Loading...
HomeMy WebLinkAboutSupplemental_Gorsuch Haus Cover Letter_Incomplete MaterialsDesign Workshop, Inc. Landscape Architecture Planning Urban Design Strategic Services 120 East Main Street Aspen, Colorado 81611 970.925.8354 designworkshop.com March 23, 2020 Garrett Larimer, Planner II City of Aspen Community Development Department 130 S. Galena St. Aspen, CO 81611 Dear Garrett, Thank you for your thorough review of the Gorsuch Haus – Detailed Review land use application. In response to the Determination of Completeness dated March 13, 2020 the Applicant has prepared the missing submission items to complete the land use application. 1. The Applicant has updated the Permission to Represent letter with a signature from the Aspen Skiing Company (owner of the property) authorizing Design Workshop to submit the land use application on behalf of Norway Island, LLC. 2. The Applicants written response has been updated per the Commercial Design Guidelines – Mountain Base Area – Final Review Design Guidelines. 3. An Outdoor Lighting Plan is included to supplement the outdoor lighting narrative. 4. Existing Landscape Plan P005 has been updated to identify the diameter and value of trees to be removed. A sheet titled L0-04 Tree Removal Summary Sheet was not included in the Application, reference to this sheet has been removed. We have included a tree survey report completed by Aspen Tree Service in 2016, which supports the tree mitigation fees. 5. The finalized Mudflow Report was to be included within Appendix C. Exhibit 3 Engineering Report. An updated Engineering Report is included in this delivery where the Mudflow Report is now located (pg.76). With the submittal of these missing items, we look forward to a Letter of Completeness for the Gorsuch Haus – Detailed Review land use application. We understand that throughout the review process the Applicant may be requested to provide additional information as deemed necessary by the Community Development Department. Sincerely, Richard Shaw Principal Design Workshop