Loading...
HomeMy WebLinkAboutDRC ResponsesDesign Workshop, Inc. Landscape Architecture Planning Urban Design Strategic Services 120 East Main Street Aspen, Colorado 81611 970.925.8354 designworkshop.com September 21, 2020 Garrett Larimer Community Development Department Copy to: Jennifer Phelan Capital Assets City of Aspen 130 South Galena Street, 3rd Floor Aspen, CO 81611 Dear Garrett, In response to the collective August 17th, 2020 Development Review Committee (DRC) Comments and subsequent requests for additional details/revisions to the Gorsuch Haus Detailed Review Application and Draft Plan Set submitted on March 2nd, 2020 we have prepared a package of updated materials with responses to questions raised in your review. The package also includes previously requested materials and additional studies useful for our upcoming Planning and Zoning review. Summary of Amendments The following summary of our amendments is organized around the comments we received from the Detailed Review Development Review Committee. Life safety and further detailing has required changes as detailed herein; the application is materially consistent with the Ordinance 39. Tramway Board Approval The Aspen Skiing Company airspace variance request for the Gorsuch Haus was approved by the Colorado Passenger Tramway Safety Board on September 9, 2020. The Project obtained approval following review and recommendations by the Technical committee. These changes are: • The addition of a lift tower between the previously located Tower 4 and 5. Tower 5 shifted upslope and was renumbered Tower 6. • Tower heights increased to achieve greater vertical separation between the public amenity space below. • The Gorsuch Haus roof overhang at the Northeast corner of the building was reduced and the face of building was modified to provide 12ft of horizontal clearance between the downhill carrier and face of building. To make this change, a reduction of the enclosed dining area at the World Cup Terrace occurred. Tree Mitigation and Landscape Plan As a result of the September 1, 2020 meeting with the Parks Department, it was determined the removal of all trees in South Aspen St. ROW would be necessary due to Design Workshop, Inc. 2 grade changes below the drip line of the trees to accommodate mudflow and stormwater infrastructure. Submitted as part of this update are: • Updated Survey identifying these trees to be removed and their size. • Updated Existing Landscape Plan and tree mitigation fee calculation • Updated Landscape Plan showing additional replacement trees and updates of street trees type to red maple. Engineering Meeting between the Applicant team and Engineering occurred on August 28 and September 10, 2020 to discuss the DRC comments received. The changes reflected in the draft Detailed Review Plan Set included as part of this update include: • Minor changes documented in the West Swale Plan, Profile and Sections due to grade modification in ROW as a result of tree removal and the lower the cul de sac wall height. • Minor changes documented in the Perimeter Grading Plan. On the west, changes have occurred to the top of wall heights as a result of the swale adjustments and also the modification the exiting on Level 4 from a door on the west side to a door and a new corridor on the east. East perimeter grades have been updated to accommodate this new exiting strategy. • The Cul de Sac Plan, Profile & Grading Plan reflects the adjusted wall heights at the cul-de-sac walls and provides further clarification of spot elevations at the entrance to the garage – indicating that the entrance is also the high point. • Bollards have been included at the cul de sac. • The snow-melted concrete specification has been updated to reflect a higher strength psi. • Design Workshop memos of August 26th and September 15th to the Engineering Department provided additional responses to the Department’s comments. Development Agreement, Easement Modifications and Plat Updates The Applicant team discussed easement and plat modifications with Engineering during the discussions on August 28 and September 10, 2020. All modifications have been reviewed and verified with the Aspen Skiing Company. The noted changes to the Draft Development Agreements, Easements and Plat include: • Additional language clarifying access for pedestrians and bicyclists on the Mountain Access Road. • The access easement from the Project to Monarch Street has increased in width to 6ft. • An access easement has been included for City maintenance of the mudflow inlet. • A permanent encroachment license agreement has been included for the 16in water line in the Hill Street ROW. • Drainage easements have been updated. Dimensional Standards The Applicant team engaged Community Development and Zoning in several discussions related to the classification of space and calculations of floor area. The Project design steps Design Workshop, Inc. 3 with the topography so minor floor area adjustments have been driven by proportionate sub-grade area, as revised. This has resulted in updates listed below to the overall project. The revised floor areas are documented in the tables provided. • Adjustments have been made to the classification of space from non-unit to lodge use. Greater detail of non-unit spaces has been provided. Additionally, calculations have been updated to include the following areas: o The Parking Level entry to garage o Level 4 Mechanical space • Average net livable are for individual lodge units has been updated to comply with the method for measuring determined by Community Development. This resulted in a decrease of the average unit size – impacting Affordable Housing calculations. Table 1. Floor Area Comparison Project Review Detailed Review Lodge 42,077 34,022 Commercial 7,730 7,483 Affordable Housing 730 730 Free Market Residential 8,633 8,000 Total Floor Area 64,023 63,614 Total Number of Keys (Hotel Rooms) 81 Table 2. Proposed Floor Area Floor Level % of Exposed Wall Affordable Housing Lodge Commercial Residential Below Grade Parking Level 0.0%0 0 0 0 0 - Level 1 Arrival 27.0%0 806 49 0 2,595 3,450 Level 2 41.6%334 3,400 308 0 1,137 5,179 Level 3 67.3%0 1,923 3,852 0 1,793 7,568 Level 4 69.5%0 6,094 582 0 1,138 7,815 Level 5 72.5%0 9,496 0 0 718 10,214 Level 6 75.5%0 8,226 0 0 747 8,973 Level 7 85.2%0 10,217 0 0 488 10,705 Level 8 Rooftop Deck 100.0%0 0 0 5,441 1,076 6,517 Level 9 100.0%0 0 3,192 0 3,192 334 40,163 4,791 8,633 9,693 63,614 Total Lot Area (slopes and rights-of-ways excluded)28,301 0.01 1.42 0.17 0.31 2.25 TOTAL FLOOR AREA PROPOSED FLOOR AREA RATIO Total Floor Area Total Proposed Unit Space SF Non-Unit Space AH, L, C ,R Total Above Grade Floor Area Design Workshop, Inc. 4 The Applicant maintains the request that the approved dimensions from the Project Approval pursuant to Ordinance 39 Series of 2016 remain in full effect. Minor adjustments to reflect programming changes as the project moves from planning to building permit shall be permitted, but in no instance shall any dimensions exceed what is outlined in said Ordinance. Table 3. Proposed Net Livable/Net Leasable Calculations Affordable Housing Lodge Free Market Residential Commercial Below Grade Parking Level - - - Level 1 Arrival - - 180 Level 2 730 2,394 742 Level 3 - 1,944 5,723 Level 4 - 5,010 838 Level 5 - 7,704 - Level 6 - 7,858 - Level 7 - 9,112 - Level 8 - - 5,072 - Level 9 - - 2,928 - Total Net Livable / Leasable 730 34,022 8,000 7,483 81 420.02Average Net Livable Area of Individual Lodge Units Net Leasable / Livable Sq. Ft. Floor Level Total Number of Keys (Hotel Rooms) Design Workshop, Inc. 5 Affordable Housing Updated calculations will be conducted at final review and confirmed at building permit. The Affordable Housing requirement with the Density Standard incentives applied are derived using 26.470.100(A)³ and interpolated from the chart in Code Section: 26.470.070.8.a.2 based on the average unit size of 420. Table 4. Affordable Housing Mitigation Requirements Lodging Take-offs 1 Regular Hotel Rooms 81 Total Number of Keys 81 Required GMQS Pillow Allotments 2016 Pillow Allotments 2017 Pillow Allotments Total Lodging Net Livable Area (sf) 34,022 162 112 50 Average Unit Size - Total Lodging Net Livable Area / Total Number of Keys (sf) 420.0 Chart / Average Unit Size - Net Livable Area of Lodge Units Percent (431.9- 400)/100 500 420.0 0.20 400 Required Mitigation Percentage - Interpolated Chart - Sec. 26.470.070.8.a.2 Lodge Development 2 Mitigation % of Employee Generation (Lodge/Commercial) ((40-20)*0.20+20)*100 40 24.00% 20 Mitigation % of Net Livable Area (Free Market) ((30-20)*0.20+20)*100 30 22.00% 20 Design Workshop, Inc. 6 Table 5. Affordable Housing Mitigation Calculations 0.00% 24.00% # of Keys Average Unit Size Lodge / Owner Restricted Condominiums 81 420.0 0.6 Employees / Key4 48.60 24.00%11.67 11.67 4,666.56 Commercial Land Use Category6 Total Commercial Net Leasable Total Commercial Net Leasable At Grade 4.7 25.23 24.00%6.06 Total Commercial Net Leasable Subgrade [Level 2 & 3]3.5 8.3 24.00%1.98 8.04 3,216.34 Free Market Multi-Family Residential Percent of Square Footage Required for Mitigation Requited Mitigation (8,000 x 30%) Net Livable Area 0.00%- 0.00 - 19.71 7,882.90 Free Market - Net Livable Area Percentage Requiring Mitigation Required Mitigation Percentage Requited Mitigation (48.6 FTE x 26.39%) Total Employee Generation Required (FTE) Total Square Footage Requirement9 (at 400 sf per FTE) Net Leasable Square Feet (sf)7 Percent of Employee Generation Required for Mitigation1 Lodge Land Use Category 4 Totals for Mitigation Employee (FTEs) Generation Rate5 (Code Generation) FTE Employees Generated (81 x 0.6) FTE Employees Generated a.(5,958/1000)* 4.7 b.(642/1000)*3. 5 Percent of Employee Generation Required for Mitigation1 Requited Mitigation AFFORDABLE HOUSING REQUIREMENTS SUMMARY: Total Employee Mitigation Required (FTEs) (Lodging FTE + Commercial FTE +,Free Market Net Livable Conversion to FTE) Total Square Footage Mitigation Requirement (sq. ft.) Total Square Footage Requirement9 (at 400 sf per FTE) Total Employee Generation Required (FTE)³ 2,362 5,368 Employees (FTEs) Generated for each 1,000 sf8 (Code Generation) Lodging/Commercial - Employee Generation Percentage Requiring Mitigation 7,483 Total Employee Generation Required (FTE) Total Square Footage Requirement9 (at 400 sf per FTE) Net Livable Square Feet (sf)7 8,000 Design Workshop, Inc. 7 Notes: 1. For lodging projects with flexible unit configurations, also known as "lock-off units," each separate "key" or rentable division shall constitute a unit. 2. With the density bonus established at 550 sf of gross lot area per lodging key through the dimensional standards for the Gorsuch Haus Planned Development within the Lodge zone district, the employee generation mitigation requirements are established utilizing the chart applicable to lodging development pursuant to the chart in Section 26.470.070.8.a.2 of the Land Use Code. The chart requires an interpolation of the percentage of mitigation required based on the average net livable area of the lodging units for the Gorsuch Haus development. When the average unit size falls between the square-footage categories (in this case between 400 sf and 500 sf) the required affordable housing is determined by interpolating the schedule illustrated in the chart for Section 26.470.070.8.a.2 (in this case between 20% and 30% for the Affordable Housing Net Livable Area required as a percent of free-market net livable area and between 20% and 40% for the percentage of employee generation requiring the provision of mitigation). 3. Per Code Section 26.470.100 (A) for lodge projects only: An efficiency or reduction in the number of employees required for the lodging component of the project may, at the discretion of the Commission as a City of Aspen Land Use Code Part 400 – GMQS Page 9 means of incentivizing a lodge project, be applied as a credit towards the mitigation requirement of the free-market residential component of the project. Any approved reduction shall require an audit to determine actual employee generation after two (2) complete years of operation of the lodge. 4. AH employee generation for Lodging is based off of the number of lodging units, other uses including administration, back of house, living room, front desk, ski concierge, ski locker, valet, storage, conference space, business center, etc. are classified as accessory uses and therefore they do not generate employees. The spa is also under the accessory use category as it is not anticipated to be open to the public and will serve only lodging and residential guests. Additionally, the unit space for lodging does not include circulation, mechanical, and other space that is not included in the calculations for net-livable or net leasable space. 5. Employee Generation Rate for the Lodge zone district pursuant to code section 26.470.100.A.1. Employee generation is 0.6 per lodging bedroom and 4.7 employees generated per 1000 sf of net leasable space 6. Commercial uses include Food and Beverage, Retail, Service and Recreation. The accessory lodging uses such as the spa area and conference facilities are not included in the mitigation for affordable housing as these are accessory lodging uses. 7. AH calculations for commercial and residential areas are based on the Net Leasable and Net Livable areas within a development as defined Per Code Section 26.575.020.I Measurement of Net Leasable Area and Net Livable Area. 8. Section 26.470.100.A states that per the Lodge or Commercial district zoning 4.7 employees are generated per 1,000 sf of net leasable space; however, for basement and upper floors the rates of employee generation shall be reduced by 25% (does not apply to lodge units) this equates to an employee generation rate of 3.525 employees per 1,000 sf of net leasable commercial space. 9. Per code section 26.470.100.A.4. Employee/square footage conversion. Whenever an affordable housing mitigation requirement is required to be converted between a number-of-employees requirement and a square- footage requirement, regardless of direction, the following conversion factor shall be used: 1 employee equals 400 square feet of net livable area. Design Workshop, Inc. 8 Building Code compliance review performed by Jensen Hughes in addition to DRC comments from Building resulted in modifications to the existing strategy and construction to improve life safety. Changes are listed below: • Emergency egress and exiting change occurred at Level 4. Exiting was redirected from the west to the east through a new corridor and discharge door. • Additional wall sections and code compliance reviews are included to provide greater detail. • The Jensen Hughes Code Compliance narrative of September 8, 2020 was provided to the City of Aspen Building Department to provide detailed support for the project’s IBC compliance. Measurement of Height Community Development, Zoning and the Applicant Team have engaged in detailed discussions to confirm the method for measuring height. Following is the method defined by the Land Use Code and the approach the Applicant is utilizing for this Project: • At the perimeter of the building, height is measured from the most restrictive of proposed or interpolated grade measured at the midpoint of the continuous roof plane. The midpoint is defined by Aspen Land Use code section 26.575.020.f.2.b. It is our understanding from this code section that the midpoint of each roof plane and all portions below the midpoint of the roof line must be to be under 40ft of the most restrictive grade. • Within the proposed grade definition, our understanding of what is considered finished grade is either the dirt or occupiable surface at the face of the building as would be defined by measuring grade under the IBC. o Within 15ft of that perimeter, we are using interpolated grade (per code section 26.575.020.f.3.b). • For the west elevation, proposed grade is measured at the top of the western most retaining wall as documented in Ordinance 39 Series of 2016. Additional modifications related to height include: • The roof top deck amenity has been lowered and a 50% transparent pool deck railing has been included. • Building perimeter has been modified due to revised exiting strategy at Level 4 • The Height Plan has been updated to document all changes Special Review The Applicant team maintains the request for special review of the transformer, recloser and switchgear currently proposed on the east side of the Project, within the property setback and crossing into the proposed Lot 2. This utility vault design will include a metal, mesh-screen lid and is considered as exterior space. No additional construction is proposed within the setbacks. Design Workshop, Inc. 9 Supplemental Materials Package: The materials included provide additional details and refinements to the plans submitted as an amendment to the application on September 1st, 2016. While some of the calculations have changed slightly due to conversations/clarifications with Staff, no substantial changes have been made. 1. Gorsuch Haus CPTSB Variance Request – Submitted May 25, 2020 Approved September 9, 2020 2. Gorsuch Haus Subdivision and PD Development Agreements 3. Certificate of Ownership, Dedications and Reservations Draft Plan Set Exhibit Revised Materials: Only the updated materials have been included in this package of updated exhibits. Sheets italicized indicate new materials prepared as requested by review agency. P001 Draft Gorsuch Haus Subdivision/Detail Review Plan Set Cover Sheet P002 Site Improvement Survey P003 Proposed Illustrative Site Plan P004.1 Existing and Proposed Development Overlay P004.2 Proposed Development Enlargements P004.3 Proposed Development Enlargements P005 Existing Landscape Plan P006 Proposed Landscape Plan P008 Illustrative Perspective P010 Illustrative Plan arrival at South Aspen St. P011 Illustrative Perspective South Aspen St. Approach R100 Reference Plan - Level P1 R101 Reference Plan - Level 01 R102 Reference Plan - Level 02 R103 Reference Plan - Level 03 R104 Reference Plan - Level 04 R105 Reference Plan - Level 05 R106 Reference Plan - Level 06 R107 Reference Plan - Level 07 R108 Reference Plan - Level 08 R109 Reference Plan - Level 09 R110 Reference Plan - Roof G021 Code Summary G022 Code Summary G023 Code Summary G024 Code Summary Design Workshop, Inc. 10 G025 Code Summary G026 Code Summary G031 Proposed Floor Area Calculations G032 Proposed Floor Area Calculations G033 Proposed Floor Area Calculations G034 Height Plan - Proposed Grade G090 Code Analysis – Fire Separation Distance G091 Code Analysis – Fire Separation Distance G100 Code Analysis – Occupancy & Fire Rated Walls G101 Code Analysis – Occupancy & Fire Rated Walls G102 Code Analysis – Occupancy & Fire Rated Walls G103 Code Analysis – Occupancy & Fire Rated Walls G104 Code Analysis – Occupancy & Fire Rated Walls G105 Code Analysis – Occupancy & Fire Rated Walls G106 Code Analysis – Occupancy & Fire Rated Walls G107 Code Analysis – Occupancy & Fire Rated Walls G108 Code Analysis – Occupancy & Fire Rated Walls G109 Code Analysis – Occupancy & Fire Rated Walls G110 Exterior Stair Protection G200 Code Analysis – Egress and Travel Distance G201 Code Analysis – Egress and Travel Distance G202 Code Analysis – Egress and Travel Distance G203 Code Analysis – Egress and Travel Distance G204 Code Analysis – Egress and Travel Distance G205 Code Analysis – Egress and Travel Distance G206 Code Analysis – Egress and Travel Distance G207 Code Analysis – Egress and Travel Distance G208 Code Analysis – Egress and Travel Distance G209 Code Analysis – Egress and Travel Distance D200 Building Elevations D201 Building Elevations D202 Building Elevations Conceptual Approval vs Detailed Review D306 Height Study – Section 1 D307 Height Study – Section 2 D308 Height Study – Section 3 D309 Height Study – Section 4 D310 Height Study – Section 5 D311 Height Study – Section 6 D312 North Height – Section 1 and 2 D312 North Height – Section 3 and 4 Design Workshop, Inc. 11 G050 Snow Shedding Roof Plan G051 Dormer Plan A801 Material Board C.2.00 Cul-de-sac Plan, Profile and Grading C.2.03 Conceptual Perimeter Grading Plan C.2.06 West Swale Plan, Profile & Sections S.101 Gorsuch Haus PD/ Subdivision S.102 Gorsuch Haus PD/ Subdivision S.103 Gorsuch Haus PD/ Subdivision S.104 Gorsuch Haus PD/ Subdivision S.105 Gorsuch Haus PD/ Subdivision GORSUCH HAUS LIFT ONE ASPEN MOUNTAIN COLORADO PASSENGER SAFETY TRAMWAY BOARD SETBACK VARIANCE REQUEST PREPARED FOR ASPEN SKIING COMPANY MAY 25, 2020 REVISED AUGUST 5,2020 COMPILED BY 120 EAST MAIN STREET ASPEN, CO 81611 970.925.8354 Gorsuch Haus Arrival | Aspen, CO On the Cover: Gorsuch Haus | Aspen, CO INTRODUCTION PROJECT DESCRIPTION LIFT 1A REPLACEMENT LIFT CORRIDOR EXTENT LOCAL FIRE PROTECTION ASPEN FIRE DEPARTMENT FIRE ACCESS AND STAGING SURROUNDING IMPROVEMENTS ARCHITECTURAL SITE PLAN PREPARED BY 4240 ARCHITECTURAL FLOOR PLANS PREPARED BY 4240 WALL SECTIONS PREPARED BY 4240 WALL ASSEMBLIES PREPARED BY 4240 SUPPORTING MATERIALS EXTERIOR MATERIALS AND FIRE / LIFE SAFETY STRATEGY PREPARED BY 4240 CODE COMPLIANCE NARRATIVE PREPARED BY JENSEN HUGHES CPTSB FIRE & LIFE SAFTEY REQUIREMENTS PREPARED BY BG BUILDINGWORKS DEVELOPMENT TEAM INTRODUCTION 1. PROJECT DESCRIPTION The Gorsuch Haus is a proposed Lodge at the west portal to Aspen Mountain. The site at the base of the mountain and adjacent to recreation and skiing represents an ideal hotel site. This modest sized hotel provides 81 hotel rooms. This Project is the right size, in a good location, and fulfills an important need in our tourist-based economy. This application describes a variance request to the Colorado Passenger Safety Tramway Board to accommodate the lift replacement and the mixed-use lodge program of the Gorsuch Haus. Together with the replacement of Lift 1A, surrounding base area improvements and the proposed Lift One Lodge, the Gorsuch Haus represents a component of the Lift One Corridor. The Lift Corridor is multiple parcels that can meet the needs of providing the replacement lift closer to the core of Aspen. The developers for the Gorsuch Haus and Lift One Lodge have collaborated with Aspen Skiing Company, the City of Aspen and Lift One Lodge to achieve consensus in locating the replacement of Lift 1A at Dean Street and develop a vision that reflects the Aspen community needs. Replacement of Lift 1A is essential to retaining World Cup skiing in Aspen as has been made clear by FIS, the Cup governing body. Lift replacement, in turn, necessitates investment in the overall base area to upgrade insufficient infrastructure, improve accessibility and provide a supportive community focal point. The Lift One Corridor Plan is forward-thinking and ensures that this area serves as a new portal to Aspen Mountain. The components of the plan encourage a much larger vision than provided by individual projects. Great community benefit is realized though the replacement of the lift, the continuation of the skiway to Town and the expanded public amenities. To accommodate replacement of the lift and redevelopment of the western portal to Aspen Mountain, proposed improvements will activate this part of town with critical infrastructure improvements, lodging and community-oriented spaces, resulting in a high level of public benefit. The Project Site Plan (Figure 1) identifies the major components of the Project (listed below) in relation to the Colorado Passenger Safety Tramway Board setbacks and ANSI standards. a. Lift corridor and realigned lift towers b. New pedestrian walkways and street crosswalks connecting to the site c. Gorsuch Haus Mixed Use Lodge will include: • 81 hotel lodging rooms • 4 free-market multi-family units • 1 affordable housing unit • Underground structured parking with 56 spaces • Outdoor restaurant/après ski deck with direct ski-in/ski-out access • Indoor restaurant and bar • Hotel amenity space d. World cup race staging area e. Relocated ski operations access road f. Snowcat turnaround and ski return g. Expanded South Aspen Street cul-de-sac and other infrastructure improvements that relate to the neighborhood Figure 1: Project Site Plan 30 28 26 27 29 12 11 8 103637 9 3231 14 13 18 16 1517 353433 3 2 4 5 7 2025 19 24 212223 ANSI Airspace Clearance TOWER 4 TOWER 5 CARRIER EDGE CABLE GUAGE - TELEMIX CPTSB Airspace Requirement CENTERLINE ALIGNMENT TOWER 6 August 5, 2020 DESIGN WORKSHOP Landscape Architecture · Land Planning · Urban Design · Tourism Planning 120 East Main Street · Aspen, Colorado 81611 · 970-925-8354 Facsimile 970-920-1387NORTH0 ORIGINAL SCALE: 10 20 40 1"=20'-00" 16' 100' MIN 60' *per SE Group SHADOWMOUNTAINCONDOMINIUMS G o r s u c h H a u s Site Plan A s p e n , C o l o r a d o HILL STR E E T R O W SO U T H A S P E N ST R E E T GORSUCH H A U S FOOTPRIN T 81 KEYS PROPOSED LIFT ONE LODGE FOOTPRINT MOUNTAIN QUEEN CONDOMINIUMS 60-foot Minimum Skiway Shadow Mountain Lift, Proposed Tower Locations and Required Setback Gorsuch Haus Property Boundary Gorsuch Haus Property Boundary Setback Building Below Grade Building Overhead Skier Access to Gorsuch Haus Public Amenities World Cup Terrace Restaurant Terrace Pedestrian Access to Gorsuch Haus Public Amenities Gorsuch Haus Arrival and Guest Check-In South Aspen Street Cul-de-Sac Aspen Skiing Company Plaza Snowcat Turnaround Mountain Access Road Enclosed Utilities (Transformer, Recloser) Neighborhood Skier Access to Dean Street Lift Terminal Pedestrian Stair Connection Existing Trees/Shrubs to be Removed Skier Return to Adjacent Properties SITE PLAN NOTES 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 1 2 34 5 67 8 9 10 11 12 13 14 15 16 17 PROPOSED LIFT ONE LODGE FOOTPRINT 18 18 19 19 44'-412" 5' 17'-10" 9'-412" 20 20 12'-10" 2. LIFT 1A REPLACEMENT The replacement of the existing Lift 1A terminal has been relocated to a planned Dean Street location. The City of Aspen organized a one-year process to determine the location of the replacement for Lift 1A. This has involved numerous stakeholders including the Lift One Lodge property, Aspen Skiing Company, Aspen Historical Society, City of Aspen Departments, and Gorsuch Haus. Following the study of the neighborhood by a SE Group, a third-party consultant, City Council selected several options to develop further. Phase Two of the study examined the lift terminal location and design of these options in further detail. The Final Report presented in a Council Work Session May 15, 2018 included three-dimensional studies, grading, lift profiles, and the width of corridors for lift and skiway return. The lower lift to a terminal site at Dean Street was determined by City Council as the location preferred. The Gorusch Haus Site Plan and information contained in this variance request is consistent with the depiction in the Lift 1A Corridor Assessment. Figure 2. Lift One Corridor illustrates the proposed lift corridor context at the base of Aspen Mountain. 3. LIFT CORRIDOR EXTENT The Lift One Corridor extends to new top terminal located slightly west of the original location. A clear line of site is maintained from the lift operator building at the Dean Street load terminal clear through the proposed development at Lift One Lodge to Gorsuch Haus. Figure 2: Proposed Lift One Base Area Redevelopment 7 1. ASPEN FIRE PROTECTION DISTRICT Aspen Volunteer Fire Department and career staff is made up of 43 individuals serving the City of Aspen in addition to Woody Creek and the entire 87 square miles that make up the District. The Aspen Fire Department is a full service fire department providing services ranging from fire suppression and prevention, wildfire, hazardous materials mitigation, motor vehicle and aircraft accidents, technical rope rescue, as well as emergency medical and other emergencies that may require a quick and professional response of equipment and personnel to help mitigate any number of potential threats to life and property within the Aspen Fire District and beyond. The Aspen Fire Department Operates from 4 strategically located stations which houses a total of 10 apparatus which include 4 structure engines, 2 wildfire engines, 2 rescue trucks, 1 water tender and our 104’ ladder truck. The District continues to modernize firefighting tactics, equipment, protective gear and fire codes as advancements occur in order to protect over $21.5 billion in property located in the District. The Aspen Fire Protection District provides 24-hour emergency response to a wide variety of critical situations, including structural, wildland, and urban interface fires, explosions, hazardous materials incidents, medical emergencies, accidents, auto extrication, swiftwater rescue, ice, low-angle rope, trench, confined space rescue, and miscellaneous public assistance requests. In addition, the fire department has the capability to respond to emergency medical needs, including basic life support. The department also operates active fire prevention and emergency preparedness programs which provides for fire inspections, hazardous process permitting, burn permits, fire code enforcement, community education, and business emergency planning in accordance with Colorado laws. Each year the Aspen Fire Protection District spends over 4,000 hours completing hands-on training activities, which build important practical skills and provide each firefighter with the abilities needed to quickly and correctly respond to all types of emergency situations. 2. FIRE ACCESS AND STAGING The nearest Aspen Fire Department location is approximately 4 minutes from the Gorsuch Haus site, allowing for quick response in the event of a fire. See Figure 3. To reach the site, emergency responders would travel south, or uphill on South Aspen Street where the street is proposed to culminate in a cul-de-sac design to City of Aspen Engineering Standards. This cul- de-sac has a minimum 50ft turning radius and is no less than 100ft in diameter. The Fire Truck Access and Staging Exhibit included in this application depicts the turning movement of a fire truck as well as established points for fire truck staging. The fire access and staging points have been thoroughly discussed with the City’s Deputy Fire Chief. 3. SURROUNDING IMPROVEMENTS In addition to site improvements to assist in rapid emergency response times, Gorsuch Haus will be installing a dry stand pipe fire suppression system on the east side of the skiway adjacent to the Mountain Queen Condominiums to enhance the neighborhood fire protection. Figure 3: Proximity of Fire Department to Project Site LOCAL FIRE PROTECTION 8 | ORIGINAL SIZE 24X36 PREPARED BY SOPRIS ENGINEERING FIRE TRUCK ACCESS AND STAGING 22.0'± FL-FL SUPPORT FIRE TRUCKS (PUMPER) SECOND ARRIVING AERIAL FIRE TRUCK (LADDER) ENTERS CUL-DE-SAC CLOCKWISE. OUTRIGGERS ENGAGED AND WITHIN PAVED PORTION OF CUL-DE-SAC; IF NEEDED THIS SECOND AERIAL MASTER (ALPHA-BRAVO) CAN BE SUPPLIED BY THE ADJACENT FIRE HYDRANT STAGED AMBULANCE ALONG S. ASPEN STREET LA N D S C A P E B U F F E R SN O W M E L T S I D E W A L K SN O W M E L T S I D E W A L K EXISTING HYDRANT PROPOSED HYDRANT FIRST ARRIVING ENGINE CONNECTS TO NEW HYDRANT AND SUPPLIES THE FDC TO SUPPORT THE FIRE SPRINKLER SYSTEM. APPARATUS ENTERS CLOCKWISE TO PLACE THE PUMP PANEL ON THE STRUCTURE SIDE FOR IMPROVED VISIBILITY. PROPOSED FDC FIRST ARRIVING AERIAL FIRE TRUCK POSITIONED AT THE NORTHWEST CORNER OF THE BUILDING (ALPHA-DELTA CORNER) & ENTERS CUL-DE-SAC COUNTERCLOCKWISE. CONNECTS TO EXISTING FIRE HYDRANT ALONG S. ASPEN STREET TO PROVIDE AN ELEVATED MASTER STREAM AS NECESSARY. HATCHED AREA REFLECTS PROPOSED PLAZA/PORTE COCHERE/LOADING DOCK AREA;BE ADVISED THIS AREA MAY BE OCCUPIED WITH LOADING/UNLOADING VEHICLES BUT COULD ALSO PROVIDE ADDITIONAL FIRE DEPARTMENT ACCESS DURING AN EMERGENCY FDC SUPPLY LINES SUPPLY LINE MOUNTABLE CURB ADJACENT TO PLAZA SUPPLY LINE MOUNTABLE CURB AROUND PERIMETER OF ISLAND LIMITS OF PROPOSED SNOWMELT ASSOCIATED WITH CUL-DE-SAC IMPROVEMENTS APPROX. LOCATION OF GRADE BREAK FROM S. ASPEN STREET TO CUL-DE-SAC WA L L 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 ISSUE DATE: SHEET NUMBER REVIEWED:DRAWN: REVISIONS GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O W W W . S O P R I S E N G . C O M F e b 2 5 , 2 0 2 0 - 2 : 5 4 p m G: \ 2 0 1 5 \ 1 5 1 0 1 . 0 6 - G o r s u c h H a u s \ C I V I L \ C i v i l D W G s \ P L O T \ C . 1 . 0 3 F I R E S T A G I N G E X H I B I T 1 5 1 0 1 . 0 6 . d w g CJB JKS C.1.03 OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 EMERGENCY FIRE STAGING PLAN FIRE TRUCK BODY ANTICIPATED LIMITS OF OUTRIGGERS GENERAL NOTE: DUE TO THE EXTREME TERRAIN CHALLENGE OF CONSTRUCTION ON A SKI SLOPE, IT IS UNDERSTOOD THAT FIREFIGHTING OPERATIONS WILL BE CONDUCTED WITHIN AND THROUGHOUT THE STRUCTURE VIA STANDPIPE CONNECTIONS (SIMILAR TO COMMON HIGH-RISE OPERATIONS). A FIRE COMMAND CENTER IS BEING PROVIDED TO FURTHER ASSIST IN COORDINATING INTERIOR FIRE OPERATIONS. S. ASPEN STREET SNOWMELT AREA PROPOSED PLAZA, UNLOADING/LOADING & PORTE COCHERE AREA NOTE: THESE PLANS ARE CONCEPTUAL OR ILLUSTRATIVE IN NATURE. PRECISE INFORMATION SHALL BE PROVIDED AS PART OF THE BUILDING PERMIT APPLICATION, AND IN SITUATIONS WHERE THE FINAL PD DEVELOPMENT PLANS AND APPROVED BUILDING PERMIT DIFFER, THE APPROVED BUILDING PERMIT SHALL RULE. 2020-01-15 DRAFT-DETAILED REVIEW PROJECT NUMBER:15101.06 2 PROJECT DETAILED REVIEW 3-2-20203 DETAILED REVIEW 9 ARCHITECTURAL SITE PLAN ORIGINAL SIZE 24X36 PREPARED BY 4240 DN DN DN DN DN DN DN DN DN DN 7995 7990 7985 TOWER 6 TOWER 4 LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT D301 D302 D303 D304 D305 D301 D302 D303 D304 D305 CPTSB AIRSPACE REQUIREMENT ANSI AIRSPACE CLEARANCE CARRIER EDGE CABLE GUAGE - TELEMIX CENTERLINE ALIGNMENT 9' - 4 1/2" 12' - 10" 5' - 0" 44' - 4 1/2" TOWER 5 SHEET NOTES: 1. REFER TO CIVIL DRAWINGS FOR TOPOGRAPHY & UTILITIES 2. REFER TO LANDSCAPE DRAWINGS FOR PLANTING & MATERIALS NOTE: DIMENSIONS ON THIS SHEET ARE FOR REFERENCE ONLY AND ARE APPROXIMATE. (RE: GRID PLAN FOR MORE DEFINITION) TOWER 4 TOWER 6 BOTTOM OF GONDOLA CAB BASE: 8003.96' TOP: 8053.24' BASE: 8062.9' TOP: 8116.07'SECTION_SHEET D305SECTION_SHEET D304 SECTION_SHEET D303 SECTION_SHEET D302 SECTION_SHEET D301 1 2 ' - 1 0 " TOWER 5 BASE: 8031.4' TOP: 8088.62' attachment: 8056.55' attachment: 8059.45' attachment: 8071' attachment: 8085.42'attachment: 8106.54' ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R001 ARCHITECTURAL SITE PLAN 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1" = 20'-0"1 ARCHITECTURAL SITE PLAN Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 0'4'8'16' SCALE:1" = 30'-0"2 LIFT SLOPE FLOOR PLANS ORIGINAL SIZE 24X36 PREPARED BY 4240 R200 2 R201 2 LEVEL 1 WALL ABOVE BOILER ROOM 24' - 0" 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 6 TOWER 4 1:20 1:12 PARKING 7,985.00' AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 7,988.00' 21 BQ 1 R250 1 R251 A100 1 7,988.00' 7,985.50' MA T C H L I N E PROPERTY LINE FAN ROOM SERVICE ELEVATOR PIT ELEVATOR 1 PIT ELEV. LOBBY ELEVATOR 2 PIT UP STAIR 2 STAIR 1 TOTAL SPACES: 56 STALLS 1 4 2 3 5 6 7 8 9 1110 30 31 42 4132 35 3736 38 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 56 55 54 53 52 51 50 49 48 47 46 45 44 43 33 34 40 39 40 39 33 ROPE ROPE 3 5 ' - 0 " TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R100 REFERENCE PLAN - LEVEL P1 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL P1 (7988') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 ARRIVAL LOBBY R200 2 R201 2 3 5' - 0" BELL CONCIERGE PROPERTY LINE 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENTTOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A101N 1 RECEPTION 7,998.50' 7,999.00' MA T C H L I N E GM VESTIBULE ELEVATOR 2 EMERGENCY GENERATOR MAIN ELECTRICAL FIRE CONTROL CENTER HSK SUPPORT ELEV. LOBBY SERVICE STAIR 02 RECEPTION CONTROLLER MENSWOMENS TELECOM FIRE PUMP WATER ENTRY ELEVATOR 1 VALET LUGGAGE ENGINEERING SKI STORAGE SECURITY MULTI-USE RECEIVING CUST. BREAK ROOMHR ACCT OFFICE OWNERS STORAGE SALES LOADING / RECEIVING UNIFORM ADMIN SERVICE CORRIDOR MECH DN PARKING GARAGE VENTILATION FIREPLACE TRASH AND RECYCLING approx. 