HomeMy WebLinkAboutagenda.apz.20260107AGENDA
ASPEN PLANNING & ZONING
COMMISSION
January 7, 2026
4:30 PM, Council Chambers
3rd Floor, 427 Rio Grande Pl,
Aspen
I.SITE VISIT
II.ROLL CALL
III.COMMENTS
IV.MINUTES
V.DECLARATION OF CONFLICT OF INTEREST
VI.OTHER BUSINESS
VII.PUBLIC HEARINGS
VII.AResolution #01, Series of 2026 - Minor Planned Development Amendment to
Detailed Review, Amendment to Final Commercial Design Review - 610 S. West
End St., The Gant Condominium Association
VII.BResolution #02, Series of 2026 - 10 Club Circle - Maroon Creek Club - Minor PD
Detailed Review Amendment, Amendment to Final Commercial Design Review
P&Z Site Visit - The Gant, 610 S W End St. - 3:00pm
Start point in the lobby of the Gant at 3:00pm.
Election of Chair and Vice Chair
Staff Memo_610 S West End St_Minor Amendment to Detailed Review.pdf
Draft Resolution #01 Series of 2026.pdf
Attachment A_Application.pdf
Attachment B_Staff Analysis of Criteria.pdf
Attachment C_Compiled Referral Comments.pdf
10 Club Circle_Maroon Creek Club_Memo_Minor PD Amendment.pdf
10 Club Circle_Maroon Creek Club_Draft Resolution #02, Series of 2026.pdf
10 Club Circle_Maroon Creek Club_Exhibit A_PD Detailed Review Standards
Responses.pdf
10 Club Circle_Maroon Creek Club_Exhibit B_Commercial Design Standards
Responses.pdf
1
1
VIII.BOARD REPORTS
IX.ADJOURN
TYPICAL PROCEEDING FORMAT FOR ALL PUBLIC HEARINGS
1) Conflicts of Interest (handled at beginning of agenda)
2) Provide proof of legal notice (affidavit of notice for PH)
3) Staff presentation
4) Board questions and clarifications of staff
5) Applicant presentation
6) Board questions and clarifications of applicant
7) Public comments
8) Board questions and clarifications relating to public comments
9) Close public comment portion of bearing
10) Staff rebuttal/clarification of evidence presented by applicant and public comment
11) Applicant rebuttal/clarification
End of fact finding. Deliberation by the commission commences. No further interaction
between commission and staff, applicant or public
12) Chairperson identified the issues to be discussed among commissioners.
13) Discussion between commissioners*
14) Motion*
*Make sure the discussion and motion includes what criteria are met or not met
Revised January 9, 2021
2
2
STAFF REPORT
TO: Planning and Zoning Commission
FROM: Sophie Varga, Zoning Administrator
THROUGH: Dan Folke, Planning Director
MEETING DATE: January 7th, 2026
SUBJECT: 610 South West End Street, The Gant Condominium Association -
Minor Planned Development Amendment to Detailed Review,
Amendment to Final Commercial Design Review, Mountain View
Plane Exemption
__________________________________________________________________
INTENDED OUTCOME:
The request of the Planning and Zoning Commission is to consider the following land
use code review processes:
• Minor Planned Development (PD) Amendment to Detailed Review (Sections
26.445.110.e, 26.445.070)
• Amendment to Final Commercial Design Review (Section 26.412.060)
• Mountain View Plane Exemption (Section 26.435.050.d.1)
The Planning and Zoning Commission is the final review authority of these requests.
EXECUTIVE SUMMARY:
The purpose of this report is to provide the Planning and Zoning Commission (P&Z) with
an overview and analysis of a request for a Minor PD Amendment to Detailed Review
and Amendment to Commercial Design Review so that the P&Z can make an informed
decision. The P&Z may approve, deny, or approve the application with conditions. The
P&Z may also continue the application to obtain additional information necessary to
approve or deny.
Overview of Project:
The application proposes changes to building materials and landscaping elements.
Staff Recommendation:
Staff recommends approval of the requests with conditions, as noted in the draft
resolution.
3
DISCUSSION:
Background:
The Gant Condominium Association (The Gant) received final planned development
approval in 1973 and was re-zoned via Ordinance #41, Series of 1989, to Moderate-
Density Residential (R-15) with a Lodge Preservation Overlay. The Gant is approved as
multi-family residential buildings with the ability to operate as a lodge.
Project Summary:
The application proposes changes to building materials in order to address wildfire
resiliency and modernize the property as well as adjustments to exterior amenities on
the site. The Gant currently has a pool area on the west side of the property, tennis
courts in the middle, and a second pool area to the east. The application proposes to
remove the western pool and replace it with an open gathering area. The central tennis
courts are proposed to be removed and replaced with a pool and spas. The eastern
pool and spa are proposed to be replaced in substantively the same location.
Staff Comments:
Staff find that the application meets applicable criteria. Full staff analysis of the
application can be found in Attachment B. Highlighted responses can be found below.
Minor PD Amendment to Detailed Review (Sections 26.445.110.e, 26.445.070)
Detailed Review concentrates on specific aspects of the project, including site planning,
landscape architecture, Commercial Design Standards, and Engineering Design
Standards. Landscaping plans were reviewed by Parks staff and found to be
appropriate. Engineering found that the application meets the intent of the Engineering
Design Standards and Urban Runoff Management Plan. Additional review will take
place at time of building permit. The proposed materials comply with applicable design
standards.
Amendment to Final Commercial Design (Sections 26.412.060, 26.412.090)
The application includes changes to materials and landscaping. The Mountain Base
character area includes a mix of architectural styles and materials; the application
reflects this mix and the proposed changes were therefore found to be appropriate. The
landscape changes do not impact overall site design.
Mountain View Plane (Section 26.435.050)
The application included a view plane analysis; this analysis shows that existing and
proposed development on the property does not infringe on the Glory Hole Park View
Plane and is not subject to Mountain View Plane review.
4
Referral Comments:
The application was referred to the Building, Engineering, and Parks Departments.
Combined comments can be found in Attachment C. The comments resulted in the
three conditions found in the recommendation below.
RECOMMENDATION:
Staff recommend approval with the following conditions:
1. Water easements shall be formalized in an easement agreement with easement
extents reflecting as-built conditions of the water mains and fire hydrants.
2. A tree removal plan and phased tree removal approach will be reviewed and
approved by the Parks Department via a tree removal permit.
3. All exterior materials shall comply with adopted or State mandated building
codes regarding wildfire resiliency in place at time of building permit submittal.
Proposed Motion:
“I move to approve Resolution #01, Series of 2026.”
ATTACHMENTS:
Draft Resolution 01, Series of 2026
Attachment A – Application
Attachment B – Staff Analysis of Criteria
Attachment C – Combined Referral Comments
Attachment D – Existing and Proposed Site Plans
5
610 S. West End St.
Resolution 01, Series of 2026
Page 1 of 3
RESOLUTION #01
SERIES OF 2026
A RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION
GRANTING APPROVAL FOR A MINOR PLANNED DEVELOPMENT AMENDMENT
TO DETAILED REVIEW AND AN AMENDMENT TO FINAL COMMERCIAL
DESIGN REVIEW AT 610 SOUTH WEST END STREET, LEGALLY DESCRIBED AS:
THE GANT CONDOMINIUMS, ACCORDING TO THE MAP THEREOF RECORDED
NOVEMBER 14, 1974 IN PLAT BOOK 4 AT PAGE 499 AS RECEPTION NO. 171343
AND RECORDED AUGUST 24, 1976 IN PLAT BOOK 5 AT PAGE 22 AS RECEPTION
NO. 186413 AND ACCORDING TO THE CONDOMINIUM DECLARATION FOR THE
GANT CONDOMINIUMS RECORDED NOVEMBER 16, 1973 IN BOOK 281 AT PAGE
390 AS RECEPTION NO. 163549 AND SUPPLEMENTAL DECLARATION THERETO
RECORDED NOVEMBER 14, 1974 IN BOOK 293 AT PAGE 291 AS RECEPTION NO.
171345 AND AMENDED SUPPLEMENTAL DECLARATION RECORDED
DECEMBER 5, 1975 IN BOOK 306 AT PAGE 352 AS RECEPTION NO. 179993 AND
SUPPLEMENTAL DECLARATION RECORDED AUGUST 24, 1976 IN BOOK 315 AT
PAGE 716 AS RECEPTION NO. 186412, COUNTY OF PITKIN, STATE OF
COLORADO, AND SUBSEQUENT AMENDMENTS, INCLUDING RESOLUTION
CONFIRMING ADOPTION OF AMENDMENTS TO THE CONDOMINIUM
DECLARATION FOR GANT CONDOMINIUMS RECORDED JUNE 11, 1986 IN BOOK
512 AT PAGE 605 AND RESOLUTION CONFIRMING ADOPTION OF
AMENDMENTS TO THE CONDOMINIUM DECLARATION RECORDED
SEPTEMBER 4, 2020 AS RECEPTION NO. 667792; AND ARTICLES OF
INCORPORATION OF THE GANT CONDOMINIUM ASSOCIATION RECORDED
NOVEMBER 16, 1973 IN BOOK 281 AT PAGE 445, COUNTY OF PITKIN, STATE OF
COLORADO.
PARCEL ID: 2737-182-67-800
WHEREAS, the Community Development department received an application (the
“Application”) from Jessica Garrow of Design Workshop representing the Gant Condominiums
(the “Applicant”), requesting Planned Development Amendment and an amendment to
Commercial Design Review related to proposed changes to building façade materials and site
updates at 610 South West End Street (the “Property”); and,
WHEREAS, the application was referred to other City Departments for comments and the
Community Development department Staff reviewed the application for compliance with the
applicable review standards; and,
WHEREAS, upon review of the application and the Land Use Code standards, the Community
Development Director recommended approval of the requested development application; and,
WHEREAS, the City of Aspen Planning and Zoning Commission reviewed and considered
the application under the applicable provisions of the Land Use Code as identified herein, in
particular Sections 445.110.e and 26.445.070, Minor PD Amendment to Detailed Review, Section
6
610 S. West End St.
Resolution 01, Series of 2026
Page 2 of 3
26.412.060 and 26.412.090, Amendment to Final Commercial Design, and Section
26.435.050.d.1, Mountain View Plane Exemption, considered the recommendation of the
Community Development Director, and took and considered public comment at a duly noticed
public hearing on January 7th, 2026; and,
WHEREAS, the City of Aspen Planning and Zoning Commission finds that the development
proposal meets the applicable review criteria and that approval of the request is consistent with the
goals and objectives of the Land Use Code; and,
WHEREAS, the City of Aspen Planning and Zoning Commission finds that this Resolution
furthers and is necessary for the promotion of public health, safety, and welfare, and,
WHEREAS, the City of Aspen Planning and Zoning Commission approves Resolution #01,
Series of 2026, by a XX to XX (XX-XX) vote, approving the requested land use reviews as
identified herein.
NOW, THEREFORE BE IT RESOLVED BY THE PLANNING AND ZONING
COMMISSION OF THE CITY OF ASPEN, COLORADO THAT:
Section 1: Minor Planned Development Amendment to Detailed Review Approval,
Amendment to Final Commercial Design Review Approval
The Planning and Zoning Commission hereby approves a Minor Amendment to Detailed Review
and an Amendment to Final Commercial Design Review for the following:
• Building material changes.
• Site layout updates as shown in Attachment A, including changing the western pool area
to a gathering area, removing the central tennis courts and adding a pool and spas, and
replacing the eastern pool and spa. Changes of a technical nature may occur via building
permit.
Section 2: Conditions of Approval
The application shall meet the following conditions of approval:
1. Water easements shall be formalized in an easement agreement prior to building permit
issuance with easement extents reflecting as-built conditions of the water mains and fire
hydrants.
2. A tree removal plan and phased tree removal approach will be reviewed and approved
by the Parks Department via a tree removal permit.
3. All exterior materials shall comply with adopted or State mandated building codes
regarding wildfire resiliency in place at time of building permit submittal.
4. Proposed development may not project further into the setback than existing development.
Section 3: Vested Rights
The development approvals granted herein shall constitute a vested property right attaching to and
running with the Property for a period of three (3) years from the date of issuance of a development
order. However, any failure to abide by any of the terms and conditions attendant to this approval
shall result in the forfeiture of said vested property right.
7
610 S. West End St.
Resolution 01, Series of 2026
Page 3 of 3
Section 4: Material Representations
All material representations and commitments made by the Applicant pursuant to the development
proposal approvals as herein awarded, whether in public hearing or documentation presented
before the Planning and Zoning Commission, are hereby incorporated in such site development
approvals and the same shall be complied with as if fully set forth herein, unless amended by an
authorized entity.
Section 5: Existing Litigation
This Resolution shall not affect any existing litigation and shall not operate as an abatement of any
action or proceeding now pending under or by virtue of the ordinances repealed or amended as
herein provided, and the same shall be conducted and concluded under such prior ordinances.
Section 6: Severability
If any section, subsection, sentence, clause, phrase, or portion of this Resolution is for any reason
held invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed
a separate, distinct, and independent provision and shall not affect the validity of the remaining
portions thereof.
FINALLY, adopted, passed, and approved this 7th day of January, 2026.
Approved as to form: Approved as to content:
______________________________ __________________________________
James R. True, Special Counsel Teraissa McGovern, Chair
Attest:
_______________________________
Tracy Terry, Deputy Clerk
Attachment:
Exhibit A – Existing and Proposed Site Plans
8
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DYH
DYH
D
S
S
S
S
S
D
D
D
D
D
D
D
D
D
S
D
DYH
DYH
D
D
D
D
E
E
E
OSW
CO
CO
COCO
COCO
CO
CO
CO
CO
CO
D
WV
WV
WV
ICV
ICV
ICV
ICV
G
ICV
ICV
D
G
DOG
DYH
CO
W
WV
WV
FO
F
ICV
E
ICV
CTV CTV
CT
V
CT
V
CT
V
CT
V
CT
V
D
D
ICV
T1
T6
T11
T12
T13
T18
T19
T20
T30
T107
T108
T110
T111
T112
T113
T130T131
T134
T136
T141
T147
T148
T150
T151
T152
T176
T178
T179
T182
T183
T184
T194
T195
T196
T198
T213
T214
T215
T241
T242
T243
T250
T251
T265
T266
T276
T294
T295
T296
T300
T305
T306T307
T308
T310
T311
D
G
G AC
D
ICV
ICV
X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
T312*
T313*
Gant Campus Enhancement Plan
610 S. West End Street, Aspen, Colorado
EXISTING SITE SETBACKS PER PREVIOUS APPROVAL AND R15 ZONE DISTRICT
DECEMBER 29, 2025NORTH0
ORIGINAL SCALE:
10 20 40
1"=20'-00"
DESIGN WORKSHOP
Landscape Architecture · Land Planning · Urban Design · Tourism Planning
22860 Two Rivers Rd #102 · Basalt, Colorado 81621 · 970-925-8354 Facsimile 970-920-1387
BUILDING A
BUILDING C
BUILDING C
BUILDING B
BUILDING J
BUILDING K
CONFERENCE CENTER
TENNIS COURTS
PARKING
PARKING
PARKING
PARKING
BUILDING D
BUILDING E
BUILDING F
BUILDING G
BUILDING H
PROPERTY BOUNDARY
P
R
O
P
E
R
T
Y
B
O
U
N
D
A
R
Y
PRO
P
E
R
T
Y
B
O
U
N
D
A
R
Y
PRO
P
E
R
T
Y
B
O
U
N
D
A
R
Y
PR
O
P
E
R
T
Y
B
O
U
N
D
A
R
Y
U
T
E
A
V
E
.
SO
U
T
H
W
E
S
T
E
N
D
S
T
R
E
E
T
5' and 10' Setbacks,
Per P&Z Resolution 4, Series of 2013
5' Side Setback, Per P&Z Resolution 4, Series of 2013
10'-0" R-15 Zone District Setback
25'-0" R-15 Zone District Setback
10'-0" R-15 Zone District Setback
9
FO
CTV CTV
CT
V
CT
V
CT
V
CT
V
CT
V
G
G AC
X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Gant Campus Enhancement Plan
610 S. West End Street, Aspen, Colorado
SITE PLAN: SETBACKS
SEPTEMBER 25, 2025NORTH0
ORIGINAL SCALE:
10 20 40
1"=20'-00"
DESIGN WORKSHOP
Landscape Architecture · Land Planning · Urban Design · Tourism Planning
22860 Two Rivers Rd #102 · Basalt, Colorado 81621 · 970-925-8354 Facsimile 970-920-1387
22
'
-
0
"
5
'
-
0
"
5'-0
"
5'-0
"
2'
-
0
"
2'-0"
10
a |
THE GANT
PREPARED FOR THE CITY OF ASPEN AUGUST 2025
PLANNED DEVELOPMENT AMENDMENT &
COMMERCIAL DESIGN REVIEW
| 19
CENTRAL GARDEN
22860 TWO RIVERS ROAD #102
BASALT, COLORADO 81621
970.925.8354
11
2 |
COVER LETTER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3
EXHIBIT A: Responses to CD Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
EXHIBIT B: Responses to Mountain View Plane Criteria . . . . . . . . . .11
EXHIBIT C: Responses to PD Criteria . . . . . . . . . . . . . . . . . . . . . . . . . . . .12
EXHIBIT D: Vicinity Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .14
EXHIBIT E: Conceptual Landscape Renderings . . . . . . . . . . . . . . . . . .15
EXHIBIT F: Landscape Plans . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .20
EXHIBIT G: Conceptual Architectural Renderings . . . . . . . . . . . . . . . .36
EXHIBIT H: Architectural Elevation Example . . . . . . . . . . . . . . . . . . . . .42
EXHIBIT I: View Plane Exhibit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51
EXHIBIT J: Letter of Authorization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .55
EXHIBIT K: Proof of Ownership . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .56
EXHIBIT L: Land Use Application Form . . . . . . . . . . . . . . . . . . . . . . . . . .58
EXHIBIT M: Pre-Application Form . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .66
EXHIBIT N: Survey . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .69
PLANNER + LANDSCAPE ARCHITECT |
APPLICANT REPRESENTATIVE
Design Workshop, Inc .
22860 Two Rivers Road Suite 102
Basalt, Colorado 81621
970.925.8354
www.designworkshop.com
APPLICANT + OWNER
The Gant Condominum Association
610 S West End Street
Aspen CO 81611
970.925.5000
Project Manager: Jean.Coulter@GantAspen.com
ARCHITECT OF DESIGN
CCY
228 Midland Ave.
Basalt, Colorado 81621
970.927.4925
ARCHITECT OF RECORD
OPI ARCHITECTS
419 Main Street, Unit 1
Frisco, Colorado 80443
970.668.1133
CIVIL ENGINEER
Roaring Fork Engineering
592 CO-133
Carbondale, Colorado 81623
970.340.4130
SURVEYOR
Peak Surveying Inc .
PO Box 1746
Rifle, CO 81650
WATER FEATURE ENGINEER
Water Design Inc .
6740 S. 1300 E #110
Cottonwood Heights, Utah 84121
801.261.4009
TABLE OF CONTENTS
2 12
3 |
Design Workshop, Inc.
Landscape Architecture
Planning
Urban Design
Strategic Services
Environmental Graphic Design
22860 Two Rivers Road
Suite 102
Basalt, Colorado 81621
970.925.8354
designworkshop.com
August 15, 2025
Mr. Daniel Folke
Community Development Director
City of Aspen
427 Rio Grande Place
Aspen, CO 81611
RE: The Gant - Insubstantial PD Amendment PRE-25-084
Dear Mr. Folke,
We are pleased to submit the enclosed land use application on behalf of the Gant
Condominium Association (“The Gant”). Please accept this application for a Planned
Development Amendment and Commercial Design Review approval in accordance with
Sec. 26.412, 26.435.050(d), and 26.445.110 of the City of Aspen Code for updates to the site
plan and architectural materials.
The Gant is a multi-family complex located in the east end of town. It is in the R 15 Zone
District within a Lodge Overlay. In the fall of 2024, the Gant experienced a local fire within
its property premises, causing the homeowners to begin considering the best ways to
address fire safety of the property and update and improve amenities for the residents and
guests of the property in a resilient and sustainable way.
The Homeowners’ Association submitted an initial application earlier this year to update
the roofing material to address these needs. After continued exploration, additional
updates to the site plan and other architectural materials is proposed. No changes to floor
area or heights are proposed as part of this application. The Gant seeks to renovate and
modernize the original pools and spas with similarly sized ones, including relocation and
centralization of the main pool as part of the modernization with removal of the existing
tennis courts; renovation and modernization of the original building cladding materials;
and updates to the campus paving materials. The proposed selected building materials
align with the architectural character of the current neighborhood block context and
improve the property’s wildfire resilience as well as its lifespan.
Responses to required Commercial Design and Planned Development criteria are all
included as Exhibits A, B, C, and D. Renderings illustrating the changes are included in the
landscape set (Exhibit E and F) and architectural set (Exhibit G and H).
We appreciate your time in reviewing this request and look forward to working with the
Community Development Department to move forward with this important safety and
sustainability improvement. Please let us know if any additional information is required or
if you have any questions.
Sincerely,
Jessica Garrow, FAICP
Principal, DESIGN WORKSHOP, INC.
COVER LETTER
3 13
4 |
An application for commercial design review may be approved, approved with conditions, or denied based on
conformance with the following criteria:
(a) Guidelines and Standards.
(1) The Commercial, Lodging and Historic District Design Standards and Guidelines are met as determined by
the appropriate Commission. The Standards and Guidelines include design review criteria that are to be used to
determine whether the application is appropriate.
RESPONSE: See detailed responses to criteria in the next section.
(2) All applicable standards in the Commercial, Lodging and Historic District Design Standards and Guideline
shall be met unless granted a Variation pursuant to Section 26.412.040(d), Variations.
RESPONSE: A variance is not requested . This criterion is not applicable.
(3) Not every guideline will apply to each project, and some balancing of the guidelines must occur on a case-by-
case basis. The applicable Commission must:
a. Determine that a sufficient number of the relevant guidelines are adequately met in order to approve a
project proposal;
b. Weigh the applicable guidelines with the practicality of the measure.
RESPONSE: See detailed responses to criteria in the next section.
(b) Pedestrian Amenity. The proposed development meets the requirements of Section 26.412.070, Pedestrian
Amenity.
RESPONSE: Pedestrian Amenity areas are not proposed to be changed in this application . These criteria
are not applicable .
EXHIBIT A: RESPONSES TO TO CD CRITERIASEC . 26 .412 .060 REVIEW CRITERIA .
4 | Exhibit A 14
5 |
SITE PLANNING AND LANDSCAPE
1.1 All projects shall provide a context study.
RESPONSE: This application features a context map and land survey to provide an overview of the project
context .
1.2 All projects shall respond to the traditional street grid.
RESPONSE: No changes to the driveways or streets are proposed . This is not applicable .
1.3 Landscape elements (both hardscape and softscape) should complement the surrounding context, support
the street scene, and enhance the architecture of the building.
RESPONSE: The project proposes updated landscaping in three areas of the site – the existing pool areas
and tennis courts . Landscape materials and location are driven by best management practices for wildfire
mitigation . On the interior portions of the site, where the Alpine Garden and relocated pool are proposed,
limited areas of synthetic turf are proposed . These are not visible from a public street, in a “No Pets” area,
and are included to minimize water usage and support longer term maintenance .
Tree and landscape placement is based on Firewise principles, with non-combustible materials in the
two-foot Zone 1 (stone, high moisture content perennials, and non-flammable mulch), high moisture
content plant materials in the five-foot Zone 2 area (irrigated shrubs and perennials with limited mulch),
and Limited high-moisture content deciduous trees in the ten-foot Zone 3 . An anticipated tree removal
plan to address these best management practices are included in Exhibit F . Phased tree removals are
anticipated and ongoing with standard tree removal permits with the Parks Department .
Limited adjustments to landscaping are proposed in the public-facing areas along Ute Ave and S . West
End Street .
1.4 Where there is open space on a site, reinforce the traditional transition from public space to semi-public
space to private space.
RESPONSE: As a lodging property, there is a mix of public and private spaces . The improvements are all to
the interior of the site and create semi-private spaces for guests to gather, as well as more public spaces
such as pools and lawn areas . No changes to the landscaping on the edges or streetscape are proposed .
1.5 Maintain alignment of building facades where appropriate.
RESPONSE: The materials for the buildings are proposed to change, but no other façade adjustments are
proposed . This criterion is not applicable .
1.6 When a building facade is set back, define the property line. Review the context of the block when selecting
an appropriate technique.
RESPONSE: No façade adjustments are proposed . This criterion is not applicable .
ALLEYWAYS
1.7 Develop alley facades to create visual interest.
1.8 Consider small alley commercial spaces, especially on corner lots or lots with midblock access from the
street (See Pedestrian Amenity Section PA4).
RESPONSE: There are no alleys on the site . This criterion is not applicable .
EXHIBIT A: RESPONSES TO TO CD CRITERIACOMMERCIAL, LODGING AND HISTORIC DISTRICT DESIGN STANDARDS AND GUIDELINES
5 | Exhibit A 15
6 |
PARKING
1.9 Minimize the visual impacts of parking.
RESPONSE: The property includes an existing central parking area, located adjacent to the current tennis
courts . The tennis courts are proposed to be removed and replaced with an updated pool and lawn area .
This is smaller in size than the existing tennis courts, providing an opportunity for ten (10) new parking
spaces . These new spaces are proposed to be interior to the property, created from a reorientation to the
current parking configuration, and will be screened from view of the pool through landscaping and a fence
with climbing vines (a green wall) . This is proposed to be 8 feet in height (the existing tennis court fence
is 10 feet high) . The inclusion of native shrubs and trees will provide a minimized view of these parking
spaces from the property premises, and for people coming into the Gant .
BUILDING MASS, HEIGHT, AND SCALE
1.10 A new building should appear similar in scale and proportion with buildings on the block.
1.11 A minimum building height difference of 2 feet from immediately adjacent buildings is required.
1.12 On lots larger than 6,000 square feet, break up building mass into smaller modules.
1.13 Development adjacent to a historic landmark should respond to the historic resource.
RESPONSE: No additional buildings will be constructed as part of this project proposal . These criteria are
not applicable .
STREET LEVEL DESIGN
1.14 Commercial entrances shall be at the sidewalk level and oriented to the street.
1.15 Incorporate an internal airlock or air curtain into first floor commercial space.
1.16 Entries that are significantly taller or shorter than those seen historically or that conflict with the established
scale are highly discouraged.
1.17 ATMs and vending machines visible from the street are prohibited.
RESPONSE: No building entry locations or massing changes are proposed . These criteria are not
applicable .
ROOFSCAPE
1.18 The roofscape should be designed with the same attention as the elevations of the building.
1.19 Use materials that complement the design of the building façade
1.20 Incorporate green roofs and low landscape elements into rooftop design where feasible.
1.21 Minimize visibility of rooftops railings.
RESPONSE: Changes to the roof are not proposed as part of this application . These criteria are not
applicable .
6 | Exhibit A 16
7 |
MATERIALS AND DETAILS
1.22 Complete and accurate identification of materials is required.
RESPONSE: The Architectural Plans (Exhibit G and H) include a material sheet that shows the proposed
materials . The proposed materials include :
•Cementitious Siding (such as GFRC, Glass Fiber Reinforced Concrete)
•Exterior cementitious plaster
•Exterior wood siding (WUI Compliant with SFM 12-7A-1 Fire Rating)
•Metal window and door trim, and railings
•Pavers for the building’s exterior elevated walking surfaces
Renderings and an example elevation are also provided to show where these materials will be applied to
the buildings .
1.23 Building materials shall have these features:
•Convey the quality and range of materials found in the current block context or seen historically in the
Character Area.
•Convey pedestrian scale.
•Enhance visual interest through texture, application, and/or dimension.
•Be non-reflective. Shiny or glossy materials are not appropriate as a primary material.
•Have proven durability and weathering characteristics within Aspen’s climate.
•A material with an integral color shall be a neutral color. Some variation is allowed for secondary materials.
RESPONSE: The building is currently all wood from the original construction, which has reached the
end of its useful life and is less wildfire resistant than newer materials . The updated design introduces
thermally modified wood in key visual areas such as gable edges and gable conditions to preserve
the mountain character and ensure continuity with existing aesthetics . To enhance durability while
maintaining a textured and crafted appearance, cementitious (GFRC) siding will be used as the primary
material, allowing for articulated surface expression . Wood railings will be replaced with metal railings,
designed to complement the building’s overall palette while providing a refined, low-maintenance detail .
The new building materials will align with the current neighborhood block context for the Character Area .
The primary goal of the project is to improve wildfire defensibility and resilience . The primary exterior
materials are cementitious siding and cementitious plaster, which provide a high degree of wildfire
resistance . Materials will be non-reflective, durable, and ideal for Aspen’s climate . Neutral colors are
anticipated to be used across the outdoor landscape design and building design .
The building materials will align with the local community character and context . The space will be
walkable, and the landscape elements will provide visual interest by utilizing diverse plant textures and
artistic elements and features across the programmed spaces . The outdoor materials used will be in
alignment with the architectural character of the building .
7 | Exhibit A 17
8 |
1.24 Introducing a new material, material application, or material finish to the existing streetscape may be
approved by HPC or P&Z if the following criteria are met:
•Innovative building design.
•Creative material application that positively contributes to the streetscape.
•Environmentally sustainable building practice.
•Proven durability.
RESPONSE: New streetscape elements are not proposed . New building materials are focused on
durability and environmental sustainability and resilience .
1.25 Architecture that reflects corporate branding of the tenant is not permitted.
RESPONSE: No corporate branding is proposed . This criterion is not applicable .
LIGHTING, SERVICE, AND MECHANICAL AREAS
1.26 The design of light fixtures should be appropriate to the form, materials, scale, and style of the building.
RESPONSE: All lighting fixtures will meet the requirements of the City of Aspen lighting code .
1.27 Trash and recycle service areas shall be co-located along an alleyway where one exists, and screened
from view with a fence or door.
1.28 Design trash and recycle areas thoughtfully and within the style of the building, with the goal of
enhancing pedestrian and commercial uses along alleys.
1.29 Delivery areas shall be located along an alleyway where one exists.
1.30 Mechanical equipment, ducts, and vents shall be accommodated internally within the building and/or
co-located on the roof.
1.31 Minimize the visual impacts of utility connections and service boxes.
1.32 Transformer location and size are dictated by City and utility company standards and codes.
RESPONSE: Changes to these elements are not proposed . These criteria are not applicable .
REMODEL
1.33 All remodel projects shall meet Standards 1.22 and 1.23.
RESPONSE: See responses to these standards, above .
1.34 Consider updating windows, doors, and/or primary entrances to better relate to the Character Area and
pedestrian experience.
RESPONSE: Material updates to the doors and windows are proposed as part of the remodel to improve
overall durability and reduce maintenance costs . The size and location of doors and windows are not
proposed to change, though recladding may result in slight changes to proud window trim . The overall
size of glazing is not proposed to change .
