Loading...
HomeMy WebLinkAboutFile Documents.716 E Hopkins Ave.0098-2022-BCHO (7) Field Plan Set Must Be Printed In Color ,�►►;�; APPLICATION ACCEPTED DATE: 2022-12-23 PERMIT NUMBER: 0098-2022-BCHOA \;'',) CITY.°OF ASPEN CITY COMMUNITY DEVELOPMENT DEPARTMENT ,1'�; • ASPEN BUILDING PERMIT COVERSHEET \�4�I EE NOTES #1 PLANS 0064-2022-BRES CITYOFFASPEN PERMIT NO . These plans mu's except at the building site or inspection PROPERTY INFORMATION OWNER delays may occur.Construction ADDRESS: 716EHOPKINSA�E SNIT. GOLDBERG ASPEN FAMILY QPRT shall conform to these plans.All changes shall be approved by PARCEL ID: 273707334005 LEGAL DESCRIPTION: PITKIN ROW - — - the building Official. OWNER: GOLDBERG ASPEN FAMILY QPRT PERMIT CONTRACTOR: ADDRESS 716 E Hopkins SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING,MECHANICAL,OR FIRE SPRINKLER WORK DESCRIPTION OF WORK Replace all exterior windows and doors with new units(no changes to size or quantity),change specification of REFERENCES FROM 2015 IRC CV/A=crawl space ventilation required,sec.R408.1 Access required,R408.4 SMOKE ALARMS AND Living Room fireplace,add HVAC system,lighting plan,structural updates,addition of door to lower level PARCEL ID 273707334005 CARBON MONOXIDE EE=emergency escape required sec R310.1 hallway EU=enclosed usable space under stairs shall be''/"Gyp,sec R302.7 DETECTORS REQUIRED G/D=garage/dwelling separation,sec R302.5 and R302.6 THROUGHOUT DWELLING STC=Sound transmission class not less than 45 at dwelling separations,app K UNIT PER CITY OF ASPEN RV=roof and rafter ventilation required,R806.1 MUNICIPAL CODE 8.15 A=attic access 22"x 30",30"headroom above,R807.1 SA=smoke alarms installed to NFPA 72 requirements,sec R314 USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? Yes CO=carbon monoxide detector per City Ordinance 41 series 2008 It should be known that this review shall SG=safety glazing required,sec R308.4 not relieve the applicant of their GR=guardrails,36"min ht,4"max opening;req at 30"drop any point Win 36" horizontally,sec R312 responsibility to comply with the WFP=window fall protection-operable window<24"AFF&>72"above SPECIAL INSPECTION REQUIRED: requirements of the City of Aspen CLASS OF WORK Residential FIRE SPRINKLER TYPE NFPA 13 R grade:use opening control device listed to ASTM F2090,sec R312.2 Municipal Code.Pursuant to HR=handrails 34"-38"ht,sec R311.7.8 -Structural steel welding:Field&Shop Sec.26.104.050,any permit or approval SI=stairway illumination,sec R303.7 -High strength bolting issued in error or otherwise not in PD=protect against decay,sec R317 -Epoxy anchors conformitywith the requirements of this REQUIRED SPECIAL High-Strength Bolting;Structural REFERENCES FROM 2015 lMCq BUILDING TYPE(IRC) Townhouse V=bathroom and balanced whole house mechanical ventilation req. -Intumescent paint Title,shall be void.Similarly,any permit INSPECTIONS Steel Welding Ordinance 40,2016 -Spray applied fire resistive materials or approval issued in reliance upon or DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM -Permanent micropiles as a result of,a materially false AS=access and service space for maintenance req'd,sec 306 statement or representation made in MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 Special inspection is required per 2015 IBC theprocess of obtainingthe permit or CONSTRUCTION TYPE ENERGY CODE COMPLIANCE Prescriptive Table ET=exhausts terminate 3'from prop line and openings,10'from intakes, 501.3.1 section 1704.Inspector to verify that copy of development approval shall,likewise, IT=intake openings 10'from lot line&contaminant sources(vents,streets), agreement for inspection program to be on be void.Any person having received a 401.4 the job site prior to performing any void or voidable permit or approval OCCUPANCY GROUP(IBC) WORK CHANGES BUILDING No D=fasten and seal all ductwork per 603.9 inspections.A copy of all Special Inspector shall not be relieved from having to FOOTPRINT? REFERENCES FROM 20151FGC field reports to be on the job site for comply with all applicable terms and DV=direct vent req'd,sec 303.3 CA=combustion air not taken from bedrooms,bathrooms or inspectors'review if requested.Failure to conditions of this Title and the City shall storage sec 303.3 comply may result in denial of inspection. not be estopped from fully enforcing CODE EDITIONS 2015 IRC TOTAL SPA SQ.FT. OD=outdoor appliances must be listed for outdoor use,sec 303.6 same. REFERENCES FROM 2015 IECC F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label required,Ordinance 40,2016 L=75%of lamps in permanently installed lights must be high efficacy,sec SEE NOTES#1 PLANS OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. R404.1 SE=Continuous air barrier required;all exterior joints,cracks,and holes to be caulked,gasketed,sealed,table R402.4.1.1 REFERENCES FROM 2014 NEC ���''''''yyy '1�y1 EP=electric panel'happy space'30"x36"x78",not in storage,sec 110.26 HISTORIC PROPERTY? No TOTAL POOL SQ.FT. f1f1f1p!!!