12'x33' = 400sf DEDICATED TRASH/RECYCLING AREA. PERMANENT MARKINGS ON WALL AND FLOOR TO INDICATE AREA NOT TO BE USED FOR ANY OTHER PURPOSE. GREASE INTERCEPTOR ROPE ROPE CPTSB AIRSPACE REQUIREMENT 3 5 ' - 0 " TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R101 REFERENCE PLAN - LEVEL 01 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 01 (7999') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 WARMING KITCHEN R200 2 R201 2 ELECTRICAL MEETING / BANQUET 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A102N 1 MECHANICAL AFFORDABLE HOUSING UNIT 8,009.50' MA T C H L I N E PROPERTY LINE 1 D304 MEN MTG STORAGE KING KING KING KING ELEVATOR 2 SERVICE STAIR 02 KING KING ELEVATOR 1 PRE-FUNCTION SERVICE CORRIDOR STORAGE CORRIDOR WOMEN F&B OFFICE F&B SALES GREEN ROOF GREEN ROOF 1/8" / 1'-0"OPEN TO BELOWCPTSB AIRSPACE REQUIREMENT ROPE ROPE 3 5 ' - 0 " TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R102 REFERENCE PLAN - LEVEL 02 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 02 (8009.5') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 5T 72 24 5T60 24 5T60 24 5T 48 24 5T 48 24 5T48 24 5T48 245T 48 24 5T72 18 5T72 18 5T72 18 5T72 18 5T 36 24 5T48 24 5T36 24 5T 72 24 5T36 14 5T30 14 JAN. BEV/SERVER ICE COOKEXPO SERVICE ADA SERVICE HOST HOST SERV. PANTRY SH E L F S H E L F SH E L F SHELF UNIVERSAL MOP 20- 8 H FISHER2445 D C D DBL RACK CH E M D H H C H C 14 5T72 14 5T72 R200 1 KITCHEN R200 2 R201 2 OUTDOOR MECH. CHILLER YARD 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A103N 1 RESTAURANT MA T C H L I N E PROPERTY LINE LIBRARY 1 D304 KING KING KING KING KING 8,020.50' RESTROOM RESTROOM CPTSB AIRSPACE REQUIREMENT ROPE ROPE 3 5 ' - 0 " TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R103 REFERENCE PLAN - LEVEL 03 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 03 (8020.5') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 BOOT ROOM R200 2 R201 2 OPEN TO COOLING TOWER BELOW FITNESS 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 WORLD CUP BAR LIFT CENTERLINE ALIGNMENT TOWER 4 OPEN TO BELOW AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A104N 1 A104S 1 MA T C H L I N E PROPERTY LINE 1 D304 Q/Q KING KING KING KING KING KING KING KING EXT.Q/Q Q/Q KING 8,031.00' 8,031.00' MECH CPTSB AIRSPACE REQUIREMENT ROPE ROPE 3 5 ' - 0 " 16' - 1 1/2" 17' - 6" TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R104 REFERENCE PLAN - LEVEL 04 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 04 (8031') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 R200 2 R201 2 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A105N 1 A105S 1 MA T C H L I N E PROPERTY LINE RIDGEVALLEYVALLEY1 D304 1 D305 KING KING KING Q/QQ/QKING EXT. Q/Q KING KING EXT. Q/Q STAIR 02 KING KING ADA KINGKING KING EXT. CORRIDOR Q/Q KING KING STAIR 03 SPA 8,041.50' CPTSB AIRSPACE REQUIREMENT ROPE ROPE 3 5 ' - 0 " 22' - 4 1/2" 16' - 1 1/2" 16' - 3 1/2" TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R105 REFERENCE PLAN - LEVEL 05 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 05 (8041.5') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 R200 2 R201 2 R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A106N 1 A106S 1 MA T C H L I N E PROPERTY LINE 1 D304 1 D305 ADA KING Q/QQ/QKING EXT. KINGKINGKING KING SUITE SUITE KINGKINGKINGKING KING KING KING KING KING 8,052.00' CPTSB AIRSPACE REQUIREMENT ROPE ROPE 3 5 ' - 0 " 23' - 5 1/2" 23' - 4" 16' - 1 1/2" 16' - 3 1/2" TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R106 REFERENCE PLAN - LEVEL 06 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 06 (8052') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 R200 2 R201 2 SPA EQUIP R2011BOH 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A107N 1 A107S 1 8,062.50' MA T C H L I N E PROPERTY LINE 1 D304 1 D305 KINGQ/QQ/Q KING KING ADA KING KING KING KING KING KING KING KING KING KING EXT. KINGKINGKINGKING KING KING EXT. VOID VOID CPTSB AIRSPACE REQUIREMENT ROPE ROPE 3 5 ' - 0 " 23' - 4" 28' - 2" 23' - 3 1/2" TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R107 REFERENCE PLAN - LEVEL 07 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 07 (8062.5') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 CONDO LODGE R200 2 R201 2 CONDO LODGE CONDO LODGE CONDO LODGE R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT AJ SPA 12' X 28'2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A108S 1 8,074.00' MA T C H L I N E PROPERTY LINE 1 D304 1 D305 8,073.00' 8,067.70' 8,067.75' 8,073.00' 2,000sf2,000sf 2,000sf 2,000sf 8,072.95' 8,072.95' STORAGE/SUPPORT UNISEX UNISEX UNISEX ELEVATOR 4 STAIR 03 CPTSB AIRSPACE REQUIREMENT ROPE ROPE 3 5 ' - 0 " TOWER 4 23' - 4" 23' - 0 1/2"23' - 3" TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R108 REFERENCE PLAN - LEVEL 08 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 08 (8073') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 CONDO LODGE CONDO LODGE R200 2 R201 2 CONDO LODGE CONDO LODGE R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A109S 1 MA T C H L I N E PROPERTY LINE 1 D304 1 D305 open to below open to below 8,084.00' 8,084.00' CPTSB AIRSPACE REQUIREMENT ROPE ROPE 3 5 ' - 0 " TOWER 4 23' - 4" 22' - 2" 24' - 3 1/2" TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R109 REFERENCE PLAN - LEVEL 09 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 09 (8082') Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 R200 1 R200 2 R201 2 R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 6 TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A110N 1 A110S 1 MA T C H L I N E RIDGEVALLEYVALLEYRIDGE RI D G E RI D G E RIDGEVALLEYVALLEYRIDGEVALLEYVALLEYRI D G ERIDGEPROPERTY LINE 8,074.00'8,076.00' 3" / 1 ' - 0 " 3" / 1 ' - 0 " 1" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0"3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0"3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1'-0" 3" / 1'-0" FLAT ROOF FLAT ROOF FLAT ROOF FLAT ROOF FLAT ROOF 3" / 1'- 0" 3" / 1'- 0" OCCUPIABLE ROOF 1 D305 ROPE ROPE 3 5 ' - 0 " 19' - 0 1/2" 22' - 2" 16' - 2 1/2" 16' - 1 1/2" TOWER 5 FLAT ROOF W/ INTERNAL DRAINS AND VEGETATION DIAMOND PATTERN SOLAR TILES POOL DECK TERRACE - FLAT ROOF W/ INTERNAL DRAINS AND PEDESTAL PAVER SYSTEM ROOF LEGEND FLAT ROOF W/ INTERNAL DRAINS ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R110 REFERENCE PLAN - ROOF 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 ROOF Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 WALL SECTIONS ORIGINAL SIZE 24X36 PREPARED BY 4240 PARKING CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE DRY STACK STONE VENEER ON CAST-IN PLACE CONCRETE WALL AND RIGID INSULATION BOARD 5" STONE CAP, TYP. FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. SNOW-MELTED STONE PAVER ASSEMBLY OVER EXTERIOR CAST-IN PLACE CONCRETE STAIR FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. COMPOSITE STEEL DECK AND STEEL FRAMING WITH BELOW DECK INSULATION, TYP. RE: STRUC. COMPOSITE STEEL DECK AND STEEL FRAMING WITH BELOW DECK INSULATION, TYP. RE: STRUC. CAST IN-PLACE CONCRETE SLAB ON GRADE , RE: STRUC SNOW-MELTED STONE PAVER ASSEMBLY OVER COMPOSITE METAL DECK ASSMEBLY LOADING / RECEIVING STORAGE BEYOND TERRACED LANDSCAPE, RE: LANDSCAPE 9' - 4 1/2" 1 5 .0 0 ° 28 ' - 2 " 27 ' - 9 1 / 2 " 24 ' - 2 " 8,053.25' 8,056.55' t.o. tower ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D301 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 1 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 1 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 PARKING CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE DRY STACK STONE VENEER ON CAST-IN PLACE CONCRETE WALL AND RIGID INSULATION BOARD 5" STONE CAP, TYP. FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. SNOW-MELTED STONE PAVER ASSEMBLY OVER EXTERIOR CAST-IN PLACE CONCRETE STAIR FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. COMPOSITE STEEL DECK AND STEEL FRAMING WITH BELOW DECK INSULATION, TYP. RE: STRUC. COMPOSITE STEEL DECK AND STEEL FRAMING WITH BELOW DECK INSULATION, TYP. RE: STRUC. CAST IN-PLACE CONCRETE SLAB ON GRADE , RE: STRUC SNOW-MELTED STONE PAVER ASSEMBLY OVER COMPOSITE METAL DECK ASSMEBLY LOADING / RECEIVING STORAGE BEYOND TERRACED LANDSCAPE, RE: LANDSCAPE 9' - 4 1/2" 1 5 .0 0 ° 29 ' - 7 1 / 2 " 29 ' - 1 1 / 2 " 25 ' - 6 " 8,053.25' 8,056.55' t.o. tower ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D301 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 1 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 1 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 PARKING CENTERLINE OF PROP OSED LIFT CORRIDOR CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE 5" STONE CAP, TYP. FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. DRY STACK STONE VENEER ON CAST-IN PLACE CONCRETE WALL AND RIGID INSULATION BOARD SNOW-MELTED STONE PAVERS ASSEMBLY OVER COMPOSITE METAL DECK ASSEMBLY CAST IN-PLACE CONCRETE SLAB ON GRADE , RE: STRUC WALL ASSEMBLY W4A HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS ROOF ASSEMBLY R1A FIRE RETARDANT TREATED WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS 8,020.50' 26 ' - 1 " 22 ' - 5 1 / 2 " CAST IN-PLACE CONCRETE WALL POTENTIAL SNOW DRIFT, 2' HIGH 22 ' - 1 " HEAT TRACE AT GUTTERS, TYP 1 5 .0 0 ° 8,059.45' 12' - 4 1/2" 9' - 4" ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D302 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 2 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 2 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 PARKING CENTERLINE OF PROP OSED LIFT CORRIDOR CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE 5" STONE CAP, TYP. FIRE RETARDANT TREATED WOOD RAIL SYSTEM, STAINED. TYP. DRY STACK STONE VENEER ON CAST-IN PLACE CONCRETE WALL AND RIGID INSULATION BOARD SNOW-MELTED STONE PAVERS ASSEMBLY OVER COMPOSITE METAL DECK ASSEMBLY CAST IN-PLACE CONCRETE SLAB ON GRADE , RE: STRUC WALL ASSEMBLY W4A HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS ROOF ASSEMBLY R1A FIRE RETARDANT TREATED WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS 8,020.50' CAST IN-PLACE CONCRETE WALL POTENTIAL SNOW DRIFT, 2' HIGH HEAT TRACE AT GUTTERS, TYP 27 ' - 6 1 / 2 " 23 ' - 1 1 " 23 ' - 4 1 / 2 " 12' - 1 1/2" 9' - 5 1/2" 1 5 .0 0 ° 8,059.45' ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D302 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 2 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 2 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 PARKING VESTIBULE PRE-FUNCTION KING EXT. WORLD CUP BAR 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM SNOW-MELTED STONE PAVER ASSEMBLY OVER EXTERIOR CAST-IN PLACE CONCRETE STAIR RESTAURANT CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE ADMINSERVICE CORRIDOR FLOOR F6A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F1A R1A R2A FLOOR F3A FLOOR F3A 9' - 4 1/2" 8,031.00' 9' - 7 1/2" 12 ' - 2 1 / 2 " 1 5 .0 0 ° 27 ' - 1 1 / 2 " W4B METAL FASCIA OVER FIRE RETARDANT TREATED WOOD FASCIA POTENTIAL SNOW DRIFT, 2' HIGH HEAT TRACE AT GUTTERS, TYP FIRE RETARDANT TREATED HEAVY TIMBER 23 ' - 2 1 / 2 " FIRE RETARDANT TREATED WOOD RAILING STONE CAP HIGH PERFORMANCE GLASS BI- FOLD DOOR SYSTEM FIRE RETARDANT TREATED WOOD FASCIA 26 ' - 9 " 12' - 8" 8,071.00' ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D303 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 3 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 3 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 PARKING VESTIBULE PRE-FUNCTION KING EXT. WORLD CUP BAR 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM SNOW-MELTED STONE PAVER ASSEMBLY OVER EXTERIOR CAST-IN PLACE CONCRETE STAIR RESTAURANT CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE ADMINSERVICE CORRIDOR FLOOR F6A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F1A R1A R2A FLOOR F3A FLOOR F3A 9' - 4 1/2" 8,031.00' 1 5 .0 0 ° W4B METAL FASCIA OVER FIRE RETARDANT TREATED WOOD FASCIA POTENTIAL SNOW DRIFT, 2' HIGH HEAT TRACE AT GUTTERS, TYP FIRE RETARDANT TREATED HEAVY TIMBER FIRE RETARDANT TREATED WOOD RAILING STONE CAP HIGH PERFORMANCE GLASS BI- FOLD DOOR SYSTEM FIRE RETARDANT TREATED WOOD FASCIA 28 ' - 7 " 24 ' - 7 1 / 2 " 28 ' - 1 " 12' - 5" 9' - 9" 13 ' - 7 1 / 2 " 8,071.00' ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D303 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 3 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 3 Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE FIRE RETARDANT TREATED WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING WALL ASSEMBLY W4A EXTERIOR DRY TYPE FIRE SUPPRESSION SYSTEM, TYPICAL AT BALCONIES 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS WRAPPING 1 HR PROTECTED STEEL COLUMNS HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WALL ASSEMBLY W4A DRY STACK STONE VENEER FLOOR F6A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F2A R1A 8,062.50' 1 5 .0 0 ° 17' - 8" 20' - 8 1/2" 40 ' - 6 " 40 ' - 1 1 / 2 " 8,085.40' ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D304 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 4 - CPTSB Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 4 CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE FIRE RETARDANT TREATED WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING WALL ASSEMBLY W4A EXTERIOR DRY TYPE FIRE SUPPRESSION SYSTEM, TYPICAL AT BALCONIES 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS WRAPPING 1 HR PROTECTED STEEL COLUMNS HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WALL ASSEMBLY W4A DRY STACK STONE VENEER FLOOR F6A FLOOR F1A FLOOR F1A FLOOR F1A FLOOR F2A R1A 8,062.50' 1 5 .0 0 ° 41 ' - 1 1 1 / 2 " 41 ' - 5 1 / 2 " 20' - 5 1/2" 17' - 10" 8,085.40' ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D304 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/4" = 1'-0"1 SECTION 4 - CPTSB Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 4 CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE FIRE RETARDANT TREATED WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING WALL ASSEMBLY W4A EXTERIOR DRY TYPE FIRE SUPPRESSION SYSTEM, TYPICAL AT BALCONIES 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS WRAPPING 1 HR PROTECTED STEEL COLUMNS HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING 5" STONE CAP FIRE RETARDANT TREATED WOOD RAILING SYSTEM WALL ASSEMBLY W4A HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD BALCONY DIVIDER 5" STONE CAP DRY STACK STONE VENEER ON CONCRETE WALL FLOOR F6A FLOOR F1B FLOOR F1B CONDO LODGE R1A TOWER 6 BEYOND 8,083.00' 8,073.00' 9' - 4 1/2" 1 5 .0 0 ° 15' - 5 1/2" 37 ' - 1 1 1 / 2 " 37 ' - 7 " 8,106.55' 12' - 5" ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D305 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 SCALE:1/4" = 1'-0"1 SECTION 5 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 5 CENTERLINE OF PROPOSED LIFT CORRIDOR CPTSB AIRSPACE EXTENTS CABLE GUAGE -TELEMIX CARRIER EDGE ANSI AIRSPACE CLEARANCE FIRE RETARDANT TREATED WOOD FASCIA 6X12 FIRE RETARDANT TREATED HEAVY TIMBER RAFTERS 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING WALL ASSEMBLY W4A EXTERIOR DRY TYPE FIRE SUPPRESSION SYSTEM, TYPICAL AT BALCONIES 8X14 FIRE RETARDANT TREATED HEAVY TIMBER COLUMNS WRAPPING 1 HR PROTECTED STEEL COLUMNS HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD RAILING SYSTEM 3" FIRE RETARDANT TREATED SOLID WOOD DECK 4X6 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 6X12 FIRE RETARDANT TREATED HEAVY TIMBER BEAM 8X14 FIRE RETARDANT TREATED HEAVY TIMBER BEAM WITH ZINC CAP FLASHING 5" STONE CAP FIRE RETARDANT TREATED WOOD RAILING SYSTEM WALL ASSEMBLY W4A HIGH PERFORMANCE METAL CLAD WOOD WINDOWS/ SLIDING DOORS FIRE RETARDANT TREATED WOOD BALCONY DIVIDER 5" STONE CAP DRY STACK STONE VENEER ON CONCRETE WALL FLOOR F6A FLOOR F1B FLOOR F1B CONDO LODGE R1A TOWER 6 BEYOND 8,083.00' 8,073.00' 9' - 4 1/2" 1 5 .0 0 ° 15' - 2" 12' - 6 1/2" 39 ' - 5 " 38 ' - 1 1 " 8,106.55' ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D305 ENLARGED - CPTSB - SECTION & 3D 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 SCALE:1/4" = 1'-0"1 SECTION 5 - CPTSB NTS, FOR INFORMATION ONLY2AXON SECTION - CPTSB 5 12 | WALL ASSEMBLIES ORIGINAL SIZE 24X36 PREPARED BY 4240 SECTION PLAN 5" M I N . 1 1 / 2 " M I N . 2 1 / 2 " 10 1/2" SHOWN VARIES DRY STACK STONE VENEER GROUT CAVITY SOLID 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING, TYPICAL (2) LAYERS 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING TYPE [W1C] (1) LAYER 5/8" TYPE "X" GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" GYPSUM WALL BOARD TYPE [W1C] 1/4" DRAINAGE BOARD METAL STUD FRAMING, RE: BELOW DRY STACK STONE VENEER GROUT CAVITY SOLID 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING, TYPICAL (2) LAYERS 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING TYPE [W1C] (1) LAYER 5/8" TYPE "X" GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" GYPSUM WALL BOARD TYPE [W1C] 1/4" DRAINAGE BOARD METAL STUD FRAMING, RE: BELOW VARIES 3/8" TYP. SHEET NOTES: USE CEMENTITIOUS BACKER BOARD AT INSIDE FACE OF WET WALLS. 1. WHERE BATT INSULATION IS SHOWN, TO BE CLASS 'A' COTTON BATT INSULATION. WIDTH AS INDICATED IN WALL TYPE TABLES 2. EXTERIOR FINISH NOTES: REGIONALLY SOURCED, DRY STACK GREY GRANITE (GALLEGOS OR EQUIV). RANDOM, ASHLAR PATTERN. STONE: OPTION 1 -STAINED DOUGLAS FIR CLADDING, CLEAR WITH INTEGRATED FIRE RETARDANT OPTION 2 -STAINED ACCOYA WOOD CLADDING WITH INTEGRATED "ULTRA-A" FIRE RETARDANT BY MULTI-PRO SYSTEM OR EQUIV. OPTION 3 -CEDAR, CLEAR, A & BETTER, TONGUE AND GROOVE, SMOOTH V-JT BY REAL CEDAR OR EQUIV. WWW.REALCEDAR.COM. WITH INTEGRATED FIRE RETARDANT WOOD CLADDING: OPTION 1 -ZOLA 'THERMOCLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-7). WWW.ZOLAWINDOWS.COM OPTION 2 -ZOLA "CLASSIC CLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-4). WWW.ZOLAWINDOWS.COM OPTION 3 -SIERRA PACIFIC ALUMINUM CLAD WOOD WINDOW WINDOWS: OPTION 1 -2'X2' FSC IPE WOOD TILE ON PEDESTALS WITH SNOWMELT SYSTEM. WWW.BISONIP.COM OPTION 2 -PORCELAIN "WOOD-PLANK" SERIES BY TILETECH ON PEDESTALS WITH HEX-TRAY SNOWMELT SYSTEM. WWW.TILETECHPAVERS.COM ROOF DECK FINISH: 5" MIN. 1 1/2" MIN. 2 1/2" DRY STACK STONE VENEER GROUT CAVITY SOLID 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CONCRETE WALL, RE: STRUCT. 1/4" DRAINAGE BOARD DRY STACK STONE VENEER GROUT CAVITY SOLID 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER 1/4" DRAINAGE BOARD RE: STRUCTURAL CONCRETE WALL, RE: STRUCT. VARIES 3/8" TYP. SECTION PLAN 3/4" 7/8" 2 1/2" 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING (1) LAYER 5/8" TYPE X GYPSUM WALL BOARD METAL STUD FRAMING, RE: BELOW 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING (1) LAYER 5/8" TYPE X GYPSUM WALL BOARD METAL STUD FRAMING, RE: BELOW 3/4" FINISH GRADE PLYWOOD, PAINTED. COLOR PER ARCHITECT. 3/4" FINISH GRADE PLYWOOD, PAINTED. COLOR PER ARCHITECT. 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL 4 1/8" 9 1/4" 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL SECTION PLAN ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A501 EXTERIOR WALL TYPES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:3" = 1'-0"W1 WALL ASSEMBLY - MTL STUD W/ STONE SCALE:3" = 1'-0"W2 WALL ASSEMBLY - CONCRETE W/ STONE SCALE:3" = 1'-0"W3 WALL ASSEMBLY - MTL STUD W/ PLYWOOD PANEL FINISH WALL TAG FRR WIDTH DESCRIPTION W1A NR 1' - 6 1/4" 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR STONE FINISH W1B 1HR 1' - 6 1/4" UL #U432 - 1 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR STONE FINISH W1C 2HR 1' - 7 1/2" UL #U425 - 2 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, (2) LAYERS GYP. EACH SIDE, EXTERIOR STONE FINISH WALL TAG FRR WIDTH DESCRIPTION W2A NR 1' - 5" 8" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR W2B NR 9" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR - REFER TO STRUCTURAL FOR CONCRETE THICKNESS W2C NR 6 1/2" CIP CONCRETE WALL WITH STONE EXTERIOR, OMIT BOARD INSULATION - REFER TO STRUCTURAL FOR CONCRETE THICKNESS W2D 1HR 1' - 5" PER IBC TABLE 722.2.1.1 - 1 HR RATED - 8" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR W2E NR 1' - 9" 12" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR W2F 2HR 1' - 5" PER IBC TABLE 722.2.1.1 - 2 HR RATED - 8" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR W2G 2HR 1' - 9" PER IBC TABLE 722.2.1.1 - 2 HR RATED - 12" CIP CONCRETE WALL WITH BOARD INSULATION, STONE EXTERIOR WALL TAG FRR WIDTH DESCRIPTION W3A 1HR 1' - 1 3/8" UL #U432 - 1 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, BOARD INSULATION, PLYWOOD EXTERIOR W3B NR 10 7/8" 8" METAL STUD FRAMING, OMIT BOARD INSULATION, PLYWOOD EXTERIOR W3C 1HR 1' - 7 7/8" UL #U432 - 1 HR RATED - PAINTED PLYWOOD FINISH AND HAT CHANNEL AT INTERIOR FACE OF WALL TYPE W1B W3D NR 1' - 10 3/8" PAINTED PLYWOOD FINISH, HAT CHANNEL, AND BOARD INSULATION AT INTERIOR FACE OF WALL TYPE W1A Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 3/4" 7/8" 2 1/2" VARIES 10 1/2" SHOWN 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD TYPE [W4C, W4D] (1) LAYER 5/8" TYPE "X" GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" GYPSUM WALL BOARD TYPE [W4C, W4D] METAL STUD FRAMING, RE: BELOW 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD TYPE [W4C, W4D] (1) LAYER 5/8" TYPE "X" GYPSUM WALL BOARD, TYPICAL (2) LAYERS 5/8" TYPE "X" GYPSUM WALL BOARD TYPE [W4C, W4D] METAL STUD FRAMING, RE: BELOW 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL SECTION PLAN 3/4" 7/8" 2 1/2" 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER RE: STRUCTURAL CONCRETE WALL, RE: STRUCT. 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL CONCRETE WALL, RE: STRUCT. SECTION PLAN 3/4" 7/8" 7 1/4" 7/8" 3/4" 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING 6" METAL STUD FRAMING (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL 1x8 NOM. FIRE RETARDANT TREATED WOOD SIDING 1x8 NOM. FIRE RETARDANT TREATED T&G WOOD SIDING FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD METAL STUD FRAMING, RE: BELOW 7/8" VERTICALLY ORIENTED METAL HAT CHANNEL SECTION PLAN SHEET NOTES: USE CEMENTITIOUS BACKER BOARD AT INSIDE FACE OF WET WALLS. 1. WHERE BATT INSULATION IS SHOWN, TO BE CLASS 'A' COTTON BATT INSULATION. WIDTH AS INDICATED IN WALL TYPE TABLES 2. EXTERIOR FINISH NOTES: REGIONALLY SOURCED, DRY STACK GREY GRANITE (GALLEGOS OR EQUIV). RANDOM, ASHLAR PATTERN. STONE: OPTION 1 -STAINED DOUGLAS FIR CLADDING, CLEAR WITH INTEGRATED FIRE RETARDANT OPTION 2 -STAINED ACCOYA WOOD CLADDING WITH INTEGRATED "ULTRA-A" FIRE RETARDANT BY MULTI-PRO SYSTEM OR EQUIV. OPTION 3 -CEDAR, CLEAR, A & BETTER, TONGUE AND GROOVE, SMOOTH V-JT BY REAL CEDAR OR EQUIV. WWW.REALCEDAR.COM. WITH INTEGRATED FIRE RETARDANT WOOD CLADDING: OPTION 1 -ZOLA 'THERMOCLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-7). WWW.ZOLAWINDOWS.COM OPTION 2 -ZOLA "CLASSIC CLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-4). WWW.ZOLAWINDOWS.COM OPTION 3 -SIERRA PACIFIC ALUMINUM CLAD WOOD WINDOW WINDOWS: OPTION 1 -2'X2' FSC IPE WOOD TILE ON PEDESTALS WITH SNOWMELT SYSTEM. WWW.BISONIP.COM OPTION 2 -PORCELAIN "WOOD-PLANK" SERIES BY TILETECH ON PEDESTALS WITH HEX-TRAY SNOWMELT SYSTEM. WWW.TILETECHPAVERS.COM ROOF DECK FINISH: ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A502 EXTERIOR WALL TYPES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:3" = 1'-0"W4 EXT. WALL ASSEMBLY - MTL STUD W/ WOOD SIDING SCALE:3" = 1'-0"W5 EXT. WALL ASSEMBLY - CONCRETE W/ WOOD SIDING SCALE:3" = 1'-0"W6 EXT. WALL ASSEMBLY - WOOD WINGWALL WALL TAG FRR WIDTH DESCRIPTION W4A NR 1' - 1 3/8" 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING W4B 1HR 1' - 1 3/8" UL #U432 - 1 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING W4C 2HR 1' - 2 5/8" UL #U425 - 2 HR RATED - 8" METAL STUD FRAMING W/ BATT INSULATION, (2) LAYERS GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING W4D 1HR 1' - 2 5/8" 1 HR - 8" METAL STUD FRAMING W/ BATT INSULATION, (2) LAYER GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING WALL TAG FRR WIDTH DESCRIPTION W5A NR 4 1/8" CIP CONCRETE WALL WITH BOARD INSULATION, EXTERIOR WOOD T&G SIDING - REFER TO STRUCTURAL FOR CONCRETE THICKNESS WALL TAG FRR WIDTH DESCRIPTION W6A NR 10 1/2" 6" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR WOOD T&G SIDING EACH SIDE Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 3/4" 1" 2 1/2" 9 1/4" 1x8 NOM. FIRE RETARDANT TREATED VERTICAL WOOD T&G SIDING 1" NOM. VENTED METAL HAT CHANNEL, HORIZONTALLY ORIENTED 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING (1) LAYER 5/8" TYPE X GYPSUM WALL BOARD METAL STUD FRAMING, RE: BELOW 1x8 NOM. FIRE RETARDANT TREATED VERTICAL T&G WOOD SIDING 1" VENTED METAL HAT CHANNEL, HORIZONTALLY ORIENTED 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CLASS A COTTON BATT INSULATION, UNFACED (R-21 MINIMUM) (1) LAYER 5/8" TYPE "X" EXTERIOR GYPSUM WALL BOARD SHEATHING (1) LAYER 5/8" TYPE X GYPSUM WALL BOARD 8" METAL STUD FRAMING SECTION PLAN 3/4" 1" 2 1/2" 1x8 NOM. FIRE RETARDANT TREATED VERTICAL WOOD T&G SIDING 1" VENTED METAL HAT CHANNEL, HORIZONTALLY ORIENTED 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CONCRETE WALL, RE: STRUCTURAL 1x8 NOM. FIRE RETARDANT TREATED VERTICAL T&G WOOD SIDING 1" VENTED METAL HAT CHANNEL, HORIZONTALLY ORIENTED 2 1/2" BOARD INSULATION (R 15.2 MINIMUM) FLUID APPLIED WEATHER BARRIER CONCRETE WALL, RE: STRUCTURAL RE: STRUCTURAL SECTION PLAN SHEET NOTES: USE CEMENTITIOUS BACKER BOARD AT INSIDE FACE OF WET WALLS. 1. WHERE BATT INSULATION IS SHOWN, TO BE CLASS 'A' COTTON BATT INSULATION. WIDTH AS INDICATED IN WALL TYPE TABLES 2. EXTERIOR FINISH NOTES: REGIONALLY SOURCED, DRY STACK GREY GRANITE (GALLEGOS OR EQUIV). RANDOM, ASHLAR PATTERN. STONE: OPTION 1 -STAINED DOUGLAS FIR CLADDING, CLEAR WITH INTEGRATED FIRE RETARDANT OPTION 2 -STAINED ACCOYA WOOD CLADDING WITH INTEGRATED "ULTRA-A" FIRE RETARDANT BY MULTI-PRO SYSTEM OR EQUIV. OPTION 3 -CEDAR, CLEAR, A & BETTER, TONGUE AND GROOVE, SMOOTH V-JT BY REAL CEDAR OR EQUIV. WWW.REALCEDAR.COM. WITH INTEGRATED FIRE RETARDANT WOOD CLADDING: OPTION 1 -ZOLA 'THERMOCLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-7). WWW.ZOLAWINDOWS.COM OPTION 2 -ZOLA "CLASSIC CLAD PANORAMIC VIEW", ALUMINUM CLAD WOOD TILT TURN (R-4). WWW.ZOLAWINDOWS.COM OPTION 3 -SIERRA PACIFIC ALUMINUM CLAD WOOD WINDOW WINDOWS: OPTION 1 -2'X2' FSC IPE WOOD TILE ON PEDESTALS WITH SNOWMELT SYSTEM. WWW.BISONIP.COM OPTION 2 -PORCELAIN "WOOD-PLANK" SERIES BY TILETECH ON PEDESTALS WITH HEX-TRAY SNOWMELT SYSTEM. WWW.TILETECHPAVERS.COM ROOF DECK FINISH: ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A503 EXTERIOR WALL TYPES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"W7 EXT. WALL ASSEMBLY - MTL STUD W/ VERTICAL WD SIDING SCALE: 3" = 1'-0"W8 EXT. WALL ASSEMBLY - CONCRETE W/ VERTICAL WD SIDING WALL TAG FRR WIDTH DESCRIPTION W7A NR 1' - 1 1/2" 8" METAL STUD FRAMING W/ BATT INSULATION, (1) LAYER GYP. EACH SIDE, EXTERIOR VERTICAL WOOD SIDING WALL TAG FRR WIDTH DESCRIPTION W8A NR 4 1/4" CIP CONCRETE WALL WITH BOARD INSULATION, EXTERIOR VERTICAL WOOD SIDING - REFER TO STRUCTURAL FOR CONCRETE THICKNESS Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 DROUGHT TOLERANT, REGIONAL SPECIFIC PLANTED MATERIALS, RE: LANDSCAPE SYSTEMFILTER GROWING MEDIA (8" MIN.) 6" EXPANDED POLYSTYRENE OR MINERAL WOOL BOARD INSULATION, R-35 MIN. HYDROFLEX RB MM 6125-FR SELF-HEALING WATERPROOFING MEMBRANE 5/8" TYPE "X" GYPSUM WALL BOARD EXTERIOR SHEATHING METAL ROOF DECK, RE: STRUCTURAL 6" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK AT INTERIOR SPACES GARDENDRAIN GR30 OR GR 50 ZINC ROOF BY FINE METAL ROOF TECH (OR EQUIV.) VAPOR RETARDER 5/8" TYPE "X" GYPSUM COVER BOARD EXTERIOR SHEATHING METAL ROOF DECK, RE: STRUC. UNDERSIDE TO RECEIVE FIREPROOFING. 6" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK AT INTERIOR SPACES 1/2" PROTECTION BOARD 6" EXPANDED POLYSTYRENE OR MINERAL WOOL BOARD INSULATION, R-35 MIN ICE AND WATER SHIELD WATERPROOFING GREY DIAMOND PHOTOVOLTAIC SHINGLES BY SUNSTYLE VAPOR RETARDER 5/8" TYPE "X" GYPSUM COVER BOARD EXTERIOR SHEATHING METAL ROOF DECK, RE: STRUC. UNDERSIDE TO RECIEVE FIREPROOFING 6" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK AT INTERIOR SPACES 1/2" NAILBASE 6" EXPANDED POLYSTYRENE OR MINERAL WOOL BOARD INSULATION, R-35 MIN 2 LAYERS OF ICE + WATERSHIELD 2x3 WOOD COUNTER BATTEN 2x3 WOOD CROSS BATTEN WOOD SOLAR BATTEN (ALTERNATING SIZES) PV SHINGLE MOUNTING BOLT (ALTERNATING SIZES) SEALING CORNER VAPOR RETARDER 5/8" TYPE "X" GYPSUM COVER BOARD EXTERIOR SHEATHING METAL ROOF DECK, RE: STRUC. UNDERSIDE TO RECIEVE FIREPROOFING 6" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK 6" EXPANDED POLYSTYRENE OR MINERAL WOOL BOARD INSULATION, R-35 MIN EPDM ROOFING MEMBRANE SHEET NOTES: XXX1.PRIMARY ROOF FINISH SUNSTYLE PHOTOVOLTAIC ROOF -GREY SHINGLES WWW.SUNSTYLE.COM BASE OPTION: PREWEATHERED ZINC SHINGLE, SIZE 20 (.8MM) WITH 90 DEGREE PROFILE BY FIND METAL ROOF TECH WWW.FINEMETALROOFTECH.COM ALTERNATE OPTION: ROOF DECK FINISH BASE OPTION: PORCELAIN "WOOD-PLANK" SERIES BY TILETECH WITH HEX-TRAY SNOWMELT SYSTEM WWW.TILETECHPAVERS.COM ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A504 ROOF / FLOOR ASSEMBLIES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"R2 ROOF ASSEMBLY R2A - GREEN ROOF SCALE:3" = 1'-0"R1-ALT ROOF ASSEMBLY R1A - ZINC ROOF_ALTERNATE OPTION SCALE: 3" = 1'-0"R1 ROOF ASSEMBLY R1A - PV ROOF_BASIS OF DESIGN Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 SCALE:3" = 1'-0"R3 ROOF ASSEMBLY R3A - EPDM ROOF TAG FIRE RATING DESCRIPTION R1A 1HR PHOTOVOLTAIC SHINGLES ON SLATS OVER RIGID INSULATION, STRUCTURAL METAL DECKING. COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK. ROOF TAG FIRE RATING DESCRIPTION R2A 1HR GREEN ROOF OVER RIGID INSULATION, STRUCTURAL METAL DECKING. COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK. ROOF TAG FIRE RATING DESCRIPTION R3A 1HR EPDM ROOFING MEMBRANE OVER RIGID INSULATION, STRUCTURAL METAL DECKING. COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK. SNOWMELT SYSTEM PER SPEC SET IN 2" SAND. RE: LANDSCAPE FOR LOCATIONS. COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOPED 1/8 PER FOOT (MIN) FOR DRAINAGE MAINTAIN MINIMUM SLAB THICKNESS FOR 2HR FIRE RATING TERRACE PAVERS SET IN MORTAR, RE: LANDSCAPE CEILING ATTACHMENT (WIRE-SUSPENDED GRID OR METAL FRAMING, TBD) CEILING FINISH, REFER TO RCPs 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK 2" RIGID INSULATION WATERPROOFING MEMBRANE SLOPE PER PLAN, RE: STRUC DRAINAGE MAT OVER 1/2" PROTECTION BOARD ACOUSTICAL UNDERLAYMENT (6MM) COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. FINISH FLOOR (VARIES) SUSPENDED METAL GRID SYSTEM FOR CEILING FINISH ATTACHMENT CEILING FINISH, VARIES, RE: RCP 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK DECK FLUTES STUFFED WITH CLASS A COTTON BATT INSULATION AND SEALED WITH BOTTOM OF DECK WITH HILTI SPEED SPRAY OR EQUIV. SLOPE PER PLAN, RE: STRUC 1x8 NOMINAL EXTERIOR WOOD TONGUE + GROOVE SOFFIT CLEAR 0' - 8" SUSPENDED METAL GRID SYSTEM FOR CEILING FINISH ATTACHMENT RE: BELOW COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOPED 1/8 PER FOOT (MIN) FOR DRAINAGE SUSPENDED METAL GRID SYSTEM FOR CEILING FINISH ATTACHMENT CEILING FINISH, VARIES, RE: RCPs 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK 5" RIGID INSULATION WATERPROOFING MEMBRANE SLOPE PER PLAN, RE: STRUC DRAINAGE MAT OVER 1/2" PROTECTION BOARD PAVERS SET ON THERMA-HEXX PANEL SYSTEM THERMA HEXX PANEL W/ INSULATION ATTACHED TO UNDERSIDE SHEET NOTES: XXX1.PRIMARY ROOF FINISH SUNSTYLE PHOTOVOLTAIC ROOF -GREY SHINGLES WWW.SUNSTYLE.COM BASE OPTION: PREWEATHERED ZINC SHINGLE, SIZE 20 (.8MM) WITH 90 DEGREE PROFILE BY FIND METAL ROOF TECH WWW.FINEMETALROOFTECH.COM ALTERNATE OPTION: ROOF DECK FINISH BASE OPTION: PORCELAIN "WOOD-PLANK" SERIES BY TILETECH WITH HEX-TRAY SNOWMELT SYSTEM WWW.TILETECHPAVERS.COM ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A505 ROOF / FLOOR ASSEMBLIES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"F3 F4A - EXTERIOR TERRACE ASSEMBLY - OVER CONDITIONED SPACE SCALE: 3" = 1'-0"F1 F1A - TYPICAL FLOOR ASSEMBLY SCALE: 3" = 1'-0"F3 @ EXT F3A - EXTERIOR TERRACE ASSEMBLY - OVER EXTERIOR SPACE Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 SCALE: 3" = 1'-0"F2 F2A - EXTERIOR SNOW-MELT PAVER SYSTEM ON PEDESTALS FLOOR TAG FIRE RATING STC DESCRIPTION F1A 60 6" SOMD - TYPICAL FLOOR ASSEMBLY F1B 2HR 6" SOMD W/ 3" TOPPING SLAB (RADIANT HEAT) F1C 2HR 50 5" SOMD - EXIT ENCLOSURE STAIR FLOOR - OMIT PLENUM, INSULATION, AND CEILING BELOW SLAB. F1D 2HR 6" SOMD W/ 4" TOPPING / HOUSEKEEPING SLAB (CHILLER PAD) FLOOR TAG FIRE RATING STC DESCRIPTION F2A 2HR 2" PAVERS SET ON PANEL SCREEN W/INSULATION. PEDESTALS INSTALLED OVER BOARD INSULATION, DRAINAGE MAT AND WATERPOOFING MEMBRANE. 6" SOMD WITH BATT INSULATION AND SUSPENDED CEILING. FLOOR TAG FIRE RATING STC DESCRIPTION F3A 6" SOMD F3B 2HR 5" SOMD SNOWMELT SYSTEM PER SPEC SET IN 2" SAND. RE: LANDSCAPE FOR LOCATIONS. TERRACE PAVERS SET IN MORTAR, RE: LANDSCAPE CAST IN PLACE CONCRETE SLAB ON GRADE GRAVEL BASE 3" BOARD INSULATION 2" 2" 3" 6" CAST IN PLACE CONCRETE SLAB ON GRADE GRAVEL BASE 3" BOARD INSULATION, OMIT AT TYPE [F6B] 6" 3" SOUND ISOLATION UNDERLAYMENT09 64 29 3/4" PLYWOOD UNDERLAYMENT06 10 53.h 2x10 WOOD OVERFRAMING, RIPPED AS NEEDED TO PROVIDE LEVEL SUBFLOOR 1' - 0" LEVEL 08 FINISH FLOOR -BASIS OF DESIGN IS 3/4" ENGINEERED WOOD FLOORING 1" GYPCRETE UNDERLAYMENT REFER TO OVERALL SECTIONS FOR STRUCTURAL FLOOR ASSEMBLY FILL FLOOR CAVITY WITH CLASS A COTTON BATT INSULATION SHEET NOTES: XXX1.PRIMARY ROOF FINISH SUNSTYLE PHOTOVOLTAIC ROOF -GREY SHINGLES WWW.SUNSTYLE.COM BASE OPTION: PREWEATHERED ZINC SHINGLE, SIZE 20 (.8MM) WITH 90 DEGREE PROFILE BY FIND METAL ROOF TECH WWW.FINEMETALROOFTECH.COM ALTERNATE OPTION: ROOF DECK FINISH BASE OPTION: PORCELAIN "WOOD-PLANK" SERIES BY TILETECH WITH HEX-TRAY SNOWMELT SYSTEM WWW.TILETECHPAVERS.COM COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOPED 1/8 PER FOOT (MIN) FOR DRAINAGE MAINTAIN MINIMUM SLAB THICKNESS FOR 2HR FIRE RATING 2" BRICK PAVERS SET IN MORTAR, RE: LANDSCAPE 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK 2" RIGID INSULATION WATERPROOFING MEMBRANE SLOPE PER PLAN, RE: STRUC 1/2" DRAINAGE BOARD 4" CONCRETE W/ HYDRONIC PIPING SYSTEM 1" SETTING BED DRAINAGE AND PROTECTION BOARD COMPOSITE 07 13 00.b STRUCTRUAL FOAM MINIMIMUM DEPTH PER STRUC. THICKNESS VARIES SO THAT TOP OF 2" PAVER ALIGNS WITH TOP OF ADJACENT 6" PAVER, RE: FLOOR ASSEMBLY TYPE F8A ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A506 ROOF / FLOOR ASSEMBLIES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 SCALE: 3" = 1'-0"F5 F5A - EXTERIOR SNOW-MELT PAVER SYSTEM ON S.O.G. SCALE: 3" = 1'-0"F6 F6A - CONCRETE SLAB ON GRADE SCALE: 3" = 1'-0"F7 F7A - OVERFRAMED FLOOR @ LEVEL 08 FLOOR TAG FIRE RATING STC DESCRIPTION F5A 2" PAVERS SET IN 2" SANDBED WITH SNOWMELT OVER 3" BOARD INSULATION AND 6" CONCRETE S.O.G. FLOOR TAG FIRE RATING STC DESCRIPTION F6A NR 6" CONCRETE S.O.G. - INSULATED F6B 6" CONCRETE S.O.G. - OMIT UNDERSLAB INSULATION FLOOR TAG FIRE RATING STC DESCRIPTION F7A NR 3/4" FINISH FLOOR OVER 1" GYPCRETE AND 6MM SOUND UNDERLAYMENT. 3/4" PLYWOOD SUBFLOOR AND 2x WOOD FLOOR FRAMING FILLED W/ INSULATION. SCALE: 3" = 1'-0"F8 F8A - 2" BRICK PAVER FLOOR ASSEMBLY 6" BRICK PAVERS SET IN MORTAR, RE: LANDSCAPE DRAINAGE AND PROTECTION BOARD COMPOSITE 07 13 00.b 1" SETTING BED 1/2" DRAINAGE BOARD WATERPROOFING MEMBRANE 2" BOARD INSULATION07 21 00.s COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOED 1/8" PER FOOT (MIN.) FOR DRAINAGE MAINTAIN MINIMUM SLAB THICKNESS FOR 2 HR FIRE RATING. 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK SLOPE PER PLAN, RE: STRUC 3" CAST IN PLACE CONCRETE HOUSEKEEPING PAD DRAINAGE AND PROTECTION BOARD COMPOSITE 07 13 00.b 1/2" HYDRODRIN DRAINAGE MAT WATERPROOFING MEMBRANE COMPOSITE CONCRETE AND METAL DECK, RE: STRUC. TOP SLOPED 1/8" PER FOOT (MIN.) FOR DRAINAGE MAINTAIN MINIMUM SLAB THICKNESS FOR 2 HR FIRE RATING. 4" CLASS A COTTON BATT INSULATION ATTACHED TO UNDERSIDE OF DECK SLOPE PER PLAN, RE: STRUC 6" BOARD INSULATION WATERPROOFING MONOLITHIC MEMBRANE 6125-FR ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A507 ROOF / FLOOR ASSEMBLIES 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE: 3" = 1'-0"F9 F9A - 6" BRICK PAVER FLOOR ASSEMBLY Lift One Aspen Mountain CO Colorado Passenger Safety Tramway Board Lift One Setback Variance Request 07 AUG 2020 SCALE: 3" = 1'-0"F10 F10 - 3" HOUSEKEEPING PAD @ CHILLER 13 4240 Architecture Inc 3507 Ringsby Court Suite 117 Denver Colorado 80216 T 303 292 3388 W 4240architecture.com A 05 October 2018 To Whom it Concerns, As requested, below is a summary of the conceptual level understanding of the exterior materials and fire / life safety strategy for the Gorsuch Haus as it is understood today. Exterior Materials To reduce the perceived scale of the building, materials will be proportioned and divided into a base, middle and top that steps with the natural contours of the site. Exterior materials will be predominantly stone, wood and glass, with accents of metal and regional in tone to reflect the alpine setting. The base of the building will be dry-stack stone that blends with the site walls tying the building to the site. Cut stone caps will terminate the masonry walls at the second level. Fenestration within this masonry mass is envisioned as vertically proportioned punched openings. Above the second level, stone walls will transition to fire retardant cedar wood siding and flat seam metal panels in select locations. Window to wall ratio within this zone is likely 50/50. Wall patterns within this zone will be textured, catching the sun and further providing a hand crafted nature to the cladding. Heavy timber columns, architectural projections and hand crafted wood balconies with flower boxes will further animate the façade. All exterior wood will be fire retardant treated. Sloped roof overhangs, with layered beams and purlins will project beyond the building walls providing a canopy over the balconies below. The eave of the building will vary along the building facades and step/slope with the sloping site. Fire / Life Safety A combined fire and domestic water main is planned to serve the project. It is possible, due to existing City of Aspen line sizes in the area North of the property that two, separate water entrances (one for fire, one for domestic use) will be required, This will be determined during the project’s design phases. The fire protection components are as follows: a. The fire protection system shall be designed in conjunction with an independent registered engineer or NICET Class III engineering technician working for the installing contractor. b. The majority of spaces on the project are anticipated to be light hazard. Kitchen service areas and mechanical rooms are assumed to be Ordinary Hazard. c. Due to the size and configuration of the project, standpipes are required per the International Building code. Standpipes will need to be extended to the roof level where rooftop gardens or landscaped roofs exist. d. Preliminary coordination with the City of Aspen water department has confirmed site water pressure to be 60psi. Portions of the building exist above the elevation 8040’ where the city does not guarantee adequate water pressures for fire suppression systems. Based on this, the project will require a fire pump system to provide adequate water pressure for sprinkler systems. e. The majority of the system will be wet pipe; however there may be unconditioned space and exterior areas where dry zones or sprinkler heads will be required. An air compressor for dry systems is anticipated. SUPPORTING MATERIALS 1. EXTERIOR MATERIALS AND FIRE / LIFE SAFETY STRATEGY 14 | 4240 Architecture Inc 3507 Ringsby Court Suite 117 Denver Colorado 80216 T 303 292 3388 W 4240architecture.com A 1. A complete fire protection system consisting of riser piping, lateral piping, sprinkler heads, flow switches and valve monitors shall be provided in accordance with NFPA 13 criteria. a. Automatic Sprinkler Systems: (1) The building shall be fully covered by the sprinkler system. The system will have the necessary fire department connections located on the exterior of the building (quantity shall be per the authority having jurisdiction). The system will consist of a predominately-wet pipe, and a partial glycerin antifreeze or dry pipe system (including compressor) as required to prevent freezing near the garage entry, soffit areas, outside air intake, and other areas subject below freezing conditions. A pre-action system will be provided in building communication and data center rooms (MDF, IDF, etc.). (2) Sprinkler system zones to be limited to a single floor or partial floor. (3) Quick response, residential sprinkler heads in residential units. (4) Sprinkler coverage will be provided at the top and bottom of elevator hoistways, unless prohibited by the authority having jurisdiction. (5) Sprinkler coverage will be provided at the top of any laundry or trash chute, unless prohibited by the authority having jurisdiction. (6) Sprinkler heads in finished areas (including residential units) to be concealed type with finish to match architectural ceiling. Side-wall heads (where required) will be semi-recessed with white or polished chrome finish as directed by architect. (7) Sprinkler heads in un-finished areas will be pendant type with a rough bronze finish. Provide medium and high temperature sprinkler heads in areas with excessive heat such as the central plant. (8) Dry type system to be provided at areas of potential freezing. (9) Occupancy Classifications are per NFPA 13: (a) Light Hazard: Administration Areas, Common Areas, Residential units. (b) Ordinary Hazard (Group I): Parking Garage(s) (c) Ordinary Hazard (Group II): Boiler Room, Trash Rooms, Commercial Laundry rooms, Spa/pool equipment room. b. Standpipe Systems: (1) The building shall each be equipped with Class III standpipe systems. Standpipe(s) will be located in each stairwell, rooftop terrace/garden areas, and as required to satisfy code requirements. Fire valve connections (cabinets where required) with hose valves shall be located at intermediate landings of every floor-level at every standpipe. The system will have the necessary fire department connections located on the exterior of the buildings per the authority having jurisdiction. (2) Intermediate standpipes with hose valves and all appurtenances will be provided where necessary in corridors, garage levels, etc. to provide hose coverage as directed by authority having jurisdiction. c. A fire pump system is anticipated to provide necessary flow for sprinkler systems. 15 4240 Architecture Inc 3507 Ringsby Court Suite 117 Denver Colorado 80216 T 303 292 3388 W 4240architecture.com A Fire Alarm System: 1. General System Requirements a. System shall be designed to meet the minimum requirements of NFPA 72 (Fire Alarm Code) and NFPA 101 (Life Safety Code). b. The fire alarm system shall be addressable and the main control panel shall be located in the Fire Command Center (FCC). The FCC shall contain the following: (1) Main fire alarm control panel. (2) Elevator status panel. (3) Generator and ATS remote annunciator panels. (4) Fire department Voice Command Center. c. Building shall have a remote annunciator panel located at the main entrance for fire department access. 2. Detection System a. Detectors will be provided to accomplish the following tasks: (1) Activate the alarm signaling devices and remote notification to the fire department. (2) Elevator recall. (3) Shut down required for HVAC equipment and closing fire/smoke dampers. b. Ceiling mounted photoelectric type smoke detectors shall be located in approved areas throughout the building. 3. Notification System a. Combination speaker/strobe signaling devices shall be installed to provide an audio/visual alarm signal throughout all buildings and garage areas. This alarm will occur upon activation of any sprinkler flow switch, manual pull station, single smoke detector, heat detector, or any other automatic detection device and can be hard wired to a “campus” wide system with connection to lift shack at the bottom terminal. b. Remote central station: The following summary alarm conditions shall be transmitted to a UL approved remote central station facility via leased telephone lines: (1) System trouble. (2) Smoke detection system alarm. (3) Manual pull station alarm. (4) Sprinkler flow switch. 16 | 4445 Northpark Drive, Suite 204, Colorado Springs, CO, 80907 USA O:+1 720-441-6608 July 26, 2019 Christian Barlock Principal 4240 Architecture Inc. 3507 Ringsby Court, Suite 117 Denver, Colorado 80216 RE: Gorsuch Haus – Aspen, Colorado Code Compliance Narrative The Gorsuch Haus project is a proposed commercial residential (hotel and condominium) hospitality facility in Aspen, Colorado. The building design covers a footprint of approximately 26,000 square feet and is generally four stories above adjacent grade with several sub-grade floors housing parking and support/amenity spaces. Located on sloping terrain, the building will maintain a consistent height above the adjacent grade but will increase in overall height as the grade elevation rises. Given the building height variation due to the sloped site, the building may be subject to certain prescriptive code requirements applicable to very tall buildings, but which are intended to address hazards not present in the proposed design. Jensen Hughes has been asked to evaluate the proposed design and outline significant code provisions including rationale supporting how compliance will be achieved or options for compliance, as appropriate. The project is subject to the 2015 International Building Code (IBC) as amended and adopted by the City of Aspen. Occupancy Classification The facility will house both Groups R-1 and R-2 occupancies (hotel and condominium) in addition to Groups A-2/A-3 (dining and meeting spaces) as well as Group S-2 (enclosed, below-grade parking) and various functional building support rooms and guest amenity spaces. The building’s various occupancies will not be required to be separated per the provisions for mixed, nonseparated occupancies in 508.3. In accordance with this approach, the most restrictive provisions of IBC Chapter 9 and minimum construction type determined from the occupancies present are applicable to the entire building. Building Height and Area Stories. A building’s number of stories above grade is based on the location of grade plane or the finished ground level, whichever is most restrictive (202). For this building, Levels 3 and above qualify as stories above grade plane resulting in the building being classified a 7-story building. Construction type for this building is driven by the number of stories above grade, which, given the occupancies present, will require a minimum of Type I-B construction (Table (504.4). Building Height. In a building of Type I-B construction, the maximum allowable building height is 180 feet. Building height is measured from grade plane to the average roof height. The method for establishing the average roof height on a roof with multiple facets as in the proposed design is not clear in the code. For this project, the average roof height was established at the midpoint in a single theoretical plane representing the roof. The resulting building height is calculated to be approximately 43 feet, well within the code allowable height. Building Area. In a building of Type I-B construction, the allowable floor area per story and the total building area is unlimited per Table 506.2. 