Loading...
HomeMy WebLinkAboutAppendix C. Exhibit 12 Tramway Board VarianceGORSUCH HAUS LIFT ONE ASPEN MOUNTAIN COLORADO PASSENGER SAFETY TRAMWAY BOARD SETBACK VARIANCE REQUEST PREPARED FOR ASPEN SKIING COMPANY FEBRUARY 25, 2020 COMPILED BY 120 EAST MAIN STREET ASPEN, CO 81611 970.925.8354 Appendix C. Exhibit 12 INTRODUCTION 1 PROJECT DESCRIPTION 1 LIFT 1A REPLACEMENT 1 LIFT CORRIDOR EXTENT 1 LOCAL FIRE PROTECTION 1 ASPEN FIRE DEPARTMENT 1 FIRE ACCESS AND STAGING 1 SURROUNDING IMPROVEMENTS 1 FLOOR PLANS 1 PARKING 1 LEVEL 01 1 LEVEL 02 1 LEVEL 03 1 LEVEL 04 1 LEVEL 05 1 LEVEL 06 1 LEVEL 07 1 LEVEL 08 1 LEVEL 09 1 LEVELROOF 1 PREPARED BY 4240 WALL SECTIONS 1 SECTION 01 1 SECTION 02 1 SECTION 03 1 SECTION 04 1 SECTION 05 1 EXTERIOR WALL TYPES 1 ROOF AND FLOOR ASSEMBLY 1 PREPARED BY 4240 SUPPORTING MATERIALS 1 CODE COMPLIANCE NARRATIVE 1 PREPARED BY JENSEN HUGHES CPTSB FIRE & LIFE SAFTEY REQUIREMENTS 1 PREPARED BY BG BUILDINGWORKS DEVELOPMENT TEAM 1 CONTENTS On the Cover: Gorsuch Haus | Aspen, CO Opposite: World Cup Stage | Aspen, CO INTRODUCTION 1. PROJECT DESCRIPTION The Gorsuch Haus is a proposed Lodge at the west portal to Aspen Mountain. The site at the base of the mountain and adjacent to recreation and skiing represents an ideal hotel site. This modest sized hotel provides 81 hotel rooms. This Project is the right size, in a good location, and fulfills an important need in our tourist-based economy. This application describes a variance request to the Colorado Passenger Safety Tramway Board to accomodate the lift replacement and the mixed-use lodge program of the Gorsuch Haus. Together with the replacement of Lift 1A, surrounding base area improvements and the proposed Lift One Lodge, the Gorsuch Haus represents a component of the Lift One Corridor. The Lift Corridor is multiple parcels that can meet the needs of providing the replacement lift closer to the core of Aspen. The developers for the Gorsuch Haus and Lift One Lodge have collaborated with Aspen Skiing Company, the City of Aspen and Lift One Lodge to achieve consensus in locating the replacement of Lift 1A at Dean Street and develop a vision that reflects the Aspen community needs. Replacement of Lift 1A is essential to retaining World Cup skiing in Aspen as has been made clear by FIS, the Cup governing body. Lift replacement, in turn, necessitates investment in the overall base area to upgrade insufficient infrastructure, improve accessibility and provide a supportive community focal point. The Lift One Corridor Plan is forward-thinking and ensures that this area serves as a new portal to Aspen Mountain. The components of the plan encourage a much larger vision than provided by individual projects. Great community benefit is realized though the replacement of the lift, the continuation of the skiway to Town and the expanded public amenities. To accommodate replacement of the lift and redevelopment of the western portal to Aspen Mountain, proposed improvements will activate this part of town with critical infrastructure improvements, lodging and community-oriented spaces, resulting in a high level of public benefit. The Project Site Plan (Figure 1) identifies the major components of the Project (listed below) in relation to the Colorado Passenger Safety Tramway Board setbacks and ANSI standards. a. Lift corridor and realigned lift towers b. New pedestrian walkways and street crosswalks connecting to the site c. Gorsuch Haus Mixed Use Lodge will include: • 81 hotel lodging rooms • 4 free-market multi-family units • 1 affordable housing unit • Undergrounded structured parking with 56 spaces • Outdoor restaurant/après ski deck with direct ski-in/ski-out access • Indoor restaurant and bar • Hotel amenity space d. World cup race staging area e. Relocated ski operations access road f. Snowcat turnaround and ski return g. Expanded South Aspen Street cul-de-sac and other infrastructure improvements that relate to the neighborhood Figure 1: Project Site Plan 30 28 26 27 29 12 11 8 103637 9 3231 14 13 18 16 1517 353433 3 2 4 5 7 2025 19 24 212223 ANSI Airspace Clearance TOWER 4 TOWER 5 CARRIER EDGE CABLE GUAGE - TELEMIX CPTSB Airspace Requirement CENTERLINE ALIGNMENT February 25, 2020 DESIGN WORKSHOP Landscape Architecture · Land Planning · Urban Design · Tourism Planning 120 East Main Street · Aspen, Colorado 81611 · 970-925-8354 Facsimile 970-920-1387NORTH0 ORIGINAL SCALE:10 20 401"=20'-00" 16' 100' MIN 60' *per SE Group SHADOWMOUNTAINCONDOMINIUMS G o r s u c h H a u s Site Plan A s p e n , C o l o r a d o HILL STR E E T R O W SO U T H A S P E N ST R E E T GORSUCH H A U S FOOTPRIN T 81 KEYS PROPOSED LIFT ONE LODGE FOOTPRINT MOUNTAIN QUEEN CONDOMINIUMS 60-foot Minimum Skiway Shadow Mountain Lift, Proposed Tower Locations and Required Setback Gorsuch Haus Property Boundary Gorsuch Haus Property Boundary Setback Building Below Grade Building Overhead Skier Access to Gorsuch Haus Public Amenities World Cup Terrace Restaurant Terrace Pedestrian Access to Gorsuch Haus Public Amenities Gorsuch Haus Arrival and Guest Check-In South Aspen Street Cul-de-Sac Aspen Skiing Company Plaza Snowcat Turnaround Mountain Access Road Neighborhood Skier Access to Dean Street Lift Terminal Pedestrian Stair Connection Existing Trees/Shrubs to be Removed Skier Return to Adjacent Properties SITE PLAN NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 2 34 5 6 7 8 9 10 11 12 13 14 15 16 17 PROPOSED LIFT ONE LODGE FOOTPRINT 18 18 19 19 45'-10" 5' 19'-8" 10.83 2. LIFT 1A REPLACEMENT The replacement of the existing Lift 1A terminal has been relocated to a planned Dean Street location. The City of Aspen organized a one-year process to determine the location of the replacement for Lift 1A. This has involved numerous stakeholders including the Lift One Lodge property, Aspen Skiing Company, Aspen Historical Society, City of Aspen Departments, and Gorsuch Haus. Following the study of the neighborhood by a SE Group, a third-party consultant, City Council selected several options to develop further. Phase Two of the study examined the lift terminal location and design of these options in further detail. The Final Report presented in a Council Work Session May 15, 2018 included three-dimensional studies, grading, lift profiles, and the width of corridors for lift and skiway return. The lower lift to a terminal site at Dean Street was determined by City Council as the location preferred. The Gorusch Haus Site Plan and information contained in this variance request is consistent with the depiction in the Lift 1A Corridor Assessment. Figure 2. Lift One Corridor illustrates the proposed lift corridor context at the base of Aspen Mountain. 