8 | Exhibit A 18
9 |
1.35 Design alternations to relate to the existing building style and form may remain.
RESPONSE: There are no exterior massing changes proposed . Materials are proposed to be updated to
improve overall resilience of the buildings and to implement wildfire best management practices . The
materials include:
•Cementitious Siding (such as GFRC, Glass Fiber Reinforced Concrete)
•Exterior cementitious plaster
•Exterior wood siding (WUI Compliant with SFM 12-7A-1 Fire Rating)
•Metal window and door trim, and railings
•Pavers for the building’s exterior elevated walking surfaces
1.36 Incorporate elements that define the property line in accordance with Guideline 1.6.
RESPONSE: Guideline 1 .6 relates to changes to building facades, which are not changed as part of the
proposal . This criterion is not applicable .
1.37 Creative solutions that incorporate ADA compliance into the architecture are encouraged.
RESPONSE: ADA access is currently provided to buildings at The Gant’s buildings . Landscaping updates
will be completed to comply with ADA requirements . For instance, as part of the updates to the pool and
hot tubs, an 18-inch transfer wall is incorporated into the hot tub designs to enable ADA access without a
mechanized chair . All improvements will meet the applicable requirements of the building code .
MOUNTAIN BASE CHARACTER AREA GUIDELINES
BUILDING PLACEMENT
6.1 On lots greater than 15,000 square feet, the massing of the building should be broken into smaller volumes.
6.2 Place a building into the topography to minimize visual impacts from downtown and to reinforce a strong
relationship to the mountain.
6.3 Minimize retaining walls.
6.4 Incorporate open space into building placement and site design.
6.5 Eclectic and creative approaches to break up building mass and scale is encouraged.
6.6 Create interest along the street, for instance by providing places for the public to sit.
RESPONSE: There are no changes to the building locations as part of the remodel project, so most of
these criteria are not applicable . Site plan updates are proposed, which will adjust the common open
areas on the site . There are currently three open areas on the property, which are proposed to be updated
as follows:
•The lower existing pool area will be updated to include an alpine garden with a lawn, semi-private
gathering areas, an updated grill area, a fire pit, and a relocated water feature .
•The existing tennis courts will be removed as replaced with a lawn, semi-private seating areas, fire pits, a
relocated pool and two relocated hot tubs (spas) .
•The upper pool and hot tub will be reconfigured and retain the existing general size . The raised grilling
and gathering space in this area is not proposed to change .
9 | Exhibit A 19
10 |
ARCHITECTURE
6.7 Carefully plan parking areas and loading zones to minimize visual impacts.
RESPONSE: Ten (10) new parking spaces are proposed in the center of the site as part of the removal of
the tennis courts . These are located adjacent to existing parking and will be screened from the proposed
central pool through fencing and planted material .
6.7 Roof forms should be low pitched to reinforce the mountain character of the neighborhood.
RESPONSE: No changes to the roof forms are proposed . This criterion is not applicable
DETAILS AND MATERIALS
6.8 Easily identifiable architectural details are encouraged.
RESPONSE: The Gant maintains its recognizable character through the thoughtful integration of
identifiable architectural details . While the buildings are currently all wood clad, the updated design
introduces thermally modified wood in key visual areas such as gable edges and gable conditions to
preserve the mountain character and ensure continuity with existing aesthetics . To enhance durability
while maintaining a textured and crafted appearance, cementitious siding will be used as the primary
material, allowing for articulated surface expression . Wood railings will be replaced with metal railings,
designed to complement the building’s overall palette while providing a refined, low-maintenance detail .
Pedestrian areas and walkways are also addressed with attention to material expression . Porcelain pavers
will be used on elevated building walkways and around the pool areas, while concrete pavers and natural
stone paving are proposed for ground-level walkways to reinforce a tactile and layered sense of place .
These details support the architectural identity at The Gant and provide clear, expressive elements that
contribute to the pedestrian experience and the site’s contextual harmony .
10 | Exhibit A 20
11 |
EXHIBIT B: RESPONSES TO MOUNTAIN VIEW PLANE CRITERIA
SEC . 26 .435 .050 . MOUNTAIN VIEW PLANE REVIEW .
(d) Exemptions. The following development activities on properties located in the mid- and background of a view
plane are exempt from the provisions of this Section and may proceed directly to zoning compliance check and
building permit review, where the applicant shall demonstrate the improvement meets the following review criteria.
(1) Structures.
a. Any addition or remodel of an existing structure that does not change or decreases a building’s height at
any point or visible mass from the view plane reference point; or
b. Any of the following structures or structural elements that comply with the standards contained herein or
in the applicable code section for those structures or structural elements
RESPONSE: The Glory Hole View Plane crosses the property and was established just prior to the
development of the Gant . In fact, adjustments in the original approval to building height and location were
made to comply with the new view plane . A portion of Building A and Building B are located in the view
plane – these do not encroach and are located below the view plane line . Today, existing vegetation and
buildings off the Gant property infringe on the view plane and block the Gant . This is illustrated in the View
Plane Exhibit (Exhibit I) .
The proposed changes are all located below the view plane line, in full compliance with the requirements
of the view plane regulations . When viewed from the protected reference point, the updated design is
not visually prominent and does not materially alter the preserved mountain views . Sightline studies and
view simulations in the View Plane Exhibit confirm that the development does not obstruct or significantly
change the character of the view corridor .
11 | Exhibit B 21
12 |
Amendments to an approved Project Review or to an approved Detailed Review shall be reviewed according to
the standards and procedures outlined below. Amendments to Planned Unit Development and Specially Planned
Area approvals (pre-Ordinance 36, 2013, approvals) shall also proceed according to the standards and procedures
outlined below and the Community Development Director shall determine the type of procedure most-applicable to
the requested amendment.
(a) Insubstantial Amendments. An insubstantial amendment to an approved Project Review or an approved
Detailed Review may be authorized by the Community Development Director. An insubstantial amendment shall
meet the following criteria:
(1) The request does not change the use or character of the development.
RESPONSE: This request does not change the use or character of the development . The materiality
updates to the building and the landscape features will not change the building’s architectural integrity
and will not change the existing land use . The building material and landscape updates are intended to
improve the resilience of the Gant, providing additional protection from fire hazards . The landscape plans
replace the pools, spas, and other water features in a like-for-like manner .
(2) The request is consistent with the conditions and representations in the project’s original approval or
otherwise represents an insubstantial change.
RESPONSE: The exterior building material updates, amenity reconfiguration, and landscaping
enhancements maintain the intent and character of the approved design . These changes do not alter
the building form, height, or use, and remain within the originally approved dimensions and location .
There are 12 buildings on site, which include the conference center, front desk and check-in areas,
and individual units . No changes to the floor area or height of buildings are proposed, and there are no
building expansions that would impact the setbacks .
Where updates are proposed, they are technical or programmatic refinements that represent
insubstantial changes and reflect best practices in durability, maintenance, and site functionality . All
renovations will preserve the project’s original vision and compliance with applicable standards .
Updates proposed to the building materials include:
•The existing all-wood siding will be updated with thermally modified wood on key architectural
features, such as the gable ends . This material is fire rated and is used in key areas to provide texture
and materials that are consistent with the existing character .
•The general siding will be replaced with high-quality cementitious (likely GFRC) and exterior plaster .
These are fire resistant materials that will provide long-term durability and fire hazard mitigation while
retaining the existing character of the property .
•Wood railings will be replaced with metal railings and steel accents, providing additional fire resistance
in the interior walkways and on exterior balconies .
•Building elevated walkways will feature pavers, which are anticipated to be porcelain .
•Neutral color tones such as dark brown, grey, and dark grey and similar colors are anticipated for all
building materials .
Landscape updates are focused on meeting modern building and ADA requirements, as well as wildfire
best management practices . The property currently includes two (2) pools, three (3) hot tubs (spas), and
multiple water features . With the proposal, the existing pools will be replaced in a similar size to ensure
compliance with the city’s water requirements . One water feature is proposed to be relocated as part
of the proposal, which will also retain its size to comply with city requirements . There are three amenity
areas that currently exist which will be updated as follows:
EXHIBIT C: RESPONSES TO PD CRITERIASEC . 26 .445 .100 . AMENDMENTS .
12 | Exhibit C 22
13 |
•The lower existing pool area is located between the lobby and conference center, and currently
includes a grill area, two hot tubs (spas), one pool, and pathways . This pool area does not include
fencing, which is now required by modern building and insurance safety requirements . Given these
modern requirements, the pool and hot tubs are is proposed to be relocated to an area with adequate
space to provide this safety fencing . This area is proposed as an alpine garden, with an updated grill
area, lawn, low plantings, a water feature relocated from an existing feature at the conference center,
and fire pit with seating .
•The existing tennis courts in the center of the site are proposed to be removed and replaced with the
relocated pool and hot tubs . A rectilinear pool is proposed with two hot tubs and an at-grade pool deck
area . A new lawn and seating areas are proposed to the west of the pool area, providing space for lawn
games and gatherings . The new pool and lawn area will require less space than the current tennis court
area, providing an opportunity for new parking spaces . A total of ten (10) new head-in parking spaces
are proposed, which will be EV ready . An existing fence (approximately 10 feet in height) with Virginia
creeper surrounds the tennis courts . A similar green wall that is 8 in height and new trees are proposed
on the eastern side of the pool area to provide screening from the parking area . The remainder of the
pool area is proposed to include a fence that is no more than 6 feet tall .
•The existing upper pool area remains substantially similar to what exists today . The pool will be
updated to be rectilinear in shape and the hot tub will be relocated and updated to a rectilinear shape .
An existing fence around the pool will remain .
•Additionally, throughout the site the pathways will be updated with concrete and natural stone paving .
(3) The request does not require granting a variation from the project’s allowed use(s) and does not request
an increase in the allowed height or floor area.
RESPONSE: The proposal does not request any variation from the project’s allowed uses, nor the allowed
height or floor area . All improvements, including exterior material updates, site amenity modifications,
and landscape enhancements remain fully within the parameters of the existing approvals . No additional
square footage is being added, and the project continues to comply with all applicable land use, height,
and floor area requirements .
(4) Any proposed changes to the approved dimensional requirements are limited to a technical nature,
respond to a design parameter that could not have been foreseen during the Project Review approval, are
within dimensional tolerances stated in the Project Review, or otherwise represents an insubstantial change.
RESPONSE: There are no changes to heights, floor area, net leasable, nor net livable calculations .
The project approvals do not have clear setbacks areas identified, so existing conditions are proposed to
remain . The Landscape Plans illustrate the setback areas and identify the setbacks proposed for the areas
impacted by this project . The pool relocation results in the ability to provide ten (10) new parking spaces,
which is proposed to be memorialized as part of this approval, pending any referral comments from the
Building Department regarding the required mix of regular and ADA spaces . This change is only possible
due to the removal of the tennis court and is a technical change that is insubstantial .
All proposed changes are insubstantial and do not materially alter the project’s approved design intent,
land use, or zoning compliance . The revised exterior materials maintain visual consistency with the
established character of the Gant, and the landscape and amenity changes represent functional upgrades
that do not increase density or intensity of use . Overall, the modifications improve durability, aesthetics,
and site functionality while remaining consistent with the original approval .
(5) An applicant may not apply for Detailed Review if an amendment is pending.
RESPONSE: Detail Review not required . This criterion is not applicable .
13 | Exhibit C 23
14 | N 0 0.04 0.09 0.14 0.180.02
Miles
0 0.04 0.09 0.14 0.180.02
Miles
UTE MESA UTE CEMENTARY
THE GANT
EXHIBIT D: VICINITY MAP
U
T
E
A
V
E
N
U
E
ASPEN MTN
BASE AREA
S. W
E
S
T
E
N
D
S
T
R
E
E
T
COO
P
E
R
A
V
E
/
H
W
Y
8
2
OR
I
G
I
N
A
L
S
T
R
E
E
T
LEGEND
Existing Site Development Boundary
14 | Exhibit D 24
EXHIBIT E: CONCEPTUAL LANDSCAPE RENDERINGS
15 | Exhibit E 25
| 14
ALPINE GARDEN
16 | Exhibit E 26
| 17
LOWER POOL PERSPECTIVE CENTRAL POOL
17 | Exhibit E 27
| 19
CENTRAL GARDEN
18 | Exhibit E 28
| 21
UPPER POOL
19 | Exhibit E 29
EXHIBIT F: LANDSCAPE PLANS
20 | Exhibit F 30
SHEET INDEX
Sheet
No.Sheet Name
Landscape Drawings:
L0-00 Cover
L0-01 Illustrative Site Plan
L0-02 Site Plan
L0-02a Site Plan Enlargement
L0-02b Site Plan Enlargement
L0-02c Site Plan Enlargement
L0-03 Vegetation Protection and Tree Removal Plan
L0-04 Defensible Space
L0-05 Landscape Plan
L0-05a Landscape Plan Enlargement
L0-05b Landscape Plan Enlargement
L0-05c Landscape Plan Enlargement
L0-06 Site Materials
L0-07 Site Fencing
L0-08 Site Planting Palette
OWNER/CLIENT
The Gant
610 S. West End Street
Aspen, Colorado, 81611
Tel: (970) 925-5000
PROJECT DESCRIPTION
The Gant project is located at 610 S. West End Street, Aspen, Colorado. The Land Use application package includes
landscape architecture and site design drawings as shown on the Sheet Index. The work contained within these
documents consists of site renovations to identified areas within the Gant Campus, including renovating an existing
swimming pool terrace between Building A and the Conference Center into a garden; replacing the area of the removed
swimming pool and spas in the location of the existing tennis courts, along with some additional new parking; and
comprehensive renovations to the east swimming pool, spa and terrace east of Building F and G.
VICINITY MAP GANT CAMPUS ENHANCEMENT
NOT TO SCALE
DW Project Number: 7110
NORTH
NORTH
PROJECT TEAM
CIVIL ENGINEER
Roaring Fork Engineering
592 CO-133
Carbondale, Colorado 81623
Tel: (970) 340-4130
610 S W END STREET
ASPEN, COLORADO
ARCHITECT OF DESIGN
CCY
228 Midland Ave.
Basalt, Colorado 81621
Tel: (970) 927-4925
ILLUSTRATIVE PLAN
LAND USE APPLICATION
ISSUED: AUGUST 11, 2025
C C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
LANDSCAPE ARCHITECT &
LAND PLANNING
DESIGNWORKSHOP
22860 Two Rivers Road #1
Basalt, Colorado 81621
Tel: (970) 925-8354
S W END STREET
PROJECT LOCATION
S. ORIGINAL STREET
HWY 82 / E. COOPER AVE.
UTE AVENUE
BUILDING
A BUILDING
C
BUILDING
C
BUILDING
B
CONFERENCE
CENTER
BUILDING
J
BUILDING
K
BUILDING
D
BUILDING
F
BUILDING
E
BUILDING
GBUILDING
H
ARCHITECT OF RECORD
OPI ARCHITECTS
419 Main Street, Unit 1
Frisco, Colorado 80443
Tel: (970) 668-1133
WATER FEATURE ENGINEER
WATER DESIGN INC.
6740 S. 1300 E. #110
Cottonwood Heights, Utah 84121
Tel: (801) 261-4009
31
SO
U
T
H
W
E
S
T
EN
D
S
T
R
E
E
T
S
.
U
T
E
A
V
E
N
U
E
X
EX-U
E
EX-UE
EX-U
E
EX-UE
EX-U
E
EX-
U
E
EX
-
U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
T
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T T
T
T
T
T
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
G
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
T
EX
-
U
E
EX-U
E
DYH
DYH
D
S
S
S
S
S
D
D
D
D
D
D
D
D
D
S
D
DYH
DYH
D
D
D
D
E
E
E
OSW
CO
CO
COCO
COCO
CO
CO
CO
CO
CO
D
WV
WV
WV
ICV
ICV
ICV
ICV
G
ICV
ICV
D
G
DOG
DYH
CO
W
WV
WV
FO
EX-UE
F
ICV
E
T T
T
T
EX-UE
ICV
EX
-
U
E
E
X
-
U
E
G
GGEX-UE EX-UE
EX
-
U
E
EX
-
U
E
CTV
CT
V
CT
V
EX
-
U
E
EX
-
U
E
E
X
-
U
E
G
T
D
D
W
ICV
D
G
G AC
EX
-
U
E
EX-UE
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-
U
E
D
ICV
ICV
X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
ILLUSTRATIVE
SITE PLAN
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
7
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
7
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-01
CONFERENCE
CENTER
PARKING
PARKING
POOL
LAWN
LAWN
POOL
SPA
SPA
SPA
BUILDING A
BUILDING C
BUILDING CBUILDING B
BUILDING J
BUILDING K
BUILDING D
BUILDING E
BUILDING F
BUILDING G
BUILDING H
EX
I
S
T
I
N
G
T
R
A
I
L
SHEET LEGEND
PROPERTY LINE
SID
E
S
E
T
B
A
C
K
32
SO
U
T
H
W
E
S
T
EN
D
S
T
R
E
E
T
S
.
U
T
E
A
V
E
N
U
E
EX-U
E
EX-UE
EX-U
E
EX-UE
EX-U
E
EX-
U
E
EX
-
U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
T
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T T
T
T
T
T
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
G
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
T
EX
-
U
E
EX-U
E
DYH
DYH
D
S
S
S
S
S
D
D
D
D
D
D
D
D
D
S
D
DYH
DYH
D
D
D
D
E
E
E
OSW
CO
CO
COCO
COCO
CO
CO
CO
CO
CO
D
WV
WV
WV
ICV
ICV
ICV
ICV
G
ICV
ICV
D
G
DOG
DYH
CO
W
WV
WV
FO
EX-UE
F
ICV
E
T T
T
T
EX-UE
ICV
EX
-
U
E
E
X
-
U
E
G
GGEX-UE EX-UE
EX
-
U
E
EX
-
U
E
CTV
CT
V
CT
V
EX
-
U
E
EX
-
U
E
E
X
-
U
E
G
T
D
D
W
ICV
D
G
G AC
EX
-
U
E
EX-UE
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-
U
E
D
ICV
ICV
X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SITE PLAN
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
7
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
7
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-02
CONFERENCE
CENTER
PARKING
PARKING
POOL
LAWN
LAWN
POOL
SPA
SPA
SPA
BUILDING A
BUILDING C
BUILDING CBUILDING B
BUILDING J
BUILDING K
BUILDING D
BUILDING E
BUILDING F
BUILDING G
BUILDING H
EX
I
S
T
I
N
G
T
R
A
I
L
SHEET LEGEND
ENLARGEMENT AREA
ENLARGEMENT A - SEE SHEET L0-02A
ENLARGEMENT B - SEE SHEET L0-02B
ENLARGEMENT C - SEE SHEET L0-02C
AREA OUTSIDE OF SCOPE OF WORK
PROPERTY LINE
SETBACK
LIMIT OF SCOPE OF WORK
SITE MATERIALS LEGEND
EXISTING METAL
CHAIN LINK FENCE
X X X
TALL METAL FENCE
SHORT METAL FENCE
COMPOSITE WOOD
PRIVACY FENCE
X X X X
STONE PAVING
CRUSHER FINES
CONCRETE PAVING
STEPPING STONE
LANDSCAPE BOULDER
STONE COPPING
STONE VENEER STEP
GRAVEL
STONE STEP TYPE 2
PORCELAIN PAVER
UNIT PAVER
STONE STEP TYPE 1
SYNTHETIC TURF
33
T
T
T
T
T
T
T
TT
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T
D
D
CO
CO
CO
CO
D
D
G
CO
EX-
U
E
CT
V
CTV CTV CTV CTV
CT
V
CT
V
T
T
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
G
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
7
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
7
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-02A
SITE PLAN
ENLARGEMENT
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
CONFERENCE CENTER
LAWN
BUILDING A
BUILDING B
EX
I
S
T
I
N
G
T
R
A
I
L
ENLARGEMENT A
BUILDING B
PA
PA
PA
PA
PA
PA
PA
BUILDING J
PA = PLANTING AREA
SHEET LEGEND
AREA OUTSIDE OF SCOPE OF WORK
PROPERTY LINE
SETBACK
LIMIT OF SCOPE OF WORK
EXISTING GRILL FEATURE
WATER FEATURE
FIRE FEATURE
SITE MATERIALS LEGEND
TALL METAL FENCE
STONE PAVING
CRUSHER FINES
CONCRETE PAVING
STONE COPPING
STONE VENEER STEP
PORCELAIN PAVER
UNIT PAVER
STEPPING STONE
LANDSCAPE BOULDER
GRAVEL
STONE STEP TYPE 2
STONE STEP TYPE 1
SYNTHETIC TURF
SID
E
S
E
T
B
A
C
K
5
'
-
0
"
,
T
Y
P
.
S
I
D
E
S
E
T
B
A
C
K
34
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
D
E
CO
CO
EX-
U
E
EX-UE
EX
-
U
E
EX
-
U
E
CT
V
CTV
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
T
T
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-02B
SITE PLAN
ENLARGEMENT
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
POOL
LAWN
SPA
SPA
BUILDING C
BUILDING B
BUILDING J
BUILDING K
ENLARGEMENT B
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PA
PARKING
PA
PA = PLANTING AREA
SITE MATERIALS LEGEND
SHEET LEGEND
AREA OUTSIDE OF SCOPE OF WORK
PROPERTY LINE
SETBACK
LIMIT OF SCOPE OF WORK
STONE PAVING
CRUSHER FINES
CONCRETE PAVING
TALL METAL FENCE
STONE COPPING
STONE VENEER STEPFIRE FEATURE COMPOSITE WOOD
PRIVACY FENCE
X X X X
PORCELAIN PAVER
UNIT PAVER
STEPPING STONE
LANDSCAPE BOULDER
GRAVEL
STONE STEP TYPE 2
STONE STEP TYPE 1
SYNTHETIC TURF
FIRE
FEATURE
FIRE
FEATURE
35
W
W
W
T
EX-
U
E
EX-U
E
EX-UE
E
X
-
U
E
EX
-
U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
G
G
G
G
G
G
G
G
G
GEX-UE
EX-UE
EX-UE
EX-UE
EX-UE
E
X
-
U
E
EX
-
U
E
X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-02C
SITE PLAN
ENLARGEMENT
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
BUILDING G
POOL
SPA
PA
PA
PAPA
PA
PA
PA = PLANTING AREA
SHEET LEGEND
AREA OUTSIDE OF SCOPE OF WORK
PROPERTY LINE
SETBACK
LIMIT OF SCOPE OF WORK
SITE MATERIALS LEGEND
EXISTING METAL
CHAIN LINK FENCE
X X X
TALL METAL FENCE
(POOL ENCLOSURE)
SHORT METAL FENCE
(PATIO ENCLOSURE)
FIRE
FEATURE
PATIO
PATIO
PATIO
PATIO
PATIO
PATIO
STONE PAVING
PORCELAIN PAVER
UNIT PAVER
CRUSHER FINES
CONCRETE PAVING
STONE COPPING
STONE VENEER STEP
STEPPING STONE
LANDSCAPE BOULDER
GRAVEL
STONE STEP TYPE 2
STONE STEP TYPE 1
SYNTHETIC TURF
SIDE SETBACK
2'
-
0
"
,
TY
P
.
S
I
D
E
S
E
T
B
A
C
K
EXISTING SITE WALL
TO REMAIN, TYP.
EXISTING PATH TO REMAIN
PA
PA
PA
PA
PA
PA
PA
PA
PA
ENLARGEMENT C
36
X
X
X
X
X
X
X
X
X
EX-U
E
EX-UE
EX-UE
EX-UE
EX-U
E
EX-
U
E
EX
-
U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
T
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T T
T
T
T
T
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
G
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
T
EX
-
U
E
EX-
U
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FO
EX-UE
T T
T
T
EX-UE
EX
-
U
E
E
X
-
U
E
G
GGEX-UE EX-UE
EX
-
U
E
EX
-
U
E
CTV
CT
V
CT
V
EX
-
U
E
EX
-
U
E
E
X
-
U
E
G
T
W
T3
T4
T5
T7
T8
T10
T14
T15
T16T17
T21
T22
T23
T24
T25
T26
T27
T28
T29
T31
T32
T33
T34
T35 T36
T37
T38
T39T40 T41
T42
T44
T43
T45 T46
T47
T48
T49
T50
T51
T53
T55
T52
T54
T56
T57 T59
T60
T58
T61
T62
T63
T64
T65
T66 T67
T68
T69
T70
T71
T72
T73
T74
T75
T76
T77 T78
T79
T80 T81 T82
T83
T84
T85
T86
T87
T88 T89
T90
T91
T92 T93
T94
T95
T96 T97 T98
T99
T100
T101
T102
T103
T104
T121T120
T119
T118
T105
T106
T109
T114
T115
T116
T117
T122
T123
T124
T125T126
T127
T129
T131
T128
T132
T133
T135
T137
T138
T139 T140
T142
T143
T144 T145
T146
T149
T153
T154
T155
T156
T157
T158
T159
T160
T161
T162
T163
T164
T165
T166
T167
T168
T169
T170
T171
T172
T173
T174
T175
T176
T178
T179
T180
T181
T182
T183
T184 T185
T186
T187
T188
T190T189
T191
T192
T193
T197
T199
T200
T202
T203
T205
T206T207
T208
T209
T210
T211
T212
T216
T217
T218
T219
T220
T221T222T223
T224
T225
T226
T227
T228
T229
T230
T231
T232
T233
T234
T235
T236
T237
T239
T240
T238
T244
T245
T246
T247
T248
T249
T252
T254
T255
T256
T257
T258
T259
T260
T261
T262
T263
T264
T267T268T269
T270
T271
T272
T273
T274
T275
T276
T277
T278
T279
T280
T281 T282
T283
T284
T285
T286
T287
T288
T289
T290
T291
T292
T293
T295
T296
T297
T298
T299
T302
T303
T304
T309
G
G AC
EX
-
U
E
EX-UE
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-
U
E
X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EX-U
E
EX-UE
EX-UE
EX-UE
EX-U
E
EX-
U
E
EX
-
U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
T
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T T
T
T
T
T
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
G
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
T
EX
-
U
E
EX-
U
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
FO
EX-UE
T T
T
T
EX-UE
EX
-
U
E
E
X
-
U
E
G
GGEX-UE EX-UE
EX
-
U
E
EX
-
U
E
CTV
CT
V
CT
V
EX
-
U
E
EX
-
U
E
E
X
-
U
E
G
T
W
T3
T4
T5
T7
T8
T10
T14
T15
T16T17
T21
T22
T23
T24
T25
T26
T27
T28
T29
T31
T32
T33
T34
T35 T36
T37
T38
T39T40 T41
T42
T44
T43
T45 T46
T47
T48
T49
T50
T51
T53
T55
T52
T54
T56
T57 T59
T60
T58
T61
T62
T63
T64
T65
T66 T67
T68
T69
T70
T71
T72
T73
T74
T75
T76
T77 T78
T79
T80 T81 T82
T83
T84
T85
T86
T87
T88 T89
T90
T91
T92 T93
T94
T95
T96 T97 T98
T99
T100
T101
T102
T103
T104
T121T120
T119
T118
T105
T106
T109
T114
T115
T116
T117
T122
T123
T124
T125T126
T127
T129
T131
T128
T132
T133
T135
T137
T138
T139 T140
T142
T143
T144 T145
T146
T149
T153
T154
T155
T156
T157
T158
T159
T160
T161
T162
T163
T164
T165
T166
T167
T168
T169
T170
T171
T172
T173
T174
T175
T176
T178
T179
T180
T181
T182
T183
T184 T185
T186
T187
T188
T190T189
T191
T192
T193
T197
T199
T200
T202
T203
T205
T206T207
T208
T209
T210
T211
T212
T216
T217
T218
T219
T220
T221T222T223
T224
T225
T226
T227
T228
T229
T230
T231
T232
T233
T234
T235
T236
T237
T239
T240
T238
T244
T245
T246
T247
T248
T249
T252
T254
T255
T256
T257
T258
T259
T260
T261
T262
T263
T264
T267T268T269
T270
T271
T272
T273
T274
T275
T276
T277
T278
T279
T280
T281 T282
T283
T284
T285
T286
T287
T288
T289
T290
T291
T292
T293
T295
T296
T297
T298
T299
T302
T303
T304
T309
G
G AC
EX
-
U
E
EX-UE
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-
U
E
X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SO
U
T
H
W
E
S
T
EN
D
S
T
R
E
E
T
S
.
U
T
E
A
V
E
N
U
E
PLANT
PROTECTION AND
REMOVAL PLAN
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
VEGETATION
PROTECTION
AND TREE
REMOVAL PLAN
CONFERENCE CENTER
PARKING
PARKING
POOL
SPA
D
e
c
1
9
,
2
0
2
5
-
1
1
:
3
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
1
-
R
E
M
O
V
A
L
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
D
e
c
1
9
,
2
0
2
5
-
1
1
:
3
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
1
-
R
E
M
O
V
A
L
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-03
5' FIRE PROTECTION OFFSET
EXISTING CONIFEROUS TO REMAIN. DO NOT DISTURB. PROTECT IN PLACE.
EXISTING CONIFEROUS TREE TO BE REMOVED; INCLUDING ROOTS AND STUMP.
FILL DEPRESSION WITH SUITABLE SOIL. PITCH TO DRAIN. SEE ALSO CIVIL
GRADING AND DRAINAGE PLANS.
TREE PROTECTION FENCE
XXX
EXISTING VEGETATION AND HARDSCAPING, INCLUDING POOLS AND SPAS, TO
BE CLEARED AND GRUBBED. STRIP, SALVAGE AND STOCKPILE TOPSOIL.
PLANT PROTECTION AND REMOVAL LEGEND
SPA
SPA
POOL
EXISTING TENNIS COURTS
EXISTING DECIDUOUS TO REMAIN. DO NOT DISTURB. PROTECT IN PLACE.
EXISTING DECIDUOUS TO REMAIN. DO NOT DISTURB. PROTECT IN PLACE.
EXISTING DECIDUOUS TREE TO BE REMOVED; INCLUDING ROOTS AND STUMP.
FILL DEPRESSION WITH SUITABLE SOIL. PITCH TO DRAIN. SEE ALSO CIVIL
GRADING AND DRAINAGE PLANS.XXX
EXISTING DECIDUOUS TREE TO BE REMOVED; INCLUDING ROOTS AND STUMP.
FILL DEPRESSION WITH SUITABLE SOIL. PITCH TO DRAIN. SEE ALSO CIVIL
GRADING AND DRAINAGE PLANS.XXX
1 TYP.
BUILDING A
BUILDING C
BUILDING CBUILDING B
BUILDING J
BUILDING D
BUILDING E
BUILDING F
BUILDING G
BUILDING H
SHEET LEGEND
PROPERTY LINE
LIMIT OF SCOPE OF WORK
T178
TREE REMOVAL AND DEMOLITION REFERENCE NOTES
1 Existing tree to remain. Do Not Disturb. Protect in place.
2 Existing tree to be removed, including roots. Fill depression with
suitable soil. Pitch to drain. Contractor to salvage and not scar.
3
4
5
Existing Boulder to remain. Do not disturb. Protect in place
Existing BBQ structure to remain. Do not disturb. Protect in place.