2. CODE COMPLIANCE NARRATIVE 17 Gorsuch Haus; Aspen, Colorado – Code Compliance Narrative 4240 Architecture Construction Type Type I-B construction requires structural elements (from Table 601) to be of noncombustible materials with a minimum 2-hour fire-resistance rating (FRR) for primary structural frame, bearing walls, and floors and a minimum 1-hour FRR for roof construction and associated secondary members. Per Table 601, footnote c, heavy timber is permitted for roof the construction and associated secondary members. Fire Protection Systems Automatic Sprinkler. The building is required to be protected throughout with an automatic sprinkler system. Insofar as the building is classified as a 7-story building, and NFPA 13R sprinkler systems are limited to buildings with a maximum of 4 stories, the required sprinkler system will be required to be designed per NFPA 13. Standpipe System. A standpipe system is required in a building where the highest occupied story is more than 30 feet above the lowest level of fire department vehicle access (905.3.1). A Class I standpipe system will be required per 905.3.1, Exception 1. Fire Alarm. A manual fire alarm system is required throughout the residential and assembly occupancies (907.2.1, 907.2.8, 907.2.9). Manual fire alarm boxes are not required provided that notification appliances will activate on sprinkler flow; except at least one manual fire alarm box is required for the R-1 (hotel) occupancy (907.2.1, Exception; 907.2.8.1, Exception 2; 907.2.9, Exception 2). Automatic smoke detection is required in Group R-1 corridors (907.2.8.2). Exterior Walls Exterior Wall Covering. Exterior wall covering, as regulated by the IBC, includes veneers, siding, cornices, soffits, and facias (202). In a building of Type I-B construction, combustible exterior wall coverings are permitted but are limited to a maximum of 40 feet above grade plane (1406.2.1, 2). Combustible exterior wall coverings constructed of fire-retardant-treated wood are permitted up to a height of 60 feet above grade plane (1406.2.1, 3). More than 60 feet above grade plane, exterior wall covering is required to be non-combustible. Balconies. Exterior balconies are limited to a maximum of 50 percent of the building’s perimeter on each floor (1406.3) unless sprinkler protection is extended to the balcony areas (1406.3, Exception 4). Balconies made of combustible construction are required to be Type IV, heavy timber construction or have a minimum 2-hour FRR (1406.3). Guards, pickets, rails, and similar guardrail devices are permitted to be of untreated wood (1406.3, Exception 2). If you have any questions regarding this evaluation or would like to discuss further, please feel free to contact me directly at jevans@jensenhughes.com or 719-314-7381. Sincerely, JENSEN HUGHES Jeffrey Evans, RA, CBO 18 | 1626 Cole Boulevard, Suite 300 Lakewood, CO 80401 P 303.278.3820 www.bgbuildingworks.com July 30, 2019 Attn: Marc Snyder 3507 Ringsby Court, Ste. #117 Denver, CO 80216 RE: Gorsuch Haus CPTSB Fire & Life Safety Requirements Dear Marc, We are providing this letter to summarize Fire Alarm system design intent to meet Colorado Passenger Tramway Safety Board (CPTSB) requirements for the Gorsuch Haus project. The fire alarm system at the Gorsuch Haus facility shall be designed to meet the minimum requirements of NFPA 72 (Fire Alarm Code), NFPA 101 (Life Safety Code) and the International Building Code (IBC). As the fire alarm system pertains to the ski lift, a remote annunciation panel from the Gorsuch Haus fire alarm system will reside in the ski lift operator facility to notify lift personnel of general building alarm events at the hotel so the lift may be shut down. It is anticipated that an audio/visual notification appliance such as a speaker strobe will be located above the annunciation panel to indicate an alarm. Additionally flammable liquids will not be stored under the Airspace encroachment as part of plumbing systems design, and the building will be fully sprinklered. Please update us with if any requirement changes or contact us with any questions. Sincerely, Wesley Ploof, P.E. Engineer Cc: Brian Robertson, Eric Aden – BG Buildingworks 3. CPTSB FIRE & LIFE SAFETY REQUIREMENTS 21 DEVELOPMENT TEAM PLANNER + LANDSCAPE ARCHITECTURE Design Workshop, Inc 120 East Main Street, Suite 100 Aspen, CO 81611 970.925.8354 | www.designworkshop.com ARCHITECTURE 4240 Architecture 3507 Ringsby Court, Suite 117 Denver, CO 80216 303.292.3388 | www.4240architecture.com CIVIL ENGINEERING + SURVEYING Sopris Engineering, LLC 502 Main Street, Suite A3 Carbondale, CO 81623 970.704.0311| www.sopriseng.com FIRE PROTECTION CONSULTANT Jensen & Hughes 4445 Northpark Drive, Suite 204, Colorado Springs, CO 80907 719.257.2728 | jensenhughes.com MUDFLOW ANALYSIS Tetra Tech 130 Ski Hill Road, Suite 130 Breckenridge, CO 80424 970.453.6394 | www.tetratech.com GEOTECHNICAL ASSESSMENT HP Geotech 5020 County Road 154 Glenwood Springs, CO 81601 970.945.7988 | www.hpgeotech.com PUBLIC COMMUNICATIONS O Communications P.O. Box 5128 Aspen, CO 81611 970.925.8480 | www.ocommunications.net LEGAL REPRESENTATION Holland & Hart, LLP 600 East Main Street, Suite 104 Aspen, CO 81611 970.925.3476 | www.hollandhart.com HOTEL OPERATIONS CoralTree Hospitality 5299 DTC BLVD #1260 Greenwood Village, CO 80111 303.799.3830 | www.coraltreehospitality.com DW LEGACY DESIGN® We believe that when environment, economics, art and community are combined in harmony with the dictates of the land and needs of society, magical places result — sustainable places of timeless beauty, significant value and enduring quality, places that lift the spirit. Design Workshop is dedicated to creating Legacy projects: for our clients, for society and for the well-being of our planet. www.designworkshop.com CERTIFICATE OF OWNERSHIP, DEDICATIONS AND RESERVATIONS KNOW ALL MEN BY THESE PRESENTS, THAT ASPEN SKIING COMPANY (“ASC”) BEING THE RECORD TITLE OWNER OF THE SUBJECT PROPERTY AS DESCRIBED AND DEPICTED ON SHEET 2 HEREOF, SITUATED IN THE CITY OF ASPEN, PITKIN COUNTY, COLORADO. PURSUANT TO AND IN ACCORDANCE WITH ORDINANCE NO. 39, SERIES OF 2016, (HEREINAFTER, “ORDINANCE 39”) RECORDED APRIL 8, 2019 IN THE PITKIN COUNTY REAL PROPERTY RECORDS UNDER RECEPTION NO. 655085, OWNER HAS, BY THESE PRESENTS, LAID OUT, PLATTED AND SUBDIVIDED THE SAME INTO LOTS 1 AND 2, AS DEPICTED AND DESCRIBED HEREON UNDER THE NAME AND STYLE OF GORSUCH HAUS PD/SUBDIVISION. ASC EXPRESSLY RESERVES THE RIGHT TO ENGAGE IN SKI OPERATIONS ON, OVER AND ACROSS ALL OF LOT 2 IN CONJUNCTION WITH THE OPERATION AND MANAGEMENT OF THE ASPEN MOUNTAIN SKI AREA. IN THIS REGARD, ASC EXPRESSLY RESERVES THE RIGHT TO CONDUCT AND ACCOMMODATE SKIING, SKI OPERATIONS AND RECREATIONAL ACTIVITIES ON THE PROPERTIES COVERED BY THIS PLAT AS DESCRIBED IN THE PLAT NOTES ON SHEET 4 AND SHEET 5 HEREOF, INCLUDING, WITHOUT LIMITATION TO CONDUCT AND ACCOMMODATE SKI ACTIVITIES AND SKI OPERATIONS ON THE “SKIWAY” SHOWN AND IDENTIFIED ON SHEET 4 HEREOF AND ON THE DRAINAGE ACCESS AND MAINTENANCE EASEMENTS SHOWN AND IDENTIFIED ON SHEET 5 . ALL OF THE FOLLOWING DEDICATIONS AND RESERVATIONS ARE MADE SUBJECT TO SUCH RESERVED RIGHTS AND EXPRESS AUTHORIZATIONS CONTAINED IN ORDINANCE 39 TO ENGAGE IN SKI ACTIVITIES AND RECREATIONAL OPERATIONS ON LOT 2, AND SPECIFICALLY WITHIN THE SKIWAY ON LOT 1 AND LOT 2 AND THE DRAINAGE AND MAINTENANCE EASEMENTS SHOWN AND IDENTIFIED ON SHEET 5 . ASC HEREBY MAKES THE FOLLOWING DEDICATIONS AND RESERVATIONS FOR THIS PLAT: 1. DOES HEREBY DEDICATE TO THE CITY OF ASPEN THOSE PORTIONS OF THE LANDS CONTAINED HEREIN SHOWN AND DEPICTED ON SHEET 3 HEREON, AND LABELED “DEDICATED ROW” FOR PURPOSES OF CONSTRUCTING, OPERATING, AND MAINTAINING SUBGRADE PUBLIC UTILITIES, A PUBLIC ROADWAY, PEDESTRIAN SIDEWALK, AND OTHER ASSOCIATED IMPROVEMENTS NECESSARY FOR VEHICULAR AND PEDESTRIAN TRAVEL; PROVIDED, HOWEVER, THAT THIS DEDICATION IS SUBJECT TO, CONDITIONAL ON AND WILL NOT BECOME EFFECTIVE UNTIL THE CITY OF ASPEN ACCEPTS THE FINAL, AS-BUILT ROADWAY, UTLITY INFRASTRUCTURE AND OTHER BUILDING IMPROVEMENTS CONTEMPLATED TO BE PLACED WITHIN SUCH DEDICATED ROW AREAS AS THE SAME ARE DESCRIBED IN THE CIVIL ENGINEERING DESIGN PLANS RECORDED SIMULTANEOUSLY WITH THIS FINAL PLAT; AND 2. DOES HEREBY DEDICATE AND GRANT A PERPETUAL, NON-EXCLUSIVE PUBLIC TRAIL EASEMENT, SIX (6)FIVE (5) FEET IN WIDTH, FOR PURPOSES OF NON-MOTORIZED INGRESS AND EGRESS, COMMENCING ON THE NORTHERLY BOUNDARY LINE OF THE PUBLIC PEDESTRIAN EASEMENT ON LOT 1 AS SHOWN HEREON AND THENCE CONTINUING IN A NORTHEASTERLY DIRECTION OVER LOT 1 AND THE HILL STREET RIGHT OF WAY AND THENCE CONTINUING IN A SOUTHEASTERLY DIRECTION ACROSS LOT 2, IN THE AREA DEPICTED AS THE "PUBLIC TRAIL EASEMENT" ALIGNMENT SHOWN AND DEPICTED ON SHEET 4 HEREOF; SUCH PUBLIC TRAIL EASEMENT EXTENDS TO A POINT ON THE EASTERLY BOUNDARY LINE OF LOT 2, WHICH POINT COINCIDES WITH THE WESTERLY BOUNDARY LINE OF THE ADJOINING SKIER AND PEDESTRIAN EASEMENT SHOWN AND DESCRIBED IN THE DOCUMENT RECORDED IN PLAT BOOK 4 AT PAGE 489; OWNER RESERVES THE RIGHT TO UNILATERALLY RE- ALIGN THIS PUBLIC TRAIL EASEMENT TO COINCIDE WITH THE AS-BUILT LOCATION THEREOF SO LONG AS SUCH REALIGNMENT DOES NOT ADVERSELY IMPACT THE INTENDED USES OF THE PUBLIC TRAIL EASEMENT AND ASC ALSO RESERVES THE RIGHT TO UTILIZE LOT 2 FOR SKI AREA OPERATIONS AND TO PROHIBIT PEDESTRIAN, BICYCLE OR SIMILAR USES OF THE PUBLIC TRAIL EASEMENT DURING THE SKI SEASON AND TO LIMIT THE USE OF AND/OR TEMPORARILY CLOSE THE PUBLIC TRAIL EASEMENT DURING THE SKI SEASON TO ACCOMMODATE SNOWMAKING, SNOW STORAGE, SNOW GROOMING, SKIING AND OTHER WINTER SKI OPERATIONS; AND 3. DOES HEREBY DEDICATE AND RESERVE A RECIPROCAL, NON-EXCLUSIVE CONSTRUCTION EASEMENT FOR THE USE AND BENEFIT OF THE OWNERS OF LOTS 1 AND 2 AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES OVER, UPON, AND ACROSS ONLY THE PORTIONS OF LOTS 1 AND 2 NECESSARY TO COMPLETE THE IMPROVEMENTS ON SAID LOTS WITHIN THE AREA DEPICTED AS THE “TEMPORARY CONSTRUCTION EASEMENT” SHOWN AND DEPICTED ON SHEET 4 HEREOF, INCLUDING THE EXCAVATION, SHORING, DEWATERING AND ALL OTHER CONSTRUCTION ACTIVITIES APPROVED IN ACCORDANCE WITH CITY OF ASPEN ORDINANCE 39 (SERIES OF 2016), TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES. THIS RECIPROCAL TEMPORARY CONSTRUCTION EASEMENT SHALL BE TEMPORARY AND SHALL AUTOMATICALLY TERMINATE UPON THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR THE IMPROVEMENTS APPROVED AND CONSTRUCTED UNDER ORDINANCE 39; THE TERMS AND CONDITIONS OF THIS RECIPROCAL TEMPORARY CONSTRUCTION EASEMENT ARE MORE PARTICULARLY DESCRIBED IN THAT CERTAIN RECIPROCAL TEMPORARY CONSTRUCTION EASEMENT RECORDED IN THE OFFICE OF THE PITKIN COUNTY CLERK & RECORDED AT RECEPTION NO. _________________________; AND 4. DOES HEREBY DEDICATE AND RESERVE RECIPROCAL, PERPETUAL, NON-EXCLUSIVE SUBSURFACE STRUCTURAL EASEMENTS OF VARYING WIDTHS ALONG EITHER SIDE OF PORTIONS OF THE COMMON BOUNDARY OF LOTS 1 AND 2 (THE “SUBSURFACE STRUCTURAL EASEMENTS”), SHOWN AND DEPICTED ON SHEET 4 HEREOF, FOR THE USE AND BENEFIT OF THE OWNERS OF SAID LOTS AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES FOR THE PURPOSE OF CONSTRUCTING AND MAINTAINING ANY SUBSURFACE FOUNDATIONS, FOOTER PADS, DEWATERING FACILITIES, DRAINAGE FACILITIES OR OTHER STRUCTURAL ELEMENTS OF THOSE STRUCTURES THAT MAY BE CONSTRUCTED WITHIN SAID SUBSURFACE STRUCTURAL EASEMENTS, TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES PROVIDED THAT THE SAME DOES NOT INTERFERE WITH ASC’S LIFT FACILITIES, UTILITIES AND OPERATIONS; AND, ASC RESERVES THE RIGHT TO UNILATERALLY RE-ALIGN SUBSURFACE STRUCTURAL EASEMENTS TO COINCIDE WITH THE AS-BUILT LOCATIONS OF SUCH STRUCTURAL ELEMENTS; AND 5. DOES HEREBY DEDICATE AND RESERVE A NON-EXCLUSIVE PRIVATE ACCESS EASEMENT OVER, UPON, AND ALONG THE MOUNTAIN OPERATIONS ROAD, SHOWN AND DEPICTED ON SHEET 4 HEREOF AS IT CROSSES LOT 2, LABELED "MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT," AND OVER, UPON AND ALONG THOSE PORTIONS OF LOT 2 LOCATED WEST OF THE MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT, FOR THE USE AND BENEFIT OF THE OWNER OF LOT 1 AND ITS SUCCESSORS, ASSIGNS, EMPLOYEES, LICENSEES AND INVITEES FOR THE PURPOSES OF VEHICULAR AND PEDESTRIAN ACCESS FROM TIME TO TIME NECESSARY FOR THE OPERATION, MAINTENANCE AND UPKEEP OF IMPROVEMENTS LOCATED ON SAID LOT 1 AND FOR ACCESS TO LIMITED, PERIODIC SPECIAL EVENTS ACTIVITIES LOCATED ON, IN AND AROUND PUBLIC AMENITIES SPACES ON LOT 1; SUCH PRIVATE ACCESS EASEMENT DOES NOT CONFER ANY RIGHTS TO THE GENERAL PUBLIC, AND NO PUBLIC ACCESS IS INTENDED TO BE CREATED BY THIS DEDICATION; ASC FOR ITSELF, ITS GRANTEES, SUCCESSORS AND ASSIGNS, RESERVES THE RIGHT TO LIMIT THE USE OF AND/OR TEMPORARILY DENY THE OWNER OF LOT 1 AND ITS SUCCESSORS, ASSIGNS, EMPLOYEES, LICENSEES, AND INVITEES ACCESS TO THE MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT DURING THE SKI SEASON TO ACCOMMODATE SNOWMAKING, SNOW STORAGE, SNOW GROOMING, SKIING AND OTHER WINTER SKI OPERATIONS; AND 6. DOES HEREBY DEDICATE AND GRANT A PERPETUAL, NON-EXCLUSIVE PUBLIC PEDESTRIAN EASEMENT OVER AND ACROSS LOT 1 AND SUCH PORTIONS OF LOT 2 AS ARE SPECIFICALLY IDENTIFIED ON PAGE 4 HEREOF FOR PURPOSES OF NON- MOTORIZED, PEDESTRIAN-ONLY ACCESS OVER AND UPON A STRIP OF LAND AS SHOWN AND DEPICTED ON SHEET 4 HEREOF AND LABELED “PUBLIC PEDESTRIAN EASEMENT” [NOTE: THIS EASEMENT IS FOR (A) PUBLIC PEDESTRIAN ACCESS WITHIN THE 8’ WIDE SIDEWALK ON THE OUTER EDGE OF THE CUL-DE-SAC, (B) THE STAIRWAY AREAS ALONG THE WEST SIDE OF LOT 1 AND (C) THE IRREGULARLY SHAPED AREA PROVIDING PEDESTRIAN ACCESS OVER AND ACROSS THE FAR WESTERN PORTION OF LOT 2 TO THE BARBEE OPEN SPACE PARCEL.]; ASC RESERVES THE RIGHT FOR ITSELF, ITS GRANTEES, SUCCESSORS AND ASSIGNS TO BLOCK, LIMIT OR DENY ACCESS TO SUCH PORTIONS OF THE PUBLIC PEDESTRIAN EASEMENT AS ARE NECESSARY FOR PURPOSES OF USE OF THE MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT BY THE OWNER OF LOT 1 FOR PURPOSES AS DESCRIBED IN PARAGRAPH 5 ABOVE AND ASC, ITS GRANTEES, SUCCESSORS, ASSIGNS, LICENSEES AND INVITEES, AS DESCRIBED IN PARAGRAPH 10 BELOW; AND 7. DOES HEREBY DEDICATE AND RESERVE FOR THE USE AND BENEFIT FROM TIME TO TIME OF THE OWNERS OF LOTS 1 AND 2 AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES, PERPETUAL, NON-EXCLUSIVE EASEMENTS ON THOSE PORTIONS OF LOTS 1 AND 2 ALONG THE ENTIRE COURSE OF THE ON-SITE DRAINAGE IMPROVEMENTS SHOWN AND DEPICTED ON THE CONCEPTUAL MASTER DRAINAGE PLAN (SHEET C.4.02) RECORDED SIMULTANEOUSLY WITH THIS PLAT, FOR PURPOSES OF CONSTRUCTION, INSTALLATION, USE, OPERATION, MAINTENANCE, REPAIR, REMOVAL AND REPLACEMENT OF PRIVATE ON-SITE STORM WATER DRAINAGE SYSTEMS FACILITIES, WITH ALL APPROPRIATE SUB-SURFACE AND SURFACE IMPROVEMENTS, TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES (COLLECTIVELY, THE "DRAINAGE EASEMENTS"); ASC RESERVES THE RIGHT TO UNILATERALLY RELOCATE THE ACTUAL LOCATION OF SUCH DRAINAGE EASEMENTS TO COINCIDE WITH THE AS-BUILT LOCATION OF SUCH DRAINAGE IMPROVEMENTS; AND 8. DOES HEREBY DEDICATE AND RESERVE THE RIGHT TO GRANT EASEMENTS AND LICENSES TO AND FOR THE USE AND BENEFIT OF UTILITY COMPANIES OWNING, OPERATING OR OTHERWISE MANAGING THE UTILITY LINES AND SYSTEMS WITHIN LOTS 1 AND 2, AND FOR THE USE AND BENEFIT FROM TIME TO TIME OF THE OWNERS OF SAID LOTS AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES, A PERPETUAL, NON- EXCLUSIVE UTILITY EASEMENT OVER, UPON, AND BENEATH THE "UTILITY EASEMENT" SHOWN AND LABELED ON SHEET 4 HEREOF, FOR THE PURPOSE OF CONSTRUCTION, INSTALLATION, ENLARGEMENT, USE, OPERATION, MAINTENANCE, REPAIR, REMOVAL AND REPLACEMENT OF UNDERGROUND UTILITIES INCLUDING WATER, SEWER, STORM WATER DRAINAGE, GAS, ELECTRICITY, TELEPHONE, TELEVISION AND TELECOMMUNICATIONS, TOGETHER WITH ASSOCIATED EQUIPMENT AND FACILITIES REQUIRED ABOVE GROUND, REGARDING WHICH ALL SAID EASEMENTS AND LICENSES SHALL BE IN LOCATIONS REASONABLY APPROVED IN ADVANCE BY THE OWNER(S) OF THE IMPACTED LOT(S), TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES; THE FINAL OWNER UTILITY EASEMENTS TO COINCIDE WITH THE AS-BUILT LOCATIONS OF SUCH UTILITIES; AND 9. DOES HEREBY RESERVE UNTO ASC, ITS GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES, AS THE OWNER, OPERATOR OR MANAGER OF THE LIFT FACILITIES LOCATED ON LOT 1 A PERPETUAL, NON- EXCLUSIVE EASEMENT OVER, UPON AND BENEATH THE "LIFT FACILITIES EASEMENT" SHOWN ON SHEET 4 HEREOF, FOR THE PURPOSE OF CONSTRUCTING, INSTALLING, ENLARGING, OPERATING (INCLUDING, WITHOUT LIMITATION, TRANSPORTING PEOPLE, GOODS AND MATERIALS), MAINTAINING, REPAIRING, REMOVING AND REPLACING LIFT FACILITIES, AND FOR THE ADDITIONAL USE AND BENEFIT OF ASC, ITS GRANTEES, SUCCESSORS, ASSIGNS, LICENSEES AND INVITEES; AND 10. DOES HEREBY RESERVE FOR THE USE AND BENEFIT OF ASC, ITS GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS AND EMPLOYEES, AS OPERATOR AND MANAGER OF THE LIFT FACILITIES WITHIN THE LIFT FACILITIES EASEMENT DESCRIBED ABOVE AND AS OPERATOR AND MANAGER OF THE ASPEN MOUNTAIN SKI AREA, A NON-EXCLUSIVE PRIVATE ACCESS EASEMENT OVER, UPON, AND ALONG THE MOUNTAIN OPERATIONS ROAD, SHOWN AND DEPICTED ON SHEET 4 HEREOF AS IT CROSSES LOT 1, LABELED "MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT," FOR THE USE AND BENEFIT OF THE OWNER OF LOT 2 AND ITS SUCCESSORS, ASSIGNS, EMPLOYEES, LICENSEES AND INVITEES FOR THE PURPOSE OF VEHICULAR AND PEDESTRIAN ACCESS FROM TIME TO TIME NECESSARY FOR THE OPERATION AND MAINTENANCE OF IMPROVEMENTS LOCATED ON LOT 2 AND FOR ACCESS TO THE ASPEN MOUNTAIN SKI AREA THROUGHOUT THE YEAR; SUCH PRIVATE ACCESS EASEMENT INCLUDES THE RIGHT TO INSTALL SNOWMAKING WATER LINES AND ENGAGE IN SNOWMAKING, SNOW STORAGE, SNOW GROOMING, SKIING AND SKI OPERATIONS, INCLUDING, WITHOUT LIMITATION, SKI RACING AND SPECIAL EVENTS, ON THAT PORTION OF THE SKIWAY LOCATED WITHIN THE MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT; SUCH PRIVATE ACCESS EASEMENT DOES NOT CONFER ANY RIGHTS TO THE GENERAL PUBLIC, AND NO PUBLIC ACCESS OR USE OF THE MOUNTAIN OPERATIONS ROAD AS SHOWN HEREON IS INTENDED TO BE CREATED BY THIS PLAT, EXCEPT AS OUTLINED IN DEDICATION PARAGRAPH 12 HEREON; AND 11. DOES HEREBY DEDICATE AND RESERVE FOR THE USE AND BENEFIT FROM TIME TO TIME OF THE OWNERS OF LOTS 1 AND 2 AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES, A PERPETUAL, NON-EXCLUSIVE “UTILITY SERVICE LINE EASEMENT” OVER, UNDER AND UPON SAID LOTS ALONG THE ENTIRE COURSE OF ALL UTILITY SERVICE LINES THAT MAY BE CONSTRUCTED BETWEEN OR OTHERWISE CONNECT TO THE UTILITY SERVICE LINES AND MAINS ON LOTS 1 AND 2 TO THE IMPROVEMENTS THEREON, IN THE AS-BUILT LOCATIONS OF SUCH UTILITY SERVICE LINES, FOR PURPOSES OF CONSTRUCTION, INSTALLATION, USE, OPERATION, MAINTENANCE, REPAIR, REMOVAL AND REPLACEMENT OF SUCH UTILITY SERVICES LINES, TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES AND TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE PURPOSE OF RELOCATING SAID UTILITY SERVICE LINES; ASC AND ITS SUCCESSORS RESERVES THE RIGHT, EXCEPT IN THE CASE OF A BONA FIDE EMERGENCY, TO TEMPORARILY DENY THE OWNER OF LOT 1 AND ITS SUCCESSORS, ASSIGNS, EMPLOYEES, LICENSEES, AND INVITEES ACCESS TO THE UTILITY SERVICE LINE EASEMENT DURING THE SKI SEASON TO ACCOMMODATE SNOWMAKING, SNOW STORAGE, SNOW GROOMING, SKIING AND OTHER WINTER SKI OPERATIONS; AND 12. DOES HEREBY DEDICATE AND GRANT TO THE GENERAL PUBLIC THE LIMITED, NON- EXCLUSIVE RIGHT TO USE THE MOUNTAIN OPERATIONS ROAD PRIVATE EASEMENT OUTSIDE OF THE SKI SEASON FOR PEDESTRIAN AND BICYCLE USES; SUCH EASEMENT SHALL EXTEND FROM THE MOUNTAIN OPERATIONS ROAD’S INTERSECTION WITH THE HILL STREET RIGHT OF WAY AND CONTINUE ALONG AND WITHIN THE ALIGNMENT OF THE MOUNTAIN OPERATIONS ROAD SOUTHWARD TO THE SOUTHERN BOUNDARY OF THE GORSUCH HAUS PD/SUBDIVISION; SUCH GRANT IS EXPRESSLY MADE SUBJECT TO ASC’S RIGHTS, EXERCISED IN ITS SOLE DISCRETION, TO CONTROL AND MANAGE AND/OR ENFORCE CLOSURES OF THE MOUNTAIN OPERATIONS ROAD IN CONNECTION WITH ASPEN MOUNTAIN SKI AREA OPERATIONS AT ANY TIME AS DETERMINED BY THE OPERATOR OF ASPEN MOUNTAIN SKI AREA FOR SAFETY, MAINTENANCE, OPERATIONS, LOADING, UNLOADING AND STAGING PURPOSES AND/OR AS CONTEMPLATED UNDER THE ASPEN MOUNTAIN SKI AREA MASTER PLAN, AS AMENDED FROM TIME TO TIME; AND 12.13. DOES HEREBY DEDICATE TO THE CITY OF ASPEN NON-EXCLUSIVE DRAINAGE ACCESS AND MAINTENANCE EASEMENTS OVER AND ACROSS THE AREAS SHOWN ON SHEET 5 HEREOF, FOR PURPOSES OF ACCESS TO AND MAINTENANCE OF THE STORM WATER DRAINAGE FACILITIES SHOWN AND IDENTIFIED ON SHEET 5, WHICH INCLUDE THE MAIN UNDERGROUND STORM DRAINAGE PIPELINE AND THE LATERAL CONNECTIONS THERETO, THE STORM INLETS, THE ROADSIDE SWALES AND THE DRAINAGE SWALE (ALSO KNOWN AS THE WEST SWALE) SHOWN THEREON (THE “DRAINAGE INFRASTRUCTURE”). THE ACCESS AND MAINTENANCE EASEMENTS SHOWN AND IDENTIFIED ON SHEET 5 ARE INTENDED TO ALLOW FOR THE CITY OF ASPEN, UPON REASONABLE ADVANCE WRITTEN NOTICE TO THE OWNERS OF LOT 1 AND LOT 2 (EXCEPT IN EMERGENCIES, WHEN NO ADVANCE WRITTEN NOTICE WILL BE REQUIRED), TO ACCESS AND MAINTAIN THE DRAINAGE INFRASTRUCTURE , AND INCLUDE THE RIGHT TO CONSTRUCT, INSTALL, REMOVE, REPLACE, MAINTAIN, REPAIR, OPERATE BUT NOT ADD TO, CHANGE OR ALTER THE DRAINAGE FACILITIES LO CATED ON LOT 1 OR LOT 2 UNLESS THE AFFECTED OWNER(S) EXPRESSLY AGREE IN WRITING TO SUCH ADDITONS, CHANGES OR ALTERATIONS. THE CITY OF ASPEN’S ACCESS AND MAINTENANCE ACTIVITIES SHALL BE CONDUCTED AT ALL TIMES TO PROVIDE MINIMUM DISRUPTION TO THE DAY-TO-DAY HOSPITALITY AND SKI OPERATIONS OF THE OWNERS OF LOT 1 AND LOT 2 AND THEIR RESPECTIVE GUESTS AND INVITEES. THESE EASEMENTS ARE ALSO EXPRESSLY MADE SUBJECT TO THE RESERVED RIGHTS OF ASC TO ENGAGE IN SKI OPERATIONS AS DESCRIBED IN THE THIRD PREFATORY PARAGRAPH SET FORTH ABOVE, AND ARE ALSO SUBJECT TO THE RESERVED RIGHT OF THE OWNER OR OWNERS OF LOT 1 TO ENGAGE IN LODGE, HOTEL, COMMERCIAL AND RESIDENTIAL CONDOMINIUM ACTIVITIES AND OPERATIONS IN CONNECTION WITH THE DEVELOPMENT, OPERATION, MANAGEMENT, MAINTENANCE AND CAPITAL REPAIRS OR REPLACEMENTS OF THE BUILDING IMPROVEMENTS AND LANDSCAPING IMPROVEMENTS PLACED ON LOT 1 AND WITHIN ALL EASEMENT AND LICENSED AREAS APPURTENANT TO LOT 1. THE CITY OF ASPEN SHALL BE RESPONSIBLE FOR THE RESTORATION, REPAIR OR REPLACEMENT OF BUILDING IMPROVEMENTS OR LANDSCAPING DAMAGED AS A RESULT OF THE CITY OF ASPEN’S EXERCISE OF ITS ACCESS AND MAINTENANCE EASEMENT RIGHTS DESCRIBED IN THIS PARAGAPAH 13. IN CONNECTION WITH THE EXERCISE OF ANY RIGHT UNDER AND USE OF ANY EASEMENT GRANTED OR RESERVED BY THIS CERTIFICATE, THE OWNER (OF LOT 1 OR LOT 2 AS THE CASE MAY BE) EXERCISING SUCH RIGHT SHALL INDEMNIFY AND HOLD HARMLESS THE OTHER OWNER (OF LOT 1 OR 2, AS THE CASE MAY BE) FROM ANY CLAIMS, DEMAND, SUIT, JUDGMENT, LIEN OR DAMAGES OF ANY NATURE ARISING OUT OF SUCH OWNER’S RIGHT, EXERCISE OR USE, INCLUDING REASONABLE ATTORNEYS FEES AND COSTS INCURRED IN CONNECTION THEREWITH; AND THE OWNERS OF LOTS 1 AND 2 SHALL EACH AT ALL TIMES MAINTAIN A COMMERCIAL LIABILITY INSURANCE POLICY WITH AN INSURANCE COMPANY WITH A BEST’S RATING OF $_________, AND WITH MINIMUM LIMITS OF 15376305_v2 Page 1 of 28 HOLLAND & HART DRAFT February 28, 2020; Updated 9/16/20 GORSUCH HAUS SUBDIVISION/PD DEVELOPMENT AGREEMENT THIS GORSUCH HAUS DEVELOPMENT AGREEMENT (the “Agreement”) is made and entered into this ______ day of ____________ by and between THE CITY OF ASPEN, COLORADO, a Colorado home rule municipal corporation (hereinafter referred to as “City”), and NORWAY ISLAND, LLC a Delaware limited liability company (hereinafter referred to as “Norway Island”). WITNESSETH: WHEREAS, Norway Island has, with the consent of the Aspen Skiing Company, submitted to the City an application for Planned Development - Detailed Review approval (the “Application”) for that certain property in the City of Aspen, Colorado, including Parcel ID Nos. 273513127001, 273513126001, and 273513400028 (4 parcels total, 3 Parcel ID numbers) more particularly described on Exhibit A attached hereto and a made a part hereof by this reference (all of which, together with a portion of the South Aspen Street and all of the Summit Street rights-of-way to be vacated by the City, are collectively referred to in this Agreement as the “Property”), which Application requests the approval and recordation of an Approved Plan Set documenting the design, layout and configuration of the proposed development (the “Approved Plan Set”); and the approval, execution and recordation of a Final Plat of the Gorsuch Haus Subdivision/Planned Development (the “Final Plat”), consisting of two (2) platted lots, identified on the Final Plat as Lot 1 (“Lot 1”) and Lot 2 (“Lot 2”); and WHEREAS, City has fully considered the Application, the Approved Plan Set, the Final Plat, the proposed development and improvement of the Property, and the effects of the proposed development and improvement of said Property on adjoining or neighboring properties and property owners; and WHEREAS, City has approved the Application and in connection therewith has imposed certain conditions and requirements in connection with its approval and recordation of the Approved Plan Set and its approval, execution and recordation of the Final Plat, such matters being necessary to protect, promote and enhance the public safety, health and welfare; and WHEREAS, Norway Island is willing to acknowledge, accept, abide by and faithfully perform the conditions and requirements imposed by City in approving the Application, the Approved Plan Set, and the Final Plat; and Page 2 of 28 WHEREAS, pursuant to Section 26.490.060.B., Site Protection Guarantee, and Section 26.490.060.C., Site Enhancement Guarantee, of Title 26, Land Use Regulations, of the Aspen Municipal Code ( the “Regulations”), City is entitled to certain financial guarantees to ensure recovery of the Property and surrounding grounds to a safe and visually acceptable condition, and the installation of public improvements on or adjacent to the Property in the event of a work stoppage, and Norway Island is prepared to provide such guarantees as hereinafter set forth; and WHEREAS, pursuant to Section 26.490.070.A.1., Landscape Guarantee; Section 26.490.070.A.7., Public Facilities and Public Infrastructure Guarantee; and Section 26.490.070.8., Storm Water and Drainage Improvements Guarantee, of the Regulations, City is entitled to certain financial guarantees to ensure (i) that the required landscaping is implemented and maintained, (ii) that required public facilities are installed and (iii) the successful implementation of required storm water and drainage infrastructure, and Norway Island is prepared to provide such guarantees as hereinafter set forth; and WHEREAS, contemporaneously with the execution and recording of this Agreement, City and Norway Island have recorded the Approved Plan Set as Reception No. ________ and City and Aspen Skiing Company have executed and recorded the Final Plat in Plat Book _____ at Page ____ as Reception No. ___________, both in the Real Estate Records of the Clerk and Recorder of Pitkin County, Colorado (all recording information described in this Agreement refers to the Real Estate Records of the Clerk and Recorder of Pitkin County, Colorado); and WHEREAS, contemporaneously with the execution and recording of this Agreement Aspen Skiing Company has conveyed to Norway Island all of Lot 1; and WHEREAS, for the purpose of this Agreement, the following additional definitions shall apply: “Gorsuch Haus Project” or the “Project”—the subject development to contain up to 81 lodge keys, four free-market residential units totaling up to 8000 sq. feet of net livable area, one 1-bedroom affordable housing unit, 7,730 sq. feet of net leasable commercial space (including restaurant and retail uses), and ski lift and facilities on Lot 1, together with ski area operations and associated ski and non-mechanized summer uses for the relocated Lift 1A, skier return, snow making infrastructure and event staging and viewing areas on Lot 2. “Gorsuch Haus Lodge”—the main mixed-use building to be developed as part of the Gorsuch Haus Project upon Lot 1, with features to include 81 lodge units and a rooftop public amenity area. “Current Lift 1A”—this term is used to describe the existing and functioning Lift 1A terminal and related skier services and ski patrol facilities “Future Lift Terminal” – this term is used to describe the new lift terminal that will be located in Willoughby Park. “Lift 1 Corridor”—this includes the Property and the property related to the adjacent Lift One Lodge project described in Ordinance No. 38, Series of 2018, together with Page 3 of 28 adjacent future park lands that will eventually become a necessary part of the ski way and ski operations. the “Lift One Lodge Project”—a separate development project approved by the City pursuant to Ordinance No. 38, Series of 2018 that will be developed in connection with the development of the Gorsuch Haus Project. NOW, THEREFORE, for and in consideration of the forgoing provisions, the mutual covenants and agreements herein contained, the approval of the Application and approval and acceptance of the Approved Plan Set and the approval, execution and acceptance of the Final Plat for recordation by the City, and for other good and valuable considerations, the receipt and sufficiency of which are hereby acknowledged, the parties hereto agree as follows: ARTICLE I. PURPOSE OF DEVELOPMENT AGREEMENT 1.1 Purpose. The purpose of this Agreement is to set forth the complete and comprehensive understanding and agreement of the parties hereto with respect to the development of the Gorsuch Haus Project, and to enumerate all terms and conditions under which such development may occur. ARTICLE II. LAND USE APPROVALS 2.1 Approval Actions. The following land use approvals (the “Approvals”) have been granted to Norway Island for the development of the Property: (a) Ordinance No. 39, Series of 2016, approved December 12, 2018 and recorded on April 8, 2019 as Reception No. 655085 (“Ordinance 39”) granted the following land use approvals (i) Planned Development -Project Review; (ii) Rezoning; (iii) Growth Management Quota System Reviews; (iv) Conceptual Commercial Design Review; (v) 8040 Greenline Review; (vi) Mountain View Plane; (vii) Major Subdivision; (viii) Special Review for Lodge Density Standard; (ix) Special Review for affordable housing net unit livable standards; and (x) Vested Property Rights. Ordinance 39 also included approval of vacation by the City of approximately 8,206 sq. feet of public street right of way (a portion of the South Aspen Street right-of-way and the entire Summit Street right-of-way) adjacent to the Property for use in connection with the Project, which vacation is depicted on the Street and Easement Vacation Plat to be executed by the Aspen Skiing Company and the City and recorded immediately prior to recordation of the Final Plat. (b) Planning and Zoning Commission Resolution No. ____ Series of ______ approved _______________ and recorded _______________ as Reception No. ____________ granted Planned Development – Detailed Review approval and Final Commercial Design Review approval for the Project. (c) The Development Order (“Development Order”) for the above-described Approvals was issued by City of Aspen Community Development on _______________, with an effective date of _______________. Page 4 of 28 2.2 Development Orders Control. The provisions of the above-described Approvals, including the Development Order, are incorporated herein and made a part of this Agreement. To the extent that matters addressed in such Approvals are also addressed in this Agreement, the provisions of the Approvals and the Development Order shall control. 2.3 Dimensional Requirements. Exhibit B to Ordinance 39 established and approved the following dimensional requirements for the Project:* (a) Minimum Gross Lot Area 44,545 Sq. Ft. (lot 1) (b) Minimum Net Lot Area Per Dwelling Unit N/A (c) Minimum Lot Width +/- 60 Feet (d) Minimum Front Yard Setback 5 feet (e) Minimum Side Yard Setback 5 feet (f) Minimum Rear Yard Setback 5 feet (g) Maximum Height 40 feet (except as otherwise allowed by Section 7.A of Ordinance 39). (h) Allowable Floor Area Lodge Commercial Multi-family Affordable Housing 64,023 Sq. Ft. 42,077 Sq. Ft. 7,730 Sq. Ft. 8,633 Sq. ft. 730 Sq. Ft. (i) Maximum Multi-Family Size Cap 4 units with 1,500 Sq. Ft. per unit (up to 2,000 Sq. Ft. per unit via use of TDRs) (j) Minimum Off-Street Parking Lodge Residential Commercial 81 keys = 41 spaces 4 units = 4 spaces 7,730 Sq. Ft. = 7.7 spaces (k) Public Amenity Space Minimum of 11,136 Sq. Ft. Page 5 of 28 *Note: The approved dimensions from the Project Approval pursuant to Ordinance 39 Series of 2016 remain in full effect. Minor adjustments to reflect programming changes as the project moves from planning to building permit shall be permitted, but in no instance shall any dimensions exceed what is outlined in said Ordinance. Minor changes to the Project’s dimensional requirements may be approved by the City’s Community Development Department provided that the resulting floor areas do not exceed that which is permitted in the Lodge zone district. Should the dimensions of the Final Building Permit issuance be lower than those outlined in the Ordinance 39, the Applicant shall have the right to add additional square footage to the project though an Insubstantial Amendment through the period of vesting. The governing Dimensional Standard in Section 1: General Approval, Section 7: Project Dimensions paragraphs A and B and Exhibit B Dimensional Standards on Exhibit B of Ordinance 39 complete approved standards. Norway Island shall also comply with the additional conditions regarding dimensional requirements set forth in sub-sections 7.A (exceptions to height limitation for rooftop elevators, 7.B and 7.C of Ordinance 39). 2.4 Vested Rights. In accordance with the requirements of C.R.S. Section 24-68- 103(b) (2019), a properly noticed public hearing concerning the establishment of such vested rights for the Property was conducted on January 7, 2019. The City has since determined that the Project and the Approvals related to the same constitute a new site-specific development plan pursuant to Land Use Code Section 26.308.010 and C.R.S. § 24-68-101 et seq. attaching to and running with the Property and conferring upon Norway Island the right to undertake and complete the site-specific development plan and use of the Property under the terms and conditions of the site-specific development plan, and any approved amendments thereto. As such, development of the Project and shall not be altered, impaired, diminished or delayed by any subsequent zoning or land use action that is prohibited by C.R.S. Section 24-68-105(1). However, any failure to abide by any of the terms and conditions attendant to the Approvals that is not cured by Norway Island after written notice from the City, a right to a public hearing in accordance with applicable provisions of the Land Use Code, and a reasonable opportunity to cure, will result in the forfeiture of said vested property rights. The City and Norway Island further agree that, due to various factors, including but not limited to the significant scope of this Project, the City’s request to pursue relocation of the base of Current Lift 1A, and the need to wait until all required City-owned property is available for this use, it is appropriate for vested rights to extend beyond three years. Consequently, the right to undertake and complete the development and use of the Property pursuant to the terms and conditions of the Approvals and the Approved Plan Set for the Property shall commence upon the effective date of the Development Order for the Project issued by the City pursuant to Section 26.304.080 of the Land Use Code and be vested thereafter for a period extending until five years following the effective date of the use rights conferred as part of the initial 40-year term of the Dolinsek License pursuant to Section 6.A.1 of Ordinance No. 38, Series of 2018. If the effective date of the use rights conferred as part of the initial 40-year term of the Dolinsek License has already occurred, the vested rights shall extend for a period of five (5) years from the effective date of the Development Order. However, the vesting period shall not extend longer than the validity of the Development Order issued for the Project pursuant to Section 26.304.080 of the Land Use Code, as amended from time to time (which Section 26.304.080 currently provides that a Development Order will not be valid for more than ten years). Additionally, nothing herein shall be construed as limiting Norway Island’s right to proceed with the Project Formatted: Highlight Page 6 of 28 prior to the commencement of the initial 40-year term of the Dolinsek License, provided that the Project has received the required Detailed/Final Review approvals described in Ordinance 39 and complied with the City’s permit requirements. As authorized by CRS § 24-68-102(4)(a), the City and Norway Island agree that the Site Specific Development Plan for the Property consists of and includes, but is not limited to, the number, permitted size, and configuration of the Project’s lodge units, residential units, affordable housing unit, the size and configuration of associated commercial spaces, and other areas of the Project; all matters set forth in the Approvals referenced in Section 2.1 above; the Approved Plan Set recorded as Reception No. ________; the Final Plat recorded as Reception No._________; this Agreement; and all other documents recorded concurrent herewith. For purposes of this Section 2.4, this Agreement shall be considered a “development agreement” as that term is used in C.R.S. Section 24-68-104(2). ARTICLE III. DEVELOPMENT REQUIREMENTS AND RESTRICTIONS 3.1 Project Components. The Project approved pursuant to the Approvals referenced in Section 2.1 above consists of the following principal components: (a) Lodge. The Project will contain eighty-one (81) lodge units with 81 keys. The Project’s lodge units will contain maximum allowable floor area of approximately 42,077 square feet. Minor changes to the Project’s allowable lodge floor area, and any resulting changes to its net livable area, may be administratively approved by the City’s Community Development Department provided that the resulting floor area does not exceed that which is permitted in the Lodge (L) zone district. (b) Commercial Net Leasable Area. The Project’s commercial components will include a restaurant and retail uses, [and others?]