Loading...
HomeMy WebLinkAboutFile Documents.814 W Bleeker St.0107-2021-BRES Z GROUP ARCHITECTS, P.C. 411 East Main Street, Suite 205 Aspen, Colorado 81611 Telephone 970-925-1832 Raptis Remodel— Permit Comment Response Memo December 01, 2021 This is the supplemental narrative of responses for the review comments for the Raptis Remodel, permit #0107-2021-BRES. The responses are highlighted below and fully addressed in the submitted plan sheets—90.Raptis-ReSubmittalSet-20211201 Zoning Comments The main concern addressed in the response is in regards to the lack of clearly communicated FAR information. Refer to Zoning Comments, pages 2 and 3 below. Sheet A1.0 has been added to supply the correct information. Additional information regarding windows has been added and clarified on Sheet A2.1 P RECEIVED 12/06/2021 ASPEN BUILDING DEPARTMENT 0107-2021 -BRES_ZoningComments_1 90. Raptis-SubmittalSet20210809.pdf(8) Subject:Text Box Page: [1] Raptis Remodel-Demo-A1.1 Need existing and proposed FA Page Index: 2 sheets,this should include deck and subgrade. Author: haleyh Color: • FA provided on sheet A1.0 File Name: 90. Raptis-SubmittalSet20210809.pdf Subject: Cloud+ — i Page: [2] Raptis Remodel-Demo-A1.2 Need all proposed window Page Index: 3 square footage. W;w O�_ omPP Author: haleyh pt 51 r Color: • t.,. _ File Name: 90. Raptis-SubmittalSet20210809.pdf Window information = — Iw,=I provided on sheet A2.1P Subject: 3/16"Scale 0 sf Page: [2] Raptis Remodel-Demo-A1.2 Page Index: 3 I f Author: haleyh 0 S I Color: • File Name: 90. Raptis-SubmittalSet20210809.pdf Subject: 3/16"Scale 0 sf Page: [2] Raptis Remodel-Demo-A1.2 Page Index: 3 z(s_i ill Author: haleyh Color: ■ File Name: 90. Raptis-SubmittalSet20210809.pdf _A d I Subject: 3/16"Scale "p"' Page: [2] Raptis Remodel-Demo-A1.2 193.68 sf Page Index: 3 Author: haleyh —= ME Color: ■ File Name: 90. Raptis-SubmittalSet20210809.pdf NOFIN ELEVATION RECEIVED 12/06/2021 ASPEN BUILDING DEPARTMENT Subject: Cloud+ Page: [2] Raptis Remodel-Demo-A1.2 A bit confused by this.Want Page Index: 3 demo calcs, sub grade wall cals, Author: haleyh and FA cals since you are 7-4: Color: • demoing deck and proposing new deck and havingchange in � File Name: 90. Raptis-SubmittalSet20210809.pdf g subgrade wall cals. Please separate out. Give us one FA sheet which should include sub Tm grade calculation and one demo sheet Subject:Text Box „" „ You are giving calculations for all „„,a;roe Page: [2] Raptis Remodel-Demo-A1.2 walls,we only need sub grade no oa Page Index: 3 walls.And then use exposed/ n v Author: haleyh Color: • subgrade wall to calculate u „b°.,„ „„ File Name: 90. Raptis-SubmittalSet20210809.pdf percent which will then give you your subgrade FA. Subject:Text Box Page: 5 Confirming there is no exterior Page Index: 6 lighting. If there is please include Author: haleyh where and cutsheets showing Confirming there is no the lighting unit. exterior lighting.If there is Color: • cutsheetsplease include File Name: 90. Raptis-SubmittalSet20210809.pdf showing the lighting unit. Correct-There is no new exterior lighting. RECEIVED 12/06/2021 ASPEN BUILDING DEPARTMENT