Existing site wall to remain. Do not disturb, protect in place.
6 Existing pool and spa(s) to be removed, including all related
equipment.
7 Existing gate to be removed.
for land use submittal
T176
T179
T182
T183
T184
1 TYP.
2 TYP.
3
4
4
5 TYP.
7
7
IDENTIFIED TREE TO BE REMOVED IN FUTURE AS PART OF AN EXISTING
ON-GOING PROCESS OF REMOVING TREES AS PART OF WILD FIRE MITIGATION.
SIZETREE TYPETREE #
TREE REMOVAL LIST
10
109
155
156
202
203
212
245
248
249
U.POOL
NOTES:
List includes "code-size" trees only.
(4" DBH Coniferous) (6" DBH deciduous)
COTTONWOOD
ASPEN
ASPEN
ASPEN
ASPEN
ASPEN
ASPEN
ASPEN
ASPEN
ASPEN
ASPEN
15" cal.
8" cal.
6" cal.
6" cal.
8" cal.
12" cal.
6" cal.
6" cal.
6" cal.
6" cal.
6" cal.
SIZETREE TYPETREE #
U.POOL
U.POOL
10" cal.
6" cal.
TO REMOVE - TO REMOVE -
W/IN 5' WILDFIRE SETBACK
ASPEN
ASPEN
TOTAL 85" cal.
TOTAL 16" cal.
NEW DEVELOPMENT
37
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-04
DEFENSIBLE
SPACE
Zone 1 | 2’ Offset
Remove flammable vegetation and woody debris
Allowed: non-combustible ground materials adjacent to structures
(stone, high-moisture content irrigated perennials, non-flammable
mulches)
Zone 2 | 5’ Offset
High-moisture content plant materials (irrigated shrubs and perennials,
limited mulch)
Zone 3 | 10’ Offset
Limited high-moisture content deciduous trees
BUILDING
A
BUILDING
C
BUILDING
C
BUILDING
B
CONFERENCE
CENTER
BUILDING
J
BUILDING
K
BUILDING
D
BUILDING
F
BUILDING
E
BUILDING
G
BUILDING
H
ZO
N
E
3
:
1
0
'
O
F
F
S
E
T
ZO
N
E
2
:
5
'
O
F
F
S
E
T
ZO
N
E
1
:
2
'
O
F
F
S
E
T
Two-Story
Residential Building
TYPICAL CROSS SECTION
10' OFFSET
5' OFFSET
2' OFFSET
38
SO
U
T
H
W
E
S
T
EN
D
S
T
R
E
E
T
S
.
U
T
E
A
V
E
N
U
E
EX-U
E
EX-UE
EX-U
E
EX-UE
EX-U
E
EX-
U
E
EX
-
U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
T
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T T
T
T
T
T
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
G
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
W
T
EX
-
U
E
EX-U
E
DYH
DYH
D
S
S
S
S
S
D
D
D
D
D
D
D
D
D
S
D
DYH
DYH
D
D
D
D
E
E
E
OSW
CO
CO
COCO
COCO
CO
CO
CO
CO
CO
D
WV
WV
WV
ICV
ICV
ICV
ICV
G
ICV
ICV
D
G
DOG
DYH
CO
W
WV
WV
FO
EX-UE
F
ICV
E
T T
T
T
EX-UE
ICV
EX
-
U
E
E
X
-
U
E
G
GGEX-UE EX-UE
EX
-
U
E
EX
-
U
E
CTV
CT
V
CT
V
EX
-
U
E
EX
-
U
E
E
X
-
U
E
G
T
D
D
W
ICV
D
G
G AC
EX
-
U
E
EX-UE
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-
U
E
D
ICV
ICV
X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-05
LANDSCAPE PLAN
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
CONFERENCE CENTER
PARKING
PARKING
POOL
LAWN
LAWN
POOL
SPA
SPA
SPA
BUILDING A
BUILDING C
BUILDING CBUILDING B
BUILDING J
BUILDING K
BUILDING D
BUILDING E
BUILDING F
BUILDING G
BUILDING H
EX
I
S
T
I
N
G
T
R
A
I
L
ENLARGEMENT A - SEE SHEET L0-05A
ENLARGEMENT B - SEE SHEET L0-05B
ENLARGEMENT C - SEE SHEET L0-05C
SHEET LEGEND
ENLARGEMENT AREA
AREA OUTSIDE OF SCOPE OF WORK
PROPERTY LINE
SETBACK
LIMIT OF SCOPE OF WORK
PLANTING LEGEND
Cotoneaster lucidus Peking Cotoneaster 117
Rhus aromatica 'Gro-low'Dwarf Fragrant Sumac 96
Spiraea betulifolia 'Tor'Birchleaf Spirea 180
Spiraea nipponica 'Snowmound'Snowmound Spirea 64
Syringa vulgaris 'Charles Joly' Double Red French Lilac 64
SHRUBS
Populus tremuloides Quaking Aspen 18
TREES
Populus tremula 'Erecta'Swedish Aspen 13
QTY.
Aegopodium podagraria Green Bishop's Weed 314
Astilbe 'Bridal Veil'Bridal Veil Hybrid Astilbe 295
Athyrium filix-femina Lady Fern 450
Galium ordoratum Sweet Woodruff 765
Helictotrichon sempervirens Blue Oat Grass 295
Hosta 'Blue Angel'Blue Angel Hosta 190
Hosta 'Honeybells'Honeybells Hosta 75
Nepeta x faassenii 'Walker's Low'Walker's Low Catmint 115
PERENNIALS & VINES
Parthenocissus quinquefolia Virginia Creeper 22
Populus tremuloides Quaking Aspen Multi-Stem 21
39
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
T
D
D
CO
CO
D
G
EX-
U
E
CT
V
CTV CTV CTV CTV
CT
V
CT
V
T
T
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
G
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-05A
LANDSCAPE PLAN
ENLARGEMENT
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
CONFERENCE CENTER
LAWN
BUILDING A
BUILDING B
EX
I
S
T
I
N
G
T
R
A
I
L
ENLARGEMENT A
BUILDING B
BUILDING J
SHEET LEGEND
AREA OUTSIDE OF SCOPE OF WORK
PROPERTY LINE
SETBACK
LIMIT OF SCOPE OF WORK
FIRE FEATURE
SID
E
S
E
T
B
A
C
K
5
'
-
0
"
,
T
Y
P
.
S
I
D
E
S
E
T
B
A
C
K
PLANTING LEGEND
Cotoneaster lucidus Peking Cotoneaster 117
Rhus aromatica 'Gro-low'Dwarf Fragrant Sumac 96
Spiraea betulifolia 'Tor'Birchleaf Spirea 180
Spiraea nipponica 'Snowmound'Snowmound Spirea 64
Syringa vulgaris 'Charles Joly' Double Red French Lilac 64
SHRUBS
TREES
Populus tremula 'Erecta'Swedish Aspen 13
QTY.
Aegopodium podagraria Green Bishop's Weed 314
Astilbe 'Bridal Veil'Bridal Veil Hybrid Astilbe 295
Athyrium filix-femina Lady Fern 450
Galium ordoratum Sweet Woodruff 765
Helictotrichon sempervirens Blue Oat Grass 295
Hosta 'Blue Angel'Blue Angel Hosta 190
Hosta 'Honeybells'Honeybells Hosta 75
Nepeta x faassenii 'Walker's Low'Walker's Low Catmint 115
PERENNIALS & VINES
Parthenocissus quinquefolia Virginia Creeper 22
Populus tremuloides Quaking Aspen 18
Populus tremuloides Quaking Aspen Multi-Stem 21
40
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
D
E
CO
CO
EX-
U
E
EX-UE
EX
-
U
E
EX
-
U
E
CT
V
CTV
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
T
T
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
8
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-05B
LANDSCAPE PLAN
ENLARGEMENT
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
POOL
LAWN
SPA
SPA
BUILDING C
BUILDING B
BUILDING J
BUILDING K
ENLARGEMENT B
PARKING
SHEET LEGEND
AREA OUTSIDE OF SCOPE OF WORK
LIMIT OF SCOPE OF WORK
METAL POOL FENCE
WOOD PRIVACY FENCE
FIRE FEATURE
FIRE
FEATURE
FIRE FEATURE
PLANTING LEGEND
Cotoneaster lucidus Peking Cotoneaster 117
Rhus aromatica 'Gro-low'Dwarf Fragrant Sumac 96
Spiraea betulifolia 'Tor'Birchleaf Spirea 180
Spiraea nipponica 'Snowmound'Snowmound Spirea 64
Syringa vulgaris 'Charles Joly' Double Red French Lilac 64
SHRUBS
TREES
Populus tremula 'Erecta'Swedish Aspen 13
QTY.
Aegopodium podagraria Green Bishop's Weed 314
Astilbe 'Bridal Veil'Bridal Veil Hybrid Astilbe 295
Athyrium filix-femina Lady Fern 450
Galium ordoratum Sweet Woodruff 765
Helictotrichon sempervirens Blue Oat Grass 295
Hosta 'Blue Angel'Blue Angel Hosta 190
Hosta 'Honeybells'Honeybells Hosta 75
Nepeta x faassenii 'Walker's Low'Walker's Low Catmint 115
PERENNIALS & VINES
Parthenocissus quinquefolia Virginia Creeper 22
Populus tremuloides Quaking Aspen 18
Populus tremuloides Quaking Aspen Multi-Stem 21
41
W
W
W
T
EX-
U
E
EX-U
E
EX-UE
E
X
-
U
E
EX
-
U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
G
G
G
G
G
G
G
G
G
GEX-UE
EX-UE
EX-UE
EX-UE
EX-UE
E
X
-
U
E
EX
-
U
E
X X X X X X X X X
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-05C
LANDSCAPE PLAN
ENLARGEMENT
NORTH 0
ORIGINAL SCALE:
15'30'60'
1"=30'
BUILDING G
ENLARGEMENT C
POOL
SPA
SHEET LEGEND
AREA OUTSIDE OF SCOPE OF WORK
PROPERTY LINE
SETBACK
LIMIT OF SCOPE OF WORK
X X X X X X X X X EXISTING CHAIN LINK FENCE
FIRE FEATURE
EXISTING SITE WALL
TO REMAIN, TYP.
SIDE SETBACK
2'
-
0
"
,
TY
P
.
S
I
D
E
S
E
T
B
A
C
K
PLANTING LEGEND
Cotoneaster lucidus Peking Cotoneaster 117
Rhus aromatica 'Gro-low'Dwarf Fragrant Sumac 96
Spiraea betulifolia 'Tor'Birchleaf Spirea 180
Spiraea nipponica 'Snowmound'Snowmound Spirea 64
Syringa vulgaris 'Charles Joly' Double Red French Lilac 64
SHRUBS
TREES
Populus tremula 'Erecta'Swedish Aspen 13
QTY.
Aegopodium podagraria Green Bishop's Weed 314
Astilbe 'Bridal Veil'Bridal Veil Hybrid Astilbe 295
Athyrium filix-femina Lady Fern 450
Galium ordoratum Sweet Woodruff 765
Helictotrichon sempervirens Blue Oat Grass 295
Hosta 'Blue Angel'Blue Angel Hosta 190
Hosta 'Honeybells'Honeybells Hosta 75
Nepeta x faassenii 'Walker's Low'Walker's Low Catmint 115
PERENNIALS & VINES
Parthenocissus quinquefolia Virginia Creeper 22
Populus tremuloides Quaking Aspen 18
Populus tremuloides Quaking Aspen Multi-Stem 21
42
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-06
SITE MATERIALS
SITE MATERIALS - IN NATURAL SUNLIGHT
INDIVIDUAL SITE MATERIALS
EXISTING MATERIALITY OF SITE WALLS
STONE PAVING AND STONE STEPS - GRAY FLAGSTONE PORCELAIN PAVER - GRAY UNIT PAVER STONE VENEER FOR STEPS, AND COPPING - TO MATCH EXISTING SITE WALLS
CRUSHER FINE - GRAY SYNTHETIC TURF
43
EX-U
EEX-U
E
T
T
D
E
CO
CO
CT
V
EX
-
U
E
X
X
X
X
X
X
X
X
X
X
X
X EX-U
E
EX-U
E
T
T
D
E
CO
CO
CT
V
EX
-
U
E
X
X
X
X
X
X
X
X
X
X
X
X
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-07
SITE FENCING
6'-0"
PLAN
ELEVATION
ELEVATION
SECTION
8'
-
0
"
4x4 TUBULAR STEEL POSTS
1
1
/
2
"
T
Y
P
.
ADJACENT SURFACE
SEE PLAN
2x4 TUBULAR STEEL POST BELOW
CONCRETE FOOTING BELOW
PER STRUCTURAL.
FINISH SURFACE. SEE PLAN
ANCHOR PLATE.
PER STRUCTURAL
CONCRETE FOOTING.
PER STRUCTURAL.
1'
-
0
"
MI
N
.
GROUND ANCHOR CONDITION
AT TYP. PAVING
TYPICAL PANEL ASSEMBLY.
IMBEDDED 2" INTO POSTS
ELEVATION OF TOP RAIL
FOOTING. PER
STRUCTURAL.
ANCHOR PLATE.
PER STRUCTURAL.
1/
2
"
T
Y
P
.
3
1
/
2
"
T
Y
P
.
1/4 " POST FASTENER
8'
-
0
"
1
1
/
2
"
T
Y
P
.
1/
2
"
T
Y
P
.
3
1
/
2
"
T
Y
P
.
1/4 " POST FASTENER
COMPOSITE WOOD PRIVACY FENCE DETAIL
6'-0"
PLAN
ELEVATION
ELEVATION
SECTION
5'
-
0
"
2x2 TUBULAR STEEL POSTS
1X2 CAPPED U-CHANNEL OR TUBULAR STEEL
RAIL AT CABLE INFILL CONDITION. SEE "TOP
RAIL ENLARGEMENT" OPTIONS ABOVE.
3" O.C. TYP.
(CENTER PATTERN IN FRAME)
1"
3
16" DIA. STANDARD
MANUFACTURED CABLE
INFILL. TYP.
MANUFACTURER STANDARD
CABLE START ASSEMBLY AND
STAINLESS HARDWARE CAP.
QUICK START ASSEMBLY TO
TOP OF PANEL.
MANUFACTURER STANDARD
TENSIONING HARDWARE AND
CABLE ASSEMBLY. TENSIONING
HARDWARE TO BOTTOM OF
PANEL.
THRU. HOLE FOR CABLE.
BOTTOM OF TOP RAIL ONLY.
.2" DIA. HOLE. THRU TOP OF
BOTTOM RAIL TYP.
SEE RAIL ENLARGEMENTS.
2"
T
Y
P
.
5'
-
0
"
2"
T
Y
P
.
ADJACENT SURFACE
SEE PLAN
2x2 TUBULAR STEEL POST BELOW
TOP RAIL. PER INFILL CONDITION.
CONCRETE FOOTING BELOW
PER STRUCTURAL.
FINISH SURFACE. SEE PLAN
ANCHOR PLATE.
PER
MANUFACTURER
CONCRETE FOOTING.
PER STRUCTURAL.
1'
-
0
"
MI
N
.
GROUND ANCHOR CONDITION
AT TYP. PAVING
TYPICAL PANEL ASSEMBLY.
MESH OR CABLE INFILL.
ELEVATION OF TOP RAIL
REMAINS CONSTANT AT ENTIRE
PERIMETER OF POOL TERRACE.
FOOTING. PER
STRUCTURAL.
ANCHOR PLATE.
PER STRUCTURAL.
TALL METAL FENCE (FOR POOL ENCLOSURE)
COMPOSITE WOOD PRIVACY FENCE CROSS SECTION TALL METAL FENCE (FOR POOL ENCLOSURE) CROSS SECTION
SCALE: 3
4" = 1'-0"SCALE: 3
4" = 1'-0"
ParkingPlanting with 8' Privacy Fence
SidewalkPlanting with 5' Pool Fence Planting
IMAGE OF COMPOSITE
WOOD MATERIAL
TALL METAL POOL FENCING WITH GATE
NOTE: THE ONLY DIFFERENCE BETWEEN THE "TALL METAL FENCE" AND THE "SHORT METAL
FENCE" IS THE OVERALL HEIGHT OF THE FENCE. THE TALL METAL FENCE, WHICH ENCLOSES THE
POOL AREAS, HAS A HEIGHT OF 5'-0". THE SHORT METAL FENCE HAS A HEIGHT OF 3'-0" AND
ENCLOSES INDIVIDUAL PATIOS.
44
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
C
ISSUE DATE:
SHEET NUMBER
REVIEWED:
PROJECT NUMBER:
DRAWN:
1
REVISIONS
7110
2 3 4 5 6 7
A
B
C
D
E
AS
P
E
N
,
C
O
L
O
R
A
D
O
C O P Y R I G H T D E S I G N W O R K S H O P, I N C.
F
8 9
1 2 3 4 5 6 7 8 9
A
u
g
1
5
,
2
0
2
5
-
1
0
:
0
9
a
m
F:
\
P
R
O
J
E
C
T
S
_
A
-
L
\
7
1
1
0
-
G
a
n
t
2
0
2
3
C
a
m
p
u
s
E
n
h
a
n
c
e
m
e
n
t
P
l
a
n
\
D
-
C
A
D
\
0
2
.
S
h
e
e
t
s
\
L
a
n
d
u
s
e
S
u
b
m
i
t
t
a
l
\
d
w
-
7
1
1
0
-
L
a
n
d
U
s
e
S
u
b
m
i
t
t
a
l
S
h
e
e
t
s
.
d
w
g
JP, AH MA
AUGUST 12, 2025
DESIGN WORKSHOP
Landscape Architecture · Land Planning
Urban Design · Tourism Planning
Aspen · Austin · Denver · Houston
Lake Tahoe · Los Angeles · Raleigh
W W W . D E S I G N W O R K S H O P . C O M
22860 Two Rivers Road #1
Basalt, CO 81621
(970) 925-8354
TH
E
GA
N
T
LAND USE
APPLICATION
FOR REVIEW ONLY
NOT FOR
CONSTRUCTION
L0-08
SITE PLANTING
PALETTE
Aegopodium podagraria / Green Bishop's Weed Astilbe 'Bridal Veil' / Bridal Veil Hybrid Astilbe Athyrium filix-femina / Lady Fern Galium ordoratum / Sweet Woodruff Helictotrichon sempervirens / Blue Oat Grass
Hosta 'Blue Angel' / Blue Angel Hosta Hosta 'Honeybells' / Honeybells Hosta Nepeta x faassenii 'Walker's Low' / Walker's Low Catmint
Cotoneaster lucidus / Peking Cotoneaster Rhus aromatica 'Gro-low' / Dwarf Fragrant Sumac Spiraea betulifolia 'Tor' / Birchleaf Spirea
Spiraea nipponica 'Snowmound' / Snowmound Spirea Syringa vulgaris 'Charles Joly' / Double Red French Lilac
TREES
Populus tremuloides / Quaking Aspen Populus tremula 'Erecta' / Swedish Aspen
SHRUBS
PERENNIALS, ORNAMENTAL GRASSES & VINES
Parthenocissus quinquefolia / Virginia Creeper
45
EXHIBIT G: CONCEPTUAL ARCHITECTURAL RENDERINGS
36 | Exhibit G 46
| 8
ENTRY PLAZA
37 | Exhibit G 47
| 9
BUILDING EDGE CONDITION
38 | Exhibit G 48
| 10
BUILDING PLAZA
39 | Exhibit G 49
MATERIAL PALETTE
THERMALLY MODIFIED
WOOD
STAINED TIMBERSCEMENTITIOUS (GFRC) SIDING METAL RAILINGS WITH GRATE/MESH INFILL ELEVATED WALKWAY
PAVER
EXTERIOR CEMENTITIOUS PLASTER
40 | Exhibit G 50
| 12
BLACKENED STEEL
THERMALLY MODIFIED WOOD
EXTERIOR PLASTER
PERFORATED METAL RAILING
GFRC SIDING
PORCELAIN PAVER
PROPOSED MATERIAL SAMPLES
MATERIAL PALETTE
41 | Exhibit G 51
EXHIBIT H: ARCHITECTURAL ELEVATION EXAMPLE
42 | Exhibit H 52
A200.1-B
1
1
A200.1-B
2
2
A200.1-C
1
1
A 2 0 2.1-A12
12
A203.
1-A
1
1
A202.1-B
1 1
A202.1-B
22
A202.1-B
3 3
A202.1-B
44
A202.1-B
5 5
A202.1-B
66
A202.1-B
7 7
A202.1-B
88
A202.1-B
9 9
A202.1-B
1010
A202.1-B
11 11
A202.1-B
1212
A203.1-B
1 1
A203.1-B
22
A203.1-B
3 3
A203.1-B
44
A203.1-B
55
A203.1-B
6 6A203.1-B
77
A203.1-B
9
9
A203.1-B
8 8
A203.1-B
1010
A203.1-B
1111
A203.1-B
12 12
A204.1-B
11
A204.1-B
2 2
A204.1-B
3 3
A204.1-B
44
A204.1-B
55
A204.1-B
6 6
A204.1-B
7 7
A204.1-B
9
9
A204.1-B
88
A204.1-B
10
10
A204.1-B
11 11
A202.1-C
6 6A202.1-C
99
Revisions:
Project No:
Date:
Drawn by:
Checked by:
P.O. Box 2773
737 Ten Mile Drive Unit 206
Frisco, CO 80443
Tel: 970.668.1133
www.OPARCH.com
8/
1
4
/
2
0
2
5
3
:
0
9
:
4
1
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
T
h
e
G
a
n
t
/
T
h
e
G
a
nt
_
R
2
3
.
r
v
t
BUILDING B - LEVEL1 -
PROPOSED
TH
E
G
A
N
T
61
0
S
W
E
S
T
E
N
D
S
T
.
AS
P
E
N
,
C
O
,
8
1
6
1
1
08.11.2025
2821.00
KT
AB
A100.1-B3/16" = 1'-0"
BUILDING B - LEVEL 1 - PROPOSED1
53
A200.1-B
1
1
A200.1-B
2
2
A200.1-C
1
1
A202.1-B
1 1
A202.1-B
22
A202.1-B
3 3
A202.1-B
44
A202.1-B
5 5
A202.1-B
66
A202.1-B
7 7
A202.1-B
88
A202.1-B
9 9
A202.1-B
1010
A202.1-B
11 11
A202.1-B
1212
A203.1-B
1 1
A203.1-B
22
A203.1-B
3 3
A203.1-B
44
A203.1-B
55
A203.1-B
6 6A203.1-B
77
A203.1-B
9
9
A203.1-B
8 8
A203.1-B
1010
A203.1-B
1111
A203.1-B
12 12
A204.1-B
11
A204.1-B
2 2
A204.1-B
3 3
A204.1-B
44
A204.1-B
55
A204.1-B
6 6
A204.1-B
7 7
A204.1-B
9
9
A204.1-B
88
A204.1-B
10
10
A204.1-B
11 11
A202.1-C
6 6A202.1-C
99
Revisions:
Project No:
Date:
Drawn by:
Checked by:
P.O. Box 2773
737 Ten Mile Drive Unit 206
Frisco, CO 80443
Tel: 970.668.1133
www.OPARCH.com
8/
1
4
/
2
0
2
5
3
:
0
9
:
4
2
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
T
h
e
G
a
n
t
/
T
h
e
G
a
nt
_
R
2
3
.
r
v
t
BUILDING B - LEVEL 2 -
PROPOSED
TH
E
G
A
N
T
61
0
S
W
E
S
T
E
N
D
S
T
.
AS
P
E
N
,
C
O
,
8
1
6
1
1
08.11.2025
2821.00
Author
Checker
A101.1-B3/16" = 1'-0"
BUILDING B LEVEL PLAN - PROPOSED1
54
A200.1-B
1
1
A200.1-B
2
2
A200.1-C
1
1
A 2 0 2.1-A12
12
A203.
1-A
1
1
A202.1-B
1 1
A202.1-B
22
A202.1-B
3 3
A202.1-B
44
A202.1-B
5 5
A202.1-B
66
A202.1-B
7 7
A202.1-B
88
A202.1-B
9 9
A202.1-B
1010
A202.1-B
11 11
A202.1-B
1212
A203.1-B
1 1
A203.1-B
22
A203.1-B
3 3
A203.1-B
44
A203.1-B
55
A203.1-B
6 6A203.1-B
77
A203.1-B
8 8
A203.1-B
1010
A203.1-B
1111
A203.1-B
12 12
A204.1-B
11
A204.1-B
2 2
A204.1-B
3 3
A204.1-B
44
A204.1-B
55
A204.1-B
6 6
A204.1-B
7 7
A204.1-B
9
9
A204.1-B
88
A204.1-B
10
10
A204.1-B
11 11
A202.1-C
6 6A202.1-C
99
Revisions:
Project No:
Date:
Drawn by:
Checked by:
P.O. Box 2773
737 Ten Mile Drive Unit 206
Frisco, CO 80443
Tel: 970.668.1133
www.OPARCH.com
8/
1
4
/
2
0
2
5
3
:
0
9
:
4
2
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
T
h
e
G
a
n
t
/
T
h
e
G
a
nt
_
R
2
3
.
r
v
t
BUILDING B - LEVEL 3-
PROPOSED
TH
E
G
A
N
T
61
0
S
W
E
S
T
E
N
D
S
T
.
AS
P
E
N
,
C
O
,
8
1
6
1
1
08.11.2025
2821.00
Author
Checker
A102.1-B3/16" = 1'-0"
BUILDING B - LEVEL 3 - DEMO1
55
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-02
MT-02
EXT-03EXT-03
EXT-03
EXT-03
EXT-01
MT-02
MT-03
EXT-02
EXT-01
EXT-01
MT-01
MT-03
MT-03EXT-02 MT-01
EXT-03
EXT-02
EXT-01EXT-01
EXT-01EXT-01
EXT-01 EXT-01
EXT-01
EXT-01
EXT-01
EXT-02
MT-01
MT-02 EXT-04
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-03EXT-02
MT-03
EXT-01
EXT-01MT-03
MT-03
EXT-01
EXT-01
EXT-01
EXT-04
MT-01 MT-02
EXT-03
THERMALLY MODIFIED WOOD SIDING
EXTERIOR CEMENTITIOUS PLASTER
CEMENTITIOUS SIDING
EXTERIOR WALL MATERIAL KEY
Revisions:
Project No:
Date:
Drawn by:
Checked by:
P.O. Box 2773
737 Ten Mile Drive Unit 206
Frisco, CO 80443
Tel: 970.668.1133
www.OPARCH.com
8/
1
4
/
2
0
2
5
3
:
0
9
:
4
5
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
T
h
e
G
a
n
t
/
T
h
e
G
a
nt
_
R
2
3
.
r
v
t
BUILDING B - PROPOSED
ELEVATIONS
TH
E
G
A
N
T
61
0
S
W
E
S
T
E
N
D
S
T
.
AS
P
E
N
,
C
O
,
8
1
6
1
1
08.11.2025
2821.00
Author
Checker
A200.1-B3/16" = 1'-0"
BUILDING B - ELEVATION 1 - PROPOSED1
3/16" = 1'-0"
BUILDING B - ELEVATION 3 - PROPOSED2
MT-03 METAL RAILING WITH GRATE/MESH INFILL
MT-02 METAL FASCIA
MT-01 STANDING SEAM METAL ROOF
EXT-04 STAINED TIMBERS
EXT-03 EXTERIOR CEMENTITIOUS PLASTER
EXT-02 THERMALLY MODIFIED WOOD
EXT-01 CEMENTITIOUS SIDING
MATERIAL TAG MATERIAL DESCRIPTION
1 08.11.25 PRICING SET
56
MT-01
MT-02
MT-03
EXT-01
EXT-01
EXT-01
EXT-03
EXT-03
EXT-03
EXT-01
MT-03
MT-03
EXT-01
EXT-03
EXT-01 EXT-03 EXT-01
MT-02
Revisions:
Project No:
Date:
Drawn by:
Checked by:
P.O. Box 2773
737 Ten Mile Drive Unit 206
Frisco, CO 80443
Tel: 970.668.1133
www.OPARCH.com
8/
1
4
/
2
0
2
5
3
:
0
9
:
4
8
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
T
h
e
G
a
n
t
/
T
h
e
G
a
nt
_
R
2
3
.
r
v
t
BUILDING B - PROPOSED
ELEVATIONS
TH
E
G
A
N
T
61
0
S
W
E
S
T
E
N
D
S
T
.
AS
P
E
N
,
C
O
,
8
1
6
1
1
08.11.2025
2821.00
Author
Checker
A201.1-B
3/16" = 1'-0"
BUILDING B - ELEVATION 4 - PROPOSED2
3/16" = 1'-0"
BUILDING - ELEVATION 2 - PROPOSED1
1 08.11.25 PRICING SET
57
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
MT-03
EXT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
MT-03
EXT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-03
MT-03
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-03
MT-03
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
MT-03
EXT-01
EXT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
MT-03
EXT-01
EXT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
MT-01
Revisions:
Project No:
Date:
Drawn by:
Checked by:
P.O. Box 2773
737 Ten Mile Drive Unit 206
Frisco, CO 80443
Tel: 970.668.1133
www.OPARCH.com
8/
1
4
/
2
0
2
5
3
:
0
9
:
5
1
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
T
h
e
G
a
n
t
/
T
h
e
G
a
nt
_
R
2
3
.
r
v
t
BUILDING B - PROPOSED
ELEVATIONS
TH
E
G
A
N
T
61
0
S
W
E
S
T
E
N
D
S
T
.
AS
P
E
N
,
C
O
,
8
1
6
1
1
08.11.2025
2821.00
Author
Checker
A202.1-B
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION1
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION2
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION3
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION4
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION5
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION6
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION7
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION8
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION9
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION10
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION11
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION12
1 08.11.25 PRICING SET
58
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
MT-03
EXT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-03
MT-03
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-03
MT-03
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
MT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-03
MT-03
MT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
MT-03
EXT-03
EXT-01
Revisions:
Project No:
Date:
Drawn by:
Checked by:
P.O. Box 2773
737 Ten Mile Drive Unit 206
Frisco, CO 80443
Tel: 970.668.1133
www.OPARCH.com
8/
1
4
/
2
0
2
5
3
:
0
9
:
5
6
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
T
h
e
G
a
n
t
/
T
h
e
G
a
nt
_
R
2
3
.
r
v
t
BUILDING B - PROPOSED
ELEVATIONS
TH
E
G
A
N
T
61
0
S
W
E
S
T
E
N
D
S
T
.
AS
P
E
N
,
C
O
,
8
1
6
1
1
08.11.2025
2821.00
Author
Checker
A203.1-B
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION1
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION2
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION3
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION4
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION5
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION7
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION8
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION9
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION10
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION11
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION12
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION6
1 08.11.25 PRICING SET
59
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
MT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-02
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-02
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-03
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
BLDG B 1
7954' - 10"
BLDG B 2
7964' - 0"
BLDG B 3
7973' - 1"
EXT-01MT-03
MT-03
Revisions:
Project No:
Date:
Drawn by:
Checked by:
P.O. Box 2773
737 Ten Mile Drive Unit 206
Frisco, CO 80443
Tel: 970.668.1133
www.OPARCH.com
8/
1
4
/
2
0
2
5
3
:
1
0
:
0
0
P
M
A
u
t
o
d
e
s
k
D
o
c
s
:
/
/
T
h
e
G
a
n
t
/
T
h
e
G
a
nt
_
R
2
3
.
r
v
t
BUILDING B - PROPOSED
ELEVATIONS
TH
E
G
A
N
T
61
0
S
W
E
S
T
E
N
D
S
T
.