`YYYFFF sophiej V v j,+ 12/27/2022 FIRE SPRINKLER EXISTING? No ZONING GLASS IN GUARDS AND HANDRAILS Glass ind guards ande handrails shall11 two plies equal thickness r,,,.,,„-.,„ laminated glass. Tempered glass is only permitted where notabove a walking surface and when a top rail that is either self-supported(glass infill panels)or is supported by a minimum of 0 6/2 02 3 three panes of glass. IRC 308.7/IBC 2407. j imp Prescriptive Energy Requirements j. Table R402.1.2"Insulation and Insulation and Fenestration Requirements by Component"has been amended as follows: R-Value Fenestration Skylight Glazed Ceiling Wood Mass Wall Floor Basement Slab Crawl- U-Factor U-Factor Fenestration R-Value Frame R-Value(i) R-Value Wall R-Value& space Wall (b) (b) SHGC(b) Wall R-Value Depth(d) R-Value (e) R-Value (c) (c) 0.28 0.55 NR 49 20+5 or 19/21 38(g) 15/19 10,4ft 15/19 13+10(h) OR k. Table R402.1.4"Equivalent U-Factors"has been amended as follows: U-factor Fenestration Skylight Ceiling Frame Mass Wall Floor Basement Crawl- U-Factor U-Factor U-Factor Wall U- U-Factor U-Factor Wall space Wall Factor (b) U-Factor U-Factor 0.28 0.55 0.026 0.045 0.057 0.028 0.050 0.055 \IIig' CITY OF ASPEN B. Owner Responsibilities: 1. Thep project owner,an agent of the owner,or the design professional in responsible charge acting G. Building Department Responsibilities: SPECIAL INSPECTION AND TESTING AGREEMENT as the owner's agent,is responsible for employing special-inspection services.The special 1. Approve special-inspection program.The building department shall approve all special inspector/agency shall not be in the employ of*contractor,subcontractor or material supplier. inspectors and special-inspection requirements. This form is required for projects needing special inspection and/or testing per Chapter 17 of the International [IBC Sec 1704.1]In case of an ownee/contmetor,the special inspectortagency shall be employed 2. Enforces 1 inspection.Work r l inspection and the building inspector shall BuildingCode(IBC). as specified bythe buildingofficial. special pec requiring specie epee gin pec ( ) o orator the performance of special inspectors.His/Her approval,in addition to that of the special 716 East Hopkins Unit 5 0064-2022-BRES C. Design Professional in Responsible Charge Responsibilities: inspector,must be obtained prior to placement of concrete,covering of structural steel,or other Project Address: Permit Number: Design Professional in Responsible Charge definition:An individual who is registered or liorcord to practice their ti design profession as defined by the statute a of the professional registration laws of the stare or similar materials. BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional elSin responsible charge,acting as respective statutory regrdremen pro essiona re i 3. Review inspection reports.The building official should review special-inspection progress and the owner's agent,shall complete two copies of this agreement and the attached Special-inspection and Testing jurisdiction in whim the project is m be constructed;who is engaged by the owner m review and inordinate certain Schedule,Including the required acknowledgments.A pre-construction conference with the parties involved may be aspects of the project,as determined by the building official,for compatibility with the design of the building or final reports. structure. 4. Perform fmal inspection.The building official should perform the final inspection and approval required to review the special-inspection requirements and procedures. 1. Prepare statement of special inspections.The registered design professional in responsible fora project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for approved. which they provide special inspections.Special inspectors shall be approved by the building department prior to submittal by the applicant.The statement of special inspections shall identify the following: performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for a. The materials,systems,components and work required to have special inspection or pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, testing by the building official or by the registered design professional responsible for when performing the function of special inspector. each portion of the work. Special inspection and testingshall meet the minimum c. The type and extent of each special inspection. 