Loading...
HomeMy WebLinkAboutFile Documents.364 Exhibition Ln.0117-2023-BROF (8) WOOD SHAKE AREA= Field Plan Set Must Be Printed In Color 1► CITY OF ASPEN NON-HIGHLIGHTED AREA 44'��j, PERMIT NO.0117-2023-BROF I Qnly Wood St.okc iS ,A� ' ►. //'►� GP 1 ESR-2119 I Most twdely Accepted and Trusted Page 3 of 7 I OWNER ROCKIES 5 TWO LLC CAet C Vt'WA W)RO 4.8 Reroofing: 5.2 The roof shingles are manufactured in Lenexa, CITY OF r- pr., y) Prior to application of the shingles, the existing roof Kansas, under a quality-control program with ASPEN ADDRESS 364 EXHIBITION LN MLA SU It EM ENT REPORT 3641 in nnl1o\I km covering and underlayment must be completely removed. inspections by ICC-ES. Asrr\,CU.161 I Any damaged sheathing must be replaced.The installation 6.0 EVIDENCE SUBMITTED PARCEL ID of the shingles must then proceed as described in Data in accordance with the ICC-ES Acceptance Criteria 273514316004 Sections 4.1 through 4.5. An existing self-adhered ice for Special Roofing Systems(ACO7),dated February 2014 barrier membrane may remain in place if covered with a These plans must De Kept at the new ice barrier membrane in accordance with the (editorially revised May 2016). �o(Ip-1 building site or inspection applicable code. The roof classification is as noted in 7.0 IDENTIFICATION delays occur.Construction toff, o f f, & Section 4.6 and Table 1. eay may Vo J 7.1 Each roof shingle is labeled with the report holder's shall conform to these plans.All I 5.0 CONDITIONS OF USE name(DaVinci Roofscapes,LLC)and address,the M()„'I(II OI The DaVinci Slate,DaVinci Shake,Bellaforte Shake,and product name,the shingle width,a production date changes shall be approved by code, and the ICC-ES evaluation report number the shallOfficial. APPLICATION ACCEPTED DATE: 2023-11-29 PERMIT NUMBER: 0117-2023-BROF 41 I I I Bellaforte Slate roof shingles described in this report ( ) building _ I comply with, or are suitable alternatives to what is ESR-2119. _ /. 13= ___ ra specified in,those codes listed in Section 1.0 of this report, 7.2 The report holder's contact information is the GU"' sa subject to the following conditions: following: `� '06 - D SEPARATE PERMITS ARE tn� >gn Dd G -'I I 5.1 Installation must comply with the applicable code,the DaVINCI ROOFSCAPES,LLC REQUIRED FOR ELECTRICAL, COMMUNITY DEVELOPMENT DEPARTMENT 1 r 1 manufacturer's published installation instructions and 13890 WEST 101sT STREET � � 1r�//� l7 this report. In the event of a conflict between this LENEXA,KANSAS 66215 PLUMBING,MECHANICAL,OR 'r��� ✓_ JA I I �s report and the manufacturer's published installation (913)599-0766 FIRE SPRINKLER WORK BUILDING PERMIT COVERSHEET w \ /� I instructions,this report governs. www.davinciroofscapes.com CITY OF ASPEN e Sr3� - ,aa \ 63 �e G SMOKE ALARMS AND " \ /�� CARBON MONOXIDE ,, PROPERTY INFORMATION r I s2 /� �\�// DETECTORS REQUIRED I ����y J . \ THROUGHOUT DWELLING �h@O L�J �AYI s� /� UNIT PER CITY OF ASPEN ADDRESS: 364 EXHIBITION IN UNIT: (Y Copt 1 — \ MUNICIPAL CODE 8.15 PARCEL ID: 273514316004 LEGAL DESCRIPTION: ASPEN HIGHLANDS VILLAGE PUD lopll, 00 /� .\\ TABLE 1—FIRE CLASSIFICATIONS 77 \ DaVINCI ROOF SHINGLE OWNER: ROOKIES 5 TWO LLC SYSTEM ROOF ROOF MIN. PERMIT CONTRACTOR: \ \� S p NO. CLASS DECK SLOPE UNDERLAYMENT' Roof Shingle Exposure(In.) .� ( t,{ �S /8,, �� v ! G It should be known that this review shall to One layer ASTM D226 Type II(No.30)or two layers not relieve the applicant of their t rj Golf( f.v ♦](T l G of ASTM D Type I(No.15)asphalt-saturated organic responsibilityelievfO COm with the DESCRIPTION OF WORK Re-Roofing of a Weather Damaged Wood Shake roof.The roof is currently leaking and has been mitigated but �\` Oil l ""'7 / 1 A in h plywood 3:12 felt may be used;or DaVinci Slate 6 comply needs to be replaed ASAP.Removal of entiretyof wood shake and Installation of Davinci Select-Shake and the j One layer GAF Versashield®Fire-Resistant Roof requirements of the City of Aspen %I\ I l Snow stops required at all locations Deck Protection(ESR-2053) Municipal Code.Pursuant to color is Tahoe.The heat tape is not being detached or replaced.Please advise. V o t . hOS where roofs could shed snow onto Sec.26.104.050,any permit or approval walkways,stairs,alleys,decks,exits, 2 A Min."