AS
P
E
N
,
C
O
,
8
1
6
1
1
08.11.2025
2821.00
Author
Checker
A204.1-B
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION2
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION3
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION4
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION5
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION6
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION7
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION8
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION9
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION10
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION11
3/16" = 1'-0"
BUILDING B - PARTIAL ELEVATION1
1 08.11.25 PRICING SET
60
EXHIBIT I: VIEW PLANE EXHIBIT
51 | Exhibit I 61
3
A101
2
A101
1
A101
TREES BLOCKING VIEW IN VIEW
PLANE
GLORY HOLE VIEW PLANE EXTENTS
BUILDING A -
3 STORY
BUILDING B -
2 STORY
BUILDING J -
2 STORY
BUILDING C -
2 STORY
TREES BLOCKING
VIEW IN VIEW
PLANE
3 STORY BUILDING BLOCKING
VIEW PLANE
1" = 40'-0"VIEW PLANE DRAWINGS
THE GANT 2025 - 06 - 17 A100
62
TREES BLOCKING VIEW PLANE TREES BLOCKING VIEW PLANEEXISTING 3 STORY BUILDING IN
VIEW PLANE
GLORY HOLE PARK VIEW
PLANE START
7947.55'
SECTION OF BUILDING B NOT
BLOCKED BY EXISTING
BUILDINGS
2 - STORY, BELOW VIEW PLANE
SECTION OF BUILDING A IN VIEW
PLANE
TREES BLOCKING VIEW PLANE TREES BLOCKING VIEW PLANEEXISTING 3 STORY BUILDING IN
VIEW PLANE
GLORY HOLE PARK VIEW
PLANE START
7947.55'
SECTION OF BUILDING B NOT
BLOCKED BY EXISTING
BUILDINGS
2 - STORY, BELOW VIEW PLANE
TREES BLOCKING VIEW PLANE TREES BLOCKING VIEW PLANEEXISTING 3 STORY BUILDING IN
VIEW PLANE
GLORY HOLE PARK VIEW
PLANE START
7947.55'
SECTION OF BUILDING B NOT
BLOCKED BY EXISTING
BUILDINGS
2 - STORY, BELOW VIEW PLANE
1" = 20'-0"VIEW PLANE DRAWINGS
THE GANT 2025 - 06 - 17 A101
1" = 20'-0"1 VIEW PLANE SECTION 1
1" = 20'-0"2 VIEW PLANE SECTION 2
1" = 20'-0"3 VIEW PLANE SECTION 3
63
VIEW PLANE DRAWINGS
THE GANT 2025 - 06 - 17 A102
TREES
BLOCKING
VIEW
PLANE
3 STORY
STRUCTURE
BLOCKING
VIEW PLANE
TREES
BLOCKING
VIEW
PLANE
64
29 |
EXHIBIT J: LETTER OF AUTHORIZATION
April 6, 2025
Mr. Ben Anderson
Community Development Director
City of Aspen
427 Rio Grande Place
Aspen, CO 81611
Re: Letter of Authorization to Submit Land Use Application for The Gant Condominiums,
610 S West End Street
Dear Mr. Anderson:
As the General Manger of the Gant, authorized by the owners to act for and on their
behalf, I hereby authorize Design Workshop, Inc. and CCY Architects to act as my
designated and authorized representative for the preparation, submittal and processing
of any land use reviews related to development on our property. Design Workshop Inc.
and CCY are also authorized to represent me in meetings with City of Aspen staff, the
Hearing officer, the Planning and Zoning Commission, City Council, and/or the Board
of Adjustment.
Please also see the letter from Paul Taddune outlining the proof of ownership and
management structure for the Gant.
Should you have any need to contact us during the course of the review, please do so
through Design Workshop, Inc, whose address and telephone number is included in the
application.
Thank you.
Sincerely,
Donnie Lee
General Manager, Gant Condominiums
610 West End Street
Aspen, CO 81611
Design Workshop, Inc.
Landscape Architecture
Planning
Urban Design
Strategic Services
Environmental Graphic Design
22860 Two Rivers Road
Suite 102
Basalt, Colorado 81621
970.925.8354
designworkshop.com
55 | Exhibit J 65
30 |
EXHIBIT K: PROOF OF OWNERSHIP
56 | Exhibit K 66
31 | 57 | Exhibit K 67
32 |
EXHIBIT L: LAND USE APPLICATION FORM
58 | Exhibit K 68
LAND USE APPLICATION PACKET
Name: __________________________________________________________________________________
Location: ________________________________________________________________________________
_______________________________________________________________________________________
(Indicate street address, lot & block number or metes and bounds description of property)
Parcel ID #: ______________________________________________________________________________
PROJECT:
Name: __________________________________________________________________________________
Address: ________________________________________________________________________________
Phone # : _______________________ E-mail: __________________________________________________
APPLICANT:
Name: __________________________________________________________________________________
Address: ________________________________________________________________________________
Phone # : _______________________ E-mail: __________________________________________________
REPRESENTATIVE:
EXISTING CONDITIONS: (description of existing buildings, uses, previous approvals, etc.)
PROPOSAL: (description of proposed buildings, uses, modifications, etc.)
City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000
LAND USE APPLICATION FORM
69
City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000
DIMENSIONAL REQUIREMENTS FORM
LAND USE APPLICATION PACKET
Project: __________________________________________________________________________________________
Applicant: ________________________________________________________________________________________
Project Location: ___________________________________________________________________________________
Zone District: _____________________________________________________________________________________
Lot Size: _________________________________________________________________________________________
Gross Lot Area:________________________________ Net Lot Area:_________________________________________
For the purposes of calculating Floor Area, Lot Area may be reduced for areas within the high-water mark, easements, and steep
slopes. Please refer to the definition of Lot Area in the Municipal Code.
Existing non-conformities or encroachments and note if encroachment licenses have been issued:
Variations requested (identify the exact variations being requested):
70
City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000
DIMENSIONAL REQUIREMENTS FORM
LAND USE APPLICATION PACKET
Commercial net leaseable: Existing: _____________ Proposed: _____________
Number of Lodge Pillows: Existing: _____________ Proposed: _____________
Number of Lodge Units: Existing: _____________ Proposed: _____________
Number of residential units: Existing: _____________ Proposed: _____________
Number of Free-Market residential units: Existing: _____________ Proposed: _____________
Number of Affordable residential units: Existing: _____________ Proposed: _____________
Proposed % of demolition: ________________ %
DIMENSIONS:
Write N/A where no requirements exists in the zone district.
Floor Area: Existing: _____________ Allowable: _____________ Proposed: _____________
Height
Principal Building: Existing: _____________ Allowable: _____________ Proposed: _____________
Accessory Building: Existing:_____________ Allowable: _____________ Proposed: _____________
On-Site Parking: Existing: _____________ Allowable: _____________ Proposed: _____________
% Site Coverage: Existing: _____________ Allowable: _____________ Proposed: _____________
% Open Space: Existing: _____________ Allowable: _____________ Proposed: _____________
Front Setback: Existing: _____________ Allowable: _____________ Proposed: _____________
Rear Setback: Existing: _____________ Allowable: _____________ Proposed: _____________
Combined Front/Rear: Existing: _____________ Allowable: _____________ Proposed: _____________
Indicate N, S, E, W
Side Setback: Existing: _____________ Allowable: _____________ Proposed: _____________
Side Setback: Existing: _____________ Allowable: _____________ Proposed: _____________
Combined Front/Rear: Existing: _____________ Allowable: _____________ Proposed: _____________
Distance between Buildings: Existing: _____________ Allowable: _____________ Proposed: _____________
71
LAND USE APPLICATION PACKET
TYPE OF APPLICATION
ESA Review (Stream Margin, 8040 Greenline, View
Plane, or Hallam Lake Bluff)
Non Conformities
Pre-Development Topography
Temporary Use
Accessory Dwelling Unit/Carriage House
Dimensional Variance
Growth Management Review
Outdoor Vending
Planned Development Review
Certificates of Affordable Housing Credit
Establishment of Zoning or Rezoning
Subdivision Review Condominiumization
Approval Documents
Special Review
Wireless Facilities
Residential Design Standard Review
Conditional Use Review
Historic Designation
Certificate of Appropriateness
Minor Historic Development
Major Historic Development (select one below)
Conceptual Development
Final Development
Relocation (temporary, on or off-site)
Demolition (total demolition)
Substantial Historic Preservation Amendment
Historic Landmark Lot Split
Establishment of Transferable Development Rights
(TDRs)
Other
City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000
HISTORIC PRESERVATION REVIEWS
72
City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000
AGREEMENT TO PAY APPLICATION FEES
LAND USE APPLICATION PACKET
An agreement between the City of Aspen (“City”) and
Property Owner Name: _____________________________________________________________________________
Address of Property: _______________________________________________________________________________
Representative Name (If different from Property Owner): _________________________________________________________
Billing Name and Address - Send Bills to:
____________________________________________
____________________________________________
____________________________________________
Contact Email for Billing:
____________________________________________
Contact Phone for Billing:
____________________________________________
I understand that the City has adopted, via Ordinance No.40, Series of 2018, as may be amended, review fees for Land Use
applications and payment of these fees is a condition precedent to determining application completeness. I understand that as the
property owner that I am responsible for paying all fees for this development application.
For Deposit cases only: The City and I understand that because of the size, nature or scope of the proposed project, it is not possi-
ble at this time to know the full extent or total costs involved in processing the application. I understand that additional costs over
and above the deposit may accrue. I understand and agree that it is impracticable for City staff to complete processing, review and
presentation of sufficient information to enable legally required findings to be made for project consideration, unless invoices are
paid in full.
The City and I understand and agree that invoices mailed by the City to the above listed billing address and not returned to the
City shall be considered by the City as being received by me. I agree to remit payment within 30 days of presentation of an invoice
by the City for such services.
I have read, understood, and agree to the Land Use Review Fee Policy including consequences for no-payment. I agree to pay the
following initial deposit amounts for the specified hours of staff time. I understand that payment of a deposit does not render and
application complete or compliant with approval criteria. If actual recorded costs exceed the initial deposit, I agree to pay addi-
tional monthly billings to the City to reimburse the City for the processing of my application at the hourly rates hereinafter stated.
73
33 | City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000
AGREEMENT TO PAY APPLICATION FEES
LAND USE APPLICATION PACKET
For flat fees and referral fees: I agree to pay the following fees for the services indicated. I understand that these flat fees are
non-refundable.
Engineering Fee: $ __________
Parks Fee: $ __________
APCHA Fee: $ __________
Other Fee: $ __________
$_________ deposit for __________ hours of Community Development Department staff time. Additional time above the deposit amount
will be billed at $325.00 per hour.
$_________ deposit for __________ hours of Community Development Department staff time. Additional time above the deposit amount
will be billed at $325.00 per hour.
City of Aspen:
____________________________________________
Ben Anderson, AICP
Community Development Director
Property Owner, or Representative
Signature: ___________________________________
PRINT Name: ________________________________
Title: ________________________________________
City Use
Fees Due: $ _____________________
Received: $ _____________________
Case # _________________________
Principal
Jessica Garrow
13.694450
975
1605
74
34 | City of Aspen | City Hall, 427 Rio Grande Place Aspen, CO 81611 | (970) 920-5000
HOMEOWNER ASSOCIATION COMPLIANCE POLICY
LAND USE APPLICATION PACKET
All land use applications within the City of Aspen are required to include a Homeowner Association Compliance Form (this
form) certifying the scope of work included in the land use application complies with all applicable covenants and homeowner
association policies. The certification must be signed by the property owner or Attorney representing the property owner.
Property Owner (“I”)
Name: _______________________________________
Email: _______________________________________
Phone Number: ________________________________
Address of Property (Subject of Application):
_____________________________________________
_____________________________________________
_____________________________________________
I certify as follows: (Select One)
This property is not subject to a homeowners association or other form of private covenant.
This property is subject to a homeowners association or private covenant and the improvements proposed in this land use
application do not require approval by the homeowners association or covenant beneficiary.
This property is subject to a homeowners association or private covenant and the improvements proposed in this land use
application have been approved by the homeowners association or covenant beneficiary.
I understand this policy and I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning or
effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document.
Owner Signature: __________________________________________ Date: _______________________
Printed Name: ____________________________________________
or,
Attorney Signature: _________________________________________ Date: _______________________
Attorney Printed Name: _____________________________________
The Gant Condominium Association,Donnie Lee,General Manager
donnie.lee@gantaspen.com
970-920-6070
The Gant Condimuniums
610 S.West End Street
Aspen,CO 81611
August 15,2025
Donnie Lee
75
35 |
PRE-APPLICATION CONFERENCE SUMMARY
PRE-25-084
DATE: July 1, 2025
PLANNER: Dan Folke, 970-404-9200, daniel.folke@aspen.gov
REPRESENTATIVE: Jessica Garrow, 970-399-1404, jgarrow@designworkshop.com
PROJECT LOCATION: The Gant, 610 W West End Street
PARCEL ID: 2737-182-67-800
REQUEST: Planned Development Amendment & Commercial Design Review
DESCRIPTION: The Gant is a multiple-family property located in the R-15 Moderate Density
residential district with a Lodge and Planned Development overlay. As identified in the January 2013
Administrative Determination both multi-family residential and lodge/short term rentals are permitted
uses. The owners would like to complete an exterior remodel with all new exterior materials. No
new square footage will be added to the existing units, but site improvements will include relocating
a swimming pool, landscaping and parking. The applicant may also make changes to property
lighting and signage.
As found in the Aspen Land Use Code Section 26.412.020, Commercial Design Review applies to
all commercial, lodging and mixed-use developments. Planned Developments with no outdoor
lighting plans are subject to underlying zoning and related lighting zone. Properties within the R-15
zone are in Lighting Zone 1. The property is within the Glory Hole and Wagner Park mountain view
planes, although no changes in height are proposed and should qualify for an exemption. Proposed
improvements include:
• Change of all exterior materials including siding, fascia, trim, railings and balconies.
• Removal of the west swimming pool and tennis courts
• Construction of a new swimming pool
• Reconfigure parking and install new landscaping
Based on the information provided the improvements should qualify for an Insubtantial Amendment
to the Planned Development and there should be no impacts to the mountain view planes.
Commercial Design Review does require review by the Planning & Zoning Commission, but will be
a one step process.
RELEVANT LAND USE CODE SECTIONS:
Section Number Section Title
26.304 Common Development Review Procedures
26.412 Commercial Design Review
26.435.050(d) Mountain View Plane exemptions
26.445.110 Planned Development Amendments
26.510 Signs
26.512 Outdoor Lighting
26.710.050 Land Use Regulations - Moderate Density Residential (R-15)
EXHIBIT M: PRE-APPLICATION FORM
66 | Exhibit M 76
36 |
Commercial, Loding, and Historic District Design Standards and Guidelines
1.33 All remodel projects shall meet Standards 1.22 and 1.23 …
HELPFUL LINKS:
• Land Use Application (PDF)
• Land Use Code (PDF)
• Commercial, Lodging, and Historic District Design Standards (PDF)
REVIEW BY:
• Staff for completeness and recommendations
• Community Development Director for PD Amendment
• Planning & Zoning Commission for Commercial Design Review
REQUIRED LAND USE REVIEW(S):
• ESA Review (Mountain view plane exemption confirmation)
• Planned Development Review (Insubstantial Amendment)
• Commercial Design Review (Final only)
PUBLIC HEARING: Yes, Planning & Zoning Commission
PLANNING FEES: $4,450 (P&Z Commercial Design Review only) (Additional/ lesser hours will
be billed/ refunded at a rate of $325 per hour.)
REFERRAL FEES: $1,605 (flat fee Board Review minor) Engineering, $975 (flat fee) Parks
TOTAL DEPOSIT: $7,030
APPLICATION CHECKLIST: Below is a list of submittal requirements for this review.
Please email the entire application as one pdf to cdehadmins@aspen.gov. Include PRE-
25-084 in the subject line. If more than 18 months has lapsed since this letter was issued,
please reach out to planneroftheday@gmail.com.
Completed Land Use Application, signed Fee Agreement, and signed HOA Compliance
form
Pre-application Conference Summary (this document).
Contained within a letter signed by the applicant, the applicant's name, address and
telephone number and the name, address and telephone number of any representative
authorized to act on behalf of the applicant.
The street address, legal description and parcel identification number of the property
proposed for development.
A disclosure of ownership of the parcel proposed for development, consisting of a current
(no older than 6 months) certificate from a title insurance company or attorney licensed to
practice in the state, listing the names of all owners of the property and all mortgages,
judgments, liens, easements, contracts and agreements affecting the parcel and
demonstrating the owner's right to apply for the development application.
An eight and one-half (8½) inches by eleven (11) inches vicinity map locating the subject
parcel within the City of Aspen.
67 | Exhibit M 77
37 |
Proposed and existing site plans depicting the proposed layout and the project's physical
relationship to the land and its surroundings including locations of swimming pools and
parking
A site improvement survey (no older than a year from submittal) certified by a registered
land surveyor, licensed in the state, showing the current status of the parcel including the
current topography and vegetation.
A written description of the proposal and a written explanation of how the proposed
development complies with the review standards relevant to the development application.
Sec. 26.412.050 Commercial Design Review application requirements including
proposed architectural elevations and exterior material samples
Proposed landscape plan
Lighting plan (if new lighting is proposed)
Sign Plan (if changes to public facing signage are proposed)
Depending on further review of the case, additional items may be requested of the
application. Once the application is deemed complete by staff, the applicant/applicant’s
representative will receive an e-mail requesting submission of the deposit. Once the
deposit is received, the case will be assigned to a planner and the land use review will
begin.
Disclaimer: The foregoing summary is advisory in nature only and is not binding on the City.
The summary is based on current zoning, which is subject to change in the future, and upon
factual representations that may or may not be accurate. The summary does not creat e a legal
or vested right.
68 | Exhibit M 78
EXHIBIT N: SURVEY
69 | Exhibit N 79
SHEET 3
SHEET 4
SHEET 5
SHEET 6
SHEET 7
SHEET 8
SHEET 9
SHEET 2
S 75°0
9
'
1
1
"
E
2
6
4
.
9
9
'
S 75°0
9
'
1
1
"
E
1
3
3
.
3
2
'
S
1
5
°
0
5
'
0
0
"
W
4
7
.
6
1
'
S
0
2
°
0
0
'
2
9
"
W
1
1
6
.
8
9
'
S
2
7
°
0
3
'
3
3
"
E
1
2
8
.
7
8
'
S 89°35'43" W 371.31'
S 2
8
°
2
8
'
0
0
"
W
1
3
4
.
5
6
'
100.13
'
33.19'
PH
A
S
E
I
I
PE
R
B
O
O
K
4
P
A
G
E
4
9
9
PH
A
S
E
I
PE
R
B
O
O
K
4
P
A
G
E
4
3
1
PH
A
S
E
I
I
PE
R
B
O
O
K
4
P
A
G
E
4
9
9
PH
A
S
E
I
PE
R
B
O
O
K
4
P
A
G
E
4
3
1
PHA
S
E
I
I
PER
B
O
O
K
4
P
A
G
E
4
9
9
PHA
S
E
I
PER
B
O
O
K
4
P
A
G
E
4
3
1
P
H
A
S
E
I
I
P
E
R
B
O
O
K
4
P
A
G
E
4
9
9
P
H
A
S
E
I
P
E
R
B
O
O
K
4
P
A
G
E
4
3
1
95.3
2
'
56.9
8
'
3
1
5
.
3
7
'
3
9
.
3
3
'
52
.
4
4
'
64
.
4
5
'
PH
A
S
E
I
I
I
PE
R
B
O
O
K
5
P
A
G
E
2
2
PH
A
S
E
I
I
PE
R
B
O
O
K
4
P
A
G
E
4
9
9
PH
A
S
E
I
I
I
PE
R
B
O
O
K
5
P
A
G
E
2
2
PH
A
S
E
I
I
PE
R
B
O
O
K
3
0
6
P
A
G
E
3
5
2
BOO
K
4
P
A
G
E
4
9
9
BOO
K
5
P
A
G
E
2
2
BUILDING B
BUILDING A
BUILDING C
BUILDING C
BUILDING D
BUILDING E
BUILDING F
BUILDING G
BUILDING H
BUILDING J
BUILDING K
CONFERENCE
BUILDING
PHASE I
BOOK 4, PAGE 431
88,426 SQ. FT. ±
2.030 ACRES ±PHASE II
BOOK 4, PAGE 499A
93,901 SQ. FT. ±
2.156 ACRES ±
PHASE III
BOOK 5, PAGE 22
38,261 SQ. FT. ±
0.878 ACRES ±
THE GANT CONDOMINIUM
5.27 ACRES ±
20' CITY OF ASPEN
UTILITY EASEMENT,
PER BOOK 4 PAGE 431
20' CITY OF ASPEN
UTILITY EASEMENT
PER BOOK 4 PAGE 499A
20' CITY OF ASPEN
UTILITY EASEMENT,
PER BOOK 4 PAGE 431
SHED
ELEVATOR
MAINTENANCE
BUILDING
ELEVATOR
STONE POOL
MECHANICAL
BUILDING
DUMPSTER
ENCLOSURE
ELEVATOR
STAIRWELL
ELEVATOR
STAIRWELL
ELECTRIC AND
GAS SHED
U
T
E
A
V
E
N
U
E
A
S
P
H
A
L
T
R
O
A
D
S
O
U
T
H
W
E
S
T
E
N
D
S
T
R
E
E
T
A
S
P
H
A
L
T
R
O
A
D
ASPHALT DRIVE
AND PARKING
ASPHALT DRIVE
AND PARKING
ASPHALT DRIVE
AND PARKING
CONCRETE
APRON
CONCRETE DRIVE
PK NAIL AND SHINER
P.L.S. NO. 37972 FOUND
BASIS OF BEARINGS
TBM = 7968.18'
NO. 5 REBAR AND 1.25"
BLUE PLASTIC CAP
P.L.S. NO. 37972 FOUND
1.46' WITNESS CORNER
0.10' BELOW GROUND
NO. 5 REBAR AND 1.25"
YELLOW PLASTIC CAP
P.L.S.ILLEGIBLE FOUND
0.30' UNDER GROUND
BASIS OF BEARINGS
20' CITY OF ASPEN
UTILITY EASEMENT,
PER BOOK 4 PAGE 431
20' CITY OF ASPEN
UTILITY EASEMENT
PER BOOK 4 PAGE 499A
20' CITY OF ASPEN
UTILITY EASEMENT
PER BOOK 5 PAGE 22
20' CITY OF ASPEN
UTILITY EASEMENT
PER BOOK 5 PAGE 22
PHA
S
E
I
I
P
E
R
PHA
S
E
I
I
I
PER
PAR
C
E
L
2
,
C
L
A
R
E
N
D
O
N
C
O
N
D
O
M
I
N
I
U
M
S
PER
P
L
A
T
B
O
O
K
1
1
3
,
P
A
G
E
6
CIT
Y
O
F
A
S
P
E
N
SOU
T
H
W
E
S
T
E
N
D
S
T
R
E
E
T
PER
P
L
A
T
B
K
4
,
P
G
3
8
1
CIT
Y
O
F
A
S
P
E
N
SO
U
T
H
W
E
S
T
E
N
D
S
T
R
E
E
T
PER
P
L
A
T
B
K
4
,
P
G
3
8
1
1" IRON BAR FOUND
0.18' ABOVE GROUND
NO. 5 REBAR AND 1.5"
ALUMINUM CAP
ILLEGIBLE FOUND
0.25' UNDER GROUND
LOT
A
,
B
L
K
1
2
0
LOT
B
,
B
L
K
1
2
0
LOT
C
,
B
L
K
1
2
0
LOT
D
,
B
L
K
1
2
0
LOT
E
,
B
L
K
1
2
0
LOT F
,
B
L
K
1
2
0
LOT
G
,
B
L
K
1
2
0
LOT
H
,
B
L
K
1
2
0
LOT I,
B
L
K
1
2
0
CAM
P
B
E
L
L
S
U
R
V
I
V
O
R
S
T
R
U
S
T
919 W
A
T
E
R
S
A
V
E
LOT
A
,
B
L
K
4
1
LOT
B
,
B
L
K
4
1
LOT
C
,
B
L
K
4
1
LOT
D
,
B
L
K
4
1
LOT
E
,
B
L
K
4
1
ALLE
Y
B
L
O
C
K
1
2
0
NOT
S
H
O
W
N
O
N
O
F
F
I
C
I
A
L
C
I
T
Y
P
L
A
T
PER P
L
A
T
B
K
4
,
P
G
3
8
1
OPEN
S
P
A
C
E
-
P
U
B
L
I
C
W
A
Y
P
E
R
PLAT
B
K
4
,
P
G
3
8
1
O
P
E
N
S
P
A
C
E
-
P
U
B
L
I
C
W
A
Y
P
E
R
P
L
A
T
B
K
4
,
P
G
3
8
1
O
P
E
N
S
P
A
C
E
-
P
U
B
L
I
C
W
A
Y
P
E
R
P
L
A
T
B
K
4
,
P
G
3
8
1
LOT 4
CALDERWOOD
SUBDIVISION PER
PLAT BK 2A, PG 264
LOT 5
CALDERWOOD
SUBDIVISION PER
PLAT BK 2A, PG 264
LOT 6
CALDERWOOD
SUBDIVISION PER
PLAT BK 2A, PG 264
LOT 7
CALDERWOOD
SUBDIVISION PER
PLAT BK 2A, PG 264
UTE CREEK
CONDO
LOT 6
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
LOT 5
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
LOT 17-R
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
LOT 1
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
CITY OF ASPEN
UTILITY EASEMENT
PER BOOK 5 PAGE 22
LAUNDRY
STAIRWELL
SHED
LOT
1
,
C
L
A
R
E
N
D
O
N
C
O
N
D
O
M
I
N
I
U
M
S
PER
P
L
A
T
B
O
O
K
1
1
3
,
P
A
G
E
6
LO
T
1
,
C
L
A
R
E
N
D
O
N
C
O
N
D
O
M
I
N
I
U
M
S
PER
P
L
A
T
B
O
O
K
1
1
3
,
P
A
G
E
6
PARCEL 1,
CLARENDON
CONDOMINIUMS
PER PLAT
BK 113, PG 6
N
3
7
°
4
7
'
3
4
"
W
3
5
4
.
6
3
'
N 49
°
1
3
'
0
0
"
E
1
5
2
.
3
0
'
N
1
9
°
0
1
'
0
0
"
W
1
0
6
.
6
2
'
N 47
°
5
4
'
0
0
"
E
1
2
4
.
7
3
'
N 56°24'10" E
3.13'
N 79°28'49" E
11.09'
PH
A
S
E
I
I
PE
R
B
O
O
K
3
0
6
P
A
G
E
3
5
2
∆=90°10'52"
R=55.00'
L=86.57'
L=86.62' (PLAT)
CHB=N29°57'28"W
CHL=77.90'
GLORYHOLE
VIEWPLANE
20' - 30'
GLORYHOLE
VIEWPLANE
20' - 30'
GLORYHOLE
VIEWPLANE
30' - 40'
GLORYHOLE
VIEWPLANE
30' - 40'
GLORYHOLE
VIEWPLANE
40' - 50'
GLORYHOLE
VIEWPLANE
40' - 50'
COURTHOUSE #1
VIEWPLANE
170' - 180'
COURTHOUSE #1
VIEWPLANE
180' - 190'
COURTHOUSE #1
VIEWPLANE
190' - 200'
COURTHOUSE #1
VIEWPLANE
190' - 200'
WAGNER
VIEWPLANE
130' - 140'
WAGNER
VIEWPLANE
140' - 150'
WAGNER
VIEWPLANE
150' - 160'
WAGNER
VIEWPLANE
150' - 160'
WAGNER
VIEWPLANE
140' - 150'
WAGNER
VIEWPLANE
160' - 170'
COURTHOUSE #1
VIEWPLANE
180' - 190'
COURTHOUSE #1
VIEWPLANE
200' - 210'
MAIN STREET
VIEWPLANE
280' - 290'
MAIN STREET
VIEWPLANE
290' - 300'
MAIN STREET
VIEWPLANE
290' - 300'
MAIN STREET
VIEWPLANE
300' - 310'
MAIN STREET
VIEWPLANE
300' - 310'
MAIN STREET
VIEWPLANE
310' - 320'
MAIN STREET
VIEWPLANE
310' - 320'
MAIN STREET
VIEWPLANE
320' - 330'
MAIN STREET
VIEWPLANE
320' - 330'
MAIN STREET
VIEWPLANE
330' - 340'
MAIN STREET
VIEWPLANE
330' - 340'
MAIN STREET
VIEWPLANE
340' - 350'
MAIN STREET
VIEWPLANE
340' - 350'
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
1 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
NOTES:
1) THIS PROPERTY IS SUBJECT TO RESERVATIONS, RESTRICTIONS, COVENANTS, BUILDING
SETBACKS AND EASEMENTS OF RECORD, OR IN PLACE. THIS SURVEY WAS PREPARED WITHOUT
THE BENEFIT OF A TITLE COMMITMENT THEREFORE, EXCEPTIONS TO TITLE THAT MAY AFFECT
THE SUBJECT PROPERTY HAVE NOT BEEN RESEARCHED BY PEAK SURVEYING, INC.
2) THE DATE OF THIS SURVEY WAS DECEMBER 5, 7, 20, 2023, JANUARY 11, 30, FEBRUARY 4, 13, 14,
MARCH 1, AND 6, 2024.
3) BASIS OF BEARINGS FOR THIS SURVEY IS A BEARING OF N 15°32'36" W BETWEEN A
SOUTHERLY BOUNDARY POINT, A PK NAIL AND SHINER P.L.S. #37972 FOUND IN PLACE AND A
WESTERLY BOUNDARY POINT, A NO. 5 REBAR AND YELLOW PLASTIC CAP ILLEGIBLE, FOUND IN
PLACE.
4) UNITS OF MEASURE FOR ALL DIMENSIONS SHOWN HEREON IS U.S. SURVEY FEET.
5) THIS SURVEY IS BASED ON THE THE GANT CONDOMINIUMS, ACCORDING TO THE
CONDOMINIUM MAP RECORDED NOVEMBER 16, 1973 IN PLAT BOOK 4 AT PAGE 431, AS
RECEPTION NO. 163550, THE SUPPLEMENTAL MAP OF THE GANT CONDOMINIUMS, PHASE TWO,
RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4 AT PAGE 499 AS RECEPTION NO. 173343, AND
THE SUPPLEMENTAL MAP OF THE GANT CONDOMINIUMS, PHASE THREE, RECORDED AUGUST
24, 1976 IN PLAT BOOK 5 AT PAGE 22 AS RECEPTION NO. 186413, IN THE PITKIN COUNTY CLERK
AND RECORDER'S OFFICE, THE SURVEY OF THE GANT CONDOMINIUMS PREPARED BY HIGH
COUNTRY ENGINEERING INC. DATE AND JOB NUMBER UNKNOWN, AND CORNERS FOUND IN
PLACE.