3. LIFT CORRIDOR EXTENT The Lift One Corridor extends to new top terminal located slightly west of the original location. The corridor itself contains a Xdegree angle beginning at a point south, or upslope of the Gorsuch Haus. A clear line of site is maintained from the lift operator building at the Dean Street load terminal clear through the proposed development at Lift One Lodge to Gorsuch Haus. Figure 3. Lift One Corridor Extent depicts the the proposed lift corridor alignment from the load point at Dean Street to the new unload terminal. Figure 2: Proposed Lift One Base Area Redevelopment Figure 3: Lift One Corridor PR O P O S E D S K I W A Y ANSI Airspace Clearance 200 P E R S O N M A Z E SKI RACKS RELOCATED HISTORICLIFT STRUCTURES SNOW STORAGE AREA PEDESTRIAN ACCESSTO GONDOLA CABINS SKI R A C K S SNOW EDGE Skier Milling Area Skier Milling Area Skier Milling Area TOWER 2 TOWER 3 TOWER 4 TOWER 5 TOWER 6 TOWER 1 TOWER 7 CARRIER EDGE CABLE GUAGE - TELEMIX CPTSB Airspace Requirement CENTERLINE ALIGNMENT February 12, 2020NORTH0 ORIGINAL SCALE: 25 50 100 1"=50'-00" DESIGN WORKSHOP Landscape Architecture · Land Planning · Urban Design · Tourism Planning 120 East Main Street · Aspen, Colorado 81611 · 970-925-8354 Facsimile 970-920-1387 G o r s u c h H a u s Lift One Base A s p e n , C o l o r a d o MOU N T A I N A C C E S S R O A D HISTORIC LIFT 1 DOLINSEK PROPERTY GILBERT S T R E E T ROW HILL STR E E T R O W PROPOSED LIFT ONE LODGE PROPOSED LIFT ONE LODGE PROPOSED GORSUCH HAUS PROPOSED SKIWAY PROPOSED DEAN ST LIFT TERMINAL PROPOSEDSKIMUSEUM RELOCATED STEAKHOUSE SKIER D R O P O F F ONE WA Y D E A N S T R E E T PA R K I N G G A R A G E EN T R Y PROPOSED LIFT ONE LODGE 45'-10" 5' 19'-8" 10.83 TOWER 4 TOWER 5 [This location was set through multiple coordination meetings] TOWER 6 TOWER 7 SU B G R A D E P A R K I N G ROOF OVER H E A D LOCAL FIRE PROTECTION 1. ASPEN FIRE PROTECTION DISTRICT Aspen Volunteer Fire Department and career staff is made up of 43 individuals serving the City of Aspen in addition to Woody Creek and the entire 87 square miles that make up the District. The Aspen Fire Department is a full service fire department providing services ranging from fire suppression and prevention, wild fire, hazardous materials mitigation, motor vehicle and aircraft accidents, technical rope rescue, as well as emergency medical and other emergencies that may require a quick and professional response of equipment and personnel to help mitigate any number of potential threats to life and property within the Aspen Fire District and beyond. The Aspen Fire Department Operates from 4 strategically located stations which houses a total of 10 apparatus which include 4 structure engines, 2 wildfire engines, 2 rescue trucks, 1 water tender and our 104’ ladder truck. The District continues to modernize firefighting tactics, equipment, protective gear and fire codes as advancements occur in order to protect over $21.5 billion in property located in the District. The Aspen Fire Protection District provides 24-hour emergency response to a wide variety of critical situations, including structural, wildland, and urban interface fires, explosions, hazardous materials incidents, medical emergencies, accidents, auto extrication, swiftwater rescue, ice, low-angle rope, trench, confined space rescue, and miscellaneous public assistance requests. In addition, the fire department has the capability to respond to emergency medical needs, including basic life support. The department also operates active fire prevention and emergency preparedness programs which provides for fire inspections, hazardous process permitting, burn permits, fire code enforcement, community education, and business emergency planning in accordance with Colorado laws. Each year the Aspen Fire Protection District spends over 4,000 hours completing hands-on training activities, which build important practical skills and provide each firefighter with the abilities needed to quickly and correctly respond to all types of emergency situations. 2. FIRE ACCESS AND STAGING The nearest Aspen Fire Department location is approximately 4 minutes from the Gorsuch Haus site, allowing for quick response in the event of a fire. See Figure 4. To reach the site, emergency responders would travel south, or uphill on South Aspen Street where the street is proposed to culminate in a cul-de-sac design to City of Aspen Engineering Standards. This cul-de- sac has a minimum 50ft turning radius and is no less than 100ft in diameter. Figure 5: Fire Truck Access and Staging depicts the turning movement of a fire truck as well as established points for fire truck staging. The fire access and staging points have been thouroughly discussed with the City’s 3. SURROUNDING IMPROVEMENTS In addition to site improvements to assist in rapid emergency response times, the Gorsuch Haus will be installing a dry stand pipe fire suppression system on the east side of the skiway adjacent to the Mountain Queen Condominiums to enhance the neighborhood fire protection. Figure 4: Proximity of Fire Department to Project Site ORIGINAL SIZE 24X36 PREPARED BY SOPRIS ENGINEERING FIRE TRUCK ACCESS AND STAGING 10 | PAGE INTENTIONALLY LEFT BLANK XT V XT V XT V XT V XT V XT V 22.0'± FL-FL SUPPORT FIRE TRUCKS (PUMPER) SECOND ARRIVING AERIAL FIRE TRUCK (LADDER) ENTERS CUL-DE-SAC CLOCKWISE. OUTRIGGERS ENGAGED AND WITHIN PAVED PORTION OF CUL-DE-SAC; IF NEEDED THIS SECOND AERIAL MASTER (ALPHA-BRAVO) CAN BE SUPPLIED BY THE ADJACENT FIRE HYDRANT STAGED AMBULANCE ALONG S. ASPEN STREET LA N D S C A P E B U F F E R SN O W M E L T S I D E W A L K SN O W M E L T S I D E W A L K EXISTING HYDRANT PROPOSED HYDRANT FIRST ARRIVING ENGINE CONNECTS TO NEW HYDRANT AND SUPPLIES THE FDC TO SUPPORT THE FIRE SPRINKLER SYSTEM. APPARATUS ENTERS CLOCKWISE TO PLACE THE PUMP PANEL ON THE STRUCTURE SIDE FOR IMPROVED VISIBILITY. PROPOSED FDC FIRST ARRIVING AERIAL FIRE TRUCK POSITIONED AT THE NORTHWEST CORNER OF THE BUILDING (ALPHA-DELTA CORNER) & ENTERS CUL-DE-SAC COUNTERCLOCKWISE. CONNECTS TO EXISTING FIRE HYDRANT ALONG S. ASPEN STREET TO PROVIDE AN ELEVATED MASTER STREAM AS NECESSARY. HATCHED AREA REFLECTS PROPOSED PLAZA/PORTE COCHERE/LOADING DOCK AREA; BE ADVISED THIS AREA MAY BE OCCUPIED WITH LOADING/UNLOADING VEHICLES BUT COULD ALSO PROVIDE ADDITIONAL FIRE DEPARTMENT ACCESS DURING AN EMERGENCY FDC SUPPLY LINES SUPPLY LINE MOUNTABLE CURB ADJACENT TO PLAZA SUPPLY LINE MOUNTABLE CURB AROUND PERIMETER OF ISLAND WITH 12" WIDE SNOWMELT HARDSCAPE BUFFER ALONG BACKSIDE OF CURB LIMITS OF PROPOSED SNOWMELT ASSOCIATED WITH CUL-DE-SAC IMPROVEMENTS APPROX. LOCATION OF GRADE BREAK FROM S. ASPEN STREET TO CUL-DE-SAC WA L L 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: REVISIONS 4735 GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O W W W . S O P R I S E N G . C O M D e c 1 7 , 2 0 1 9 - 1 : 0 3 p m G: \ 2 0 1 5 \ 1 5 1 0 1 . 0 6 - G o r s u c h H a u s \ C I V I L \ C i v i l D W G s \ E X H I B I T S \ F I R E T R U C K S T A G I N G \ A e r i a l F i r e S t a g i n g 2 0 1 9 - 1 2 - 1 3 . d w g CJB JKS 1 OF 2 OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 FIRE STAGING EXHIBIT EXHIBIT FIRE TRUCK BODY ANTICIPATED LIMITS OF OUTRIGGERS NOTES: 1.REFER TO SHEET 2 OF 2 FOR AERIAL FIRE TRUCK TURNING MOVEMENTS & FIRE TRUCK SPECIFICATIONS/DIMENSIONS. 