HomeMy WebLinkAboutAppendix F.4 - Intent to Serve Letters@om cast
July 11, 2018
Sopris Engineering
Attn: Jesse Swann
Aspen, Colorado 81611
RE: Gorsuch Haus
Aspen, Colorado
Please accept this letter as confirmation that Comcast of Colorado/Florida, Inc.
has the ability to provide cable service to the captioned location. The provision of
service is contingent upon successful negotiations of an Agreement between the
developer and Comcast Cable Communications, Inc.
Should you require additional information, please contact Michael Johnson. I can
be reached at (970) 930-4713 or by email at
Michael_Johnson@cable.comcast.com
Sincerely,
Michael Johnso ·
Construction/Engineering
Comcast Cable Communications
This letter is not intended to give rise to binding obligations for either party. Any contractual relationship between the
parties will be the result of formal negotiations and will only become effective upon execution of the contract by
representatives of the parties authorized to enter into such agreements. During any negotiations, each party will bear its
own costs and will not be responsible for any costs or expenses of the other party, unless separately agreed to in writing.
APPENDIX F.4 - INTENT TO SERVE LETTERS
08/23/2018
Attn: Jesse K. Swann, P.E.
Sopris Engineering, LLC
CARBONDALE, CO 81623
(970) 704-0311 ext. 43
FAX: (970)-704-0313
RE: Gorsuch Haus
To whom it may concern:
Your request for facilities to the Gorsuch Haus is within CenturyLink’s serving
area and will be provided in accordance with all the rates and tariffs set forth by
the Colorado Public Utilities Commission.
Connections to CenturyLink facilities are contingent upon the customer meeting
all the requirements of the Utilities tariffs that are in effect for each requested
utility service at the time the application for service is made by the customer and
formally accepted by CenturyLink. Connection requirements may include
provisions for necessary line extensions and/or other system improvements, and
payment of all applicable system development charges, recovery agreement
charges and other fees or charges applicable to the requested service.
Although CenturyLink diligently seeks to expand its facilities as necessary to
meet anticipated growth, CenturyLink services are provided to eligible customers
at the time of connection to the facilities on a “first come, first served” basis after
acceptance of the customer’s application as described above. In certain
instances, our facilities and capacities may be limited. Accordingly, no specific
allocations or amounts of CenturyLink facilities or supplies are reserved for
service to the subject property, and no commitments are made as to the
availability of CenturyLink service at future times.
Sincerely,
Jason Sharpe
Senior Field Engineer
970-328-8290
Aspen Consolidated Sanitation District
John Keleher - President Stoney Davis - Member
Joe Zanin - Vice President Jeff Yusem - Member
Roy Holloway - Secretary/Treasurer
July 10, 2018
Jesse Swann
Sopris Engineering
502 Main St. Suite A-3
Carbondale, CO 81623
RE: Gorsuch Haus - Commitment for Sanitary Sewer Service
Dear Jesse,
Bruce Matherly - Manager
The Aspen Consolidated Sanitation District currently has sufficient wastewater
collection and treatment capacity to serve this project. Service is contingent
upon compliance with the district's rules, regulations, and specifications,
which are on file at the District office. There are downstream constraints in the
District's collection system that will be corrected through a system of
proportionate impact fees.
A tap permit must be completed at our office when detailed plans become
available. Fees will be estimated at that time. The total connection charges
due the District must be paid prior to the issuance of a foundation and/or
infrastructure permit.
Existing service lines or laterals connected to the District's main line, serving
the subject property and adjacent properties must be identified, located and
isolated from soil stabilization processes or other potential damage, or, properly
disconnected from the ACSD main line at the point of connection according to
specific ACSD requirements.
Once detailed plans are made available to the district, we can comment
specifically about this proposed project.
Sincer ,
H5 ilton T arp
Collection Systems Superintendent
CC Bruce Matherly, ACSD District Manager
565 North Mill Street Aspen, Colorado 81611 970.925.3601 FAX 970.925.2537
3799 HIGHWAY 82 • P.O. BOX 2150
GLENWOOD SPRINGS, COLORADO 81602
(970)945-5491-FAX (970) 945-4081
July 2, 2018
Jesse K. Swann, P.E.
Project Manager
Sopris Engineering, LLC
RE: Gorsuch House
Dear Jesse,
The above mentioned development is within the certified service area of Holy Cross Energy
Holy Cross Energy has adequate power supply to provide electric power to the development, subject to tariffs,
rules and regulations on file. Any power line enlargements, relocations, and new extensions necessary to deliver
adequate power to and within the development will be undertaken by Holy Cross Energy upon completion of
appropriate contractual agreements and subject to necessary governmental approvals.
Additionally, due to current economic conditions, Holy Cross Energy is not stocking the quantity of construction
materials as in past years. If your project is slated for construction this year, please advise us as soon as
possible. You will need to enter into agreements with Holy Cross Energy, and pay for the project, sufficiently in
advance of construction to avoid possible delays while materials are procured. The currently estimated lead time
for procurement of materials is around 12 weeks.
Please advise when you wish to proceed with the development of the electric system for this project
Sincerely
HOLY CROSS ENERGY
Russ Winder
Manager of Construction Engineering
rwinder@holycross.com
(970) 947-5443
Gorsuch House - 90-68 - W/O N/A
A Touchstone Energy Cooperative�`