Loading...
HomeMy WebLinkAboutDRC Response_Cover Letter_Detailed Review Summary of Updates 200921Design Workshop, Inc. Landscape Architecture Planning Urban Design Strategic Services 120 East Main Street Aspen, Colorado 81611 970.925.8354 designworkshop.com September 21, 2020 Garrett Larimer Community Development Department Copy to: Jennifer Phelan Capital Assets City of Aspen 130 South Galena Street, 3rd Floor Aspen, CO 81611 Dear Garrett, In response to the collective August 17th, 2020 Development Review Committee (DRC) Comments and subsequent requests for additional details/revisions to the Gorsuch Haus Detailed Review Application and Draft Plan Set submitted on March 2nd, 2020 we have prepared a package of updated materials with responses to questions raised in your review. The package also includes previously requested materials and additional studies useful for our upcoming Planning and Zoning review. Summary of Amendments The following summary of our amendments is organized around the comments we received from the Detailed Review Development Review Committee. Life safety and further detailing has required changes as detailed herein; the application is materially consistent with the Ordinance 39. Tramway Board Approval The Aspen Skiing Company airspace variance request for the Gorsuch Haus was approved by the Colorado Passenger Tramway Safety Board on September 9, 2020. The Project obtained approval following review and recommendations by the Technical committee. These changes are: • The addition of a lift tower between the previously located Tower 4 and 5. Tower 5 shifted upslope and was renumbered Tower 6. • Tower heights increased to achieve greater vertical separation between the public amenity space below. • The Gorsuch Haus roof overhang at the Northeast corner of the building was reduced and the face of building was modified to provide 12ft of horizontal clearance between the downhill carrier and face of building. To make this change, a reduction of the enclosed dining area at the World Cup Terrace occurred. Tree Mitigation and Landscape Plan As a result of the September 1, 2020 meeting with the Parks Department, it was determined the removal of all trees in South Aspen St. ROW would be necessary due to Design Workshop, Inc. 2 grade changes below the drip line of the trees to accommodate mudflow and stormwater infrastructure. Submitted as part of this update are: • Updated Survey identifying these trees to be removed and their size. • Updated Existing Landscape Plan and tree mitigation fee calculation • Updated Landscape Plan showing additional replacement trees and updates of street trees type to red maple. Engineering Meeting between the Applicant team and Engineering occurred on August 28 and September 10, 2020 to discuss the DRC comments received. The changes reflected in the draft Detailed Review Plan Set included as part of this update include: • Minor changes documented in the West Swale Plan, Profile and Sections due to grade modification in ROW as a result of tree removal and the lower the cul de sac wall height. • Minor changes documented in the Perimeter Grading Plan. On the west, changes have occurred to the top of wall heights as a result of the swale adjustments and also the modification the exiting on Level 4 from a door on the west side to a door and a new corridor on the east. East perimeter grades have been updated to accommodate this new exiting strategy. • The Cul de Sac Plan, Profile & Grading Plan reflects the adjusted wall heights at the cul-de-sac walls and provides further clarification of spot elevations at the entrance to the garage – indicating that the entrance is also the high point. • Bollards have been included at the cul de sac. • The snow-melted concrete specification has been updated to reflect a higher strength psi. • Design Workshop memos of August 26th and September 15th to the Engineering Department provided additional responses to the Department’s comments. Development Agreement, Easement Modifications and Plat Updates The Applicant team discussed easement and plat modifications with