6) THERE WAS APPROXIMATELY 12-60" OF SNOW AND ICE ON THE GROUND AT THE TIME OF
SURVEY.
7) ELEVATIONS ARE BASED ON A GPS OBSERVATION UTILIZING THE WESTERN COLORADO
RTVRN GPS NETWORK (1988 DATUM) YIELDING AN ON-SITE ELEVATION OF 7968.18' ON A TBM AS
SHOWN. CONTOUR INTERVAL EQUALS 1 FOOT.
8) THIS PROPERTY IS ZONED R-15 PER CITY OF ASPEN COMMUNITY DEVELOPMENT SITE
BUILDING SETBACKS SHOULD BE VERIFIED WITH COMMUNITY DEVELOPMENT PRIOR TO ANY
PLANNING, DESIGN OR CONSTRUCTION.
SUBJECT
PROPERTY
VICINITY MAP
SCALE: 1" = 2000'
SURVEYOR'S STATEMENT:
I, JASON R. NEIL, HEREBY CERTIFY TO THE GANT CONDOMINIUM ASSOCIATION, INC., THAT I
AM A PROFESSIONAL LAND SURVEYOR LICENSED UNDER THE LAWS OF THE STATE OF
COLORADO; THAT THIS EXISTING CONDITIONS SURVEY IS TRUE, CORRECT AND COMPLETE
BASED ON MY KNOWLEDGE, INFORMATION AND BELIEF AS LAID OUT AND SHOWN HEREON;
THAT THIS EXISTING CONDITIONS SURVEY IS NOT A GUARANTY OR WARRANTY, EITHER
EXPRESSED OR IMPLIED, THAT THIS EXISTING CONDITIONS SURVEY WAS MADE BY ME FROM
AN ACCURATE SURVEY OF THE REAL PROPERTY PERFORMED BY ME OR UNDER MY DIRECT
SUPERVISION ON DECEMBER 5, 7, 20, 2023, JANUARY 11, 30, FEBRUARY 4, 13, 14, MARCH 1, AND 6,
2024.
DATED: APRIL 24, 2025
BY:___________________________________
JASON R. NEIL, P.L.S. NO. 37935
FOR AND ON BEHALF OF
PEAK SURVEYING, INC.
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
PROPERTY DESCRIPTION
THE GANT CONDOMINIUMS, ACCORDING TO THE CONDOMINIUM MAP RECORDED
NOVEMBER 16, 1973 IN PLAT BOOK 4 AT PAGE 431, AS RECEPTION NO. 163550, THE
SUPPLEMENTAL MAP OF THE GANT CONDOMINIUMS, PHASE TWO, RECORDED NOVEMBER 14,
1974 IN PLAT BOOK 4 AT PAGE 499 AS RECEPTION NO. 173343, AND THE SUPPLEMENTAL MAP
OF THE GANT CONDOMINIUMS, PHASE THREE, RECORDED AUGUST 24, 1976 IN PLAT BOOK 5
AT PAGE 22 AS RECEPTION NO. 186413 IN THE PITKIN COUNTY CLERK AND RECORDERS
OFFICE, CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO.
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
ak
S u r v e y i n
g
,
I
n
c
.
030 30 60 12015
COL O R A D O L I CE
N
S
E
D
P
R
O
F
E
SSIONAL L A N D S U RVEYO
R
JAS O N R . N
E
I
L
37935
80
EX-
U
E
EX-
U
E
E
X
-
U
E
EX-
U
E
EX-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-UE
EX-UE
EX-UE
EX-UE
EX-U
E
EX-U
E
EX-U
E
EX-UE
T
T
T
T
T
T
T
T
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
T
X
X
X
X
X
X
X
3 STORY
WOOD FRAME
BUILDING A
610 S. WEST END STREET #A
DYH
D
S
S
D
D
D
E
CO
WV
WV
ICV
FIRE
HYDRANT
EDGE OF
ASPHALTSIGN WATER
VALVE
UNDERGROUND
WATER LINE
(TYPICAL)
STORM
GRATE
SEWER
MANHOLE
UNDERGROUND
TELEPHONE LINE
(TYPICAL)
UNDERGROUND
ELECTRIC LINE
(TYPICAL)
DECIDUOUS
TREE
(TYPICAL)
FENCE
(TYPICAL)
FLOWLINE
DITCH
20' CITY OF ASPEN
UTILITY EASEMENT
20' EASEMENT
20' CITY OF ASPEN
UTILITY EASEMENT
SIGN
(TYPICAL)
SEWER MANHOLE
RIM = 7954.16'
ELECTRIC
MANHOLE
(TYPICAL)
LIGHT
(TYPICAL)
WATER
VALVE
(TYPICAL)
STONE WALL
(TYPICAL)
DECIDUOUS
TREE
(TYPICAL)
CON
C
R
E
T
E
PATI
O
W
I
T
H
DEC
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
AS
P
H
A
L
T
WA
L
K
W
A
Y
CONCRETE
DRIVE
CONCRETE
DRIVE
CONCRETE
PAN
ASPHALT
DRIVE
CONCRETE
DRIVE
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
CONCRETE
ENTRY
SIGN
(TYPICAL)LANDSCAPE TIE
(TYPICAL)
3 STORY
WOOD FRAME
BUILDING C
610 S. WEST END STREET #C
3 STORY
WOOD FRAME
BUILDING A
610 S. WEST END STREET #A
LIGHT
(TYPICAL)
NO.5 REBAR AND 1.25"
YELLOW PLASTIC CAP
P.L.S.ILLEGIBLE FOUND
0.30' UNDER GROUND
BASIS OF BEARINGS
C
T
V
CTV
CT
V
FO
FO
FO
FO
EX-UE
EX-UE
EX-UE
EX
-
U
E
EX-
U
E
EX
-
U
E
EX-U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
EX-
U
E
F
ICV
E
ICV
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
2.9
'
4.7'
5.0
'
15.9'
0.6
'
2.5'
15
.
5
'
3.0'2.2
'
2.0'
1.0
'
2.1'
2.2
'
3.0'
15
.
5
'
2.5'
0.7
'
15.9'5.0
'
4.7'
2.8
'3.0'
15
.
7
'
2.6'
0.6
'
15.9'4.6
'
2.0'
0.6
'
0.6'
2.0
'
10.8'2.0
'
0.6'
2.0
'
25.1'
16
.
5
'
11.7'
24
.
1
'
11.6'
15
.
6
'
11.6'
5.4
'
5.2'
6.4'
7.6'
4.9'
3.0
'
11.8'
15
.
9
'
2.6'0.6
'
2.6'
15
.
5
'
3.0'
4.9
'
25.2'
4.9
'
12.1'
4.9
'
13.4'
5.4
'
2.5'
0.7
'
2.5'
15
.
7
'
3.1'
2.9
'
16.4'
11
.
6
'
11.8'
5.5
'
16.0'
0.8
'
2.6'
15
.
6
'
3.1'
6.0'
8.0
'
11.8'
36
.
0
'
19.9'
12
.
6
'
7.6'
14.8'
D
3
4
.
5
'
2.1'
11.6'
7.6
'
LO
T
1
,
C
L
A
R
E
N
D
O
N
C
O
N
D
O
M
I
N
I
U
M
S
PER
P
L
A
T
B
O
O
K
1
1
3
,
P
A
G
E
6
SOUTH WEST END STREET
ASPHALT ROAD
LOT A, BLOCK 120
LOT B, BLOCK 120
LOT C, BLOCK 120
LOT D, BLOCK 120
LOT E, BLOCK 120
CITY OF ASPEN
SOUTH WEST END STREET
CITY OF ASPEN
SOUTH WEST END STREET
PER PLAT BK 4, PG 381
ALLE
Y
B
L
O
C
K
1
2
0
NOT
S
H
O
W
N
O
N
O
F
F
I
C
I
A
L
C
I
T
Y
P
L
A
T
PER P
L
A
T
B
K
4
,
P
G
3
8
1
1" IRON BAR FOUND
0.18' ABOVE GROUND
LOT F
BLOCK 120
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
UNDERGROUND
FIBER MARKER
OUTLET
(TYPICAL)
STONE
WALK
CONCRETE
PATIO WITH
DECK ABOVE
ST
A
I
R
W
E
L
L
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
STONE COLUMN
WITH LIGHT
STONE COLUMN
WITH LIGHT
IRRIGATION
VAULT
IRRIGATION
BOX (TYPICAL)
LIGHT
(TYPICAL)
SIGN
(TYPICAL)
LIGHT
(TYPICAL)
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CLEANOUT
(TYPICAL)
CON
C
R
E
T
E
RAM
P
GAS METER AND
ELECTRIC
TRANSFORMER
ENCLOSURESTONE WALL
(TYPICAL)
C
O
N
C
R
E
T
E
R
A
M
P
STAI
R
W
E
L
L
T1 T2
T3
T4
T5
T6
T7
T8
T9
T10
T11
T12
T13T14
T15
T16T17
T18
T19
T20
T21
T22
T23
T24
T25
T26
T27
T28
T29
T30
T31
T32
T33
T34
T35 T36
T37
T38
T39 T40 T41
T42
T44
T43
T45 T46
T47
T48
T49
T50
T51
T53
T55
T52
T54
T56
T57 T59
T60
T58
T61
T62
T63
T64
T65
T66 T67
DSTORM DRAIN
7959.17' FL @ DOME
G
17.5'
8
.
6
'
38
'
PARCEL 1,
CLARENDON
CONDOMINIUMS
PER PLAT BOOK
113, PAGE 6
ART
SCULPTURE
E
X
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-UE
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-
U
E
EX-
U
E
EX-
U
E
EX-
U
E
EX
-
U
E
EX
-
U
E
7955
7
9
5
3
7954
7956
7
9
5
3
7
9
5
4
795
3
7955
7958
7
9
5
4
7958
7959
7959
7
9
5
5
7955
7
9
5
7
7
9
5
8
7959
7956
7
9
5
5
795
5
795
9
7958
7959
7957
7956
7
9
5
5
795
6
7956.23'
7954.51'
7954.27'
7954.68'
7954.60'
7954.58'
7954.59'7954.56'
7954.87'
7954.29'
7953.78'
7953.81'
7955.05'
7954.93'
DRY WELL
RIM = 7954.35'
STORM GRATE
RIM = 7952.79'
STORM GRATE
RIM = 7954.04'
STORM MANHOLE
RIM = 7953.97'
ELECTRIC MANHOLE
RIM = 7954.03'
GLORYHOLE
VIEWPLANE
20' - 30'
MAIN STREET
VIEWPLANE
280' - 290'
MAIN STREET
VIEWPLANE
290' - 300'
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
SEE SHEET 9
SE
E
S
H
E
E
T
3
SEE SHEET 3SEE SHEET 9
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
2 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
ak
S u r v e y i n
g
,
I
n
c
.
010 10 20 405
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
81
EX-U
E
EX-U
E
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-
U
E
EX-
U
E
EX-
U
E
EX-
U
E
EX-
U
E
E
X
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
T
T
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
3 STORY
WOOD FRAME
BUILDING D
610 S. WEST END STREET #D
20' CITY OF ASPEN
UTILITY EASEMENT
20' CITY OF ASPEN
UTILITY EASEMENT
CONCRETE
PAN
ASPHALT
DRIVE
ASPHALT
DRIVE
ASPHALT
DRIVE
CONCRETE
DRIVE
ASPHALT
DRIVE
ASPHALT
DRIVE AND
PARKING
PAV
E
R
WAL
K
W
A
Y
CON
C
R
E
T
E
RAM
P
UNDERGROUND
ELECTRIC LINE
(TYPICAL)
STONE WALL
(TYPICAL)
CONIFER TREE
(TYPICAL)
DECIDUOUS TREE
(TYPICAL)
FENCE
(TYPICAL)
FLOWLINE
DITCH
ELEV
A
T
O
R
ST
A
I
R
W
E
L
L
STAI
R
W
E
L
L
C
O
N
C
R
E
T
E
W
A
L
K
STONE
WALK
(TYPICAL)
STONE
WALK
(TYPICAL)
STEPS
(TYPICAL)
STONE
STEPS
LIGHT
(TYPICAL)
STONE WALL
(TYPICAL)
BOULDER
BOULDER
BOULDER WALL
(TYPICAL)
FLOWLINE
DITCH
CONCRETE
PATIO
BUILDING
COLUMN
(TYPICAL)
BUILDING
COLUMN
(TYPICAL)
IRRIGATION
VALVE BOX
(TYPICAL)
BOULDER
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-
U
E
EX-UE
E
EX-UE
EX-UE
E
X
-
U
E
E
X
-
U
E
EX
-
U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
G
G
G
G
G
G
G
G
EX
-
U
E
EX
-
U
E
E
X
-
U
E
2.5'
0.7
'
2.5'
0.8
'
2.6'
15.9'
0.7
'
2.5'
15
.
8
'
3.1'
2.8
'
2.8
'3.0'
23.9'
11
.
7
'
24.6'
11
.
6
'
15.6'
11
.
6
'
32.4'
11
.
6
'
15.6'
11
.
6
'
24.2'
14
.
7
'
7.9'
8.
9
'
2.6'
2.
0
'
2.5'
11
.
8
'
5.3'
15
.
8
'
0.7'
2.
5
'
15.5'
3.
0
'
2.1'
2.
0
'
1.0'
2.
0
'
2.1'
3.
0
'
15.5'
2.
5
'
0.7'
15
.
8
'
10.3'
15
.
8
'
0.7'
2.
4
'
15.5'
3.
0
'
2.1'
2.
0
'
1.0'
2.
0
'
2.1'
3.
0
'
15.6'
2.
4
'
1.0'
15
.
8
'
5.0'
4.
6
'
2.9'
3.
0
'
15.6'
2.
8
'
0.7'
16
.
2
'
5.0'
4.
6
'
2.8'
3.
1
'
15.6'
2.
4
'
0.7'
15
.
7
'
4.7'
2.
5
'
0.7'
0.
6
'
2.0'
10
.
7
'
2.0'
0.
6
'
2.0'
25
.
1
'
16.4'
11
.
7
'
19
.
6
5
'
11.70
'
16
.
4
5
'
25.1'
1.9
'
0.6'
1.9
'
6.7'3.9
'
4.4'
3.9
'
13.6'
5.3
'
2.4'
0.6
'
2.4'
15
.
6
'
7.8'
13
.
9
'
7.8'
13
.
9
'
24.7'
24.1'
24.1'
11
.
2
'
7.5'
14
.
6
'
2.46'
3.
5
6
'
2.52'
11
.
1
'
4.
8
'
D
LOT F
BLOCK 120
LOT G, BLOCK 120
LOT H, BLOCK 120
LOT I, BLOCK 120
CAMPBELL SURVIVORS TRUST
919 WATERS AVE
LOT A, BLOCK 41
LOT B, BLOCK 41
LOT C, BLOCK 41
LOT D, BLOCK 41
OPEN
S
P
A
C
E
-
P
U
B
L
I
C
W
A
Y
P
E
R
PLAT
B
K
4
,
P
G
3
8
1
NO.5 REBAR AND 1.5"
ALUMINUM CAP
ILLEGIBLE FOUND
0.25' UNDER GROUND
LOT F
BLOCK 120
LIGHT
(TYPICAL)
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
STONE WALL
(TYPICAL)
SHED
PAVER
PATIO
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
IRRIGATION
BOX
IRRIGATION
BOX
CONCRETE CURB
AT SNOW STORAGE
LOCATION UNKNOWN
EDGE OF ASPHALT
PER H.C.E. SURVEY
ROCK WALL AT
SNOW STORAGE
LOCATION UNKNOWN
ICV
CONCRETE
CURB
(TYPICAL)
STONE
WALL
(TYPICAL)
DECIDUOUS TREE
(TYPICAL)
UTILITY
SHED
T2
T3
T4
T5
T6
T7
T8
T9
T59
T60
T58
T61
T62
T63
T64
T65
T66 T67
T68
T69
T70
T71
T72
T73
T74
T75
T76
T77 T78
T79
T80 T81
T82
T83
T84
T85
T86
T87
T88
T89
T90
T91
T92 T93
T94
T95
T96 T97 T98
T99
T100
T101
T102
T103
T104
T121T120
T119
T118
T105
T106
T107
T108
T109
T110
T111
T112
T113
T114
T115
T116
T117
T122
T123
T124
T125T126
T137
T138
T139 T140
T141
T142
T143 T146
T294
DSTORM DRAIN
7959.17' FL @ DOME
UP
P
E
R
F
L
O
O
R
WA
L
K
W
A
Y
S
UPP
E
R
F
L
O
O
R
WAL
K
W
A
Y
S
G AC
GAS
METER
A.C.
UNIT
28
.
1
'
112.3'
24.1'
ALLE
Y
B
L
O
C
K
1
2
0
NOT
S
H
O
W
N
O
N
O
F
F
I
C
I
A
L
C
I
T
Y
P
L
A
T
PER P
L
A
T
B
K
4
,
P
G
3
8
1
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX-UE
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX-U
E
EX-U
E
EX-UE
EX-U
E
EX-U
E
EX-U
E
EX-U
E
7958
7959
7959
7
9
5
5
7955
7
9
5
7
7
9
5
8
795
9
7960
7958
7959
7957
7956
7
9
5
5
796
0
79
5
9
79
5
6
79
6
0
79
6
5
796
0
7960
7
9
6
5
7970
7
9
7
0
7
9
7
0
7
9
7
5
7
9
8
0
7980
7975
797
0
797
0
796
8
797
2
79
7
5
79
7
0
796
5
7964
7962
7961
7960
798
0
79
7
5
797
0
79
5
7
7
9
6
2
7
9
6
3
7956.36'
7956.54'
7958.35'
7955.77'
7955.60'
7955.41'
7956.18'
7958.59'
7960.45'
7964.61'
7964.96'
7964.98'
7965.71'
7955.05'
7954.93'
ELECTRIC MANHOLE
RIM = 7954.89'
STORM MANHOLE
RIM = 7955.11'
GAS
RISER
ICV
ICV
CMP
LIGHT
(TYPICAL)
UNDERGROUND
ELECTRIC LINE
(TYPICAL)
UNDERGROUND
ELECTRIC LINE
(TYPICAL)UNDERGROUND
GAS LINE
(TYPICAL)
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
SEE SHEET 4SEE SHEET 4
SE
E
S
H
E
E
T
9
SE
E
S
H
E
E
T
2
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
3 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
ak
S u r v e y i n
g
,
I
n
c
.
010 10 20 405
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
82
X
X
X
X
X
X
X
EX-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX-UE
EX-UE
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WT
T
T
T
T
T
T
T
T T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
GGG
G
G
G
G
G
G
G
G
G
G
G
E
X
-
U
E
EX
-
U
E
E
X
-
U
E
EX-
U
E
EX-
U
E
E
X
-
U
E
W
W
W
W W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
X
X
X
X
X
X
X
X
3 STORY
WOOD FRAME
BUILDING E
610 S. WEST END STREET #E
3 STORY
WOOD FRAME
BUILDING F
610 S. WEST END STREET #F
D
D
DYH
WV
20' CITY OF ASPEN
UTILITY EASEMENT
ASPHALT
DRIVE
ASPHALT
DRIVE
ASPHALT
DRIVE AND
PARKING
PAV
E
R
WAL
K
PAV
E
R
WAL
K
W
A
Y
STONE
WALK
(TYPICAL)
STONE
WALK
(TYPICAL)
STEPS
(TYPICAL)
STONE
STEPS
BOULDER
BOULDER
WALL
BOULDER WALL
(TYPICAL)
CONCRETE
PATIO
STAIRS DOWN
TO LOWER
LEVEL WALK
BUILDING
COLUMN
(TYPICAL)
IRRIGATION
VALVE BOX
(TYPICAL)
T T T T T
T
T
T
T
T
T
T
T
T
EX-
U
E
EX-UE
EX-UE
EX-UE
EX-
U
E
EX-U
E
EX-UE
E
X
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX-UE
EX-UE
EX-UE
E
X
-
U
E
E
X
-
U
E
EX
-
U
E
EX
-
U
E
G
G
G
G
G
G
G
G
G
G
G
EX
-
U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
EX
-
U
E
T
T
T
T
15
.
8
'
3.1'
2.8
'
23.6'
16.4'
2.8
'3.0'
15
.
6
'
2.5'
0.6
'
15.9'
0.7
'
2.5'
15
.
6
'
3.0'
2.2
'
2.0'
1.1
'
2.2'2.1
'
3.0'
2.6'
2.
0
'
2.5'
11
.
8
'
5.3'
15
.
8
'
0.7'
2.
5
'
15.5'
3.
0
'
2.1'
2.
0
'
1.0'
2.
0
'
2.1'
3.
0
'
15.5'
2.
5
'
0.7'
15
.
8
'
10.3'
15
.
8
'
0.7'
2.
4
'
15.5'
3.
0
'
2.1'
2.
0
'
1.0'
2.
0
'
2.1'
3.
0
'
15.6'
2.
4
'
1.0'
15
.
8
'
6.2
'
15.6'
1.0
'
2.5'
15
.
3
'
5.7'
5.
9
'
5.8'
15
.
3
'
2.6'
0.9
'
15.7'5.3
'
11.7'3.5
'
15.7'
0.9
'
2.7'
15
.
4
'
5.8'
3.3
'
18.9'
11
.
2
'
18.8'
3.3
'
5.8'
15
.
4
'
2.6'
0.
8
'
15.6'
7.3
'
0.8'
2.0
'
10.9'2.0
'
0.8'
2.0
'
25.0'
16
.
9
'
11.7'
27
.
1
'
11.7'
16
.
9
'
11.7'
16
.
0
'
11.7'
6.2
'
11.1'
9.1
'
0.5'
16
.
9
'
4.1
'
11.9'
16
.
3
'
11.7'
15
.
7
'
11.70
'
16
.
3
5
'
6.05'
7.3
7
'
11.65
'
16
.
3
0
'
5.65'
19
.
6
5
'
11.70
'
16
.
4
5
'
25.1'
1.
9
'
0.6'
1.9
'
6.7'3.9
'
4.4'
3.9
'
13.6'
5.3
'
2.4'
0.6
'
2.4'
15
.
6
'
3.0'
2.8
'
16.3'
11
.
7
'
6.1'
5.3
'
15.7'
0.6
'
2.4'
15
.
6
'
3.0'
2.8
'
10.7'
5.0
'
15.8'
0.6
'
2.4'
15
.
6
'
3.0'
2.1
'
2.0'
1.0
'
2.0'2.1
'
3.0'
15
.
5
'
2.4'
0.6
'
2.4'
5.4
'
50.3'
2.5'
0.
6
'
2.5'
15
.
6
'
15
.
6
'
11.8'
16
.
3
'
50.3'
5.3
'
16
.
8
'
8.5'
16
.
8
'
16
.
8
'
6.8'
2.46'
3.
5
6
'
2.52'
11
.
1
'
OP
E
N
S
P
A
C
E
-
P
U
B
L
I
C
W
A
Y
P
E
R
PL
A
T
B
K
4
,
P
G
3
8
1
LOT 5
CALDERWOOD
SUBDIVISION PER
PLAT BK 2A, PG 264
UPPER ASPHALT DRIVE AND
PARKING WITH COVERED
PARKING BELOW
3 STORY
WOOD FRAME
BUILDING E
610 S. WEST END STREET #E
3 STORY
WOOD FRAME
BUILDING G
610 S. WEST END STREET #G
TENNIS
COURTS
W
W
W
W
W
X
X
X
X
X
X
X
X
X
X
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CONC
R
E
T
E
PATI
O
W
I
T
H
DECK
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
TIE WALL
DILAPIDATED
BOULDER
DRY WELL
RIM = 7964.75'
WATER
VALVE
LIGHT
(TYPICAL)
ELECTRIC
PEDESTAL
FENCE
(TYPICAL)
STAIRWELL
LIGHT
(TYPICAL)
SIGN
(TYPICAL)
FIRE HYDRANT
(TYPICAL)
IRRIGATION
BOX
IRRIGATION
BOX
LIGHT
(TYPICAL)
CO
N
C
R
E
T
E
WA
L
K
W
I
T
H
WA
L
K
A
B
O
V
E
GAS SHED
ELECTRIC
ICV
STAIRWELL
STONE WALL
(TYPICAL)TIE WALL
DILAPIDATED
TIE WALL
DILAPIDATED
LIGHT
(TYPICAL)
PLANTER
UNDERGROUND
WATER LINE
(TYPICAL)
GUARDRAIL
CON
C
R
E
T
E
WAL
K
STONE WALL
(TYPICAL)
LOWER ASPHALT DRIVE
AND PARKING
LOWER LEVEL
PARKING
EL = 7959.1'
UTILITY
SHED
T121T120
T119
T118
T113
T114
T115
T116
T117
T122
T123
T124
T125T126
T127
T129
T130T131
T128
T132
T133
T134
T135
T136
T137
T138
T139 T140
T141
T142
T143
T144 T145
T146
T147
T148
T149
T150
T151
T152
T153
T154
T155
T156
T157
T158
T159T204
T205
T206T207
T208
T295
T296
T297
T298
T299
T300
UPP
E
R
F
L
O
O
R
WAL
K
W
A
Y
S
UPP
E
R
F
L
O
O
R
WAL
K
W
A
Y
S
UPP
E
R
F
L
O
O
R
WAL
K
W
A
Y
S
UPP
E
R
F
L
O
O
R
WAL
K
W
A
Y
S
UP
P
E
R
F
L
O
O
R
WA
L
K
W
A
Y
S
UP
P
E
R
F
L
O
O
R
WA
L
K
W
A
Y
S
UPP
E
R
F
L
O
O
R
WAL
K
W
A
Y
S
WATER
FEATURE
24.1'
21.2'
17.3'
9.6'
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX-UE
EX-UE
EX-UE
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX-UE
EX
-
U
E
EX
-
U
E
EX
-
U
E
UPPER LEVEL
WALKWAYS
ABOVE
LOWER LEVEL WALL
AND WALK BELOW
SECOND LEVEL WALL
AND WALK ABOVE
7975
797
0
796
8
797
2
79
7
5
79
7
0
796
5
7964
7962
798
0
79
7
5
797
0
79
7
0
797
6
7
9
7
0
7
9
7
0
7
9
7
2
79
7
6
7
9
7
5
7977
7
9
7
0
7970
7970
79
7
5
7970
796
8
79
6
7
796
6
79
5
7
7960
796
5
79
6
6
79
6
6
7957
7
9
5
8
7
9
5
9
7
9
6
0
7
9
5
8
7
9
6
2
7
9
6
3
7
9
6
3
7
9
6
4
79
6
5
7967
79
6
6
7958
7959
SECOND LEVEL
7977.52'
SECOND LEVEL
7977.52'
LOWER LEVEL
7968.59'
7968.51'
SECOND LEVEL
7977.50'
SECOND LEVEL
7977.50'
SECOND LEVEL
7977.53'
LOWER LEVEL
7968.18'
LOWER LEVEL
7968.11'
7968.00'
7967.99'
7967.90'
7977.48'
7976.04'
7956.36'
7956.54'
7958.34'
7958.35'
D
LIGHT
(TYPICAL)
ICV
ICV
STORM DRAIN
RIM = 7967.99'
UNDERGROUND
ELECTRIC LINE
(TYPICAL)
UNDERGROUND
ELECTRIC LINE
(TYPICAL)UNDERGROUND
GAS LINE
(TYPICAL)
UNDERGROUND
GAS LINE
(TYPICAL)
UNDERGROUND
WATER LINE
(TYPICAL)
UNDERGROUND
PHONE LINE
(TYPICAL)
STONE
WALK
(TYPICAL)
PLA
N
T
E
R
PL
A
N
T
E
R
EDGE OF UPPER
LEVEL PARKING
FENCE
(TYPICAL)
GLORYHOLE
VIEWPLANE
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
SEE SHEET 3
SE
E
S
H
E
E
T
9
SEE SHEET 3
SE
E
S
H
E
E
T
6
SEE SHEET 6 SEE SHEET 5
SEE SHEET 5
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
4 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
a
k
S u r v e y i n
g
,
I
n
c
.
010 10 20 405
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
83
W
W
W
W
W
W
W
W
W
W
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
E
X
-
U
E
EX-
U
E
EX-
U
E
E
X
-
U
E
W
W
W
T
EX-U
E
EX-U
E
EX-
U
E
EX-
U
E
X
X X
X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X
X
3 STORY
WOOD FRAME
BUILDING G
610 S. WEST END STREET #G
3 STORY
WOOD FRAME
BUILDING H
610 S. WEST END STREET #H
D
D
D
S
CO
ICV
G
ICV
ICV SPA
POOL
UPPER ASPHALT DRIVE AND
PARKING WITH COVERED
PARKING BELOW
E
X
-
U
E
EX
-
U
E
EX
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
G
G
G
G
G
G
G
G
G
GG
G
G
G
G
E
X
-
U
E
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-UE
EX-U
E
EX-UE
EX-UE EX-UE EX-UE EX-UE EX-UE
EX-UE
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX-UE
T
BRICK
PATIO
FIRE
PIT
BBQ
E
X
-
U
E
EX
-
U
E
6.2
'
15.6'
1.
0
'
2.5'
9.1
'
0.5'
16
.
9
'
5.1'
4.1
'
20.7'
4.
1
'
11.9'
2.5'
0.
6
'
2.5'
15
.
6
'
3.0'
2.
1
'
2.1'
1.
0
'
2.1'2.
1
'3.0'
15
.
5
'
2.5'
0.6
'
15.7'
10
.
3
'
15.6'
0.6
'
2.4'
15
.
6
'
3.2'
2.8
'
16.6'
11
.
8
'
16.3'
2.
8
'
3.0'
15
.
7
'
2.6'
0.
6
'
2.6'
5.3
'
31.0'
11
.
7
'
16.4'
2.8
'
3.0'
15
.
6
'
2.5'
0.6
'
2.5'
5.3
'
13.3'
2.0
'
0.6'
2.0
'
10.9'
2.0
'
0.6'
2.
0
'
24.9'
16
.
3
'
11.5'
19
.
9
'
6.0'
16
.
1
'
11.7'
8.
7
'
2.7'
10
.
4
'
2.7'
8.6
'
11.7'
32
.
4
'
11.8'
15
.
6
'
11.8'
5.3
'
40.4'
16
.
8
'
14.7'
15
.
1
'
11.6'
16
.
7
'
11.6'
16
.
1
'
11.8'
27
.
4
'
10.7'2.0
'
0.6'
18
.
2
'
25.1'
1.9
'
0.6'
1.9
'
10.8'
1.9
'
0.6'
1.9
'
13.1'
4.8
'
2.4'
0.6
'
2.4'
15
.