2.NO VERTICAL OBSTRUCTIONS ALLOWED WITHIN 2-FT OF FLOWLINE OF CURB PER CITY OF ASPEN DESIGN STANDARDS. GENERAL NOTE: DUE TO THE EXTREME TERRAIN CHALLENGE OF CONSTRUCTION ON A SKI SLOPE, IT IS UNDERSTOOD THAT FIREFIGHTING OPERATIONS WILL BE CONDUCTED WITHIN AND THROUGHOUT THE STRUCTURE VIA STANDPIPE CONNECTIONS (SIMILAR TO COMMON HIGH-RISE OPERATIONS). A FIRE COMMAND CENTER IS BEING PROVIDED TO FURTHER ASSIST IN COORDINATING INTERIOR FIRE OPERATIONS. S. ASPEN STREET SNOWMELT AREA PROPOSED PLAZA, UNLOADING/LOADING & PORTE COCHERE AREA S W I T C H G E A R S W I T C H G E A R S W I T C H G E A R 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 20 ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: REVISIONS 4735 GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O W W W . S O P R I S E N G . C O M D e c 1 7 , 2 0 1 9 - 1 2 : 4 0 p m G: \ 2 0 1 5 \ 1 5 1 0 1 . 0 6 - G o r s u c h H a u s \ C I V I L \ C i v i l D W G s \ E X H I B I T S \ F I R E T R U C K S T A G I N G \ A e r i a l F i r e S t a g i n g 2 0 1 9 - 1 2 - 1 3 . d w g CJB JKS 2 OF 2 OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 AERIAL FIRE TRUCK TURNING MOVEMENTS EXHIBIT REAR WHEEL TRACKING FRONT WHEEL TRACKING VEHICLE CENTERLINE VEHICLE CLEARANCE TURNING MOVEMENT LEGEND AERIAL FIRE TRUCK TURNING MOVEMENT ENTERING CLOCKWISE AERIAL FIRE TRUCK TURNING MOVEMENT ENTERING COUNTER-CLOCKWISE SOUTH ASPEN ST.SOUTH ASPEN ST. AMBULANCE TURN AROUND MOVEMENT NOTE: 1.NO VERTICAL OBSTRUCTIONS ALLOWED WITHIN 2-FT OF FLOWLINE OF CURB PER CITY OF ASPEN DESIGN STANDARDS. 11 FLOOR PLANS ORIGINAL SIZE 24X36 PREPARED BY 4240 PAGE INTENTIONALLY LEFT BLANK R200 2 R201 2 LEVEL 1 WALL ABOVE BOILER ROOM 24' - 0" 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 TOWER 4 1:20 1:12 PARKING 7,985.00' AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 7,988.00' 21 BQ 1 R250 1 R251 A100 1 7,988.00' 7,985.50' MA T C H L I N E PROPERTY LINE FAN ROOM SERVICE ELEVATOR PIT ELEVATOR 1 PIT ELEV. LOBBY ELEVATOR 2 PIT UP STAIR 2 STAIR 1 TOTAL SPACES: 56 STALLS SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R100 REFERENCE PLAN - LEVEL P1 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL P1 (7988') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 ARRIVAL LOBBY R200 2 R201 2 3 5' - 0 " BELL CONCIERGE PROPERTY LINE 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A101N 1 RECEPTION 7,998.50' 7,999.00' MA T C H L I N E GM VESTIBULE ELEVATOR 2 EMERGENCY GENERATOR MAIN ELECTRICAL FIRE CONTROL CENTER HSK SUPPORT ELEV. LOBBY SERVICE STAIR 02 RECEPTION CONTROLLER MENSWOMENS TELECOM FIRE PUMP WATER ENTRY ELEVATOR 1 VALET LUGGAGE ENGINEERING SKI STORAGE SECURITY MULTI-USE RECEIVING CUST. BREAK ROOMHR ACCT OFFICE OWNERS STORAGE SALES LOADING / RECEIVING UNIFORM ADMIN SERVICE CORRIDOR MECH DN PARKING GARAGE VENTILATION FIREPLACE TRASH AND RECYCLING 14'x29' = 406sf DEDICATED TRASH/RECYCLING AREA. PERMANENT MARKINGS ON WALL AND FLOOR TO INDICATE AREA NOT TO BE USED FOR ANY OTHER PURPOSE. SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R101 REFERENCE PLAN - LEVEL 01 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 01 (7999') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 WARMING KITCHEN R200 2 R201 2 ELECTRICAL MEETING / BANQUET 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A102N 1 MECHANICAL AFFORDABLE HOUSING UNIT 8,009.50' MA T C H L I N E PROPERTY LINE MEN MTG STORAGE KING KING KING KING ELEVATOR 2 SERVICE STAIR 02 KING KING ELEVATOR 1 PRE-FUNCTION SERVICE CORRIDOR STORAGE CORRIDOR WOMEN F&B OFFICE F&B SALES GREEN ROOF GREEN ROOF 1/8" / 1'-0" SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R102 REFERENCE PLAN - LEVEL 02 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 02 (8009.5') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 KITCHEN R200 2 R201 2 OUTDOOR MECH. CHILLER YARD 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 TOWER 4 CLR 15 ' - 0 " CLR 26' - 0" AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A103N 1 RESTAURANT MA T C H L I N E PROPERTY LINE LIBRARY KING KING KING KING KING 8,020.50' SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R103 REFERENCE PLAN - LEVEL 03 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 03 (8020.5') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 BOOT ROOM R200 2 R201 2 OPEN TO COOLING TOWER BELOW FITNESS 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD WORLD CUP BAR LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 TOWER 4 OPEN TO BELOW AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A104N 1 A104S 1 MA T C H L I N E PROPERTY LINE Q/Q KING KING KING KING KING KING KING KING EXT.Q/Q Q/Q KING 8,031.00' 8,031.00' SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R104 REFERENCE PLAN - LEVEL 04 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 04 (8031') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 R200 2 R201 2 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A105N 1 A105S 1 MA T C H L I N E PROPERTY LINE RIDGEVALLEYVALLEYKINGKINGKING Q/QQ/QKING EXT. Q/Q KING KING EXT. Q/Q STAIR 02 KING KING ADA KINGKING KING EXT. CORRIDOR Q/Q KING KING STAIR 03 SPA 8,041.50' SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R105 REFERENCE PLAN - LEVEL 05 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 05 (8041.5') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 R200 2 R201 2 R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A106N 1 A106S 1 MA T C H L I N E PROPERTY LINE ADA KING Q/QQ/QKING EXT. KINGKINGKING KING SUITE SUITE KINGKINGKINGKING KING KING KING KING KING 8,052.00' SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R106 REFERENCE PLAN - LEVEL 06 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 06 (8052') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 R200 2 R201 2 SPA EQUIP R2011BOH 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A107N 1 A107S 1 8,062.50' MA T C H L I N E PROPERTY LINE KINGQ/QQ/Q KING KING ADA KING KING KING KING KING KING KING KING KING KING EXT. KINGKINGKINGKING KING KING EXT. SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R107 REFERENCE PLAN - LEVEL 07 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 07 (8062.5') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 CONDO LODGE R200 2 R201 2 CONDO LODGE CONDO LODGE CONDO LODGE R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 AJ SPA 12' X 28'2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A108S 1 8,074.00' MA T C H L I N E PROPERTY LINE 8,073.00' 8,067.70' 8,067.75' 8,073.00' 8,069.95' 8,073.00' SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R108 REFERENCE PLAN - LEVEL 08 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 08 (8073') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 CONDO LODGE CONDO LODGE R200 2 R201 2 CONDO LODGE CONDO LODGE R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A109S 1 MA T C H L I N E PROPERTY LINE 8,083.00' SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R109 REFERENCE PLAN - LEVEL 09 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 09 (8082') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 R200 1 R200 2 R201 2 R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 5 TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A110N 1 A110S 1 MA T C H L I N E RIDGEVALLEYVALLEYRIDGE RI D G E RI D G E RIDGEVALLEYVALLEYRIDGEVALLEYVALLEYRI D G ERIDGEPROPERTY LINE 8,074.00'8,076.00' 3" / 1 ' - 0 " 3" / 1 ' - 0 " 1" / 1'-0" 2 3 / 4 " / 1 ' - 0 " 2 3 / 4 " / 1 ' - 0 " 3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0"3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0"3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1'-0" 3" / 1'-0" FLAT ROOF FLAT ROOF FLAT ROOF FLAT ROOF FLAT ROOF 3" / 1' -0 " 3" / 1' -0 " OCCUPIABLE ROOF FLAT ROOF W/ INTERNAL DRAINS AND VEGETATION DIAMOND PATTERN SOLAR TILES POOL DECK TERRACE - FLAT ROOF W/ INTERNAL DRAINS AND PEDESTAL PAVER SYSTEM ROOF LEGEND FLAT ROOF W/ INTERNAL DRAINS ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R110 REFERENCE PLAN - ROOF 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/16" = 1'-0"1 ROOF Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 WALL SECTIONS ORIGINAL SIZE 24X36 PREPARED BY 4240 14 | PAGE INTENTIONALLY LEFT BLANK LEVEL 01 (7999') 78' - 6" LEVEL 02 (8009'-6") 89' - 0" LEVEL 03 (8020'-6") 100' - 0" LEVEL 04 (8031') 110' - 6" PARKING 1 (7988') 67' - 6" AK.5 AK AI PARKING CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE DRY STACK STONE VENEER ON CAST-IN PLACE CONCRETE WALL AND RIGID INSULATION BOARD 5" STONE CAP, TYP. FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. SNOW-MELTED STONE PAVER ASSEMBLY OVER EXTERIOR CAST-IN PLACE CONCRETE STAIR FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. COMPOSITE STEEL DECK AND STEEL FRAMING WITH BELOW DECK INSULATION, TYP. RE: STRUC. COMPOSITE STEEL DECK AND STEEL FRAMING WITH BELOW DECK INSULATION, TYP. RE: STRUC. CAST IN-PLACE CONCRETE SLAB ON GRADE , RE: STRUC SNOW-MELTED STONE PAVER ASSEMBLY OVER COMPOSITE METAL DECK ASSMEBLY AJAO LOADING / RECEIVING STORAGE BEYOND WATER FEATURE, RE: STRUC. ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D301 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 1 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 1 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 LEVEL 01 (7999') 78' - 6" LEVEL 02 (8009'-6") 89' - 0" LEVEL 03 (8020'-6") 100' - 0" LEVEL 04 (8031') 110' - 6" LEVEL 05 (8041'-6") 121' - 0" PARKING 1 (7988') 67' - 6" AK.5 AK BD PARKING MEETING / BANQUET CENTERLINE OF PROP OSED LIFT CORRIDOR CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE 5" STONE CAP, TYP. FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. DRY STACK STONE VENEER ON CAST-IN PLACE CONCRETE WALL AND RIGID INSULATION BOARD SNOW-MELTED STONE PAVERS ASSEMBLY OVER COMPOSITE METAL DECK ASSEMBLY AJAO RESTAURANT SECURITY ENGINEERING CAST IN-PLACE CONCRETE SLAB ON GRADE , RE: STRUC SERVICE CORRIDOR VOID SPACE MECH WALL ASSEMBLY W4A HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS ROOF ASSEMBLY R1A FIRE RETARDANT TREATED WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D302 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/4" = 1'-0"1 SECTION 2 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 2 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 LEVEL 01 (7999') 78' - 6" LEVEL 02 (8009'-6") 89' - 0" LEVEL 03 (8020'-6") 100' - 0" LEVEL 04 (8031') 110' - 6" LEVEL 05 (8041'-6") 121' - 0" LEVEL 06 (8052') 131' - 6" LEVEL 07 (8062'-6") 142' - 0" PARKING 1 (7988') 67' - 6" AK.5 AK AI PARKING WOMENS VESTIBULE PRE-FUNCTION KING EXT. WORLD CUP BAR 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM SNOW-MELTED STONE PAVER ASSEMBLY OVER EXTERIOR CAST-IN PLACE CONCRETE STAIR EXTERIOR DRY TYPE FIRE SUPPRESSION SYSTEM, TYPICAL AT BALCONIES AJAO SERVICE CORRIDOR RESTAURANT SUITE CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE ADMIN 10' - 10"3' - 10"5' - 0" SERVICE CORRIDOR FLOOR F6A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F1A R1A FLOOR F3A R2A FLOOR F3A FLOOR F3A ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D303 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/4" = 1'-0"1 SECTION 3 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 3 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 LEVEL 04 (8031') 110' - 6" LEVEL 05 (8041'-6") 121' - 0" LEVEL 06 (8052') 131' - 6" LEVEL 07 (8062'-6") 142' - 0" LEVEL 08 (8073') 152' - 6" BD BE CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING WALL ASSEMBLY W4A EXTERIOR DRY TYPE FIRE SUPPRESSION SYSTEM, TYPICAL AT BALCONIES 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS WRAPPING 1 HR PROTECTED STEEL COLUMNS HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WALL ASSEMBLY W4A DRY STACK STONE VENEER FLOOR F6A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F2A R1A ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D304 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 1/4" = 1'-0"1 SECTION 4 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 4 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 LEVEL 07 (8062'-6") 142' - 0" LEVEL 08 (8073') 152' - 6" LEVEL 09 (8082') 162' - 6" ROOF (8098'-6") 178' - 0" BD CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING WALL ASSEMBLY W4A EXTERIOR DRY TYPE FIRE SUPPRESSION SYSTEM, TYPICAL AT BALCONIES 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS WRAPPING 1 HR PROTECTED STEEL COLUMNS HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING 5" STONE CAP FIRE RETARDANT TREATED WOOD RAILING SYSTEM WALL ASSEMBLY W4A 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD BALCONY DIVIDER 5" STONE CAP DRY STACK STONE VENEER ON CONCRETE WALL FLOOR F6A FLOOR F1B FLOOR F1B CONDO LODGE CONDO LODGE KING R1A ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D305 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 5 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 5 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 SECTION PLAN 5" M I N . 1 1 / 2 " M I N . 2 1 / 2 " 10 1/2" SHOWN VARIES DRY STACK STONE VENEER GROUT CAVITY SOLID 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING, TYPICAL (2) LAYERS 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING TYPE [W1C] (1) LAYER 5/8" TYPE "X" GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" GYPSUM WALL BOARD TYPE [W1C] 1/4" DRAINAGE BOARD METAL STUD FRAMING, RE: BELOW DRY STACK STONE VENEER GROUT CAVITY SOLID 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING, TYPICAL (2) LAYERS 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING TYPE [W1C] (1) LAYER 5/8" TYPE "X" GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" GYPSUM WALL BOARD TYPE [W1C] 1/4" DRAINAGE BOARD METAL STUD FRAMING, RE: BELOW VARIES 3/8" TYP. SHEET NOTES: USE CEMENTITIOUS BACKER BOARD AT INSIDE FACE OF WET WALLS. 