Engineering during the discussions on August 28 and September 10, 2020. All modifications have been reviewed and verified with the Aspen Skiing Company. The noted changes to the Draft Development Agreements, Easements and Plat include: • Additional language clarifying access for pedestrians and bicyclists on the Mountain Access Road. • The access easement from the Project to Monarch Street has increased in width to 6ft. • An access easement has been included for City maintenance of the mudflow inlet. • A permanent encroachment license agreement has been included for the 16in water line in the Hill Street ROW. • Drainage easements have been updated. Dimensional Standards The Applicant team engaged Community Development and Zoning in several discussions related to the classification of space and calculations of floor area. The Project design steps Design Workshop, Inc. 3 with the topography so minor floor area adjustments have been driven by proportionate sub-grade area, as revised. This has resulted in updates listed below to the overall project. The revised floor areas are documented in the tables provided. • Adjustments have been made to the classification of space from non-unit to lodge use. Greater detail of non-unit spaces has been provided. Additionally, calculations have been updated to include the following areas: o The Parking Level entry to garage o Level 4 Mechanical space • Average net livable are for individual lodge units has been updated to comply with the method for measuring determined by Community Development. This resulted in a decrease of the average unit size – impacting Affordable Housing calculations. Table 1. Floor Area Comparison Project Review Detailed Review Lodge 42,077 34,022 Commercial 7,730 7,483 Affordable Housing 730 730 Free Market Residential 8,633 8,000 Total Floor Area 64,023 63,614 Total Number of Keys (Hotel Rooms) 81 Table 2. Proposed Floor Area Floor Level % of Exposed Wall Affordable Housing Lodge Commercial Residential Below Grade Parking Level 0.0%0 0 0 0 0 - Level 1 Arrival 27.0%0 806 49 0 2,595 3,450 Level 2 41.6%334 3,400 308 0 1,137 5,179 Level 3 67.3%0 1,923 3,852 0 1,793 7,568 Level 4 69.5%0 6,094 582 0 1,138 7,815 Level 5 72.5%0 9,496 0 0 718 10,214 Level 6 75.5%0 8,226 0 0 747 8,973 Level 7 85.2%0 10,217 0 0 488 10,705 Level 8 Rooftop Deck 100.0%0 0 0 5,441 1,076 6,517 Level 9 100.0%0 0 3,192 0 3,192 334 40,163 4,791 8,633 9,693 63,614 Total Lot Area (slopes and rights-of-ways excluded)28,301 0.01 1.42 0.17 0.31 2.25 TOTAL FLOOR AREA PROPOSED FLOOR AREA RATIO Total Floor Area Total Proposed Unit Space SF Non-Unit Space AH, L, C ,R Total Above Grade Floor Area Design Workshop, Inc. 4 The Applicant maintains the request that the approved dimensions from the Project Approval pursuant to Ordinance 39 Series of 2016 remain in full effect. Minor adjustments to reflect programming changes as the project moves from planning to building permit shall be permitted, but in no instance shall any dimensions exceed what is outlined in said Ordinance. Table 3. Proposed Net Livable/Net Leasable Calculations Affordable Housing Lodge Free Market Residential Commercial Below Grade Parking Level - - - Level 1 Arrival - - 180 Level 2 730 2,394 742 Level 3 - 1,944 5,723 Level 4 - 5,010 838 Level 5 - 7,704 - Level 6 - 7,858 - Level 7 - 9,112 - Level 8 - - 5,072 - Level 9 - - 2,928 - Total Net Livable / Leasable 730 34,022 8,000 7,483 81 420.02Average Net Livable Area of Individual Lodge Units Net Leasable / Livable Sq. Ft. Floor Level Total Number of Keys (Hotel Rooms) Design Workshop, Inc. 5 Affordable Housing Updated calculations will be conducted at final review and confirmed at building permit. The Affordable Housing requirement with the Density Standard incentives applied are derived using 26.470.100(A)³ and interpolated from the chart in Code Section: 26.470.070.8.a.2 based on the average unit size of 420. Table 4. Affordable Housing Mitigation Requirements Lodging Take-offs 1 Regular Hotel Rooms 81 Total Number of Keys 81 Required GMQS Pillow Allotments 2016 Pillow Allotments 2017 Pillow Allotments Total Lodging