/3r 3:12 One layer GAF Versashielde Fire-Resistant Roof DaVinci Slate 6 to 7'/z inch plywood Deck Protection(ESR-2053) DaVinci Shake 9to 10 issued in error or otherwise not in utilities and meters,emergency escape conformity with the requirements of this and rescue opening window wells,or Min."/, One layer ASTM D226 Type II(No.30)asphalt- DaVinci Slate 6 to 8 p g3 A 3.12 saturated organic felt plus one layer of ASTM D3909 DaVinci Shake 9to10 Title,shall be void.Similarly,any permit ROOF AREA DIAGRAM adjacent properties-Ordinance 1, E inch plywood • mineral-surfaced cap sheet Bellaforte Shake 12 or approval issued in reliance upon or USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? 2023. DaVinci Slate 6 to 8 as a result of,a materially false Min."4.- Two layers ASTM D226 Type II(No.30)asphalt- DaVinci Shake 9 to 10 statement or representation made in 4 A inch plywood 3.12 coated-gloss fibo•nip Bellaforte Shake 12 the process of obtaining the permit or TOTAL AREA 62.91 SQ Bellato- .- 12 development approval shall,likewise, CLASS OF WORK Residential FIRE SPRINKLER TYPE HEAT TAPE MANDATORY CONTROL REQ'S. DaVinci Slate 6 to 6 person having received a HIGH ROOF AREA 32.39 SQ be void.Any All heat tape systems shall meet the following per(Ordinance 1 Series 2023): 5 A Min."/3r 3:12 One layer Eco Chief Products SolarHide^"-SRW DaVinci Shake 9to 10 void or voidablepermit or roves STEEP ROOF(7-9) 10.59 SQ -Automatic controls configured for system shut off when air temperature is abo inch plywood (ESR-4035) Bellaforte Shake 12PP l 401F and comply with one of the following: Sanatoria Slate 12 shall not be relieved from having to REQUIRED SPECIAL -shut on m absence of moisture BUILDING TYPE(IRO) STEEP ROOF(10-12) 27.74 SQ -shut off at night(daylight sensor or timer) For .=25.4 mm;1ft=0.305m comply with all applicable terms and INSPECTIONS STEEP ROOF(>12) 0.00 SQ 'ASTM D226 Type I(No.1 an. ..- . ••-. .. . - ._-::-- -app Icable building code. GAF conditions of this Title and the City shall Versashield®Fire-Resistant Roof Deck Protection underlayment must be installed in accordance with ESR-2053.Eco Chief Products not be estopped from fully enforcing SolarHide*"-SRW underlayment must be instated in accordance with ESR-4035. same. CONSTRUCTION TYPE ENERGY CODE COMPLIANCE IiiI,AI_FACET 8 30 OCCUPANCY GROUP(IBC) WORK CHANGES BUILDING r ���FOOTPRINT? 28/2023 ijVEV '+ CODE EDITIOLIECUMFUN ONS 2021 IBC TOTAL SPA SQ.FT. -_. _ 11/29/2023 g linzhid 11TOR000EIX1f PLINCiE OTHER CODE EDITIONS 2021 IBC TOTALSNOWMELTSQ.FT. Wage 0-d) linzhid HISTORIC PROPERTY? No TOTAL POOL SQ.FT. L 13•i 1� FIRE SPRINKLER EXISTING? �J��/ 3 Propose" ODT Ass eA,L1y Poi, . fik Amenity Energy Use Approved(zozl CODE) 7b1� �X�t,61�10� LA. x❑ RREMP ❑ CREMP PERMIT#:0117-2023-BROF DATE:11/29/23_ O \ 6 ppn CO ID`/1f HEAT TAPE TOTAL WATTAGE:_1920 r _ /� / f WATTS/FT: 6 17- ' GLOSS 11 RSS1• TOTAL LINEAR FT: 320 i ' / r OFFSET:_REMP PAYMENT j)?rtJ ou L G%ce, LL & Wo-ter- 5.1;et1r1 f(UP'S A3 { 1LJ Te^t rn!\ Q5(A 3 0 6601—Atte- V4M�r�i/n^Pn-t 1do5S/fJ *Note: J -The first 1000W are exempt from REMP. I • / (' p I -All roof permits will require a sub-electrical 3�c /I 1 p Sp pr Hyde, Uctts A Vitt,Fte,I.,.s# & er(�w5� permit applied for by a licensed electrician. (tA'V^ ` / �I -A sub-electrical permit must be applied for prior to the final roof inspection as both final Lax 9Q�; t' setei: •sINohC, , T . c ,,IS rot,., C, inspections will occur simultaneously. ck� P I'tV;0U3• SUB-ELECTRICAL PERMIT REQUIRED FOR HEAT MID-ROOF AND FINAL S` N'GJ (��Je p10 #;0, +0 reflo- A sub-electrical permit is required ifTAPE tape system is present,no matter the ROOF INSPECTIONS total wattage,Alicensed electrician must apply for the permit. REQUIRED TO RECEIVE A t The sub-electrical permit must be applied for prior to the final roof inspection as both final inspections will occur simultaneously. LETTER OF COMPLETENESS