. These components are limited to a total net leasable area of 7,730 square feet and to a maximum allowable floor area of approximately 7,730 square feet. Minor changes to the Project’s allowable commercial floor area may be administratively approved by the City’s Community Development Department provided that the resulting commercial floor area does not exceed that which is permitted in the Lodge zone district. (c) Affordable Housing Unit. The Project will contain one onsite (1) one- bedroom affordable housing unit. The one-bedroom unit will contain a minimum of 730 square feet of net livable area. The Project’s affordable housing component is limited to a maximum allowable floor area of approximately 730 square feet. Minor changes to the Project’s allowable affordable housing floor, and any resulting changes to its net livable area, area may be administratively approved by the City’s Community Development Department provided that the resulting lodge affordable housing floor area does not exceed that which is permitted in the Lodge zone district. (d) Parking. The Project will contain fifty-six (56) off-street parking spaces in its Subgrade Garage which are permitted to be tandem spaces. All parking spaces in the Subgrade Garage shall be limited to the use of lodge guests, residential unit owners, affordable Formatted: Highlight Page 7 of 28 housing unit tenants, and users of the Project on space available basis. Each residential unit and the affordable housing unit shall be assigned a standard, non-stacked parking space in the Subgrade Garage. Long-term car parking by any user of the Subgrade Garage shall be prohibited provided, however, that the parking of vehicles that are owned or used by the residential unit owners and the affordable housing tenants is permitted. (e) Public Amenity Spaces. Norway Island shall provide a total of 11,136 square. feet of public amenity space, a portion of which shall be on the rooftop of the Gorsuch Haus Lodge building. Minor changes in the distribution of the Project’s public amenity space may be approved by the City’s Community Development Department. These spaces shall remain permanently accessible to the general public via stairs and/or elevators. These spaces shall not be enclosed with temporary or permanent walls or windows, or otherwise enclosed as interior conditioned space, except to the extent that tents and similar soft-sided enclosures may be allowed pursuant to the land use code, and some portions for the public amenity spaces may need to be covered due to the proximity of the proposed ski lift. The public amenity space may be partially covered by overhangs due to the close proximity of this space to the future ski lift alignment. All public amenity space may be oriented to the ski slope east of the Project. The rooftop public amenity space shall be subject to a public access easement, said easement to be referenced on the Final Plat. The rooftop public access easement shall be subject to the reasonable additional rules and regulations governing its use by the public to be established and periodically updated by the Gorsuch Haus Lodge. (f) Other Ski-Rrelated Uses on Lot 2. The Project approvals also contemplate the construction, operation, and maintenance of ski-related infrastructure on Lot 2, ownership of which shall be retained by Aspen Skiing Company. These improvements include a relocated ski lift alignment for the Future Lift Terminal, development of new lift towers, regrading for skier return, regrading for the Aspen Mountain service road, traditional ski and non-mechanized recreational operation maintenance activities, and a ski race finish/special event use viewing area. A special event permit shall be obtained for the viewing area to the extent required by City code at the time of development. Service gates may be placed at the entrance of the realigned Aspen Mountain service road on Lot 2, provided that the service gate locations, dimensions, materials and color shall be subject to future administrative review and approval by the City’s Community Development Department. (g) Growth Management Allotments. The following growth management allotments have been allocated to the Project: (i) Four free market residential dwelling unit allotments (from 2016 GMQS calendar year). (ii) One 1-bedroom affordable housing unit allotment (from 2016 GMQS calendar year). (iii) 7,730 square feet of new commercial net leasable space (from 2016 GMQS calendar year). Page 8 of 28 (iv) 112 lodging pillows, which equals 56 lodging keys, from the 2016 calendar year, with approval for 50 lodging pillows, which equals 25 keys, to be granted from the 2017 GMQS calendar year. 3.2 Affordable Housing. (a) Mitigation Requirements. The Community Development Department has determined that the Project will require the mitigation of 24.68 Full-Time Equivalent employees (“FTEs”). Upon request of APCHA two years after issuance of certificates of occupancy for the Project, Norway Island or its successors, at their own expense, shall complete an audit to evaluate actual employee generation by the Project—if the free market component is shown to generate FTEs in addition to those supplied by the lodging component, additional mitigation may be required by the City commensurate with the employees generated by the free market component, up to an additional 4.64 FTEs. As set forth in Section 3.1(c) above, the Project will contain one (1) one-bedroom unit which is credited with housing 1.95 FTEs. In addition to the provision of one on-site affordable housing unit, mitigation may be satisfied utilizing on-site units, off-site units, “buy-down” units, or City of Aspen Affordable Housing Credits. Off-site units may be provided at locations within the Aspen Urban Growth Boundary. Cash in lieu is not permitted to satisfy affordable housing requirements. All required affordable housing mitigation shall be satisfied prior to issuance of certificates of occupancy for the Project. (b) Special Review. Special Review approval pursuant to Land Use Code Section 26.430.040 was granted pursuant to Ordinance 39 to allow a maximum of fifty (50) percent of the finished floor of the affordable housing unit to be located below finished grade. (c) Affordable Housing Conditions. The Project’s one affordable housing unit shall be deed restricted to the Aspen/Pitkin County Housing Authority’s (“APCHA”) Category 4 income and occupancy guidelines, and shall meet the following conditions: (i) The affordable housing unit shall meet or exceed the minimum net livable area requirements for Category 4 units; (ii) The deed restriction for the affordable housing unit shall be recorded prior to the issuance of a Certificate of Occupancy (“CO“) for the unit. The CO for the affordable housing units shall be issued at the same time or prior to the CO for the Gorsuch Haus Lodge; (iii) All tenants shall be approved by APCHA prior to occupancy; (iv) Employees of the Project residing within the on-site affordable housing unit shall be exempt from APCHA’s maximum asset and income limitations provided, however, that such tenants work full time and do not own any other property within APCHA’s ownership exclusion zone, both as defined in the APCHA Guidelines; (v) Minimum occupancy requirements shall be maintained for each unit as defined in the APCHA Guidelines; Formatted: Highlight Formatted: Highlight Formatted: Highlight Page 9 of 28 (vi) The unit shall not remain vacant for more than forty-five (45) days unless APCHA is notified as to why the unit has been left vacant; (vii) A washer and dryer shall be provided in the affordable housing unit; (viii) The affordable housing unit shall be assigned one (1) parking space in the Subgrade Garage--this space shall not be a stacked or tandem space; and (ix) The affordable housing unit shall be a rental unit. The Project’s Condominium Declaration shall contain language, to be reviewed and approved by APCHA, that in the event the unit becomes an ownership unit: 1.• It will be sold through the lottery system; 2.• The dues for the unit will be pro-rated based on the assessed value of the deed restricted unit versus the free market residential units, as well as the relative square footage of the units; and 3.• No common expenses will be charged to the deed restricted unit owner unless approved by APCHA. 3.3 Reimbursement Agreement for South Aspen Street Improvements. Norway Island agrees to enter into a reimbursement agreement for purposes of cost-sharing, on a proportionate basis, the costs of reconstruction of South Aspen Street as depicted on the engineering drawings prepared by Schmueser, Gordon & Meyer, Inc., and recorded as part of the development approvals for Lift One Lodge in Plat Book 102 at Pages 11-19 (the “South Aspen Street Improvement Plans”). The proportionate share of such expenses allocated to Lot 1 shall be 20.45%. The reimbursement agreement shall also include cost recovery provisions regarding prior road surface and sidewalk improvements as well as certain infrastructure improvements (including water lines, sewer lines, and shallow utility lines) consistent with the development approvals for the One Aspen Townhome project. Any improvements to the cul-de-sac beyond the scope of the South Aspen Street Improvement Plans shall be allocated fully to Norway Island. 3.4 Construction in Accordance with Building Codes and Plans. Construction of the Project, and all its component parts, shall be accomplished in substantial compliance with adopted City building and accessibility codes in effect at the time a Building Permit application is submitted, and with the Approved Plan Set. The elevator access to the Project’s rooftop amenities shall meet International Building Code accessibility requirements. The affordable housing unit shall be provided with an ADA compliant circulation path within the hotel interior that connects the unit to the Subgrade Garage and the public right-of-way. (a) The Project shall be subject to the 2015 IECC Energy Code. (b) Pursuant to Section 26.575.020 (F)(3)(c) of Title 26, Land Use Regulations, building/mechanical heights shall be measured to the first layer of exterior sheathing or weatherproofing membrane. Any additional insulation and associated material Formatted: Indent: Left: 1.5", Bulleted + Level: 1 +Aligned at: 0.5" + Indent at: 1", Tab stops: Not at 0.5" Formatted: Not Highlight Page 10 of 28 requirements imposed by the 2015 IECC Energy Code shall constitute “other veneer treatments” for the purpose of calculating building/mechanical heights. 3.5 Engineering Department Requirements. The Project shall comply with all sections of Title 21, Streets, Sidewalks and Other Public Places, of the Aspen Municipal Code, and all construction and excavation standards published by the Engineering Department. (a) Drainage. The Project shall meet the requirements of the City’s Urban Runoff Management Plan. A compliant drainage plan, including a 100-year mudflow analysis, shall be submitted with the building permit application for the Project. (b) Sidewalk/Curb/Gutter. All sidewalk curb and gutter shall meet the Engineering Standards set forth in Title 21 of the City of Aspen Municipal Code. (c) Excavation Stabilization. Due to the scale of excavation and proximity of excavation to neighboring property, an excavation stabilization plan shall be submitted to the Engineering Department at building permit submittal. Soil stabilization shall be located within the pProperty boundaries and within the construction easements established in Section 5(D) of Ordinance 39 or follow Section 21.12.140 of the Municipal Code. (d) Ground Stability Monitoring. In order to ensure that development of the Project does not exacerbate naturally occurring ground movement, an inclinometer shall be installed and maintained by Norway Island or its successors or assigns and bi-annual readings shall be taken through the time until issuance of certificates of occupancy for the Project. (e) West Drainage Swale Headwall and Catch Basin Maintenance. Norway Island shall provide routine maintenance and periodic inspections of the headwall and catch basin facilities for the west swale located on portions of Lot 1 and Lot 2 as well as within the South Aspen Street right of way, as depicted on Sheet 5 of the Final Plat. This routine maintenance and periodic inspection shall include trash and debris removal. Actual ownership of the headwall and catch basin facilities shall remain with the City, and the City shall be responsible for any and all future capital repairs, improvements or replacements of these facilities upon acceptance of these facilities by the City following construction of the Project. The City shall have non-exclusive easements for access to and maintenance of these facilities as well as other drainage facilities, as provided in Paragraph 13 of the Certificate of Ownership, Dedications and Reservations on Sheet 1 of the Final Plat, and as shown and described on Sheet 5 of the Final Plat. 3.6 Fire Mitigation. The Project shall comply with all codes adopted by the Aspen Fire Protection District. This includes, but is not limited to, access (International Fire Code, 2003 Edition, Section 503), approved fire sprinkler, and fire alarm systems (International Fire Code, as amended, Sections 903 and 907). The Subgrade Garage shall have adequate fire access which shall be reviewed and approved by the City’s Fire Marshall. 3.7 Parks Department Requirements. (a) Tree removal permits are required prior to issuance of a building permit for any demolition or significant site work. Mitigation for tree removal (after consideration of Formatted: Font: Bold Page 11 of 28 any appropriate credits) shall be met by a cash-in-lieu payment, by on-site plantings, or a combination of both as provided for in Title 13, Chapter 13.20, Tree Removal Permits, of the Aspen Municipal Code. Rooftop plantings shall not qualify as mitigation. (b) A tree protection plan depicting the drip lines of each individual tree or group of trees which is to remain on the Property shall be included in the building permit submittal for any demolition or significant site work. The plan shall depict the location of tree protection zones which shall be approved by the City Forester. The plan shall prohibit excavation; the storage of building materials, construction and equipment; and access over or through the protection zones by foot or vehicles. (c) Norway Island shall dedicate to the City on the Final Plat an easement for a public pedestrian and bicycle trail that provides access from Hill Street to the existing public access and skiers easement recorded in Book 42 on Page 489 to the satisfaction of the Parks Department. (d) The Final Plat shall also include a public access easement that permits access from Hill Street, across Lot 2 and along and within the alignment and is commensurate with of the Aspen Mountain OperationsService Road to the satisfaction of the Parks Department. The City agrees, however, that public access may be managed to restrict access from time to time at the discretion of the Aspen Skiing Company for safety, maintenance, operations, loading, unloading, and staging purposes, as it determines. This easement may overlap with the trail easement referred to in the preceding sub-paragraph. (e) The Final Plat shall also include dedication of a public access easement on the western stairway of the Gorsuch Haus Lodge to the satisfaction of the Parks Department. 3.8 Aspen Consolidated Sanitation District Requirements. Sanitary sewer service is contingent upon compliance with the Aspen Consolidated Sanitation District’s (“ACSD”) rules, regulations and specifications which are on file at the ACSD office. Prior to certificates of occupancy for the Project, Norway Island shall connect to the recently upgraded sanitary sewer line in the South Aspen Street right-of-way. Prior to construction of the connection, the connection shall be approved to the satisfaction of ACSD. 3.9 Environmental Health Department Requirements. (a) Environmental Health Codes. Code requirements to be aware of when filing a building permit include (i) a prohibition against engine idling, (ii) regulation of fireplaces, (iii) fugitive dust requirements, (iv) noise abatement, and (v) pool design. (b) Trash Requirements. The Project’s trash enclosures shall meet the minimum requirements outlined in Title 12, Solid Waste, of the Aspen Municipal Code. Special Review approval from the Environmental Health Department may be required to satisfy dimensional requirements. (c) Ski Lift Operations. The City and Norway Island understand and acknowledge that functional operation of the Lift 1 Corridor requires that the Aspen Skiing Company undertake certain operation and maintenance activities, including snowmaking, snow Page 12 of 28 grooming, lift maintenance, load in and load out for special events and mountain operations, outside of operational hours, including during early morning, evening, and nighttime hours throughout the Lift 1 Corridor. 3.10 Water / Utilities Department Requirements. The Project shall comply with the City of Aspen Water System Standards, with Title 25, and with the applicable standards of Title 8 (Water Conservation and Plumbing Advisory Code) of the Aspen Municipal Code, as required by the City of Aspen Water Department. All water System Distribution Standards in place at the time of building permit submittal shall apply, and all tap fees will be assessed per applicable codes and standards. 3.11 Outdoor Lighting and Signage. All outdoor lighting and signage shall meet the requirements of Section 26.575.150, Outdoor Lighting, of the Regulations. Compliance with this condition shall be verified at building permit review. 3.12 Colorado Passenger Tramway Safety Board Review. The Colorado Passenger Tramway Safety Board will conduct a review of the lift and ski corridor for compliance with safety and design standards. If the review by the Tramway Board requires modification to any element of the design of this approved project to comply with standards, such modifications will be reviewed and may be approved administratively by the Community Development Director. 3.13 Cost Sharing for Dean Street Improvements and Skiers’ Chalet Relocation and Rehabilitation. Pursuant to Ordinance No. 38, Series of 2018 and a separate development agreement between the City and Lift One Lodge, the City shall contribute a fixed amount of $4,360,000.00 to Lift One Lodge in support of the public facing elements of its project, including improvements to Dean Street and the relocation and rehabilitation of the Skiers’ Chalet Lodge. Additionally, at the time of demolition of Aspen Skiing Company’s existing Lift 1A ski operations space), Norway Island shall contribute $1,000.000.00 to the City toward the relocation, rehabilitation and repurposing of the ski operations-related elements of the Skiers’ Chalet Building. Such funds shall then be held in escrow and released to Lift One Lodge upon its delivery of the relocated and rehabilitated Skiers’ Chalet Building in a “white box” condition as provided in Ordinance No. 38, Series of 2018. However, if the delivery of the relocated and rehabilitated Skiers’ Chalet Building in “white box” condition takes place prior to the demolition of the Current Lift 1A ski operations space, then Norway Island shall deliver the $1,000,000.00 contribution directly to Lift One Lodge at the time of delivery. 3.14 Lot 2 Development Restriction. The Property Owner shall include a plat note on the final subdivision plat that restricts Lot 2 against all future residential building and residential development and other land uses and activities that are not consistent with the intent and approved development contemplated by Ordinance 39. Any amendment to the condition relating to residential building and residential development shall require a successful majority vote of the public. This plat note shall expressly authorize the construction and use of all ski and non- mechanized recreational infrastructure, including ski lifts, towers, snowmaking equipment, accessory and support structures pursuant to Ordinance 39 as well as the ability to conduct skiing, recreational uses and uses that do not require mechanized infrastructure, all related ski and recreational operations and accessory ski and recreational uses, including snowmaking, snow management, grooming, hiking, biking, up-hilling and events related thereto, as well as Page 13 of 28 traditional and routine ski operations and maintenance on the Property, including Mountain Access Road use and maintenance, as well as motorized vehicle, equipment and material staging and access in both winter and summer seasons along the Mountain Access Road. [NOTE: See also the dedications and reservations as well as the Plat Notes covering ski and non-mechanized recreational uses and operations set forth on the draft Final Plat.] 3.15 South Aspen Street Winter Maintenance. The City is not presently requiring the Gorsuch Haus Project or the Lift One Lodge Project to construct a snowmelt system in South Aspen Street. However, Norway Island hereby expressly confirms, acknowledges, and agrees to be bound to participate in the South Aspen Street Winter Maintenance process outlined in Section 30 of Ordinance 39 and also set forth on Exhibit B attached hereto to evaluate the feasibility and efficacy of installation of a snowmelt system, to include the pursuit of alternatives to a snowmelt system. After completion of all required elements and triggers pursuant to that process, if it is nonetheless determined by the City that a snowmelt system is the only mechanism to adequately and reasonably respond to winter street conditions and actual post- development traffic impacts from this Project and the Lift One Lodge Project, the City may then proceed to require Norway Island and the developer of the Lift One Lodge Project to install a snowmelt system, in which case Norway Island shall only be required to pay 1/3 of the cost. Norway Island expressly accepts these obligation as a condition of approval of the Project. As Aspen Street is a public street, any contemplated snowmelt system shall be exempt from applicable Renewable Energy Mitigation Program (REMP) fees. 3.16 Construction Staging and Sequencing Plan. A preliminary construction staging and sequencing plan of coordination between Norway Island, the developer of the Lift One Lodge Project, and Aspen Skiing Company is attached to this Agreement as Exhibit C___. 3.17 Material Representations. All material representations and commitments made by Norway Island in connection with the Project’s development approvals contained or referenced herein, whether made in public hearings or in documentation presented before the Aspen Planning and Zoning Commission or the Aspen City Council, are hereby expressly incorporated in said Project’s development approvals and such representations and commitments shall be complied with by Norway Island as if fully set forth herein, unless amended by an authorized entity. 3.18 School Land Dedication Fee. Before building permits are issued for the Project, Norway Island shall pay to City a cash payment in lieu of school land dedication for the Project’s four free market residential units and one affordable housing unit in an amount to be determined at building permit issuance based on the regulations in effect at that time. 3.19 Park Development Impact Fee. Before building permits are issued for the Project, Norway Island shall pay to City a Park Development Impact Fee for the Project in an amount to be determined at building permit issuance based on the regulations in effect at that time. Formatted: Font: Bold Page 14 of 28 3.20 Air Quality Impact Fee. Before building permits are issued for the Project, Norway Island shall pay to City an Air Quality Impact Fee in an amount to be determined at building permit issuance based on the regulations in effect at that time. 3.21 Additional Licenses and Easements. Pursuant to Section 5 of Ordinance 39, within 180 days following the City’s issuance of a Development Order for the Project, and prior to issuance of a CO, Norway Island shall finalize and provide the following additional licenses and easements to the City, which agreements shall all contain commercially reasonable insurance and indemnity provisions (provided, however, that the City will not provide an indemnification to any party): A. As contemplated in the dedications and reservations set forth in the Final Plat, an easement agreement between Norway Island and the Aspen Skiing Company to allow ski-related activity and infrastructure on Lot 1 and to allow skiing and ski and lift related activities, equipment, improvements and infrastructure, including, without limitation, subgrade snowmaking infrastructure as well as above grade ski and lift related equipment, improvements and infrastructure to occur on, over and under the Hill Street right-of-way. The easement agreement will provide that Aspen Skiing Company will own and exclusively control all ski and lift related equipment, improvements and infrastructure construed on, over, and under the Hill Street right-of-way. [NOTE: See dedications and reservations shown and described on the Final Plat as well as in the Ski Operations Agreement.] B. A fee-free easement agreement between Norway Island and the City pursuant to which the City will grant to Norway Island an easement over, under and across and through all public rights-of-way and City-owned lands adjacent to the Project for the purpose of allowing construction work and staging, crane swinging, over-digging, shoring, soil nails and other construction activities necessary or appropriate to undertake the construction of the Project and to establish and maintain a safe working environment during such construction. However, no such easements to be granted by the City with respect to the Dolinsek Property shall be legally effective until the City is permitted to grant such easements pursuant to the Dolinsek Deed, and no such easements on the Dolinsek Property shall violate the terms and restrictions of the Conservation Easement on the Dolinsek Property held by the Aspen Valley Land Trust. C. As provided in Paragraph 13 of the Certificate of Ownership, Dedications and Reservations on Sheet 1 of the Final Plat, and as shown on Sheet 5 of the Final Plat, the City shall be granted limited, non-exclusive easements over and across Lot 1 and Lot 2 for access to and maintenance of storm water and surface drainage facilities and infrastructure, including the west swale headwall and catch basin depicted on Sheet 5 of the Final Plat. [NOTE: See dedications and acceptances shown and described in the Vacation Plat as well as in the Final Plat.] Page 15 of 28 3.22 City Vacation of Street Rights-of-Way and Acceptance of Private Property. Pursuant to Section 4 of Ordinance 39, the City has approved vacation of public right-of-way comprising approximately 8,206 square feet of area, to be replaced with all necessary utility easements, all as shown on the Final Plat. The City has also agreed to accept the dedication of approximately 3,462 square feet of private property at the terminus of South Aspen Street for a public right-of-way for cul-de-sac improvements. To the extent that such dedications and acceptance of private property by the City are not effectuated by the Final Plat, the parties agree to exchange deeds no later than 45 days following the recordation of the Final Plat 3.23 Encroachment Licenses. Upon receipt by the City from Norway Island of completed revocable easement license applications, the City shall grant revocable encroachment licenses to Norway Island for all private improvements and infrastructure for the Project shown on the Approved Plan Set that will be located within City rights of way. 3.24 Other Agreements. Following completion of the construction of the building improvements on Lot 1, a Condominium Map and Condominium Declaration shall be submitted pursuant to Section 26.480.050(A) of the City of Aspen Municipal Code. [See Section 16.C.2 of Ordinance 39 which refers to “Other Agreements as necessary --- between the stakeholders to the project including: the City of Aspen, Aspen Historical Society, Aspen Skiing Company, Lift One Lodge, and Gorsuch Haus.” We should specifically identify any agreements to be signed by the City after the date of the Development Agreement and make sure the Development Agreement commits the City to approve/sign.] ARTICLE IV. PUBLIC IMPROVEMENTS 4.1 Prior to issuance of a final CO for the Project, Norway Island shall accomplish certain public improvements, all as depicted on the recorded Approved Plan Set, and summarized in narrative format on including the following Exhibits: (a) Landscape Improvements. See Exhibit DC attached hereto and incorporated herein by this reference. (b) Public Infrastructure Improvements. See Exhibit ED attached hereto and incorporated herein by this reference. (c) Storm Water and Drainage Improvements. See Exhibit FE attached hereto and incorporated herein by this reference. ARTICLE V. FINANCIAL ASSURANCES 5.1 Site Protection/Enhancements Requirements. (a) Site Protection Guarantee. Before the issuance of any building permits for the Project, Norway Island shall deposit with __________________________ (“Escrow Page 16 of 28 Agent”) the sum of ____________ and 00/ U.S. Dollars ($_________) in the form of cash or wired funds (the “Escrow Funds”) and will execute an Escrow Agreement and Instructions with the Escrow Agent which recites as follows: In the event construction work on the Project shall cease for 90 days or longer (“Work Stoppage”) prior to a final inspection by the City of the work authorized by a foundation/structural frame permit and cessation of such construction work continues for a period of one hundred twenty (120) days after notice from the City to Norway Island specifying the subject work in reasonable detail, or if such Work Stoppage cannot reasonably be cured within such one hundred twenty (120) day period and Norway Island fails to commence and proceed diligently to cure such Work Stoppage within a reasonable time period, then the City, in its reasonable discretion, may draw upon the Escrow Funds from time to time as needed for the purposes of protecting and securing the Project site and improvements from damage by the elements and/or from trespass by unauthorized persons and for purposes of improving the Project site to a safe condition such that it does not become an attractive nuisance or otherwise pose a threat to neighbors or other persons. The City shall use commercially reasonable efforts to not adversely impact the operation of, or access to the Project by Norway Island. The Escrow Funds or any remaining balance thereof shall be returned to Norway Island upon completion by the City of a final inspection of the work authorized by the Foundation/Structural Frame Permit on the Project; provided, however, that the Community Development Director shall promptly authorize partial releases, in increments of no less than 25% of the original surety, of the Site Protection Guarantee as portions of the Project protection, security, and safety are reduced. The City shall be a named party to the Escrow Agreement with the express right and authority to enforce the same from time to time. (b) Site Enhancement Guarantee. Before the issuance of a Building Permit for the Project, Norway Island shall deposit with _________________ (“Escrow Agent”) the sum of ___________ and 00/ U.S. Dollars ($__________) in the form of cash or wired funds (the “Escrow Funds”) and will execute an Escrow Agreement and Instructions with the Escrow Agent which recites as follows: In the event construction work on the Project shall cease for 90 days or longer (”Work Stoppage“) prior to a final inspection by the City of the work authorized by any permit or phase of permit for the Project and cessation of such construction work continues for a period of one hundred twenty (120) days after notice from the City to Norway Island specifying the subject work in reasonable detail, or if such Work Stoppage cannot reasonably be cured within such one hundred twenty (120) day period and Norway Island fails to commence and proceed diligently to cure such Work Stoppage within a reasonable time period, then the City, in its reasonable discretion, may draw upon the Escrow Funds from time to time as needed for the purposes of improving the appearance of any construction work already completed on the Project site and for installing any public improvements on or adjacent to the Project site. The City shall use commercially reasonable Page 17 of 28 discretion with respect to the manner or improving the appearance of construction work in progress as well as determining the public improvements to be installed. The City shall use commercially reasonable efforts to not adversely impact the operation of, or access to the Project by Norway Island. The Escrow Funds or any remaining balance thereof shall be returned to Norway Island upon completion by the City of a final inspection of the work authorized by the Foundation/Structural Frame Permit on the Project; provided, however, that the Community Development Director shall promptly authorize partial releases, in increments of no less than 25% of the original surety, of the Site Enhancement Guarantee as portions of the Project pertaining to its appearance, or the installing any public improvements on or adjacent to the Project are substantially performed. The City shall be a named party to the Escrow Agreement with the express right and authority to enforce the same from time to time. 5.2 Performance Guarantees. 5.2.1 Public Improvements. (a) Public Improvements Itemized. (i) Landscape Improvements for landscaping to be placed on Lot 1 and Lot 2 are itemized on Exhibit DC attached hereto and incorporated herein by this reference. (ii) Public Infrastructure Improvements for Lots 1 and 2 are itemized on Exhibit ED attached hereto and incorporated herein by this reference. (iii) Storm Water and Drainage Improvements associated with Lot 1 and Lot 2 are itemized on Exhibit FE attached hereto and incorporated herein by this reference. (b) Security for Improvements. Prior to the issuance of a Building Permit for the Project, Norway Island shall provide a performance guarantee (the “Guarantee”) in an amount (the “Guarantee Amount”) equal to one hundred fifty percent (150%) of the estimated costs of the Public Improvements (“Improvements”) itemized on Exhibits D, E and FC, D & E attached hereto. The Guarantee may be in the form of a cash escrow held by a third-party escrow agent (an “Escrow Agent”), an irrevocable sight draft or letter of commitment from a financially responsible lender, or any financial security acceptable to the City Attorney. It is further agreed that Guarantee Amount described above shall constitute the total of all security required for all the Improvements which Norway Island is required to perform. For purposes hereof “Substantially Complete“ or “Substantial Completion” shall mean that the City has inspected the Improvements and has reasonably determined that they are Substantially Complete in compliance with applicable specifications and has issued a Certificate of Substantial Completion or similarly intended form of approval. Subject to provisions below in section 5.2.1 (c) including, without limitation, partial release provisions, the Guarantee Amount representing the cost of part or all of the Improvements (as itemized on Exhibit D, E and FC, D, or E) which are Substantially Complete shall be immediately released to Norway Island. If there is any balance remaining in the Guarantee Amount after all partial releases and all Improvements are Substantially Complete, all such remaining amounts shall be immediately released to Norway Page 18 of 28 Island upon delivery of written notice to any applicable Escrow Agent by Norway Island directing such delivery. (c) Escrow Release Provisions. Upon delivery by Norway Island of written notice that the Improvements or any part or parts thereof are complete and ready for inspection (“Request for Inspection“) along with a showing of the value of the Improvements or part(s) thereof completed, the City will, within 14 days, inspect the Improvements identified in the Request for Inspection, to determine whether or not such Improvements are Substantially Complete. If the City finds that the Improvements identified in the Request for Inspection are Substantially Complete, the City shall, within 7 days, deliver a written Certificate of Substantial Completion to Norway Island and any applicable Escrow Agent. Upon receipt of a Certificate of Substantial Completion for Improvements identified in the Request for Inspection, the City or any applicable Escrow Agent shall immediately release to Norway Island the total itemized amount (per Exhibit D, E or FC, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete. Pursuant to Section 26.445.070(C)(4) of the Land Use Code, ten percent (10%) of the value of the Improvement(s) set forth in the City’s Certification of Substantial Completion shall be retained by the City or any applicable Escrow Agent. If no Certificate of Substantial Completion is delivered within the said seven (7) day period, all Improvements identified in the Request for Inspection shall automatically be deemed Substantially Complete without requirement of any further action. Norway Island need only provide written notice to any applicable Escrow Agent, with a copy to the City that no Certificate of Substantial Completion was delivered. Such notice to any applicable Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the City and upon receipt of such notice, the City or any applicable Escrow Agent is authorized to promptly release to Norway Island the total itemized amount (per Exhibit D, E or FC, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete minus the 10% withholding as per Section 26.445.070(C)(4) of the Land Use Code. If the cost to Substantially Complete the Improvements, or part(s) thereof is less than the corresponding amount itemized in each of Exhibits D, E or FC, D & E attached hereto, and the City certifies that such Improvements, or part (s) thereof are Substantially Complete, the City or any applicable Escrow Agent shall immediately release to Norway Island the total itemized amount (per Exhibit D, E or FC, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete minus the 10% required to be withheld pursuant to Section 26.445.070(C)(4) of the Land Use Code. If the City finds that all or a portion of the Improvements identified in the Request for Inspection are not Substantially Complete, the City shall furnish a letter of potential deficiencies to Norway Island and any applicable Escrow Agent within fourteen (14) days of such finding. Any such letter of potential deficiencies shall specify which Improvements identified in the Request for Inspection are potentially deficient. If a letter of potential deficiencies is issued which specifies a portion of the Improvements identified in the Request for Inspection as potentially deficient, then all Improvements identified in such Request for Inspection which are not specified as being Page 19 of 28 potentially deficient shall automatically be deemed Substantially Complete without requirement of any further action. Norway Island need only provide written notice to any applicable Escrow Agent with a copy to the City that the Improvements not specified in the letter of potential deficiencies are Substantially Complete. Such notice to any applicable Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the City and upon receipt of such notice, the City or any applicable Escrow Agent shall immediately release to Norway Island the total itemized amount (per Exhibit D, E or FC, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete minus the 10% withholding as per Section 26.445.070(C)(4) of the Land Use Code. If no letter of potential deficiency is furnished within the said fourteen (14) day period, all Improvements identified in the Request for Inspection shall automatically be deemed Substantially Complete without requirement of any further action. Norway Island need only provide written notice to any applicable Escrow Agent, with a copy to the City that no letter of potential deficiency was provided as required hereunder. Such notice to any applicable Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the City and upon receipt of such notice, the City or any applicable Escrow Agent shall promptly release to Norway Island the total itemized amount (per Exhibit D, E or F C, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete minus the 10% withholding as per Section 26.445.070(C)(4) of the Land Use Code. With respect to any Improvements identified in the Request for Inspection that are specified as potentially deficient in a letter of potential deficiencies as provided hereunder, Norway Island shall have a reasonable period of time to cure any such potential deficiencies. After performing cure measures, Norway Island shall submit to the City a Request for Inspection, along with a showing of the cost of the Improvements completed. The City will, within 14 days, inspect the Improvements previously identified as potentially deficient to determine whether or not such Improvements have been made Substantially Complete. If the City reasonably finds that the Improvements previously identified as potentially deficient have been made Substantially Complete, the City shall, within 7 days, deliver a Certificate of Substantial Completion to Norway Island and any applicable Escrow Agent. In such event, the City or any applicable Escrow Agent shall release to Norway Island within 5 days, the total itemized amount (per Exhibit D, E or FC, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete minus the 10% withholding as per Section 26.445.070(C)(4) of the Land Use Code. If the City fails to respond to Norway Island’s Request for Inspection regarding cure measures taken as to previously identified potentially deficient Improvements within such 7-day period, all such Improvements identified in the Request for Inspection shall automatically be deemed Substantially Complete. Norway Island need only provide written notice to any applicable Escrow Agent, with a copy to the City that no letter of potential deficiency was provided as required hereunder. Such notice to any applicable Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the City and upon receipt of such notice, the City or any applicable Escrow Agent shall promptly release to Norway Island the total itemized amount (per Exhibit D, E or FC, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete minus the 10% withholding as per Section 26.445.070(C)(4) of the Land Use Code. If the City reasonably finds that the Improvements previously identified as potentially deficient have not been made Substantially Complete then City and Norway Island shall have 14 Page 20 of 28 days after the date of the City’s finding, to reach written resolution regarding the Improvements determined by the City to be potentially deficient. If Norway Island and the City are not able to reach resolution within such 14 day period then the City and Norway Island agree to submit the dispute to the Board of Appeals and Examiners of the City of Aspen (hereinafter referred to as ”Board“). The Board shall base its decision upon substantial evidence presented. The Board’s finding would be subject to review pursuant to C.R.C.P. Rule 106(a)(4) in accordance with the laws of the State of Colorado. If Norway Island has not applied to the District Court for review of the determination of the Board within that time set forth pursuant to C.R.C.P. 106(a)(4) and has not obtained