HomeMy WebLinkAboutCopy of Lift 1 Corridor - RequirementsOrdinance Section Party(ies)Task Document Type Notes Generator
Section 11 City Verify dimensions (Garrett assist)application
Will potential changes in net leasable vs. lodge accessory…trigger
Major Development (potential council re-review/vote issue)City
Section 15(E)GH An updated TIA will include a monitoring plan at Detailed Review application GH
Section 15(F)GH A final engineered design for S. Aspen Street application
1. Requires review by Fire and Engineering
2. A reimbursement agreement is required between LOL, GH and
S. Aspen Street Townhomes (section 14)GH
Section 15(G)GH Draft subdivision and vacation plat plat GH
Section 15(H)GH Draft Ski operations plan GH
Section 15(I)GH Draft Hill St. revoacable encroachment license for hardscape license GH
Section 15(J)GH
Utility easments for Summit St. and S. Aspen St. (applicant's private utilities?)recorded with
subdivision plat easement GH
Section 18(F)GH TIA. At Detail Review submit mudflow analysis, utility plans, address DRC comments, remedy TIA application GH
Section 20(A)GH
Landscape plan considering planting, maturation needs, and ski corridort operational needs as part
of Detail application GH
Section 20(C)GH Prior to Final approval finalize pedestrian/bike trail public access from Hill, BK4, PG 489.easement Appears to need to be a separate easement GH
Section 20(D)GH Prior to Final approval dedicate public access that allows access across Lot 2/mtn service road easement Appears to need to be a separate easement GH
Section 20(E)GH Prior to Final approval dedicate pedestrian/public access on western stairway easement Appears to need to be a separate easement GH
Section 22(B)GH As part of Detail Review, appropriate trash design is needed application GH
Section 26 GH Any changes required by Tramway Board can be reviewed as part of Detail application GH
Section 2 (C) & (D)City/SkiCo
Vesting: commences with issuance of D.O. (10 year clock), but 5 year clock begins with issuance of
40 year 'Dolinsek License' to SkiCO; however, 10 year vesting allowance for the D.O.
D.O./Dolinsek
license 1. Important to time the 40 year Dolinsek license.SkiCo
Section 3(B)GH Recordation: Subdivision plat to be submitted within 180 days of issuance of D.O.plat GH
Section 5(A)GH/SkiCo
Within 180 days of issuance of D.O., easement/licenses for skiing/operations shall be submitted for
review (Lot 1)easement
1. Easement for skiing and operations developed for Lot 1
2. Must provide insurance provision GH
Section 5(C)City/SkiCo
Within 180 days of issuance of D.O., easement/licenses for skiing/operations shall be submitted for
review easement
1. City will enter into a fee-free non-exclusive easement
agreement w/SkiCo for ski related purposes over Hill Street
2. must provide insurance provision ASC
Section 5(D)City/GH
City will enter into easement agreement w/GH over city owned land for construction work/staging,
over-digging, soil nails, crane, etc. except Dolinsek (unless permitted to do so)easement 1. must provide insurance provision GH
Section 30 Winter Maintenance - S. Aspen St., from final approval Installation of snowmelt is deferred
Detailed Review Application: Submitted
Issuance of Development Order
(A) and (B)City/GH/LOL
Year 1 - Baseline traffic study completed and submitted to Com Dev, City of Aspen will evaluate
potential effectiveness of alternative applications
traffic study and
EIA?
1. Baseline study of traffic.
2. Also evaluates future approved uses traffic volumes
3. City needs to study alternative products, treatments to S.
Aspen street and monitor water quality GH/LOL/City
(C)City
Year 2 - City shall indentify snowmelt technologies and evaluate environmental/financial costs and
study renewable options report City
(D)GH/LOL/City
Within 1 year of CO for LOL and GH - actual traffic impact evaluated by LOL and GH, City will engage
in alternative snow plowing/storage/removal techniques (document), council can require snow
melt at a public meeting, if installed 1/3 of cost paid byGH and LOL (2/3 total)
traffic study
update, report GH/LOL/City
Section 3(C)City Rezoning occurs upon recordation of plats, plan sets and development agreements.Zoning Map