Net Livable Area (sf) 34,022 162 112 50 Average Unit Size - Total Lodging Net Livable Area / Total Number of Keys (sf) 420.0 Chart / Average Unit Size - Net Livable Area of Lodge Units Percent (431.9- 400)/100 500 420.0 0.20 400 Required Mitigation Percentage - Interpolated Chart - Sec. 26.470.070.8.a.2 Lodge Development 2 Mitigation % of Employee Generation (Lodge/Commercial) ((40-20)*0.20+20)*100 40 24.00% 20 Mitigation % of Net Livable Area (Free Market) ((30-20)*0.20+20)*100 30 22.00% 20 Design Workshop, Inc. 6 Table 5. Affordable Housing Mitigation Calculations 0.00% 24.00% # of Keys Average Unit Size Lodge / Owner Restricted Condominiums 81 420.0 0.6 Employees / Key4 48.60 24.00%11.67 11.67 4,666.56 Commercial Land Use Category6 Total Commercial Net Leasable Total Commercial Net Leasable At Grade 4.7 25.23 24.00%6.06 Total Commercial Net Leasable Subgrade [Level 2 & 3]3.5 8.3 24.00%1.98 8.04 3,216.34 Free Market Multi-Family Residential Percent of Square Footage Required for Mitigation Requited Mitigation (8,000 x 30%) Net Livable Area 0.00%- 0.00 - 19.71 7,882.90 Free Market - Net Livable Area Percentage Requiring Mitigation Required Mitigation Percentage Requited Mitigation (48.6 FTE x 26.39%) Total Employee Generation Required (FTE) Total Square Footage Requirement9 (at 400 sf per FTE) Net Leasable Square Feet (sf)7 Percent of Employee Generation Required for Mitigation1 Lodge Land Use Category 4 Totals for Mitigation Employee (FTEs) Generation Rate5 (Code Generation) FTE Employees Generated (81 x 0.6) FTE Employees Generated a.(5,958/1000)* 4.7 b.(642/1000)*3. 5 Percent of Employee Generation Required for Mitigation1 Requited Mitigation AFFORDABLE HOUSING REQUIREMENTS SUMMARY: Total Employee Mitigation Required (FTEs) (Lodging FTE + Commercial FTE +,Free Market Net Livable Conversion to FTE) Total Square Footage Mitigation Requirement (sq. ft.) Total Square Footage Requirement9 (at 400 sf per FTE) Total Employee Generation Required (FTE)³ 2,362 5,368 Employees (FTEs) Generated for each 1,000 sf8 (Code Generation) Lodging/Commercial - Employee Generation Percentage Requiring Mitigation 7,483 Total Employee Generation Required (FTE) Total Square Footage Requirement9 (at 400 sf per FTE) Net Livable Square Feet (sf)7 8,000 Design Workshop, Inc. 7 Notes: 1. For lodging projects with flexible unit configurations, also known as "lock-off units," each separate "key" or rentable division shall constitute a unit. 2. With the density bonus established at 550 sf of gross lot area per lodging key through the dimensional standards for the Gorsuch Haus Planned Development within the Lodge zone district, the employee generation mitigation requirements are established utilizing the chart applicable to lodging development pursuant to the chart in Section 26.470.070.8.a.2 of the Land Use Code. The chart requires an interpolation of the percentage of mitigation required based on the average net livable area of the lodging units for the Gorsuch Haus development. When the average unit size falls between the square-footage categories (in this case between 400 sf and 500 sf) the required affordable housing is determined by interpolating the schedule illustrated in the chart for Section 26.470.070.8.a.2 (in this case between 20% and 30% for the Affordable Housing Net Livable Area required as a percent of free-market net livable area and between 20% and 40% for the percentage of employee generation requiring the provision of mitigation). 3. Per Code Section 26.470.100 (A) for lodge projects only: An efficiency or reduction in the number of employees required for the lodging component of the project may, at the discretion of the Commission as a City of Aspen Land Use Code Part 400 – GMQS Page 9 means of incentivizing a lodge project, be applied as a credit towards the mitigation requirement of the free-market residential component of the project. Any approved reduction shall require an audit to determine actual employee generation after two (2) complete years of operation of the lodge. 