a Certificate of Substantial Completion City regarding the potentially deficient Improvements within such time or such additional time as may be reasonably needed by Norway Island under the circumstances, the City may cause the potentially deficient Improvements to be Substantially Complete and the costs of making the potentially deficient Improvements Substantially Complete shall be paid from the Guarantee Amount; provided, however, that in so doing, the City’s expenses shall be commercially reasonable. If the City’s costs are less than the itemized amounts for such Improvements (per Exhibit D, E or FC, D or E) the difference remaining shall be promptly paid to Norway Island. If the Board finds that the City’s determination was correct, then Norway Island, in addition to appeal rights, shall have the right to take such corrective action as may be reasonably necessary to correct the Improvements found by the Board to be potentially deficient. Upon completion of such corrective action, Norway Island will submit to the City a Request for Inspection. If the City determines that Improvements found by the Board to be potentially deficient have been made Substantially Complete then the City shall, within 7 days, deliver a Certificate of Substantial Completion to Norway Island and any applicable Escrow Agent. In such event, the City or any applicable Escrow Agent shall release to Norway Island within five (5) days, the total itemized amount (per Exhibit D, E or FC, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete minus the 10% withholding as per Section 26.445.070(C)(4) of the Land Use Code. If the City determines that Improvements found by the Board to be potentially deficient remain potentially deficient then the City may cause such potentially deficient Improvements to be Substantially Complete and the costs of making such potentially deficient Improvements Substantially Complete shall be paid from the Guarantee Amount; provided, however, that in so doing, the City’s expenses shall be commercially reasonable. If the City’s costs are less than the itemized amounts for such Improvements (per Exhibit D, E or FC, D or E) the difference remaining shall be promptly paid to Norway Island. In the event the Board finds in favor of Norway Island, then the Improvements in issue shall automatically be deemed Substantially Complete without requirement of any further action. Norway Island need only provide written notice to any applicable Escrow Agent, with a copy to the City that the Board found in favor of Norway Island. Such notice to any applicable Escrow Agent shall be deemed the equivalent of a Certificate of Substantial Completion from the Board. Upon receipt of such notice, the City or any applicable Escrow Agent shall immediately release to Norway Island the total itemized amount (per Exhibit D, E or FC, D, or E) corresponding to all Improvements which the City has certified as Substantially Complete minus the 10% withholding as per Section 26.445.070(C)(4) of the Land Use Code. Page 21 of 28 Notwithstanding anything to the contrary contained herein, after any and all partial releases, and once all Improvements are Substantially Complete, the 10% withheld pursuant to Section 26.445.070(C)(4) of the Land Use Code shall be immediately released by the City or any applicable Escrow Agent to Norway Island. If there are delays in performance hereunder due to abnormal adverse weather conditions, acts of God, casualties or any causes beyond the control of Norway Island or the City, or by other causes which reasonably would justify delay, then the affected time period or deadline shall be extended for a reasonable period of time, as may be agreed upon by the parties. No agreement to extend may be unreasonably withheld or delayed. It is the express understanding of the parties that compliance with the procedure set forth in Article VI below pertaining to the procedure for default and amendment of this Agreement shall be required with respect to the enforcement and implementation of the financial assurances and guarantees to be provided by Norway Island as set forth above; provided, however that all procedures and requirements of this Article V shall be exhausted by the City before any action under Article VI below is taken by the City with regard to matters pertaining to this Article V. ARTICLE VI. NON-COMPLIANCE AND REQUEST FOR AMENDMENTS OR EXTENSIONS In the event that the City determines that Norway Island is not acting in substantial compliance with the terms of this Agreement, the City shall notify Norway Island in writing specifying the alleged non-compliance and asking that Norway Island remedy the alleged non- compliance within such reasonable time as the City may determine, but not less than 30 days. If the City determines that Norway Island has not complied within such time, the City may issue and serve upon Norway Island a written order specifying the alleged non-compliance and requiring Norway Island to remedy the same within thirty (30) days. Within twenty (20) days of the receipt of such order, Norway Island may file with the City Council either a notice advising the City that it is in compliance or a written request to determine any one or both of the following matters: (a) Whether the alleged non-compliance exists or did exist, or (b) Whether a variance, extension of time or amendment to this Agreement should be granted with respect to any such non-compliance which is determined to exist. Upon the receipt of such request, the City shall promptly schedule a meeting of the parties to consider the matters set forth in the order of non-compliance. The meeting of the parties shall be convened and conducted pursuant to the procedures normally established by the City. If the City determines that a non-compliance exists which has not been remedied, it may issue such orders as may be appropriate, including the imposition of daily fines until such non- compliance has been remedied, the withholding of permits and/or certificate of occupancy, as applicable; provided, however, no order shall terminate any land use approval. The City may also grant such variances, extensions of time or amendments to this Agreement as it may deem appropriate under the circumstances. Page 22 of 28 In addition to the foregoing, Norway Island may, on its own initiative, petition the City for a variance, an amendment to this Agreement or an extension of one or more of the time periods required for performance hereunder. The City may grant such variances, amendments to this Agreement, or extensions of time as it may deem appropriate under the circumstances. The parties expressly acknowledge and agree that the City shall not unreasonably refuse to extend the time periods for performance hereunder if Norway Island demonstrates that the reasons for the delay(s) which necessitate said extension(s) result from acts of God or other events beyond the reasonable control of Norway Island, despite good faith efforts on its part to perform in a timely manner. ARTICLE VII. PRIOR INSTRUMENTS AND APPROVALS 7.1 Prior Instruments and Approvals. (a) Ordinance 39. (b) Street and Easement Vacation Plat. (c) Planning and Zoning Commission Resolution No. ____ (d) City of Aspen Community Development Order No. _____ (e) [Any others?] (f)(e) Any and all agreements, approvals, ordinances, resolutions, and similar instruments not specifically listed above (recorded or unrecorded) which could be construed to adversely affect, negate, or otherwise diminish the Approved Plan Set, Final Plat, this Agreement, any amendments to any of the foregoing, and any and all agreements or instruments made or given in connection with the Approved Plan Set, Final Plat, and this Agreement. ARTICLE VIII. GENERAL PROVISIONS 8.1 The provisions hereof shall be binding upon and inure to the benefit of Norway Island and City and their respective successors and assigns. 8.2 This Agreement shall be subject to and construed in accordance with the laws of the State of Colorado. 8.3 If any of the provisions of this Agreement or any paragraph, sentence, clause, phrase, word, or section or the application thereof in any circumstance is invalidated, such invalidity shall not affect the validity of the remainder of this Agreement, and the application of any such provision, paragraph, sentence, clause, phrase, word, or section in any other circumstance shall not be affected thereby. 8.4 This Agreement and the exhibits attached hereto contain the entire understanding between the parties hereto with respect to the transactions contemplated hereunder. Norway Page 23 of 28 Island, its successors or assigns, may, on its own initiative, petition the City Council for an amendment to this Agreement or for an extension of one or more of the time periods required for performance hereunder. The City Council shall not unreasonably deny such petition for amendment or extension after considering all appropriate circumstances. Any such amendments or extensions of time shall only become effective upon the execution by all parties hereto that are affected by the proposed amendment. 8.5 Numerical and title headings contained in this Agreement are for convenience only, and shall not be deemed determinative of the substance contained herein. As used herein, where the context requires, the use of the singular shall include the plural and the use of any gender shall include all genders. 8.6 Upon execution of this Agreement by all parties hereto, City agrees to approve and execute the Final Plat and to approve the Approved Plan Set and to accept the same for recordation in the Office of the Clerk and Recorder of Pitkin County, Colorado, upon payment of the recordation fees by Norway Island. 8.7 Notices to be given to the parties to this Agreement shall be considered to be given if hand delivered or if deposited in the United States Mail to the parties by certified mail, return receipt requested, at the addresses indicated below, or such other addresses as may be substituted upon written notice by the parties or their successors or assigns Page 24 of 28 CITY: City of Aspen City Manager 130 South Galena Street Aspen, CO 81611 (Email: ____________________) NORWAY ISLAND: Norway Island, LLC c/o James DeFrancia and Jean Coulter P.O. Box 12393 Aspen, CO 91612 (Email:jdefrancia@lowe-re.com; jeanncoulter@gmail.com) With copies to: ____________________________________ ____________________________________ 8.8 This Agreement may be executed in counterparts, in which case all such counterparts together shall constitute one and the same instrument which is binding on all of the parties thereto, notwithstanding that all of the parties are not signatory to the original or the same counterpart. Facsimile and email signatures shall be treated as original signatures hereon. 8.9 The terms, conditions, provisions and obligations herein contained shall be deemed covenants that run with and burden the Property and any and all owners thereof or interests therein, their respective successors, grantees or assigns, and further shall inure to the benefit of and be specifically enforceable by or against the parties hereto, their respective successors, grantees or assigns. Page 25 of 28 IN WITNESS WHEREOF, the parties have hereunto set their hands and seals as of the day and year first above written. CITY: THE CITY OF ASPEN, COLORADO, a Colorado home rule municipal corporation By: _____________________________ ____________________, Mayor Attest: ________________________________ City Clerk APPROVED AS TO FORM: ____________________________ James True, City Attorney STATE COLORADO COUNTY OF PITKIN ) ) ss. ) The foregoing instrument was acknowledged before me this _____ day of ________, 2020__, by ___________________ as Mayor and _____________________ as City Clerk of the City of Aspen, Colorado, a Colorado home rule municipal corporation. Witness my hand and official seal. My commission expires: _________________________________ Notary Public Page 26 of 28 NORWAY ISLAND: NORWAY ISLAND, LLC a Delaware limited liability company By: Destination Lift One, LLC, a Delaware limited liability company, its Administrative Managing Member, By: LDD Lift One Investor, LLC, a Delaware limited liability company, its Managing Member By: _________________________________ Name/Title STATE OF COLORADO COUNTY OF ____________ ) ) ss. ) The foregoing instrument was acknowledged before me this _____ day of ________, 2020, by _______________________ as ___________________ of LDD Lift One Investor, LLC, a Delaware limited liability company, as Managing Member of Destination Lift One, LLC, a Delaware limited liability company, as Administrative Managing Member of Norway Island, LLC, a Delaware limited liability company. Witness my hand and official seal. My commission expires: _________________________________ Notary Public Page 27 of 28 EXHIBIT B South Aspen Street Winter Maintenance: The City of Aspen has considered the potential traffic impacts to South Aspen Street from the approved Gorsuch Haus Development and Lift One Lodge Development (Applicants), including the ability for South Aspen Street, as it exists, to provide safe, unobstructed access. Due to its steep grade, narrow width, and north facing aspect, requiring South Aspen Street to be improved with a snowmelt system has been considered in relation to the subject applications. At the time of this approval, the City of Aspen defers requiring the Applicant to install a snowmelt system. The purpose of this deferment is to engage in a process to evaluate the efficacy of requiring the Applicants to install a South Aspen Street snowmelt system. At the conclusion of this process, the City of Aspen may require installation. The following timeframes, service/maintenance adjustments, and triggers shall be used to evaluate the potential installation of a snowmelt system: Year 1 - from date of Final approval: A. The Applicants shall complete a traffic study that provides a baseline evaluation of existing traffic volumes associated with the existing land uses located along South Aspen Street. The traffic study shall also include an evaluation of future traffic impacts as a result of the Gorsuch Haus development, the Lift One Lodge Development, and new location of Lift 1A near Dean Street. This evaluation of future traffic impacts shall consider the width, grade, and winter conditions of South Aspen Street and consider types personal and commercial vehicles that will access the future lodges. Once complete, this study shall be submitted to the Community Development Director for evaluation. B. The City of Aspen shall evaluate the general impacts and potential effectiveness of alternative product applications that could provide increased traction on South Aspen Street such as salt-based de-icers, use of Magnesium Chloride or other similar product, increase application of sand or other similar material, or some combination of these alternatives. The City of Aspen shall also evaluate the potential of resurfacing South Aspen Street with a combination of traction base material, permanent bonding, and grooved pavement, as well as restrictions on vehicle types and vehicle tires. These evaluations shall include referral comments from the Environmental Health Department for environmental impact consideration and the Engineering Department. Once complete, the evaluation shall be released to the Applicants. Year 2 – from date of Final approval: C. The City of Aspen shall identify current snowmelt system technologies and evaluate the financial and environmental costs of installation, maintenance, and operation of such a system. The City of Aspen shall also explore renewable energy alternatives associated with this potential installation. Due to the unknown timeframe for completion of the Gorsuch Haus and Lift One Lodge developments and the potential for future Formatted: Centered Formatted: Centered Formatted: Numbered + Level: 1 + Numbering Style:A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5", Tab stops: Not at 0.5" Formatted: Numbered + Level: 1 + Numbering Style:A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5", Tab stops: Not at 0.5" Formatted: Numbered + Level: 1 + Numbering Style:A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5", Tab stops: Not at 0.5" Page 28 of 28 improvement in snowmelt technologies, the City of Aspen may choose to further evaluate snowmelt technologies past this established timeframe. Within 1 year of the completion of the Gorsuch Haus and the Lift One Lodge: D. Post development of the Gorsuch Haus and the Lift One Lodge, actual traffic impact to South Aspen Street shall be evaluated by the Applicants. This evaluation shall include a traffic study that details average and peak traffic volume counts and details the use of South Aspen Street in relation to the types of personal and commercial vehicles that are used in both summer and winter conditions. Once complete, this study shall be submitted to the Community Development Director for evaluation. This traffic study shall be considered in tandem with the baseline traffic study that was required in subsection A above. E. The City of Aspen shall prioritize South Aspen Street winter maintenance and engage in alternative snow plowing, snow storage, and snow removal techniques that are proportional with the full commercial operation of the Gorsuch Haus and Lift One Lodge developments. These techniques shall be documented and logged. The City of Aspen, the Gorsuch Haus, and the Lift One Lodge shall evaluate these techniques for their effectiveness to provide safe access to the lodge developments. F. Should increased winter service maintenance to South Aspen Street not provide reasonably safe access to the lodge developments, the City Council, at its discretion, shall consider, and potentially implement, the use of alternative product applications and/or an alternative traction surface to South Aspen Street using the evaluation outlined in subsection B above. G. If it is found that a snowmelt system is the only mechanism to adequately and reasonably respond to winter street conditions and associated traffic impacts from the lodge developments, the City Council at a public meeting, using the information outlined above and at their discretion, shall have the ability to require the Gorsuch Haus and the Lift One Lodge, or assigns, to install a snowmelt system within South Aspen Street. The following triggers shall also be used to evaluate this requirement: o Unsafe conditions on South Aspen Street that do not allow the safe access of vehicles to the approved lodge developments. o Excessive City of Aspen cost overruns and environmental impacts due to the increased service maintenance measures to South Aspen Street. H. Should the City of Aspen require the installation of a snowmelt system on South Aspen Street, the Lift One Lodge and Gorsuch Haus hereby agree to each contribute one-third (1/3) of the cost for such installation. As Aspen Street is a public street, any contemplated snow melt system is exempt from applicable REMP (Renewable Energy Mitigation Program) fees. 14261104_v5 Formatted: Numbered + Level: 1 + Numbering Style:A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5", Tab stops: Not at 0.5" Formatted: Numbered + Level: 1 + Numbering Style:A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5", Tab stops: Not at 0.5" Formatted: Numbered + Level: 1 + Numbering Style:A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5", Tab stops: Not at 0.5" Formatted: Numbered + Level: 1 + Numbering Style:A, B, C, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5", Tab stops: Not at 0.5" Formatted: Bulleted + Level: 2 + Aligned at: 0.75" +Indent at: 1", Tab stops: Not at 1" LANDSCAPE ARCHITECT: DESIGNWORKSHOP CONTACT: Richard Shaw 120 East Main Street Aspen, Colorado 81611 Tel: (970) 925-8354 GORSUCH HAUS SUBDIVISION/ DETAIL REVIEW PLAN SET COVER SHEET N CIVIL ENGINEER: SOPRIS ENGINEERING CONTACT: Jesse Swan Main Street Carbondale, CO 81623 Tel: (970) 7040311 DW PROJECT NUMBER 4735 South Aspen Street GORSUCH HAUS ASPEN, COLORADO VICINITY MAP PROJECT DESCRIPTION LODGE AND LIFT ONE CORRIDOR Sheet No. Sheet Title P001 Draft Gorsuch Haus Subdivision/Detail Review Plan Set Cover Sheet P002 Site Improvement Survey P003 Proposed Illustrative Site Plan P004.1 Existing and Proposed Development Overlay P004.2 Proposed Development Enlargements P004.3 Proposed Development Enlargements P005 Existing Landscape Plan P006 Proposed Landscape Plan P007 Public Amenities Plan P008 Illustrative Perspective P009 Illustrative Perspective World Cup P010 Illustrative Plan arrival at South Aspen St. P011 Illustrative Perspective South Apsen St. Approach R100 Reference Plan - Level P1 R101 Reference Plan - Level 01 R102 Reference Plan - Level 02 R103 Reference Plan - Level 03 R104 Reference Plan - Level 04 R105 Reference Plan - Level 05 R106 Reference Plan - Level 06 R107 Reference Plan - Level 07 R108 Reference Plan - Level 08 R109 Reference Plan - Level 09 R110 Reference Plan - Roof G021 Code Summary G022 Code Summary G023 Code Summary G024 Code Summary G025 Code Summary G026 Code Summary G031 Proposed Floor Area Calculations G032 Proposed Floor Area Calculations G033 Proposed Floor Area Calculations G034 Height Plan - Proposed Grade G090 Code Analysis - Fire Separation Distance G091 Code Analysis - Fire Separation Distance G100 Code Analysis - Occupancy and Fire Rated Walls G101 Code Analysis - Occupancy and Fire Rated Walls G102 Code Analysis - Occupancy and Fire Rated Walls G103 Code Analysis - Occupancy and Fire Rated Walls G104 Code Analysis - Occupancy and Fire Rated Walls G105 Code Analysis - Occupancy and Fire Rated Walls G106 Code Analysis - Occupancy and Fire Rated Walls G107 Code Analysis - Occupancy and Fire Rated Walls G108 Code Analysis - Occupancy and Fire Rated Walls G109 Code Analysis - Occupancy and Fire Rated Walls G110 Exterior Stair Protection G200 Code Analysis - Egress and Travel Distance G201 Code Analysis - Egress and Travel Distance G202 Code Analysis - Egress and Travel Distance G203 Code Analysis - Egress and Travel Distance G204 Code Analysis - Egress and Travel Distance G205 Code Analysis - Egress and Travel Distance G206 Code Analysis - Egress and Travel Distance G207 Code Analysis - Egress and Travel Distance G208 Code Analysis - Egress and Travel Distance G209 Code Analysis - Egress and Travel Distance D200 Building Elevations D201 Building Elevations D202 Building Elevations Conceptual Approval vs. Detailed Review D306 Height Study - Section 1 D307 Height Study - Section 2 D308 Height Study - Section 3 D309 Height Study - Section 4 D310 Height Study - Section 5 D311 Height Study - Section 6 D312 Section 1 and 2 D312 Section 3 and 4 G050 Snow Shedding Roof Plan G051 Dormer Plan A801 Material Board C.1.00 Cover & General Notes C.1.01 Overall Site Plan C.1.02 Snow Storage Plan C.1.03 Emergency Fire Staging Plan C.2.00 Cul-de-sac Plan, Profile and Grading C.2.01 Cul-de-sac Sections C.2.02 Cul-de-sac Sidewalk Plan & Profiles C.2.03 Conceptual Perimeter Grading Plan C.2.04 Mountain Road Plan, Profile & Grading C.2.05 Mountain Road Sections C.2.06 West Swale Plan, Profile & Sections SHEET INDEX ARCHITECT: 4240 CONTACT: Christian Barlock 3507 Ringsby Court Suite 117 Denver, CO 80216 Tel: (303) 292-3388 MEP. ENGINEER: BG BUILDING WORKS CONTACT: 222 Chapel Place, Unit AC-201 P.O. Box 9650, Avon, CO 81620 Tel: (970) 949-6108 PROJECT MANAGER: NORWAY ISLAND LLC. CONTACT: Jean Coulter Tel: (303) 882-0702 DEAN S T R E E T MO N A R C H S T R E E T SO U T H A S P E N S T R E E T PROJECT SITE Project is located in downtown Aspen,Colorado. Together with the Lift One Corridor, the Gorsuch Haus and infrastructure, skiing, and public amenity improvements comprise significant development at the western portal to Aspen Mountain. Issue Date: March 2, 2020 3- 2 - 2 0 2 0 DR A F T R E V I E W P L A N S E T LIGHTING DESIGNER: 186 LIGHTING DESIGN GROUP CONTACT: Greg Mackell 1200 Bannock St, Denver, CO 80204 Tel: (303) 534-5350 ASPE N M O U N T A I N GON D O L A Detail Application Drawings: NTS Updated: September 21, 2020 9- 2 1-2 0 2 0 U P D A T E S D R A F T R E V I E W P L A N S E T 3- 2 - 2 0 2 0 DR A F T R E V I E W P L A N S E T Detail Application Drawings: 9- 2 1 - 2 0 2 0 U P D A T E S D R A F T R E V I E W P L A N S E T C.2.07 Mudflow Mitigation Plan C.3.00 Master Conceptual Utility Plan C.3.01 Ruthie's Sanitary Sewer Service Plan & Profile C.3.02 Gorsuch Haus Sanitary Sewer Service Plan & Profile C.3.03 16" Water Main Plan & Profile STA: 0+00+2+50 C.3.04 16" Water Main Plan & Profile STA: 2+50+END C.3.05 6" Water Service Plan & Profile C.4.00 Existing Offsite Drainage Basin Plan C.4.01 Post Development Drainage Basin Plan C.4.02 Conceptual Master Drainage Plan C.4.03 Onsite Conceptual Water Quality Treatment Plan C.4.04 West Storm Pipe Profile C.4.05 East Storm Pipe Profile C.4.06 East Storm Pipe Profile C.5.00 Site Details C.5.01 Sanitary Sewer Details (Typ.) C.5.02 City of Aspen Water Details S.101 Gorsuch Haus PD/ Subdivision S.102 Gorsuch Haus PD/ Subdivision S.103 Gorsuch Haus PD/ Subdivision S.104 Gorsuch Haus PD/ Subdivision S.105 Gorsuch Haus PD/ Subdivision S.201 Street and Easement Vacation Plat X S A X S A XS A XS A XS A X S A X S A XS A XS A XS A XS A X S A XS A XS A XS A XS A XS A XS A XS A XS A XS A XS A XS A XS A XS A XELXEL XU T XU T XU T XU T x x X S D X S D X S D XE L XEL XE L XEL XEL XEL XEL XEL XEL XUT X U T XUT XU T XG A S XU T XU T XU T X U T XU T XUT XUT XU T XEL XEL XEL XEL XEL XEL X E L XE L XE L XE L XEL XEL XE L X E L XEL XEL XEL XE L XE L XE L XE L XE L XE L XE L XE L XE L XE L XE L XE L X E L X E L XE L XE L XE L XE L XE L XE L XE L X E L X E L XE L XE L XE L XE L XE L XEL XEL XEL XEL X U T X U T XU T XU T X U T XU T XU T XU T XU T XU T X U T XU T XU T XU T XGAS XGAS XGAS XGAS XGAS XGAS X G A S XWL XWL XWL XWL XWL XWL XWL X W L XW L XW L XU T XU T XU T XU T XU T XU T XU T XU T XUT XUT XUT XUT XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T X U T XEL XSA XS A XSA XSA XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XWL XTVXUT XTV X U T XE L XE L XE L XEL XE L XE L X T V XS D XS D XSD XS A XS A XS A XGA S XGAS X G A S X G A S X G A S XG A S XG A S XG A S XG A S X G A S X G A S XG A S XG A S XE T C XE T C X S D X S D XSD X W L X W L X W L X W L XW L XW L XTV > > > XW L XWL XU T XT V XT V XT V XTV XTV S. ASPEN STREET 75.3' WIDE R.O.W. SUMMIT S T R E E T 20.0' WID E R . O . W . HILL STRE E T25.0' WID E R . O . W . FOUND #5 REBAR AND 114" PLASTIC CAP L.S. #25947 CENTERLINE 15' WIDE WATER PIPELINE EASEMENT GRANTED TO CITY OF ASPEN BK.412 PG.557 S 69°30'00" E 36.50' S 64° 2 5 ' 0 0 " E 3 1 . 0 0 ' S 2 1 ° 2 2 ' 0 0 " W 4 8 . 5 0 ' 7.5 ' 53.26' 27.52' EASEM E N T G R A N T E D B Y MOUN T A I N Q U E E N C O N D O S FOR SK I E R S A N D P E D E S T R I A N S PLAT B K . 4 P G . 4 8 9 AND W A T E R L I N E E A S E M E N T T O C I T Y O F A S P E N BK. 41 1 P G . 9 9 6 90' WIDE SKI EASEMENT CENTERED OVER EXISTING LIFT 1A BK.259 PG.83 CENTERLINE 15' WIDE DRAINAGE EASEMENT GRANTED TO MOUNTAIN QUEEN CONDOS BK.291 PG.649 7.5 ' S 32°25'30" E 16.87' S 1 0 ° 2 5 ' 3 0 " E 7 7 . 7 0 ' N 79°34'30" E 4.50' NE14 NE14 SECTION 13 SE14 NE14 SECTION 13 PARCEL 4 240,375 sq.ft.± 5.518 acres± (PORTION OF LOT 31, SECTION 13 WITHIN CITY LIMITS) SOUTHERLY BOUNDARY LINE OF SOUTH ASPEN STREET R.O.W. PER BARBEE SUBDIVISION RECREATION EASEMENTREC. #597440 (PARA. 2) SKI CORRIDOR EA S E M E N T REC. #597440 45.0' AREA OF REVOKABLE ENCROACHMENT LICENSE GRANTED TO SHADOW MOUNTAIN VILLAGE APARTMENTS REC. #543674 ASPEN C I T Y L I M I T S PITKIN C O U N T Y S. ASPEN STREET 37.65' WIDE R.O.W. PARCEL 2 10,917 sq.ft. 0.251 acres± PARCEL 1 23,897 sq.ft.± 0.549 acres± PARCEL 3 2,973 sq.ft.± 0.068 acres± LIFT TOWERS (TYP) GRAVELROAD STORMGRATE LIFT LOADAREA SH E D ST E P S SH E D GR O U N D L E V E L DE C K TRAILER LIFT 1A TERMINAL BUILDINGTWO-STORYWOOD FRAME CONSTRUCTION PARKINGAREA (ASPHALT) RAILROAD TIERETAINING WALL (TYP)ST E P S GRAVELSURFACE GATE CONTROLLER RETAINI N G W A L L ST E P S POOL POOL SKI TRAIL AREA OF DENSEVEGETATION AREA OF DENSEVEGETATION 4"X4" POST 50' SETBACK BUILDING RESTRICTIONBK 231 PG 278 37.65' EDGE OF VEGETATION SNOWMAKING HYDRANT &FAN GUN ELECTRIC PEDESTAL A P P R O X I M A T E S T R A I G H T L I N E D B E T W E E N F I E L D L O C A T E D M A N H O L E S GAS RISER ELECTRIC SWITCHGEAR ELECTRIC METERCABINET ELECTRICTRANSFORMER ELECTRICTRANSFORMER (PLACED FROM CITY OF ASPEN GIS AERIAL) SNOWMAKING HYDRANT &FAN GUN ELECTRIC PEDESTAL SNOWMAKING HYDRANT &FAN GUN ELECTRIC PEDESTAL 39 40 41 42 43 44 45 20.0' WIDE EASEMENT FOR FIRE ACCESSAND DRAINAGE GRANTED TOMOUNTAIN QUEEN CONDOSBK.275 PG.378 AND WATERLINE EASEMENTGRANTED TO CITY OF ASPENBK.291 PG.649 53 54 55 52 13139.01 01/02/2020 CL G:\2013\13139\SURVEY\Survey DWGs\13139-ISP.dwg CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 81623 (970) 704-0311 NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARSAFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTIONBASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TENYEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. A PARCEL OF LAND SITUATED IN THE NE14NE14 AND SE14NE14 OF SECTION 13 TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6th P.M. CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADOSHEET 3 OF 4 SUBJECT PROPERTY EXISTING CONDITIONS IMPROVEMENT SURVEY PLAT OF: EXISTING GAS EXISTING COMMON TRENCH EXISTING UNDERGROUND ELECTRIC EXISTING OVERHEAD ELECTRIC EXISTING WATER EXISTING SEWER EXISTING UNDERGROUND TELEPHONE EXISTING SIGN EXISTING SEWER CLEANOUT EXISTING TELEPHONE SERVICE EXISTING LIGHT POLE EXISTING GAS METER EXISTING TELEPHONE MANHOLE EXISTING UTILITY MANHOLE EXISTING POWER POLE EXISTING ELECTRIC SERVICE EXISTING WATER MANHOLE EXISTING GUY WIRE EXISTING SEWER MANHOLE EXISTING ELECTRIC MANHOLE EXISTING FIRE HYDRANT EXISTING WATER VALVE EXISTING CURB STOP EXISTING DRAINAGE MANHOLE EXISTING ELECTRIC TRANSFORMER EXISTING CONDITIONS LEGEND EXISTING BUSH EXISTING EDGE OF VEGETATION EXISTING CONIFER TREE - CALIPER"XDRIP DIAMETER' EXISTING DECIDUOUS TREE - CALIPER"XDRIP DIAMETER' EXISTING BOULDER EXISTING WIRE FENCE EXISTING WOOD FENCE EXISTING CHAIN LINK FENCE EXISTING ROCK RETAINING WALL EXISTING TIE RETAINING WALL EXISTING ELECTRIC METER EXISTING TELEPHONE PEDESTAL EXISTING CATV PEDESTAL EXISTING GAS MARKER EXISTING IRRIGATION VALVE BOX EXISTING IRRIGATION VALVE BOX 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 030 30 60 30 12015TREE DISCLAIMER SOPRIS ENGINEERING PERSONNEL ARE NOT TRAINED ARBORISTS OR LANDSCAPE PROFESSIONALS. THE TREE INFORMATION SHOWN HEREON WAS FIELD SURVEYED BY SOPRIS ENGINEERING TO THE BEST OF OUR ABILITY AS PART OF THE PROJECT'S SCOPE. DATA WAS ACQUIRED PER PROCEDURES OUTLINED IN THE CITY OF ASPEN ENGINEERING DEPARTMENT'S SUBMITTAL CHECKLIST. CURRENT CITY OF ASPEN RIGHT-OF-WAY AREAS PROPOSED TO BE VACATED AREA OF REVOKABLE ENCROACHMENT LICENSE GRANTED TO SHADOW MOUNTAIN VILLAGE APARTMENTS REC. #543674 SEE DETAIL THIS SHEET FOR ADDITIONAL VEGETATIONINFORMATION 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 010 10 10 5 ADDITIONAL VEGETATION DETAIL VEGETATION TYPE AND DIMENSIONS OEL OEL XUT XUT XEL XEL XSA XSA XWL XWL XGAS XGAS XETC XETC EXISTING STORM SEWERXSDXSD TREENUMBER TREE TYPE TRUNKDIAMETER (INCHES) DRIPLINEDIAMETER (FEET) 1 SUB 3" GROUP 4 2 GAMBLE OAK 5 10 3 SUB 3" GROUP 6 4 GAMBLE OAK 4 8 5 GAMBLE OAK 4 8 6 GAMBLE OAK 4.6 8 7 GAMBLE OAK 4.8 8 8 SUB 3" GROUP 4 9 SUB "3 GROUP 4 10 GAMBLE OAK 4.1 8 11 SUB 3" GROUP 2 12 SUB 3" GROUP 2 13 SUB 3" GROUP 8 14 CHOKE CHERRY 3.6 7 15 CHOKE CHERRY 3.1 6 16 CHOKE CHERRY 3 6 17 SUB 3" GROUP 5 18 SUB 3" GROUP 5 19 CHOKE CHERRY 3.2 6 20 CHOKE CHERRY 3 6 21 CHOKE CHERRY 3 6 22 CHOKE CHERRY 4.3 8 23 CHOKE CHERRY 5.3 10 24 SUB 3" GROUP 4 25 CHOKE CHERRY 4.7 10 26 SUB 3" GROUP 5 27 SUB 3" GROUP 7 28 SUB 3" GROUP 6 29 SUB 3" GROUP 6 30 SUB 3" GROUP 4 31 CHOKE CHERRY 3.4 6 32 SUB 3" GROUP 3 33 CHOKE CHERRY 3.1 6 34 CHOKE CHERRY 3.1 6 35 CHOKE CHERRY 3.1 6 36 DECIDUOUS TREE 5.8 12 37 DECIDUOUS TREE 3.6 6 38 PINE TREE 4 8 39 PINE TREE 7.3 14 40 PINE TREE 14.6 28 41 PINE TREE 12 24 42 PINE TREE 17 34 43 PINE TREE 13 26 44 DECIDUOUS TREE 37 65 45 PINE TREE 9.2 18 46 PINE TREE 10.8 22 47 DECIDUOUS TREE 13.5 26 48 DECIDUOUS TREE 30.1 60 49 DECIDUOUS TREE 40.2 70 50 DECIDUOUS TREE 3.5 7 51 DECIDUOUS TREE 4.2 8 52 PINE TREE 12.4 24 53 19.8 40 54 10.7 20 55 14.3 28 PINE TREE PINE TREE PINE TREE ______________________________________MARK S. BECKLER L.S. #28643 P002 LIFT ONE LODGE FOOTPRINT* LIFT ONE LODGE FOOTPRINT* SO U T H A S P E N S T R E E T SHADOW MOUNTAIN CONDOMINIUMS MOUNTAIN QUEEN CONDOMINIUMS M O U N T A I N O P E R A T I O N S R O A D CARIBOU CONDOMINIUMS GORSUCH HAUS NORWAY RUN AN S I S E T B A C K Lift Corridor & Proposed Lift Towers Lodge Loading/ Unloading Schuss Gully Ski Run Outdoor Restaurant/ Apres Ski Deck Indoor Restaurant & Bar Relocated Mountain Access Road Expanded South Aspen St. Cul-de-Sac Pedestrian Access Path New Pedestrian Pathway Gorsuch Haus Lodge: • 81 Hotel Lodging Rooms • 4 Free-Market Multi-Family Units • 1 Affordable Housing Unit • Underground Structured Parking: 56 Spaces *Approximate Location Based on Ordinance 38 Series of 2018 1 2 3 4 5 6 7 8 9 9 1 6 4 5 2 3 8 7 S W I T C H G E A R LIFT 1 LODGE *2019 PROPOSED FOOTPRINT 0 ORIGINAL SCALE: 10 20 40 1"= 20' KEY PLAN NOT TO SCALE NORTH C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: REVISIONS 4735 GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED W W W . D E S I G N W O R K S H O P . C O M DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 EXISTING AND PROPOSED DEVELOPMENT OVERLAY P004.1OVERALL SITE PLAN SCALE: 1”-30’ S W I T C H G E A R LIFT 1 LODGE *2019 PROPOSED FOOTPRINT 1.2 KEY PLAN NOT TO SCALE C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: REVISIONS 4735 GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED W W W . D E S I G N W O R K S H O P . C O M DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 P004.2 SITE KEYNOTES: 1.0 PAVEMENTS, RAMPS, CURBS 2.0 JOINTING 3.0 STEPS 4.0 SITE WALLS/ EMBANKMENTS 5.0 SITE FURNITURE 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE 9.0 PLANTING AND LANDSCAPE 10.0 MISCELLANEOUS ELEMENTS 5.1 Planter Type 1 1.2 1.3a Concrete Paving Type 1A 1.4a Stone Paving Type 1B - Over Structure Stone Paving Type 1A 1.3b 3.1a Stair Type 1a - Concrete 3.1b Stair Type 1b - Concrete Over Structure 4.1a Wall Type 1a - Stone Veneer 4.1b 5.2 Planter Type 2 - Window Box 5.3 Benches 5.4 Trash Receptacles 5.5 Bike Racks 6.1 Handrail Type 1 6.2 Handrail Type 2 6.4 10.1 6.3 4.2 Wall Type 1b - Stone Veneer Over Structure 5.6 Ski Racks 8.1 Hardscape Area Drain Fire Feature Water Feature Entry Sign REFER TO PLANTING SERIES. 8.3 Trench Drain 8.4 Slot Drain 10.2 Utility Area Overhead Screening Grate 2.1 Control Joint 2.2 Expansion Joint - Doweled 2.3 Expansion Joint - Non-Doweled Stone Paving Type 2A - 4x4 Cobble 1.4b Gravel Paving - Decomposed Granite 1.5a Concrete Paving Type 1B - Over Structure Stone Paving Type 2B - Over Structure1.5b Silva Cells 1.7 2.4 Stone Paving Mortar Joint - Type 1 3.2a Stair Type 2a - Stone Veneer 3.2b Stair Type 2b - Stone Veneer Over Structure 3.3 Stair Type 3 - Stone Veneer - Roof Wall Type 2 Rusticated Ribbed Concrete Wall 10.3 Utility Area Gates 10.4 Art Installation10.5 Mountain Access Road Ramp 1.1 Gravel Mulch Flagpoles 10.6 Stone Paving Type 3 - Stone Band Over Structure1.6 Stone Paving Type 4 - Roof 10.7 4.3 Crafted Boulder Wall 8.2 Softscape Area Drain 2.5 Stone Paving Mortar Joint - Type 2 REFER TO LIGHTING DESIGNER DRAWINGS. Pylon Light10.8 WALL MATERIAL LEGEND: A STONE VENEER WALL - SEE ARCHITECTURE MATERIALS LEGEND B CONCRETE WALL - SEE ARCHITECTURE MATERIALS LEGEND *NOTE: DEPENDING ON WEST STAIR, IT MAY ONLY BE STONE. PROPOSED DEVELOPMENT ENLARGEMENTS WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL GAS GAS GAS GAS GAS GAS GAS GAS GAS UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UE L UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GA S GAS GAS GAS GAS GA S GAS GAS GAS GAS GAS GA S GAS GAS GAS GAS GAS GA S GAS GA S GAS GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS S W I T C H G E A R GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS sa svc sasvc sasvc sa svc sa svc sasvc 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA GAS 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA DS DS DS DS DS DS 8'' SA 8'' SA 8''SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8''SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8''SA 8''SA 8'' SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL WL SVC WL SVC WL SVC TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL TEL UELUELUELUELUEL UEL UEL UEL UEL UEL UELUELUELUEL XUT XUT XUT XUT XU T XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUTXUT LE V E L 2 A B O V E LE V E L 3 A B O V E BUILDING SUBGRADE LIFT CENTER LINE LIFT CABLE GAUGE EDGE OF CARRIER LI M I T O F P R O J E C T S C O P E O F W O R K LIFT ONE PARK RO O F A B O V E TOWER 4 0 ORIGINAL SCALE: 5 10 20 1"= 10' KEY PLAN NOT TO SCALE TYP. 1.4a 1.4b 1.5a 1.5b TYP. 1.6TYP. TYP. TYP. TYP. 3.1a 4.1b 4.1a 3.2b 4.1a 10.8 10.8 10.16.1 10.2 10.3 10.4 8.2 TYP. 10.8 10.7TYP. 6.1 6.1 1.2 5.3 5.1 TYP. NORTH 8.4 5.5 TYP. LEVEL 1 SITE PLAN C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 4735 2 3 4 5 6 7 A B C D E GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED F 8 9 1 2 3 4 5 6 7 8 9 W W W . D E S I G N W O R K S H O P . C O M S e p 1 8 , 2 0 2 0 - 8 : 5 6 a m F: \ P R O J E C T S _ A - L \ 4 7 3 5 - L i f t 1 a \ D - C A D \ 0 2 . S h e e t s \ D W - 4 7 3 5 - E X . C - D e t a i l e d S i t e P l a n . d w g DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 4.2 TYP. 1.5b TYP. SITE KEYNOTES: 1.0 PAVEMENTS, RAMPS, CURBS 2.0 JOINTING 3.0 STEPS 4.0 SITE WALLS/ EMBANKMENTS 5.0 SITE FURNITURE 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE 9.0 PLANTING AND LANDSCAPE 10.0 MISCELLANEOUS ELEMENTS 5.1 Planter Type 1 1.2 1.3a Concrete Paving Type 1A 1.4a Stone Paving Type 1B - Over Structure Stone Paving Type 1A 1.3b 3.1a Stair Type 1a - Concrete 3.1b Stair Type 1b - Concrete Over Structure 4.1a Wall Type 1a - Stone Veneer 4.1b 5.2 Planter Type 2 - Window Box 5.3 Benches 5.4 Trash Receptacles 5.5 Bike Racks 6.1 Handrail Type 1 6.2 Handrail Type 2 6.4 10.1 6.3 4.2 Wall Type 1b - Stone Veneer Over Structure 5.6 Ski Racks 8.1 Hardscape Area Drain Fire Feature Water Feature Entry Sign REFER TO PLANTING SERIES. 8.3 Trench Drain 8.4 Slot Drain 10.2 Utility Area Overhead Screening Grate 2.1 Control Joint 2.2 Expansion Joint - Doweled 2.3 Expansion Joint - Non-Doweled Stone Paving Type 2A - 4x4 Cobble 1.4b Gravel Paving - Decomposed Granite 1.5a Concrete Paving Type 1B - Over Structure Stone Paving Type 2B - Over Structure1.5b Silva Cells 1.7 2.4 Stone Paving Mortar Joint - Type 1 3.2a Stair Type 2a - Stone Veneer 3.2b Stair Type 2b - Stone Veneer Over Structure 3.3 Stair Type 3 - Stone Veneer - Roof Wall Type 2 Rusticated Ribbed Concrete Wall 10.3 Utility Area Gates 10.4 Art Installation10.5 Mountain Access Road Ramp 1.1 Gravel Mulch Flagpoles 10.6 Stone Paving Type 3 - Stone Band Over Structure1.6 Stone Paving Type 4 - Roof 10.7 4.3 Crafted Boulder Wall 8.2 Softscape Area Drain 2.5 Stone Paving Mortar Joint - Type 2 REFER TO LIGHTING DESIGNER DRAWINGS. Pylon Light10.8 A B A A 1.3a WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL GAS GAS GAS GAS GAS GAS GAS GAS GAS UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UE L UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UE L UEL UEL ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS S W I T C H G E A R GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS sa svc sasvc sasvc sa svc sa svc sasvc 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA GAS 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8'' SA 8''SA 8''SA 8''SA 8''SA UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UE L UEL UEL UEL UEL UEL UEL UELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UELUELUELUELUEL UEL UEL UEL UEL UEL UEL UELUELUEL XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUTXUT PROPERTY BOUNDARY SETBACK LEVEL 2 LIMIT OF PROJECT SCOPE OF WORK LE V E L 2 B A L C O N Y LE V E L 3 A B O V E LIFT CENTER LINE LIFT CABLE GAUGE EDGE OF CARRIER LIMIT OF WORK HILL STREET ROW TOWER 4 LEVEL 2 LIMIT OF PROJECT SCOPE OF WORK LE V E L 2 B A L C O N Y 1.1 4.1a 1.3a 1.3a 1.4b TYP.TYP. 5.2TYP. TYP. 6.3 6.3 6.4 TYP.4.1b 5.1 6.4 3.2b 6.1 1.3a TYP. 0 ORIGINAL SCALE: 5 10 20 1"= 10' KEY PLAN NOT TO SCALE TYP. NORTH LEVEL 2 SITE PLAN C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 4735 2 3 4 5 6 7 A B C D E GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED F 8 9 1 2 3 4 5 6 7 8 9 W W W . D E S I G N W O R K S H O P . C O M S e p 1 8 , 2 0 2 0 - 8 : 5 7 a m F: \ P R O J E C T S _ A - L \ 4 7 3 5 - L i f t 1 a \ D - C A D \ 0 2 . S h e e t s \ D W - 4 7 3 5 - E X . C - D e t a i l e d S i t e P l a n . d w g DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 6.1 6.1 3.1a 1.3a 4.2 TYP. TYP. SITE KEYNOTES: 1.0 PAVEMENTS, RAMPS, CURBS 2.0 JOINTING 3.0 STEPS 4.0 SITE WALLS/ EMBANKMENTS 5.0 SITE FURNITURE 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE 9.0 PLANTING AND LANDSCAPE 10.0 MISCELLANEOUS ELEMENTS 5.1 Planter Type 1 1.2 1.3a Concrete Paving Type 1A 1.4a Stone Paving Type 1B - Over Structure Stone Paving Type 1A 1.3b 3.1a Stair Type 1a - Concrete 3.1b Stair Type 1b - Concrete Over Structure 4.1a Wall Type 1a - Stone Veneer 4.1b 5.2 Planter Type 2 - Window Box 5.3 Benches 5.4 Trash Receptacles 5.5 Bike Racks 6.1 Handrail Type 1 6.2 Handrail Type 2 6.4 10.1 6.3 4.2 Wall Type 1b - Stone Veneer Over Structure 5.6 Ski Racks 8.1 Hardscape Area Drain Fire Feature Water Feature Entry Sign REFER TO PLANTING SERIES. 