Sept. 1, 2016
Jennifer Phelan
Community Development Department
City of Aspen
130 South Galena Street, 3rd Floor
Aspen, CO 81611
Dear Jennifer,
The Gorsuch Haus team has further refined the concepts and plans presented at the
Planning and Zoning Hearing on Aug. 16. This memo and the attached materials
demonstrate how the project has been revised in response to comments received from
Staff, P&Z commissioners and the public and build on the application amendments memo
dated August 15th. It also provides additional information supporting the rationale behind
some of the design decisions which have informed this proposal.
To date, the hearing process has been focused on the big picture elements of the project
including the site plan, public access and neighborhood compatibility. This memo
addresses the changes to these plan elements and provides additional updates to the
review criteria that have not been discussed in detail in the public forum including the
subdivision, right of way vacation request and affordable housing mitigation requirements.
As requested in your email dated Aug. 19, 2016, the following materials documenting the
amendments to the proposal have been uploaded to box.com at the following link:
https://designworkshop.box.com/s/oehp4ten3fwvrbb0un1ghtj3ct0iujej
1. Updated Site Plan – Identifies top of wall heights and proposed grading
2. Turnaround Enlargement
3. East and west elevations showing building height from interpolated natural or
proposed grade (whichever is lower)
4. Three site sections illustrating the grading changes to accommodate the hotel and
lift infrastructure and heights of the Gorsuch Haus project and adjacent parcels.
5. Floor area calculations and diagrams
6. Net livable/net leasable calculations and diagrams
7. Affordable housing mitigation strategy with the updated number of employees
generated by the project.
8. Updated subdivision / lot configuration
a. Updated Street and Easement Vacation Plat
Design Workshop, Inc.
2
b. Updated Planned Development / Subdivision Plat – including updated
description of easements
9. Updated Utilities Plan and Drainage Evaluation Memo
10. Sketch Up views along South Aspen Street from the intersections with Dean Street,
Durant Avenue and Main Street
11. A working sketch up massing model will be available at the Sept. 20 P&Z meeting
Summary of Application Updates:
Subdivision and right of way vacation:
The Street and Vacation Plat and the PD/Subdivision Plat have been revised to reflect the
following changes in the subdivision and lot configuration:
Lot Configuration:
The Applicant is proposing revisions to the subdivision originally contemplated in the
March submission. The changes reflect a two lot configuration which aligns more closely to
the original townsite plat. Lot 1 incorporates the two existing parcels of the original
townsite plat and extends to the south on the gentler slopes within the City of Aspen
boundary. Lot 2 largely resembles the original configuration of Government Lot 31. The
review standards under the general subdivision and major subdivision are addressed in the
revised PD/Subdivision Plat, including the guaranteed access of both lots to a public way,
alignment with the original townsite plat, and the removal of non‐conforming site
improvements.
Lot 1 ‐ Lot 1 is the primary development lot for the mixed use lodge, the lift infrastructure
and associated site improvements. The Lot has access to a public way with its entrance
and driveway provided along the expanded South Aspen Street frontage. Lot 1 will total
75,446 sf, inclusive of a 201 sf area within the South Aspen Street right of way to support
the structural columns required for the porte cochere of the building. Additional air rights
for the porte cochere as described below will be retained through the subdivision process.
Lot 2 ‐ Lot 2 will comprise the remaining portion of the Planned Development and will
include site improvements such as the regrading of the mountain access road as well as
skiable terrain and open space. Lot 2 will total 213,303 sf. Guaranteed access to a public
way is provided with a non‐exclusive private access easement as described in the
PD/Subdivision Plat under the certificate of ownership, dedications and reservations, #5.
This mountain access road will traverse the north and northwestern portion of Lot 1
providing access to Lot 2. The mountain access road is seasonal in nature which supports
the use of Lot 2 as a ski area parcel. No changes to the use of this road are proposed.
Design Workshop, Inc.