716 East Hopkins Unit 5 Permit Number: 0064-2022-BRES p p requirements of International Building Code Section The type and extent of each test. Project Address: 1704.The following conditions are also applicable: d. For each type of special inspection,identification as to whether it will be continuous A. Special Inspector Responsibilities: special inspection or periodic special inspection. ACKNOWLEDGMENTS D. Contractor Responsibilities: I have read and agree to comply with the conditions of this agreement. 1. Signify presence at job site.Special inspectors should notify contractor personnel of their 1. Notify the special inspector.The contractor is responsible for notifying the special inspector or presence and responsibilities at the job site.If required by the building official,they shall sign in on on the appropriate form posted with the building permit. the buildency ing department individualtetnnnapproved inspections for to lnotice shall attached schedule the s special inspector g ep approv p egos providedp p 2. Observe assigned work.The special inspector shall observe assigned work for conformance with has time to become familiar with the project. the building department approved(stamped)design drawings,specifications,and applicable 2. Provide access to approved plans.The contractor is responsible for providing the special SApecid Inspection Signature Prated Name Date Email mania r access to approved plans. Agency*** Owings a provisions of the International Building Code.Architectkngineer-reviewed shop 3. Retain special inspection records Upon request,the contractor is also responsible for retaining, uaube p main snot OM( c•W Jeff Goldberg Z-L jgddbe J@nalaamnegpmm drawings may be used only as an aid m inspection, at the job site,all special inspection records completed by the special inspector. Owner* Signature Printed Name Date Email For continuous special-inspection,the special inspector shall be on site at all times observing the E. Inspection of Fabricators: Evolve Structural Design Steve Edminston sleve@evoloestruct.com work requiring special inspection.Periodic inspections,if any,must have prior approval based on 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing a separate written plan reviewed and approved by the building department and the engineer or members and assemblies is being performed on the premises of a fabricator's shop,IBC Section Design Professional in Signature Printed Name Date Email architect of record. 1704.2 shall require special inspection of the fabricated items. Responsible Charge** 3. Report nonconforming items.The special inspector shall bring nonconforming items to the 2. Fabrication and implementation procedures.The special inspector shall verify that the $H Built mediate attention of the contractor and note all such items in the daily report.If any item is not fabricator maintains detailed fabrication and quality control procedures that provide a basis for resolved in a timely manner or is about to be incorporated in the work,the special inspector shall inspection control of the workmanship and the fabricator's ability to conform to approved Contractor Signature Printed Name Date Email immediately notify the building department by telephone or in person,notify the engineer or construction documents and reference standards.The special inspector shall review the procedures architect,and post a discrepancy notice. for completeness and adequacy relative to code requirements for fabricator's scope of work. 4. Provide timely reports.The special inspector shall complete written inspection reports for each F. Approved Fabricator Responsibilities: Approved Signature Printed Name Date Email inspection visit and provide the reports on a timely basis determined by the building official.The 1. Fabrication exempt inspections.Special inspections are not required where work is done on the Fabricator*** special inspector or inspection agency shall furnish these reports directly to the building official, premise of a fabricator registered and approved to perform such work without special inspection. engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should If work is done on site that requires special inspection,special inspection will be required. be organized on a daily format and may be submitted weekly at the option of the building official. 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written Inspected Signature Printed Name Date Email These reports should include: procedural and quality control manuals and periodic auditing of fabrication practices by an Fabricator*** a. Description of daily inspections and tests made with applicable locations, approved special inspection agency. b. Listing of nonconforming items, 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit City of Aspen Building c. Report on how nonconforming items were resolved or unresolved as applicable, certificate of compliance to the building official staring that the work was performed in accordance Department: Signature Printed Name Date Email d. Itemized changes authorized by the architect,engineer,and building official if with the approved construction documents. not included in nonconforming items •one a list afwha may sign as the owner on page 2. 