1. WHERE BATT INSULATION IS SHOWN, TO BE CLASS 'A' COTTON BATT INSULATION. WIDTH AS INDICATED IN WALL TYPE TABLES 2. EXTERIOR FINISH NOTES: REGIONALLY SOURCED, DRY STACK GREY GRANITE (GALLEGOS OR EQUIV). RANDOM, ASHLAR PATTERN. STONE: OPTION 1 -STAINED DOUGLAS FIR CLADDING, CLEAR WITH INTEGRATED FIRE RETARDANT OPTION 2 -STAINED ACCOYA WOOD CLADDING WITH INTEGRATED "ULTRA-A" FIRE RETARDANT BY MULTI-PRO SYSTEM OR EQUIV. OPTION 3 -CEDAR, CLEAR, A & BETTER, TONGUE AND GROOVE, SMOOTH V-JT BY REAL CEDAR OR EQUIV. WWW.REALCEDAR.COM. WITH INTEGRATED FIRE RETARDANT WOOD CLADDING: OPTION 1 -ZOLA 'THERMOCLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-7). WWW.ZOLAWINDOWS.COM OPTION 2 -ZOLA "CLASSIC CLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-4). WWW.ZOLAWINDOWS.COM OPTION 3 -SIERRA PACIFIC ALUMINUM CLAD WOOD WINDOW WINDOWS: OPTION 1 -2'X2' FSC IPE WOOD TILE ON PEDESTALS WITH SNOWMELT SYSTEM. WWW.BISONIP.COM OPTION 2 -PORCELAIN "WOOD-PLANK" SERIES BY TILETECH ON PEDESTALS WITH HEX-TRAY SNOWMELT SYSTEM. WWW.TILETECHPAVERS.COM ROOF DECK FINISH: 5" MIN. 1 1/2" MIN. 2 1/2" DRY STACK STONE VENEER GROUT CAVITY SOLID 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CONCRETE WALL, RE: STRUCT. 1/4" DRAINAGE BOARD DRY STACK STONE VENEER GROUT CAVITY SOLID 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER 1/4" DRAINAGE BOARD RE: STRUCTURAL CONCRETE WALL, RE: STRUCT. VARIES 3/8" TYP. SECTION PLAN 3/4" 7/8" 2 1/2" 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING (1) LAYER 5/8" TYPE X GYPSUM WALL BOARD METAL STUD FRAMING, RE: BELOW 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING (1) LAYER 5/8" TYPE X GYPSUM WALL BOARD METAL STUD FRAMING, RE: BELOW 3/4" FINISH GRADE PLYWOOD, PAINTED. COLOR PER ARCHITECT. 3/4" FINISH GRADE PLYWOOD, PAINTED. COLOR PER ARCHITECT. 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL 4 1/8" 9 1/4" 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL SECTION PLAN ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A501 EXTERIOR WALL TYPES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:3" = 1'-0"W1 WALL ASSEMBLY - MTL STUD W/ STONE SCALE: 3" = 1'-0"W2 WALL ASSEMBLY - CONCRETE W/ STONE SCALE: 3" = 1'-0"W3 WALL ASSEMBLY - MTL STUD W/ PLYWOOD PANEL FINISH WALL TAG FRR WIDTH DESCRIPTION W1A NR 1' - 6 1/4" 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR STONE FINISH W1B 1HR 1' - 6 1/4" UL #U432 - 1 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR STONE FINISH W1C 2HR 1' - 7 1/2" UL #U425 - 2 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, (2) LAYERS GYP. EACH SIDE, EXTERIOR STONE FINISH WALL TAG FRR WIDTH DESCRIPTION W2A NR 1' - 5" 8" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR W2B NR 9" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR - REFER TO STRUCTURAL FOR CONCRETE THICKNESS W2C NR 6 1/2" CIP CONCRETE WALL WITH STONE EXTERIOR, OMIT BOARD INSULATION - REFER TO STRUCTURAL FOR CONCRETE THICKNESS W2D 1HR 1' - 5" PER IBC TABLE 722.2.1.1 - 1 HR RATED - 8" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR W2E NR 1' - 9" 12" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR W2F 2HR 1' - 5" PER IBC TABLE 722.2.1.1 - 2 HR RATED - 8" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR W2G 2HR 1' - 9" PER IBC TABLE 722.2.1.1 - 2 HR RATED - 12" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR WALL TAG FRR WIDTH DESCRIPTION W3A 1HR 1' - 1 3/8" UL #U432 - 1 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, BOARD INSULATION, PLYWOOD EXTERIOR W3B NR 10 7/8" 8" METAL STUD FRAMING, OMIT BOARD INSULATION, PLYWOOD EXTERIOR W3C 1HR 1' - 7 7/8" UL #U432 - 1 HR RATED - PAINTED PLYWOOD FINISH AND HAT CHANNEL AT INTERIOR FACE OF WALL TYPE W1B W3D NR 1' - 10 3/8" PAINTED PLYWOOD FINISH, HAT CHANNEL, AND BOARD INSULATION AT INTERIOR FACE OF WALL TYPE W1A Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 3/4" 7/8" 2 1/2" VARIES 10 1/2" SHOWN 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD TYPE [W4C, W4D] (1) LAYER 5/8" TYPE "X" GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" GYPSUM WALL BOARD TYPE [W4C, W4D] METAL STUD FRAMING, RE: BELOW 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD TYPE [W4C, W4D] (1) LAYER 5/8" TYPE "X" GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" GYPSUM WALL BOARD TYPE [W4C, W4D] METAL STUD FRAMING, RE: BELOW 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL SECTION PLAN 3/4" 7/8" 2 1/2" 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER RE: STRUCTURAL CONCRETE WALL, RE: STRUCT. 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL CONCRETE WALL, RE: STRUCT. SECTION PLAN 3/4" 7/8" 7 1/4" 7/8" 3/4" 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING 6" METAL STUD FRAMING (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL 1x8 NOM. FIRE RETARDANT TREATED WOOD SIDING 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD METAL STUD FRAMING, RE: BELOW 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL SECTION PLAN SHEET NOTES: USE CEMENTITIOUS BACKER BOARD AT INSIDE FACE OF WET WALLS. 1. WHERE BATT INSULATION IS SHOWN, TO BE CLASS 'A' COTTON BATT INSULATION. WIDTH AS INDICATED IN WALL TYPE TABLES 2. EXTERIOR FINISH NOTES: REGIONALLY SOURCED, DRY STACK GREY GRANITE (GALLEGOS OR EQUIV). RANDOM, ASHLAR PATTERN. STONE: OPTION 1 -STAINED DOUGLAS FIR CLADDING, CLEAR WITH INTEGRATED FIRE RETARDANT OPTION 2 -STAINED ACCOYA WOOD CLADDING WITH INTEGRATED "ULTRA-A" FIRE RETARDANT BY MULTI-PRO SYSTEM OR EQUIV. OPTION 3 -CEDAR, CLEAR, A & BETTER, TONGUE AND GROOVE, SMOOTH V-JT BY REAL CEDAR OR EQUIV. WWW.REALCEDAR.COM. WITH INTEGRATED FIRE RETARDANT WOOD CLADDING: OPTION 1 -ZOLA 'THERMOCLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-7). WWW.ZOLAWINDOWS.COM OPTION 2 -ZOLA "CLASSIC CLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-4). WWW.ZOLAWINDOWS.COM OPTION 3 -SIERRA PACIFIC ALUMINUM CLAD WOOD WINDOW WINDOWS: OPTION 1 -2'X2' FSC IPE WOOD TILE ON PEDESTALS WITH SNOWMELT SYSTEM. WWW.BISONIP.COM OPTION 2 -PORCELAIN "WOOD-PLANK" SERIES BY TILETECH ON PEDESTALS WITH HEX-TRAY SNOWMELT SYSTEM. WWW.TILETECHPAVERS.COM ROOF DECK FINISH: ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A502 EXTERIOR WALL TYPES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"W4 EXT. WALL ASSEMBLY - MTL STUD W/ WOOD SIDING SCALE: 3" = 1'-0"W5 EXT. WALL ASSEMBLY - CONCRETE W/ WOOD SIDING SCALE: 3" = 1'-0"W6 EXT. WALL ASSEMBLY - WOOD WINGWALL WALL TAG FRR WIDTH DESCRIPTION W4A NR 1' - 1 3/8" 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING W4B 1HR 1' - 1 3/8" UL #U432 - 1 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING W4C 2HR 1' - 2 5/8" UL #U425 - 2 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, (2) LAYERS GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING W4D 1HR 1' - 2 5/8" 1 HR - 8" METAL STUD FRAMING W/ BATT INSULATION, (2) LAYER GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING WALL TAG FRR WIDTH DESCRIPTION W5A NR 4 1/8" CIP CONCRETE WALL WITH BOARD INSULATION, EXTERIOR WOOD T&G SIDING - REFER TO STRUCTURAL FOR CONCRETE THICKNESS WALL TAG FRR WIDTH DESCRIPTION W6A NR 10 1/2" 6" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING EACH SIDE Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 3/4" 1" 2 1/2" 9 1/4" 1x8 NOM. FIRE RETARDANT TREATED VERTICAL WOOD T&G SIDING 1" NOM. VENTED METAL HAT CHANNEL, HORIZONTALLY ORIENTED 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING (1) LAYER 5/8" TYPE X GYPSUM WALL BOARD METAL STUD FRAMING, RE: BELOW 1x8 NOM. FIRE RETARDANT TREATED VERTICAL T&G WOOD SIDING 1" VENTED METAL HAT CHANNEL, HORIZONTALLY ORIENTED 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING (1) LAYER 5/8" TYPE X GYPSUM WALL BOARD 8" METAL STUD FRAMING SECTION PLAN 3/4" 1" 2 1/2" 1x8 NOM. FIRE RETARDANT TREATED VERTICAL WOOD T&G SIDING 1" VENTED METAL HAT CHANNEL, HORIZONTALLY ORIENTED 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CONCRETE WALL, RE: STRUCTURAL 1x8 NOM. FIRE RETARDANT TREATED VERTICAL T&G WOOD SIDING 1" VENTED METAL HAT CHANNEL, HORIZONTALLY ORIENTED 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CONCRETE WALL, RE: STRUCTURAL RE: STRUCTURAL SECTION PLAN SHEET NOTES: USE CEMENTITIOUS BACKER BOARD AT INSIDE FACE OF WET WALLS. 