Loading...
HomeMy WebLinkAboutSub Permit.729 W Francis St.0052-2022-BRES 5/5/25,4:03 PM 0025-2021-UTWC-Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0025-2021-UTWC Number 0025-2021-UTWC Record Type Utility Water Connection Address 729 W FRANCIS ST 1 Owner Fernando Cruz Original Number 21-1348 Status Issued Type Utility Water Connection Reason for Cancel or Comp!. Review Fail Applicant PHIL LEHUE Aspen Internal? No Account PHIL LEHUE Imported Project HPC-ZON-EH-UTIL Review Permit Contractor Eng Review Is This Associated w/a Building Yes Parks-Prkng-San Review Permit? Master Building Permit 0052-2022-BRES Conditional Inspections Is this an Addendum Permit? Conditional Final lnsp Supplemental/Addendum Master Permit Action Items Hold All Reviews Price Book 2021 Hold Reason Permit Dates New Application Date 5/18/2021 Expiration Date Application Complete Date 5/21/2021 Override Expiration Date Application Accepted Date 5/21/2021 Last Activity Date Issue Date 5/16/2022 Milestone Current Days in 0 Applicant Hand Days to Issue 360 Milestone Current Days in City 0 Hands Close/CO Issuance Date Job Location Address 729 W FRANCIS ST 1,ASPEN:273512427011 Lot Site Address Display on Map Block Historic Property? No Legal Description Subdivision:GOLD RUSH Unit:1 Historic District? No Eden Address Zone District R-6 Property Information Common Building Name Already on City Water? Yes Public Building? Class of Service Customer Duplex In a Park? Utility Account Number Other Use Water Service Area 1 Inside City Boundaries? Project Information Use of Building Other Size of Existing Domestic Water 0.75 Line Use Class Residential Size of Proposed Domestic Water 0.75 Line Class of Work Alteration Size of Existing Fire Suppression 0.00 Line If Residential App,Estimated New Size of Proposed Fire Suppression 0.00 ECUs Line Number of Meters Proposed 1 Description Interior Remodel;addition of 1 lay sink in master bathroom.like for like replacement throughout rest of home. CO Description Raw Water Information Identify ALL Sources of Water City water,service area 1. Is There Well or Wells on the Property? Does Project Involve Outdoor No Acre-feet of Water Currently by 0 Irrigation? Well https://cityofaspen.my.salesforce.com/a034o00000FOjgCAAD/p 1/4 5/5/25,4:03 PM 0025-2021-UTWC—Salesforce-Enterprise Edition Irrigated Area Sq Ft 0 Acre-feet of Water Rights to be 0 Conveyed Indicate Amt,Source,and Use of Is There a Pool,Spa or Water No Water Feature? Do Water Feat use Recirc/Recycled Water? Water Service Requests New Tap? No Abandon Existing Tap No Existing Tap Modifications? No Abandon Existing Well No Internal Use Only Existing ECU Count Utility Investment Charge(Tap Fees) Final ECU Count Utility Investment Charge Paid Date of Existing Tap Utility Hookup Charge Date of New Tap Utility Hookup Charge Paid CO Status if Applicable Cash in Lieu Date of CO Cash in Lieu Paid CO Approved Date Well Development Charges Date of Final Connection Fee Well Development Charges Paid Payment Water Service Agreement Summary of Prior Water Fees Paid Required? Status of Final Agreement Financials Total Fees Total Payments Fees Paid Total Balance $0.00 System Information Created By Phil LeHue,5/18/2021 9:31 PM Last Modified By Fernando Cruz,5/5/2025 4:01 PM Number 0025-2021-UTWC VIP Form Tool VIP VIP Permit Application Foreign Form Language Template VIP 5/18/2021 VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"}, Submitted 9:58 pM Template {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAS"}, Status {"parentCategoryld":"a2E6A000000UwvhUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwvc {"parentCategoryld":nul I,"isSu bmit":n u II,"isCu rrent":n u II,"categoryStatusLabels":n u II,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"}, {"parentCategoryld":nul I,"isSu bmit":n u II,"isCurrent":n u II,"categoryStatusLabels":n u