8.3 Trench Drain 8.4 Slot Drain 10.2 Utility Area Overhead Screening Grate 2.1 Control Joint 2.2 Expansion Joint - Doweled 2.3 Expansion Joint - Non-Doweled Stone Paving Type 2A - 4x4 Cobble 1.4b Gravel Paving - Decomposed Granite 1.5a Concrete Paving Type 1B - Over Structure Stone Paving Type 2B - Over Structure1.5b Silva Cells 1.7 2.4 Stone Paving Mortar Joint - Type 1 3.2a Stair Type 2a - Stone Veneer 3.2b Stair Type 2b - Stone Veneer Over Structure 3.3 Stair Type 3 - Stone Veneer - Roof Wall Type 2 Rusticated Ribbed Concrete Wall 10.3 Utility Area Gates 10.4 Art Installation10.5 Mountain Access Road Ramp 1.1 Gravel Mulch Flagpoles 10.6 Stone Paving Type 3 - Stone Band Over Structure1.6 Stone Paving Type 4 - Roof 10.7 4.3 Crafted Boulder Wall 8.2 Softscape Area Drain 2.5 Stone Paving Mortar Joint - Type 2 REFER TO LIGHTING DESIGNER DRAWINGS. Pylon Light10.8 TYP. B A A SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC WL SVC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC TC WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' WL 16'' GAS GAS GAS GAS GAS GAS GAS GAS GAS ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET ET GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GA S GAS GA S GAS GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS S W I T C H G E A R GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS sasvc sasvc sa svc sa svc sa svc sasvc 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA GAS 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8''SA 8''SA 8''SA 8''SA 8'' SA 8''SA 8''SA 8''SA 8''SA 8'' SA 8'' SA 8''SA 8''SA 8'' SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8''SA 8'' SA 8'' SA 8''SA 8''SA 8'' SA 8'' SA 8''SA 8''SA 8''SA 8''SA UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUELUEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UEL UELUELUELUELUEL UEL UEL UEL UEL UEL UEL UELUELUEL XUT XUT XUT XUT XU T XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUT XUTXUT RO O F A B O V E TYP. 3.2b 6.1 6.1 TYP. 1.4b 10.6 5.1 TYP. 0 ORIGINAL SCALE: 5 10 20 1"= 10' KEY PLAN NOT TO SCALE NORTH LEVEL 3 SITE PLAN C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 4735 2 3 4 5 6 7 A B C D E GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED F 8 9 1 2 3 4 5 6 7 8 9 W W W . D E S I G N W O R K S H O P . C O M S e p 1 8 , 2 0 2 0 - 8 : 5 8 a m F: \ P R O J E C T S _ A - L \ 4 7 3 5 - L i f t 1 a \ D - C A D \ 0 2 . S h e e t s \ D W - 4 7 3 5 - E X . C - D e t a i l e d S i t e P l a n . d w g DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 LEVEL 3 BALCONY 6.1 1.3a 6.1 3.1aTYP. 1.3b 4.2 SITE KEYNOTES: 1.0 PAVEMENTS, RAMPS, CURBS 2.0 JOINTING 3.0 STEPS 4.0 SITE WALLS/ EMBANKMENTS 5.0 SITE FURNITURE 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE 9.0 PLANTING AND LANDSCAPE 10.0 MISCELLANEOUS ELEMENTS 5.1 Planter Type 1 1.2 1.3a Concrete Paving Type 1A 1.4a Stone Paving Type 1B - Over Structure Stone Paving Type 1A 1.3b 3.1a Stair Type 1a - Concrete 3.1b Stair Type 1b - Concrete Over Structure 4.1a Wall Type 1a - Stone Veneer 4.1b 5.2 Planter Type 2 - Window Box 5.3 Benches 5.4 Trash Receptacles 5.5 Bike Racks 6.1 Handrail Type 1 6.2 Handrail Type 2 6.4 10.1 6.3 4.2 Wall Type 1b - Stone Veneer Over Structure 5.6 Ski Racks 8.1 Hardscape Area Drain Fire Feature Water Feature Entry Sign REFER TO PLANTING SERIES. 8.3 Trench Drain 8.4 Slot Drain 10.2 Utility Area Overhead Screening Grate 2.1 Control Joint 2.2 Expansion Joint - Doweled 2.3 Expansion Joint - Non-Doweled Stone Paving Type 2A - 4x4 Cobble 1.4b Gravel Paving - Decomposed Granite 1.5a Concrete Paving Type 1B - Over Structure Stone Paving Type 2B - Over Structure1.5b Silva Cells 1.7 2.4 Stone Paving Mortar Joint - Type 1 3.2a Stair Type 2a - Stone Veneer 3.2b Stair Type 2b - Stone Veneer Over Structure 3.3 Stair Type 3 - Stone Veneer - Roof Wall Type 2 Rusticated Ribbed Concrete Wall 10.3 Utility Area Gates 10.4 Art Installation10.5 Mountain Access Road Ramp 1.1 Gravel Mulch Flagpoles 10.6 Stone Paving Type 3 - Stone Band Over Structure1.6 Stone Paving Type 4 - Roof 10.7 4.3 Crafted Boulder Wall 8.2 Softscape Area Drain 2.5 Stone Paving Mortar Joint - Type 2 REFER TO LIGHTING DESIGNER DRAWINGS. Pylon Light10.8 4.1b A B B SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA 8'' GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS DS DS DS DS DS DSDS DS DS DS SETBACK PR O P E R T Y B O U N D A R Y SE T B A C K PROPERTY BOUNDARY SETBACK LE V E L 5 F L O O R P L A T E LIFT CENTER LINE LIFT CABLE GAUGE EDGE OF CARRIER LIMIT OF WORK TOWER 5 LEVEL 4 LIMIT OF PROJECT SCOPE OF WORK 4.1b 10.6 1.4b TYP. TYP. 4.1a 1.4a TYP. TYP. 3.2b 6.1 0 ORIGINAL SCALE: 5 10 20 1"= 10' KEY PLAN NOT TO SCALE NORTH LEVEL 4-6 SITE PLAN C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 4735 2 3 4 5 6 7 A B C D E GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED F 8 9 1 2 3 4 5 6 7 8 9 W W W . D E S I G N W O R K S H O P . C O M S e p 2 1 , 2 0 2 0 - 2 : 3 2 p m F: \ P R O J E C T S _ A - L \ 4 7 3 5 - L i f t 1 a \ D - C A D \ 0 2 . S h e e t s \ D W - 4 7 3 5 - E X . C - D e t a i l e d S i t e P l a n . d w g DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 BUILDING OVERHEAD 1.3a 3.1a 6.1 3.1a 4.1a TYP. TYP. TYP. TYP. 4.2 TYP. TYP. SITE KEYNOTES: 1.0 PAVEMENTS, RAMPS, CURBS 2.0 JOINTING 3.0 STEPS 4.0 SITE WALLS/ EMBANKMENTS 5.0 SITE FURNITURE 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE 9.0 PLANTING AND LANDSCAPE 10.0 MISCELLANEOUS ELEMENTS 5.1 Planter Type 1 1.2 1.3a Concrete Paving Type 1A 1.4a Stone Paving Type 1B - Over Structure Stone Paving Type 1A 1.3b 3.1a Stair Type 1a - Concrete 3.1b Stair Type 1b - Concrete Over Structure 4.1a Wall Type 1a - Stone Veneer 4.1b 5.2 Planter Type 2 - Window Box 5.3 Benches 5.4 Trash Receptacles 5.5 Bike Racks 6.1 Handrail Type 1 6.2 Handrail Type 2 6.4 10.1 6.3 4.2 Wall Type 1b - Stone Veneer Over Structure 5.6 Ski Racks 8.1 Hardscape Area Drain Fire Feature Water Feature Entry Sign REFER TO PLANTING SERIES. 8.3 Trench Drain 8.4 Slot Drain 10.2 Utility Area Overhead Screening Grate 2.1 Control Joint 2.2 Expansion Joint - Doweled 2.3 Expansion Joint - Non-Doweled Stone Paving Type 2A - 4x4 Cobble 1.4b Gravel Paving - Decomposed Granite 1.5a Concrete Paving Type 1B - Over Structure Stone Paving Type 2B - Over Structure1.5b Silva Cells 1.7 2.4 Stone Paving Mortar Joint - Type 1 3.2a Stair Type 2a - Stone Veneer 3.2b Stair Type 2b - Stone Veneer Over Structure 3.3 Stair Type 3 - Stone Veneer - Roof Wall Type 2 Rusticated Ribbed Concrete Wall 10.3 Utility Area Gates 10.4 Art Installation10.5 Mountain Access Road Ramp 1.1 Gravel Mulch Flagpoles 10.6 Stone Paving Type 3 - Stone Band Over Structure1.6 Stone Paving Type 4 - Roof 10.7 4.3 Crafted Boulder Wall 8.2 Softscape Area Drain 2.5 Stone Paving Mortar Joint - Type 2 REFER TO LIGHTING DESIGNER DRAWINGS. Pylon Light10.8 B A A B A A LEVEL 1 ENLARGEMENT SCALE: 1”-20’ LEVEL 3 ENLARGEMENT SCALE: 1”-20’ LEVEL 2 ENLARGEMENT SCALE: 1”-20’ LEVEL 4-6 ENLARGEMENT SCALE: 1”-20’ S W I T C H G E A R LIFT 1 LODGE *2019 PROPOSED FOOTPRINT PROPOSED DEVELOPMENT ENLARGEMENTS KEY PLAN NOT TO SCALE C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: REVISIONS 4735 GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED W W W . D E S I G N W O R K S H O P . C O M DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 P004.3 SITE KEYNOTES: 1.0 PAVEMENTS, RAMPS, CURBS 2.0 JOINTING 3.0 STEPS 4.0 SITE WALLS/ EMBANKMENTS 5.0 SITE FURNITURE 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE 9.0 PLANTING AND LANDSCAPE 10.0 MISCELLANEOUS ELEMENTS 5.1 Planter Type 1 1.2 1.3a Concrete Paving Type 1A 1.4a Stone Paving Type 1B - Over Structure Stone Paving Type 1A 1.3b 3.1a Stair Type 1a - Concrete 3.1b Stair Type 1b - Concrete Over Structure 4.1a Wall Type 1a - Stone Veneer 4.1b 5.2 Planter Type 2 - Window Box 5.3 Benches 5.4 Trash Receptacles 5.5 Bike Racks 6.1 Handrail Type 1 6.2 Handrail Type 2 6.4 10.1 6.3 4.2 Wall Type 1b - Stone Veneer Over Structure 5.6 Ski Racks 8.1 Hardscape Area Drain Fire Feature Water Feature Entry Sign REFER TO PLANTING SERIES. 8.3 Trench Drain 8.4 Slot Drain 10.2 Utility Area Overhead Screening Grate 2.1 Control Joint 2.2 Expansion Joint - Doweled 2.3 Expansion Joint - Non-Doweled Stone Paving Type 2A - 4x4 Cobble 1.4b Gravel Paving - Decomposed Granite 1.5a Concrete Paving Type 1B - Over Structure Stone Paving Type 2B - Over Structure1.5b Silva Cells 1.7 2.4 Stone Paving Mortar Joint - Type 1 3.2a Stair Type 2a - Stone Veneer 3.2b Stair Type 2b - Stone Veneer Over Structure 3.3 Stair Type 3 - Stone Veneer - Roof Wall Type 2 Rusticated Ribbed Concrete Wall 10.3 Utility Area Gates 10.4 Art Installation10.5 Mountain Access Road Ramp 1.1 Gravel Mulch Flagpoles 10.6 Stone Paving Type 3 - Stone Band Over Structure1.6 Stone Paving Type 4 - Roof 10.7 4.3 Crafted Boulder Wall 8.2 Softscape Area Drain 2.5 Stone Paving Mortar Joint - Type 2 REFER TO LIGHTING DESIGNER DRAWINGS. Pylon Light10.8 WALL MATERIAL LEGEND: A STONE VENEER WALL - SEE ARCHITECTURE MATERIALS LEGEND B CONCRETE WALL - SEE ARCHITECTURE MATERIALS LEGEND *NOTE: DEPENDING ON WEST STAIR, IT MAY ONLY BE STONE. SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA 8'' GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GA S GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS DS DS DS DS DS DSDS DS DS DS SETBACK PR O P E R T Y B O U N D A R Y SE T B A C K PROPERTY BOUNDARY SETBACK LIMIT OF WORK LEVEL 7 LIMIT OF PROJECT SCOPE OF WORK LEVEL 7 LIMIT OF PROJECT SCOPE OF WORK TOWER 5 1.4a TYP. 4.1a TYP. 0 ORIGINAL SCALE: 5 10 20 1"= 10' KEY PLAN NOT TO SCALE NORTH LEVEL 7 SITE PLAN C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 4735 2 3 4 5 6 7 A B C D E GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED F 8 9 1 2 3 4 5 6 7 8 9 W W W . D E S I G N W O R K S H O P . C O M S e p 1 8 , 2 0 2 0 - 9 : 0 1 a m F: \ P R O J E C T S _ A - L \ 4 7 3 5 - L i f t 1 a \ D - C A D \ 0 2 . S h e e t s \ D W - 4 7 3 5 - E X . C - D e t a i l e d S i t e P l a n . d w g DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 SITE KEYNOTES: 1.0 PAVEMENTS, RAMPS, CURBS 2.0 JOINTING 3.0 STEPS 4.0 SITE WALLS/ EMBANKMENTS 5.0 SITE FURNITURE 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE 9.0 PLANTING AND LANDSCAPE 10.0 MISCELLANEOUS ELEMENTS 5.1 Planter Type 1 1.2 1.3a Concrete Paving Type 1A 1.4a Stone Paving Type 1B - Over Structure Stone Paving Type 1A 1.3b 3.1a Stair Type 1a - Concrete 3.1b Stair Type 1b - Concrete Over Structure 4.1a Wall Type 1a - Stone Veneer 4.1b 5.2 Planter Type 2 - Window Box 5.3 Benches 5.4 Trash Receptacles 5.5 Bike Racks 6.1 Handrail Type 1 6.2 Handrail Type 2 6.4 10.1 6.3 4.2 Wall Type 1b - Stone Veneer Over Structure 5.6 Ski Racks 8.1 Hardscape Area Drain Fire Feature Water Feature Entry Sign REFER TO PLANTING SERIES. 8.3 Trench Drain 8.4 Slot Drain 10.2 Utility Area Overhead Screening Grate 2.1 Control Joint 2.2 Expansion Joint - Doweled 2.3 Expansion Joint - Non-Doweled Stone Paving Type 2A - 4x4 Cobble 1.4b Gravel Paving - Decomposed Granite 1.5a Concrete Paving Type 1B - Over Structure Stone Paving Type 2B - Over Structure1.5b Silva Cells 1.7 2.4 Stone Paving Mortar Joint - Type 1 3.2a Stair Type 2a - Stone Veneer 3.2b Stair Type 2b - Stone Veneer Over Structure 3.3 Stair Type 3 - Stone Veneer - Roof Wall Type 2 Rusticated Ribbed Concrete Wall 10.3 Utility Area Gates 10.4 Art Installation10.5 Mountain Access Road Ramp 1.1 Gravel Mulch Flagpoles 10.6 Stone Paving Type 3 - Stone Band Over Structure1.6 Stone Paving Type 4 - Roof 10.7 4.3 Crafted Boulder Wall 8.2 Softscape Area Drain 2.5 Stone Paving Mortar Joint - Type 2 REFER TO LIGHTING DESIGNER DRAWINGS. Pylon Light10.8 A A 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA 8'' SA 8'' SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA 8''SA 8'' SA GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GA S GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS SETBACK PR O P E R T Y B O U N D A R Y SE T B A C K PROPERTY BOUNDARY SETBACK LIFT CENTER LINE LIFT CABLE GAUGE EDGE OF CARRIER LIMIT OF WORK LE V E L 8 L I M I T O F P R O J E C T S C O P E O F W O R K TOWER 5 LEVEL 8 SITE PLAN 1.7 10.6 3.3 4.1a TYP. TYP. 0 ORIGINAL SCALE: 5 10 20 1"= 10' KEY PLAN NOT TO SCALE NORTH C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 4735 2 3 4 5 6 7 A B C D E GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED F 8 9 1 2 3 4 5 6 7 8 9 W W W . D E S I G N W O R K S H O P . C O M S e p 1 8 , 2 0 2 0 - 9 : 0 2 a m F: \ P R O J E C T S _ A - L \ 4 7 3 5 - L i f t 1 a \ D - C A D \ 0 2 . S h e e t s \ D W - 4 7 3 5 - E X . C - D e t a i l e d S i t e P l a n . d w g DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 1.4b TYP. SITE KEYNOTES: 1.0 PAVEMENTS, RAMPS, CURBS 2.0 JOINTING 3.0 STEPS 4.0 SITE WALLS/ EMBANKMENTS 5.0 SITE FURNITURE 6.0 RAILINGS, BARRIERS, FENCING 7.0 SITE LIGHTING 8.0 DRAINAGE 9.0 PLANTING AND LANDSCAPE 10.0 MISCELLANEOUS ELEMENTS 5.1 Planter Type 1 1.2 1.3a Concrete Paving Type 1A 1.4a Stone Paving Type 1B - Over Structure Stone Paving Type 1A 1.3b 3.1a Stair Type 1a - Concrete 3.1b Stair Type 1b - Concrete Over Structure 4.1a Wall Type 1a - Stone Veneer 4.1b 5.2 Planter Type 2 - Window Box 5.3 Benches 5.4 Trash Receptacles 5.5 Bike Racks 6.1 Handrail Type 1 6.2 Handrail Type 2 6.4 10.1 6.3 4.2 Wall Type 1b - Stone Veneer Over Structure 5.6 Ski Racks 8.1 Hardscape Area Drain Fire Feature Water Feature Entry Sign REFER TO PLANTING SERIES. 8.3 Trench Drain 8.4 Slot Drain 10.2 Utility Area Overhead Screening Grate 2.1 Control Joint 2.2 Expansion Joint - Doweled 2.3 Expansion Joint - Non-Doweled Stone Paving Type 2A - 4x4 Cobble 1.4b Gravel Paving - Decomposed Granite 1.5a Concrete Paving Type 1B - Over Structure Stone Paving Type 2B - Over Structure1.5b Silva Cells 1.7 2.4 Stone Paving Mortar Joint - Type 1 3.2a Stair Type 2a - Stone Veneer 3.2b Stair Type 2b - Stone Veneer Over Structure 3.3 Stair Type 3 - Stone Veneer - Roof Wall Type 2 Rusticated Ribbed Concrete Wall 10.3 Utility Area Gates 10.4 Art Installation10.5 Mountain Access Road Ramp 1.1 Gravel Mulch Flagpoles 10.6 Stone Paving Type 3 - Stone Band Over Structure1.6 Stone Paving Type 4 - Roof 10.7 4.3 Crafted Boulder Wall 8.2 Softscape Area Drain 2.5 Stone Paving Mortar Joint - Type 2 REFER TO LIGHTING DESIGNER DRAWINGS. Pylon Light10.8A A 3.2a 6.1 1.4a LEVEL 7 ENLARGEMENT SCALE: 1”-20’ LEVEL 8 ENLARGEMENT SCALE: 1”-20’ 3 0 2 8 2 6 2 7 2 9 1 2 1 1 8 1 0 3 6 3 7 9 3 2 3 1 1 4 1 3 1 8 1 6 1 5 1 7 3 5 3 4 3 3 3 2 4 5 7 2 0 2 5 1 9 2 4 2 1 2 2 2 3 8095 812 0 808 0 80 3 5 803 0 PROPERTY BOUNDARY SETBACK LIMIT OF WORK LIMIT OF WORK 0 ORIGINAL SCALE: 15 30 60 1"= 30' EXISTING LANDSCAPE PLAN SITE KEYNOTES: 11.0 PLANT PROTECTION DETAI SHEE 2 TYP TYP. NORTH 1 TYP 2 TYP. 11.0 3 C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: 1 REVISIONS 4735 2 3 4 5 6 7 A B C D E GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED F 8 9 1 2 3 4 5 6 7 8 9 W W W . D E S I G N W O R K S H O P . C O M S e p 1 8 , 2 0 2 0 - 5 : 4 9 p m F: \ P R O J E C T S _ A - L \ 4 7 3 5 - L i f t 1 a \ D - C A D \ 0 2 . S h e e t s \ D W - 4 7 3 5 - E X . D - E x i s t i n g L a n d s c a p e P l a n . d w g DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 SIZE NOTESTREE TYPETREE # TREE REMOVAL LIST 15 16 19 3.1" cal. 3" cal. 3.2" cal. 3" cal. 3" cal. 4.3" cal. 5.3" cal. 4.7" cal. 3.4" cal. 3.1" cal. 3.1" cal. 3.1" cal. 7.3" cal. 14.6" cal. 12" cal. 17" cal. 13" cal. 37" cal. 9.2" cal. 10.8" cal. 13.5" cal. 30.1" cal. 40.2" cal. 12.4" cal. 19.8" cal. 10.7" cal. 14.3" cal. NOTES: 1.Only Deciduous trees larger than 6" caliper in size, Conifer trees larger than 4" caliper in size, and Gamble Oak/Choke Cherry trees larger than 3" caliper in size, are provided on this chart. Additional vegetation (i.e, understory shrubs, groundcover, etc.) may also need to be removed and is indicated as approximately as possible. Final limits of vegetation removal shall be determined in field. 2.Refer to P006 Plant List for proposed trees and caliper inches for mitigation 3.Final value to be removed to be determined by City Forester Choke Cherry Choke Cherry Choke Cherry Choke Cherry Choke Cherry Choke Cherry Choke Cherry Choke Cherry Choke Cherry Choke Cherry Choke Cherry Choke Cherry Pine Tree Pine Tree Pine Tree Pine Tree Pine Tree Deciduous Tree Pine Tree Pine Tree Deciduous Tree Deciduous Tree Deciduous Tree Pine Tree Pine Tree Pine Tree Pine Tree 20 21 22 23 25 31 33 34 35 39 40 41 42 43 44 45 46 47 48 49 52 53 54 55 NOTE: Only trees planned to be removed are labeled in this list. Find corresponding trees labeled below on drawing. VALUE $339.47 $317.93 $361.73 $317.93 $317.93 $653.16 $992.28 $780.33 $408.36$339.47 $339.47 $339.47$1,882.47 $7,529.88 $5,086.80$10,208.93 $5,969.93 $12,089.98$2,989.91 $4,120.31 $6,437.98$8,001.20 $14,271.65 $5,431.57 Value less 75% due to poor tree condition Value less 75% due to poor tree condition Value less 75% due to poor tree condition Value less 75% due to poor tree condition Value less 25% due to poor tree condition Value less 25% due to poor tree condition $13,848.81 $4,044.36 $7,223.61 $109,879.91 29 27 31 32 33-3515-17 19-25 30 39-41 42 44 4849 43 47 46 45 1 Existing tree to be preserved. Do not disturb. Protect in place. PLANT PROTECTION & DEMO REFERENCE NOTES: 2 Existing tree to be removed. 3 Existing stand of shrubs to be removed. 1TYP P005 52-55 OVERALL PROPOSED LANDSCAPE PLAN SCALE: 1”-30’ S W I T C H G E A R DS DS DS DS DS DS DS DS DS DS DS DSDS DS DS DS 80 4 5 80 5 5 80 7 0 80 7 5 80 8 0 TOWER 6 TOWER 4 3 0 2 8 2 6 2 7 2 9 1 2 1 1 8 1 0 3 6 3 7 9 3 2 3 1 1 4 1 3 1 8 1 6 1 5 1 7 35 3 4 3 3 3 2 4 5 7 2 0 2 5 1 9 2 4 2 1 2 2 2 3 8095 812 0 808 0 80 3 5 803 0 SETBACK PROPERTY BOUNDARY SETBACK LIFT 1 LODGE *2019 PROPOSED FOOTPRINT 0 ORIGINAL SCALE: 10 20 40 1"= 20' PROPOSED LANDSCAPE PLAN KEY PLAN NOT TO SCALE NATIVE G R A S S NATIVE GRASS NATIVE G R A S S WILD FLOWER MIX SOD NORTH PITCO Native Grass Mix Effusa JuniperJuniperus communis 'Effusa' Colorado Blue SprucePicea pungens NATIVE GRASSES/ WILDFLOWERS GROUNDCOVERS/ PERENNIALS/ ORNAMENTAL GRASSES DECIDUOUS & EVERGREEN SHRUBS CONIFEROUS TREES DECIDUOUS TREES Red MapleAcer rubrum COMMON NAMEBOTANICAL NAME PLANT LIST Woods' RoseRosa Woodsii Japanese SpireaSpiraea japonica 'Froebelii' McKay's White PotentillaPotentilla fruticosa 'McKay's White' Meadow Sage SalviaSalvia nemorosa 'Caradonna' Peking CotoneasterCotoneaster acutifolius var. lucidus Grow Low SumacRhus aromatica 'Gro-Low' Virginia CreeperParthenocissus quinquefolia VINE Purple ConeflowerEchinacea purpurea Purple ConeflowerEchinacea purpurea 'White Swan' Johnson's Blue GeraniumGeranium 'Johnson's Blue' Alaska Shasta DaisyLeucanthemum x superbum Autumn Joy StonecropSedum spectabile 'Autumn Joy' Faassen's CatmintNepeta x faassenii 'Little Trudy' Rocky Mountain ColumbinAquilegia caerulea Massachusetts KinnikinnicArctostaphylos uva-ursi 'Massachusetts' Mother of ThymeThymus serpylum PITCO Wildflower Mix Kentucky Blue GrassPoa pratensis SOD Colorado Blue SprucePicea pungens Colorado Blue SprucePicea pungens Colorado Blue SprucePicea pungens Cranberry CotoneasterCotoneaster apiculatus False Forget-Me-NotBrunnera macrophylla Ragwort 'The Rocket'Ligularia stenocephala Sweet WoodruffGalium odoratum Red Twig DogwoodCornus sericea Peking CotoneasterCotoneaster acutifolius 2PP-18 5AR-3 3PP-20 1PP-22 4PP-16 QTY.ABBR. PLANTING PLAN REFERENCE NOTES 1 All Areas distributed due to construction activity, shall be re-vegetated with approved native seed mix. 2 Existing Aspen to remain 3 Existing Spruce to remain C DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED: PROJECT NUMBER: DRAWN: REVISIONS 4735 GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O C O P Y R I G H T D E S I G N W O R K S H O P, I N C. DETAILED W W W . D E S I G N W O R K S H O P . C O M DESIGN WORKSHOP Landscape Architecture · Land Planning Urban Design · Tourism Planning Asheville · Aspen · Austin · Chicago · Denver · Dubai Houston · Lake Tahoe · Los Angeles · Shanghai 120 East Main Street (970) 925-8354 (970) 920-1387 Aspen, Colorado 81611 APPLICATION MM, CK RWS January 15, 2020 P006 WILDFLOWER MIX NATIVE GRASS MIX OVERALL PROPOSED LANDSCAPE PLAN SCALE: 1”-30’ DESIGN WORKSHOP Landscape Architecture · Land Planning · Urban Design · Tourism Planning 120 East Main Street · Aspen, Colorado 81611 · 970-925-8354 Facsimile 970-920-1387 G o r s u c h H a u s A s p e n , C o l o r a d o JANUARY 15, 2020 ILLUSTRATIVE PERSPECTIVE P008 ILLUSTRATIVE PERSPECTIVE ARRIVAL AT SOUTH ASPEN STREEET P010 DESIGN WORKSHOP Landscape Architecture · Land Planning · Urban Design · Tourism Planning 120 East Main Street · Aspen, Colorado 81611 · 970-925-8354 Facsimile 970-920-1387 G o r s u c h H a u s A s p e n , C o l o r a d o JANUARY 15, 2020 DESIGN WORKSHOP Landscape Architecture · Land Planning · Urban Design · Tourism Planning 120 East Main Street · Aspen, Colorado 81611 · 970-925-8354 Facsimile 970-920-1387 G o r s u c h H a u s A s p e n , C o l o r a d o JANUARY 15, 2020 ILLUSTRATIVE PERSPECTIVE FROM THE SOUTH ASPEN STREET APPROACH P011 R200 2 R201 2 LEVEL 1 WALL ABOVE BOILER ROOM 24 ' - 0 " 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 6 TOWER 4 1:20 1:12 PARKING 7,985.00' AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 7,988.00' 21 BQ 1 R250 1 R251 A100 1 7,988.00' 7,985.50' MA T C H L I N E PROPERTY LINE FAN ROOM SERVICE ELEVATOR PIT ELEVATOR 1 PIT ELEV. LOBBY ELEVATOR 2 PIT UP STAIR 2 STAIR 1 TOTAL SPACES: 56 STALLS 1 4 2 3 5 6 7 8 9 1110 42 4132 35 3736 38 12 13 14 15 16 17 18 19 20 56 55 54 53 52 51 50 49 48 47 46 45 44 43 33 34 40 39 40 39 33 ROPE ROPETOWER 5 31 232221 30292827262524 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R100 REFERENCE PLAN - LEVEL P1 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL P1 (7988') Detailed Review Application_Revised 14 SEP 2020 R200 1 ARRIVAL LOBBY R200 2 R201 2 3 5' - 0" BELL CONCIERGE PROPERTY LINE 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENTTOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A101N 1 7,998.50' 7,999.10' MA T C H L I N E GM VESTIBULE ELEVATOR 2 EMERGENCY GENERATOR MAIN ELECTRICAL FIRE CONTROL CENTER HSK SUPPORT ELEV. LOBBY SERVICE STAIR 02 RECEPTION CONTROLLER MENSWOMENS TELECOM FIRE PUMP WATER ENTRY ELEVATOR 1 VALET LUGGAGE ENGINEERING SKI STORAGE SECURITY MULTI-USE RECEIVING CUST. BREAK ROOMHR ACCT OFFICE OWNERS STORAGE SALES LOADING / RECEIVING UNIFORM ADMIN SERVICE CORRIDOR MECH DN PARKING GARAGE VENTILATION FIREPLACE TRASH AND RECYCLING approx. 12'x33' = 400sf DEDICATED TRASH/RECYCLING AREA. PERMANENT MARKINGS ON WALL AND FLOOR TO INDICATE AREA NOT TO BE USED FOR ANY OTHER PURPOSE. GREASE INTERCEPTOR ROPE ROPE CPTSB AIRSPACE REQUIREMENT TOWER 6 TOWER 5 RETAIL SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R101 REFERENCE PLAN - LEVEL 01 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 01 (7999') Detailed Review Application_Revised 14 SEP 2020 R200 1 WARMING KITCHEN R200 2 R201 2 ELECTRICAL MEETING / BANQUET 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A102N 1 MECHANICAL AFFORDABLE HOUSING UNIT 8,009.50' MA T C H L I N E PROPERTY LINE 1 D304 MEN MTG STORAGE KING KING KING KING ELEVATOR 2 SERVICE STAIR 02 KING KING ELEVATOR 1 PRE-FUNCTION SERVICE CORRIDOR STORAGE CORRIDOR WOMEN F&B OFFICE F&B SALES GREEN ROOF GREEN ROOF 1/8" / 1'-0"OPEN TO BELOWCPTSB AIRSPACE REQUIREMENT ROPE ROPE TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R102 REFERENCE PLAN - LEVEL 02 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 02 (8009.5') Detailed Review Application_Revised 14 SEP 2020 5T 72 24 5T60 24 5T60 24 5T 48 24 5T 48 24 5T48 24 5T48 245T 48 24 5T72 18 5T72 18 5T72 18 5T72 18 5T 36 24 5T48 24 5T36 24 5T 72 24 5T36 14 5T30 14 JAN. BEV/SERVER ICE COOKEXPO SERVICE ADA SERVICE HOST HOST SERV. PANTRY SH E L F S H E L F SH E L F SHELF UNIVERSAL MOP 20- 8 H FISHER2445 D C D DC DBL RACK CH E M D H H C H C 14 5T72 14 5T72 R200 1 KITCHEN R200 2 R201 2 OUTDOOR MECH. CHILLER YARD 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A103N 1 RESTAURANT MA T C H L I N E PROPERTY LINE LIBRARY 1 D304 KING KING KING KING KING 8,020.50' RESTROOM RESTROOM CPTSB AIRSPACE REQUIREMENT ROPE ROPE TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R103 REFERENCE PLAN - LEVEL 03 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 03 (8020.5') Detailed Review Application_Revised 14 SEP 2020 R200 1 BOOT ROOM R200 2 R201 2 OPEN TO COOLING TOWER BELOW FITNESS 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 WORLD CUP BAR LIFT CENTERLINE ALIGNMENT TOWER 4 OPEN TO BELOW AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A104N 1 A104S 1 MA T C H L I N E PROPERTY LINE 1 D304 Q/Q KING KING KING KING KING KING KING KING EXT.Q/Q Q/Q KING 8,031.00' 8,031.00' MECH CPTSB AIRSPACE REQUIREMENT ROPE ROPE 16 ' - 1 1 / 2 " 17 ' - 6 " TOWER 6 TOWER 5 dn STAIR 02 STAIR 03 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R104 REFERENCE PLAN - LEVEL 04 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 04 (8031') Detailed Review Application_Revised 14 SEP 2020 R200 1 R200 2 R201 2 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A105N 1 A105S 1 MA T C H L I N E PROPERTY LINE RIDGEVALLEYVALLEY1 D304 1 D305 KING KING KING Q/QQ/QKING EXT. Q/Q KING KING EXT. Q/Q STAIR 02 KING KING ADA KINGKING KING EXT. CORRIDOR Q/Q KING KING STAIR 03 SPA 8,041.50' CPTSB AIRSPACE REQUIREMENT ROPE ROPE 22 ' - 4 1 / 2 " 16 ' - 1 1 / 2 " 16 ' - 3 1 / 2 " TOWER 6 TOWER 5 ELEVATOR 4 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R105 REFERENCE PLAN - LEVEL 05 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 05 (8041.5') Detailed Review Application_Revised 14 SEP 2020 R200 1 R200 2 R201 2 R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D301 1 D302 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A106N 1 A106S 1 MA T C H L I N E PROPERTY LINE 1 D304 1 D305 ADA KING Q/QQ/QKING EXT. KINGKINGKING KING SUITE SUITE KINGKINGKINGKING KING KING KING KING KING 8,052.00' CPTSB AIRSPACE REQUIREMENT ROPE ROPE 23 ' - 5 1 / 2 " 23 ' - 4 " 16 ' - 1 1 / 2 " 16 ' - 3 1 / 2 " TOWER 6 TOWER 5 STAIR 03 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R106 REFERENCE PLAN - LEVEL 06 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 06 (8052') Detailed Review Application_Revised 14 SEP 2020 R200 1 R200 2 R201 2 SPA EQUIP R2011BOH 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD 1 D303 LIFT CENTERLINE ALIGNMENT TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A107N 1 A107S 1 8,062.50' MA T C H L I N E PROPERTY LINE 1 D304 1 D305 KINGQ/QQ/Q KING KING ADA KING KING KING KING KING KING KING KING KING KING EXT. KINGKINGKINGKING KING KING EXT. VOID VOID CPTSB AIRSPACE REQUIREMENT ROPE ROPE 23 ' - 4 " 28 ' - 2 " 23 ' - 3 1 / 2 " TOWER 6 TOWER 5 STAIR 03 STAIR 04 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R107 REFERENCE PLAN - LEVEL 07 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 07 (8062.5') Detailed Review Application_Revised 14 SEP 2020 R200 1 FREE MARKET R200 2 R201 2 FREE MARKET FREE MARKET FREE MARKET R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT AJ SPA 12' X 28'2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A108S 1 8,074.00' MA T C H L I N E PROPERTY LINE 1 D304 1 D305 8,073.00' 8,067.70' 8,067.75' 8,073.00' 2,000sf2,000sf 2,000sf 2,000sf 8,072.95' 8,072.95' STORAGE/SUPPORT UNISEX UNISEX UNISEX ELEVATOR 4 STAIR 03 ROPE ROPETOWER 4 23 ' - 4 " 23 ' - 0 1 / 2 " 23 ' - 3 " TOWER 6 TOWER 5 8,074.00' 8,070.55' 8,074.00' 8,074.00' STAIR 04 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R108 REFERENCE PLAN - LEVEL 08 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 08 (8073') Detailed Review Application_Revised 14 SEP 2020 R200 1 FREE MARKET FREE MARKET R200 2 R201 2 FREE MARKET FREE MARKET R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A109S 1 MA T C H L I N E PROPERTY LINE 1 D304 1 D305 open to below open to below 8,084.00' 8,084.00' ROPE ROPE TOWER 4 23 ' - 4 " 22 ' - 2 " 24 ' - 3 1 / 2 " TOWER 6 TOWER 5 SHEET NOTES: 1. ARCH ELEV 100'-0" = CIVIL ELEV 7999'-0" TYP ALL SHEETS 2. PLANS SHOWN ARE FOR NOTATIONAL USE ONLY. REFER TO A100 AND A200 SERIES FOR ARCHITECTURAL INFORMATION. 3. EAST & WEST ELEVATIONS SHOWN ARE FOR REFERENCE ONLY. ELEVATIONS ARE FULLY REFERENCED IN A200 SERIES. 4. BUILDING SECTIONS SHOWN ARE FOR REFERENCE ONLY. SECTIONS ARE FULLY REFERENCED IN A200 SERIES ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R109 REFERENCE PLAN - LEVEL 09 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 REFERENCE PLAN - LEVEL 09 (8082') Detailed Review Application_Revised 14 SEP 2020 R200 1 R200 2 R201 2 R2011 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD LIFT CENTERLINE ALIGNMENT CPTSB AIRSPACE REQUIREMENT TOWER 6 TOWER 4 AJ 2 R250 3 R251 2 R251 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ 1 R250 1 R251 A110N 1 A110S 1 MA T C H L I N E RIDGEVALLEYVALLEYRIDGE RI D G E RI D G E RIDGEVALLEYVALLEYRIDGEVALLEYVALLEYRI D G ERIDGEPROPERTY LINE 8,074.00'8,075.40' 3" / 1 ' - 0 " 3" / 1 ' - 0 " 1" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0"3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0"3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1'-0" 3" / 1'-0" FLAT ROOF FLAT ROOF FLAT ROOF FLAT ROOF FLAT ROOF 3" / 1'- 0" 3" / 1'- 0" OCCUPIABLE ROOF 1 D305 ROPE ROPE 19 ' - 0 1 / 2 " 22 ' - 2 " 16 ' - 2 1 / 2 " 16 ' - 1 1 / 2 " TOWER 5 FLAT ROOF W/ INTERNAL DRAINS AND VEGETATION DIAMOND PATTERN SOLAR TILES POOL DECK TERRACE - FLAT ROOF W/ INTERNAL DRAINS AND PEDESTAL PAVER SYSTEM ROOF LEGEND FLAT ROOF W/ INTERNAL DRAINS ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER R110 REFERENCE PLAN - ROOF 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 ROOF Detailed Review Application_Revised 14 SEP 2020 LEVEL 01 (7999') 78' - 6" LEVEL 02 (8009'-6") 89' - 0" LEVEL 03 (8020'-6") 100' - 0" LEVEL 04 (8031') 110' - 6" LEVEL 05 (8041'-6") 121' - 0" LEVEL 06 (8052') 131' - 6" LEVEL 07 (8062'-6") 142' - 0" LEVEL 08 (8073') 152' - 6" LEVEL 09 (8082') 162' - 6" ROOF (8098'-6") 178' - 0" AF AD ABAEAK.5 AK AI ACAGAHAJAO 1/D3122/D3121/D3132/D313 LEVEL 01 (7999') 78' - 6" LEVEL 02 (8009'-6") 89' - 0" LEVEL 03 (8020'-6") 100' - 0" LEVEL 04 (8031') 110' - 6" LEVEL 05 (8041'-6") 121' - 0" LEVEL 06 (8052') 131' - 6" LEVEL 07 (8062'-6") 142' - 0" LEVEL 08 (8073') 152' - 6" LEVEL 09 (8082') 162' - 6" ROOF (8098'-6") 178' - 0" 14 12 10 8 46161820 231917151311759 121 ALLOWABLE DORMER PER 26.575.020.F.2.g HIGHEST RIDGE POINT AT ELEVATION 8,077.4' ACCEPTABLE STAIR / ELEVATOR OVERRUN PER 26.575.020.f.4.c HIGHEST CORNER AT ELEVATION 8,082.65' ALLOWABLE DORMER PER 26.575.020.F.2.g ACCEPTABLE ELEVATOR OVERRUN PER 26.575.020.f.4.c HIGHEST CORNER AT ELEVATION 8,090.5' ALLOWABLE DORMER PER 26.575.020.F.2.g HIGHEST RIDGE POINT AT ELEVATION 8,097.00' METAL CLAD WOOD WINDOWS, TYP. HEAVY TIMBER POSTS, STAINED WOOD BALCONY RAILING STONE VENEER WOOD SIDING, TYP. ROOFTOP POOL TERRACE W/ GLASS RAILING ACCEPTABLE PERMANENT ROOFTOP AMENITY PER 26.575.020.f.4.k ROOF MID-POINT 8,039.75' T.O. SHEATHING ROOF MID-POINT 8,065.00' T.O. SHEATHING ROOF MID-POINT 8,073.35' T.O. SHEATHING 8,088.20' T.O. SHEATHING ROOF MID-POINT 8,097.15' T.O. SHEATHING ROOF MID-POINT PROPOSED GRADE 40'-0" OFFSET INTERPOLATED NATURAL GRADE 40'-0" OFFSET INTERPOLATED NATURAL GRADE 1/D3061/D307 1/D308 1/D309 1/D310 1/D311 LINE OF DECK SURFACE BEYOND ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D200 BUILDING ELEVATIONS 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 NORTH ELEVATION SCALE:1/16" = 1'-0"2 EAST ELEVATION Detailed Review Application_Revised 14 SEP 2020 LEVEL 01 (7999') 78' - 6" LEVEL 02 (8009'-6") 89' - 0" LEVEL 03 (8020'-6") 100' - 0" LEVEL 04 (8031') 110' - 6" LEVEL 05 (8041'-6") 121' - 0" LEVEL 06 (8052') 131' - 6" LEVEL 07 (8062'-6") 142' - 0" LEVEL 08 (8073') 152' - 6" LEVEL 09 (8082') 162' - 6" ROOF (8098'-6") 178' - 0" 141210846 16 18 202319171513117591 21 8,039.75' T.O. SHEATHING ROOF MID-POINT 8,065.00' T.O. SHEATHING ROOF MID-POINT 8,073.35' T.O. SHEATHING ROOF MID-POINT 8,090.00' T.O. SHEATHING ROOF MID-POINT 8,097.15' T.O. SHEATHING ROOF MID-POINT INTERPOLATED NATURAL GRADE 40'-0" OFFEST PROPOSED GRADE 40'-0" OFFSET METAL CLAD WOOD WINDOWS HEAVY TIMBER POSTS, STAINED WOOD SIDING, TYP WOOD BALCONY RAILING ALLOWABLE DORMER PER 26.575.020.F.2.g ACCEPTABLE ELEVATOR OVERRUN PER 26.575.020.f.4.c HIGHEST CORNER AT ELEVATION 8,090.5' ALLOWABLE DORMER PER 26.575.020.F.2.g HIGHEST RIDGE POINT AT ELEVATION 8,097.00' ROOFTOP POOL TERRACE W/ GLASS RAILING ACCEPTABLE PERMANENT ROOFTOP AMENITY PER 26.575.020.f.4.k ALLOWABLE DORMER PER 26.575.020.F.2.g HIGHEST RIDGE POINT AT ELEVATION 8,077.4' ACCEPTABLE STAIR / ELEVATOR OVERRUN PER 26.575.020.f.4.c HIGHEST CORNER AT ELEVATION 8,082.65' STONE VENEER STAIR BEYOND INTERPOLATED NATURAL GRADE 1/D3071/D306 1/D308 1/D309 1/D3101/D311 LINE OF ROOF DECK BEYOND LEVEL 07 (8062'-6") 142' - 0" LEVEL 08 (8073') 152' - 6" LEVEL 09 (8082') 162' - 6" ROOF (8098'-6") 178' - 0" BIBN BDBTBRBEBJ.2 BG.5BQ ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D201 BUILDING ELEVATIONS 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING Detailed Review Application_Revised 14 SEP 2020 SCALE:1/16" = 1'-0"2 WEST ELEVATION SCALE:1/16" = 1'-0"1 SOUTH ELEVATION LEVEL 01 (7999') 78' - 6" LEVEL 02 (8009'-6") 89' - 0" LEVEL 03 (8020'-6") 100' - 0" LEVEL 04 (8031') 110' - 6" LEVEL 05 (8041'-6") 121' - 0" LEVEL 06 (8052') 131' - 6" LEVEL 07 (8062'-6") 142' - 0" LEVEL 08 (8073') 152' - 6" LEVEL 09 (8082') 162' - 6" ROOF (8098'-6") 178' - 0" PARKING 1 (7988') 67' - 6" 141210846 16 18 202319171513117591 21 8,039.75' T.O. SHEATHING ROOF MID-POINT 8,065.00' T.O. SHEATHING ROOF MID-POINT 8,073.35' T.O. SHEATHING ROOF MID-POINT 8,090.00' T.O. SHEATHING ROOF MID-POINT 8,097.15' T.O. SHEATHING ROOF MID-POINT INTERPOLATED NATURAL GRADE 40'-0" OFFEST PROPOSED GRADE 40'-0" OFFSET METAL CLAD WOOD WINDOWS HEAVY TIMBER POSTS, STAINED WOOD SIDING, TYP WOOD BALCONY RAILING ALLOWABLE DORMER PER 26.575.020.F.2.g ACCEPTABLE ELEVATOR OVERRUN PER 26.575.020.f.4.c HIGHEST CORNER AT ELEVATION 8,090.5' ALLOWABLE DORMER PER 26.575.020.F.2.g HIGHEST RIDGE POINT AT ELEVATION 8,097.00' ROOFTOP POOL TERRACE W/ GLASS RAILING ACCEPTABLE PERMANENT ROOFTOP AMENITY PER 26.575.020.f.4.k ALLOWABLE DORMER PER 26.575.020.F.2.g HIGHEST RIDGE POINT AT ELEVATION 8,077.4' ACCEPTABLE STAIR / ELEVATOR OVERRUN PER 26.575.020.f.4.c HIGHEST CORNER AT ELEVATION 8,082.65' STAIR BEYOND INTERPOLATED NATURAL GRADE CONCEPTUAL GRADE OVERLAY CONCEPTUAL APPROVAL CURRENT ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER D202 WEST ELEVATION OVERLAY 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING Detailed Review Application_Revised 14 SEP 2020 SCALE: 1/16" = 1'-0"1 WEST ELEVATION ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER A801 MATERIAL BOARD 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING Detailed Review Application_Revised 14 SEP 2020 EXTERIOR MATERIALS PALETTE DRY STACK GREY STONE -REGIONALLY SOURCED -RANDOM ASHLAR PATTERN -TO BE USED ON RETAINING WALLS LABELED AS TYPE A ON SITE PLAN. 1x6 OR 1x8 WOOD CLADDING -CLEAR STAIN WITH INTEGRATED FIRE RETARDANT COMPLIANT WITH IBC 2303.2 -HORIZONTAL AND VERTICAL APPLICATIONS SUNSTYLE PHOTOVOLTAIC ROOF -GREY SHINGLES -35"x35" PANELS WITH APPROXIMATE 26"x26" EXPOSURE -OCCURS AT SLOPED ROOFS WOOD SOFFITS AND BEAMS -T&G WOOD SOFFIT BOARDS -HEAVY TIMBER COLUMNS, BEAMS, AND PURLINS WOOD BALCONY RAILINGS -WOOD POSTS WITH DECORATIVE CAP FLASHING -HORIZONTAL WOOD RAILS -VERTICAL PICKETS WITH DECORATIVE CUTOUTS AT SELECT LOCATIONS GREEN ROOF -DROUGHT TOLERANT, REGIONAL SPECIFIC VEGETATION LAZER CUT METAL SCREEN -UTILIZED FOR SCREENING TRANSFORMERS AND CUSTOM LOUVERS AT LOADING DOCK CRAFTED METAL CONNECTIONS ZOLA ALUMINUM CLAD WOOD WINDOWS AND DOORS -DARK ALUMINUM EXTERIOR CLADDING CUSTOM METAL GUTTERS & DOWNSPOUTS -GALVANIZED METAL EXTERIOR PAVERS W/ SNOWMELT SYSTEM -GRAY GRANITE 1x8 HORIZONTAL FRT WOOD CLADDING 1x8 VERTICAL FRT WOOD CLADDING T&G WOOD SOFFITS GREEN ROOF SUNSTYLE PHOTOVOLTAIC ROOF WOOD BALCONY RAILINGS ZOLA ALUMINUM CLAD WOOD WINDOWS AND DOORS DRY STACK GREY STONE HEAVY TIMBER COLUMNS, BEAMS AND PURLINS EXTERIOR PAVERS W/ SNOWMELT SYSTEM 5" THICK STONE CAP EXPOSED GALVANIZED 2HR STEEL COLUMN AT REVEAL CAPLESS CLEAR GLASS RAILING AT ROOF TERRACE BALCONY MOUNTED FLOWER BOXES (BY OWNER) CUSTOM METAL DOWNSPOUTS CUSTOM WOOD OUT-SWING CARRIAGE DOORS -LOADING DOCK / GARAGE ENTRY DOORS 5T72 24 5T72 24 5T 60 24 5T 60 24 5T 60 24 5T 60 24 5T 36 24 5T66 24 5T 72 24 5T 72 24 BEV/SERVICE DISH ASSEMBLYPLATING STOR. HOTHOLDING REF. REF. FR.FR. STORAGE ICE D WINS T O N CAC - 5 2 2 D WIN S T O N CAC- 5 2 2 D WIN S T O N CAC- 5 2 2 DBL RACK TRUE T-49F TRUE T-49F U N IVER SAL MOP 20-8 1331NEW AGE 1331NEW AGE 1331NEW AGE AIRIN DD C AIROUT HOSH I Z A K I K M - 1 3 0 1 S A H 3 D 1331NEW AGE RDRD RDRD 5T 72 24 5T60 24 5T60 24 5T 48 24 5T 48 24 5T48 24 5T48 245T 48 24 5T72 18 5T72 18 5T72 18 5T72 18 5T 36 24 48 24 36 24 5T 72 24 5T36 14 5T30 14 JAN. BEV/SERVER ICE COOKEXPO SERVICE ADA SERVICE HOST HOST SERV. PANTRY SH E L F S H E L F SH E L F SHELF UNIVERSAL MOP 20-8 H FISHER2445 D C D DBL RACK CH E M D H H C H C 14 5T72 14 5T72 LODGE COMMERCIAL RESIDENTIAL AFFORDABLE HOUSING NON-UNIT SPACE (SHARED) EXEMPTIONS OPEN TO BELOW USE LEGEND *FAR CALCULATED PURSUANT TO LAND USE CODE SECTION 26.575.020 NOTE: CALCULATIONS SUBJECT TO CHANGE AS BUILDING DESIGN IS REFINED DURING PERMITTING STAGE A B C D 133' - 2" 211' - 11" 133' - 2" 211' - 11" 1' - 0 " 10 ' - 0 " 1' - 0 " 10 ' - 0 " EXPOSED WALL (Xlf) x X'(h) = XXXX SF PERCENTAGE OF EXPOSED EXTERIOR WALL = 00% *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 NON EXPOSED WALL 598LF X 10'(h) = 5980 sf NON-UNIT SPACE =20,284 sf 20,284 sf A B C D E 133' - 2" 7' - 5 1/2"13' - 8"3' - 2" 1' - 6 " 9' - 0 " 1' - 6 " 9' - 0 " *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 147' - 8" 11' - 0"34' - 4"2' - 8" EXPOSED WALL 180.5lf x 9'(h)=1,624.5 sf NON EXPOSED WALL 483.75lf x9'(h) = 4,353.75 sf PERCENTAGE OF EXPOSED EXTERIOR WALL = 27% EXP WALL sf(1624.5) / (EXP+NON EXP)sf(5978.25sf)= 27% COMMERCIAL= LODGE= NON-UNIT SPACE = EXEMPTIONS = (-100 sf) 180 sf 2,986 sf 9,611 sf 11,598 sf 44' - 7" F G H I J 20' - 0"84' - 9" 4' - 10 1/2" 18' - 6" 15' - 9 1/2" 9' - 5 1/2" K 4' - 10 1/2" 27' - 4"80' - 11" L A B C D G 21' - 0"71' - 0"20' - 8" 26' - 3" 6' - 8" 1' - 6 " 9' - 0 " 1' - 6 " 9' - 0 " EXPOSED WALL (305.5 lf) x 9'(h) - roof = 2,749.5 SF NON EXPOSED WALL 134.3(lf) x 9'(h) = 1,208.7 SF *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 EXP WALL SF (2749.5 SF ) /(EXP + NON EX PSF) (3,958.2 sf) = 69.5% PERCENTAGE OF EXPOSED EXTERIOR WALL = 69.5% LODGE= NON-UNIT SPACE = COMMERCIAL= 8,769 sf 1,638 sf 838 sf 11,245 sf 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " 30' - 0"110' - 1 1/2" 93' - 9"26' - 1 1/2"20' - 3" E 15' - 9" 9' - 0 " F 1' - 10" 9' - 0 " H 1' - 7" 9' - 0 " A B C D F 96' - 0"11' - 10" 25' - 0"88' - 4 1/2" 49' - 0" 113' - 3" 6' - 8 1/2" 1' - 6 " 9' - 0 " 1' - 6 " 9' - 0 " *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 EXP WALL SF (2758.5 SF ) /(EXP + NON EX PSF) (4101.3 sf) = 67.3% PERCENTAGE OF EXPOSED EXTERIOR WALL = 67.3% EXPOSED WALL 306.5(lf) x 9(h) = 2,758.5 sf NON EXPOSED WALL 149.2(lf) x 9'(h) = 1,342.8 SF LODGE= COMMERCIAL = NON-UNIT SPACE = 2,858 sf 5,723 sf 2,664 sf 11,245sf 58' - 10" E 6' - 8 1/2" A B C D 133' - 8" 10' - 4 1/2"123' - 4" 1' - 6 " 9' - 6 " 1' - 6 " 9' - 6 " *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 EXPOSED WALL 212.5'(lf)x9.5'(h)=2,018.75 sf NON EXPOSED WALL 298.67'(lf) x 9.5'(h) =2837.37 sf PERCENTAGE OF EXPOSED EXTERIOR WALL =41.57% EXP WALLsf (2,018.75 sf) / EXP +EX SF (4,856.12 sf) = 41.57 % LODGE= COMMERCIAL = NON-UNIT SPACE = AFFORDABLE HOUSIING = 8,178 sf 742 sf 2,735 sf 804 sf 12,459 sf 9' - 6 " 9' - 6 " 9' - 6 " 75' - 7"26' - 1"20' - 11" 122' - 7 1/2" 20284 SF NON-UNIT SPACE (SHARED) 14121084 AF AD AB AE AK.5 6 AK AI AC 2 AG AH BI BN BD AJ 3 AO 15131175 A B C D B 133 ' - 0 3 / 4 " 211' - 11 5/8" 133 ' - 0 3 / 4 " 91 BT BR BE BJ.2 BG.5 BQ ramp up slope dn slope dn LODGE = 2986 sf NON-UNIT SHARED SPACE = 9611 sf RAMP DN 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 191715131175 A B C H J 91 BT BR BE BJ.2 BG.5 21 BQ D E G I K L COMMERCIAL = 180 sf F LODGE = 8178 SF NON-UNIT SHARED SPACE = 2735 Sf AFFORDABLE HOUSING = 804 SF COMMERCIAL = 742 SF 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 191715131175 A C OPEN 91 BT BR BE BJ.2 BG.5 21 BQ BD 2858 SF LODGE NON-UNIT SPACE (SHARED) = 2664 SF COMMERICAL = 5723 SF exterior 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 191715131175 A B C D E F 91 BT BR BE BJ.2 BG.5 21 BQ NON-UNIT SPACE= 1,638 SF LODGE 8,769 SF COMMERCIAL 838SF 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 191715131175 open to below D G 91 BT BR BE BJ.2 BG.5 21 BQ areawell vo i d u n d e r r o o f vo i d u n d e r r o o f B H C F E ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER G031 PROPOSED FLOOR AREA CALCULATIONS 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1" = 40'-0"1 PARKING LEVEL 01_FAR SCALE:1" = 40'-0"2 LEVEL 01_FAR SCALE: 1" = 40'-0"3 LEVEL 02_FAR SCALE: 1" = 40'-0"4 LEVEL 03_FAR SCALE: 1" = 40'-0"5 LEVEL 04_FAR Detailed Review