Loading...
HomeMy WebLinkAbout160816_P&ZHearing3 Slides_lowresGorsuch Haus Gorsuch Haus BUILDING CONFIGURATION & SITE PLAN REVISED DESIGN • Northeastern portion of the building removed • Enhanced views from the turnaround to the lift • Historic ski corridor views are improved and return skiing has more room. • Reduced amount of hardscape and retaining walls • Less tree removal • 7% smaller building square footage • 8% reduction in the building footprint • Contains all of the same uses as the previous design • Restaurant relocated adjacent to skier plaza/lift area • A portion of the program relocated to the porte cochere above the larger turn around • Pulled back from Norway ski run GORSUCH HAUS ShadowMountainCondos Mountain QueenCondos Lift OneLodge Lift OneLodge One Aspen Townhomes S. A S P E N S T . S. M O N A R C H S T . SUMMI T S T . Gorsuch Haus BUILDING CONFIGURATION & SITE PLAN COMPARISON GORSUCH HAUS ShadowMountainCondos Mountain QueenCondos Lift OneLodge Lift OneLodge One Aspen Townhomes S. A S P E N S T . S. M O N A R C H S T . SUMMI T S T . Gorsuch Haus BUILDING CONFIGURATION & SITE PLAN COMPARISON GORSUCH HAUS ShadowMountainCondos Mountain QueenCondos Lift OneLodge Lift OneLodge One Aspen Townhomes S. A S P E N S T . S. M O N A R C H S T . SUMMI T S T . Gorsuch Haus BUILDING CONFIGURATION & SITE PLAN COMPARISON GORSUCH HAUS ShadowMountainCondos Mountain QueenCondos Lift OneLodge Lift OneLodge One Aspen Townhomes S. A S P E N S T . S. M O N A R C H S T . SUMMI T S T . Gorsuch Haus NORTH 0 10' 20'40' 1"=20'-0" G o r s u c h H a u s Site Plan A s p e n , C o l o r a d o WORKSHOPDESIGN 120 East Main Street Aspen, CO 81621 August 8, 2016 S. A S P E N S T R E E T Lift One Lodge Shadow Mountain Condos Food TentGrandstands Mountain Queen Condos Caribou Condos Lift One Lodge +8005 March Submission Outline MARCH SUBMISSION LIFT LOCATION ShadowMountainCondos Mountain QueenCondos Lift OneLodge S. A S P E N S T . SUMMI T S T . GORSUCH HAUS March Load Elevation: 8015’ March Building Footprint Lift Gorsuch Haus REVISED DESIGN NORTH 0 10' 20'40' 1"=20'-0" G o r s u c h H a u s Site Plan A s p e n , C o l o r a d o WORKSHOPDESIGN 120 East Main Street Aspen, CO 81621 August 8, 2016 LIFT LOCATION Lift is visible from the South Aspen Street right of way ShadowMountainCondos Mountain QueenCondos Lift OneLodge S. A S P E N S T . SUMMI T S T . GORSUCH HAUS March Load Elevation: 8015’ Proposed Lift Load Elevation: 8016.5’ Proposed Building Footprint Lift Gorsuch Haus COMPARISON NORTH 0 10' 20'40' 1"=20'-0" G o r s u c h H a u s Site Plan A s p e n , C o l o r a d o WORKSHOPDESIGN 120 East Main Street Aspen, CO 81621 August 8, 2016 LIFT LOCATION ShadowMountainCondos Mountain QueenCondos Lift OneLodge Proposed Lift S. A S P E N S T . SUMMI T S T . GORSUCH HAUS Horizontal Distance from Existing Lift: 66’ Proposed Lift Load Elevation: 8016.5’ Existing Lift Load Elevation: 8018’ Vertical distance: 1.5 ft lower Gorsuch Haus COMPARISON LIFT LOCATION Horizontal Distance from Existing Lift: 66’ 8016.58018 Vertical Distance from Existing Lift: 1.5’ Gorsuch Haus HISTORIC CORRIDOR AND MOUNTAIN VIEWS MARCH SUBMISSION REVISED DESIGN Gorsuch Haus HISTORIC CORRIDOR AND MOUNTAIN VIEWS MARCH SUBMISSION REVISED DESIGN Gorsuch Haus DEAN ST. DROP-OFF MARCH SUBMISSION Gorsuch