4. AH employee generation for Lodging is based off of the number of lodging units, other uses including administration, back of house, living room, front desk, ski concierge, ski locker, valet, storage, conference space, business center, etc. are classified as accessory uses and therefore they do not generate employees. The spa is also under the accessory use category as it is not anticipated to be open to the public and will serve only lodging and residential guests. Additionally, the unit space for lodging does not include circulation, mechanical, and other space that is not included in the calculations for net-livable or net leasable space. 5. Employee Generation Rate for the Lodge zone district pursuant to code section 26.470.100.A.1. Employee generation is 0.6 per lodging bedroom and 4.7 employees generated per 1000 sf of net leasable space 6. Commercial uses include Food and Beverage, Retail, Service and Recreation. The accessory lodging uses such as the spa area and conference facilities are not included in the mitigation for affordable housing as these are accessory lodging uses. 7. AH calculations for commercial and residential areas are based on the Net Leasable and Net Livable areas within a development as defined Per Code Section 26.575.020.I Measurement of Net Leasable Area and Net Livable Area. 8. Section 26.470.100.A states that per the Lodge or Commercial district zoning 4.7 employees are generated per 1,000 sf of net leasable space; however, for basement and upper floors the rates of employee generation shall be reduced by 25% (does not apply to lodge units) this equates to an employee generation rate of 3.525 employees per 1,000 sf of net leasable commercial space. 9. Per code section 26.470.100.A.4. Employee/square footage conversion. Whenever an affordable housing mitigation requirement is required to be converted between a number-of-employees requirement and a square- footage requirement, regardless of direction, the following conversion factor shall be used: 1 employee equals 400 square feet of net livable area. Design Workshop, Inc. 8 Building Code compliance review performed by Jensen Hughes in addition to DRC comments from Building resulted in modifications to the existing strategy and construction to improve life safety. Changes are listed below: • Emergency egress and exiting change occurred at Level 4. Exiting was redirected from the west to the east through a new corridor and discharge door. • Additional wall sections and code compliance reviews are included to provide greater detail. • The Jensen Hughes Code Compliance narrative of September 8, 2020 was provided to the City of Aspen Building Department to provide detailed support for the project’s IBC compliance. Measurement of Height Community Development, Zoning and the Applicant Team have engaged in detailed discussions to confirm the method for measuring height. Following is the method defined by the Land Use Code and the approach the Applicant is utilizing for this Project: • At the perimeter of the building, height is measured from the most restrictive of proposed or interpolated grade measured at the midpoint of the continuous roof plane. The midpoint is defined by Aspen Land Use code section 26.575.020.f.2.b. It is our understanding from this code section that the midpoint of each roof plane and all portions below the midpoint of the roof line must be to be under 40ft of the most restrictive grade. • Within the proposed grade definition, our understanding of what is considered finished grade is either the dirt or occupiable surface at the face of the building as would be defined by measuring grade under the IBC. o Within 15ft of that perimeter, we are using interpolated grade (per code section 26.575.020.f.3.b). • For the west elevation, proposed grade is measured at the top of the western most retaining wall as documented in Ordinance 39 Series of 2016. Additional modifications related to height include: • The roof top deck amenity has been lowered and a 50% transparent pool deck railing has been included. • Building perimeter has been modified due to revised exiting strategy at Level 4 • The Height Plan has been updated to