3
Public Access ‐ The proposed lot configuration and subdivision facilitate improved access
to the ski area from the public right of way at the terminus of South Aspen Street. The
right of way dedication facilitates significant improvements to the South Aspen Street
terminus to meet the City’s engineering standards, supporting a full 50’ radius for the
dedicated right of way. The additional use of private land will support public
transportation with an 11’ pull out for transit and vehicle drop off as well as a 13’ wide
sidewalk/permeable pavement area for enhanced pedestrian facilities, providing access to
skier services and the lift. Along the southern side of the turnaround a minimum 6’
sidewalk has been included to accommodate pedestrian traffic, primarily from existing
neighborhood uses located west of the turnaround. Public access through the site
connecting South Aspen Street to Summit Street is provided through a pedestrian
easement across Lot 1. The combination of existing rights of way and the dedication of
private lands for the turnaround will accommodate traffic circulation and improve access
for emergency service vehicles, with ambulance parking provided outside of the traffic
circulation area for on mountain emergency egress and loading. The minimum clearance
of the porte cochere and grades of the turnaround are a significant improvement for
emergency services over existing conditions.
Recreational Ski Access and Historic Views ‐ The site plan greatly enhances the visual
connection of the historic ski corridor from Dean Street towards the on‐mountain skiing as
well as improving the practical use of the ski corridor for return skiing into town. Skiing
along the western side of the building will remain possible for those skiing the western
edge of the Norway Ski run to the top of S. Aspen Street. The primary ski return will be
relocated to the eastern side of the lift where skiers will have the option of exiting at the
turnaround or returning through the Lift One Park ski corridor all the way to Dean Street.
This area has been widened and at its minimum width is 30’, a sufficient width to
accommodate skiing as well as the operational needs of the ski area. ADA access for
example will be accommodated with the integration of an ADA elevator and ramps, taking
skiers from elevation 7,999’ to the lift load elevation of 8016.5’ providing access to the site
where none currently exists as the lift is now only accessed by stairways.
Right of Way Vacation ‐ A number of criteria are considered in vacating the unimproved
vehicular rights of way, including the City’s requirements for vehicular and pedestrian
access, utility and drainage provisions, and recreational connections. When considered as
a whole, the vacation of the rights of way achieves the criteria to maintain or improve the
public health, safety and welfare of the community and has no negative impact on current
needs, with alternative accommodations provided with easements to support the current
and future public needs served by the existing rights of way.
The vacation of the rights of way adjacent to the parcel are important to facilitate a
functional site plan while accommodating community goals to re‐establish the historic ski
corridor of Lift 1 and create a welcoming public portal to Aspen Mountain. The applicant is
Design Workshop, Inc.
4
proposing to dedicate private property to the city to accommodate expanded right of way
improvements at the terminus of South Aspen Street. The total land area of the
unimproved rights of way requested for vacation for S. Aspen Street, Summit Street and
Hill Street is 13,234 sf and the proposed private land dedication of the original lots to the
city for the public right of way is 2,828 sf.
The function of the rights of way to be vacated will be met through the use of permanent
easements to address the utility and drainage requirements typically fulfilled within the
rights of way. The proposed utility corridor improves upon the current conditions by
providing greater width and a more direct route for the city’s utilities across Lot 1 through
a perpetual easement. The waterline and utilities easement running across the northern
end of Lot 1 will be a minimum of 30’ wide, whereas currently the corridor is limited to the
25’ width of the Hill Street ROW. The width and more direct route are improvements over
the current conditions, providing additional separation between utilities within the sloped
site.
Process:
A two‐step process is required to create the lot configuration represented in the revised
site plan. The first step, as described on the Street and Easement Vacation Plat proposes
that the City of Aspen vacate all portions of the original platted S. Aspen Street, Summit
Street and Hill Street Rights of Way which are adjacent to Blocks 10 and 12 of the Eames
Addition. Upon vacation, the ownership of these strips of land vest with the owner of
Blocks 10 and 12, currently the Aspen Skiing Company. The subgrade public utilities will be
accommodated along the vacated rights of way in the form of wider and more practical
easements that satisfy the City’s existing and future needs.
In the second step, represented on the Final Plat for Gorsuch Haus PD/Subdivision, ASC
plats and dedicates a new, larger public right of way area for the expanded turnaround
area with a 50’ radius. To facilitate the construction and use of the building’s porte
cochere, the dedication language reserves the “doughnut hole” in the center of the radius
to accommodate the vertical structural support serving the porte‐cochere, as well as the
air space above the lowest point of the underside of the porte‐cochere. These elements
are illustrated and described on the revised final plat.
The air space reservation described in Step 2 is permitted under Colorado Revised Statute
Section 38‐12‐101, et. seq., which expressly allows for estates above the surface of the
ground to be created, owned, used, conveyed and encumbered in the same manner as any
other interests in real estate. This process and ownership structure meet the city’s desire
to terminate South Aspen Street within a public right of way incorporating the full 50’
radius. It also accommodates the private development improvements that will be
constructed and maintained in a fee simple ownership structure.