II,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"}, {"parentCategoryld":nul I,"isSubmit".true,"isCurrent":nu II,"categoryStatusLabels":nu II,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email:Utility Connection Permit Final Type Billable Assigned To Tim Rohe Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 10/30/2023 Days in Applicant's Hands To:phil.lehue@outlook.com CC: BCC: Attachment:729 W Francis 1 Final UCP-signed.pdf Subject:Utility Connection Permit Final Body: Hello PHIL LEHUE, Comments Attached is your final Utility Connection Permit for the completed project at 729 W FRANCIS ST 1 associated with permit#:0025-2021-UTWC. After review,please print,have signed by owner,and notarized.Once signed and notarized,please return UCP with payment,if applicable,to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively,you may upload the signed and notarized copy of the UCP as a SCANNED(not photographed).pdf file and pay all fees due via Salesforce,but if submitting via Salesforce,please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a"push"notification that these permit requirements are complete. Please reach out with any questions or concerns. Email:Utility Connection Permit Review https://cityofaspen.my.salesforce.com/a034o00000FOjgcAAD/p 2/4 5/5/25,4:03 PM 0025-2021-UTWC—Salesforce-Enterprise Edition Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 6/1/2021 Days in Applicant's Hands To:phil.lehue@outlook.com CC: BCC: Attachment:UCP_Insubstantial_Review_20210601.docx.pdf Subject:Utility Connection Permit Review Body: Hello Phil LeHue, Comments Attached is your review Utility Connection Permit for the proposed project at729 W FRANCIS ST 1 associated with permit#:0025-2021-UTWC After review,please print,have signed by owner and notarized.Once signed and notarized,please return with payment,if applicable,to the Finance Department window located on the first floor of City Hall at 130 S.Galena St. Please reach out with any questions or concerns. Thank you Phil,always a pleasure. Steve Contacts PHIL LEHUE Account PHIL LEHUE Type Applicant Active Contractor License Count 0.00 Number 0036709 NOELLE HERNANDEZ Account MATTER PLANNING&DESIGN LLC Type Architect or Engineer of Record Active Contractor License Count 0.00 Number 0036710 NOELLE HERNANDEZ Account MATTER PLANNING&DESIGN LLC Type Owner Active Contractor License Count 0.00 Number 0036711 Files 729 W Francis 1 Final UCP-signed UCP_Permit_and_Agreement_at_Final_20231030.docx Last Modified 10/30/2023 11:19 AM Last Modified 10/30/2023 11:07 AM Created By Tim Rohe Created By Tim Rohe UCP_Insubstantial_Review_20210601.docx Permit Application 2021-05-19 03:58:56.pdf Last Modified 6/1/2021 2:59 PM Last Modified 5/18/2021 9:58 PM Created By Steve Wilson Created By Phil LeHue Milestones Review Round 1-0025-2021-UTWC Status Approved Due Date Created Date 5/21/2021 Permit History 5/5/2025 4:01 PM User Fernando Cruz Action Changed Owner from Robert Gregor to Fernando Cruz. Reviews REV-018908 Milestone Review Round 1-0025-2021-UTWC Status Approved Type Engineering Water Due Date Completed Date 5/26/2021 10:59 AM Owner Alias TRohe On Hold Created Date 5/21/2021 Submissions 50.2019 REVIEW UCP 0090.2019.ARBK_2021.05.17.pdf Actions Submission Date 5/18/2021 9:57 PM Latest Submission Date Status Pending https://cityofaspen.my.salesforce.com/a034o00000FOjgCAAD/p 3/4 5/5/25,4:03 PM 0025-2021-UTWC—Salesforce-Enterprise Edition Required Description 50.RESIDENTIAL ECU CALCULATOR_2021.05.17.xlsx Actions Submission Date 5/18/2021 9:57 PM Latest Submission Date Status Pending Required Description 90.ARCHITECTURAL PLANS_2021.05.10.pdf Actions Submission Date 5/18/2021 9:57 PM Latest Submission Date Status Pending Required Description 50.REVIEW UCP 0025-2021-UTW_21.06.15.pdf Actions Submission Date 6/16/2021 8:11 AM Latest Submission Date Status Pending Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a034o00000FOjgcAAD/p 4/4