1. Lot 1 is rezoned to Lodge (L)
2. Lot 2 remanins Conservation (C).
3. Both get a PD designation City
Section 4(A)City/GH
Within 45 days of plat recordation, conveyance of title will occur (conveyance of deeds) for altered
r-o-w (vacation & dedication)deeds
1. plat needs vacation of r-o-w shown, acceptance of new r-o-w,
and any necesssary easements GH
Section 14
GH/LOL/Bald
Mountain Reimbursement agreement, GH = 20.45% for S. Aspen Street agreement GH/LOL
Section 15(I)GH Hill St. revocable encroachment license recorded with subdivision plat
encroachment
license GH
Section 15(J)GH
Utility easments for Summit St. and S. Aspen St. (applicant's private utilities?)recorded with
subdivision plat easements GH
Section 16 (A)GH
Documents required for Approved Plan Set: Architectural Character Plans, Mud flow/storm water
mitgaton plans, Public Infrastructure plan, Final TIA/monitoring plan, subdivsion plat (including
vacation and dedication/easements)plats GH
Section 16(B)GH
Subdivision/PD Agreement (same as Development Agreement)submitted within 180 days of Detail
approval by P&Z: construction staging/sequencing w/coordinantion, easement or license for skiing
and operations, site protection and site enhancement guarantees, landscape guarantees, public
facilities/public infrastructure (redundant with Eng?), Stormwater/drainage agreements GH
Section 28 GH Plat note with development restriction on Lot 2
1. Note will restrict residential development
2. Authorize ski infrastructure and operations
3. Ability to conduct approved special events GH
Section 29 GH access easment needed for rooftop amenity space
easement/agree
ment GH
Section 18(B)GH Compliant drainage and mudflow plans at building permit submission
building permit
application GH
Section 18(D)GH Excavation/stabilization plan with building permit submission
building permit
application GH
Section 18(E)GH
Inclinometer installation & monitoring required through issuance of C.O. Initial report at building
permit application, then biannual readings and subsequent report prior to C.O.
building permit
application GH
Section 20(B)GH Tree protection plan as part of bulding permit application
building permit
application GH
Recordation of Entitlements
Building Permit Application
Building Permit Issuance
Section 16(B)(5)GH Proof of Financing, prior to issuance of buildig permit, reviewed by City Attorney/Building Dept.GH
Section 20(A)GH Tree removal permits prior to demolition or site work GH
Section 27 (F)GH
At time of demolition of 1A, GH will contribute 1 million via escrow, to be released to LOL with
White Box delivery of Skier's Chalet Lodge GH
Section 12 GH
An employee generation audit is required after 2 years of CO to verify employee generation of FM
component.audit
1. Approved for employee reduction of FM. Audit to verify FM
generation, compared to lodge. Mitigation could result
depending on outcome.
2. APCHA requests audit, paid by GH.GH
Section 12 GH AH Mitigation for GH shall be satisfied prior to issuance of CO.mitigation
1. Besides on-site, off-site, buy-down, AHCs.
2. Physical units within the UGB.
3. Cash-in-lieu is not permitted.GH
Section 13 GH/APCHA
Deed restriction for on-site AH unit shall be recorded prior to issuance of CO of lodge, FM, or
Commercial of the hotel. Requires 1 assigned parking space in garage
deed restriction/
condo dec.
1. Condo declaration, needs language approved by APCHA, of
requirements if the unit were to become an ownership unit.GH
Section 21 GH prior to CO, must connect to ACSD upgraded sewer line
Section 16(B)(6)Condo plat - clarify with final that it is submitted upon substantial completion of the project
Section 16(C)Other Agreements as necessaery between parties
Need to rezone Dolinsek to Park, currently zoned lodge, what zone district works for trust and allows for skier return?
Issuance of C.O.
Follow-up Questions
need to pull in Bart on
reimbursement
may be on plat, check
refrence on the plat of theplat or
can it be part of plat for ease?
refrence on the plat of theplat or
can it be part of plat for ease?
refrence on the plat of theplat or
can it be part of plat for ease?
Follow-up with True on
execution/clock start
target for final approval is Jan.
2021 building permit is april,
2022, this has to happen winters
2020/2021. done January 2022.
assume final approval Jan 2021,
EOY 2 would be Jan. 2023
year to require snowmelt?
how does this get hashed out?
(Bald Mtn?) changes to cul-de-
sac beyond intial design borne by
GH
check and make sure Eng wants
TIA recorded, sometimes pul
certain documents
different from LOL, no cash-in-
lieu