Haus DEAN ST. DROP-OFF REVISED DESIGN Gorsuch Haus SKI RETURN CORRIDOR MARCH SUBMISSION Gorsuch Haus SKI RETURN CORRIDOR REVISED DESIGN Gorsuch Haus TURNAROUND AND PUBLIC ARRIVAL MARCH SUBMISSION Gorsuch Haus TURNAROUND AND PUBLIC ARRIVAL REVISED DESIGN Gorsuch Haus TURNAROUND AND PUBLIC ARRIVAL REVISED DESIGN Gorsuch Haus SKI RETURN MARCH SUBMISSION GORSUCH HAUS Mountain QueenCondos Lift OneLodge Lift OneLodge Ski Return S. A S P E N S T . S. M O N A R C H S T . SUMMI T S T . GORSUCH HAUS Mountain QueenCondos Lift OneLodge Lift OneLodge Ski Return S. A S P E N S T . S. M O N A R C H S T . SUMMI T S T . REVISED DESIGN Gorsuch Haus TURNAROUND 8031.6+ 8021+ 8009.5+ 803 0 7999 7993 7992 8035 7990 7997 7996 79957995 7997 802 5 8 0 2 0 8015 8005 8000.5+ 7996 7998 7994 7991 7990 7985 7998+ 7998.5+ TW 8000.5 TW 7999 8001+ 7991 7992 7993 7994 8031.6 8017+ 8021+ 7998+ 8021+ 8009.6+ 8009.6+ 8005.5+ 8009.5 TW 8021 + 8022+ 8025.5+ 8015+ 8015+ 8015+ 8022+ 8000+ 7998.5+ 7998.5+ 7999 7998 8031+8015+8015+ Rim 8015+8015 NORTH 0 5' 10'20' 1"=10'-0" G o r s u c h H a u s March Site Plan - Turnaround Zoom-in A s p e n , C o l o r a d o WORKSHOPDESIGN 120 East Main StreetAspen, CO 81621 August 10, 2016 MARCH SUBMISSION Service/Parking Garage Entry Pedestrian Zone 11.5’ Vehicle Queuing 45’ Radius Gorsuch Haus Lift OneLodge Pedestrian Zone Skier Plaza 11.5’R 45’ S. A S P E N S T . Gorsuch Haus 8019.5+ 803 0 8035 802 5 8 0 2 0 TW 8005 + 8000+ 8017.5 SNOW LOAD + 8016.5+ 8016.5+ 7999+ 7999+ 7998+ 8016.5+ 8029.5+ 7993 7992 7990 7997 7996 79957995 7998 7994 7991 7990 7985 7991 7992 7993 7994 NORTH 0 5' 10'20' 1"=10'-0" G o r s u c h H a u s Revised Site Plan - Turnaround Zoom-in A s p e n , C o l o r a d o WORKSHOPDESIGN 120 East Main StreetAspen, CO 81621 August 10, 2016 TURNAROUND REVISED DESIGN R 50’ 11’13’6’ 50’ Radius (previously 45’) Porte Cochere 13.5’ Minimum Clearance Vehicle Queuing/Drop-off 11’ Gorsuch Haus Lift OneLodge S. A S P E N S T . Pedestrian Zone Skier Plaza Pedestrian Zone 13’ Sidewalk + Buffer (previously 11.5’) Gorsuch Haus TRANSPORTATION STRATEGY * *►►►► ►►►►*Rubey Park Wagner Park Grand Hyatt Gorsuch Haus Lift One Lodge St. Regis Gorsuch Haus MARCH SUBMISSION ELEVATIONS COMPARISON: EAST March Lift LocationMarch Building Elevation Gorsuch Haus ELEVATIONS COMPARISON: EAST REVISED DESIGN Redesigned Building Elevation March Building Elevation Area of Structure / Stairway Reduced Gorsuch Haus ELEVATIONS COMPARISON: WEST MARCH SUBMISSION March Building Elevation Gorsuch Haus ELEVATIONS COMPARISON: WEST MARCH SUBMISSION March Building Elevation Current Design Building Elevation Gorsuch Haus EXISTINGNEIGHBORHOOD COMPATIBILITY Gorsuch Haus NEIGHBORHOOD COMPATIBILITY REVISED DESIGN Gorsuch Haus NEIGHBORHOOD COMPATIBILITY 2 STORIES 3-4 STORIES 4 STORIES 2-3 STORIES Gorsuch Haus ADJACENT HEIGHTS 2 STORIES 3-4 STORIES 4 STORIES 2-3 STORIES 19.5’ 19.5’ 19.5’ 19.5’ 19.5’ 23.3’-25.5’ 17.8’-27.4’ 24’-27.9’ 33.6’ 28.3’ 33.9’’ 34.5’ 34.6’ 34.7’ 40.7’ 20.4’ 35.9’ 43.2’ 39.5’ 33’31’ 37’ 38.5’ 39’ 39.3’ 47.3’48.5’ 52.5’ - 53.3’ 36.2’ Average 49’ 43’ Gorsuch Haus WHEELER VIEW PLANE Gorsuch Haus SKI APPROACH MARCH SUBMISSION Gorsuch Haus SKI APPROACH REVISED DESIGN Gorsuch Haus SITE PLAN GORSUCH HAUS ShadowMountainCondos Mountain QueenCondos Lift OneLodge Lift OneLodge