1. WHERE BATT INSULATION IS SHOWN, TO BE CLASS 'A' COTTON BATT INSULATION. WIDTH AS INDICATED IN WALL TYPE TABLES 2. EXTERIOR FINISH NOTES: REGIONALLY SOURCED, DRY STACK GREY GRANITE (GALLEGOS OR EQUIV). RANDOM, ASHLAR PATTERN. STONE: OPTION 1 -STAINED DOUGLAS FIR CLADDING, CLEAR WITH INTEGRATED FIRE RETARDANT OPTION 2 -STAINED ACCOYA WOOD CLADDING WITH INTEGRATED "ULTRA-A" FIRE RETARDANT BY MULTI-PRO SYSTEM OR EQUIV. OPTION 3 -CEDAR, CLEAR, A & BETTER, TONGUE AND GROOVE, SMOOTH V-JT BY REAL CEDAR OR EQUIV. WWW.REALCEDAR.COM. WITH INTEGRATED FIRE RETARDANT WOOD CLADDING: OPTION 1 -ZOLA 'THERMOCLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-7). WWW.ZOLAWINDOWS.COM OPTION 2 -ZOLA "CLASSIC CLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-4). WWW.ZOLAWINDOWS.COM OPTION 3 -SIERRA PACIFIC ALUMINUM CLAD WOOD WINDOW WINDOWS: OPTION 1 -2'X2' FSC IPE WOOD TILE ON PEDESTALS WITH SNOWMELT SYSTEM. WWW.BISONIP.COM OPTION 2 -PORCELAIN "WOOD-PLANK" SERIES BY TILETECH ON PEDESTALS WITH HEX-TRAY SNOWMELT SYSTEM. WWW.TILETECHPAVERS.COM ROOF DECK FINISH: ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A503 EXTERIOR WALL TYPES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:3" = 1'-0"W7 EXT. WALL ASSEMBLY - MTL STUD W/ VERTICAL WD SIDING SCALE:3" = 1'-0"W8 EXT. WALL ASSEMBLY - CONCRETE W/ VERTICAL WD SIDING WALL TAG FRR WIDTH DESCRIPTION W7A NR 1' - 1 1/2" 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR VERTICAL WOOD SIDING WALL TAG FRR WIDTH DESCRIPTION W8A NR 4 1/4" CIP CONCRETE WALL WITH BOARD INSULATION, EXTERIOR VERTICAL WOOD SIDING - REFER TO STRUCTURAL FOR CONCRETE THICKNESS Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 DROUGHT TOLERANT, REGIONAL SPECIFIC PLANTED MATERIALS, RE: LANDSCAPE SYSTEMFILTER GROWING MEDIA (8" MIN.) 6" EXPANDED POLYSTYRENE OR MINERAL WOOL BOARD INSULATION, R-35 MIN. HYDROFLEX RB MM 6125-FR SELF-HEALING WATERPROOFING MEMBRANE 5/8" TYPE "X" GYPSUM WALL BOARD EXTERIOR SHEATHING METAL ROOF DECK, RE: STRUCTURAL 6" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK AT INTERIOR SPACES GARDENDRAIN GR30 OR GR 50 ZINC ROOF BY FINE METAL ROOF TECH (OR EQUIV.) VAPOR RETARDER 5/8" TYPE "X" GYPSUM COVER BOARD EXTERIOR SHEATHING METAL ROOF DECK, RE: STRUC. UNDERSIDE TO RECEIVE FIREPROOFING. 6" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK AT INTERIOR SPACES 1/2" PROTECTION BOARD 6" EXPANDED POLYSTYRENE OR MINERAL WOOL BOARD INSULATION, R-35 MIN ICE AND WATER SHIELD WATERPROOFING GREY DIAMOND PHOTOVOLTAIC SHINGLES BY SUNSTYLE VAPOR RETARDER 5/8" TYPE "X" GYPSUM COVER BOARD EXTERIOR SHEATHING METAL ROOF DECK, RE: STRUC. UNDERSIDE TO RECIEVE FIREPROOFING 6" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK AT INTERIOR SPACES 1/2" NAILBASE 6" EXPANDED POLYSTYRENE OR MINERAL WOOL BOARD INSULATION, R-35 MIN 2 LAYERS OF ICE + WATERSHIELD 2x3 WOOD COUNTER BATTEN 2x3 WOOD CROSS BATTEN WOOD SOLAR BATTEN (ALTERNATING SIZES) PV SHINGLE MOUNTING BOLT (ALTERNATING SIZES) SEALING CORNER VAPOR RETARDER 5/8" TYPE "X" GYPSUM COVER BOARD EXTERIOR SHEATHING METAL ROOF DECK, RE: STRUC. UNDERSIDE TO RECIEVE FIREPROOFING 6" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK 6" EXPANDED POLYSTYRENE OR MINERAL WOOL BOARD INSULATION, R-35 MIN EPDM ROOFING MEMBRANE SHEET NOTES: XXX1.PRIMARY ROOF FINISH SUNSTYLE PHOTOVOLTAIC ROOF -GREY SHINGLES WWW.SUNSTYLE.COM BASE OPTION: PREWEATHERED ZINC SHINGLE, SIZE 20 (.8MM) WITH 90 DEGREE PROFILE BY FIND METAL ROOF TECH WWW.FINEMETALROOFTECH.COM ALTERNATE OPTION: ROOF DECK FINISH BASE OPTION: PORCELAIN "WOOD-PLANK" SERIES BY TILETECH WITH HEX-TRAY SNOWMELT SYSTEM WWW.TILETECHPAVERS.COM ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A504 ROOF / FLOOR ASSEMBLIES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"R2 ROOF ASSEMBLY R2A - GREEN ROOF SCALE: 3" = 1'-0"R1-ALT ROOF ASSEMBLY R1A - ZINC ROOF_ALTERNATE OPTION SCALE: 3" = 1'-0"R1 ROOF ASSEMBLY R1A - PV ROOF_BASIS OF DESIGN Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 SCALE: 3" = 1'-0"R3 ROOF ASSEMBLY R3A - EPDM ROOF TAG FIRE RATING DESCRIPTION R1A 1HR PHOTOVOLTAIC SHINGLES ON SLATS OVER RIGID INSULATION, STRUCTURAL METAL DECKING. COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK. ROOF TAG FIRE RATING DESCRIPTION R2-B 1HR GREEN ROOF OVER RIGID INSULATION, STRUCTURAL METAL DECKING. COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK. R2A 1HR GREEN ROOF OVER RIGID INSULATION, STRUCTURAL METAL DECKING. COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK. ROOF TAG FIRE RATING DESCRIPTION R3A 1HR EPDM ROOFING MEMBRANE OVER RIGID INSULATION, STRUCTURAL METAL DECKING. COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK. SNOWMELT SYSTEM PER SPEC SET IN 2" SAND. RE: LANDSCAPE FOR LOCATIONS. COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOPED 1/8 PER FOOT (MIN) FOR DRAINAGE MAINTAIN MINIMUM SLAB THICKNESS FOR 2HR FIRE RATING TERRACE PAVERS SET IN MORTAR, RE: LANDSCAPE CEILING ATTACHMENT (WIRE-SUSPENDED GRID OR METAL FRAMING, TBD) CEILING FINISH, REFER TO RCPs 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK 2" RIGID INSULATION WATERPROOFING MEMBRANE SLOPE PER PLAN, RE: STRUC DRAINAGE MAT OVER 1/2" PROTECTION BOARD ACOUSTICAL UNDERLAYMENT (6MM) COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. FINISH FLOOR (VARIES) SUSPENDED METAL GRID SYSTEM FOR CEILING FINISH ATTACHMENT CEILING FINISH, VARIES, RE: RCP 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK DECK FLUTES STUFFED WITH CLASS A COTTON BATT INSULATION AND SEALED WITH BOTTOM OF DECK WITH HILTI SPEED SPRAY OR EQUIV. SLOPE PER PLAN, RE: STRUC 1x8 NOMINAL EXTERIOR WOOD TONGUE + GROOVE SOFFIT CLEAR 0' - 8" SUSPENDED METAL GRID SYSTEM FOR CEILING FINISH ATTACHMENT RE: BELOW COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOPED 1/8 PER FOOT (MIN) FOR DRAINAGE SUSPENDED METAL GRID SYSTEM FOR CEILING FINISH ATTACHMENT CEILING FINISH, VARIES, RE: RCPs 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK 5" RIGID INSULATION WATERPROOFING MEMBRANE SLOPE PER PLAN, RE: STRUC DRAINAGE MAT OVER 1/2" PROTECTION BOARD PAVERS SET ON THERMA-HEXX PANEL SYSTEM THERMA HEXX PANEL