HomeMy WebLinkAboutGorsuch Detailed Review notesReview Checklist:
- Changes from Project Review
o Floor plans
o Elevations
o Height
o Floor area
Free market
Lodge
Commercial
AH
Non-unit
o Net livable
Free market
AH
Commercial
Lodge
Average unit size
o Site plan
o Pedestrian Amenity
- GMQS Calculations
o Lodge density as it relates to gmqs
- Parking
- Confirm development on lot 2 complies with ordinance
o Vacation of rights of way
Revocable encroachment licesnse – Hill street ROW (hardscaping,
pedestrian lighting, pedestrian benches, landscaping)
Utility easements – summit ROW, Aspen St. ROW
o Easement for public use of roof top deck
o AH unit conditions from ordinance
o Outdoor lighting
o Landscape plan
o Draft CMP
o Snow storage/snow shedding
o TIA
o Review draft subdivision/vacation plat
o Ski operations plan
o Approval documents
1) Final Commercial Design Review/ Architectural Character Plan
2) Planned Development Project and Detail Review Plans.
3) Mud flow and Storm Water Mitigation Plans
4) Public Amenity Plans.
5) Public Infrastructure Plan.
6) Final Transportation Impact Analysis (TIA), including a monitoring plan.
7) Subdivision Plat.
8) Street, Alley and Easement Vacation Plat
o Development Agreements
construction staging and sequencing plan
Easements or long-term irrevocable licenses to provide for ski operations to
operate on the properties associated with the ski corridor.
Financial and Site Protection Requirements,
• Site protection(subsection B) and a site enhancement guarantee
(subsection C).
Performance Guarantees equal to 150% of the current estimated cost of
the improvement:
• Landscape Guarantee for landscaping placed on Lot 1 and Lot 2
• Public Facilities and Public Infrastructure Guarantee associated with
Lot 1 and Lot 2.
• Storm Water and Drainage Improvements Guarantee associated with
Lot 1 and Lot 2.
o PD Detailed Review Standards
o Commercial Design Review Standards
Gorsuch Detailed Review initial meeting w/ Jen 3.10.20
- Grading variance?
- Talk to True:
o Outdated title, Tom Todd is the attorney, he can write a letter to verify proof of
ownership – look for old letter in original application
o Owner is skico, under contract with defrancia SKICO needs letter authorizing
defrancia to be applicant
- Snow storage looks a little small, is some in right of way? Might need to dig into this
- Check outdoor lighting plan – reference to check lighting sheets but none provided
- Need to do a completeness review letter
- Commercial design standards done by nori winter, not the ones justin worked on. (previous)
need to find
- Pull old Gorsuch land use files from mikes office
- Things to consider when reviewing:
o Property line vs improvements on east side (transformers or other utilities?), do
improvements go beyone prop. Boundaries
o Vacated ROW not counted as ped amenity, not sure why? Check ped amentity
requirements
o Grading variance? Appendix C, exhibit 3
o Plans show condo lodge, may be mislabed free market
o Tramway board needs to review request for variance prior to P&Z
Gorsuch/LOL need to go together
Two cycles to go to tram board
Decision could be June or July
o Design guidelines –
Completeness Review 3.11.20
- Application subject to land use code in effect March 29, 2016
OVERALL REVIEW QUESTIONS:
Review 6.3.20
Net livable, net leasable, accessory lodge
- Overall floor plan/elevation changes
o Level 1
Shift in admin support/BOH areas on first floor
Addition of commercial space
o Level 2
shift in north BOH support area/massing to west
o Level 3
alterations to mechanical/chiller area along west of building
No exterior ski storage, now outdoor mechanical?
o Level 4
no lodge units about entry – now open to below (library)
No guest ski support
To lodge units with N/S orientation moved to double east west orientation,
used to be 3 stacked now 4.
Addition of mechanical room east of fitness area
World cup bar is larger
Lodge unit changed to boot room (by world cup bar)
o Level 5
two lodge rooms on west side shifted to e/w orientation, all used to be n/s,
this changes massing to west
Outdoor hot tub area on west side of building?
o Level 6
larger and more exterior decks
o Level 7
larger and more exterior decks
What are the “void” areas by the BOH/Spa Equip areas?
o Level 8 – larger outdoor pool deck
No dry sauna
No pool?
