Loading...
HomeMy WebLinkAboutFile Documents.729 W Francis St.0052-2022-BRES (10) Zoning-1 -729 W Francis St-0052-2022-BRES 80.Survey.729 W Francis.20220328.pdf(1) Subject:Text Box Page: 1 Survey or Improvement survey Page Index: 1 should be dated within a year of Author: kylas permit submittal date.This Color: • survey is 40 years old. Existing File Name: 80.Survey.729 W Francis.20220328.pdf conditions as they stand now SURVEYORS CERTIFICATE need to be shown. 90.ARCHITECTURAL PLANS_2021.05.10.pdf(6) EXT5 EX Subject: Comment Box w/Arrows EXT6 Page: GO-03A EXTERIOR SCOPE OF WORK ITEMIZED Isn't this skylight being E Isn't EX demolished? EXT 9 EX Page Index: 3 Isn't this skylight being EXT,g EX demellshed? EXT„ EX Author: kylas EXT12 G1 Color: ■ c FXT 18 FX EXT 14 HA EX File Name: 90.ARCHITECTURAL PLANS_2021.05.10.pdf EXT 15 EXT 16 EX EXT 17 LI( E)(T18 EX EXT 19 EX Note EXT-18 has been revised. EM 20 NE EXT21 ME EXT 22 ME Subject:Text Box Page: GO-03A EXTERIOR SCOPE OF WORK ITEMIZED Must be mounted as a down Page Index: 3 light to be compliant with code. Author: kylas Must be mounted go down Color: • light to be compliant with code. File Name: 90.ARCHITECTURAL PLANS_2021.05.10.pdf A note has been added indicating the direction of the exterior light fixture Subject:Text Box Page: GO-04A ZONING DEMOLITION NORTH & EAST Numbers do not seem to be mrarzm FACADE MODIFICATIONS matching the tables on GO 04C Page Index: 5 or GO-04D. ,152; _,M " . 07 L , Author: kylas w a Color: • ... For example,for the north wall: m � - •• File Name: 90.ARCHITECTURAL PLANS_2021.05.10.pdf Existing Wall Area: 624 SF (pulled from table) — Existing Fenestration: 64 SF (pulled from elevations) Area Being Demoed: 24 SF demolition calculations haven been (pulled from elevations) updated on sheets GO-04A & GO-04B Demo: 24/(624-64)=4.2% Fenestration being in-filled or like for like replacement is not area being demoed. Only relocated, expanded or new fenestration counts as demo. Demo must also be expressed as a percentage. Please redo Demo calcs. See Section 26.575.020 (h) 09/26/2022 ASPEN BUILDING DEPARTMENT Subject:Text Box _ -- =_ Page: GO-04B ZONING DEMOLITION SOUTH &WEST Using my measure, 110 SF (as at = ,-�— FACADE MODIFICATIONS listed in the schematic on the ' = Page Index: 6 side)is way to much area for this — ® ,,, noioio M Author: kylas small strip of demo. Please Juiuiu- correct. Color: ■ 7 1'? File Name: 90.ARCHITECTURAL PLANS_2021.05.10.pdf III If IE \:. „ Square footage has been updated on sheet GO-04B/ ELEV 5A � ,�— - Iram Subject: 3/16"Scale 19 sf =I' Page: GO-04B ZONING DEMOLITION SOUTH &WEST lil®III ; _�' -goo FACADE MODIFICATIONS =J=o` I�Wuu Page Index: 6 Author: kylas Ar� r� ��rr Color: • 1I°� of �'I m ° File Name: 90.ARCHITECTURAL PLANS 2021.05.10.pdf Square footage has been updated on ® sheet GO-04B/ ELEV 5A Subject: Comment Box w/Arrows Page: GO-04B ZONING DEMOLITION SOUTH &WEST This door also counts as existing ®rv. © = m. FACADE MODIFICATIONS fenestration, please include in =moo Page Index: 6 calculations. � m Author: kylas Color: ■ File Name: 90.ARCHITECTURAL PLANS 2021.05.10.pdf 1TION Lower level/ South door is existing to remain per keynote D-35. Door has been added to exterior door demolition scope of work schedule RECEIVED 09/26/2022 ASPEN BUILDING DEPARTMENT