W/ INSULATION ATTACHED TO UNDERSIDE SHEET NOTES: XXX1.PRIMARY ROOF FINISH SUNSTYLE PHOTOVOLTAIC ROOF -GREY SHINGLES WWW.SUNSTYLE.COM BASE OPTION: PREWEATHERED ZINC SHINGLE, SIZE 20 (.8MM) WITH 90 DEGREE PROFILE BY FIND METAL ROOF TECH WWW.FINEMETALROOFTECH.COM ALTERNATE OPTION: ROOF DECK FINISH BASE OPTION: PORCELAIN "WOOD-PLANK" SERIES BY TILETECH WITH HEX-TRAY SNOWMELT SYSTEM WWW.TILETECHPAVERS.COM ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A505 ROOF / FLOOR ASSEMBLIES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"F3 F4A - EXTERIOR TERRACE ASSEMBLY - OVER CONDITIONED SPACE SCALE: 3" = 1'-0"F1 F1A - TYPICAL FLOOR ASSEMBLY SCALE: 3" = 1'-0"F3 @ EXT F3A - EXTERIOR TERRACE ASSEMBLY - OVER EXTERIOR SPACE SCALE: 3" = 1'-0"F2 F2A - EXTERIOR SNOW -MELT PAVER SYSTEM ON PEDESTALS FLOOR TAG FIRE RATING STC DESCRIPTION F1A 60 6" SOMD - TYPICAL FLOOR ASSEMBLY F1B 2HR 6" SOMD W/ 3" TOPPING SLAB (RADIANT HEAT) F1C 2HR 50 5" SOMD - EXIT ENCLOSURE STAIR FLOOR - OMIT PLENUM, INSULATION, AND CEILING BELOW SLAB. F1D 2HR 6" SOMD W/ 4" TOPPING / HOUSEKEEPING SLAB (CHILLER PAD) FLOOR TAG FIRE RATING STC DESCRIPTION F2A 2HR 2" PAVERS SET ON PANEL SCREEN W/INSULATION. PEDESTALS INSTALLED OVER BOARD INSULATION, DRAINAGE MAT AND WATERPOOFING MEMBRANE. 6" SOMD WITH BATT INSULATION AND SUSPENDED CEILING. FLOOR TAG FIRE RATING STC DESCRIPTION F3A 2HR 6" SOMD F3B 2HR 5" SOMD Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 SNOWMELT SYSTEM PER SPEC SET IN 2" SAND. RE: LANDSCAPE FOR LOCATIONS. TERRACE PAVERS SET IN MORTAR, RE: LANDSCAPE CAST IN PLACE CONCRETE SLAB ON GRADE GRAVEL BASE 3" BOARD INSULATION 2" 2" 3" 6" CAST IN PLACE CONCRETE SLAB ON GRADE GRAVEL BASE 3" BOARD INSULATION, OMIT AT TYPE [F6B] 6" 3" SOUND ISOLATION UNDERLAYMENT09 64 29 3/4" PLYWOOD UNDERLAYMENT06 10 53.h 2x10 WOOD OVERFRAMING, RIPPED AS NEEDED TO PROVIDE LEVEL SUBFLOOR 1' - 0" LEVEL 08 FINISH FLOOR -BASIS OF DESIGN IS 3/4" ENGINEERED WOOD FLOORING 1" GYPCRETE UNDERLAYMENT REFER TO OVERALL SECTIONS FOR STRUCTURAL FLOOR ASSEMBLY FILL FLOOR CAVITY WITH CLASS A COTTON BATT INSULATION SHEET NOTES: XXX1.PRIMARY ROOF FINISH SUNSTYLE PHOTOVOLTAIC ROOF -GREY SHINGLES WWW.SUNSTYLE.COM BASE OPTION: PREWEATHERED ZINC SHINGLE, SIZE 20 (.8MM) WITH 90 DEGREE PROFILE BY FIND METAL ROOF TECH WWW.FINEMETALROOFTECH.COM ALTERNATE OPTION: ROOF DECK FINISH BASE OPTION: PORCELAIN "WOOD-PLANK" SERIES BY TILETECH WITH HEX-TRAY SNOWMELT SYSTEM WWW.TILETECHPAVERS.COM COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOPED 1/8 PER FOOT (MIN) FOR DRAINAGE MAINTAIN MINIMUM SLAB THICKNESS FOR 2HR FIRE RATING 2" BRICK PAVERS SET IN MORTAR, RE: LANDSCAPE 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK 2" RIGID INSULATION WATERPROOFING MEMBRANE SLOPE PER PLAN, RE: STRUC 1/2" DRAINAGE BOARD 4" CONCRETE W/ HYDRONIC PIPING SYSTEM 1" SETTING BED DRAINAGE AND PROTECTION BOARD COMPOSITE 07 13 00.b STRUCTRUAL FOAM MINIMIMUM DEPTH PER STRUC. THICKNESS VARIES SO THAT TOP OF 2" PAVER ALIGNS WITH TOP OF ADJACENT 6" PAVER, RE: FLOOR ASSEMBLY TYPE F8A ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A506 ROOF / FLOOR ASSEMBLIES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"F5 F5A - EXTERIOR SNOW -MELT PAVER SYSTEM ON S.O.G. SCALE: 3" = 1'-0"F6 F6A - CONCRETE SLAB ON GRADE SCALE: 3" = 1'-0"F7 F7A - OVERFRAMED FLOOR @ LEVEL 08 FLOOR TAG FIRE RATING STC DESCRIPTION F5A NR 2" PAVERS SET IN 2" SANDBED WITH SNOWMELT OVER 3" BOARD INSULATION AND 6" CONCRETE S.O.G. FLOOR TAG FIRE RATING STC DESCRIPTION F6A NR 6" CONCRETE S.O.G. - INSULATED F6B 6" CONCRETE S.O.G. - OMIT UNDERSLAB INSULATION FLOOR TAG FIRE RATING STC DESCRIPTION F7A NR 3/4" FINISH FLOOR OVER 1" GYPCRETE AND 6MM SOUND UNDERLAYMENT. 3/4" PLYWOOD SUBFLOOR AND 2x WOOD FLOOR FRAMING FILLED W/ INSULATION. SCALE: 3" = 1'-0"F8 F8A - 2" BRICK PAVER FLOOR ASSEMBLY Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 6" BRICK PAVERS SET IN MORTAR, RE: LANDSCAPE DRAINAGE AND PROTECTION BOARD COMPOSITE 07 13 00.b 1" SETTING BED 1/2" DRAINAGE BOARD WATERPROOFING MEMBRANE 2" BOARD INSULATION07 21 00.s COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOED 1/8" PER FOOT (MIN.) FOR DRAINAGE MAINTAIN MINIMUM SLAB THICKNESS FOR 2 HR FIRE RATING. 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK SLOPE PER PLAN, RE: STRUC 3" CAST IN PLACE CONCRETE HOUSEKEEPING PAD DRAINAGE AND PROTECTION BOARD COMPOSITE 07 13 00.b 1/2" HYDRODRIN DRAINAGE MAT WATERPROOFING MEMBRANE COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOPED 1/8" PER FOOT (MIN.) FOR DRAINAGE MAINTAIN MINIMUM SLAB THICKNESS FOR 2 HR FIRE RATING. 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK SLOPE PER PLAN, RE: STRUC 6" BOARD INSULATION WATERPROOFING MONOLITHIC MEMBRANE 6125-FR ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A507 ROOF / FLOOR ASSEMBLIES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"F9 F9A - 6" BRICK PAVER FLOOR ASSEMBLY SCALE: 3" = 1'-0"F10 F10 - 3" HOUSEKEEPING PAD @ CHILLER Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 15 JAN 2020 15 SUPPORTING MATERIALS 4445 Northpark Drive, Suite 204, Colorado Springs, CO, 80907 USA O:+1 720-441-6608 July 26, 2019 Christian Barlock Principal 4240 Architecture Inc. 3507 Ringsby Court, Suite 117 Denver, Colorado 80216 RE: Gorsuch Haus – Aspen, Colorado Code Compliance Narrative The Gorsuch Haus project is a proposed commercial residential (hotel and condominium) hospitality facility in Aspen, Colorado. The building design covers a footprint of approximately 26,000 square feet and is generally four stories above adjacent grade with several sub-grade floors housing parking and support/amenity spaces. Located on sloping terrain, the building will maintain a consistent height above the adjacent grade but will increase in overall height as the grade elevation rises. Given the building height variation due to the sloped site, the building may be subject to certain prescriptive code requirements applicable to very tall buildings, but which are intended to address hazards not present in the proposed design. Jensen Hughes has been asked to evaluate the proposed design and outline significant code provisions including rationale supporting how compliance will be achieved or options for compliance, as appropriate. The project is subject to the 2015 International Building Code (IBC) as amended and adopted by the City of Aspen. Occupancy Classification The facility will house both Groups R-1 and R-2 occupancies (hotel and condominium) in addition to Groups A-2/A-3 (dining and meeting spaces) as well as Group S-2 (enclosed, below-grade parking) and various functional building support rooms and guest amenity spaces. The building’s various occupancies will not be required to be separated per the provisions for mixed, nonseparated occupancies in 508.3. In accordance with this approach, the most restrictive provisions of IBC Chapter 9 and minimum construction type determined from the occupancies present are applicable to the entire building. Building Height and Area Stories. A building’s