7
'
3.0'2.
8
'
16.5'
11
.
5
'
18.7'
3.2
'
5.2'
15
.
4
'
2.6'
0.9
'
15.8'5.2
'
11.7'4.5
'
15.9'
0.9
'
2.5'
15
.
3
'
5.2'
5.7
'
5.3'
15
.
4
'
2.5'
1.0
'
15.8'5.
3
'
16
.
8
'
8.5'
16
.
8
'
8.5'
16
.
8
'
6.8'
16
.
8
'
6.8'
6.4
'
3.4'
6.2
'
3.4'
8.3
'
O
P
E
N
S
P
A
C
E
-
P
U
B
L
I
C
W
A
Y
P
E
R
P
L
A
T
B
K
4
,
P
G
3
8
1
LOT 6
CALDERWOOD
SUBDIVISION PER
PLAT BK 2A, PG 264
SUBDIVISION PER
PLAT BK 2A, PG 264
LOT 6
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
LOT 5
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
LOT 17-R
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
PARKING WITH COVERED
PARKING BELOW
CLEAN OUT
LIGHT
(TYPICAL)
3 STORY
WOOD FRAME
BUILDING E
610 S. WEST END STREET #E
610 S. WEST END STREET #G
X
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
LIGHT
(TYPICAL)
LIGHT
(TYPICAL)
STONE WALL
(TYPICAL)
BBQPOOL
MECHANICAL
BUILDING
SEWER MANHOLE
RIM = 7967.43'
IRRIGATION
BOX
(TYPICAL)
LIGHT
(TYPICAL)
CONCRETE
SIDEWALK
(TYPICAL)
MECHANICAL
VENTS
CO
N
C
R
E
T
E
WA
L
K
W
I
T
H
WA
L
K
A
B
O
V
E
PA
V
E
R
W
A
L
K
W
I
T
H
WA
L
K
A
B
O
V
E
GAS SHED
ELECTRIC
ROOM
TIE WALL
DILAPIDATED
UNDERGROUND
WATER LINE
(TYPICAL)
BOULDER WALL
(TYPICAL)
BOULDER WALL
(TYPICAL)
TRENCH
DRAIN
T134
T157
T158
T159
T160
T161
T162
T163
T164
T165
T166
T167
T168
T169
T170
T171
T172
T173
T174
T175
T176
T177
T178
T179
T180
T181
T182
T183
T184 T185
T186
T187
T188
T190
T189
T191
T192
T193
T194
T195
T196
T197
T198
T199
T200
T201
T202
T203
T204
T205
T206T207
T208
WA
L
K
A
B
O
V
E
BU
I
L
D
I
N
G
B
E
L
O
W
PAV
E
R
W
A
L
K
W
I
T
H
WAL
K
A
B
O
V
E
PA
V
E
R
W
A
L
K
W
I
T
H
WA
L
K
A
B
O
V
E
UP
P
E
R
F
L
O
O
R
WA
L
K
W
A
Y
S
UP
P
E
R
F
L
O
O
R
WA
L
K
W
A
Y
S
UP
P
E
R
F
L
O
O
R
WA
L
K
W
A
Y
S
UPPER LEVEL
PLANTER
UPP
E
R
F
L
O
O
R
WAL
K
W
A
Y
S
WATER
FEATURE
UP
P
E
R
L
E
V
E
L
PL
A
N
T
E
R
UP
P
E
R
L
E
V
E
L
PL
A
N
T
E
R
UP
P
E
R
L
E
V
E
L
PL
A
N
T
E
R
LO
W
E
R
L
E
V
E
L
LA
U
N
D
R
Y
8.9'
6.
4
'
6.1'
16
.
2
'
15.1'
22
.
6
'
NEW
CONCRETE
NEW
CONCRETE
17.3'
5.
5
'
5.
8
'
20
.
9
'
1.
6
'
7.6
'
7
9
7
0
7970
7967
796
7
7967
79
6
7
79
6
9
797
0
797
1
796
8
79757973
7
9
7
2
79
7
6
79
7
6
7977
7979
7980
7984
7
9
8
0
7
9
7
8
7
9
7
8
7
9
8
0
7
9
8
0
7
9
7
8
7
9
7
7
7976
7977
7976
7977
7
9
7
7
797
7
797
5
796
7
79
6
6
7967.90'
7968.05'
7968.16'
7968.16'
7968.27'
7967.86'
7968.37'
7968.39'
7976.04'
7975.54'
7975.89'
7976.40'
7976.51'
7976.47'7976.20'
7975.54'7973.05'
7970.59'
7969.37'
7968.81'
7968.05'
TRENCH DRAIN
RIM = 7968.09'
TRENCH DRAIN
RIM = 7968.04'
TRENCH DRAIN
RIM = 7968.26'
TRENCH DRAIN
RIM = 7968.21'
D
STORM DRAIN
RIM = 7966.56'
STORM DRAIN
RIM = 7966.52'
DRY WELL
RIM = 7966.89'
IN GROUND LIGHTS
UNDERGROUND
GAS LINE
(TYPICAL)
EDGE OF UPPER
LEVEL PARKING
EDGE OF UPPER
LEVEL PARKING
GAS METER
(TYPICAL)
STAIRWELL
GLORYHOLE
VIEWPLANE
40' - 50'
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
SEE SHEET 4
SE
E
S
H
E
E
T
6
SEE SHEET 4
SE
E
SH
E
E
T
7
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
5 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
ak
S u r v e y i n
g
,
I
n
c
.
010 10 20 405
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
84
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
EX-
U
E
EX
-
U
E
G
G
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
EX
-
U
E
E
X
-
U
E
WOOD FRAME
610 S. WEST END STREET #J
3 STORY
WOOD FRAME
BUILDING K
610 S. WEST END STREET #K
DYH
D
D
D
S
DYH
D
E
CO
CO
ICV
ICV
UPPER ASPHALT DRIVE AND
PARKING WITH COVERED
PARKING BELOW
ASPHALT
DRIVE AND
PARKING
ASPHALT
DRIVE
BRIC
K
WAL
K
TENNIS COURTS
ELEVATOR
CON
C
R
E
T
E
WAL
K
NO. 5 REBAR AND 1.25"
BLUE PLASTIC CAP
P.L.S.NO. 37972 FOUND
1.46' WITNESS CORNER
0.10' BELOW GROUND
EX-U
E
EX-UE
EX-UE EX-UE EX-UE
EX-UE
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
CTV CTV
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
T
T
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
T
T
T
T
EX
-
U
E
EX
-
U
E
16
.
3
'
37.1'
1.9
'
0.6'
1.9
'
10.8'
1.
9
'
0.6'
1.9
'
13.1'
4.8
'
2.4'
0.
6
'
2.4'
15
.
7
'
3.0'2.8
'
16.5'
11
.
5
'
18.7'
3.
2
'
5.2'
15
.
4
'
2.6'
0.9
'
15.8'5.2
'
0.9
'
2.5'
5.2'
5.7
'
37.2'
16
.
4
'
11.7'
24
.
1
'
11.7'
15
.
7
'
11.7'
24
.
0
'
11.7'
16
.
4
'
4.0'
7.7
'
11.7'
17
.
1
'
16.0'
9.7
'
16.0'
9.7
'
19.6'3.1
'
15.7'5.3
'
25.1'
1.
9
'
0.6'
1.
9
'
10.9'1.9
'
0.6'
1.
9
'
13.3'
5.3
'
2.3'
0.
6
'
2.3'
15
.
5
'
3.0'
2.2
'
2.0'
1.0
'
2.0'2.0
'
3.0'
15
.
6
'
2.4'
0.6
'
15.8'
5.3
'
6.1'
5.0
'
15.6'
0.7
'
2.4'
15
.
5
'
3.0'
2.
1
'
1.9'
1.0
'
1.9'2.1
'
3.0'16
.
4
'
11.7'
15
.
6
'
11.7'
16
.
4
'
6.1'
18
.
0
'
7.7'
2.0
'
4.0'
15
.
7
'
11.6'
13.0'
8.4
'
13.0'
8.4
'
11
.
2
'
9.2'
11
.
1
'
9.2'
24.5'
8.3
'
24.5'
8.3
'
15
.
9
'
LOT 17-R
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
UPPER ASPHALT DRIVE AND
PARKING WITH COVERED
PARKING BELOW
CLEAN OUT
LIGHT
(TYPICAL)
LIGHT
(TYPICAL)
ELECTRIC MANHOLE
RIM = 7958.12'
TENNIS
COURTS
W
W
W
W
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXX
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
WATER
VALVE
LIGHT
(TYPICAL)
STAIRWELL
FIRE
HYDRANT
STONE WALL
(TYPICAL)
DUMPSTER
ENCLOSURE
BOULDER
(TYPICAL)
BOULDER
(TYPICAL)
SEWER MANHOLE
RIM = 7967.43'
IRRIGATION
BOX
(TYPICAL)
LIGHT
(TYPICAL)
CONCRETE
SIDEWALK
(TYPICAL)
BOULDER WALL
(TYPICAL)
LOWER ASPHALT DRIVE
AND PARKING
LOWER ASPHALT DRIVE
AND PARKING
LOWER LEVEL
PARKING
EL = 7959.1'
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
STAIRWELL
SHED
T200
T201
T202
T203
T206T207
T208
T209
T210
T211
T212
T213
T214
T215
T216
T217
T245
T247
T248
T249
T255
T256
T257
T258
T259
10.5'
16
.
6
'
17
.
1
'
10.5'
WALL
HYDRANT
8.2
'
20
.
9
'
1.
6
'
9'
LOT 17-R
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
79
6
6
79
6
6
7
9
5
8
7967
796
7
7967
79
6
7
79
6
9
797
0
797
1
796
8
796
7
79
6
6
7968
7
9
5
9
79
6
0
79
6
1
796
1
79
6
0
79
5
9
79
6
1
7961
7963
7963
79
6
3
796
2
7
9
5
9
7959
7
9
6
1
79
6
1
7968.81'
7968.05'
7959.02'
7959.02'
7960.41'
7961.87'
STORM DRAIN
RIM = 7966.56'
STORM DRAIN
RIM = 7966.52'
DRY WELL
RIM = 7966.89'
STORM DRAIN
RIM = 7961.24'
UNDERGROUND
GAS LINE
(TYPICAL)
UNDERGROUND
PHONE LINE
(TYPICAL)
PL
A
N
T
E
R
EDGE OF UPPER
LEVEL PARKING
EDGE OF UPPER
LEVEL PARKING
(TYPICAL)
GLORYHOLE
VIEWPLANE
30' - 40'
GLORYHOLE
VIEWPLANE
40' - 50'
GLORYHOLE
VIEWPLANE
40' - 50'
WAGNER
VIEWPLANE
150' - 160'
WAGNER
VIEWPLANE
150' - 160'
WAGNER
VIEWPLANE
140' - 150'
WAGNER
VIEWPLANE
160' - 170'
MAIN STREET
VIEWPLANE
310' - 320'
MAIN STREET
VIEWPLANE
320' - 330'
MAIN STREET
VIEWPLANE
320' - 330'
MAIN STREET
VIEWPLANE
330' - 340'
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
SEE SHEET 4
SEE SHEET 9
SE
E
S
H
E
E
T
8
SEE SHEET 7
SEE SHEET 5
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
6 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
a
k
S u r v e y i n
g
,
I
n
c
.
010 10 20 405
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
85
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
EX-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
G
G
G
G
Y
S
D
E
COCO
ICV
A
S
P
H
A
L
T
W
A
L
K
W
A
Y
A
S
P
H
A
L
T
W
A
L
K
W
A
Y
PARKING
CON
C
R
E
T
E
WAL
K
CLEAN
OUT
DECIDUOUS
TREE
(TYPICAL)
DECIDUOUS
TREE
(TYPICAL)
DECIDUOUS
TREE
(TYPICAL)
ELECTRIC
MANHOLE
(TYPICAL)
LIGHT
(TYPICAL)
RETAINING
WALL
PK NAIL AND SHINER
P.L.S.NO. 37972 FOUND
BASIS OF BEARINGS
TBM = 7968.18'
NO. 5 REBAR AND 1.25"
BLUE PLASTIC CAP
P.L.S.NO. 37972 FOUND
1.46' WITNESS CORNER
0.10' BELOW GROUND
E
X
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
G
G
9.7
'
16.0'
15
.
5
'
3.0'
2.1
'
1.9'
1.0
'
1.9'2.
1
'
3.0'
15
.
5
'
2.4'
0.6
'
2.4'
5.4
'
13.4'
1.
9
'
0.8'
1.
9
'
11.6'
1.9
'
0.6'
1.
9
'
24.4'
16
.
4
'
11.7'
15
.
6
'
LOT 1
UTE PLACE SUBDIVISION
PER PLAT BK 19, PG 80
XX
STONE WALL
(TYPICAL)
STONE WALL &
CONCRETE CURB
AT SNOW STORAGE
LOCATION UNKNOWN
CONCRETE CURB
AT SNOW STORAGE
LOCATION UNKNOWN
EDGE OF ASPHALT
PER H.C.E. SURVEY
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CON
C
R
E
T
E
PATI
O
W
I
T
H
DEC
K
A
B
O
V
E
CON
C
R
E
T
E
PATI
O
W
I
T
H
DEC
K
A
B
O
V
E
U
T
E
A
V
E
N
U
E
A
S
P
H
A
L
T
R
O
A
D
T210
T216
T217
T218
T219
T220
T221T222T223
T224
T225
T226
T227
T228
T229
T230
T231
T232
T233
T234
T235
T236
T237
T239
T240
T241
T238
T242
T243
T244
T245
T246
T247
T248
T249
CONIFER
TREE
(TYPICAL)
46'
20.3
'
20.9
'
79
6
0
79
6
1
7963
7963
7968
7967
796
6
796
5
79
7
3
797
0
79
6
5
7
9
6
7
7
9
6
6
7
9
6
5
796
3
79
6
5
7962
7963STORM DRAIN
RIM = 7965.75'
STORM MANHOLE
RIM = 7964.65'
COURTHOUSE #1
VIEWPLANE
190' - 200'
COURTHOUSE #1
VIEWPLANE
200' - 210'
MAIN STREET
VIEWPLANE
330' - 340'
MAIN STREET
VIEWPLANE
340' - 350'
MAIN STREET
VIEWPLANE
340' - 350'
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
SEE SHEET 6
SEE SHEET 8
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
7 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
a
k
S u r v e y i n
g
,
I
n
c
.
010 10 20 405
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
86
X
X
X
X
X
X
EX-U
E
EX-U
E
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
G
G
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
T
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
E
X
-
U
E
EX-
U
E
EX-
U
E
EX-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
G
G
G
G
G
G
G
G
G
G
G
G
3 STORY
WOOD FRAME
BUILDING J
610 S. WEST END STREET #J
3 STORY
WOOD FRAME
BUILDING K
610 S. WEST END STREET #K
S
S
DYH
D
D
D
D
E
OSW
CO
CO
COCO
CO
ICV
A
S
P
H
A
L
T
W
A
L
K
W
A
Y
A
S
P
H
A
L
T
W
A
L
K
W
A
Y
BRI
C
K
WAL
K
BRI
C
K
WAL
K
DYH
ELEVATOR
DECIDUOUS
TREE
(TYPICAL)
ELECTRIC
MANHOLE
(TYPICAL)
CONCRETE
CURB AND
GUTTER
(TYPICAL)
WV
WV
CONIFER
TREE
(TYPICAL)
DECIDUOUS
TREE
(TYPICAL)
3 STORY
WOOD FRAME
OFFICE BUILDING
610 S. WEST END STREET CTV
CT
V
CTV CTV CTV CTV
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
CT
V
T
T
EX-U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
11.7'
16
.
3
'
37.1'
5.
8
'
37.2'
16
.
4
'
11.7'
24
.
1
'
11.7'
15
.
7
'
11.7'
24
.
0
'
11.7'
16
.
4
'
4.0'
7.7
'
11.7'
17
.
1
'
16.0'
9.7
'
16.0'
9.7
'
19.6'3.1
'
6.5'
3.1
'
10.8'
1.9
'
0.7'
0.6
'
1.9'4.7
'
15.7'
0.6
'
2.4'
15
.
6
'
3.0'2.8
'
8.7'
5.0
'
15.7'
0.7
'
2.6'
15
.
5
'
3.0'2.7
'
4.6'
4.9
'
15.8'
0.7
'
2.5'
15
.
7
'
3.0'2.0
'
2.0'
1.0
'
2.0'
2.2
'
3.0'
15
.
5
'
2.4'
0.6
'
15.7'5.4
'
4.6'
2.8
'
3.0'
16
.
0
'
2.4'
0.6
'
15.7'5.3
'
25.1'
1.9
'
0.6'
1.
9
'
5.3
'
6.1'
5.0
'
15.6'
2.4'
15
.
5
'
3.0'
2.1
'
1.9'
16
.
4
'
11.7'
15
.
6
'
11.7'
16
.
4
'
6.1'
18
.
0
'
7.7'
2.0
'
4.0'
15
.
7
'
11.6'
13.0'
8.4
'
13.0'
8.4
'
11
.
2
'
9.2'
11
.
1
'
9.2'
15
.
9
'
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
TRENCH
DRAIN
RIM = 7956.99'
11
.
0
'
5
.
0
'6.2'
1
6
.
3
'
11.2
'
3
4
.
0
'
6.9'
4
.
7
'
59.0
'
8
.
5
'
10.0
'
BOULDER
(TYPICAL)
BOULDER
(TYPICAL)
STORM DRAIN
RIM = 7959.58'
CLEANOUT
(TYPICAL)
BOULDER
(TYPICAL)
STA
I
R
W
E
L
L
STA
I
R
W
E
L
L
ASPHALT
DIVE AND PARKING
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
STAIRWELL
SHED
U
T
E
A
V
E
N
U
E
A
S
P
H
A
L
T
R
O
A
D
T246
T247
T248
T249
T250
T251
T252
T253
T254
T255
T256
T257
T258
T259
T260
T261
T262
T263
T264
T265
T266
T267T268T269
T270
T271
T272
T273
T274
CLEANOUT
(TYPICAL)
10.5'
16
.
6
'
17
.
1
'
10.5'
WALL
HYDRANT
20.9
'
22.7
'
3.3'
8.2
'
TIE
WALL
(TYPICAL)
STAIRS
FLAGSTONE
WALK
796
1
7963
79
6
3
796
2
7
9
5
9
7962
7963
7964
7
9
6
4
7
9
6
1
79
6
1
79
6
2
7
9
6
3
796
2
7
9
6
3
7
9
6
3
796
1
79
6
0
7
9
6
0
795
9
7959
7
9
6
1
796
1
7959.02'
7959.02'
7957.24'
7960.41'
7961.87'
STORM DRAIN
RIM = 7961.24'
STORM MANHOLE
RIM = 7964.65'
SEWER MANHOLE
RIM = 7963.23'
STORM MANHOLE
RIM = 7962.65'
STORM DRAIN
RIM = 7960.07'
WATER
VALVE
(TYPICAL)
FIRE
HYDRANT
(TYPICAL)
CURB STOP
(TYPICAL)C
O
N
C
R
E
T
E
D
R
I
V
E
COURTHOUSE #1
VIEWPLANE
190' - 200'
WAGNER
VIEWPLANE
150' - 160'
WAGNER
VIEWPLANE
140' - 150'
COURTHOUSE #1
VIEWPLANE
180' - 190'
MAIN STREET
VIEWPLANE
310' - 320'
MAIN STREET
VIEWPLANE
320' - 330'
MAIN STREET
VIEWPLANE
320' - 330'
MAIN STREET
VIEWPLANE
330' - 340'
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
SEE SHEET 7
SEE SHEET 6
SEE SHEET 9SEE SHEET 9
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
8 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
a
k
S u r v e y i n
g
,
I
n
c
.
010 10 20 405
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
87
X
X
X
X
X
X
X
X
X
X
X
T
W
W
W
W
W
W
W
T
T
T
T
T
T
T
T
T
TT
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
T
T
T
X
X
X
X
X
3 STORY
WOOD FRAME
BUILDING B
610 S. WEST END STREET #B
3 STORY
WOOD FRAME
BUILDING C
610 S. WEST END STREET #C
3 STORY
WOOD FRAME
OFFICE BUILDING
610 S. WEST END STREET
3 STORY
WOOD FRAME
BUILDING C
610 S. WEST END STREET #C
D
D
CO
CO
CO
CO
D
DECIDUOUS
TREE
(TYPICAL)
CONIFER
TREE
(TYPICAL)
BOULDER
POOL
SPA
SPA
AS
P
H
A
L
T
WA
L
K
W
A
Y
ASP
H
A
L
T
WAL
K
W
A
Y
CONCRETE
PATIO
CON
C
R
E
T
E
WAL
K
CON
C
R
E
T
E
WAL
K
CONCRETE
WALK
CO
N
C
R
E
T
E
WA
L
K
CON
C
R
E
T
E
WAL
K
CON
C
R
E
T
E
WAL
K
CON
C
R
E
T
E
WAL
K
CON
C
R
E
T
E
WAL
K
BRI
C
K
WAL
K
BRI
C
K
WAL
K
CONCRETE
ENTRY
PAV
E
R
WAL
K
W
A
Y
CON
C
R
E
T
E
WAL
K
D
G
DOG
STORM DRAIN
RIM = 7956.54'
RETAINING
WALL
LIGHT
ROOF DRAIN
CLEANOUT
(TYPICAL)
STAIRWELL
ELEVATOR
3 STORY
WOOD FRAME
BUILDING A
610 S. WEST END STREET #A
CO
E
X
-
U
E
EX-
U
E
T T
EX
-
U
E
CT
V
CTV CTV CTV CTV
CT
V
T
T
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX-UE
EX-UE
FIRE
PIT
BBQ
FLAGSTONE
PATIO
6.4'
7.6'
4.9'
3.0
'
11.8'
10
.
5
'
38.7'
15
.
9
'
2.6'0.6
'
2.6'
16.0'
0.8
'
2.6'
15
.
6
'
3.1'
2.6
'
1.4'
5.4
'
15.9'
2.5'
15
.
8
'
3.1'
2.8
'
23.6'
0.6
'
12.2'
0.6
'
6.0'
5.8
'
11.7'
18
.
0
'
6.0'
8.0
'
11.8'
4.0'
4.2
'
4.2'
15
.
2
'
11.8'
16
.
0
'
11.8'
16
.
4
'
11.7'
26
.
1
'
11.7'
25
.
7
'
11.6'
24
.
0
'
11.7'
16
.
3
'
37.1'
5.8
'
15.8'
0.6
'
2.5'
15
.
5
'
3.0'2.9
'
4.7'
5.
0
'
15.8'
0.7
'
2.4'
15
.
6
'
3.0'2.8
'
14.7'
11
.
7
'
14.7'
2.8
'
3.0'
15
.
6
'
2.4'
0.
7
'
15.7'5.0
'
4.6'
2.
8
'
2.5'
15
.
5
'
2.5'
0.7
'
15.8'5.0
'
11.7'
5.3
'
15.7'
0.7
'
2.5'
15
.
5
'
3.0'2.2
'
8.6'
8.7
'
4.9'
3.6
'
28.4'
0.6
'
15.8'
4.6
'
2.0'
0.7
'
39.2'
16
.
5
'
11.7'
15
.
6
'
11.7'
16
.
1
'
6.0'
16
.
2
'
11.7'
8.3
'
6.1'
0.6
'
12.2'
0.6
'
7.2'
0.3
'
16.4'
2.8
'
3.0'
15
.
6
'
2.5'
0.6
'
15.8'
4.9
'
6.0'
5.3
'
15.9'
0.7
'
2.5'
15
.
6
'
3.0'
2.2
'
2.0'
1.1
'
2.2'2.1
'
3.0'
15
.
6
'
2.5'
0.6
'
2.4'
0.6
'
15.7'5.3
'
26.3'
10
.
0
'
26.3'
10
.
0
'
7.6
'
14.8'
14.8'
3
4
.
5
'
2.1'
7.6
'
CIT
Y
O
F
A
S
P
E
N
SOU
T
H
W
E
S
T
E
N
D
S
T
R
E
E
T
PER
P
L
A
T
B
K
4
,
P
G
3
8
1
STONE
WALK
CONCRETE
PATIO WITH
DECK ABOVE
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
TENNIS COURTS
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
IRRIGATION
(TYPICAL)
CLEANOUT
(TYPICAL)
CLEANOUT
(TYPICAL)
STORM DRAIN
RIM = 7959.25'
CON
C
R
E
T
E
RAM
P
GAS METER AND
ELECTRIC
TRANSFORMER
ENCLOSURESTONE WALL
(TYPICAL)
STONE WALL
(TYPICAL)
DRY WELL
RIM = 7957.63'
GAS RISER
DOG
STATION
STONE PATIO
FIRE PLACE
ELEVATOR
TRENCH
DRAIN
RIM = 7956.99'
11
.
0
'
2
9
.
3
'
2.1'
9
.
4
'
2.1'
2
8
.
4
'
23.6
'
1
.
1
'
13.3
'
1
.
1
'
11.0
'
1
.
0
'
1.1'
1
.
0
'
17.0
'
8
.
5
'
10.0
'
BOULDER
(TYPICAL)
STA
I
R
W
E
L
L
CO
N
C
R
E
T
E
WA
L
K
W
I
T
H
WA
L
K
A
B
O
V
E
CO
N
C
R
E
T
E
WA
L
K
W
I
T
H
WA
L
K
A
B
O
V
E
CON
C
R
E
T
E
WAL
K
W
I
T
H
WAL
K
A
B
O
V
E
C
O
N
C
R
E
T
E
R
A
M
P
CO
N
C
R
E
T
E
PA
T
I
O
W
I
T
H
DE
C
K
A
B
O
V
E
T111
T112
T139
T260
T261
T275
T276
T277
T278
T279
T280
T281 T282
T283
T284
T285
T286
T287
T288
T289
T290
T291
T292
T293
T294
T295
T296
T297
T298
T299
T300
T301
T302
T303
T304
T305
T306T307
T308
T309
T310
T311
G
4
.
7
'
5
5
.
1
'
8.2
'
17.5'
10
'
5
.
1
'
17.4'
LOT
1
,
C
L
A
R
E
N
D
O
N
C
O
N
D
O
M
I
N
I
U
M
S
PER
P
L
A
T
B
O
O
K
1
1
3
,
P
A
G
E
6
PAR
C
E
L
2
,
C
L
A
R
E
N
D
O
N
C
O
N
D
O
M
I
N
I
U
M
S
PER
P
L
A
T
B
O
O
K
1
1
3
,
P
A
G
E
6
P
A
R
C
E
L
2
,
C
L
A
R
E
N
D
O
N
C
O
N
D
O
M
I
N
I
U
M
S
P
E
R
P
L
A
T
B
O
O
K
1
1
3
,
P
A
G
E
6
CON
C
R
E
T
E
RAM
P
STONE
WALKSTAIRS
STAIRS
STAIRS
STAIRS
7956
7
9
5
8
7959
7
9
5
5
7
9
5
9
7
9
6
0
7958
7959
79
5
9
79
5
9
7
9
5
9
7
9
6
0
7
9
5
9
795
8
795
7
7957
795
6
7
9
5
8
7
9
6
3
7
9
5
9
7
9
5
9
79
5
8
7
9
5
7
7959
79
6
0
796
0
7959
7959.02'
7957.24'
7957.24'
7958.34'
7958.35'
7959.12'
7957.49'
7957.19'
7956.23'
7957.62'
7956.66'
7956.82'
7956.78'
7956.80'
7956.65'
7956.70'
7956.79'
7956.73'
7956.75'
7956.62'
7954.51'
7954.27'
TRENCH DRAIN
RIM = 7956.59'
TRENCH DRAIN
RIM = 7956.66'
TRENCH DRAIN
RIM = 7956.65'
STORM DRAIN
RIM = 7956.40'
WATER MANHOLE
RIM = 7961.28'
(TYPICAL)
CURB STOP
(TYPICAL)C
O
N
C
R
E
T
E
D
R
I
V
E
GLORYHOLE
VIEWPLANE
20' - 30'
GLORYHOLE
VIEWPLANE
30' - 40'
COURTHOUSE #1
VIEWPLANE
170' - 180'
COURTHOUSE #1
VIEWPLANE
180' - 190'
WAGNER
VIEWPLANE
130' - 140'
WAGNER
VIEWPLANE
140' - 150'
MAIN STREET
VIEWPLANE
290' - 300'
MAIN STREET
VIEWPLANE
300' - 310'
MAIN STREET
VIEWPLANE
300' - 310'
MAIN STREET
VIEWPLANE
310' - 320'
NOTICE: ACCORDING TO COLORADO LAW, YOU MUST COMMENCE ANY LEGAL ACTION
BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST
DISCOVER SUCH DEFECT. IN NO EVENT MAY ANY ACTION BASED UPON ANY DEFECT IN
THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE
CERTIFICATION SHOWN HEREON.
SEE SHEET 2
SEE SHEET 8 SEE SHEET 6SEE SHEET 8
SEE SHEET 2
SE
E
S
H
E
E
T
4
SE
E
S
H
E
E
T
3
ByNO.Date Project NO.RevisionDrawn By:
Checked By:
Date:
Computer File:
P.O. Box 1746
Rifle, CO 81650
Phone (970) 625-1954
Fax (970) 579-7150
www.peaksurveyinginc.com
S
NW
E
P e a k S u r v ey ing, Inc.
Es t . 2 0 0 7
23089
9 OF 9
THE GANT CONDOMINIUM ASS.
ASPEN, COLORADO
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUM
610 S WEST END STREET
SMS
JRN
MARCH 27, 2024
089.DWG
1 04/24/25 ADD VIEWPLANES JRN
N
E
S
W
0
30
60
90
120
150
180
210
240
270
300
330
P
e
a
k
S u r v e y i n
g
,
I
n
c
.