Application_Revised 14 SEP 2020 RDRD RDRD RDRD RDRD RDRD RDRD FDFD FDFD FDFD FDFD FDFD FDFD RDRD RDRD RDRD LODGE COMMERCIAL RESIDENTIAL AFFORDABLE HOUSING NON-UNIT SPACE (SHARED) EXEMPTIONS OPEN TO BELOW USE LEGEND *FAR CALCULATED PURSUANT TO LAND USE CODE SECTION 26.575.020 NOTE: CALCULATIONS SUBJECT TO CHANGE AS BUILDING DESIGN IS REFINED DURING PERMITTING STAGE A B D F G 43' - 6" 14' - 10" 45' - 0"135' - 9" 1' - 6 " 9' - 0 " 1' - 6 " 9' - 0 " EXPOSED WALL 442.6lf) x 9'(h) = 3983.4 sf NON EXPOSED WALL (167.5lf) x 9'(h) = 1507.5 sf *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 137' - 3" 79' - 0" 27' - 10" C 1' - 6" H 12' - 0" EXP WALL sf (3983.4 sf ) /(EXP + NON EX sf) (5490.9 sf) = 72.54% PERCENTAGE OF EXPOSED EXTERIOR WALL = 72.54% LODGE= NON-UNIT SPACE = 13,091 sf 990 sf 14,081 sf 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " I 7' - 4 1/2" J 107' - 6 1/2" 9' - 0 " 9' - 0 "E 1' - 5" 9' - 0 " 9' - 0 " A B C E 162' - 3" 16' - 0" 1' - 6 " 9' - 0 " 1' - 6 " 9' - 0 " EXPOSED WALL (434.45lf) x 9'(h) = 3910sf NON EXPOSED WALL (140.75lf) x 9'(h) = 1266.75 sf *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 34' - 0" 86' - 6" EXP WALL SF (3910 sf ) /(EXP + NON EX PSF) (5176.75 sf) = 75.5% PERCENTAGE OF EXPOSED EXTERIOR WALL =75.5% LODGE= NON-UNIT SPACE = 10,895 sf 990 sf 11,885 SF 9' - 0 " 9' - 0 " 9' - 0 " 72' - 9" D 34' - 0"162' - 3" 9' - 0 " 9' - 0 " F G 2' - 3" 9' - 0 " 5' - 4" 9' - 0 " A B C D E F 192' - 0" 16' - 0" 5' - 6" 81' - 7" 192' - 0" 5' - 6" G 1' - 6 " 9' - 0 " 1' - 6 " 9' - 0 " EXPOSED WALL (469.67lf) x 9'(h) = 4,227 sf NON EXPOSED WALL (81.7lf) x 9'(h) = 735.3 sf PERCENTAGE OF EXPOSED EXTERIOR WALL = 85.2% *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 H 12' - 0"46' - 8" LODGE= NON-UNIT SPACE = 11,992 sf 573 sf 12,565 sf 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " 9' - 0 " EXP WALL SF (4227 sf ) /(EXP + NON EX PSF) (4962.3 sf) = 85.2% EXEMPTIONS =432 sf A B C D 103' - 7 1/2" 74' - 9" 103' - 7 1/2" 74' - 9" 1' - 6 " 9' - 0 " 1' - 6 " 9' - 0 " EXPOSED WALL (356.77lf) x 9'(h) = 3210.9 SF NON EXPOSED WALL (0lf) x 0'(h) = 0 SF PERCENTAGE OF EXPOSED EXTERIOR WALL = 100% *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 RESIDENTIAL = NON-UNIT SPACE = 5,441 sf 1,076 sf 6,517 sf EXEMPTIONS = 457sf A B C D 70' - 0" 1' - 6 " 13 ' - 0 " 1' - 6 " 9' - 0 " EXPOSED WALL = 2896 SF NON EXPOSED WALL (0lf) x X'(h) = 0 SF PERCENTAGE OF EXPOSED EXTERIOR WALL = 100% *FLOOR STRUCTURE NOT INCLUDED PER 26.575.020.D.8 RESIDENTIAL =3,192 sf 3,192 sf 75' - 0" 13 ' - 0 " 8' - 0 " 8' - 0 " 13 ' - 0 " 32' - 0" 13 ' - 0 " 13091 SF LODGE NON-UNIT SPACE = 990 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 191715131175 A C G B 91 BT BR BE BJ.2 BG.5 21 BQ E D F H I J 10895 SF LODGE NON-UNIT SPACE = 990 SF B 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 191715131175 G 9 BT BE BJ.2 BG.5 21 BQ A C D E F 11992 SF LODGE NON-UNIT SPACE (SHARED) 573 sf 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC AG AH BI BN BD AJ 3 AO 191715131175 B G 9 BT BR H BE BJ.2 BG.5 C 21 BQ D F VOID UNDER ROOF VOID UNDER ROOF A E C A NON-UNIT SPACE = 1,027 SF 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 191715131175 VOID 91 BT BR BE BJ.2 BG.5 21 BQ BD RESIDENTIAL = 5441 SF RESIDENTIAL= 3192 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 191715131175 D 91 BT BR BJ.2 BG.5 21 BQ A B C ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER G032 PROPOSED FLOOR AREA CALCULATIONS 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1" = 40'-0"1 LEVEL 05_FAR SCALE: 1" = 40'-0"2 LEVEL 06_FAR SCALE: 1" = 40'-0"3 LEVEL 07_FAR SCALE:1" = 40'-0"4 LEVEL 08_FAR SCALE: 1" = 40'-0"5 LEVEL 09_FAR Detailed Review Application_Revised 14 SEP 2020 5T72 24 5T72 24 5T 60 24 5T 60 24 5T 60 24 5T 60 24 5T 36 24 5T66 24 5T 72 24 5T 72 24 BEV/SERVICE DISH ASSEMBLYPLATING STOR. HOTHOLDING REF. REF. FR. FR. STORAGE ICE DC WINST O N CAC- 5 2 2 D C WIN S T O N CAC-5 2 2 D C WIN S T O N CAC-5 2 2 DBL RACK TRU E T - 4 9 F TRUE T - 4 9 F TRUE T-49F TRUE T-49F U N IVER SAL MOP 20-8 HCFISHER2445 1331NEW AGE 1331NEW AGE 1331NEW AGE AIRIN DD C AIROUT H O S H I Z A K I K M - 1 3 0 1 S A H 3 D 1331NEW AGE RDRD RDRD 5T 72 24 5T60 24 5T60 24 5T 48 24 5T 48 24 5T48 24 5T48 245T 48 24 5T72 18 5T72 18 5T72 18 5T72 18 5T 36 24 48 24 36 24 5T 72 24 5T36 14 5T30 14 JAN. BEV/SERVER ICE COOKEXPO SERVICE ADA SERVICE HOST HOST SERV. PANTRY SH E L F S H E L F SH E L F SHELF UNIVERSAL MOP 20-8 H FISH ER2445 D C D DC DBL RACK CH E M D H H C H C 14 5T72 14 5T72 RDRD RDRD RDRD RDRD RDRD RDRD FDFD FDFD RDRD RDRD RDRD LEASABLE LIVABLE -LODGE LIVABLE -RESIDENTIAL LIVABLE -AFFORDABLE HOUSING LEASABLE / LIVABLE LEGEND *LEASABLE / LIVABLE CALCULATED PURSUANT TO LAND USE CODE SECTION 26.575.020.I. NOTE: CALCULATIONS SUBJECT TO CHANGE AS BUILDING DESIGN IS REFINED DURING PERMITTING STAGE COMMERCIAL = 180SF LODGE = 2394 SF COMMERCIAL = 548 SF (BELOW GRADE 25% REDUCTION APPLIES) AFFORDABLE HOUSING = 750 SF LODGE = 1944 SF COMMERCIAL = 4126 SF (BELOW GRADE 25% REDUCTION APPLIES) LODGE = 5010 SF COMMERCIAL = 801 SF LODGE = 7704SF LODGE = 7858 sf LODGE = 9,112 sf FREE MARKET= 5072 FREE MARKET = 2928 SF ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER G033 PROPOSED FLOOR AREA CALCULATIONS 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1" = 40'-0"1 LEVEL 01_LEASABLE SCALE: 1" = 40'-0"2 LEVEL 02_LEASABLE SCALE: 1" = 40'-0"3 LEVEL 03_LEASABLE SCALE:1" = 40'-0"4 LEVEL 04_LEASABLE SCALE: 1" = 40'-0"5 LEVEL 05_LEASABLE SCALE: 1" = 40'-0"6 LEVEL 06_LEASABLE SCALE:1" = 40'-0"7 LEVEL 07_LEASABLE SCALE: 1" = 40'-0"8 LEVEL 08_LEASABLE SCALE: 1" = 40'-0"9 LEVEL 09_LEASABLE Detailed Review Application_Revised 14 SEP 2020 7 9 9 5 15' OFFSET FROM EXTERIOR WALL @ GRADE 8060 805580 5 0 8065 8 0 7 0 8075 80 4 5 80 4 0 8035 8030 8025 8020 8010 8000 8000 8010 8 0 1 5 8 0 2 0 802580308035 8040 8045 8050 8055 8060 8065 8070 8,079.00' 1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 17 18 1920 21 22 2324 25 26 2728 29 30 31 32 33 34 3536 37 38 39 40 41 42 43 44 45 46 8,099.90'FA C E O F E X T E R I O R W A L L 8,099.90' 8055 80 6 5 80 6 0 80 5 0 80 4 5 80 4 0 8,072.80'8,076.05'8,071.95' 8,072.80'8,076.05' 8,072.80' 80 3 5 80 3 0 80 2 5 80 2 0 8,095.55' 8,095.05' 8,090.70' 8,090.70'8,090.70' 8,090.50' 8,097.00' 8,090.70' 8,083.15' 8,077.45' 8,075.75' 8,076.95' 8,053.65'8,053.65' 8,068.50' 8,079.00' 8,079.00' 8,053.65' 8,052.20' 8,072.90' 8,077.40' 8,052.20' 8,052.20' 8,053.65' 8,031.75' 8,031.75' 8,041.20' 8,031.75' 8,031.75' 8,020.45' 8,015.45' 8,009.45' 8,030.90'8,030.90' 8,083.15' 8075 8015 8005 8,096.45' 8,095.25' 8,095.15' 8,095.25' 8,045.90'8,045.90' 8,074.00' 8,075.40' 8,075.40' 8,074.00' 8,096.40' 47 8,076.65' 4849 50 51 ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER G034 HEIGHT PLAN - PROPOSED GRADE 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING SCALE:1/16" = 1'-0"1 HEIGHT PLAN - PROPOSED GRADE Detailed Review Application_Revised 14 SEP 2020 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ RIDGEVALLEYVALLEYRIDGE RI D G E RI D G E RIDGEVALLEYVALLEYRIDGEVALLEYVALLEYRI D G E FLAT ROOFRIDGEPROPERTY LINE 8,074.00'8,075.40' 1 1 3" / 1 ' - 0 " 3" / 1 ' - 0 " 1" / 1'-0" 1 1 1 1 1 1 3" / 1'-0" 3" / 1'-0" 3" / 1'-0"3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0" FLAT ROOF 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1 ' - 0 " 3" / 1'-0" 3" / 1'-0" 2 2 2 2 2 2 2 2 OCCUPIABLE ROOF FLAT ROOF FLAT ROOF FLAT ROOF 1 1 1 3" / 1'- 0" 3" / 1'-0" SPA TIMBER SNOW FENCE SYSTEM LEGEND 1 OSHA FALL PROTECTION ANCHOR2 AREA OF SNOW MELT FLAT ROOF W/ INTERNAL DRAINS AND VEGETATION DIAMOND PATTERN SOLAR TILES POOL DECK TERRACE - FLAT ROOF W/ INTERNAL DRAINS AND PEDESTAL PAVER SYSTEM ROOF LEGEND FLAT ROOF W/ INTERNAL DRAINS ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER G050 SNOW SHEDDING ROOF PLAN 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING 0'4'8'16' SCALE:1/16" = 1'-0"1 SNOW SHEDDING PLAN Detailed Review Application_Revised 14 SEP 2020 3" / 1 ' - 0 " 1" / 1'-0" 3" / 1'-0" 3" / 1'-0" 3" / 1'-0" 14121084 AF AD AB AE AK.5 6 16 18 20 AK AI AC 2 AG AH BI BN BD AJ 3 AO 19171513117591 BT BR BE BJ.2 BG.5 21 BQ Calculated pursuant to City of Aspen Land Use Code Section 26.575.020.F.2.g DORMER SF / TOTAL ROOF SF = DORMER COVERAGE DORMERS Zone 1: 540sf / 2,156sf = 25% Zone 2: 3,692sf / 8,656sf = 43% Zone 3: 0sf / 606sf = 0% Zone 4: 2,279sf / 7,454sf = 30% Zone 5: 0sf / 1,359sf = 05 Zone 6: 1,624sf / 5,621sf = 29% Total: 8,135sf / 25,852sf = 31% 5 5 6 4 3 2 1 ZONEZONE ZONE ZONE ZONE ZONE ZONE ISS. # 4240 Architecture Inc. copyright 2019 ARCHITECT'S PROJECT NO. : DESIGNER: DRAFTER: CHECKER: APPROVED BY: KEY PLAN DESCRIPTION DATE NOT FOR CONSTRUCTION OWNER G051 DORMER PLAN 21222.00 Designer Author Checker Approver AS P E N , C O 8 1 6 1 1 GO R S U C H H A U S NORWAY ISLAND, LLC ASPEN, CO 81611 STUDIO NYL 2995 BASELINE RD., SUITE 314 BOULDER, CO STRUCTURAL ENGINEER BG BUILDINGWORKS 1626 COLE BLVD. SUITE 300 LAKEWOOD, CO 80401 MEP ENGINEER INTEGRAL GROUP 3000 LAWRENCE STREET DENVER, CO 80216 SUSTAINABILITY GEILER & ASSOCIATES 12355 E. CORNELL AVENUE AURORA, CO 80014 ACOUSTICAL ENGINEER 186 LIGHTING DESIGN GROUP 1200 BANNOCK STREET DENVER, CO 80204 LIGHTING Detailed Review Application_Revised 14 SEP 2020 0'4'8'16' SCALE:1/16" = 1'-0"1 ROOF_DORMER CALCULATIONS x SWITCH GEAR RECLOSE R > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >> > > > > > > PLANTER PLANTER TW: 92.52 TW: 93.63 TW: 97.50 TW: 98.00 TW: 98.00 TW: 98.00 TW: 99.55 FUTURE TW: TBD TW: 04.00 TW: 04.00 TC: 93.73 TC: 93.94 TC: 96.01 TC: 95.83 TC: 97.39 TC: 97.50 TC: 00.16 TC: 01.34 TC: 01.01 ME: 93.7'± ME: 91.4'± ME: 90.2'± 15 . 2 % 1 6 . 4 % 4 . 9 % 5 . 0 % 3 . 0 % 2. 0 % 3. 0 % 8. 3 % 8. 3 % 2.0% 2.0% 2.0% 3.5% 3.9% 4.0% 3.5% 3.5% 2.0 % 2.0 % 1 . 9 % 2 . 0 % 2 . 0 % 2 . 0 % 1.0% 2.2 % 2.2 % 2. 8 % 2. 8 % 2. 8 % 2. 8 % 2. 0 % 4.9% 1.4 % 1.2 % 2. 0 % 2. 0 % 2.0% 1.8% 1 . 9 % 1 . 7 % 2 . 0 % 1. 8 % 2 . 0 % 2.0% 2.0%3.0% 3.0% 1 . 8 % 0. 8 % 1. 0 % 2.5 % 0.7% 2. 7 % 1.0% 1.1 % 0.7% 2.1% 4.9 % 2.3 % 1 . 9 % 2. 6 % 2.6% 1 . 7 % 2.0 % 1. 8 % 2.0 % 10 . 3 % 15 . 6 % 15 . 6 % 16 . 9 % 2. 6 % 3.6% TC: 99.36 TC: 99.08 HIGH POINT TOP:7999.08' RIM: 98.87 FFE:7999.10' 2.0% TC: 98.77 RIM: 98.87TC @ HP: 99.50 TC @ HP: 99.50 TC: 99.37 TC: 99.26 TC: 99.30 TC: 99.11 FL: 99.17 TC: 99.32 FL: 99.02 TC: 99.11 TC: 99.20 TC: 99.24 TC: 98.93 FL: 98.47 FL: 98.15 TC: 99.14 TC: 98.74 TC: 98.75 TC: 98.88 TC: 98.75 TC: 98.75 TC: 99.24 TC: 99.24 TC: 98.56 TC: 98.50 TC: 98.50 TC: 98.92 TC: 97.87 TC: 97.06 TC: 92.99 TC: 91.45 TC: 90.22 STA: 1+20.02 TOC:8000.25' CENTERLINE HIGH POINT TC: 99.42 2.0% 2.0% 6.4% 5.7% 2.0% 1.9% 1. 5 % 3 . 0 % TBC: 99.27 TBC: 99.76 TBC: 00.19 TBC: 99.95 TBC: 98.21 TBC: 98.37 TBC: 98.51 TBC: 98.87 TBC: 99.83 TBC: 99.76 TBC: 99.21 TBC: 99.79 TBC: 00.27 TBC: 01.19 TBC: 00.91 TBC: 98.89 TBC: 98.05 TBC: 93.10 TBC: 91.13 TBC: 91.47 TBC: 93.39 TBC: 95.15 TBC: 97.32 TBC: 97.51 TBC: 97.62 TBC: 97.71 TBC: 97.64 TBC: 97.75 FL: 97.31 FL:7997.25' TW: 98.00 RIDGE LINE 2.0% 12.0% 12.0% 2.0% 7990 8000 8010 7992 7994 7996 7998 8002 8004 8006 8008 8012 8014 8016 8016 8016 8018 6.00' SIDEWALK TW: 06.50 FG: 97.05 2.0% 4. 0 % 2 . 0 % 1. 9 % 2.8% 3.5% 4 . 4 % BEGIN MOUNTABLE CURB TRANSITION FROM MOUNTABLE CURB TO 6" VERTICAL CURB 6" VERTICAL CURB 6" VERTICAL CURB PROPOSED SITE WALL (HATCHED) PROPOSED TRENCH DRAIN (ABOVE STRUCTURE) OVERHEAD ROOF SITE WALL EXISTING PLANTER WALL COLUMN (TYP.) PROPOSED TRENCH DRAIN ALONG EDGE OF BUILDING APPROX. LOCATION OF TOWER #4 PROP. FG: 7999.0'± PROPOSED TRENCH DRAIN 0.0 % 2.0% TBC: 02.41 FL: 00.89 8 0 0 0 80 0 0 80 0 0 79 9 8 7 9 9 8 8 0 0 2 8 0 0 2 8 0 0 2 800 0 8 0 1 0 8 0 1 0 80 2 0 0+ 5 0 1 + 0 0 1 + 5 0 2+00 2 + 5 0 3+00 3+ 5 0 3 + 7 3 EP: 3+72.55 PC: 0+51.30 PC: 1+13.97 PC: 3+35.29 PT: 0+97.05 PT: 3+06.34 PCC: 1+58.34 SITE WALL ANTICIPATED WITH LIFT ONE LODGE PATIO TC: 96.27 TC: 98.55 FFE:7999.10' TW: 06.00 TW: 12.38 TC: 00.00 TC: 99.93 TC: 99.42 TC: 99.38 TW: 09.50 FL: 07.43 SILVA CELLS (TYP.) SNOWMELTED CONCRETE 1. 4 % 7996 7998 7998 PROPOSED DEBRIS FLOW WALL (BY OTHERS) 16.00' WIDE MNT. ROAD (RE. TO C.2.04) 4.9 % 4.9 % TW: 08.50 FG: 08.00 TW: 08.50 4 . 9 % FFE:7999.25' FFE:7999.10' 1.6% 2.0% 2.0% 2 . 0 % 1.0% TC: 99.23 TC: 98.96 TC: 98.82 FL: 98.72 TC: 98.55 TC: 98.55 TC: 98.30 FL: 98.22 TC: 98.30 TC: 09.50 TC: 09.50 TC: 15.00 TC: 15.00 TC: 20.50 TW: 24.00 TW: 19.00 TW: 13.00 TW: 19.00 TW: 19.00 TW: 19.00 TW: 19.00 TW: 19.00 TW: 24.00 RIM: 98.00 RIM: 08.70 RIM: 96.80 RIM: 97.76 RIM: 97.40 RIM: 96.00 RIM: 96.86 RIM: 96.84 RIM: 97.13 RIM: 98.01 RIM: 98.08 RIM: 98.18 FG/RIM: 97.87 FG/RIM: 97.50 4 . 5 % FG: 98.75 FG: 97.48 FG: 97.32 FG: 97.15 FG: 97.05 TC: 99.14 TC: 99.05 TC: 98.95 TC: 98.49 THREE (3) 6" STEPS HILL STREET R.O.W. TW: 01.44 TW: 98.18BW: 97.44 BW: 94.18 WAT E R F E A T U R E FLUSH CURB TRANSITION FROM MOUNTABLE CATCH CURB TO MOUNTABLE SPILL CURB TRANSITION FROM MOUNTABLE CATCH CURB TO MOUNTABLE SPILL CURB 5.00 TC: 99.88 TC: 99.96 LANDSCAPE AREA MATCH EX: 02.15 MATCH EX: 00.67 7.7% 8.2% 2.1% 1.9% 15 . 4 % TW: 98.00 TC: 96.22 TC: 96.95 FG: 97.77 FG: 97.83 FG: 97.44 EXISTING: 93.4'±EXISTING: 94.3'±EXISTING: 94.6'±EXISTING: 95.1'± EXISTING: 95.6'± EXISTING: 95.7'± PROPOSED SLOT DRAIN ALONG BACK OF CURB MOUNTABLE CATCH CURB TYPE B BARRIER SPILL CURB COA TYPE A BARRIER CURB (CATCH CURB) TYPE B 6" MOUNTABLE SPILL CURB COA TYPE A 6" MOUNTABLE CURB (CATCH CURB) FLUSH BARRIER CURB 2.0% 2.0% PROPOSED SKIWAY ELECTRIC SPLICE VAULT PROPOSED 4.00 VALLEY PAN PROPOSED 4.00 VALLEY PAN CURB WALL PROPOSED FLAGPOLES (BY OTHERS) ADJUST MANHOLE RIM: 00.20 FL: 00.69 TC: 01.08FL: 01.91 FL: 02.16TBC: 02.66 RIM: 03.83 RIM: 05.38 RIM: 06.23 FL: 00.93 TBC: 00.94 2 . 0 % 2 . 0 % 2.0% ME: 93.6'± 2.0% 2.0% 2.0% 1 6 . 4 % 2 . 0 % FL: 94.82 FL: 99.56 FL: 98.39 TBC: 99.54 TC: 00.83 TC: 00.79 TC: 99.78 TC: 99.62 TC: 00.62 TC: 99.72 TC: 99.62 TC: 99.52 TC: 93.73 EX. TW: 00.27 EX. TW: 00.15EX. TW: 00.22 EX. TW: 01.20 EX. TW: 01.20 EX. INLET RIM: 99.77 TC: 98.50 TC: 98.46 TW: 19.00 TC: 15.00 TC: 15.00 TW: 09.50 TW: 13.00 TW: 06.00 TW: 06.00 TW: 04.00 TW: 13.00 TW: 13.00 TW: 13.00 TC: 09.50 TC: 02.50TW: 04.00 TW: 06.00 EXISTING WALL RESIDING OUTSIDE ROW SHALL REMAIN TW: 05.2± END NEW WALLS W/IN ROW PROPOSED BOLLARD (TYP) FUTURE TW: TBD PROFILE SCALE: HORZ: 1" = 20' VERT: 1" = 10' EXISTING GRADE PROPOSED GRADE PROPOSED GRADEEXISTING GRADE PROFILE SCALE: HORZ: 1" = 20' VERT: 1" = 10' CUL-DE-SAC PROFILE 7982 7985 7990 7995 8000 8005 8010 8015 7982 7985 7990 7995 8000 8005 8010 8015 15.40% -1.62% -0.75% -14.43 % -2.50%-1.00% MATCH EXISTING STA = 0+00.00 ELEV = 7985.12 GRADE BREAK STA = 2+80.08 ELEV = 7997.62 GRADE BREAK STA = 3+72.55 ELEV = 7993.74 GRADE BREAK STA = 1+58.34 ELEV = 7999.42 GRADE BREAK STA = 1+86.62 ELEV = 7999.14 PVI STA: 1+02.00 PVI ELEV: 8000.83 K: 2.79 LVC: 50.00 BV C S : 0 + 7 7 . 0 0 BV C E : 7 9 9 6 . 9 8 EV C S : 1 + 2 7 . 0 0 EV C E : 8 0 0 0 . 2 1 HIGH PT. STA: 1+20.02 HIGH PT ELEV: 8000.30 PVI STA: 3+49.26 PVI ELEV: 7997.10 K: 1.83 LVC: 25.00 BV C S : 3 + 3 6 . 7 6 BV C E : 7 9 9 7 . 2 0 EV C S : 3 + 6 1 . 7 6 EV C E : 7 9 9 5 . 3 0 0+00 79 8 5 . 1 79 8 5 . 1 2 79 8 8 . 9 79 8 8 . 9 7 0+50 79 9 2 . 8 79 9 2 . 8 2 79 9 6 . 6 79 9 6 . 6 7 1+00 79 9 9 . 9 79 9 9 . 5 8 80 0 2 . 5 80 0 0 . 2 5 1+50 80 0 6 . 1 79 9 9 . 6 3 80 0 8 . 8 79 9 9 . 2 6 2+00 80 1 4 . 9 79 9 8 . 9 2 80 1 1 . 1 79 9 8 . 5 2 2+50 80 0 3 . 6 79 9 8 . 1 1 80 0 2 . 8 79 9 7 . 7 1 3+00 80 0 2 . 2 79 9 7 . 4 7 79 9 9 . 5 79 9 7 . 2 9 3+50 79 9 6 . 9 79 9 6 . 6 2 3+73 79 9 3 . 7 79 9 3 . 7 4 DRAINAGE DIRECTION/SLOPE SPOT ELEVATION EXAMPLE: TOP OF CONCRETE @ 7900.00' = BW = BOTTOM OF WALL FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE FL = FLOW LINE GB = GRADE BREAK HP = HIGH POINT LP = LOW POINT MATCH EX = MATCH EXISTING TC = TOP OF CONCRETE TP = TOP OF PAVERS TW = TOP OF WALL SPOT ELEVATION LEGEND XXX:XX.XX' 2.0% TC:00.00' 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED:DRAWN: REVISIONS GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O W W W . S O P R I S E N G . C O M S e p 1 8 , 2 0 2 0 - 1 : 1 2 p m G: \ 2 0 1 5 \ 1 5 1 0 1 . 0 6 - G o r s u c h H a u s \ C I V I L \ C i v i l D W G s \ P L O T \ C . 2 . 0 0 - C . 2 . 0 1 C U L - D E - S A C P P & S E C 1 5 1 0 1 . 0 6 . d w g CJB JKS C.2.00 OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2-BUSINESS DAYS IN ADVANCE Know what's below. before you dig.Call R CUL-DE-SAC PLAN, PROFILE & GRADING 10-10-2019 SD PRICING NOTE: THESE PLANS ARE CONCEPTUAL OR ILLUSTRATIVE IN NATURE. PRECISE INFORMATION SHALL BE PROVIDED AS PART OF THE BUILDING PERMIT APPLICATION, AND IN SITUATIONS WHERE THE FINAL PD DEVELOPMENT PLANS AND APPROVED BUILDING PERMIT DIFFER, THE APPROVED BUILDING PERMIT SHALL RULE. NOTES: 1.PROPOSED & EXISTING CONTOURS AT 2-FT INTERVALS 2.REFER TO LANDSCAPE PLANS FOR HARDSCAPE PATTERNS 3.REFER TO LANDSCAPE PLANS FOR PLANTING INFORMATION 4.PROPOSED GRADING ILLUSTRATES SUMMER GRADES 5.ALL EXISTING MH'S AND VALVE BOXES TO BE ADJUSTED PROJECT NUMBER:15101.06 1 1-15-20202 DETAILED REVIEW-DRAFT PROJECT DETAILED REVIEW 3-2-20203 DETAILED REVIEW 9-21-20204 DETAILED REVIEW-REVISIONS S W I T C H G E A R R E C L O S E R X F R M R DS DS DS DS DS DS DS DS DS DS DS > > > > > > > > > > > > > > > > >>>>>>>>>>>>>>>>>> > > > > > > > > > > > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > > > > > > > > > > > > > > > > > > > > > 8 0 2 0 80 3 0 8 0 4 0 8 0 5 0 8 0 6 0 8 0 7 0 8 0 1 6 8 0 1 6 8 0 1 8 80 2 2 80 2 4 80 2 6 80 2 8 80 3 2 80 3 4 8 0 3 6 8 0 3 8 8 0 4 2 8 0 4 4 8 0 4 6 8 0 4 8 8 0 5 2 8 0 5 4 8 0 5 6 8 0 5 8 8 0 6 2 8 0 6 4 8 0 6 6 8 0 6 8 8 0 7 2 8010 80 1 0 802 0 80 2 0 80 3 0 8030 804 0 80 4 0 80 5 0 80 5 0 80 6 0 8 0 6 0 80 7 0 80 7 0 LEVEL 3 PATIO 8020.5' AREA DRAINS WITHIN PATIO T.B.D. TOC: 8 0 0 8 . 4 9 ' FFE:7999.50' FFE:7999.10' TOW : 8 0 0 6 . 4 2 ' T W : 1 8 . 0 0 T W : 1 8 . 0 0 T W : 2 2 . 0 0 TW: 22.00 T W : 2 2 . 0 0 TW: 22.00 TW: 36.00 T W : 4 4 . 5 0 TW: 44.50 TW : 4 4 . 5 0 TW: 46.00 TW: 48.50 TW: 53.50 TW: 53.50 T W : 5 3 . 5 0 TW: 53.50 TW: 63.00 TW: 73.00 T W : 6 4 . 0 0 TW: 73.00 TW: 14.39 TC: 10.12 T C : 1 0 . 6 8 T C : 1 1 . 0 0 T C : 1 5 . 2 5 TC: 15.75 F G : 1 5 . 4 7 TW: 36.00 FG: 30.00 TC: 52.00 TC: 62.00 TC : 0 9 . 0 0 TC: 00.00 FL: 15.00 FL: 10.33 RIM: 07.43 F G : 0 8 . 0 0 F G : 6 5 . 0 0 FG: 20.16 FG: 20.40 FG: 29.00 TW: 34.50 FG: 30.50 33.7% 28 . 9 % 28.6% 26.5% TW: 35.00 TW: 35.00 LEVEL 3 ENTRANCE = 8020.5' (AREA DRAIN ABOVE STRUCTURE T.B.D.) TW: 22.50 TW: 24.00 T W : 2 2 . 5 0 F G : 3 0 . 3 8 6" STEP @ LEVEL 3 STEPS ALONG EDGE OF PATIO TO ACCOMMODATE SUMMER GRADES FG: 29.50 30" MAX. WALL TC: 99.33 TC: 99.33 T C @ H P : 9 9 . 5 0 T C @ H P : 9 9 . 5 0 TC: 99.10 TC: 99.10 FFE:7999.10' FFE:7999.25' FFE:7999.10' FFE:7999.10' TW : 0 8 . 6 8 10.6% 15.6%FL: 22.30 FL: 31.55 FL: 32.50 FL: 32.98 F L : 3 3 . 3 1 FL: 39.56 FL: 41.73 F L : 4 5 . 9 6 FL: 49.70 F L : 6 0 . 1 9 FL: 67.02 FL: 69.31 FL: 69.65 FL: 69.70 F L : 6 9 . 4 8 F L : 6 8 . 5 2 FL: 64.68 5. 0 % 2. 0 % 10 . 3 % 33.3 % 33.3% 30.6% 30.6% 30.6% 30.6 % 2.6% 2.6% 16.5%18.1%29.8% TC: 04.00 T C : 0 9 . 2 4 TC : 0 4 . 0 0 RIM: 03.95 RIM: 08.96 RIM: 17.45 RIM: 23.45 RIM: 33.75 TW: 18.50 TW: 24.50 TW: 24.50 TW: 24.50 TW: 26.50 TW: 36.50 TW: 36.50 1.5% 1.1% TW: 15.00 TW: 21.00 TW: 21.00 TW: 27.00 TW: 27.00 TC: 23.50 TW: 39.00 TC : 2 1 . 0 0 T W : 2 4 . 5 0 TW: 24.50 TW: 28.00 TW: 28.00 T W : 3 6 . 5 0 T W : 3 6 . 5 0 T W : 3 6 . 5 0 T W : 3 4 . 0 0 T W : 3 4 . 0 0 T W : 3 4 . 0 0 TW: 34.00 TW: 34.00 TC: 31.00 TC : 3 1 . 0 0 TC : 3 1 . 0 0 RIM: 35.40 RIM: 30.90 RIM: 36.95 RIM: 41.45 RIM: 51.95 RIM: 51.95 RIM: 51.95 RIM: 61.95 RIM: 61.95 RIM: 72.95 RIM: 72.95 TC: 35.00 FG : 1 3 . 0 0 FG: 24.00 FG: 25.00 FG: 33.40 F G : 3 3 . 8 5 FG : 3 3 . 9 0 FG : 3 4 . 0 0 FG : 3 3 . 9 9 FG: 34.50TW: 36.50 TW: 38.00 T W : 4 2 . 5 0 TW: 47.00 TW: 47.00 TW: 48.50 T W : 5 3 . 0 0 T W : 5 3 . 0 0 TW: 53.50 TW: 53.50 TW : 6 0 . 5 0 TW : 6 0 . 5 0 TW : 6 5 . 0 0 TW : 6 5 . 0 0 TW: 73.00 TW: 73.00 T W : 7 3 . 0 0 T W : 7 3 . 0 0 TW: 36.50 TW: 36.50 TW: 36.50 TW: 38.00 TW: 42.50 TW: 42.50 TW : 4 2 . 5 0 TW: 42.50 FG: 42.00 TW: 47.00 T W : 4 8 . 5 0 TW: 53.00 TW : 5 3 . 0 0 TW : 6 2 . 0 0 TW: 62.00 TW : 7 3 . 0 0 T W : 7 3 . 0 0 TC: 35.50 TC: 37.00 TC: 37.00 TC: 40.50 TC: 46.00 TC: 46.00 TC: 47.50 TC: 52.00 TC: 52.00 TC : 5 2 . 0 0 TC: 31.00 TC: 09.30 TC: 41.50 T C : 5 2 . 0 0 T C : 5 2 . 0 0 T C : 5 2 . 0 0 TC : 6 2 . 0 0 TC: 62.00 TC: 73.00 TC: 73.00 FG: 71.00 F G : 7 1 . 0 6 5.0% 7.2% 1 5 . 6 % 2 . 0 % TW : 2 4 . 0 0 TC: 20.50 TC: 3 1 . 0 0 TC: 62.00 RIM: 72.95 RIM: 72.95 RIM: 61.95 RIM: 61.95 RIM: 51.95 RIM: 51.95 RIM: 51.95RIM: 41.45RIM: 41.45 RIM: 30.91 RIM: 30.91 PROPOSED BUILDING FOOTPRINT AT GRADE (TYP.) LOT 2 LOT 1 LOT 1 S. ASPEN ST. ROW S. ASPEN ST. ROW SHADOW MOUNTAIN SUBDIVISION LOT 1 LOT 2 LEVEL 1 FFE: 7999.1 LEVEL 2 FFE: 8009.5 LEVEL 3 FFE: 8020.5 LEVEL 4 FFE: 8031.0 LEVEL 5 FFE: 8041.5 LEVEL 6 FFE: 8052.0 LEVEL 7 FFE: 8062.5 LEVEL 8 FFE: 8073.0 PROPOSED BELOW GRADE STRUCTURE (TYP.) SETBACK (TYP.) PROPERTY LINE (TYP.) FFE:8021.00' FFE:8031.00'FFE:8031.00' FFE:8031.00' FFE:8052.00' FFE:8052.00'FFE:8052.00' FFE:8062.00'FFE:8062.00' FFE:8073.00' FFE:8073.00' FFE:8041.50' FFE:8067.70' FFE:8062.00' FFE:8062.00' FFE:8052.00' FFE:8052.00' FFE:8052.00' FFE:8041.50'FFE:8031.00' FFE:8020.50' FFE:8020.50' LEVEL 4 PATIO 8031.0' AREA DRAINS WITHIN PATIO T.B.D. LEVEL 4 PATIO LEVEL 5 PATIO LEVEL 5 PATIO LEVEL 6 PATIO LEVEL 6 PATIO LEVEL 6 PATIO LEVEL 7 PATIO LEVEL 7 PATIO LEVEL 8 PATIO LEVEL 8 PATIO LEVEL 7 PATIOLEVEL 7 PATIO LEVEL 6 PATIOLEVEL 6 PATIOLEVEL 6 PATIO PLANTER PLANTER PLANTER LANDSCAPE LANDSCAPE LEVEL 4 PATIO LEVEL 4 PATIO LEVEL 4 PATIO LEVEL 5 PATIO PLANTER PROPOSED BUILDING FOOTPRINT AT GRADE (TYP.) SETBACK (TYP.) PROPERTY LINE (TYP.) WEST SWALE (RE. TO SHEET C.2.06) FG: 34.51 FG: 36.89 FG: 46.28 FG: 47.00 FG: 52.00 F G : 5 2 . 3 0 FG: 5 7 . 0 0 FG: 59.53 FG: 63.95 FG: 65.00 FG: 67.07 FG: 71.89 FG: 71.40 FG: 7 0 . 5 4 F G : 7 0 . 6 7 FG : 7 1 . 2 0 STAIRS ST A I R S HATCH PATTERN REPRESENTS PROPOSED TIERED SOIL NAIL WALLS AT 1:1 EQUIVALENT SLOPE; RE. TO C.2.06 FOR PROPOSED SECTIONS R E . T O C . 2 . 0 0 F O R P L A Z A & C U L - D E - S A C G R A D I N G TW : 2 4 . 0 0 TW: 38.00 TW: 48.50 FG : 5 1 . 5 0 FG : 5 1 . 5 0 FG: 5 1 . 5 0 RIM: 51.25 RIM: 51.25 RIM: 51.25 RIM: 51.95 RIM: 47.45 RIM: 45.95 RIM: 41.85 RIM: 41.25 RIM: 30.25 RIM: 30.95RIM: 30.95 RIM: 27.25RIM: 20.95 2.0% FG: 71.00 T W : 7 3 . 0 0 RIM: 67.64 TW : 7 3 . 0 0 TC: 7 0 . 6 7 TC : 7 0 . 7 0 TC: 2 0 . 5 0 T W : 1 0 . 3 2 FG : 9 9 . 7 6 FG: 16.65 FG: 14.64 FG: 11.05 FG: 08.05 FG: 17.80 FG: 26.19 FG: 28.81 FG: 30.84FG: 25.14 FG: 25.37 FFE: 31.00 FG: 60.96 TW: 34.50TW: 34.50 TW: 34.50 T W : 3 6 . 0 0 T W : 3 6 . 0 0 FG: 47.27FG: 42.93 FFE:8041.50' FG: 51.01 TW: 53.50 FG: 41.47FG: 39.63 TW: 46.00 TW: 48.50 TW: 53.50 FG: 42.13 FG: 46.40 FG: 51.66 FG: 33.81 FG: 35.79 TW: 42.50 RIM: 41.50 TC: 41.50 TW: 42.50 TW: 38.00 TW: 35.00 TC: 47.50 TC: 23.50 TC: 17.50TC: 17.50 TC: 09.50 TW: 36.50 RIM: 14.50 80 2 0 8 0 3 0 8 0 1 6 8 0 1 8 8 0 2 2 8 0 2 4 80 2 6 8 0 2 8 EXISTING SHADOW MOUNTAIN DECK ENCROACHMENT T C : 0 9 . 4 0 FG: 31.73 TC: 35.50 DRAINAGE DIRECTION/SLOPE SPOT ELEVATION EXAMPLE: TOP OF CONCRETE @ 8000.00' = BW = BOTTOM OF WALL FFE = FINISHED FLOOR ELEVATION FG = FINISHED GRADE FL = FLOW LINE GB = GRADE BREAK HP = HIGH POINT LP = LOW POINT MATCH EX = MATCH EXISTING TC = TOP OF CONCRETE TP = TOP OF PAVERS TW = TOP OF WALL SPOT ELEVATION LEGEND 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0 10 DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED:DRAWN: REVISIONS GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O W W W . S O P R I S E N G . C O M S e p 2 0 , 2 0 2 0 - 1 0 : 1 9 a m G: \ 2 0 1 5 \ 1 5 1 0 1 . 0 6 - G o r s u c h H a u s \ C I V I L \ C i v i l D W G s \ P L O T \ C . 2 . 0 3 P E R I M E T E R G R A D I N G 1 5 1 0 1 . 0 6 . d w g CJB JKS C.2.03 OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2-BUSINESS DAYS IN ADVANCE Know what's below. before you dig.Call R CONCEPTUAL PERIMETER GRADING PLAN NOTES: 1.EXISTING CONTOURS ILLUSTRATED HEREIN ARE AT 2 FT INTERVAL. 2.PROPOSED CONTOURS ARE AT 2 FT INTERVALS. 3.MUDFLOW MITIGATION WALL EXTENDING 2.3' MIN. ABOVE FINAL GRADES REQUIRED ALONG WESTERN SIDE OF BUILDING. 4.PLAN ILLUSTRATES AREA DRAINS @ PATIOS HOWEVER SLOT DRAINS MAY BE UTILIZED INSTEAD. FINAL DETAILS TO BE PROVIDED @ BUILDING PERMIT. 5.AREA DRAINS ABOVE STRUCTURE TO BE DETERMINED (TBD). 6.EROSION CONTROL MATS REQUIRED FOR ALL SLOPES THAT EXCEED 3:1. 10-10-20191 SD PRICING PROJECT NUMBER:15101.06 1-15-20202 DETAILED REVIEW-DRAFT PROJECT DETAILED REVIEW XX: XX.XX 2.0% TC: 00.00 MA T C H L I N E SE E S H E E T C . 2 . 0 0 NOTE: THESE PLANS ARE CONCEPTUAL OR ILLUSTRATIVE IN NATURE. PRECISE INFORMATION SHALL BE PROVIDED AS PART OF THE BUILDING PERMIT APPLICATION, AND IN SITUATIONS WHERE THE FINAL PD DEVELOPMENT PLANS AND APPROVED BUILDING PERMIT DIFFER, THE APPROVED BUILDING PERMIT SHALL RULE. 3-2-20203 DETAILED REVIEW 9-21-20204 DETAILED REVIEW-REVISIONS XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XU T XU T XU T XU T XU T XU T XU T XU T XU T XE L XE L XE L XE L XE L XE L XE L XE L XE L >>> > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > > >>>>> XGAS XGAS XGAS XGAS XGAS XEL XEL XEL XEL XEL XEL XEL XE L XE L XE L X E L XE L XE L XE L XE L XE L XE L XE L XE L XE L XE L X E L X E L X E L XE L XE L XE L XE L XE L XE L X E L X E L X E L X E L XE L XE L XE L XE L XE L XE L XE L XEL XEL XEL XEL XEL XEL X U T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XU T XGAS XSA XSA XGA S XGA S X G A S XG A S XG A S X G A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S XG A S X G A S 8000 8010 8002 8004 8006 8008 8012 8014 8016 8018 50 . 0 % 1 1 2 2 3 3 4 4 5 5 6 6 7 7 8 8 9 9 10 10 11 11 12 12 13 13 14 14 15 15 1 6 1 6 1 7 1 7 1 8 1 8 1 9 1 9 2 0 2 0 2 1 2 1 22 22 23 23 24 24 25 25 26 262 7 2 7 2 8 2 8 29 29 30 30 31 31 32 32 33 33 34 34 8010 8020 8 0 3 0 80 4 0 8 0 5 0 8 0 6 0 8 0 7 0 8 0 8 0 80 9 0 800 6 8008 8012 8 0 1 4 801 6 8018 8022 8024 8026 8028 8 0 3 2 8 0 3 4 80 3 6 80 3 8 8 0 4 2 80 4 2 8 0 4 2 8 0 4 4 8 0 4 6 8 0 4 8 8 0 5 2 8 0 5 4 8 0 5 6 8 0 5 8 8 0 6 2 8 0 6 4 8 0 6 6 8 0 6 8 8 0 7 2 8 0 7 4 8 0 7 6 8 0 7 8 8 0 8 2 80 8 4 80 8 6 80 8 8 80 9 2 8 0 9 4 8 0 1 0 8 0 2 0 8 0 3 0 80 4 0 8 0 5 0 8 0 6 0 8 0 7 0 10 . 6 % 10. 3 % 31 . 3 % 2 . 6 % FG:8067.70' FL:8069.70' RIM:8007.43' HATCH PATTERN REPRESENTS TIERED SOIL NAIL WALLS AT AN EQUIVALENT 1:1 SLOPE EX: 5 4 . 4 % EX. WOOD DECK EX . W O O D D E C K S T A I R W A Y S. A S P E N R O W SH A D O W MO U N T A I N PROPOSED CATCH BASIN WEST SIDE SWALE PROFILE 8005 8010 8020 8030 8040 8050 8060 8070 -0+08 80 1 4 . 3 80 0 7 . 4 3 0+00 80 1 4 . 7 80 0 8 . 0 5 80 1 6 . 7 80 1 0 . 7 3 0+50 80 2 2 . 9 80 1 4 . 6 3 80 2 5 . 3 80 2 0 . 7 1 1+00 80 2 9 . 5 80 2 5 . 8 6 80 3 5 . 1 80 3 0 . 3 9 1+50 80 4 1 . 9 80 3 2 . 8 0 80 4 6 . 8 80 3 5 . 0 5 2+00 80 5 2 . 0 80 4 2 . 7 1 80 5 7 . 2 80 5 0 . 4 3 2+50 80 6 3 . 1 80 5 8 . 7 6 80 6 7 . 7 80 6 6 . 7 8 3+00 80 6 9 . 8 80 6 9 . 3 2 80 7 1 . 6 80 6 9 . 5 2 -29.4% -17.6% -2.6% -30.6% -10.3%-2.0% 18" DEEP SWALE WITH 12" WIDE BOTTOM AND 3:1 (MAX) SIDE SLOPES. INSTALL FLEXAMAT, RIP RAP LINING OR APPROVED EQUAL ALONG FLOWLINE AND SIDE SLOPES OF SWALE FOR EROSION PROTECTION (TBD TO DETERMINED PRIOR TO BUILDING PERMIT) -33.3% -10.6% FLOWLINE OF WEST SWALE; REFER TO NOTES ON THIS SHEET -15.6% -22.1% SECTION 2 - 2 7988 7992 7996 8000 8004 8008 8012 8016 8020 8024 8028 0 10 200-10 SECTION 3 - 3 7992 7996 8000 8004 8008 8012 8016 8020 8024 8028 0 10 200-10 SECTION 4 - 4 7992 7996 8000 8004 8008 8012 8016 8020 8024 8028 8032 0 10 200-10 SECTION 5 - 5 8000 8004 8008 8012 8016 8020 8024 8028 8032 0 10 200-10 SECTION 6 - 6 8000 8004 8008 8012 8016 8020 8024 8028 8032 0 10 200-10 SECTION 7 - 7 8000 8004 8008 8012 8016 8020 8024 8028 8032 8036 0 10 200-10 SECTION 8 - 8 8000 8004 8008 8012 8016 8020 8024 8028 8032 8036 0 10 200-10 SECTION 9 - 9 8000 8004 8008 8012 8016 8020 8024 8028 8032 8036 0 10 200-10 SECTION 10 - 10 8000 8004 8008 8012 8016 8020 8024 8028 8032 8036 0 100-10 SECTION 11 - 11 8008 8012 8016 8020 8024 8028 8032 8036 8040 0 100-10 SECTION 12 - 12 8008 8012 8016 8020 8024 8028 8032 8036 8040 0 100-10 SECTION 13 - 13 8012 8016 8020 8024 8028 8032 8036 8040 0 10 200-10 SECTION 14 - 14 8020 8024 8028 8032 8036 8040 8044 8048 0 10 200-10 SECTION 15 - 15 8024 8028 8032 8036 8040 8044 8048 8052 0 100-10-20 SECTION 16 - 16 8020 8024 8028 8032 8036 8040 8044 8048 8052 8056 0 100-10-20 SECTION 17 - 17 8020 8024 8028 8032 8036 8040 8044 8048 8052 8056 0 100-10-20 SECTION 18 - 18 8024 8028 8032 8036 8040 8044 8048 8052 8056 0 100-10-20 SECTION 19 - 19 8028 8032 8036 8040 8044 8048 8052 8056 8060 8064 0 100-10-20 SECTION 20 - 20 8028 8032 8036 8040 8044 8048 8052 8056 8060 8064 0 10 200-10-20 SECTION 21 - 21 8032 8036 8040 8044 8048 8052 8056 8060 8064 0 10 200-10 SECTION 22 - 22 8036 8040 8044 8048 8052 8056 8060 8064 8068 0 10 200-10-20 SECTION 23 - 23 8040 8044 8048 8052 8056 8060 8064 8068 8072 0 10 200-10-20 SECTION 24 - 24 8044 8048 8052 8056 8060 8064 8068 8072 8076 0 10 200-10-20 SECTION 25 - 25 8048 8052 8056 8060 8064 8068 8072 8076 0 10 200-10-20 SECTION 26 - 26 8052 8056 8060 8064 8068 8072 8076 8080 0 10 200-10-20 SECTION 27 - 27 8052 8056 8060 8064 8068 8072 8076 8080 8084 0 10 200-10-20 SECTION 28 - 28 8052 8056 8060 8064 8068 8072 8076 8080 8084 8088 0 10 200-10-20 SECTION 29 - 29 8056 8060 8064 8068 8072 8076 8080 8084 8088 0 10 200-10-20 SECTION 30 - 30 8056 8060 8064 8068 8072 8076 8080 8084 0 10 200-10-20 SECTION 31 - 31 8056 8060 8064 8068 8072 8076 8080 8084 0 10 200-10-20 SECTION 32 - 32 8056 8060 8064 8068 8072 8076 8080 8084 0 10 200-10-20 SECTION 1 - 1 7988 7992 7996 8000 8004 8008 8012 8016 8020 8024 0 10 200-10-20 3.0:1 2.30' DEPTH (TYPICAL) RE. TO NOTE 3 EX: 1 . 9 : 1 3.0:1 6.8:1 3.4:1 3.7:1 EX: 2. 1 : 1 EX: 1 . 9 : 1 3.0:1 3.0:1 3.1:1 3.0:1 3.0:1 3.0:1 4.0:1 3.0:1 3.0:1 3.1:1 3.0:1 3.0:1 3.0:1 3.0:1 3.0:1 3.0:1 3.1:1 3.0:1 3.0:1 3.0:1 3.0:1 3.0:1 3.7:1 3.4:1 3.0:1 3.0:1 3.1:1 3.0:1 3.0:1 3.0:1 2.0:1 2.0:1 2.0:1 2.0:1 2.0:1 2.0:1 2.0:1 3.1:1 3.0:1 2.3:1 2.0:1 2.5:1 3.0:1 3.0:1 3.0:1 3.1:1 3.7:1 2.1:1 4.2:1 3.3:1 3.5:1 3.4:1 3.4:1 3.1:1 3.2:1 3.2:1 4.0:1 4.8:1 4.0:1 3.0:1 3.0:1 4.5:1 3.5:1 3.0:1 3.0:1 3.0:1 3.0:1 3.1:1 3.0:1 3.0:1 3.0:1 3.4:1 3.4:1 3.3:1 3.1:1 3.0:1 3.0:1 3.0:1 2.5:1 3.3:1 PROPOSED TIERED SOIL NAIL WALL; (5'-6' HEIGHT W/ 5'-6' WIDE BENCHES)-TYP 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 020 20 40 20 8010 SECTION SCALE: 1" = 20' (VERT. & HORZ) NO R T H DATE#DESCRIPTION ISSUE DATE: SHEET NUMBER REVIEWED:DRAWN: REVISIONS GO R S U C H H A U S NO R W A Y I S L A N D , L L C . AS P E N , C O L O R A D O W W W . S O P R I S E N G . C O M S e p 2 0 , 2 0 2 0 - 1 0 : 0 0 a m G: \ 2 0 1 5 \ 1 5 1 0 1 . 0 6 - G o r s u c h H a u s \ C I V I L \ C i v i l D W G s \ P L O T \ C . 2 . 0 6 W E S T S W A L E P P & S E C 1 5 1 0 1 . 0 6 . d w g CJB JKS C.2.06 OPRIS ES NGINEERING, LLC. CIVIL CONSULTANTS 502 MAIN STREET CARBONDALE, CO 81623 (970) 704-0311 FAX: (970)-704-0313 MEMBER UTILITIES FOR THE MARKING OF UNDERGROUND BEFORE YOU DIG, GRADE, OR EXCAVATE CALL 2-BUSINESS DAYS IN ADVANCE Know what's below. before you dig.Call R WEST SWALE PLAN, PROFILE & SECTIONS PROFILE SCALE: 1" = 20' (VERT. & HORZ) 10-10-20191 SD PRICING PROJECT NUMBER:15101.06 1-15-20202 DETAILED REVIEW-DRAFT PROJECT DETAILED REVIEW NOTES: 1.MINIMUM DIMENSIONS OF SWALE:18" DEEP, 3:1 SIDE SLOPES, 12" WIDE BOTTOM 2.EROSION CONTROL PROTECTION REQUIRED ALONG BOTTOM & SIDE SLOPES OF CHANNEL (FLEXAMET, RIPRAP, GABION BASKETS, ETC.) MATERIAL TBD PRIOR TO BUILDING PERMIT. 3.2.3' MIN. DEPTH REQUIRED ALONG ENTIRE WEST SIDE MEASURED FROM FLOWLINE TO PATIO/TOP OF WALL PER DEBRIS FLOW MITIGATION RECOMMENDATIONS. 4.EROSION CONTROL MATS REQUIRED FOR ALL SLOPES THAT EXCEED 3:1. NOTE: THESE PLANS ARE CONCEPTUAL OR ILLUSTRATIVE IN NATURE. PRECISE INFORMATION SHALL BE PROVIDED AS PART OF THE BUILDING PERMIT APPLICATION, AND IN SITUATIONS WHERE THE FINAL PD DEVELOPMENT PLANS AND APPROVED BUILDING PERMIT DIFFER, THE APPROVED BUILDING PERMIT SHALL RULE. 3-2-20203 DETAILED REVIEW 9-21-20204 DETAILED REVIEW-REVISIONS 13 NE1/4N89° 55' 06"E 2665.35' 13 2 2 . 9 3 ' 13 2 2 . 9 3 ' 1332.68'1332.68' BLOCK 3 EAMES ADDITI O N JUAN S T R E E T DEAN S T R E E T LI T T L E M A C K M S 3 9 5 6 MO L L I E G M S 7 5 7 7 LIT T L E C H I E F M S 5 8 5 0 CO N N E R P L A C E R M S 2 5 3 5 JOTE S M I T H M S 3 9 1 4 A M PI O N E E R M S 1 7 2 1 SOUTH LINE GOVERNMENT LOT 1 (NE1/4NE1/4) NORTH LINE GOVERNMENT LOT 31(SE1/4NE1/4 MS 5 8 8 4 TOP OF MILL SUBDIVISION MTN QUEEN SUBDIVISION SOUTH ASPEN STREET PUD BARBEE FAMILY SUBDIVISION S. A S P E N S T R E E T SOUT H A N N E X A T I O N T O T H E C I T Y O F A S P E N PITKIN C O U N T Y MO N A R C H S T R E E T HILL ST R E E T SUMM I T S T R E E T (B A S I S O F BE A R I N G ) N1 4 ° 5 0 ' 4 9 " E N1 4 ° 5 0 ' 4 9 " E 3 1 7 . 9 4 ' 13 0 8 . 7 9 ' 1336.34' GOVERNMENT LOT 31 (WITHIN CITY OF ASPEN) GOVERNMENT LOT 1 SH A D O W M T N CO N D O M I N I U M S SOUTH ASPEN STREET PUD LIFT ONE LODGE PUD GOVERNMENT LOT 31 (WITHIN PITKIN COUNTY) 13 0 8 . 7 9 ' 1336.34' N23° 37' 06"W 933.16' S13° 35' 04"E 830.86' FOUND 1" IRON PIPE CITY BLOCK MONUMENT FOUND #6 REBAR AND 3.5" ALUMINUM CAP FOR THE 1/4 CORNER SECTION 12 AND 13 2008 L.S. #16129 FOUND #6 REBAR AND 3.25" ALUMINUM CAP FOR THE N-E 1/16TH CORNER SECTION 13 CORNER SECTION 12/13 T10S R85W AND 7/18 T10S R84W CORNER DESTROYED WITH CONSTRUCTION IN 2008 - SEE WITNESSES SET PER MONUMENT RECORD 132.5' WITNESS CORNER TO THE NE CORNER SECTION 13 FOUND #6 REBAR AND 3.25" ALUMINUM REFERENCE CAP L.S. #28643 115.0' WITNESS CORNER TO THE NE CORNER SECTION 13 FOUND #6 REBAR AND 3.25" ALUMINUM REFERENCE CAP L.S. #28643 ASPEN TOWNSITE CORNER 9 FOUND "X" ON ROCK FOR CORNER 18 MS 5884 FOUND CORNER 4 MS 3956 FOUND CORNER 4 MS 7577 POST AT INTERSECTION OF MS5884 AND MS3956 CORNER 2 MS5850 FOUND 3.25" BLM BRASS CAP INTERSECTION MS5850 AND MS2535 FOUND 3.25" BRASS CAP BLM 1985 INTERSECTION MS2535 AND EAST LINE SECTION 13 FOUND 3.25" BRASS CAP SET IN CONCRETE RETAINING WALL BLM 1985 CORNER 3 MS2535 FOUND 3.25" BRASS CAP SET IN CONCRETE RETAINING WALL BLM 1985 FOUND INTERSECTION ASPEN TOWNSITE LINE AND NORTH LINE SECTION 13 2.5" IRON PIPE WITH 3.25" BRASS CAP FOUND 1/4 CORNER SECTION 13 T10S R85W/18 T10S R84W 3.25" BRASS CAP ON METAL POST BLM 1954 FOUND 3" ALUMINUM CAP ILLEGIBLE BEARS N 77°29'44" E 9.29' FROM CORNER 3 MS5850 NO MONUMENT RECORD ON FILE CANNOT DETERMINE ORIGIN FOUND #5 REBAR AND 11 4" PLASTIC CAP L.S. #25947 GPS-3 FOUND 3.5" ALUMINUM CAP MARCIN GPS CONTROL AT THE APPROXIMATE INTERSECTION OF DURANT AVE. AND GARMISCH ST. N1/16 SECTION 13 T10S R85W AND SECTION 18 T10S R84W NO CORNER FOUND TO BE SETGOVERNMENT LOT 38 FOUND #5 REBAR AND 11 4" PLASTIC CAP L.S. #28643 FOUND #5 REBAR AND 11 4" PLASTIC CAP L.S. #28643 27 4 1 . 0 5 '1313 2 2 . 9 3 ' 1336.34' FOUND 1/4 CORNER SECTION 13/24 IRON PIPE WITH 3" BRASS CAP BLM 1978 FOUND 1/4 CORNER SECTION 13/14 2.5" IRON PIPE WITH 3.25" BRASS CAP BLM 1954 2648.33' 27 4 1 . 0 5 ' DRA F T FINAL PLAT OF: SHEET 1 OF 5 DEDICATION, CERTIFICATES, AND CONTROL DIAGRAM GORSUCH HAUS PD/SUBDIVISION A PARCEL OF LAND SITUATED IN THE NE1 4 OF SECTION 13, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6th P.M., CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO THE PURPOSE OF THIS PLAT IS TO CREATE A PLANNED DEVELOPMENT (PD), REZONE, AND SUBDIVIDE THE SUBJECT PROPERTY PLAT NOTES 1. LOT 2 IS RESTRICTED AGAINST ALL FUTURE RESIDENTIAL BUILDING AND RESIDENTIAL DEVELOPMENT AND OTHER LAND USES AND ACTIVITIES THAT ARE NOT CONSISTENT WITH THE INTENT AND APPROVED DEVELOPMENT OUTLINED IN ORDINANCE 39 (SERIES OF 2016) (HEREINAFTER “ORDINANCE 39”). 