number of stories above grade is based on the location of grade plane or the finished ground level, whichever is most restrictive (202). For this building, Levels 3 and above qualify as stories above grade plane resulting in the building being classified a 7-story building. Construction type for this building is driven by the number of stories above grade, which, given the occupancies present, will require a minimum of Type I-B construction (Table (504.4). Building Height. In a building of Type I-B construction, the maximum allowable building height is 180 feet. Building height is measured from grade plane to the average roof height. The method for establishing the average roof height on a roof with multiple facets as in the proposed design is not clear in the code. For this project, the average roof height was established at the midpoint in a single theoretical plane representing the roof. The resulting building height is calculated to be approximately 43 feet, well within the code allowable height. Building Area. In a building of Type I-B construction, the allowable floor area per story and the total building area is unlimited per Table 506.2. 1. CODE COMPLIANCE NARRATIVE 16 | Gorsuch Haus; Aspen, Colorado – Code Compliance Narrative 4240 Architecture Construction Type Type I-B construction requires structural elements (from Table 601) to be of noncombustible materials with a minimum 2-hour fire-resistance rating (FRR) for primary structural frame, bearing walls, and floors and a minimum 1-hour FRR for roof construction and associated secondary members. Per Table 601, footnote c, heavy timber is permitted for roof the construction and associated secondary members. Fire Protection Systems Automatic Sprinkler. The building is required to be protected throughout with an automatic sprinkler system. Insofar as the building is classified as a 7-story building, and NFPA 13R sprinkler systems are limited to buildings with a maximum of 4 stories, the required sprinkler system will be required to be designed per NFPA 13. Standpipe System. A standpipe system is required in a building where the highest occupied story is more than 30 feet above the lowest level of fire department vehicle access (905.3.1). A Class I standpipe system will be required per 905.3.1, Exception 1. Fire Alarm. A manual fire alarm system is required throughout the residential and assembly occupancies (907.2.1, 907.2.8, 907.2.9). Manual fire alarm boxes are not required provided that notification appliances will activate on sprinkler flow; except at least one manual fire alarm box is required for the R-1 (hotel) occupancy (907.2.1, Exception; 907.2.8.1, Exception 2; 907.2.9, Exception 2). Automatic smoke detection is required in Group R-1 corridors (907.2.8.2). Exterior Walls Exterior Wall Covering. Exterior wall covering, as regulated by the IBC, includes veneers, siding, cornices, soffits, and facias (202). In a building of Type I-B construction, combustible exterior wall coverings are permitted but are limited to a maximum of 40 feet above grade plane (1406.2.1, 2). Combustible exterior wall coverings constructed of fire-retardant-treated wood are permitted up to a height of 60 feet above grade plane (1406.2.1, 3). More than 60 feet above grade plane, exterior wall covering is required to be non-combustible. Balconies. Exterior balconies are limited to a maximum of 50 percent of the building’s perimeter on each floor (1406.3) unless sprinkler protection is extended to the balcony areas (1406.3, Exception 4). Balconies made of combustible construction are required to be Type IV, heavy timber construction or have a minimum 2-hour FRR (1406.3). Guards, pickets, rails, and similar guardrail devices are permitted to be of untreated wood (1406.3, Exception 2). If you have any questions regarding this evaluation or would like to discuss further, please feel free to contact me directly at jevans@jensenhughes.com or 719-314-7381. Sincerely, JENSEN HUGHES Jeffrey Evans, RA, CBO 17 1626 Cole Boulevard, Suite 300 Lakewood, CO 80401 P 303.278.3820 www.bgbuildingworks.com July 30, 2019 Attn: Marc Snyder 3507 Ringsby Court, Ste. #117 Denver, CO 80216 RE: Gorsuch Haus CPTSB Fire & Life Safety Requirements Dear Marc, We are providing this letter to summarize Fire Alarm system design intent to meet Colorado Passenger Tramway Safety Board (CPTSB) requirements for the Gorsuch Haus project. The fire alarm system at the Gorsuch Haus facility shall be designed to meet the minimum requirements of NFPA 72 (Fire Alarm Code), NFPA 101 (Life Safety Code) and the International Building Code (IBC). As the fire alarm system pertains to the ski lift, a remote annunciation panel from the Gorsuch Haus fire alarm system will reside in the ski lift operator facility to notify lift personnel of general building alarm events at the hotel so the lift may be shut down. It is anticipated that an audio/visual notification appliance such as a speaker strobe will be located above the annunciation panel to indicate an alarm. Additionally flammable liquids will not be stored under the Airspace encroachment as part of plumbing systems design, and the building will be fully sprinklered. Please update us with if any requirement changes or contact us with any questions. Sincerely, Wesley Ploof, P.E. Engineer Cc: Brian Robertson, Eric Aden – BG Buildingworks 2. CPTSB FIRE & LIFE SAFETY REQUIREMENTS 18 | PAGE INTENTIONALLY LEFT BLANK 19 DEVELOPMENT TEAM PLANNER + LANDSCAPE ARCHITECTURE Design Workshop, Inc 120 East Main Street, Suite 100 Aspen, CO 81611 970.925.8354 | www.designworkshop.com ARCHITECTURE 4240 Architecture 3507 Ringsby Court, Suite 117 Denver, CO 80216 303.292.3388 | www.4240architecture.com CIVIL ENGINEERING + SURVEYING Sopris Engineering, LLC 502 Main Street, Suite A3 Carbondale, CO 81623 970.704.0311| www.sopriseng.com FIRE PROTECTION CONSULTANT Jensen & Hughes 4445 Northpark Drive, Suite 204, Colorado Springs, CO 80907 719.257.2728 | jensenhughes.com MUDFLOW ANALYSIS Tetra Tech 130 Ski Hill Road, Suite 130 Breckenridge, CO 80424 970.453.6394 | www.tetratech.com GEOTECHNICAL ASSESSMENT HP Geotech 5020 County Road 154 Glenwood Springs, CO 81601 970.945.7988 | www.hpgeotech.com PUBLIC COMMUNICATIONS O Communications P.O. Box 5128 Aspen, CO 81611 970.925.8480 | www.ocommunications.net LEGAL REPRESENTATION Holland & Hart, LLP 600 East Main Street, Suite 104 Aspen, CO 81611 970.925.3476 | www.hollandhart.com HOTEL OPERATIONS CoralTree Hospitality 5299 DTC BLVD #1260 Greenwood Village, CO 80111 303.799.3830 | www.coraltreehospitality.com DW LEGACY DESIGN® We believe that when environment, economics, art and community are combined in harmony with the dictates of the land and needs of society, magical places result — sustainable places of timeless beauty, significant value and enduring quality, places that lift the spirit. Design Workshop is dedicated to creating Legacy projects: for our clients, for society and for the well-being of our planet. www.designworkshop.com