Loading...
HomeMy WebLinkAboutExhibit O_Applicant addendum memo 8.8.16Design Workshop, Inc. Landscape Architecture Planning Urban Design 120 East Main Street Aspen, Colorado 81611 970.925.8354 970-920-1387 fax Asheville Aspen Austin Chicago Denver Dubai Houston Lake Tahoe Los Angeles Shanghai designworkshop.com August 8, 2016 Jennifer Phelan Community Development Department City of Aspen 130 South Galena Street, 3rd Floor Aspen, CO 81611 This letter amends the Gorsuch Haus Project Review Application currently being considered by the Planning and Zoning Commission. These changes to the plan seek to respond to the comments expressed from the Commissioners, staff and public and at the Planning and Zoning hearings on July 5 and July 16, 2016. The following is a summary of the Gorsuch Haus project revisions which correspond with the revised Site Plan, Exhibit A. 1. Site Planning:  The north-eastern portion of the proposed building has been removed with some of the building’s mass relocated to western side of the site in a porte cochere configuration. This will result in a ground level opening two stories tall, framing a visual connection to the lift and the mountain.  The porte cochere will maintain a minimum of a 13.5-foot clearance, as required for fire access to comply with city engineering standards. This will accommodate an increased amount of covered pedestrian and vehicular space associated with the turnaround.  The approach from the turnaround to the snow surface of the replacement lift will be more direct and the corridor experienced by pedestrians will be focused upslope, unimpeded in terms of visibility to the ski lift, with a direct route to the milling area and the lift. This replaces the configuration in which the building encompassed the lift with the eastern wing of the building fully removed.  The overhanging porte cochere portion of the building would be incorporated into Lot 1, with permanent easements to the city and the public provided.  This change to the building footprint accommodates the historic ski corridor from Dean Street to the mountain and relocates the building from encroaching into the upslope view as generally established by Lift One Park. 2. Lift location, access and visibility:  The reduction of the northeastern portion of the proposed building enables the new Lift 1A to be relocated approximately 20 feet closer to the downtown Design Workshop, Inc. 2 or downslope from the alignment identified in the March 29 plan set. This places the new lift load location approximately 66 feet upslope from where the existing double chair loads today, however it will be much more easily accessed.  The combination of changes to the building and the adjustment in the lift location make the lift as visible upon arrival and as publicly accessible as can be achieved with any site plan. A skier arriving by transit or on foot will begin at the 7999 elevation where tickets and restrooms are provided, up the stairway to the snow level at 8016.5 where the milling and mazing area begins.  Accessible lift access to the snow surface/lift load location has been reconfigured to be accomplished with an elevator adjacent to the pedestrian route. With this revision, the ADA access is no longer a prominent visual feature in the historic ski corridor. The previous retaining walls associated with the ADA access route have been removed. 3. Ski return / historic corridor:  The plaza and associated retaining wall previously included to adjust the grade between the lift level and the return ski level has been reduced.  The grading on the eastern side of the ski return, adjacent to the Caribou Condominiums has been reconfigured to preserve the trees requiring only one tree to be removed rather than eight with the previous design. The face of the wall is located a minimum of eight feet from the base of preserved trees. The wall supports the return skiing connection to Lift One Park and allows for return skiing to the Caribou units along the northern edge.  Retaining walls along the northeastern edge of the property are necessary to maintain the snow level and facilitate the return skiing to Lift One Park as well as supporting Ski Company mountain access. 4. Architectural program and floorplans:  The hotel’s proposed interior program remains closely aligned with the original application. The floor plans have been adjusted to consolidate hotel amenity and public spaces including the lobby, check-in/arrival, restaurant and bar and living room spaces into the northern portion of the building, adjacent to a reconfigured skier plaza. Hotel rooms have been relocated to the area where the restaurant was previously envisioned.  With the changes to the internal configuration of the building’s uses, the exterior access-ways, stairs and plazas along the buildings eastern edge have Design Workshop, Inc. 3 been revised to reflect the uses internal to the building, eliminating the stairway and structure between the lift and the lodge.  The changes improve upon some of the inefficiencies in the March 29 design resulting from locating the restaurant upslope at the southern end of the site. In the revised design, spaces dedicated to circulation within the building are minimized. 5. Turnaround at the South Aspen Street terminus:  The turnaround has been redesigned to incorporate the city’s engineering standards, accommodating a 50’ radius, additional loading and unloading capability for the hotel and proposed shuttle service.  Pedestrian space has been increased on the northern side of the turnaround providing a 13-footwide sidewalk which will further enhance the public approach to the lift and direct pedestrian traffic to the mountain.  Along the southern side of the turnaround a minimum 6’ sidewalk has been included to accommodate pedestrian traffic, primarily from existing neighborhood uses located west of the turnaround. 6. Vesting Period  The previously requested vesting period of 10 years is proposed to be amended to a 5-year vesting period. These application amendments represent significant changes from the original submission and more time is required to fully resolve the internal building program and application revisions to the relevant sections of the land use code. We are working to prepare additional materials that will help to illustrate the proposed changes and intend to provide these in advance of the August 16 P&Z meeting. Sincerely, Richard Shaw, Design Workshop On behalf of Norway Island, LLC