010 10 20 405
EXISTING CONDITIONS SURVEY
THE GANT CONDOMINIUMS
ACCORDING TO THE CONDOMINIUM MAP THEREOF RECORDED NOVEMBER 16, 1973 IN
PLAT BOOK 4 AT PAGE 431, PHASE 2 MAP RECORDED NOVEMBER 14, 1974 IN PLAT BOOK 4, AT
PAGE 499, AND PHASE 3 MAP RECORDED AUGUST 24, 1976 IN PLAT BOOK 5, AT PAGE 22
CITY OF ASPEN, COUNTY OF PITKIN, STATE OF COLORADO
88
39 |
DW LEGACY DESIGN®
Legacy Design is the defining element of our practice. It is our
commitment to an elevated level of design inquiry to arrive at the
optimal solutions for clients. The process ensures that our projects
reflect the critical issues facing the built environment and that they
deliver measurable benefit to clients and communities. It is the
foundation of the firm’s workshop culture and guides all projects.
www.designworkshop.com
89
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
DYH
DYH
D
S
S
S
S
S
D
D
D
D
D
D
D
D
D
S
D
DYH
DYH
D
D
D
D
E
E
E
OSW
CO
CO
COCO
COCO
CO
CO
CO
CO
CO
D
WV
WV
WV
ICV
ICV
ICV
ICV
G
ICV
ICV
D
G
DOG
DYH
CO
W
WV
WV
FO
F
ICV
E
ICV
CTV CTV
CT
V
CT
V
CT
V
CT
V
CT
V
D
D
ICV
T1
T6
T11
T12
T13
T18
T19
T20
T30
T107
T108
T110
T111
T112
T113
T130T131
T134
T136
T141
T147
T148
T150
T151
T152
T176
T178
T179
T182
T183
T184
T194
T195
T196
T198
T213
T214
T215
T241
T242
T243
T250
T251
T265
T266
T276
T294
T295
T296
T300
T305
T306T307
T308
T310
T311
D
G
G AC
D
ICV
ICV
X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
T312*
T313*
Gant Campus Enhancement Plan
610 S. West End Street, Aspen, Colorado
EXISTING SITE SETBACKS PER PREVIOUS APPROVAL AND R15 ZONE DISTRICT
DECEMBER 29, 2025NORTH0
ORIGINAL SCALE:
10 20 40
1"=20'-00"
DESIGN WORKSHOP
Landscape Architecture · Land Planning · Urban Design · Tourism Planning
22860 Two Rivers Rd #102 · Basalt, Colorado 81621 · 970-925-8354 Facsimile 970-920-1387
BUILDING A
BUILDING C
BUILDING C
BUILDING B
BUILDING J
BUILDING K
CONFERENCE CENTER
TENNIS COURTS
PARKING
PARKING
PARKING
PARKING
BUILDING D
BUILDING E
BUILDING F
BUILDING G
BUILDING H
PROPERTY BOUNDARY
P
R
O
P
E
R
T
Y
B
O
U
N
D
A
R
Y
PRO
P
E
R
T
Y
B
O
U
N
D
A
R
Y
PRO
P
E
R
T
Y
B
O
U
N
D
A
R
Y
PR
O
P
E
R
T
Y
B
O
U
N
D
A
R
Y
U
T
E
A
V
E
.
SO
U
T
H
W
E
S
T
E
N
D
S
T
R
E
E
T
5' and 10' Setbacks,
Per P&Z Resolution 4, Series of 2013
5' Side Setback, Per P&Z Resolution 4, Series of 2013
10'-0" R-15 Zone District Setback
25'-0" R-15 Zone District Setback
10'-0" R-15 Zone District Setback
90
FO
CTV CTV
CT
V
CT
V
CT
V
CT
V
CT
V
G
G AC
X X X X X X X X X X X X X X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Gant Campus Enhancement Plan
610 S. West End Street, Aspen, Colorado
SITE PLAN: SETBACKS
SEPTEMBER 25, 2025NORTH0
ORIGINAL SCALE:
10 20 40
1"=20'-00"
DESIGN WORKSHOP
Landscape Architecture · Land Planning · Urban Design · Tourism Planning
22860 Two Rivers Rd #102 · Basalt, Colorado 81621 · 970-925-8354 Facsimile 970-920-1387
22
'
-
0
"
5
'
-
0
"
5'-0
"
5'-0
"
2'
-
0
"
2'-0"
91
Attachment B
Staff Response to Review Criteria
Sec. 26.412.060. – Commercial Design Review, Review Criteria.
An application for commercial design review may be approved, approved with
conditions or denied based on conformance with the following criteria:
(a) Guidelines and Standards.
(1) The Commercial, Lodging and Historic District Design Standards and
Guidelines are met as determined by the appropriate Commission. The
Standards and Guidelines include design review criteria that are to be used to
determine whether the application is appropriate.
(2) All applicable standards in the Commercial, Lodging and Historic District
Design Standards and Guidelines shall be met unless granted a Variation
pursuant to Section 26.412.040(d), Variations.
(3) Not every guideline will apply to each project, and some balancing of the
guidelines must occur on a case-by-case basis. The applicable Commission
must:
a. Determine that a sufficient number of the relevant guidelines are
adequately met in order to approve a project proposal;
b. Weigh the applicable guidelines with the practicality of the measure.
Staff response: Staff has found that the proposal meets applicable guidelines.
Refer to full response below. Staff find the criteria met.
Applicable Commercial, Lodging, and Historic District Design Standards and
Guidelines
General - Remodel
Standard 1.22 Complete and accurate identification of materials is required.
• Provide drawings that identify the palette of materials, specifications for the
materials, and location on the proposed building as part of the application.
• Physical material samples shall be presented to the review body. An onsite
mock-up prior to installation may be required.
Staff response: The applicant provided complete and accurate identification of
materials. Refer to Attachment A – Application. Staff find Standard 1.22 met.
Standard 1.23 Building materials shall have these features:
• Convey the quality and range of materials found in the current block context or
seen historically in the Character Area.
• Convey pedestrian scale.
• Enhance visual interest through texture, application, and/or dimension.
92
Attachment B
Staff Response to Review Criteria
• Be non-reflective. Shiny or glossy materials are not appropriate as a primary
material.
• Have proven durability and weathering characteristics within Aspen’s climate.
• A material with an integral color shall be a neutral color. Some variation is
allowed for secondary materials.
Staff response: The application proposes a number of materials, including
cementitious siding, cementitious plaster, wood, stained timbers, and metal. The
materials are not reflective and have proven durability in Aspen’s climate. The
Mountain Base character area includes a mix of architectural styles and
materials. The mix of materials proposed by the application is appropriate. Staff
find Standard 1.23 met.
Standard 1.33 All remodel projects shall meet Standards 1.22 and 1.23.
Staff response: Refer to Standards 1.22 and 1.23 above. Staff find the
criterion met.
Mountain Base
Building Placement
Guideline 6.1 On lots greater than 15,000 square feet, the massing of the building
should be broken into smaller volumes.
Staff response: The application does not propose any changes to building
massing. Staff find the criterion not applicable.
Guideline 6.2 Place a building into the topography to minimize visual impacts from
downtown and to reinforce a strong relationship to the mountain.
• Make mountain access easier when siting a building.
• For larger projects, offer pedestrians multiple entry points.
• Emphasize horizontal elements to blend the building into the topography.
• Step a building up the hillside to minimize visual impacts and allow points of
entry to be at natural grade.
Staff response: The application does not propose any changes to building
location. Staff find the criterion not applicable.
Guideline 6.3 Minimize retaining walls.
• When retaining walls are necessary, integrate them into the architecture.
Staff response: The application does not propose any changes retaining walls.
Staff find the criterion not applicable.
93
Attachment B
Staff Response to Review Criteria
Guideline 6.4 Incorporate open space into building placement and site design.
• Create views through the property to the mountain slopes to strengthen
mountain connection to the neighborhood and improve the pedestrian
experience.
Staff response: The application does not propose any changes to open space.
Staff find the criterion not applicable.
Guideline 6.5 Eclectic and creative approaches to break up building mass and scale is
encouraged.
• Consider separate buildings on a property, or linked exterior walkways instead
of internal corridors.
Staff response: The application does not propose any changes to building
massing or scale. Staff find the criterion not applicable.
Guideline 6.6 Create interest along the street, for instance by providing places for the
public to sit.
Staff response: The application does not propose any changes the streetscape.
Staff find the criterion not applicable.
Guideline 6.7 Carefully plan parking areas and loading zones to minimize visual impacts
Staff response: There are no meaningful changes to the visual impact of the
existing parking area. The parking area is not visible to the street. Staff find the
criterion met.
Architecture
Guideline 6.7 Roof forms should be low pitched to reinforce the mountain character of
the neighborhood.
• Other roof forms may be considered on a case-by-case basis depending on the
context of the block, adjacent historic landmarks, and other restrictions such as
viewplanes.
• Flat roofs are particularly appropriate to provide upper level decks and for
installation of mechanical equipment.
Staff response: The application does not propose any changes to roof form. Staff
find the criterion not applicable.
Details and Materials
Guideline 6.8 Easily identifiable architectural details are encouraged.
• Character defining details are recommended to engage the pedestrian, to
promote variety of architecture, and to aid in wayfinding
94
Attachment B
Staff Response to Review Criteria
Staff response: The application proposes a range of materials, reflecting the
existing character of the Mountain Approach Character Area. Staff find the
criterion met.
Sec. 26.435.050 – Mountain View plane review
Staff response: Per Sec. 26.575.050.c.1.c, Applicability, “[t]his Section shall not
limit the ability of development to occur below a view plane. If development on a
property is within the lateral extent of a view plane but does not infringe into the
view plane, then that development is not subject to the requirements of this
Section”. Per Sec. 26.575.050.b.1, “a development "Infringes" (or creates an
"Infringement") on a view plane if the height of the development would be above
the height at any point at which the view plane angle cuts across the subject
property”.
The application included a view plane analysis; this analysis shows that existing
development on the property does not infringe on the Glory Hole Park view plane.
The application does not include any new infringements and is not subject to
Mountain View Plane review. Staff find the section not applicable.
Sec. 26.445.110 – Planned development, Amendments
Amendments to an approved Project Review or to an approved Detailed Review shall
be reviewed according to the standards and procedures outline below. Amendments to
Planned Unit Development and Specially Planned Area approvals (pre-Ordinance 36,
2013, approvals) shall also proceed according to the standards and procedures outline
below and the Community Development Director shall determine the type of procedure
most-applicable to the requested amendment.
(e) Minor Amendment to a Detailed Review approval. An amendment found by the
Community Development Director consistent with a Project Review approval and to be
generally consistent with the allowances and limitations of a Detailed Review approval,
or which otherwise represents an insubstantial change, but which does not meet the
established thresholds for an insubstantial amendment, may be approved, approved
with conditions or denied by the Planning and Zoning Commission or the Historic
Preservation Commission as applicable, pursuant to 26.445.040(b)(3) - Step Three.
Staff response: The application is consistent with Project Review approval and is
generally consistent with the allowance and limitations of Detailed Review
approval.
95
Attachment B
Staff Response to Review Criteria
Sec. 26.445.070 – Planned development, Detailed Review Standards
(a) Compliance with Project Review Approval. The proposed development, including all
dimensions and uses, is consistent with the Project Review approval and adequately
addresses conditions on the approval and direction received during the Project Review.
Staff response: The proposed amendment is consistent with Project Review
approval. It does not include changes to dimensions or use. Staff find the
criterion met.
(b) Growth Management. The proposed development has received all required GMQS
allotments, or is concurrently seeking allotments.
Staff response: The proposed development does not require GMQS allotments.
Staff find the criterion not applicable.
(c) Site Planning and Landscape Architecture. The site plan is compatible with the
context and visual character of the area. In meeting this standard, the following criteria
shall be used:
(1) The landscape plan exhibits a well-designed treatment of exterior spaces,
preserves existing significant vegetation, and provides an ample quantity and
variety of ornamental plant species suitable for the Aspen area climate.
Vegetation removal, protection, and restoration plans shall be acceptable to the
Director of Parks and Open Space.
(2) Buildings and site grading provide simple, at-grade entrances and minimize
extensive grade changes along building exteriors. The project meets or exceeds
the requirements of the Americans with Disabilities Act and applicable
requirements for emergency, maintenance, and service vehicle access. Adequate
snow storage is accommodated.
(3) Energy efficiency or production features are integrated into the landscape in a
manner that enhances the site.
(4) All site lighting is proposed so as to prevent direct glare or hazardous
interference of any kind to adjoining streets or lands. All exterior lighting shall
comply with the City's outdoor lighting standards.
(5) Site drainage is accommodated for the proposed development in compliance
with Title 29—Engineering Design Standards and shall not negatively impact
surrounding properties.
96
Attachment B
Staff Response to Review Criteria
Staff response: The proposal was referred to the Parks, Engineering, and
Building, Departments. Referral comments may be found in Attachment C to the
memorandum. Vegetation removal, protection, and restoration plans were
reviewed by Parks staff and found to be acceptable, subject to review at permit.
There are no changes to building entrances proposed. There are no energy
efficiency/production features proposed or changes to site lighting. The
Engineering department reviewed the proposal and a drainage plan will be
required at building permit. Staff find the criteria met.
(d) Design Standards and Architecture. The proposed architectural details emphasize
quality construction and design characteristics. In meeting this standard, the following
criteria shall be used:
(1) The project architecture provides for visual interest and incorporates present-
day details and use of materials respectful of the community's past without
attempting to mimic history.
(2) Exterior materials are of a high quality, durability, and comply with applicable
design standards, including those outlined in Chapter 26.410, Residential Design
Standards, Chapter 26.412, Commercial Design Standards, and Chapter
26.415, Historic Preservation.
(3) Building entrances are sited or designed to minimize icing and snow shedding
effects.
(4) Energy efficiency or production features are integrated into structures in a
manner that enhances the architecture.
(5) All structure lighting is proposed so as to prevent direct glare or hazardous
interference of any kind to adjoining streets or lands. All exterior lighting shall
comply with the City's outdoor lighting standards.
Staff response: The proposed changes to exterior materials are of a high quality,
durable, and comply with applicable design standards. Staff find that the proposal
complies with the Commercial Design Standards; full analysis can be found
above. There are no changes proposed to building entrances, energy efficiency or
production features, or exterior lighting. Any exterior lighting proposed in the
future will meet Chapter 26.512, Outdoor lighting. Staff find the criteria met.
97
Attachment B
Staff Response to Review Criteria
(e) Common Parks, Open Space, Recreation Areas, or Facilities. If the proposed
development includes common parks, open space, recreation areas, or common
facilities, a proportionate, undivided interest is deeded in perpetuity to each lot or
dwelling unit owner within the Planned Development. An adequate assurance through a
Development Agreement for the permanent care and maintenance of open spaces,
recreation areas, and shared facilities together with a prohibition against future
development is required.
Staff response: The proposal does not include any of these areas. Staff find the
criterion not applicable.
(f) Pedestrian, bicycle & transit facilities. The development improves pedestrian, bicycle,
and transit facilities. These facilities and improvements shall be prioritized over vehicular
facilities and improvements. Any new vehicular access points minimize impacts on
existing pedestrian, bicycle and transit facilities.
Any specific designs, mitigation techniques, and implementation timelines as required
during Project Review comply with the applicable requirements of the Project Review
and as otherwise required in the Land Use Code. These plans shall provide sufficient
detail to determine if the design or mitigation concept complies with the intent of the
requirements and to determine any required cost estimating for surety requirements, but
do not need to be detailed construction documents.
Staff response: The proposal does not include change to vehicular access points
or pedestrian, bicycle, or transit facilities. Staff find the criteria not applicable.
(g) Engineering Design Standards. There has been accurate identification of
engineering design and mitigation techniques necessary for development of the
proposed subdivision to comply with the applicable requirements of Municipal Code Title
29—Engineering Design Standards and the City of Aspen Urban Runoff Management
Plan (URMP).
Any specific designs, mitigation techniques, and implementation timelines as required
during Project Review comply with the applicable requirements of Municipal Code Title
29—Engineering Design Standards and the City of Aspen Urban Runoff Management
Plan (URMP). These plans shall provide sufficient detail to determine if the design or
mitigation concept complies with the intent of the requirements, but do not need to be
detailed construction documents.
Staff response: The application was reviewed by the Engineering Department and
found to comply with the intent of the requirements. Additional review will occur
at building permit review. Staff find the criteria met.
98
Attachment B
Staff Response to Review Criteria
(h) Public Infrastructure and Facilities. The proposed Planned Development shall
upgrade public infrastructure and facilities necessary to serve the project. Improvements
shall be at the sole costs of the developer.
Any specific designs, mitigation techniques, and implementation timelines as required
during Project Review comply with the applicable requirements of Municipal Code Title
29—Engineering Design Standards and the City of Aspen Urban Runoff Management
Plan (URMP). These plans shall provide sufficient detail to determine if the design or
mitigation concept complies with the intent of the requirements, but do not need to be
detailed construction documents.
Staff response: The proposed amendment does not require any upgrades to
public infrastructure or facilities. Staff find the criteria met.
(i) Phasing of development plan. If phasing of the development plan is proposed, each
phase shall be designed to function as a complete development and shall not be reliant
on subsequent phases. Phasing shall insulate, to the extent practical, occupants of
initial phases from the construction of later phases. All necessary or proportionate
improvements to public facilities, payment of impact fees and fees-in-lieu, construction
of any facilities to be used jointly by residents of the Planned Development, construction
of any required affordable housing, and any mitigation measures shall be completed
concurrent or prior to the respective impacts associated with the phase.
Staff response: The application does not include phasing. Staff find the criteria
not applicable.
99
LPA-25-092 Building Comments
Subject: PlanCheck
Page Label: 5
Author: justinh
File Name: Gant-Land Use Application
Submittal-250815_compressed.pdf
Color:
Review the upcoming State of
Colorado Wildfire Codes that will
have to be adopted by April of
2026, as these will likely be your
requirements for landscaping in
regards to fire mitigation unless
you submit for building permit
before those codes are adopted.
All alterations to landscape will
have to comply with those codes
if they have been adopted and in
effect by time of permit
submittal.
Gant-Land Use Application Submittal-250815_compressed.pdf (5)
Subject: PlanCheck
Page Label: 6
Author: justinh
File Name: Gant-Land Use Application
Submittal-250815_compressed.pdf
Color:
Alterations effecting parking
shall comply with section C503.6
for electric vehicle charging
infrastructure
Subject: PlanCheck
Page Label: 7
Author: justinh
File Name: Gant-Land Use Application
Submittal-250815_compressed.pdf
Color:
Wood siding either needs to
comply with either the currently
adopted 2021 IBC Ch 34
requirements as amended by
Aspen or the new State Wildfire
Resistance codes depending on
whether this building permit is
applied for before or after April 1,
2026. I am not sure that the
SFM 12-7A-1 Fire rating
standard you reference here
complies.
Building permit submittal will
need to provide detailing
showing compliance with
exterior materials for all altered
building components.
Subject: PlanCheck
Page Label: 25
Author: justinh
File Name: Gant-Land Use Application
Submittal-250815_compressed.pdf
Color:
Accessibility provisions will need
to be met at all renovated pools
and spas this includes
transfer/access into the pools
and also routes to the pool and
spa areas. Gates into pool/spa
barriers must comply with both
accessible reach range and
operable part requirements, as
well as pool barrier requirements
from the ISPSC.
SITE PLANNING AND LANDSCAPE
1.1 All projects shall provide a context study.
RESPONSE: This application features a context map and land survey to provide an overview of the project context .
1.2 All projects shall respond to the traditional street grid.
RESPONSE: No changes to the driveways or streets are proposed . This is not applicable .
1.3 Landscape elements (both hardscape and softscape) should complement the surrounding context, support the street scene, and enhance the architecture of the building.
RESPONSE: The project proposes updated landscaping in three areas of the site – the existing pool areas and tennis courts . Landscape materials and location are driven by best management practices for wildfire mitigation . On the interior portions of the site, where the Alpine Garden and relocated pool are proposed, limited areas of synthetic turf are proposed . These are not visible from a public street, in a “No Pets” area, and are included to minimize water usage and support longer term maintenance .
Tree and landscape placement is based on Firewise principles, with non-combustible materials in the two-foot Zone 1 (stone, high moisture content perennials, and non-flammable mulch), high moisture content plant materials in the five-foot Zone 2 area (irrigated shrubs and perennials with limited mulch), and Limited high-moisture content deciduous trees in the ten-foot Zone 3 . An anticipated tree removal plan to address these best management practices are included in Exhibit F . Phased tree removals are anticipated and ongoing with standard tree removal permits with the Parks Department .
Limited adjustments to landscaping are proposed in the public-facing areas along Ute Ave and S . West End Street .
1.4 Where there is open space on a site, reinforce the traditional transition from public space to semi-public space to private space.
RESPONSE: As a lodging property, there is a mix of public and private spaces . The improvements are all to the interior of the site and create semi-private spaces for guests to gather, as well as more public spaces
EXHIBIT A: RESPONSES TO TO CD CRITERIACOMMERCIAL, LODGING AND HISTORIC DISTRICT DESIGN STANDARDS AND GUIDELINES
Review the upcoming State of Colorado Wildfire
Codes that will have to be adopted by April of
2026, as these will likely be your requirements for
landscaping in regards to fire mitigation unless you
submit for building permit before those codes are
adopted. All alterations to landscape will have to
comply with those codes if they have been
adopted and in effect by time of permit submittal.
PARKING
1.9 Minimize the visual impacts of parking.
RESPONSE: The property includes an existing central parking area, located adjacent to the current tennis
courts . The tennis courts are proposed to be removed and replaced with an updated pool and lawn area . This is smaller in size than the existing tennis courts, providing an opportunity for ten (10) new parking spaces . These new spaces are proposed to be interior to the property, created from a reorientation to the
current parking configuration, and will be screened from view of the pool through landscaping and a fence with climbing vines (a green wall) . This is proposed to be 8 feet in height (the existing tennis court fence is 10 feet high) . The inclusion of native shrubs and trees will provide a minimized view of these parking
spaces from the property premises, and for people coming into the Gant .
BUILDING MASS, HEIGHT, AND SCALE
1.10 A new building should appear similar in scale and proportion with buildings on the block.
1.11 A minimum building height difference of 2 feet from immediately adjacent buildings is required.
1.12 On lots larger than 6,000 square feet, break up building mass into smaller modules.
1.13 Development adjacent to a historic landmark should respond to the historic resource.
RESPONSE: No additional buildings will be constructed as part of this project proposal . These criteria are not applicable .
STREET LEVEL DESIGN
1.14 Commercial entrances shall be at the sidewalk level and oriented to the street.
1.15 Incorporate an internal airlock or air curtain into first floor commercial space.
1.16 Entries that are significantly taller or shorter than those seen historically or that conflict with the established scale are highly discouraged.
1.17 ATMs and vending machines visible from the street are prohibited.
Alterations effecting
parking shall comply
with section C503.6
for electric vehicle
charging infrastructure
MATERIALS AND DETAILS
1.22 Complete and accurate identification of materials is required.
RESPONSE: The Architectural Plans (Exhibit G and H) include a material sheet that shows the proposed
materials . The proposed materials include :
•Cementitious Siding (such as GFRC, Glass Fiber Reinforced Concrete)
•Exterior cementitious plaster
•Exterior wood siding (WUI Compliant with SFM 12-7A-1 Fire Rating)
•Metal window and door trim, and railings
•Pavers for the building’s exterior elevated walking surfaces
Renderings and an example elevation are also provided to show where these materials will be applied to
the buildings .
1.23 Building materials shall have these features:
•Convey the quality and range of materials found in the current block context or seen historically in the
Character Area.
•Convey pedestrian scale.
•Enhance visual interest through texture, application, and/or dimension.
•Be non-reflective. Shiny or glossy materials are not appropriate as a primary material.
•Have proven durability and weathering characteristics within Aspen’s climate.
•A material with an integral color shall be a neutral color. Some variation is allowed for secondary materials.
RESPONSE: The building is currently all wood from the original construction, which has reached the
end of its useful life and is less wildfire resistant than newer materials . The updated design introduces
thermally modified wood in key visual areas such as gable edges and gable conditions to preserve the mountain character and ensure continuity with existing aesthetics . To enhance durability while maintaining a textured and crafted appearance, cementitious (GFRC) siding will be used as the primary material, allowing for articulated surface expression . Wood railings will be replaced with metal railings, designed to complement the building’s overall palette while providing a refined, low-maintenance detail .
The new building materials will align with the current neighborhood block context for the Character Area .
Wood siding either needs to comply with either the currently
adopted 2021 IBC Ch 34 requirements as amended by
Aspen or the new State Wildfire Resistance codes
depending on whether this building permit is applied for
before or after April 1, 2026. I am not sure that the SFM
12-7A-1 Fire rating standard you reference here complies.
Building permit submittal will need to provide detailing
showing compliance with exterior materials for all altered
building components.
EX
-
U
E
EX
-
U
E
EX
-
U
E
EX
-
U
E
T
T
T
T
E
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
SPA
SPA
PA
PA
PA
PARKING
FIRE FEATURE
Accessibility provisions will
need to be met at all
renovated pools and spas this
includes transfer/access into
the pools and also routes to
the pool and spa areas.
Gates into pool/spa barriers
must comply with both
accessible reach range and
operable part requirements,
as well as pool barrier
requirements from the ISPSC.
100
Subject: PlanCheck
Page Label: 25
Author: justinh
File Name: Gant-Land Use Application
Submittal-250815_compressed.pdf
Color:
RREMP mitigation applies to
pools, spas, and outdoor
fireplaces/firepits. A completed
RREMP worksheet will be
required to be provided at permit
submittal.
EX-UE
RREMP mitigation applies to pools, spas, and outdoor
fireplaces/firepits. A completed RREMP worksheet will be
required to be provided at permit submittal.
101
Memorandum
TO: Sophie Varga, Sophie.varga@aspen.gov
Community Development Department
FROM: Kyla Smits, kyla.smits@aspen.gov
Engineering Department
DATE: September 29, 2025
SUBJECT: Engineering Department Referral Comments
PROJECT: LPA-25-092, 610 S West End St., The Gant Remodel
COMMENTS:
These comments are not intended to be exhaustive, but an initial response to the Land Use application
submitted for review. Other requirements may be requested at time of permit.
1. The water easements should be formalized in an easement agreement with easement extents
reflecting as-built conditions of the water mains and the fire hydrants.
2. Water features are not permitted as of January 1, 2022, on any City of Aspen Water utility
accounts.
3. A drainage plan will be required at building permit. The drainage plan must show how the new
exterior areas will be accommodated in the existing drainage system.
102
Memorandum
To: Sophie Varga
Zoning Administrator
Community Development Department
From: Joseph Pewitt, joseph.pewitt@aspen.gov
Permit Coordinator
Parks & Open Space
Date: September 30, 2025
Subject: Parks Department Referral Comments
Project: LPA-25-092, The Gant Remodel
These comments are not intended to be exhaustive, but an initial response to the project
conceptual packet submitted for the purpose of the Gant Remodel, Commercial Design Review.
Other requirements may be requested at time of permit.
Comments:
1. Please reference Municipal Code Section 13.20.020(d)(5) and the City of Aspen Wildfire
Mitigation Policy.
a. At present, this policy is intended for stand-alone tree permits for existing
structures in the City.
b. A property owner intending to remove trees for fire mitigation purposes shall
follow the steps as outlined in the Wildfire Mitigation Policy prior to permit
submittal.
2. Clarify Tree Removal Plan and phased tree removal approach.
a. Permit 0125-2024-TREE, issued 8/30/2024, provided the approval for the
removal of forty-five (45) trees throughout the Gant Campus.
i. Please ensure any duplicate notations for trees permitted and removed
are reconciled prior to permit.
b. All fifty-seven (57) tree removals are not reflected in the Tree Removal Plan.
i. Designate all trees proposed for removal in the Tree Removal Plan.
ii. Thirty-five (35) trees are designated for removal with twenty-two (22)
additional trees illustrated for removal that are unlisted.
iii. Clarify T4, T5, T9, T11, T29, T111, T131, T147, T148, T149, T153, T157,
T194, T195, T200, T209, T263, T265, T266, T274, T295, and T296.
iv. T29 is situated upon City property within South West End Street.
v. Correct tree removal list for applicability per 13.20.020(a) prior to permit.
103
3. Provide tree #’s anticipated for removal where wildfire is identified as a basis for a
removal permit related to the present remodel.
4. Provide tree #’s anticipated for removal to address tree health/condition.
5. Provide tree #’s anticipated for removal for the construction of structures or other
improvements related to the present remodel.
6. Reference 2025 Colorado Wildfire Resiliency Code for defensible space considerations.
a. Section 502.1 Structure Ignition Zone 1 (0 - 5 feet): Immediate Zone.
i. There shall be no planting of new trees in the immediate zone.
ii. Exception: Ignition-resistant plantings, per an approved list that is not
less than that created by the Colorado State Forest Service, are allowed
in the Immediate Zone.
iii. Mature trees of no less than 10-inch diameter at 4.5 feet above ground
level may be maintained.
iv. Tree crowns extending to within 10 feet of any structure shall be pruned
to maintain a minimum clearance of 10 feet.
b. Section 503.2 Structure Ignition Zone 2 (5 – 30 feet): Intermediate Zone
i. Tree crowns extending to within 10 feet of any structure shall be pruned
to maintain a minimum clearance of 10 feet.
ii. Prune tree branches to a height of 6-10 feet from the ground of a third of
the total height of the tree, whichever is less.
iii. Tree crowns within this zone shall be spaced to prevent structure ignition
and promote fuel discontinuity to limit fire spread.
104
Parks and Open Space Building Permit Application Requirements:
1. Permit documents shall include accurate tree surveys for all sites dated within one -year
identifying locations of all trees four (4) inches or over identified by trunk diameter and
species; three (3) inches or over for native species as defined by Ch.13.20 .020(a).
2. Permit documents shall include tree removal plans, site specific tree protection and
preservation plans, tree mitigation plans, and irrigation plans. All Critical Root Zones to
be protected and preserved shall be accurately illustrated to scale on all plan sheets
with 1” of surveyed tree diameter at breast height equaling 1’ in radius of required Tree
Protection Zone. The protection and preservation plans shall indicate the location of all
protective zones and methodology for approval by the City Forester and prohibit
excavation, storage of materials, storage of construction backfills, storage of equipment,
and access over or through the zone(s) by foot or vehicle.
3. Permit documents shall include, and note, any proposed grade changes within critical
root zones of trees to be protected and preserved during site disruption.
4. Permit documents shall include the location of all site improvements including
subsurface improvements such as utilities, irrigation infrastructure, or foundation work.
5. Tree Protection Zones shall be erected at the limits of Critical Root Zones to be
protected and preserved throughout construction until a Certificate of Occupancy is
issued for all proposed sites unless otherwise approved by the City Forester.
6. Protection areas shall be established on site to protect existing natural resources as
appropriate, including trees not included in the definition set forth in 13.20.020(a).
7. A Development-Related Tree Removal / Critical Root Zone Excavation Permit shall be
submitted, reviewed, and issued by the City Forester upon completion of Parks & Open
Space building permit application review.
8. Tree Removal Permit issuance and Parks initial inspection are required prior to activity
occurring on site. Mitigation for removals must be met by the replacement of trees on
site, paying cash-in-lieu fees, or a combination of both, pursuant to Chapter 13.20 of the
City Municipal Code. The applicant shall explore potential planting sites around the
property to allow sustainable planting and full maturation of all trees planted.
105
Page 1 of 7
STAFF REPORT
TO: City of Aspen Planning and Zoning Commission
FROM: Jeffrey Barnhill, AICP, Principal Planner
THROUGH: Daniel Folke, AICP, Planning Director
MEETING DATE: Wednesday, January 7, 2026
SUBJECT: Resolution #02, Series of 2026 | 10 Club Circle – Maroon Creek Club –
Minor Planned Development Amendment to a Detailed Review Approval and
Commercial Design Standards Review
__________________________________________________________________
INTENDED OUTCOME:
The request of the Planning and Zoning Commission is to consider the following land
use code review processes for changes to the Maroon Creek Club Clubhouse area:
• Planned Development | Minor Amendment to a Detailed Review Approval (Land
Use Code Section 26.445.110) – Detailed Review focuses on finalizing the
detailed aspects of the project within the parameters established during Project
Review. Detailed Review specifically focuses on landscaping, materials, and
lighting.