Design Workshop, Inc.
5
Utility & Drainage Revisions:
While the right of way vacations are described above, the function of the utility corridors is
accommodated through the provision of utility easements. The utility plans and
corresponding easements have been revised to reflect the changes to the plan and a
greater width along the City’s main water line which benefits from a more direct alignment
shown in the plans than is accommodated under current conditions.
As described in the attached memo from Sopris Engineering, the “Revised building and
associated hardscape areas have been reduced from previously estimated 37,660 SF down
to 27,937 SF that equates to a 26% net reduction. Our drainage analysis and designs as
submitted are intended to assure that the proposed stormwater management system is
feasible and adequate to address the development impacts of this project. A more
detailed engineering study will be provided at next level of review with more information
and adequate design details, however, downstream changes are anticipated to be
insignificant and have no negative impacts on the proposed storm sewer trunk line
capacities and drainage appurtenances.”
Architectural Floor Plan Revisions:
- As previously described at the Aug. 16 P&Z hearing, the Building Footprint and
Floor Plans for the new mixed‐use building have been significantly revised to
accommodate a better visual connection and public access to the lift.
- The building efficiencies have been maximized with the relocation of the publicly
accessible restaurant from the southern end of the building to the eastern edge
adjacent to the skier plaza and the lift. This change allowed some duplicative lobby
spaces to be removed and consolidated back of house, kitchen and circulation
areas.
- A vary similar program is proposed within the mixed use building including:
o 81 lodging keys (7 condos with lock offs, and 60 regular hotel rooms and
suites), average lodging room size has gone up slightly but retains a
standard modest room size of 417 sf, flexible unit configurations and
suites.
o Restaurant, Après ski deck, and grab n’ go retail
o Ski Company operations, patrol locker room, ticketing and restrooms
The ticketing area and public restrooms have been relocated
adjacent to the lodge entrance at the level of the turnaround,
elevation 7,999’, and will be a visual signal to the public identifying
the ski area portal and skier services.
o Six (6) Free Market Residential Units – similar in size and configuration to
the previous plans.
o One (1) Affordable Housing Unit, now is a 3‐bedroom unit totaling 1,400 sf
is an increase from the original submission.
Design Workshop, Inc.
6
o Accessory Lodging Facilities including: spa and fitness areas, meeting room
and pre‐function space, bar and lounge area, pool and roof deck, boot/ski
storage areas.
o 61 parking spaces – includes the code requirement for the proposed
development and four (4) public spaces.
The four public parking spots required within the right of way
improvements associated with Lift One Lodge approvals have
been accommodated within the subgrade garage (additionally,
temporary loading and unloading areas for skiers has been
accommodated outside of the 50’ right of way).
- Additional changes to the building’s configuration include:
o Loading Dock and parking garage entrance has been relocated to the
southern edge of the turnaround, further from the public ski entry and not
impeding the public arrival.
o The Trash / Recycling area complies with the sq. ft. requirements
identified in Title 12, Solid Waste of the city code for a Lodge building. This
area includes 420 sf or a 42’ long x 10 wide x 10’ height space for trash,
recycling and compost. Special Review is still required for the location and
configuration of this space, absent an alleyway on the site.
As the space is shared with the receiving dock, floor paint or
another strategy will be used to delineate between the loading
dock and the trash/recycling area.
o Condo‐Lodge floor plans are planned in a three key configuration with one
kitchen/studio module and two lock‐off bedrooms.
Floor Area Diagrams and Calculations:
- Revised Floor Area Diagrams and Calculations pages are included with the revised
materials as sheets A111 and A112.
- The total building square footage is 127,525sf
- The Gorsuch Haus’ total above grade floor area is 68,430sf with the additional
improvements for the lift canopy and the lift house totaling 1,703 sf for a total
Floor Area for Lot 1 of 70,133 sf.
- The following chart illustrates the floor area ratio for the proposed development
on Lots 1 and 2.
Design Workshop, Inc.