Larger exterior decks
o Level 9 – more floor area, less open to below for north 2 units
Exterior decks where previously open to below area existed
New exterior decks to south
o North elevation
double garage to west
More massing to west around 5th level
Something shown to the east of lift terminal?
o East elevation
Grade changes?
Roof form over free market changed, additional massing at south
o West
Fm roof/massing
New stair/walkway
Retainage at 6
Dormer at 8
Pool deck looks different
Stairway, door at 13
More exposed?
Height measured differently on this façade, did any changes affect height
measurement
o South
New decks
New roof form
- Avg. lodge unit size in application
o Density = 550 sf of gross lot area per lodge unit (44,54 sf/81 units)
o Unit size = 421.9 sf/unit (34,987 lodge net livable area/81 units)
- FM units
o Avg. unit size
Approved = 432 net livable
Proposed 420 net livable (requires recalc of mitigation)(34,022 net
livable/81) application states an increase to 448, floor area? How did they
get there?
o Shall not be combined – ok
o Subject to maximum 1,500 square feet net livable, permitted to land TDR for up
to 2,000 sf.
o Max FA for all four = 8000
o Differences from Project
Larger units
more decks
Less spa more FM?
9th level addition of decks, more interior sf.
- AH Unit
o 730 sf net livable at project, 750 sf current
- Commercial Net leasable
o 7,730 sf.
o How do you determine what’s commercial and what’s not? Why did they draw the
line the way they did?
o Showing 25% reduction for subgrade commercial space, if accurate, total net
leaseable shown = 4,795 sf?
If no deduction showing 5,989?
o Ord. showed 7,730 – 5,368 above grade, 2,362 below grade
o Differences from Project
180 sf commercial net leasable on level 1 by reception area
o Similarities from project review
Level 2
- Lodge amenities:
o Arrival lobby/arrival area = non unit space?
o Increase in outdoor pool spa SF?
o No dry sauna?
o Level 2 – meeting room similar
Floor Area
- FM Units Issues
o Non-unit space includes subgrade garage?
o All hallways that access residential units only count toward uses floor area
o Residential units are subject to non-unit space?
- Level 1
o Garage entry should be shown as floor area? Check with jim
o Check exposed wall (especially
- Level 2
o Wall c looks more exposed on east elevation
o Questions about Food and Beverage
- Level 3
o What part is above grade, at grade, or below grade – different mitigation for each
Biggest question what’s above grade vs at grade, easy to delinate below
grade
o Vestibule exemption
- Level 4:
o Got rid of ski room (commercial), added boot room lodge accessory
o Do we care about circulation being lodge not non-unit
o Check subgrade wall on southwest corner
-
- ** Get clarity on allocation of non-unit space based on use** check lodge zone district,
just fm non-unit goes to individual cap, not all
- AH Unit - 804
- Lodge Units - 2968 + 8058 + 2783 + 8745 + 13084 + 10889 + 11966 = 58,493
- Commercial – 180 + 742 + 5723 + 1078 = 7,723
- Non-Unit: 19600 + 8532 + 2441 + 1790 + 1043 + 860 + 860 +573 + 1027 = 36,726
- FM – 5441 + 3192 = 8,633
- Exemptions – 100 (1) + 372 (7) + 457 (8) = 929* what are these for?
o 110 sf level 1 = air lock
TOTAL Gross = 112,504 (- 929 exemption)
Subgrade
Lvl 0: 0
Lvl 1: (.27)(11598) = 3,131.46
Lvl 2: (.4157)(12,045) = 5007.11
Lvl 3: (.673)(10,296) = 6929.21
Lvl 4: (.695)(10866) = 7551.87
Lvl 5: (.7254)(13944) = 10114.98
Lvl 6: (.755)(11749) = 8870.5
Lvl 7: 6468
Lvl 8: 3192
TOTAL = 51,265.13?
Public Amenity
- Second story dining terrace needs have easement,
- Double check stairs counting toward deck area
- Double check west stairs counting
- Check W hotel to make sure it’s consistent
Mitigation
- Net unit
- Calculate mitigation for free market, mitigation rate for lodge
o Both use interpolated mitigation rate
- Commercial needs answer on below/above grade
6/11/20
GMQS Mitigation
- Increase in lodge net livable of 1,566 sf
- Application shows lodge net livable = 36,554sf (avg 451.3 sf/unit)
- Total from drawings = 34,022 (avg. = 420 sf/unit)