• Commercial Design Review (Land Use Code Section 26.412) – Commercial
Design Review ensures appropriate building design to create walkable
neighborhoods and support Aspen’s unique heritage. The review standards do
not prescribe architectural style, but do require that certain building elements
contribute to the streetscape and neighborhood character.
EXECUTIVE SUMMARY:
The Applicant proposes to reconfigure interior space to provide for previously
undocumented elements that count towards the floor area on site , memorialize changes
to the roof of the outdoor dining terrace, and redesign the gym expansion on site. Staff
finds that all applicable criteria have been met and recommends that the City of Aspen
Planning and Zoning Commission approve Resolution #02, Series of 2026.
106
Page 2 of 7
DISCUSSION:
Background:
The Maroon Creek Club was initially approved under Pitkin County Resolution No. 111 -
91 granting detailed approval and Resolution No. 93-104 granting final plat approval.
Eventually the project was annexed into the City of Aspen via Ordinances No. 33 , 34,
and 40, Series of 1996. Since being annexed into the City, the Maroon Creek Club has
pursued several land use cases and approvals from the City of Aspen, most recently in
2024 and earlier in 2025. The applicant team provides an excellent background on the
entire project history in the application packet.
The 2024 approvals recognized the ability for the club building to be expanded by 8,319
square feet. The scope of work for that expansion included: a covered terrace, covered
fitness area, a covered event space south of the clubhouse near the pool, the gym
expansion, the guest services kitchen expansion, and the addition of observation decks
for the tennis courts. These improvements utilized the entire allowable floor area on site.
The 2025 approvals were for Insubstantial Planned Development and Commercial
Design Reviews via a Notice of Approval (Reception #709090). These approvals
revolved around changing two tennis courts into Padel courts, changes to the trellis
area, and a reconfiguration of the kitchen.
The applicant requests the ability to amend the previous approvals to reconfigure the
floor area to address areas that were not included in the previous floor area calculations
and to allow for the redesign of the gym expansion. Additionally, the applicant wishes to
memorialize the changes to the roof of the outdoor dining terrace canopy. Staff
determined that these changes could not be approved administratively which pushed
the proposal to Planning and Zoning Commission approval.
Project Summary:
The project involves several changes from the original 2024 approvals. The restaurant
dining trellis will be increased by 112 sq. ft., the guest services kitchen will be reduced
by 352 sq. ft., the covered fitness area will be reduced by 156 sq. ft., the gym will be
expanded by 104 sq. ft., the elevator lobby will account for 136 sq. ft., and the pool vault
will account for 106 sq. ft. of floor area. Table 1 illustrates the originally approved floor
areas and the proposed floor areas of each section of the structure. There is no net gain
in floor area.
107
Page 3 of 7
Table 1: Previously Approved Floor Areas to Proposed Floor Areas
The original approvals did not account for both the mechanical vault and the elevator
lobby in the floor area measurements. This has caused the need for the applicant to
reconfigure spaces to accommodate these changes. Exhibit 1 shows the mechanical
vault and elevator lobby locations.
Exhibit 1: Mechanical Vault and Elevator Lobby locations
The biggest departure from the initial approvals is the significant redesign of the gym
area. Exhibit 2 conveys the changes from the approved plans to the proposed plans.
108
Page 4 of 7
The applicant proposes to shift the gym expansion into a more contemporary aesthetic.
The sloped atrium roof is replaced with the flat roof with support beams (Exhibit 2).
Additionally, the applicant proposes to memorialize the changes to the roof design of
the outdoor dining trellis (Exhibit 3).
Exhibit 2: Approved and Proposed Elevation Renderings (larger rendering included as attachment)
Exhibit 3: Dining Trellis Roof Changes
Staff Comments:
Planned Development | Detailed Review (Exhibit A)
Memorializing details such as building design, materials, height, bulk, mass, density,
parking, landscaping, lighting, and street layout will aid in maximizing the use of the site.
Adopting a Planned Development overlay clarifies these details upfront.
Project Review is intended to establish the allowed dimensions of a property and ensure
site planning is compatible with the context of the area. Detailed review is intended to
109
Page 5 of 7
perfect and finalize the detailed aspects of the project within the parameters established
during Project Review. As mentioned previously, this review is simply for the Detailed
Review Criteria. It is important to note that staff found that all the criteria were either met
or not applicable for the proposed project.
The proposed project is compliant with the overall Project Review Approval. The
dimensions and uses were clarified for this project under Planning and Zoning
Commission #09, Series of 2024. This approval clarified the remaining expansion rights
of the building (8,319 sq. ft.). The proposed project stays fully within those project
limitations. The scope of the project is to include a pool vault and elevator lobby area
that were not included as floor area in the original 2024 approvals as well as change the
design of the gym area. The proposed project does not require any additional GMQS
allotments nor is it concurrently seeking allotments.
The proposed project design affects hard-scape patio areas without existing vegetation.
There are no changes to site layout, parking, or snow-storage areas. The project
currently meets ADA requirements, and this will not change because of this application.
Energy production facilities are mounted on the building and not into the landscaping.
All site lighting shall meet City of Aspen requirements at building permit submittal.
Exhibit 4: Approved to Proposed Elevation Renderings
110
Page 6 of 7
The building incorporates design characteristics that are consistent and compatible with
the rest of the structure. The materials are seen throughout the current design and they
are incorporated to provide more visual appeal. As shown in Exhibit B – Commercial
Design Standards Staff Responses, the gym addition utilizes materials seen throughout
the existing structure. These materials are of a high quality, durability, and comply with
those design standards. The materials have a proven durability in Aspen’s climate and
the materials consist of timber columns, horizontal wood siding, metal framed windows,
metal flashing, stone veneer walls, and concrete hardscape. The building entrances
remain the same as existing and the roof is a flat roof that will not shed snow/ice.
Energy efficiency and production features currently exist on the current building and
were approved under a previous Planning and Zoning Commission approval. These
elements are not proposed to change. All exterior lighting shall comply with the City of
Aspen’s outdoor lighting standards.
Commercial Design Review (Exhibit B)
All of the Commercial Design Review Standards were either fully met or not applicable
for the scope of this project. The Maroon Creek Club Clubhouse (10 Club Circle) is
located outside of the roundabout and is bounded by Burlingame, Buttermilk
Mountain, and the Private Maroon Creek Club Golf Course. The adjacent development
is a mix of ski area, affordable housing, and c onservation/open space. The applicant
completely and accurately identified the materials to be used in this project. Materials
consist of timber columns, metal flashing, metal framed windows, standing seam metal
roof, horizontal wood siding, stone walls, concrete hardscape, and b ronze metal.
Exhibit 5: Proposed Materials
111
Page 7 of 7
The building materials convey the quality and range of the materials found in the
current block context and the overall context of the Maroon Creek Club and
Clubhouse building. The building provides a pedestrian scale by breaking up of roof
pitches and massing. Although the building is two stories, the breakup of the massing
and the size of the windows portray an appropriate pedestrian scale. The building
does not utilize shiny or glossy materials. The materials have proven durability and
weathering characteristics within Aspen’s climate.
Referral Comments:
This project was referred to the Engineering and Zoning Departments. The Zoning
Department had no comments or concerns about the proposed project. Engineering had
one comment for the proposed project.
Engineering:
1. All drywells must be a minimum of ten feet away from any water main or valve or
provide blueboard insulation equivalent to that separation distance.
As part of the Resolution review, the Planning and Zoning Commission may remove or
alter any of these proposed conditions or add/remove additional conditions.
RECOMMENDATIONS:
Staff recommends that the Planning and Zoning Commission approve Resolution #02,
Series of 2026.
Proposed Motion:
“I move to adopt Ordinance #15, Series of 2025.”
ATTACHMENTS:
Resolution #02, Series of 2026
Attachment A – Planned Development Detailed Review Standard Staff Responses
Attachment B – Commercial Design Review Standard Staff Responses
Attachment C – Application
112
P&Z Resolution #02, Series of 2026
Page 1 of 5
RESOLUTION #02
(SERIES OF 2026)
A RESOLUTION OF THE ASPEN PLANNING AND ZONING COMMISSION
APPROVING A MINOR PLANNED DEVELOPMENT DETAILED REVIEW
AMENDMENT AND COMMERCIAL DESIGN REVIEW, FOR THE PROPERTY
COMMONLY KNOWN AS 10 CLUB CIRCLE, LEGALLY DESCRIBED AS:
LOT 51, MAROON CREEK CLUB, ACCORDING TO THE FINAL PLAT AND PUD
FOR MAROON CREEK CLUB, RECORDED NOVEMBER 15, 1993 IN PLAT BOOK 33
AT PAGE 4 AND AS PARTIALLY CORRECTED BY INSTRUMENT RECORDED
MARCH 31, 1994 IN PLAT BOOK 34 AT PAGE 23 AND MAP RECORDED
SEPTEMBER 27, 1996 IN PLAT BOOK 40 AT PAGE 61 AND FURTHER AMENDED
BY HARMONY ROAD PLAT RECORDED AUGUST 9, 2002 IN PLAT BOOK 61 AT
PAGE 89, COUNTY OF PITKIN, STATE OF COLORADO.
Parcel ID: 2735-023-09-051
WHEREAS, the Community Development Department received an application from the
Maroon Creek, LLC, 10 Club Circle, Aspen, CO 81611 (Applicant), represented by Chris Bendon,
BendonAdams, 300 S Spring Street Suite 202, Aspen, CO 81611 requesting approval for the
following land use review approvals:
• Planned Development – Detailed Review pursuant to Land Use Code Section 26.445;
and,
• Commercial Design Review pursuant to Land Use Code Section 26.412
WHEREAS, the Community Development Department Staff reviewed the application for
compliance with the applicable review standards; and,
WHEREAS, the Engineering Department and Zoning Department provided referral
comments to the Community Development Department; and,
WHEREAS, the City of Aspen Planning and Zoning Commission reviewed and considered
the development proposal under the applicable provisions of the Municipal Code as identified
herein, reviewed, and considered the recommendation of the Community Development Director
and took and considered public comment at a duly noticed public hearing on January 7th, 2026;
and,
WHEREAS, the City of Aspen Planning and Zoning Commission finds that the development
proposal meets the applicable review criteria, and that approval of the request is consistent with
the goals and objectives of the Land Use Code; and,
WHEREAS, the City of Aspen Planning and Zoning Commission approves Resolution #02,
Series of 2026, by a ___ to ___ (___-___) vote, approving the request for a Minor Planned
Development- Detailed Review Amendment and Commercial Design Review.
113
P&Z Resolution #02, Series of 2026
Page 2 of 5
NOW, THEREFORE BE IT RESOLVED, THE ASPEN PLANNING AND ZONING
COMMISSION APPROVES THE FOLLOWING:
Section 1: Minor Planned Development Amendment to a Detailed Review Approval,
Amendment to Final Commercial Design Review Approval
The Planning and Zoning Commission hereby approves a Minor Amendment to Detailed Review
and an Amendment to Final Commercial Design Review for the following:
• Memorialization of the floor area reconfigurations to include the elevator lobby and pool
vault and the other elements in the table below.
• Memorialization of the dining trellis roof changes.
• Redesign of the gym expansion.
Section 2: Engineering Department Conditions of Approval
1. All drywells must be a minimum of ten feet away from any water main or valve or
provide blueboard insulation equivalent to that separation distance.
Section 3: Vested Rights
The development approvals granted herein shall constitute a vested property right attaching to and
running with the Property for a period of three (3) years from the date of issuance of a development
order. However, any failure to abide by any of the terms and conditions attendant to this approval
shall result in the forfeiture of said vested property right.
Section 4: Material Representations
All material representations and commitments made by the Applicant pursuant to the development
proposal approvals as herein awarded, whether in public hearing or documentation presented
before the Planning and Zoning Commission, are hereby incorporated in such site development
approvals and the same shall be complied with as if fully set forth herein, unless amended by an
authorized entity.
Section 5: Existing Litigation
This resolution shall not affect any existing litigation and shall not operate as an abatement of any
action or proceeding now pending under or by virtue of the ordinances repealed or amended as herein
provided, and the same shall be conducted and concluded under such prior ordinances.
Dining
Trellis
Observation
Bridges
Guest
Services
Kitchen
Covered
Fitness
Area
Gym
Expansion
Event
Space
Elevator
Lobby
Pool
Vault
Total
Expansion
Proposed
Floor Area
(sq. ft.) 1,511 1,846 652 450 2,538 1,080 136 106 8,319
Changes of a technical nature (as determined by the Community Development Department) may be made
during the building permit review process.
114
P&Z Resolution #02, Series of 2026
Page 3 of 5
Section 6: Severability
If any section, subsection, sentence, clause, phrase, or portion of this resolution is for any reason held
invalid or unconstitutional in a court of competent jurisdiction, such portion shall be deemed a
separate, distinct, and independent provision and shall not affect the validity of the remaining portions
thereof.
APPROVED by the Commission at its meeting on January 7th, 2026.
APPROVED AS TO FORM: PLANNING AND ZONING
COMMISSION:
___________________________ ___________________________
James R. True, Special Counsel Teraissa McGovern, Chair
ATTEST:
____________________________
Tracy Terry, Deputy Clerk
Attachments:
Exhibit A: Approved Plans
115
P&Z Resolution #02, Series of 2026
Page 4 of 5
Exhibit A: Approved Plans
116
P&Z Resolution #02, Series of 2026
Page 5 of 5
117
Exhibit A Detailed Review Standards
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 1 of 5
Sec. 26.445.070. - Detailed Review Standards.
Detailed Review shall focus on the comprehensive evaluation of the specific aspects of the development,
including utility placement, and architectural materials. In the review of a development application for
Detailed Review, the Planning and Zoning Commission, or the Historic Preservation Commission as
applicable, shall consider the following:
(a) Compliance with Project Review Approval. The proposed development, including all
dimensions and uses, is consistent with the Project Review approval and adequately
addresses conditions on the approval and direction received during the Project Review.
Staff Response: The proposed project is compliant with the overall Project Review Approval.
The dimensions and uses were clarified for this project under Planning and Zoning Commission
#09, Series of 2024. This approval clarified the remaining expansion rights of the building
(8,319 sq. ft.). The proposed project stays within those project limitations. The scope of the
project is to include a pool vault and elevator lobby area that were not included as floor area in
the original 2024 approvals as well as change the design of the gym area. Staff finds this
criterion is met.
(b) Growth Management. The proposed development has received all required GMQS
allotments or is concurrently seeking allotments.
Staff Response: The proposed project does not require any additional GMQS allotments nor is
it concurrently seeking allotments. Staff finds this criterion is met.
(c) Site Planning and Landscape Architecture. The site plan is compatible with the context
and visual character of the area. In meeting this standard, the following criteria shall be used.
(1) The landscape plan exhibits a well-designed treatment of exterior spaces, preserves
significant vegetation, and provides an ample quantity and variety of ornamental plant
species suitable for the Aspen area climate. Vegetation removal, protection, and
restoration plans shall be acceptable to the Director of Parks and Open Space.
(2) Buildings and site grading provide simple, at-grade entrances and minimize extensive
grade changes along building exterior. The project meets or exceeds the requirements
of the Americans with Disabilities Act and applicable requirements for emergency,
maintenance, and service vehicle access. Adequate snow storage is accommodated.
(3) Energy efficiency or production features are integrated into the landscape in a manner
that enhances the site.
118
Exhibit A Detailed Review Standards
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 2 of 5
(4) All site lighting is proposed so as to prevent direct glare or hazardous interference of
any kind to adjoining streets or lands. All exterior lighting shall comply with the
City’s outdoor lighting standards.
(5) Site drainage is accommodated for the proposed development in compliance with
Title 29 – Engineering Desing Standards and shall not negatively impact surrounding
properties.
Staff Response: The proposed project design affects hard-scape patio areas without existing
vegetation. There are no changes to site layout, parking, or snow-storage areas. The project
currently meets ADA requirements, and this will not change because of this application. Energy
production facilities are mounted on the building and not into the landscaping. All site lighting
shall meet City of Aspen requirements at building permit submittal. Staff finds these criteria are
met.
(d) Design Standards and Architecture. The proposed architectural details emphasize quality
construction and design characteristics. In meeting this standard, the following criteria shall
be used.
(1) The project architecture provides for visual interest and incorporates present-day details
and use of materials respectful of the community’s past without attempting to mimic history.
(2) Exterior materials are of a high quality, durability, and comply with applicable design
standards, including those outlined in Chapter 26.410, Residential Design Standards, Chapter
26.412, Commercial Design Standards, and Chapter 26.415, Historic Preservation.
(3) Building entrances are sited or designed to minimize icing and snow shedding effects.
(4) Energy efficiency or production features are integrated into structures in a manner that
enhances the architecture.
(5) All structure lighting is proposed so as to prevent direct glare or hazardous interference
of any kind to adjoining streets or lands. All exterior lighting shall comply with the City’s
outdoor lighting standards.
Staff Response: The building incorporates design characteristics that are consistent and
compatible with the rest of the structure. The materials are seen throughout the current design
and they are incorporated to provide more visual appeal.
119
Exhibit A Detailed Review Standards
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 3 of 5
As shown in Exhibit B – Commercial Design Standards Staff Responses, the gym addition
utilizes materials seen throughout the existing structure. These materials are of a high quality,
durability, and comply with those design standards. The materials have a proven durability in
Aspen’s climate and the materials consist of timber columns, horizontal wood siding, metal
framed windows, metal flashing, stone veneer walls, and concrete hardscape. The building
entrances remain the same as existing and the roof is a flat roof that will not shed snow/ice.
Energy efficiency and production features currently exist on the current building and were
approved under a previous Planning and Zoning Commission approval. These elements are not
proposed to change. All exterior lighting shall comply with the City of Aspen’s outdoor lighting
standards.
120
Exhibit A Detailed Review Standards
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 4 of 5
(e) Common Parks, Open Space, Recreation Areas, or Facilities. If the proposed development
includes common parks, open space, recreation areas, or common facilities, a proportionate,
undivided interest is deeded in perpetuity to each lot or dwelling unit owner within the Planned
Development. An adequate assurance through a Development Agreement for the permanent care
and maintenance of open spaces, recreation areas, and shared facilities together with a
prohibition against future development is required.
Staff Response: The proposed development does not include common parks, recreation areas,
or common facilities; however, the development includes common open space. Staff finds this
criterion is not applicable.
(f) Pedestrian, bicycle & transit facilities. The development improves pedestrian, bicycle, and
transit facilities. These facilities and improvements shall be prioritized over vehicular facilities
and improvements. Any new vehicular access points minimize impacts on existing pedestrian,
bicycle and transit facilities. Any specific designs, mitigation techniques, and implementation
timelines as required during Project Review comply with the applicable requirements of the
Project Review and as otherwise required in the Land Use Code. These plans shall provide
sufficient detail to determine if the design or mitigation concept complies with the intent of the
requirements and to determine any required cost estimating for surety requirements, but do not
need to be detailed construction documents.
Staff Response: The size of the facility is not changing from what was approved in 2024. There
are no changes to transportation demands because there is not increase in floor area with the
proposed project. As previously mentioned the main scope of the project is to include the pool
vault and elevator lobby in the floor area measurements, and change the design of the gym area.
Staff finds this criterion is met.
(g) Engineering Design Standards. There has been accurate identification of engineering
design and mitigation techniques necessary for development of the proposed subdivision to
comply with the applicable requirements of Municipal Code Title 29—Engineering Design
Standards and the City of Aspen Urban Runoff Management Plan (URMP). Any specific
designs, mitigation techniques, and implementation timelines as required during Project Review
comply with the applicable requirements of Municipal Code Title 29—Engineering Design
Standards and the City of Aspen Urban Runoff Management Plan (URMP). These plans shall
provide sufficient detail to determine if the design or mitigation concept complies with the intent
of the requirements, but do not need to be detailed construction documents.
Staff Response: The expansion was previously approved, this proposal changes a few items not
associated with the Engineering Design Standards and URMP. The project will still have to fully
comply with those criteria as set out by the Engineering Department at building permit. Staff
finds this criterion is met.
(h) Public Infrastructure and Facilities. The proposed Planned Development shall upgrade
121
Exhibit A Detailed Review Standards
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 5 of 5
public infrastructure and facilities necessary to serve the project. Improvements shall be at the
sole costs of the developer. Any specific designs, mitigation techniques, and implementation
timelines as required during Project Review comply with the applicable requirements of
Municipal Code Title 29—Engineering Design Standards and the City of Aspen Urban Runoff
Management Plan (URMP). These plans shall provide sufficient detail to determine if the design
or mitigation concept complies with the intent of the requirements, but do not need to be detailed
construction documents.
Staff Response: There are currently no plans to update public infrastructure and facilities at
this time; however, if there is a need to update these items, they will be at the sole cost of the
developer. Staff finds this criterion is met.
(i) Phasing of development plan. If phasing of the development plan is proposed, each phase
shall be designed to function as a complete development and shall not be reliant on subsequent
phases. Phasing shall insulate, to the extent practical, occupants of initial phases from the
construction of later phases. All necessary or proportionate improvements to public facilities,
payment of impact fees and fees-in-lieu, construction of any facilities to be used jointly by
residents of the Planned Development, construction of any required affordable housing, and any
mitigation measures shall be completed concurrent or prior to the respective impacts associated
with the phase.
Staff Response: Phasing of this development is not proposed. Staff finds this criterion not
applicable.
122
Exhibit B Commercial Design Review
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 1 of 6
Section 26.412.060 – Commercial Design Review Criteria
All projects are required to be consistent with the Commercial, Lodging and Historic Design
Standards and Guidelines. This section addresses the Standards and Guidelines and their
applicability to the proposed development.
General - Site Planning and Streetscape
Standard 1.1 All projects shall provide a context study.
Staff Response: The Maroon Creek Club Clubhouse (10 Club Circle) is located outside of the
roundabout and is bounded by Burlingame, Buttermilk Mountain, and the Private Maroon
Creek Club Golf Course. The adjacent development is a mix of ski area, affordable housing,
and conservation/open space land. Staff finds this criterion is met.
Standard 1.2 All projects shall respond to the traditional street grid.
Staff Response: The Maroon Creek Club does not respond to the traditional street grid as it is
located outside of the roundabout where the street grid is nonexistent. The development
currently exists and is located off of Harmony and Stage Road. Staff finds this criterion is not
applicable.
Guideline 1.3 Landscape elements (both hardscape and softscape) should complement the
surrounding context, support the street scene, and enhance the architecture of the building.
Staff Response: The landscape elements proposed in this application complement the
surrounding context, support the street scene, and enhance the architecture of the building.
Trees, shrubs, native grasses, and ornamental landscape treatments are already incorporated
into the design. The rest of the proposed project does not affect the landscape elements. These
include: fenestration, material, and floor area changes. Staff finds this criterion is met.
Guideline 1.4 Where there is open space on a site, reinforce the traditional transition from public
space, to semi-public space to private space.
Staff Response: Open space elements are not materially changing with this proposal. Staff
finds this criterion is not applicable.
Guideline 1.5 Maintain alignment of building facades where appropriate.
Staff Response: Building facades remain aligned where appropriate with the proposed design.
Staff finds this criterion is met.
Guideline 1.6 When a building façade is set back, define the property line. Review the context of
the block when selecting an appropriate technique.
Staff Response: The Planned Development currently has defined property lines. These are not
changing as a result of the proposed project. Staff finds this criterion is not applicable.
General – Alleyways
123
Exhibit B Commercial Design Review
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 2 of 6
Guideline 1.7 Develop alley facades to create visual interest.
Staff Response: This property has no alleyways. Staff finds this criterion is not applicable.
Guideline 1.8 Consider small alley commercial spaces, especially on corner lots or lots with
midblock access from the street.
Staff Response: This property has no alleyways. Staff finds this criterion is not applicable.
General – Parking
Standard 1.9 Minimize the visual impacts of parking.
Staff Response: There are no changes to the parking configuration in the proposal. Staff finds
this criterion is not applicable.
General – Building Mass, Height, and Scale
Guideline 1.10 A new building should appear similar in scale and proportion with buildings on
the block.
Staff Response: There are no new buildings proposed. Staff finds this criterion not applicable.
Standard 1.11 A Minimum building height difference of 2 feet from immediately adjacent
buildings is required.
Staff Response: There are no buildings immediately adjacent to the Maroon Creek Club
Clubhouse building. Staff finds this criterion not applicable.
Guideline 1.12 On lots larger than 6,000 square feet, break up building mass into smaller
modules.
Staff Response: The architecture is broken up into different planes and articulation elements.
The proposed gym adds to the articulation of the structure into smaller “modules”. Staff finds
this criterion is met.
Guideline 1.13 Development adjacent to a historic landmark should respond to the historic
resource.
Staff Response: This property is not adjacent to any historic landmarks. Staff finds this
criterion not applicable.
General – Street Level Design
Standard 1.14 Commercial entrances shall be at the sidewalk level and oriented to the street.
Staff Response: Staff finds this criterion is not applicable.
Standard 1.15 Incorporate an internal airlock or air curtain into first floor commercial space.
Staff Response: Staff finds this criterion is not applicable.
124
Exhibit B Commercial Design Review
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 3 of 6
Guideline 1.16 Entries that are significantly taller or shorter than those seen historically or that
conflict with the established scale are highly discouraged.
Staff Response: Staff finds this criterion is not applicable.
Standard 1.17 ATMs and vending machines visible from the street are prohibited.
Staff Response: ATMs and vending machines are not proposed in this application. Staff finds
this criterion is not applicable.
General – Roofscape
Guideline 1.18 The roofscape should be designed with the same attention as the elevations of the
building.
Staff Response: The proposed project does not include any mechanical equipment, etc… on
the roofscape. The proposed project incorporates a flat roof in design. Staff finds this criterion
is met.
Guideline 1.19 Use materials that complement the design of the building façade.
Staff Response: There are no roofscape improvements proposed in this project. Staff finds this
criterion is met.
Guideline 1.20 Incorporate green roofs and low landscape elements into rooftop design where
feasible.
Staff Response: Green roofs and low landscape elements are not planned on the rooftop.
There are no other green roofs/low landscape elements found on this structure. Staff finds this
criterion not applicable.
Guideline 1.21 Minimize visibility of rooftop railings.
Staff Response: There are no proposed rooftop railings in this application. Staff finds this
criterion not applicable.
General – Materials and Details
Standard 1.22 Complete and accurate identification of materials is required.
Staff Response: The applicant completely and accurately identified the materials to be used in
this project. Materials consist of timber columns, metal flashing, metal framed windows,
standing seam metal roof, horizontal wood siding, stone walls, concrete hardscape, and bronze
metal. These materials have a proven durability in cold-weather climates. Staff finds this
criterion is met.
Standard 1.23 Building Materials shall have these features:
• Convey the quality and range of materials found in the current block context or seen
historically in the Character Area.
125
Exhibit B Commercial Design Review
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 4 of 6
• Convey pedestrian scale.
• Enhance visual interest through texture, application, and/or dimension.
• Be non-reflective. Shiny or glossy materials are not appropriate as a primary material.
• Have proven durability and weathering characteristics within Aspen’s climate.
• A material with an integral color shall be a neutral color. Some variation is allowed for
secondary materials.
Staff Response: The building materials convey the quality and range of the materials found in
the current block context and the overall context of the Maroon Creek Club and Clubhouse
building. The building provides a pedestrian scale by breaking up of roof pitches and massing.
Although the building is two stories, the breakup of the massing and the size of the windows
portray an appropriate pedestrian scale. The building does not utilize shiny or glossy materials.
The materials have proven durability and weathering characteristics within Aspen’s climate.
Staff finds this criterion is met.
Guideline 1.24 Introducing a new material, material application, or material finish to the existing
streetscape may be approved by HPC or P&Z if the following criteria are met:
• Innovative building design.
• Creative material application that positively contributes to the streetscape
• Environmentally sustainable building practice.
• Proven durability.
Staff Response: The building does not introduce a new material, material application, or
material finish to the existing streetscape. All of the materials chosen currently exist in some
fashion on the existing building. Staff finds this criterion not applicable.
Standard 1.25 Architecture that reflects corporate branding of the tenant is not permitted.
Staff Response: The proposed development does not reflect corporate branding of the tenant.
Staff finds this criterion is met.
General – Lighting, Service and Mechanical Areas
Guideline 1.26 The design of light fixtures should be appropriate to the form, materials, scale,
and style of the building.
Staff Response: No new light fixtures are planned around the expansion areas. Staff finds this
criterion is met.
Standard 1.27 Trash and recycle service areas shall be co-located along an alleyway where one
exists, and screened from view with a fence or door.
126
Exhibit B Commercial Design Review
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 5 of 6
Staff Response: There is adequate trash and recycling service on site, this is not changing with
the proposal. Staff finds this criterion is not applicable.
Guideline 1.28 Design trash and recycle areas thoughtfully and within the style of the building,
with the goal of enhancing pedestrian and commercial uses along alleys.
Staff Response: There is no alleyway on this site. Staff finds this criterion not applicable.
Standard 1.29 Delivery areas shall be located along an alleyway where one exists.
Staff Response: Staff finds this criterion is not applicable.
Standard 1.30 Mechanical equipment, ducts, and vents shall be accommodated internally within
the building and/or co-located on the roof.
Staff Response: There are no visible utilities or mechanical equipment in the proposed
expansion elements. Staff finds this criterion met.
Guideline 1.31 Minimize the visual impacts of utility connections and service boxes.
Staff Response: The utility connections and service boxes are not changing with the proposal.
Staff finds this criterion is not applicable.
Standard 1.32 Transformer location and size are dictated by City and utility company standards
and codes.
Staff Response: Staff finds this criterion is not applicable.
General – Remodel
Standard 1.33 All remodel projects shall meet Standards 1.22 and 1.23.
Staff Response: The proposed remodel project meets the Standards 1.22 and 1.23 as shown
above in this document. Staff finds this criterion is met.
Guideline 1.34 Consider updating windows, doors, and/or primary entrances to better relate to
the Character Area and pedestrian experience.
Staff Response: The proposed gym redesign incorporates an updated design to fit a more
modern aesthetic. The increased window sizes on the top floor convey a sense of demarcation
between the upper and lower floor in relation to the pedestrian experience. Staff finds this
criterion is met.
Guideline 1.35 Design alterations to relate to the existing building style and form that may
remain.
Staff Response: Similar materials as found on the existing building are utilized in this new
design. Staff finds this criterion is met.
127
Exhibit B Commercial Design Review
Review Criteria Staff Findings
10 Club Circle – Maroon Creek Club
Planning and Zoning Commission
Page 6 of 6
Guideline 1.36 Incorporate elements that define the property line in accordance with Guideline
1.6.
Staff Response: Staff finds this criterion not applicable.
Guideline 1.37 Creative solutions that incorporate ADA compliance into the architecture are
encouraged.
• Minimize the appearance of ramps by exploring other on-site options such as altering
interior floor levels or exterior grade.
Staff Response: The existing building conforms with ADA standards as built. The proposed
project does not change that aspect of the building. Staff finds this criterion is met.
128