROUND UTILITIES WITH CARE AND IF NECESSARY, BY HAND. THE
CONTRACTOR BEARS FULL RESPONSIBILITY FOR THIS WORK AND DISRUPTION OR DAMAGE TO UTILITIES SHALL BE REPAIRED
IMMEDIATELY AT NO EXPENSE TO THE OWNER.
5. TREES SHALL BEAR SAME RELATION TO FINISHED GRADE AS IT BORE TO EXISTING.
6. PROVIDE MATCHING FORMS AND SIZES FOR PLANT MATERIALS WITHIN EACH SPECIES AND SIZE DESIGNATED ON THE
DRAWINGS.
7. PRUNE NEWLY PLANTED TREES ONLY AS DIRECTED BY LANDSCAPE ARCHITECT.
8. FINISH GRADES OF PERENNIAL BEDS AND REVEGETATED AREAS TO BE 1-1/2 INCHES BELOW ADJACENT PAVING OR HEADER.
(CHECK MULCH DEPTH AND IF SEEDED OR SODDED LAWNS).
9. SEE IRRIGATION DRAWINGS FOR IRRIGATION SLEEVES LOCATION.
10. CUT AND REMOVE BURLAP FROM TOP 1/3 OF ROOTBALL.
LANDSCAPE PLANTING NOTES
1 - TOPSOIL OF IRRIGATED GRASSES (INCLUDING TURF), SHRUBS, PERENNIALS, AND
ANNUALS SHALL BE A SANDY LOAM TO A DEPTH OF AT LEAST 6 INCHES (6”)
CONTAINING AT LEAST 5 PERCENT (5%) ORGANIC MATTER BY VOLUME.
2 - TREE SOIL SHOULD HAVE A MINIMUM DEPTH OF 3 FEET (3’). BOTH TOPSOIL AND
SUBSOIL LAYERS SHALL BE SANDY LOAM. THE TOP SOIL SHALL BE AT LEAST 6 INCHES
(6”) AND HAVE 5 PERCENT (5%) ORGANIC MATTER BY WEIGHT AND SUBSOIL SHALL
HAVE AT LEAST ONE TO THREE PERCENT (1 - 3%) ORGANIC MATTER BY WEIGHT.
3 - A MINIMUM OF FOUR (4) CUBIC YARDS OF ORGANIC MATTER SOIL AMENDMENT PER
ONE-THOUSAND SQUARE FEET OF LANDSCAPED AREA SHALL BE REQUIRED AS
NECESSARY TO MEET THE 5 PERCENT (5%) ORGANIC MATTER SPECIFICATION.
4 - SOIL AMENDMENT ORGANIC MATTER SHALL CONSIST OF EITHER CLASS I AND
CLASS II COMPOST.
5 - AMENDMENT SHALL BE TILLED TO A MINIMUM DEPTH OF SIX INCHES (6”).
6 - SITE SHALL BE GRADED TO WITHIN TWO-TENTHS OF A FOOT (2/10TH’) OF THE
GRADING PLAN.
7 - SITE SHALL BE FREE OF ROCKS AND DEBRIS OVER ONE INCH (1”) DIAMETER IN
SIZE. ROCKS AND DEBRIS 0.5 INCH (0.5”) TO ONE INCH (1”) SHALL NOT EXCEED 5
PERCENT (5%) BY VOLUME AND GRAVEL 0.6 INCH (0.6”) TO 1.25 INCHES (1.25”) SHALL
NOT EXCEED 5 PERCENT (5%) BY
VOLUME. PARTICLES SUCH AS CONCRETE, BRICK, GLASS, METAL, WOOD OR PLASTIC
GREATER THAN ONE INCH (1”) SHALL NOT BE ALLOWED. THE TOTAL VOLUME OF
THESE MATERIALS SMALLER THAN ONE INCH (1”) SHALL NOT EXCEED 5 PERCENT (5%).
8 - SITE SHALL BE FREE OF DIRT CLODS OVER THREE-QUARTER INCH (3/4”) DIAMETER
IN SIZE. DRYLAND SEED AREAS MAY CONTAIN DIRT CLODS UP TO TWO INCH (2”)
DIAMETER IN SIZE.
9 - STOCKPILING - STRIPPING AND STOCKPILING OF INDIGENOUS SOIL (TOPSOIL)
SHALL BE REQUIRED.
10 - THE SOIL SHALL HAVE NO HERBICIDES, HEAVY METALS, BIOLOGICAL TOXINS OR
HYDROCARBONS THAT IMPACT PLANT GROWTH OR EXCEED THE EPA’S STANDARDS
FOR SOIL CONTAMINANT.
11 - ORGANIC MULCH SHALL BE APPLIED AT ONE (1) CUBIC YARD PER EIGHTY (80)
SQUARE FEET AT A DEPTH OF FOUR (4) INCHES, AND AS APPROPRIATE TO EACH
SPECIES.
12 - ORGANIC MULCH SHALL BE APPLIED TO THE SOIL SURFACE, NOT AGAINST THE
PLANT STEM OR HIGH AGAINST THE BASE OF TRUNKS TO MINIMIZE DISEASE.
13 - CITY OF ASPEN WATER EFFICIENT LANDSCAPING STANDARDS 7 OF 16
ORGANIC MULCH MATERIAL INCLUDES BARK AND WOOD CHIPS. AVOID MULCH
CONSISTING OF CONSTRUCTION DEBRIS SUCH AS PALLETS.
14- INORGANIC MULCH INCLUDES ROCK, GRAVEL, OR PEBBLES.
ROCK MULCH SHALL HAVE A MINIMUM DEPTH OF TWO INCHES (2”)
SOIL AND MULCH PREPARATION NOTES