7
FLOOR AREA RATIO 1 LOT 1 LOT 2
USE TYPE Proposed Program
Floor Area
(Including Sub‐grade
Reductions)
Proposed Floor
Area Ratio (FAR)
Proposed Program
Floor Area
(Including Sub‐
grade Reductions)
Proposed Floor
Area Ratio
(FAR)
FAR Total2 70,133 1.50 ‐ ‐
Lodge 51,268 1.10 ‐ ‐
Affordable Multi‐Family
Housing
854 0.02 ‐ ‐
Free Market Multi‐Family
Housing
12,102 0.26 ‐ ‐
Commercial 4,398 0.09 ‐ ‐
Non‐Unit (Lift Canopy) 1,512 0.03 ‐ ‐
Commercial Parking
Facility3
N/A N/A N/A N/A
o Notes regarding the floor area calculations:
Floor assembly is excluded from both subgrade and above grade
wall sf calculations
Each face of the building including inside faces of balconies and
notches in the building are including in the surface area
calculations for the subgrade percentages.
The resident elevator is divided between lodging and free market
FAR and is counted on all levels.
The Lift Canopy on Lot 2 is classified as non‐unit space as this is
open air/mechanical use, the lift house/operations have been
included as commercial square footage.
Net Leasable/Livable Diagrams and Calculations
- The revised Sheet A113 illustrates the new net leasable and livable areas of the
building.
- The diagrams identify the basement/upper floor commercial areas that are subject
to the 25% reduction for GMQS and affordable housing generation. These areas
have been incorporated into the updated Affordable Housing mitigation
requirements.
Affordable Housing Generation:
- The Affordable Housing Mitigation credits have been recalculated pursuant to
code section 26.470.070.8.b for projects with less than one (1) lodge unit per 500
sf of lot area. The proposed project has one Lodge unit per 932 sf of lot area.
Design Workshop, Inc.
8
- The calculations sheet included has been revised to reflect the percentages
required for this code section and also addresses the reconstruction credits
generated by the existing building and ticket shed. The ticket shed houses an
approximate 42sf of net leasable area which has been added to the replacement
credits for the existing building’s affordable housing mitigation purposes.
Additionally, the subgrade, basement level generates 25% less replacement FTEs
than the other three levels of the existing building which are each considered to
be a main floor. The total reconstruction credit is therefore 9.369 FTEs.
- The on‐site affordable housing unit has been enlarged to a net livable square
footage of 1,400 sf which can accommodate a three‐bedroom affordable housing
unit, mitigating for 3 FTEs.
- The additional 40.80 FTEs will be mitigated consistent with the strategy identified
in the March submission through a combination of Affordable Housing Credits and
New Affordable Housing Construction. As established previously, applicant will
work with the city and APCHA at the detailed design stage to establish the
category required for the employee mix of the mixed use development.
- There is no expected increase to the employee generation for the actual
replacement of the lift facility.
Neighborhood Compatibility ‐ Building Height, Mass and Scale
- City Staff, Planning and Zoning commissioners, as well as community members
have acknowledged that lodging is an appropriate use at this location. While
efforts have been made to minimize the building’s mass and scale to the greatest
extent possible, a minimum number of rooms and square footage is required to
develop an operationally successful hotel project.
- Additional materials provided at previous meetings verify that the heights of the
proposed Gorsuch Haus project are compatible with the adjacent neighborhood’s
existing and approved projects. The Lift One Lodge property, for example,
measures up to 53’3” in height. Other buildings in the neighborhood have heights
between 30’ and 40’. This is consistent with the proposed heights of the Gorsuch
Haus, which range from 22’ at the building’s south end to 47’ at the mid‐section of
the building.
- The height of the building is laid against the mountain with a combination of two,
three and four story sections and a decrease in the overall height of the building as
compared to the March submission.
- Additional design strategies have been incorporated to minimize the perceived
height of the building, including:
o Established a four bay rhythm setting up smaller facade modules that step
up with the natural slope of the mountain with sensitivity to the protected
view planes from town, with lower heights on the uphill portion of the
project.
Design Workshop, Inc.
9
o Removed balconies from the top most level to deemphasize mass on the
top portion of building.
o Created vertical recessed glass elements to break the horizontal mass of
the building, giving the perception of varying building elements.
o Reduced rooftop amenity / terrace space to reduce mass
o Relocated the mechanical screen to the lower southernmost roof to
spread perceived density
o Created two‐tone wood facade palette to compliment the one story stone
base and to articulate building divisions moving up the mountain. These
material variations create more individualized layering of the building.
- Three additional vies of horizontal sections of the building from the Mountain
Queen across to Shadow Mountain have been included to illustrate both the
height comparison and the existing and proposed grading.