document all changes Special Review The Applicant team maintains the request for special review of the transformer, recloser and switchgear currently proposed on the east side of the Project, within the property setback and crossing into the proposed Lot 2. This utility vault design will include a metal, mesh-screen lid and is considered as exterior space. No additional construction is proposed within the setbacks. Design Workshop, Inc. 9 Supplemental Materials Package: The materials included provide additional details and refinements to the plans submitted as an amendment to the application on September 1st, 2016. While some of the calculations have changed slightly due to conversations/clarifications with Staff, no substantial changes have been made. 1. Gorsuch Haus CPTSB Variance Request – Submitted May 25, 2020 Approved September 9, 2020 2. Gorsuch Haus Subdivision and PD Development Agreements 3. Certificate of Ownership, Dedications and Reservations Draft Plan Set Exhibit Revised Materials: Only the updated materials have been included in this package of updated exhibits. Sheets italicized indicate new materials prepared as requested by review agency. P001 Draft Gorsuch Haus Subdivision/Detail Review Plan Set Cover Sheet P002 Site Improvement Survey P003 Proposed Illustrative Site Plan P004.1 Existing and Proposed Development Overlay P004.2 Proposed Development Enlargements P004.3 Proposed Development Enlargements P005 Existing Landscape Plan P006 Proposed Landscape Plan P008 Illustrative Perspective P010 Illustrative Plan arrival at South Aspen St. P011 Illustrative Perspective South Aspen St. Approach R100 Reference Plan - Level P1 R101 Reference Plan - Level 01 R102 Reference Plan - Level 02 R103 Reference Plan - Level 03 R104 Reference Plan - Level 04 R105 Reference Plan - Level 05 R106 Reference Plan - Level 06 R107 Reference Plan - Level 07 R108 Reference Plan - Level 08 R109 Reference Plan - Level 09 R110 Reference Plan - Roof G021 Code Summary G022 Code Summary G023 Code Summary G024 Code Summary Design Workshop, Inc. 10 G025 Code Summary G026 Code Summary G031 Proposed Floor Area Calculations G032 Proposed Floor Area Calculations G033 Proposed Floor Area Calculations G034 Height Plan - Proposed Grade G090 Code Analysis – Fire Separation Distance G091 Code Analysis – Fire Separation Distance G100 Code Analysis – Occupancy & Fire Rated Walls G101 Code Analysis – Occupancy & Fire Rated Walls G102 Code Analysis – Occupancy & Fire Rated Walls G103 Code Analysis – Occupancy & Fire Rated Walls G104 Code Analysis – Occupancy & Fire Rated Walls G105 Code Analysis – Occupancy & Fire Rated Walls G106 Code Analysis – Occupancy & Fire Rated Walls G107 Code Analysis – Occupancy & Fire Rated Walls G108 Code Analysis – Occupancy & Fire Rated Walls G109 Code Analysis – Occupancy & Fire Rated Walls G110 Exterior Stair Protection G200 Code Analysis – Egress and Travel Distance G201 Code Analysis – Egress and Travel Distance G202 Code Analysis – Egress and Travel Distance G203 Code Analysis – Egress and Travel Distance G204 Code Analysis – Egress and Travel Distance G205 Code Analysis – Egress and Travel Distance G206 Code Analysis – Egress and Travel Distance G207 Code Analysis – Egress and Travel Distance G208 Code Analysis – Egress and Travel Distance G209 Code Analysis – Egress and Travel Distance D200 Building Elevations D201 Building Elevations D202 Building Elevations Conceptual Approval vs Detailed Review D306 Height Study – Section 1 D307 Height Study – Section 2 D308 Height Study – Section 3 D309 Height Study – Section 4 D310 Height Study – Section 5 D311 Height Study – Section 6 D312 North Height – Section 1 and 2 D312 North Height – Section 3 and 4 Design Workshop, Inc. 11 G050 Snow Shedding Roof Plan G051 Dormer Plan A801 Material Board C.2.00 Cul-de-sac Plan, Profile and Grading C.2.03 Conceptual Perimeter Grading Plan C.2.06 West Swale Plan, Profile & Sections S.101 Gorsuch Haus PD/ Subdivision S.102 Gorsuch Haus PD/ Subdivision S.103 Gorsuch Haus PD/ Subdivision S.104 Gorsuch Haus PD/ Subdivision S.105 Gorsuch Haus PD/ Subdivision