Loading...
HomeMy WebLinkAboutFile Documents.814 W Bleeker St.0107-2021-BRES (4) WOK_ STRUCTURAL DESIGN 1040 MAIN STREET • CARBONDALE,CO 81623 • (970)510-0773 www.evolvestruct.com November 19t", 2021 Emily Bibb 814 W. Bleeker St, Unit C4 Aspen, CO 81611 805-341-3926 bibbemily@gmail.com RE: Raptis Remodel—814 W Bleeker#C4,Aspen Colorado Emily, Based on the Permit Application drawings provided to us by Z Group Architects dated August 9th, 2021, we understand the proposed work is primarily an interior remodel with some modifications to exterior openings as well as an approximate 14sq ft landing deck and a concrete infill of an existing opening. Our future involvement will include producing Construction Documents for all structure affected by the remodel including, but not necessarily limited to,those items noted above. Once demolition can begin,the interior wall and ceiling finishes shall be at least partially removed and existing relevant structure exposed to allow observation of the existing structural systems, as necessary. We shall be contacted to perform a site observation of the exposed elements to determine the structural implications of the proposed remodel and any necessary revisions. This shall be done prior to proceeding with the removal or modification of any framing members. Should you have any further questions regarding this matter, please feel free to contact our office. We look forward to assisting you in completing your project. Sincerely, Evolve Structural Design LLC OjDO Lice%%1 • R• FO••.`SF t� • it 51ri35 ° a °NALE,\' 11/19/2021 Steven R. Edmiston, P.E., S.E. Principal RECEIVED 12/06/2021 ASPEN BUILDING DEPARTMENT