Ski Return S. A S P E N S T . S. M O N A R C H S T . SUMMI T S T . REVISED DESIGN Gorsuch Haus City of Aspen Land Use Code Part 700, SKI zone Page 1 26.710.330 Ski Area Base (SKI). A. Purpose. The purpose of the Ski Area Base (SKI) Zone District is to provide for areas which allow for a mixture of uses related to ski area uses and operations including, skiing and appurtenant uses and structures, ski area administrative offices, recreation, lodge/hotel, retail, restaurant and bar uses, tourist-oriented service uses, residential uses, and short term vacation rentals. It is intended that this Zone District will apply to areas located at the base of ski areas and all development within this district will be master planned through a planned development (PD) process. B. Permitted uses. The following uses are permitted as of right in the Ski Area Base (SKI) Zone District: 1. Alpine and Nordic ski areas, related uses and support facilities typically associated with the uses and operations of ski areas. 2. Lodge units. 3. Hotel. 4. Multi-family dwellings. 5. Detached residential or duplex dwellings. 6. Dining rooms, customary accessory commercial uses, laundry and recreational facilities located on the same site of and for guests of lodge units, hotels and dwelling units. 7. Accessory residential dwellings restricted to Affordable Housing Guidelines and Section 26.520.040. 8. Ski area administrative offices. 9. Restaurants and bars. 10. Special events associated with ski areas including such events as ski races, bicycle races and concerts; with special event committee review. 11. Parks, outdoor recreational uses and trails. 12. Recreational facility. 13. Retail establishments. 14. Public transportation stop. 15. Terminal building and transportation related facilities. 16. Medical clinic accessory to the ski area. 17. Fire, police and emergency services facilities. 18. Accessory buildings and uses. City of Aspen Land Use Code Part 700, SKI zone Page 2 19. Outdoor vendor carts or areas for food and beverages sales and preparation. 20. Timeshare lodge. 21. Exempt timesharing. 22. Vacation rentals. Pursuant to Section 26.575.220 C. Conditional uses. The following uses are permitted as conditional uses in the Ski Area Base (SKI) Zone District, subject to the standards and procedures established in Chapter 26.425: 1. Daycare center. 2. Offices, business. 3. Public and private surface and underground parking areas. 4. Essential governmental and public utility uses, facilities, services and buildings (excluding maintenance shops). 5. Post office substation. D. Dimensional requirements. The dimensional requirements which shall apply to all permitted and conditional uses in the Ski Area Base (SKI) Zone District shall be set by the adoption of a final development plan, pursuant to Chapter 26.445, of planned development. E. Signs. Signs within the Ski Area Base (SKI) Zone District shall be subject to the provisions of Chapter 26.510, Signs. A sign master plan may be approved in conjunction with a PD review process allowing for the establishment of dimensional and quantity sign standards for the PD. (Ord. No. 35-2000, §1; Ord. No. 21-2002 §§5, 6 [part]; Ord. No.34-2011, §21) PROPOSED SKI ZONING Gorsuch Haus PROPOSED SKI ZONING Gorsuch Haus QUESTION AND ANSWER