Loading...
HomeMy WebLinkAboutAppendix F.4 - Intent to Serve Letters@om cast July 11, 2018 Sopris Engineering Attn: Jesse Swann Aspen, Colorado 81611 RE: Gorsuch Haus Aspen, Colorado Please accept this letter as confirmation that Comcast of Colorado/Florida, Inc. has the ability to provide cable service to the captioned location. The provision of service is contingent upon successful negotiations of an Agreement between the developer and Comcast Cable Communications, Inc. Should you require additional information, please contact Michael Johnson. I can be reached at (970) 930-4713 or by email at Michael_Johnson@cable.comcast.com Sincerely, Michael Johnso · Construction/Engineering Comcast Cable Communications This letter is not intended to give rise to binding obligations for either party. Any contractual relationship between the parties will be the result of formal negotiations and will only become effective upon execution of the contract by representatives of the parties authorized to enter into such agreements. During any negotiations, each party will bear its own costs and will not be responsible for any costs or expenses of the other party, unless separately agreed to in writing. APPENDIX F.4 - INTENT TO SERVE LETTERS 08/23/2018 Attn: Jesse K. Swann, P.E. Sopris Engineering, LLC CARBONDALE, CO 81623 (970) 704-0311 ext. 43 FAX: (970)-704-0313 RE: Gorsuch Haus To whom it may concern: Your request for facilities to the Gorsuch Haus is within CenturyLink’s serving area and will be provided in accordance with all the rates and tariffs set forth by the Colorado Public Utilities Commission. Connections to CenturyLink facilities are contingent upon the customer meeting all the requirements of the Utilities tariffs that are in effect for each requested utility service at the time the application for service is made by the customer and formally accepted by CenturyLink. Connection requirements may include provisions for necessary line extensions and/or other system improvements, and payment of all applicable system development charges, recovery agreement charges and other fees or charges applicable to the requested service. Although CenturyLink diligently seeks to expand its facilities as necessary to meet anticipated growth, CenturyLink services are provided to eligible customers at the time of connection to the facilities on a “first come, first served” basis after acceptance of the customer’s application as described above. In certain instances, our facilities and capacities may be limited. Accordingly, no specific allocations or amounts of CenturyLink facilities or supplies are reserved for service to the subject property, and no commitments are made as to the availability of CenturyLink service at future times. Sincerely, Jason Sharpe Senior Field Engineer 970-328-8290 Aspen Consolidated Sanitation District John Keleher - President Stoney Davis - Member Joe Zanin - Vice President Jeff Yusem - Member Roy Holloway - Secretary/Treasurer July 10, 2018 Jesse Swann Sopris Engineering 502 Main St. Suite A-3 Carbondale, CO 81623 RE: Gorsuch Haus - Commitment for Sanitary Sewer Service Dear Jesse, Bruce Matherly - Manager The Aspen Consolidated Sanitation District currently has sufficient wastewater collection and treatment capacity to serve this project. Service is contingent upon compliance with the district's rules, regulations, and specifications, which are on file at the District office. There are downstream constraints in the District's collection system that will be corrected through a system of proportionate impact fees. A tap permit must be completed at our office when detailed plans become available. Fees will be estimated at that time. The total connection charges due the District must be paid prior to the issuance of a foundation and/or infrastructure permit. Existing service lines or laterals connected to the District's main line, serving the subject property and adjacent properties must be identified, located and isolated from soil stabilization processes or other potential damage, or, properly disconnected from the ACSD main line at the point of connection according to specific ACSD requirements. Once detailed plans are made available to the district, we can comment specifically about this proposed project. Sincer , H5 ilton T arp Collection Systems Superintendent CC Bruce Matherly, ACSD District Manager 565 North Mill Street Aspen, Colorado 81611 970.925.3601 FAX 970.925.2537 3799 HIGHWAY 82 • P.O. BOX 2150 GLENWOOD SPRINGS, COLORADO 81602 (970)945-5491-FAX (970) 945-4081 July 2, 2018 Jesse K. Swann, P.E. Project Manager Sopris Engineering, LLC RE: Gorsuch House Dear Jesse, The above mentioned development is within the certified service area of Holy Cross Energy Holy Cross Energy has adequate power supply to provide electric power to the development, subject to tariffs, rules and regulations on file. Any power line enlargements, relocations, and new extensions necessary to deliver adequate power to and within the development will be undertaken by Holy Cross Energy upon completion of appropriate contractual agreements and subject to necessary governmental approvals. Additionally, due to current economic conditions, Holy Cross Energy is not stocking the quantity of construction materials as in past years. If your project is slated for construction this year, please advise us as soon as possible. You will need to enter into agreements with Holy Cross Energy, and pay for the project, sufficiently in advance of construction to avoid possible delays while materials are procured. The currently estimated lead time for procurement of materials is around 12 weeks. Please advise when you wish to proceed with the development of the electric system for this project Sincerely HOLY CROSS ENERGY Russ Winder Manager of Construction Engineering rwinder@holycross.com (970) 947-5443 Gorsuch House - 90-68 - W/O N/A A Touchstone Energy Cooperative�`