2. ORDINANCE 39 EXPRESSLY AUTHORIZES THE CONSTRUCTION AND USE OF ALL SKI AND NON-MECHANIZED RECREATIONAL INFRASTRUCTURE, INCLUDING SKI LIFTS, TOWERS, SNOWMAKING EQUIPMENT, ACCESSORY AND SUPPORT STRUCTURES APPROVED FOR PLACEMENT ON LOT 2 AND ON CERTAIN PORTIONS OF LOT 1 AS WELL AS THE ABILITY TO CONDUCT SKIING, RECREATIONAL USES THAT DO NOT REQUIRE MECHANIZED INFRASTRUCTURE, ALL RELATED SKI AND RECREATIONAL OPERATIONS AND ACCESSORY SKI AND RECREATIONAL USES, INCLUDING SNOWMAKING, SNOW MANAGEMENT, GROOMING, HIKING, BIKING, UPHILLING AND EVENTS RELATED THERETO, AS WELL AS TRADITIONAL AND ROUTINE SKI OPERATIONS AND MAINTENANCE ON THE PROPERTY, INCLUDING MOUNTAIN ACCESS ROAD USE AND MAINTENANCE, AS WELL AS MOTORIZED VEHICLE, EQUIPMENT AND MATERIAL STAGING AND ACCESS IN BOTH WINTER AND SUMMER SEASONS ALONG THE MOUNTAIN ACCESS ROAD. 3. ORDINANCE 39 ALSO EXPRESSLY ALLOWS FOR ALL ANCILLARY AND APPROVED SPECIAL EVENTS TO BE CONDUCTED ON LOT 2. NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. SOPRIS ENGINEERING - LLC CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 81623 (970) 704-0311 CL sb 13139.01 09/21/2020 G:\2013\13139\SURVEY\Survey DWGs\Survey Plots\13139-SUBDIVISION V2.dwg CLERK AND RECORDER'S ACCEPTANCE THIS FINAL PLAT OF GORSUCH HAUS PD/SUBDIVISION IS ACCEPTED FOR FILING IN THE OFFICE OF THE CLERK AND RECORDER OF PITKIN COUNTY, COLORADO THIS ______ DAY OF _______________, 2020 IN PLAT BOOK _____ AT PAGE _____ , AS RECEPTION NO. ________________. _______________________________________ PITKIN COUNTY CLERK AND RECORDER CERTIFICATE OF OWNERSHIP, DEDICATIONS AND RESERVATIONS KNOW ALL MEN BY THESE PRESENTS, THAT ASPEN SKIING COMPANY (“ASC”) BEING THE RECORD TITLE OWNER OF THE SUBJECT PROPERTY AS DESCRIBED AND DEPICTED ON SHEET 2 HEREOF, SITUATED IN THE CITY OF ASPEN, PITKIN COUNTY, COLORADO. PURSUANT TO AND IN ACCORDANCE WITH ORDINANCE NO. 39, SERIES OF 2016, (HEREINAFTER, “ORDINANCE 39”) RECORDED APRIL 8, 2019 IN THE PITKIN COUNTY REAL PROPERTY RECORDS UNDER RECEPTION NO. 655085, OWNER HAS, BY THESE PRESENTS, LAID OUT, PLATTED AND SUBDIVIDED THE SAME INTO LOTS 1 AND 2, AS DEPICTED AND DESCRIBED HEREON UNDER THE NAME AND STYLE OF GORSUCH HAUS PD/SUBDIVISION. ASC EXPRESSLY RESERVES THE RIGHT TO ENGAGE IN SKI OPERATIONS ON, OVER AND ACROSS ALL OF LOT 2 IN CONJUNCTION WITH THE OPERATION AND MANAGEMENT OF THE ASPEN MOUNTAIN SKI AREA. IN THIS REGARD, ASC EXPRESSLY RESERVES THE RIGHT TO CONDUCT AND ACCOMMODATE SKIING, SKI OPERATIONS AND RECREATIONAL ACTIVITIES ON THE PROPERTIES COVERED BY THIS PLAT AS DESCRIBED IN THE PLAT NOTES ON SHEET 4 AND SHEET 5 HEREOF, INCLUDING, WITHOUT LIMITATION TO CONDUCT AND ACCOMMODATE SKI ACTIVITIES AND SKI OPERATIONS ON THE “SKIWAY” SHOWN AND IDENTIFIED ON SHEET 4 HEREOF AND ON THE DRAINAGE ACCESS AND MAINTENANCE EASEMENTS SHOWN AND IDENTIFIED ON SHEET 5 . ALL OF THE FOLLOWING DEDICATIONS AND RESERVATIONS ARE MADE SUBJECT TO SUCH RESERVED RIGHTS AND EXPRESS AUTHORIZATIONS CONTAINED IN ORDINANCE 39 TO ENGAGE IN SKI ACTIVITIES AND RECREATIONAL OPERATIONS ON LOT 2, AND SPECIFICALLY WITHIN THE SKIWAY ON LOT 1 AND LOT 2 AND THE DRAINAGE AND MAINTENANCE EASEMENTS SHOWN AND IDENTIFIED ON SHEET 5 . ASC HEREBY MAKES THE FOLLOWING DEDICATIONS AND RESERVATIONS FOR THIS PLAT: 1. DOES HEREBY DEDICATE TO THE CITY OF ASPEN THOSE PORTIONS OF THE LANDS CONTAINED HEREIN SHOWN AND DEPICTED ON SHEET 3 HEREON, AND LABELED “DEDICATED ROW” FOR PURPOSES OF CONSTRUCTING, OPERATING, AND MAINTAINING SUBGRADE PUBLIC UTILITIES, A PUBLIC ROADWAY, PEDESTRIAN SIDEWALK, AND OTHER ASSOCIATED IMPROVEMENTS NECESSARY FOR VEHICULAR AND PEDESTRIAN TRAVEL; PROVIDED, HOWEVER, THAT THIS DEDICATION IS SUBJECT TO, CONDITIONAL ON AND WILL NOT BECOME EFFECTIVE UNTIL THE CITY OF ASPEN ACCEPTS THE FINAL, AS-BUILT ROADWAY, UTLITY INFRASTRUCTURE AND OTHER BUILDING IMPROVEMENTS CONTEMPLATED TO BE PLACED WITHIN SUCH DEDICATED ROW AREAS AS THE SAME ARE DESCRIBED IN THE CIVIL ENGINEERING DESIGN PLANS RECORDED SIMULTANEOUSLY WITH THIS FINAL PLAT; AND 2. DOES HEREBY DEDICATE AND GRANT A PERPETUAL, NON-EXCLUSIVE PUBLIC TRAIL EASEMENT, SIX (6) IN WIDTH, FOR PURPOSES OF NON-MOTORIZED INGRESS AND EGRESS, COMMENCING ON THE NORTHERLY BOUNDARY LINE OF THE PUBLIC PEDESTRIAN EASEMENT ON LOT 1 AS SHOWN HEREON AND THENCE CONTINUING IN A NORTHEASTERLY DIRECTION OVER LOT 1 AND THE HILL STREET RIGHT OF WAY AND THENCE CONTINUING IN A SOUTHEASTERLY DIRECTION ACROSS LOT 2, IN THE AREA DEPICTED AS THE "PUBLIC TRAIL EASEMENT" ALIGNMENT SHOWN AND DEPICTED ON SHEET 4 HEREOF; SUCH PUBLIC TRAIL EASEMENT EXTENDS TO A POINT ON THE EASTERLY BOUNDARY LINE OF LOT 2, WHICH POINT COINCIDES WITH THE WESTERLY BOUNDARY LINE OF THE ADJOINING SKIER AND PEDESTRIAN EASEMENT SHOWN AND DESCRIBED IN THE DOCUMENT RECORDED IN PLAT BOOK 4 AT PAGE 489; OWNER RESERVES THE RIGHT TO UNILATERALLY RE-ALIGN THIS PUBLIC TRAIL EASEMENT TO COINCIDE WITH THE AS-BUILT LOCATION THEREOF SO LONG AS SUCH REALIGNMENT DOES NOT ADVERSELY IMPACT THE INTENDED USES OF THE PUBLIC TRAIL EASEMENT AND ASC ALSO RESERVES THE RIGHT TO UTILIZE LOT 2 FOR SKI AREA OPERATIONS AND TO PROHIBIT PEDESTRIAN, BICYCLE OR SIMILAR USES OF THE PUBLIC TRAIL EASEMENT DURING THE SKI SEASON AND TO LIMIT THE USE OF AND/OR TEMPORARILY CLOSE THE PUBLIC TRAIL EASEMENT DURING THE SKI SEASON TO ACCOMMODATE SNOWMAKING, SNOW STORAGE, SNOW GROOMING, SKIING AND OTHER WINTER SKI OPERATIONS; AND 3. DOES HEREBY DEDICATE AND RESERVE A RECIPROCAL, NON-EXCLUSIVE CONSTRUCTION EASEMENT FOR THE USE AND BENEFIT OF THE OWNERS OF LOTS 1 AND 2 AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES OVER, UPON, AND ACROSS ONLY THE PORTIONS OF LOTS 1 AND 2 NECESSARY TO COMPLETE THE IMPROVEMENTS ON SAID LOTS WITHIN THE AREA DEPICTED AS THE “TEMPORARY CONSTRUCTION EASEMENT” SHOWN AND DEPICTED ON SHEET 4 HEREOF, INCLUDING THE EXCAVATION, SHORING, DEWATERING AND ALL OTHER CONSTRUCTION ACTIVITIES APPROVED IN ACCORDANCE WITH CITY OF ASPEN ORDINANCE 39 (SERIES OF 2016), TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES. THIS RECIPROCAL TEMPORARY CONSTRUCTION EASEMENT SHALL BE TEMPORARY AND SHALL AUTOMATICALLY TERMINATE UPON THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY FOR THE IMPROVEMENTS APPROVED AND CONSTRUCTED UNDER ORDINANCE 39; THE TERMS AND CONDITIONS OF THIS RECIPROCAL TEMPORARY CONSTRUCTION EASEMENT ARE MORE PARTICULARLY DESCRIBED IN THAT CERTAIN RECIPROCAL TEMPORARY CONSTRUCTION EASEMENT RECORDED IN THE OFFICE OF THE PITKIN COUNTY CLERK & RECORDED AT RECEPTION NO. _________________________; AND 4. DOES HEREBY DEDICATE AND RESERVE RECIPROCAL, PERPETUAL, NON-EXCLUSIVE SUBSURFACE STRUCTURAL EASEMENTS OF VARYING WIDTHS ALONG EITHER SIDE OF PORTIONS OF THE COMMON BOUNDARY OF LOTS 1 AND 2 (THE “SUBSURFACE STRUCTURAL EASEMENTS”), SHOWN AND DEPICTED ON SHEET 4 HEREOF, FOR THE USE AND BENEFIT OF THE OWNERS OF SAID LOTS AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES FOR THE PURPOSE OF CONSTRUCTING AND MAINTAINING ANY SUBSURFACE FOUNDATIONS, FOOTER PADS, DEWATERING FACILITIES, DRAINAGE FACILITIES OR OTHER STRUCTURAL ELEMENTS OF THOSE STRUCTURES THAT MAY BE CONSTRUCTED WITHIN SAID SUBSURFACE STRUCTURAL EASEMENTS, TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES PROVIDED THAT THE SAME DOES NOT INTERFERE WITH ASC’S LIFT FACILITIES, UTILITIES AND OPERATIONS; AND, ASC RESERVES THE RIGHT TO UNILATERALLY RE-ALIGN SUBSURFACE STRUCTURAL EASEMENTS TO COINCIDE WITH THE AS-BUILT LOCATIONS OF SUCH STRUCTURAL ELEMENTS; AND 5. DOES HEREBY DEDICATE AND RESERVE A NON-EXCLUSIVE PRIVATE ACCESS EASEMENT OVER, UPON, AND ALONG THE MOUNTAIN OPERATIONS ROAD, SHOWN AND DEPICTED ON SHEET 4 HEREOF AS IT CROSSES LOT 2, LABELED "MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT," AND OVER, UPON AND ALONG THOSE PORTIONS OF LOT 2 LOCATED WEST OF THE MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT, FOR THE USE AND BENEFIT OF THE OWNER OF LOT 1 AND ITS SUCCESSORS, ASSIGNS, EMPLOYEES, LICENSEES AND INVITEES FOR THE PURPOSES OF VEHICULAR AND PEDESTRIAN ACCESS FROM TIME TO TIME NECESSARY FOR THE OPERATION, MAINTENANCE AND UPKEEP OF IMPROVEMENTS LOCATED ON SAID LOT 1 AND FOR ACCESS TO LIMITED, PERIODIC SPECIAL EVENTS ACTIVITIES LOCATED ON, IN AND AROUND PUBLIC AMENITIES SPACES ON LOT 1; SUCH PRIVATE ACCESS EASEMENT DOES NOT CONFER ANY RIGHTS TO THE GENERAL PUBLIC, AND NO PUBLIC ACCESS IS INTENDED TO BE CREATED BY THIS DEDICATION; ASC FOR ITSELF, ITS GRANTEES, SUCCESSORS AND ASSIGNS, RESERVES THE RIGHT TO LIMIT THE USE OF AND/OR TEMPORARILY DENY THE OWNER OF LOT 1 AND ITS SUCCESSORS, ASSIGNS, EMPLOYEES, LICENSEES, AND INVITEES ACCESS TO THE MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT DURING THE SKI SEASON TO ACCOMMODATE SNOWMAKING, SNOW STORAGE, SNOW GROOMING, SKIING AND OTHER WINTER SKI OPERATIONS; AND 6. DOES HEREBY DEDICATE AND GRANT A PERPETUAL, NON-EXCLUSIVE PUBLIC PEDESTRIAN EASEMENT OVER AND ACROSS LOT 1 AND SUCH PORTIONS OF LOT 2 AS ARE SPECIFICALLY IDENTIFIED ON PAGE 4 HEREOF FOR PURPOSES OF NON-MOTORIZED, PEDESTRIAN-ONLY ACCESS OVER AND UPON A STRIP OF LAND AS SHOWN AND DEPICTED ON SHEET 4 HEREOF AND LABELED “PUBLIC PEDESTRIAN EASEMENT” [NOTE: THIS EASEMENT IS FOR (A) PUBLIC PEDESTRIAN ACCESS WITHIN THE 8’ WIDE SIDEWALK ON THE OUTER EDGE OF THE CUL-DE-SAC, (B) THE STAIRWAY AREAS ALONG THE WEST SIDE OF LOT 1 AND (C) THE IRREGULARLY SHAPED AREA PROVIDING PEDESTRIAN ACCESS OVER AND ACROSS THE FAR WESTERN PORTION OF LOT 2 TO THE BARBEE OPEN SPACE PARCEL.]; ASC RESERVES THE RIGHT FOR ITSELF, ITS GRANTEES, SUCCESSORS AND ASSIGNS TO BLOCK, LIMIT OR DENY ACCESS TO SUCH PORTIONS OF THE PUBLIC PEDESTRIAN EASEMENT AS ARE NECESSARY FOR PURPOSES OF USE OF THE MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT BY THE OWNER OF LOT 1 FOR PURPOSES AS DESCRIBED IN PARAGRAPH 5 ABOVE AND ASC, ITS GRANTEES, SUCCESSORS, ASSIGNS, LICENSEES AND INVITEES, AS DESCRIBED IN PARAGRAPH 10 BELOW; AND 7. DOES HEREBY DEDICATE AND RESERVE FOR THE USE AND BENEFIT FROM TIME TO TIME OF THE OWNERS OF LOTS 1 AND 2 AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES, PERPETUAL, NON-EXCLUSIVE EASEMENTS ON THOSE PORTIONS OF LOTS 1 AND 2 ALONG THE ENTIRE COURSE OF THE ON-SITE DRAINAGE IMPROVEMENTS SHOWN AND DEPICTED ON THE CONCEPTUAL MASTER DRAINAGE PLAN (SHEET C.4.02) RECORDED SIMULTANEOUSLY WITH THIS PLAT, FOR PURPOSES OF CONSTRUCTION, INSTALLATION, USE, OPERATION, MAINTENANCE, REPAIR, REMOVAL AND REPLACEMENT OF PRIVATE ON-SITE STORM WATER DRAINAGE SYSTEMS FACILITIES, WITH ALL APPROPRIATE SUB-SURFACE AND SURFACE IMPROVEMENTS, TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES (COLLECTIVELY, THE "DRAINAGE EASEMENTS"); ASC RESERVES THE RIGHT TO UNILATERALLY RELOCATE THE ACTUAL LOCATION OF SUCH DRAINAGE EASEMENTS TO COINCIDE WITH THE AS-BUILT LOCATION OF SUCH DRAINAGE IMPROVEMENTS; AND 8. DOES HEREBY DEDICATE AND RESERVE THE RIGHT TO GRANT EASEMENTS AND LICENSES TO AND FOR THE USE AND BENEFIT OF UTILITY COMPANIES OWNING, OPERATING OR OTHERWISE MANAGING THE UTILITY LINES AND SYSTEMS WITHIN LOTS 1 AND 2, AND FOR THE USE AND BENEFIT FROM TIME TO TIME OF THE OWNERS OF SAID LOTS AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES, A PERPETUAL, NON-EXCLUSIVE UTILITY EASEMENT OVER, UPON, AND BENEATH THE "UTILITY EASEMENT" SHOWN AND LABELED ON SHEET 4 HEREOF, FOR THE PURPOSE OF CONSTRUCTION, INSTALLATION, ENLARGEMENT, USE, OPERATION, MAINTENANCE, REPAIR, REMOVAL AND REPLACEMENT OF UNDERGROUND UTILITIES INCLUDING WATER, SEWER, STORM WATER DRAINAGE, GAS, ELECTRICITY, TELEPHONE, TELEVISION AND TELECOMMUNICATIONS, TOGETHER WITH ASSOCIATED EQUIPMENT AND FACILITIES REQUIRED ABOVE GROUND, REGARDING WHICH ALL SAID EASEMENTS AND LICENSES SHALL BE IN LOCATIONS REASONABLY APPROVED IN ADVANCE BY THE OWNER(S) OF THE IMPACTED LOT(S), TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES; THE FINAL OWNER UTILITY EASEMENTS TO COINCIDE WITH THE AS-BUILT LOCATIONS OF SUCH UTILITIES; AND 9. DOES HEREBY RESERVE UNTO ASC, ITS GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES, AS THE OWNER, OPERATOR OR MANAGER OF THE LIFT FACILITIES LOCATED ON LOT 1 A PERPETUAL, NON-EXCLUSIVE EASEMENT OVER, UPON AND BENEATH THE "LIFT FACILITIES EASEMENT" SHOWN ON SHEET 4 HEREOF, FOR THE PURPOSE OF CONSTRUCTING, INSTALLING, ENLARGING, OPERATING (INCLUDING, WITHOUT LIMITATION, TRANSPORTING PEOPLE, GOODS AND MATERIALS), MAINTAINING, REPAIRING, REMOVING AND REPLACING LIFT FACILITIES, AND FOR THE ADDITIONAL USE AND BENEFIT OF ASC, ITS GRANTEES, SUCCESSORS, ASSIGNS, LICENSEES AND INVITEES; AND 10. DOES HEREBY RESERVE FOR THE USE AND BENEFIT OF ASC, ITS GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS AND EMPLOYEES, AS OPERATOR AND MANAGER OF THE LIFT FACILITIES WITHIN THE LIFT FACILITIES EASEMENT DESCRIBED ABOVE AND AS OPERATOR AND MANAGER OF THE ASPEN MOUNTAIN SKI AREA, A NON-EXCLUSIVE PRIVATE ACCESS EASEMENT OVER, UPON, AND ALONG THE MOUNTAIN OPERATIONS ROAD, SHOWN AND DEPICTED ON SHEET 4 HEREOF AS IT CROSSES LOT 1, LABELED "MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT," FOR THE USE AND BENEFIT OF THE OWNER OF LOT 2 AND ITS SUCCESSORS, ASSIGNS, EMPLOYEES, LICENSEES AND INVITEES FOR THE PURPOSE OF VEHICULAR AND PEDESTRIAN ACCESS FROM TIME TO TIME NECESSARY FOR THE OPERATION AND MAINTENANCE OF IMPROVEMENTS LOCATED ON LOT 2 AND FOR ACCESS TO THE ASPEN MOUNTAIN SKI AREA THROUGHOUT THE YEAR; SUCH PRIVATE ACCESS EASEMENT INCLUDES THE RIGHT TO INSTALL SNOWMAKING WATER LINES AND ENGAGE IN SNOWMAKING, SNOW STORAGE, SNOW GROOMING, SKIING AND SKI OPERATIONS, INCLUDING, WITHOUT LIMITATION, SKI RACING AND SPECIAL EVENTS, ON THAT PORTION OF THE SKIWAY LOCATED WITHIN THE MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT; SUCH PRIVATE ACCESS EASEMENT DOES NOT CONFER ANY RIGHTS TO THE GENERAL PUBLIC, AND NO PUBLIC ACCESS OR USE OF THE MOUNTAIN OPERATIONS ROAD AS SHOWN HEREON IS INTENDED TO BE CREATED BY THIS PLAT, EXCEPT AS OUTLINED IN DEDICATION PARAGRAPH 12 HEREON; AND 11. DOES HEREBY DEDICATE AND RESERVE FOR THE USE AND BENEFIT FROM TIME TO TIME OF THE OWNERS OF LOTS 1 AND 2 AND THEIR RESPECTIVE GRANTEES, SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS, AND EMPLOYEES, A PERPETUAL, NON-EXCLUSIVE “UTILITY SERVICE LINE EASEMENT” OVER, UNDER AND UPON SAID LOTS ALONG THE ENTIRE COURSE OF ALL UTILITY SERVICE LINES THAT MAY BE CONSTRUCTED BETWEEN OR OTHERWISE CONNECT TO THE UTILITY SERVICE LINES AND MAINS ON LOTS 1 AND 2 TO THE IMPROVEMENTS THEREON, IN THE AS-BUILT LOCATIONS OF SUCH UTILITY SERVICE LINES, FOR PURPOSES OF CONSTRUCTION, INSTALLATION, USE, OPERATION, MAINTENANCE, REPAIR, REMOVAL AND REPLACEMENT OF SUCH UTILITY SERVICES LINES, TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE ACCOMPLISHMENT OF SUCH PURPOSES AND TOGETHER WITH A REASONABLE RIGHT OF ACCESS FOR THE PURPOSE OF RELOCATING SAID UTILITY SERVICE LINES; ASC AND ITS SUCCESSORS RESERVES THE RIGHT, EXCEPT IN THE CASE OF A BONA FIDE EMERGENCY, TO TEMPORARILY DENY THE OWNER OF LOT 1 AND ITS SUCCESSORS, ASSIGNS, EMPLOYEES, LICENSEES, AND INVITEES ACCESS TO THE UTILITY SERVICE LINE EASEMENT DURING THE SKI SEASON TO ACCOMMODATE SNOWMAKING, SNOW STORAGE, SNOW GROOMING, SKIING AND OTHER WINTER SKI OPERATIONS; AND 12. DOES HEREBY DEDICATE AND GRANT TO THE GENERAL PUBLIC THE LIMITED, NON-EXCLUSIVE RIGHT TO USE THE MOUNTAIN OPERATIONS ROAD PRIVATE EASEMENT OUTSIDE OF THE SKI SEASON FOR PEDESTRIAN AND BICYCLE USES; SUCH EASEMENT SHALL EXTEND FROM THE MOUNTAIN OPERATIONS ROAD’S INTERSECTION WITH THE HILL STREET RIGHT OF WAY AND CONTINUE ALONG AND WITHIN THE ALIGNMENT OF THE MOUNTAIN OPERATIONS ROAD SOUTHWARD TO THE SOUTHERN BOUNDARY OF THE GORSUCH HAUS PD/SUBDIVISION; SUCH GRANT IS EXPRESSLY MADE SUBJECT TO ASC’S RIGHTS, EXERCISED IN ITS SOLE DISCRETION, TO CONTROL AND MANAGE AND/OR ENFORCE CLOSURES OF THE MOUNTAIN OPERATIONS ROAD IN CONNECTION WITH ASPEN MOUNTAIN SKI AREA OPERATIONS AT ANY TIME AS DETERMINED BY THE OPERATOR OF ASPEN MOUNTAIN SKI AREA FOR SAFETY, MAINTENANCE, OPERATIONS, LOADING, UNLOADING AND STAGING PURPOSES AND/OR AS CONTEMPLATED UNDER THE ASPEN MOUNTAIN SKI AREA MASTER PLAN, AS AMENDED FROM TIME TO TIME; AND 13. DOES HEREBY DEDICATE TO THE CITY OF ASPEN NON-EXCLUSIVE DRAINAGE ACCESS AND MAINTENANCE EASEMENTS OVER AND ACROSS THE AREAS SHOWN ON SHEET 5 HEREOF, FOR PURPOSES OF ACCESS TO AND MAINTENANCE OF THE STORM WATER DRAINAGE FACILITIES SHOWN AND IDENTIFIED ON SHEET 5, WHICH INCLUDE THE MAIN UNDERGROUND STORM DRAINAGE PIPELINE AND THE LATERAL CONNECTIONS THERETO, THE STORM INLETS, THE ROADSIDE SWALES AND THE DRAINAGE SWALE (ALSO KNOWN AS THE WEST SWALE) SHOWN THEREON (THE “DRAINAGE INFRASTRUCTURE”). THE ACCESS AND MAINTENANCE EASEMENTS SHOWN AND IDENTIFIED ON SHEET 5 ARE INTENDED TO ALLOW FOR THE CITY OF ASPEN, UPON REASONABLE ADVANCE WRITTEN NOTICE TO THE OWNERS OF LOT 1 AND LOT 2 (EXCEPT IN EMERGENCIES, WHEN NO ADVANCE WRITTEN NOTICE WILL BE REQUIRED), TO ACCESS AND MAINTAIN THE DRAINAGE INFRASTRUCTURE , AND INCLUDE THE RIGHT TO CONSTRUCT, INSTALL, REMOVE, REPLACE, MAINTAIN, REPAIR, OPERATE BUT NOT ADD TO, CHANGE OR ALTER THE DRAINAGE FACILITIES LOCATED ON LOT 1 OR LOT 2 UNLESS THE AFFECTED OWNER(S) EXPRESSLY AGREE IN WRITING TO SUCH ADDITIONS, CHANGES OR ALTERATIONS. THE CITY OF ASPEN’S ACCESS AND MAINTENANCE ACTIVITIES SHALL BE CONDUCTED AT ALL TIMES TO PROVIDE MINIMUM DISRUPTION TO THE DAY-TO-DAY HOSPITALITY AND SKI OPERATIONS OF THE OWNERS OF LOT 1 AND LOT 2 AND THEIR RESPECTIVE GUESTS AND INVITEES. THESE EASEMENTS ARE ALSO EXPRESSLY MADE SUBJECT TO THE RESERVED RIGHTS OF ASC TO ENGAGE IN SKI OPERATIONS AS DESCRIBED IN THE THIRD PREFATORY PARAGRAPH SET FORTH ABOVE, AND ARE ALSO SUBJECT TO THE RESERVED RIGHT OF THE OWNER OR OWNERS OF LOT 1 TO ENGAGE IN LODGE, HOTEL, COMMERCIAL AND RESIDENTIAL CONDOMINIUM ACTIVITIES AND OPERATIONS IN CONNECTION WITH THE DEVELOPMENT, OPERATION, MANAGEMENT, MAINTENANCE AND CAPITAL REPAIRS OR REPLACEMENTS OF THE BUILDING IMPROVEMENTS AND LANDSCAPING IMPROVEMENTS PLACED ON LOT 1 AND WITHIN ALL EASEMENT AND LICENSED AREAS APPURTENANT TO LOT 1. THE CITY OF ASPEN SHALL BE RESPONSIBLE FOR THE RESTORATION, REPAIR OR REPLACEMENT OF BUILDING IMPROVEMENTS OR LANDSCAPING DAMAGED AS A RESULT OF THE CITY OF ASPEN’S EXERCISE OF ITS ACCESS AND MAINTENANCE EASEMENT RIGHTS DESCRIBED IN THIS PARAGRAPH 13. CONTINUED ... TITLE COMPANY CERTIFICATE THE UNDERSIGNED, A DULY-AUTHORIZED REPRESENTATIVE OF LAND TITLE GUARANTEE COMPANY, REGISTERED TO DO BUSINESS IN PITKIN COUNTY, COLORADO, DOES HEREBY CERTIFY, PURSUANT TO SECTION 20-15(J) OF THE ASPEN MUNICIPAL CODE, THAT ASPEN SKIING COMPANY DOES HOLD FEE SIMPLE TITLE TO THE REAL PROPERTY DESCRIBED HEREIN AND IS FREE AND CLEAR OF ALL LIENS AND ENCUMBRANCES EXCEPT THOSE LISTED ON THE TITLE COMMITMENT ISSUED BY LAND TITLE GUARANTEE COMPANY UNDER ORDER NO. QC62010933, DATED JANUARY 10, 2020. ALTHOUGH WE BELIEVE THE FACTS STATED ON THIS PLAT ARE TRUE, THIS CERTIFICATE IS NOT TO BE CONSTRUED AS AN ABSTRACT OF TITLE, NOR AN OPINION OF TITLE, NOR A GUARANTY OF TITLE, AND IT IS UNDERSTOOD AND AGREED THAT LAND TITLE GUARANTEE COMPANY, NEITHER ASSUMES NOR WILL BE CHARGED WITH ANY FINANCIAL OBLIGATION OR LIABILITY WHATEVER ON ANY STATEMENT CONTAINED HEREIN. BY:_________________________________DATE______________ NAME, TITLE ADDRESS: 533 E. HOPKINS AVENUE ASPEN, CO 81611 STATE OF COLORADO ) )SS. COUNTY OF PITKIN ) THE TITLE CERTIFICATE WAS ACKNOWLEDGED BEFORE ME THIS __________ DAY OF ____________________, 2020, BY ____________________________ AS __________________ OF LAND TITLE GUARANTEE COMPANY NAME WITNESS MY HAND AND OFFICIAL __________________________________________ NOTARY PUBLIC MY COMMISSION EXPIRES: _______________________. MY ADDRESS IS: _______________________________. 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 0200 200 400 200 800100 VICINITY MAP SCALE: 1" = 2000' SITE SURVEYOR'S CERTIFICATE I, MARK S. BECKLER, A PROFESSIONAL LAND SURVEYOR LICENSED IN THE STATE OF COLORADO, HEREBY CERTIFY THAT IN MAY-JUNE 2018, A SURVEY OF THE HEREIN DESCRIBED PROPERTY WAS PERFORMED UNDER MY SUPERVISION AND DIRECTION, IN ACCORDANCE WITH COLORADO REVISED STATUTES 1973, TITLE 38, ARTICLE 51, AS AMENDED FROM TIME TO TIME, AND THAT THIS FINAL PLAT OF GORSUCH HAUS PD/SUBDIVISION ACCURATELY AND SUBSTANTIALLY DEPICTS SAID SURVEY. THE CONTROL SURVEY PRECISION IS GREATER THAN 1/15,000. RECORDED EASEMENTS, RIGHTS-OF-WAY AND RESTRICTIONS ARE THOSE SET FORTH IN THE TITLE COMMITMENT REFERENCED IN SURVEY NOTE 5 HEREON. ______________________________________________ MARK S. BECKLER, PLS #28643 COMMUNITY DEVELOPMENT DEPARTMENT DIRECTOR REVIEW THIS FINAL PLAT OF GORSUCH HAUS PD/SUBDIVISION WAS REVIEWED BY THE COMMUNITY DEVELOPMENT DIRECTOR OF THE CITY OF ASPEN THIS ______ DAY OF ______________________, 2020. _______________________________ DIRECTOR CITY ENGINEER'S CERTIFICATE THIS FINAL PLAT OF GORSUCH HAUS PD/SUBDIVISION WAS REVIEWED FOR THE DEPICTION OF THE ENGINEERING DEPARTMENT SURVEY REQUIREMENTS THIS ________________ DAY OF ___________________ , 2020. ________________________________ CITY ENGINEER ASPEN CITY COUNCIL APPROVAL THIS FINAL PLAT OF GORSUCH HAUS PD/SUBDIVISION WAS APPROVED BY THE CITY OF ASPEN CITY COUNCIL ON THE ______ DAY OF ____________________, 20___, BY ORDINANCE NO. _____, SERIES OF 2020, RECORDED _______________, 2020 IN THE OFFICE OF THE CLERK AND RECORDER OF PITKIN COUNTY AS RECEPTION NO. ___________________ AND THE CITY OF ASPEN HEREBY SPECIFICALLY CONFIRMS FOR THE BENEFIT OF ASPEN SKIING COMPANY LLC THAT CERTAIN EASEMENT OVER AND ACROSS HILL STREET AS MORE PARTICULARLY DESCRIBED IN THE EASEMENT AGREEMENT RECORDED AS RECEPTION NO.____________, PURSUANT TO CITY OF ASPEN CITY COUNCIL ORDINANCE NO._______________, RECORDED AS RECEPTION NO. ___________, AND AS SHOWN ON SHEET 4 HEREON. ______________________________________________________ MAYOR, TORRE DATE ATTEST: _____________________________ CITY CLERK SHEET INDEX SHEET 1 - DEDICATION, CERTIFICATES, AND CONTROL DIAGRAM SHEET 2 - OVERVIEW OF GORSUCH HAUS SUBJECT PROPERTIES, PROPERTY DESCRIPTIONS, EASEMENTS AND SURVEY NOTES SHEET 3 - RIGHT-OF-WAY DEDICATION, SUBDIVISION LOT DIMENSIONS AND RECORD EASEMENTS SHEET 4 - SUBDIVISION EASEMENTS SHEET 5 - DRAINAGE ACCESS & MAINTENANCE EASEMENT CONTROL DIAGRAM CITY OF ASPEN CONFIRMATION OF RECREATIONAL USE EASEMENT GRANT HILL STREET RIGHT OF WAY PURSUANT TO CITY OF ASPEN CITY COUNCIL ORDINANCE NO. 39, AND AS FURTHER CONFIRMED IN THAT CERTAIN EASEMENT AGREEMENT RECORDED AS RECEPTION NO._____________________ IN THE PITKIN COUNTY RECORDS, THE CITY OF ASPEN HEREBY GRANTS AND CONFIRMS FOR THE USE AND BENEFIT OF ASPEN SKIING COMPANY, LLC, ITS SUCCESSORS, ASSIGNS, AFFILIATES, AGENTS, CONTRACTORS AND EMPLOYEES, AS OPERATOR AND MANAGER OF THE LIFT FACILITIES AND AS OPERATOR AND MANAGER OF THE ASPEN MOUNTAIN SKI AREA, A PERPETUAL, NON-EXCLUSIVE, PRIVATE RECREATIONAL USE EASEMENT ACROSS, OVER, UNDER AND UPON THAT PORTION OF HILL STREET DEPICTED ON SHEET 4 HEREOF AND LABELED “RECREATIONAL USE EASEMENT” FOR THE USE AND BENEFIT OF THE ASPEN SKIING COMPANY AND ITS AFFILIATES, AGENTS, CONTRACTORS, EMPLOYEES, LICENSEES AND INVITEES, FOR THE PURPOSES OF INGRESS AND EGRESS TO AND USE AND ENJOYMENT OF THE SKI LIFT FACILITIES, SKI TRAIL, SKI OPERATIONS AND OTHER SKI RELATED INFRASTRUCTURE AND FACILITIES, AND FOR CONSTRUCTING, INSTALLING, ENLARGING, OPERATING, MAINTAINING, REPAIRING, REMOVING AND REPLACING LIFT FACILITIES. THE ACTUAL LOCATION OF SAID RECREATIONAL USE EASEMENT SHALL BE DEEMED AUTOMATICALLY AMENDED TO COINCIDE WITH THE AS-BUILT LOCATION OF THE SKIWAY AND AERIAL LIFT FACILITY AS IT AFFECTS THE HILL STREET RIGHT OF WAY. THE CITY OF ASPEN, A COLORADO HOME RULE MUNICPALITY BY: _____________________ ___________________ TORRE, MAYOR DATE ATTEST: _____________________________ CITY CLERK ... CONTINUED IN CONNECTION WITH THE EXERCISE OF ANY RIGHT UNDER AND USE OF ANY EASEMENT GRANTED OR RESERVED BY THIS CERTIFICATE, THE OWNER (OF LOT 1 OR LOT 2 AS THE CASE MAY BE) EXERCISING SUCH RIGHT SHALL INDEMNIFY AND HOLD HARMLESS THE OTHER OWNER (OF LOT 1 OR 2, AS THE CASE MAY BE) FROM ANY CLAIMS, DEMAND, SUIT, JUDGMENT, LIEN OR DAMAGES OF ANY NATURE ARISING OUT OF SUCH OWNER’S RIGHT, EXERCISE OR USE, INCLUDING REASONABLE ATTORNEYS FEES AND COSTS INCURRED IN CONNECTION THEREWITH; AND THE OWNERS OF LOTS 1 AND 2 SHALL EACH AT ALL TIMES MAINTAIN A COMMERCIAL LIABILITY INSURANCE POLICY WITH AN INSURANCE COMPANY WITH A BEST’S RATING OF $_________, AND WITH MINIMUM LIMITS OF EXECUTED THIS____ DAY OF ________________, 2020. ASPEN SKIING COMPANY, LLC, A COLORADO LIMITED LIABILITY COMPANY BY: ____________________________________________________________ ___________________, ITS MANAGER STATE OF COLORADO ) ) SS. COUNTY OF PITKIN ) THE FOREGOING INSTRUMENT WAS ACKNOWLEDGED BEFORE ME THIS ______ DAY OF ____________, 2020 BY _____________________ AS ____________________ OF ASPEN SKIING COMPANY, LLC. WITNESS MY HAND AND OFFICIAL SEAL MY COMMISSION EXPIRES _________ S.101 77 78 80 GOV'T LO T 3 1 (WITHIN A S P E N CITY LIM I T S ) CENTERLINE 15' WIDE WATER PIPELINE EASEMENT BK 412 PG 557 VACATED BY THE STREET AND EASEMENT VACATION PLAT REC. #___________ CENTERLINE 15' WIDE DRAINAGE EASEMENT BK 291 PG 649 VACATED BY SEPARATE INSTRUMENT RECORDED AS REC #_________________ PUBLIC SIDEWALK, UTILITY AND SNOW STORAGE EASEMENT REC #597440 25' WIDE EASEMENT FOR SKIERS AND PEDESTRIANS PLAT BK 4 PG 489 AND WATERLINE EASEMENT TO CITY OF ASPEN BK 411 PG 996 20' WIDE EASEMENT FOR FIRE ACCESS AND DRAINAGE GRANTED TO MOUNTAIN QUEEN CONDOS BK 275 PG 378 AND WATERLINE EASEMENT GRANTED TO CITY OF ASPEN BK 291 PG 649 SKI CORRIDOR EASEMENT REC #597440 SHADOW MOUNTAIN VILLAGECONDOMINIUMSPLAT BK. 3 PG. 33 LOT 2 SOUTH ASPEN STREET SUBDIVISION/PUD,1ST AMENDEDREC. #616166 (A/K/A ONE ASPEN) MOUNTAIN QUEENCONDOMINIUMSPLAT BK. 4 PG. 489 CONSERVATION PARCELBARBEE FAMILY SUBDIVISION, FIRST AMENDEDREC. #461107CITY OF ASPEN LOT 1LIFT ONE LODGE SUBDVISION/PUDREC. #597438 LOT 3LIFT ONE LODGE SUBDVISION/PUDREC. #597438 CARIBOUCONDOMINIUMSPLAT BK. 94 PG. 52 PARCEL 2 10,917 SQ FT 0.251 ACRES PARCEL C 1,827 SQ FT 0.042 ACRES PARCEL D 1,825 SQ FT 0.042 ACRES PARCEL 3 2,973 SQ FT 0.068 ACRES PARCEL B 2,592 SQ FT 0.060 ACRES CITY OF ASPEN PITKIN COUNTY AREA SUBJECT TO PARAGRAPH 4 "TEMPORARY CONSTRUCTION EASEMENTS AND PERMANENT ENCROACHMENT EASEMENTS" PER THE MASTER EASEMENT AGREEMENT RECORDED AS REC. #597440 PARCEL 4 240,375 SQ FT 5.518 ACRES 50' SETBACK BUILDING RESTRICTION BK 231 PG 278 PARCEL A 1,917 SQ FT 0.044 ACRES GOV'T LO T 3 1 (WITHIN A S P E N CITY LIM I T S ) S70° 03' 10"E1.01' S 1 1 ° 2 5 ' 3 0 " E 1 1 0 . 7 7 ' 10.00' S75° 09' 11"E 182.60' 10.00' N75° 09' 11"W 182.44' 10.00'10.00' S14° 50' 49"W 63.83' S89° 55' 06"W38.97' N14° 50' 49"E 73.87' PARCEL 1 23,897 SQ FT 0.549 ACRES N38° 38' 25"E 72.34' N45° 13' 35"W 33.86' N14° 42' 57"E 30.93' 598.23' S14° 50' 49"W6.17' S75° 09' 11"E 181.46' 5 4 . 7 9 ' N89° 55' 0 6 " E 53.70' S4 5 ° 0 0 ' 0 0 " W 2 8 7 . 8 1 ' N70° 37' 00"W 757.26' N14° 40' 15"E 35.71' S 1 1 ° 2 5 ' 3 0 " E 1 9 7 . 7 5 ' N14° 50' 49"E 51.97' N78° 21' 58"W 37.71' S14° 50' 49"W 49.86' 37.65' S75° 09' 11"E 182.76' 13 0 . 0 2 ' N75° 09' 11"W 184.89' N89° 55' 0 6 " E 5 5 9 . 2 6 ' N1 4 ° 5 0 ' 4 9 " E 8 8 . 0 3 ' 60 . 0 1 ' GOV'TLOT 38 TOP OF MILL SUBDIVISIONREC. #471099 HILL STREET R.O.W. SOUTH ASPEN STREETR.O.W. 41 . 9 6 ' 25 . 0 0 ' AREA OF REVOCABLE ENCROACHMENT LICENSE AGREEMENT REMAINING BETWEEN CITY OF ASPEN AND SHADOW MOUNTAIN VILLAGE CONDOMINIUMS REC. #543674 FOUND #5 REBAR AND 1.25" PLASTIC CAP L.S. 28643 FOUND #5 REBAR AND 11 4" PLASTIC CAP L.S. #25947 FOUND SPIKE FOUND SPIKE FOUND #5 REBARFOUND #5 REBAR AND 1.25" PLASTIC CAP L.S. #ILLEGIBLE (BENT) CORNER BEARS S.67°16'28"E. 1.38' FOUND PK NAIL IN PAVEMENT CORNER BEARS S65°53'16"E 1.23' FOUND #5 REBAR AND 1.25" PLASTIC CAP L.S. #28643 FOUND #5 REBAR AND 1.25" PLASTIC CAP L.S. #28643 FOUND #5 REBAR AND 11 4" PLASTIC CAP L.S. #ILLEGIBLE FOUND #5 REBAR AND 11 4" PLASTIC CAP L.S. #9184 POINT OF BEGINNING PARCEL 4 BA S I S O F B E A R I N G FINAL PLAT OF: SHEET 2 OF 5 OVERVIEW OF GORSUCH HAUS SUBJECT PROPERTIES, PROPERTY DESCRIPTIONS, EASEMENTS AND SURVEY NOTES GORSUCH HAUS PD/SUBDIVISION A PARCEL OF LAND SITUATED IN THE NE1 4 OF SECTION 13, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6th P.M., CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO THE PURPOSE OF THIS PLAT IS TO CREATE A PLANNED DEVELOPMENT (PD), REZONE, AND SUBDIVIDE THE SUBJECT PROPERTY NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. SOPRIS ENGINEERING - LLC CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 81623 (970) 704-0311 CL sb 13139.01 09/21/2020 G:\2013\13139\SURVEY\Survey DWGs\Survey Plots\13139-SUBDIVISION V2.dwg 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 040 40 80 40 16020 PROPERTY DESCRIPTION ASPEN SKIING COMPANY, LLC PROPERTY: [FROM THE TITLE COMMITMENT PREPARED BY LAND TITLE GUARANTEE COMPANY UNDER ORDER NO. QC62010933, DATED JANUARY 10, 2020] PARCEL 1 LOTS 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 AND 14, BLOCK 10, EAMES ADDITION TO THE CITY OF ASPEN PARCEL 2 LOTS 1, 2, 3, 4, 5, 6 AND 7, BLOCK 12, EAMES ADDITION TO THE CITY OF ASPEN PARCEL 3 A PARCEL OF LAND BEING A PORTION OF THAT PROPERTY DESCRIBED IN THE DOCUMENT RECORDED JULY 15, 1985 AS RECEPTION NO. 156038 IN BOOK 270 AT PAGE 21 OF THE PITKIN COUNTY RECORDS AND THAT PROPERTY DESCRIBED IN THE DOCUMENT RECORDED JULY 13, 1971 AS RECEPTION NO. 146439 IN BOOK 256 AT PAGE 506; SAID PARCEL OF LAND ALSO BEING SITUATED IN GOVERNMENT LOT 1 IN SECTION 13, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE SIXTH PRINCIPAL MERIDIAN; SAID PARCEL BEING MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE EASTERLY BOUNDARY LINE OF BLOCK 10 EAMES ADDITION TO THE CITY OF ASPEN, WHENCE THE NORTHEAST CORNER OF LOT 7 OF SAID BLOCK 10 BEARS N.15°46'58"E. A DISTANCE OF 41.96 FEET; SAID POINT ALSO BEING THE SOUTHWEST CORNER OF CARIBOU CONDOMINIUMS, ACCORDING TO THE MAP THEREOF RECORDED APRIL 24, 1973 IN PLAT BOOK 4 AT PAGE 379; THENCE S.70°03'10"E. ALONG THE SOUTHERLY BOUNDARY LINE OF SAID CARIBOU CONDOMINIUMS A DISTANCE OF 1.01 FEET TO THE NORTHWEST CORNER OF MOUNTAIN QUEEN CONDOMINIUMS, ACCORDING TO THE MAP THEREOF RECORDED SEPTEMBER 27, 1974 IN PLAT BOOK 4 AT PAGE 489; THENCE LEAVING SAID SOUTHERLY BOUNDARY LINE OF SAID CARIBOU CONDOMINIUMS S.11°25'30"E. ALONG THE WESTERLY BOUNDARY LINE OF SAID MOUNTAIN QUEEN CONDOMINIUMS A DISTANCE OF 110.77 FEET TO A POINT ON THE SOUTH LINE OF SAID GOVERNMENT LOT 1; THENCE LEAVING SAID WESTERLY BOUNDARY LINE OF SAID MOUNTAIN QUEEN CONDOMINIUMS S.89°55'06"W. ALONG SAID SOUTH LINE OF SAID GOVERNMENT LOT 1 A DISTANCE OF 43.70 FEET TO A POINT ON THE EASTERLY BOUNDARY LINE OF BLOCK 12 EAMES ADDITION TO THE CITY OF ASPEN; THENCE LEAVING SAID SOUTH LINE OF SAID GOVERNMENT LOT 1 N.15°46'58"E. ALONG THE EASTERLY BOUNDARY LINE OF SAID BLOCK 12 EAMES ADDITION A DISTANCE OF 4.21 FEET TO THE NORTHEAST CORNER OF SAID BLOCK 12 EAMES ADDITION, SAID POINT ALSO BEING THE SOUTHEAST CORNER OF SUMMIT STREET RIGHT OF WAY; THENCE CONTINUING N.15°46'58"E. ALONG THE EASTERLY LINE OF SAID RIGHT OF WAY A DISTANCE OF 20.00 FEET TO THE SOUTHEAST CORNER OF SAID BLOCK 10 EAMES ADDITION; THENCE CONTINUING N.15°46'58"E. ALONG THE EASTERLY BOUNDARY LINE OF SAID BLOCK 10 EAMES ADDITION A DISTANCE OF 88.05 FEET TO THE POINT OF BEGINNING. SAID PARCEL OF LAND CONTAINING 2,973 SQUARE FEET OR 0.068 ACRES, MORE OR LESS. PARCEL 4 A PARCEL OF LAND BEING A PORTION OF THAT PROPERTY DESCRIBED IN THE DOCUMENT RECORDED DECEMBER 19, 1946 AS RECEPTION NO. 094502 OF THE PITKIN COUNTY RECORDS; SAID PARCEL OF LAND ALSO BEING SITUATED IN GOVERNMENT LOT 31 IN SECTION 13, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE SIXTH PRINCIPAL MERIDIAN AS DESCRIBED BY THE DEPENDENT RESURVEY AND SURVEY PLAT OF TOWNSHIP 10 SOUTH, RANGE 85 WEST, OF THE SIXTH PRINCIPAL MERIDIAN, FILED MAY 30, 1980 IN THE UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF LAND MANAGEMENT OFFICE IN DENVER, COLORADO ("BLM PLAT"); SAID PARCEL OF LAND IS LOCATED ENTIRELY WITHIN THE CITY LIMITS OF THE CITY OF ASPEN AND IS MORE PARTICULARLY DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WESTERLY BOUNDARY LINE OF MOUNTAIN QUEEN CONDOMINIUMS, ACCORDING TO THE MAP THEREOF RECORDED SEPTEMBER 27, 1974 IN PLAT BOOK 4 AT PAGE 489, WHENCE THE NORTHWEST CORNER OF SAID MOUNTAIN QUEEN CONDOMINIUMS BEARS N.11°25'30"W. A DISTANCE OF 110.77 FEET; THENCE S.11°25'30"E. ALONG SAID WESTERLY BOUNDARY LINE OF MOUNTAIN QUEEN CONDOMINIUMS A DISTANCE OF 197.75 FEET; THENCE CONTINUING ALONG SAID WESTERLY BOUNDARY LINE S.45°00'00"W. A DISTANCE OF 6.42 FEET TO THE SOUTHWEST CORNER OF SAID MOUNTAIN QUEEN CONDOMINIUMS; THENCE LEAVING SAID WESTERLY BOUNDARY LINE S.45°00'00"W. ALONG THE EAST LINE OF SAID GOVERNMENT LOT 31 A DISTANCE OF 281.39 FEET TO A POINT ON THE SOUTHERLY BOUNDARY LINE OF THE SOUTH ANNEXATION TO THE CITY OF ASPEN, COLO, ACCORDING TO THE MAP THEREOF RECORDED MARCH 24, 1967 IN PLAT BOOK 3 AT PAGE 132; THENCE LEAVING SAID EAST LINE OF SAID GOVERNMENT LOT 31 N.70°37'00"W. ALONG THE SOUTHERLY BOUNDARY LINE OF SAID SOUTH ANNEXATION TO THE CITY OF ASPEN A DISTANCE OF 757.26 FEET TO A POINT ON THE WEST LINE OF SAID GOVERNMENT LOT 31; THENCE N.14°40'13"E. A DISTANCE OF 35.71 FEET TO THE SOUTHERLY MOST POINT OF GOVERNMENT LOT 38, ACCORDING TO SAID "BLM PLAT"; THENCE ALONG THE COMMON LINE BETWEEN SAID GOVERNMENT LOT 31 AND SAID GOVERNMENT LOT 38 THE FOLLOWING TWO (2) COURSES: 1)N.38°38'25"E. A DISTANCE OF 72.34 FEET 2)N.45°13'35"W. A DISTANCE OF 33.86 FEET; THENCE LEAVING THE EAST LINE OF SAID GOVERNMENT LOT 38, CONTINUING ALONG THE WEST LINE OF SAID GOVERNMENT LOT 31 N.14°42'57"E. A DISTANCE OF 30.93 FEET TO A POINT ON THE NORTH LINE OF THE SE1/4NE1/4 OF SECTION 13, ALSO BEING A POINT ON THE NORTH LINE OF SAID GOVERNMENT LOT 31; THENCE LEAVING SAID WEST LINE OF SAID GOVERNMENT LOT 31 N.89°55'06"E. ALONG THE NORTH LINE OF THE SE1/4NE1/4 OF SECTION 13, ALSO BEING THE NORTH LINE OF SAID GOVERNMENT LOT 31, A DISTANCE OF 498.23 FEET TO A POINT ON THE WESTERLY BOUNDARY LINE OF BLOCK 12, EAMES ADDITION TO THE CITY OF ASPEN THENCE LEAVING SAID NORTH LINES S.14°50'49"W. ALONG THE WESTERLY BOUNDARY LINE OF SAID BLOCK 12 EAMES ADDITION A DISTANCE OF 6.17 FEET TO THE SOUTHWEST CORNER OF SAID BLOCK 12 EAMES ADDITION; THENCE LEAVING SAID WESTERLY BOUNDARY LINE OF SAID BLOCK 12 EAMES ADDITION S.75°09'11"E. ALONG THE SOUTHERLY BOUNDARY LINE OF SAID BLOCK 12 EAMES ADDITIONS A DISTANCE OF 181.46 FEET TO THE SOUTHEAST CORNER OF SAID BLOCK 12 EAMES ADDITION; THENCE N.15°46'58"E. ALONG THE EASTERLY BOUNDARY LINE OF SAID BLOCK 12 EAMES ADDITION A DISTANCE OF 44.79 FEET TO A POINT ON SAID NORTH LINE OF SAID SE1/4NE1/4 OF SECTION 13, SAID POINT ALSO BEING A POINT ON THE NORTH LINE OF SAID GOVERNMENT LOT 31; THENCE LEAVING SAID EASTERLY BOUNDARY LINE OF SAID BLOCK 12 EAMES ADDITION N.89°55'06"E. ALONG THE NORTH LINE OF THE SE1/4NE1/4 OF SECTION 13, ALSO BEING THE NORTH LINE OF SAID GOVERNMENT LOT 31, A DISTANCE OF 43.70 FEET TO THE POINT OF BEGINNING. SAID PARCEL OF LAND CONTAINING 240,375 SQUARE FEET OR 5.518 ACRES, MORE OR LESS. CITY OF ASPEN COUNTY OF PITKIN STATE OF COLORADO RIGHTS OF WAY VACATED BY ORDINANCE NO. ___ SERIES OF 2020, AS SHOWN IN THAT STREET AND EASEMENT VACATION PLAT RECORDED IN PLAT BOOK _______________ AT PAGE ___________ AS RECEPTION NUMBER _______________ (DEPICTED HEREON AS PARCELS A, B, C, AND D). ALL THE FOREGOING PROPERTY TO BE COLLECTIVELY REFERENCED HEREIN AS THE “SUBJECT PROPERTY" HATCH LEGEND ROW VACATED BY STREET AND EASEMENT VACATION PLAT RECORDED ______________________, 20___ IN PLAT BOOK _______________ AT PAGE ___________ AS RECEPTION NUMBER _______________. AREA OF REVOCABLE ENCROACHMENT LICENSE AGREEMENT BETWEEN CITY OF ASPEN AND SHADOW MOUNTAIN VILLAGE CONDOMINIUMS REC. #543674; PORTIONS OF WHICH REVOKED BY STREET AND EASEMENT VACATION PLAT RECORDED ______________________, 20___ IN PLAT BOOK _______________ AT PAGE ___________ AS RECEPTION NUMBER _______________. SURVEY NOTES 1) DATE OF FIELD WORK: AUGUST - SEPTEMBER 2005; UPDATED MAY 2006, JUNE AND JULY 2007, OCTOBER - DECEMBER 2008, SEPTEMBER 209, AND MARCH 2010; UPDATED AUGUST 2013; UPDATED AUGUST 2014; UPDATED JULY - SEPTEMBER 2015; UPDATED MAY 2018; UPDATED JANUARY 2020 2) DATE OF PREPARATION: NOVEMBER - DECEMBER 2015; FEBRUARY 2016; UPDATED AUGUST - SEPTEMBER 2016; UPDATED MAY - JUNE 2018; UPDATED JANUARY AND FEBRUARY 2020; UPDATED SEPTEMBER 2020 3) BASIS OF BEARING: A BEARING OF N 14°50'49" E BETWEEN THE SOUTHEAST CORNER OF SHADOW MOUNTAIN VILLAGE, A FOUND REBAR AND CAP L.S. #25947, AND THE SOUTHEAST CORNER OF SOUTH ASPEN STREET SUBDIVISION, A FOUND REBAR & CAP LS #28643. 4) BASIS OF SURVEY: THE 1896 W. C. WILLITS MAP OF ASPEN, COLORADO, THE OFFICIAL MAP OF THE CITY OF ASPEN PREPARED BY G.E. BUCHANAN DATED DECEMBER 15, 1959, THE SOUTH ANNEXATION TO THE CITY OF ASPEN APPROVED BY ORDINANCE NO. 4, DATED MARCH 20, 1967 RECORDED IN PLAT BOOK 3 AT PAGE 132, THE 209 GPS CONTROL MONUMENTATION MAP FOR THE CITY OF ASPEN PREPARED BY MARCIN ENGINEERING LLC REVISED JULY 13, 2010, THE PLAT OF LIFT ONE LODGE SUBDIVISION, RECORDED MARCH 5, 2013, THE STREET, ALLEYWAY AND EASEMENT VACATION PLAT RECORDED MARCH 5, 2013 UNDER RECEPTION NO. 597435, THE PLAT OF SOUTH ASPEN STREET SUBDIVISION RECORDED APRIL 27, 2007 UNDER RECEPTION NO. 537080, THE FIRST AMENDED PLAT OF SOUTH ASPEN STREET SUBDIVISION RECORDED DECEMBER 19, 2014 AS RECEPTION NO. 616166, THE CONDOMINIUM MAP OF MOUNTAIN QUEEN CONDOMINIUMS RECORDED SEPTEMBER 27, 1974 IN PLAT BOOK 4 AT PAGE 489, THE CONDOMINIUM MAP OF CARIBOU CONDOMINIUMS RECORDED SEPTEMBER 8, 209 IN PLAT BOOK 4 AT PAGE 379, THE CONDOMINIUM MAP OF SHADOW MOUNTAIN VILLAGE RECORDED JULY 12, 1965 IN PLAT BOOK 3 AT PAGE 33, THE AMENDED PLAT OF BARBEE FAMILY SUBDIVISION/PUD RECORDED NOVEMBER 21, 2001 IN PLAT BOOK 59 AT PAGE 222,THE STREET AND EASEMENT VACATION PLAT RECORDED _________________, 2020 AS RECEPTION NO. _______________, DOCUMENTS OF RECORD AND THE FOUND SURVEY MONUMENTS, AS SHOWN. 5)THIS SURVEY DOES NOT CONSTITUTE A TITLE SEARCH BY SOPRIS ENGINEERING, LLC (SE) TO DETERMINE OWNERSHIP OR EASEMENTS OF RECORD. FOR ALL INFORMATION REGARDING EASEMENTS, RIGHTS OF WAY AND/OR TITLE OF RECORD, SE RELIED UPON THE ABOVE SAID ITEMS DESCRIBED IN NOTE 4 AND THE TITLE COMMITMENT PREPARED BY LAND TITLE GUARANTEE COMPANY UNDER ORDER NO. QC62010933, DATED JANUARY 10, 2020. 6) THE LINEAR UNIT USED IN THE PREPARATION OF THIS PLAT IS THE U.S. SURVEY FOOT AS DEFINED BY THE UNITED STATES DEPARTMENT OF COMMERCE, NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. PARENTING PARCELS PARCEL AREA (SQ.FT.) AREA (ACRES) PARCEL 1 23,897 0.549 PARCEL 2 10,917 0.251 PARCEL 3 2,973 0.068 PARCEL 4 240,375 5.518 PARCEL A 1,917 0.044 PARCEL B 2,592 0.060 PARCEL C 1,827 0.042 PARCEL D 1,825 0.042 TOTAL 286,323 6.573 RESULTING SUBDIVISION PARCELS PARCEL AREA (SQ.FT.) AREA (ACRES) LOT 1 44,545 1.023 LOT 2 238,065 5.471 DEDICATED ROW 3,713 0.079 TOTAL 286,323 6.573 S.102 PUBLIC SIDEWALK, UTILITY AND SNOW STORAGE EASEMENT REC #597440 25' WIDE EASEMENT FOR SKIERS AND PEDESTRIANS PLAT BK 4 PG 489 AND WATERLINE EASEMENT TO CITY OF ASPEN BK 411 PG 996 20' WIDE EASEMENT FOR FIRE ACCESS AND DRAINAGE GRANTED TO MOUNTAIN QUEEN CONDOS BK 275 PG 378 AND WATERLINE EASEMENT GRANTED TO CITY OF ASPEN BK 291 PG 649 SKI CORRIDOR EASEMENT REC #597440 SHADOW MOUNTAIN VILLAGECONDOMINIUMSPLAT BK. 3 PG. 33 LOT 2 SOUTH ASPEN STREET SUBDIVISION/PUD,1ST AMENDEDREC. #616166 (A/K/A ONE ASPEN) MOUNTAIN QUEENCONDOMINIUMSPLAT BK. 4 PG. 489 CONSERVATION PARCELBARBEE FAMILY SUBDIVISION, FIRST AMENDEDREC. #461107CITY OF ASPEN LOT 1LIFT ONE LODGE SUBDVISION/PUDREC. #597438 LOT 3LIFT ONE LODGE SUBDVISION/PUDREC. #597438 CARIBOUCONDOMINIUMSPLAT BK. 94 PG. 52 CITY OF ASPEN PITKIN COUNTY 50' SETBACK BUILDING RESTRICTION BK 231 PG 278 GOV'TLOT 38 TOP OF MILL SUBDIVISIONREC. #471099 S75° 09' 11"E HILL STREET R.O.W. SOUTH ASPEN STREETR.O.W. AREA OF REVOCABLE ENCROACHMENT LICENSE AGREEMENT REMAINING BETWEEN CITY OF ASPEN AND SHADOW MOUNTAIN VILLAGE CONDOMINIUMS REC. #543674 LOT 2238,065 SQ FT±5.465 ACRES± DEDICATED ROW 3,713 SQ FT± 0.085 ACRES± LOT 144,545 SQ FT±1.023 ACRES± BA S I S O F B E A R I N G FINAL PLAT OF: SHEET 3 OF 5 RIGHT-OF-WAY DEDICATION, SUBDIVISION LOT DIMENSIONS AND RECORD EASEMENTS GORSUCH HAUS PD/SUBDIVISION A PARCEL OF LAND SITUATED IN THE NE1 4 OF SECTION 13, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6th P.M., CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO THE PURPOSE OF THIS PLAT IS TO CREATE A PLANNED DEVELOPMENT (PD), REZONE, AND SUBDIVIDE THE SUBJECT PROPERTY NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. SOPRIS ENGINEERING - LLC CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 81623 (970) 704-0311 CL sb 13139.01 09/21/2020 G:\2013\13139\SURVEY\Survey DWGs\Survey Plots\13139-SUBDIVISION V2.dwg 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 040 40 80 40 16020 HATCH LEGEND DEDICATED SOUTH ASPEN STREET RIGHT-OF-WAY (SEE DEDICATION PARAGRAPH 1) AREA OF REVOCABLE ENCROACHMENT LICENSE (REC. #543674) AREA OF CITY OF ASPEN RIGHT-OF-WAY FOR SOUTH ASPEN STREET PER THIS PLAT PARENTING PARCELS PARCEL AREA (SQ.FT.) AREA (ACRES) PARCEL 1 23,897 0.549 PARCEL 2 10,917 0.251 PARCEL 3 2,973 0.068 PARCEL 4 240,375 5.518 PARCEL A 1,917 0.044 PARCEL B 2,592 0.060 PARCEL C 1,827 0.042 PARCEL D 1,825 0.042 TOTAL 286,323 6.573 RESULTING SUBDIVISION PARCELS PARCEL AREA (SQ.FT.) AREA (ACRES) LOT 1 44,545 1.023 LOT 2 238,065 5.471 DEDICATED ROW 3,713 0.079 TOTAL 286,323 6.573 S.103 SUBSURFACE STRUCTURAL EASEMENT (SEE DEDICATION PARAGRAPH 4) 37.65' SOUTH ASPEN STREET ROW PUBLIC SIDEWALK, UTILITY AND SNOW STORAGE EASEMENT REC. #597440 SKI CORRIDOR EASEMENT REC. #597440 PUBLIC PEDESTRIAN EASEMENT WIDTH VARIES (SEE DEDICATION PARAGRAPH 6) MOUNTAIN OPERATIONS ROAD PRIVATE EASEMENT FOR PEDESTRIAN AND BICYCLE USES (SEE DEDICATION PARAGRAPH 12) TEMPORARY RECIPROCAL CONSTRUCTION EASEMENT (SEE DEDICATION PARAGRAPH 3) 6' PUBLIC TRAIL EASEMENT (SEE DEDICATION PARAGRAPH 2) UTILITY EASEMENT (SEE DEDICATION PARAGRAPH 8) AREA SUBJECT TO "TEMPORARY CONSTRUCTION EASEMENTS AND PERMANENT ENCROACHMENT EASEMENTS," PER PARAGRAPH 4 OF THE MASTER EASEMENT AGREEMENT, RECORDED MARCH 5, 2013 AS REC. #597440 REMAINING AREA OF REVOCABLE ENCROACHMENT LICENSE GRANTED TO SHADOW MOUNTAIN VILLAGE APARTMENTS REC. #543674 SUBSURFACE STRUCTURAL EASEMENT (SEE DEDICATION PARAGRAPH 4) EASEMENT GRANTED BY MOUNTAIN QUEEN CONDOS FOR SKIERS AND PEDESTRIANS PLAT BK.4 PG.489 AND WATERLINE EASEMENT TO CITY OF ASPEN BK. 411 PG. 996 EASEMENT FOR FIRE ACCESS AND DRAINAGE GRANTED TO MOUNTAIN QUEEN CONDOS BK.275 PG.378 AND WATERLINE EASEMENT GRANTED TO CITY OF ASPEN BK.291 PG.649 BUILDING FOOTPRINT AT GROUND LEVEL MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT (SEE DEDICATION PARAGRAPH 5 AND 12) TEMPORARY RECIPROCAL CONSTRUCTION EASEMENT (SEE DEDICATION PARAGRAPH 3)SUBSURFACE STRUCTURAL EASEMENT (SEE DEDICATION PARAGRAPH 4) TEMPORARY RECIPROCAL CONSTRUCTION EASEMENT (SEE DEDICATION PARAGRAPH 3) LOT 1 SKI ACCESS FROM NORWAY SKI RUN SOUT H A S P E N S T R E E T R O W UTILITY EASEMENT (SEE DEDICATION PARAGRAPH 8)LOT 2 LOT 2 SHADOW MOUNTAIN VILLAGE CONDOMINIUMS LIFT ONE LODGE SUBDIVISION LIFT TOWER 4 HI L L S T R E E T R O W LOT 3 SUBSURFACE EASEMENT (ALL OF LOT 3) REC. #597440 LOT 1 RECREATION EASEMENT REC. #597440 NO BUILD AND MAINTENANCE EASEMENT REC. #597440 LIFT FACILITIES EASEMENT (SEE DEDICATION PARAGRAPH 9) MOUNTAIN OPERATION ROAD PRIVATE ACCESS EASEMENT (SEE DEDICATION PARAGRAPH 10) S7 5 ° 0 9 ' 1 1 " E RE C R E A T I O N A L U S E E A S E M E N T GR A N T E D T O A S P E N S K I I N G C O M P A N Y L L C BY T H E C I T Y O F A S P E N RE C . # _ _ _ _ _ _ _ _ _ _ _ 50' SETBACK BUILDING RESTRICTION BK 231 PG 278 PUBLIC PEDESTRIAN EASEMENT TO S. ASPEN STREET UTILITY EASEMENT (SEE DEDICATION PARAGRAPH 8) PUBLIC PEDESTRIAN EASEMENT TO S. ASPEN STREET AND BARBEE OPEN SPACE BARBEE OPEN SPACE SKIWAY 19.7' LIFT CENTERL I N E LIFT TOWER 5 LIFT TOWER 75.0' SETBACK (TYP) 5.0' SETBACK (TYP) 5.0' SETBACK (TYP) UTILITY EASEMENT (SEE DEDICATION PARAGRAPH 8) 6' PUBLIC TRAIL EASEMENT (SEE DEDICATION PARAGRAPH 2) SKIWAY LOT 2 LIFT TOWER 6 FINAL PLAT OF: SHEET 4 OF 4 SUBDIVISION EASEMENTS GORSUCH HAUS PD/SUBDIVISION A PARCEL OF LAND SITUATED IN THE NE1 4 OF SECTION 13, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6th P.M., CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO THE PURPOSE OF THIS PLAT IS TO CREATE A PLANNED DEVELOPMENT (PD), REZONE, AND SUBDIVIDE THE SUBJECT PROPERTY NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. SOPRIS ENGINEERING - LLC CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 81623 (970) 704-0311 CL sb 13139.01 09/21/2020 G:\2013\13139\SURVEY\Survey DWGs\Survey Plots\13139-SUBDIVISION V2.dwg 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 020 20 40 20 8010 HATCH LEGEND ASPEN STREET AND HILL STREET RIGHT-OF-WAY PER THIS PLAT AREA OF REVOCABLE ENCROACHMENT LICENSE (REC. #543674) STAIRS PUBLIC TRAIL EASEMENT (SEE DEDICATION PARAGRAPH 2) MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT FOR THE BENEFIT OF LOT 1 (SEE DEDICATION PARAGRAPH 5) RECREATIONAL USE EASEMENT FOR THE BENEFIT OF ASPEN SKI COMPANY (DEDICATED BY THE CITY OF ASPEN) PUBLIC PEDESTRIAN EASEMENT (SEE DEDICATION PARAGRAPH 6) UTILITY EASEMENT (SEE DEDICATION PARAGRAPH 8) RESERVED LIFT AND SKI FACILITY EASEMENT AREA (SEE DEDICATION PARAGRAPH 9) MOUNTAIN OPERATIONS ROAD PRIVATE ACCESS EASEMENT FOR THE BENEFIT OF ASPEN SKI COMPANY (SEE DEDICATION PARAGRAPH 10) MOUNTAIN OPERATIONS ROAD PRIVATE EASEMENT FOR PEDESTRIAN AND BICYCLE USES (SEE DEDICATION PARAGRAPH 12) S.104 >>>>>>>>>>>>>>>>>>>>>>>>> > > > > > > > > > > > > > > > > > > > > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > > > > > > > > > >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> > > > > > > > > > > > > > > > 20.0' 10.0' 25.0' HI L L S T R E E T R . O . W . SOUTH ASPENSTREET R.O.W. LOT 2 LOT 1 20' WIDE EASEMENT FOR FIRE ACCESS AND DRAINAGE GRANTED TO MOUNTAIN QUEEN CONDOS BK 275 PG 378 AND WATERLINE EASEMENT GRANTED TO CITY OF ASPEN BK 291 PG 649 SOUTH ASPENSTREET R.O.W. STORMWATER TREATMENT VAULT STORMWATER TREATMENT VAULT (NOTE: STORMWATER TREATMENT VAULT & ASSOCIATED INFRASTRUCTURE LOCATED WITHIN CITY OF ASPEN RIGHTS-OF-WAY SHALL BE SUBJECT TO ENCROACHMENT LICENSE PRIOR TO ISSUANCE OF CERTIFICATE OF OCCUPANCY STORM INLET ROADSIDE SWALE DRAINAGE SWALE (WEST SWALE) STORM DRAIN (TYP) DRAINAGE ACCESS & MAINTENANCE EASEMENTS (SEE DEDICATION PARAGRAPH 13) LOT LINE LOT LINE MOUNTAIN OPERATION ROAD DRAINAGE ACCESS & MAINTENANCE EASEMENTS (SEE DEDICATION PARAGRAPH 13) DRAINAGE ACCESS & MAINTENANCE EASEMENTS (SEE DEDICATION PARAGRAPH 13) DRAINAGE SWALE STORM INLET STORM MANHOLE/INLET STORM MANHOLE/INLET FINAL PLAT OF: SHEET 5 OF 5 DRAINAGE ACCESS & MAINTENANCE EASEMENTS GORSUCH HAUS PD/SUBDIVISION A PARCEL OF LAND SITUATED IN THE NE1 4 OF SECTION 13, TOWNSHIP 10 SOUTH, RANGE 85 WEST OF THE 6th P.M., CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO THE PURPOSE OF THIS PLAT IS TO CREATE A PLANNED DEVELOPMENT (PD), REZONE, AND SUBDIVIDE THE SUBJECT PROPERTY NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF CERTIFICATION SHOWN HEREON. SOPRIS ENGINEERING - LLC CIVIL CONSULTANTS 502 MAIN STREET, SUITE A3 CARBONDALE, COLORADO 81623 (970) 704-0311 CL sb 13139.01 09/21/2020 G:\2013\13139\SURVEY\Survey DWGs\Survey Plots\13139-SUBDIVISION V2.dwg 1 inch = ft. ( IN FEET ) GRAPHIC SCALE 020 20 40 20 8010 HATCH LEGEND DRAINAGE ACCESS & MAINTENANCE EASEMENTS (SEE DEDICATION PARAGRAPH 13) ASPEN STREET AND HILL STREET RIGHTS OF WAY PER THIS PLAT S.105