Reception#693078 - APPROVAL - 2pg(s)
Recording Surcharge: $3.00
Recording Fee:$15.00
$18.00
Reception#693079 - APPROVAL - I Ipg(s)
Recording Surcharge: $3.00
Recording Fee: $60.00
$63.00
Total Fees
Received: Escrow Account
Change
Escrow Account: ASPEN CITY OF (COMM DEV) (New Balance: $719.00)
Presented by:
ASPEN CITY OF (COMM DEV)
COMMUNITY DEVELOPMENT
130 S GALENA ST
ASPEN, CO 81611
$81.00
$0.00
Ilillllllllilllillllllllllllllll lllllllil111111Hill Hill Hill lll1111111111
RECEPTION#: 693078, R. $18.00, D: $0.00
DOC CODE: APPROVAL
Pg 1 of 2, 02/10/2023 at 10:32:56 AM
31
_. Ingrid K. Grueter, Pitkin County, CO
CERTIFICATE OF NO NEGATIVE EFFECT, COMMERCIAL DESIGN REVIEW AND
ADMINISTRATIVE VIEWPLANE REVIEW
Applicant: Gravity Haus, with the authorization of the property owner, 315 East Hyman
Avenue Holdings LLC
Property: 315 E. Hyman Avenue, Wheeler Square Condominium Units 101 to 110, Units
200 to 209, Units 301, 303, 305 and Common Area, City and Townsite of Aspen, Colorado
Determination: This 8th day of February, 2023, the following alterations have been
approved as represented in Land Use Application LPA-22-102: Replacement of rooftop
mechanical equipment, venting and ducting; installation of new mechanical screen walls
and a new gate over an electrical equipment alcove; construction of a new roof flashing
detail, particularly at the parapet; replacement of the roof membrane; installation of wood
siding and steel panels in areas of the south fagade; replacement of a section of existing
guardrail; removal of an exterior door and vestibule in the below grade courtyard; and
addition of a new door in the below grade courtyard.
Certificate of No Negative Effect and Commercial Design Review
The subject property is not landmark designated, but is located in the Commercial Core Historic
District. The scope of work qualifies for a Certificate of No Negative Effect according to Section
26.415.070.8 of the Aspen Municipal Code in that the scope results in 1) Mechanical
equipment or accessory features that have no impact on the character -defining features of
the building or structure, and 2) alterations to a noncontributing building within a historic
district that have no adverse effect on its historic or architectural character. Similarly,
Administrative approval for compliance with Commercial Design Review is appropriate
according to Section 26.412.090.A.3.
Based on a review of the applicable Commercial, Lodging and Historic District Design
Standards and Guidelines, staff finds that the proposal as submitted complies with the design
guidelines.
ESA Mountain View Plane —Administrative Review
The property is located in the foreground of the Wheeler Opera House view plane. According
to Section 26.435.E of the Aspen Municipal Code, an addition to a structure or an attached
building feature that does not meet the criteria for Exemption from View Plane review may be
approved by the Community Development Director through Administrative Review if:
1. The Infringement is erected only to the minimum height needed to accomplish the purpose
for which it serves and the height and setbacks comply with the standards of Section
26.575.020, the dimensional requirements of Chapter 26.710, and the Design Guidelines
and Standards in Chapter 26.412, Commercial Design Review or 26.415, Historic
Preservation, as applicable; or
2. The Infringement cannot be seen with the naked eye from the reference point as
demonstrated by a visual resource analysis.
The project involves the addition of attached building features, specifically new mechanical
equipment and screening on the roof. These elements are new intrusions into the viewplane.
The application demonstrates that the equipment and screen walls are all compliant with the
height and setback standards applicable to these elements as expressed in Section
26.575.020, Calculations and Measurements and in the Commercial Core Zone District.
Applicable design guidelines are also met. The project has designed the HVAC system to
the minimum standards to serve the building while limiting impact on the view plane.
Approval is granted subject to the following conditions:
1. The new decorative steel plate to be installed on the south fagade is to attach to the
building through mortar joints only, not the face of the masonry.
2. The plywood sheathing on top of the trellis facing Hyman Avenue shall be removed in
its entirety, as represented in the application.
3. The project does not increase floor area or net leasable area and is therefore exempt
from GMQS Review according to Section 26.470.070.E of the Aspen Municipal
Code.
4. The project does not change the existing amount of on -site Pedestrian Amenity.
5. The project complies with Second Tier space minimums.
6. The structure is occupied by more than one separately operable tenant.
Director
Expires 3 years from date of separately issued Development Order. Issuance of this
certificate does not exempt the applicant from complying with all City codes, including land
use and building codes.