5. Provide Final inspection Report.The special inspector shall submit a written final report ..The Design Professional in Responsible Charge is not required to sign if they perform the duties as described in item C above. •••Either the Approved Fabricator or Inspected Fabricator must sign If all work is performed in the shooed'an Approved Fabricator,the Special documenting required special inspections and correction of any discrepancies noted in the inspection Agency signature is not required(no field work). inspections prior to the final building inspection. 30 mm-hGa:era Stray,Aker,CO aul9r-19:970920.5000i is:370920.51971 y se-n am Reaaaat RECEIVED se srma G,kaa Si-r Aa>-,.coa.a rrsrsi^.97D9n.5Cm IF:970.92,.5w71a refasoen vim MAW RECEIVED run RECEIVED G. Building Department Responsibilities: I. Approve special-inspection program.The building department shall approve all special inspectors and special-inspection requirements. 2. Enforce special inspection.Work requiring special inspection and the building inspector shall monitor the performance of special inspectors.His/Her approval,in addition to that of the special inspector,must be obtained prior to placement of concrete,covering of structural steel,or other C. Building Department Responsibilities: program. r similar materials. I. Approve and special-inspection apenHon pin requ reme building department shall approve all special imfcrce sand nselaa. requiring up 3. Review inspection reports.The building official should review special-inspection progress and 2. Enforce special inspection.Work requiring special inspection and the building inspector slut) final reports.P monitor the performance of special inspectors.His/Her approval,in addition to that of the special 4. Perform final inspection.The building official should perform the final inspection and approval inspector,must be obtained prior to placement of concrete,covering of structural steel,or other for a project[IBC Sec.109.3.1]after the final special-inspection report has boon reviewed and similar materials. approved. 3. Review Inapeeden reports.The building official should review special-inspection progress and fine/reports. 4. Perform anal inspection.The building official should perform the final inspection and approval fora project[IBC Sec.109.3.1)after the final special-inspection report has been reviewed and approved. Project Address:716 East Hopkins Unit 5 Permit Number: ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. Project Address:716 East Hopkins Unit 5 Permit Number: 0064-2022-BRES ACKNOWLEDGMENTS 1 bate and to comply with the conditions of this agreement. Special Inspection Signature Printed Name Date Email Agency*** �3, poaaemnspenrwoynrar Jeff Goldberg jgoldberg@milestonegp.com 310 ocl Owner* Signature Printed Name Date Email A�y1ar feel Natm Date Email C---2 Evolve structural Design Steve Edmiston 04/06/22 steve@evelvestruct.com ros.wpwnnrarowr Jeff Goldberg Atiettergemaesionarip.com Design Professional in Signature Printed Name Date Email Game* Signature Printed Name Dale Email Responsible Charge** Esaw sanemat oa.gn Steve Edminston steve@evolvestroctcom SH Built Design Professional in Signature Printed Name Date Email Contractor Signature Printed Name Date Email Reapansilrk Charge** SH Built Grog Meade mems= Greg Hinkle 04/01/2022 greg@shbuilt.com Approved Signature Printed Name Date Email Contractor Signature Printed Nemo Date Email - Fabricator*** Approved Signanrre Printed Nenee Date Email Inspected Signature Printed Name Date Email Fabricator*** Fabricator*** Ironman Welding l ��- Mike Cases r5I5/7z mikecasas3847@gmail.com inspected Sigetamre Printed Nance Date Email City of Aspen Building Fabricator... Department: Signature Printed Name Date Email City of Aspen Building Jim Pomeroy 2/6/23 jim.pomeroy@aspen.gov *See a fist of who may sip'•The Design Professional in Responsible Charger required tosign if they perform the duties as described in item C above. Signature Printed Name Dais Email *••Either the Approved Fabricator or Inspected Fabricator must sign.if all work is performed in the shop of an Approved Fabricator,the Special ,See a tie of who may sip,as the meow on pane 2 Inspection Agency signature is not required(no field work). ••shebnroo Pm(csd�liscsscr or Inspected batneerequiteds decoadl wot pnnamNdesushopdescribed Ahem CaFahr *••mt00 Wee Appnwed a not gtnwa(sed saidis watt). gooming RECEIVED Do South Galena Street Aspen.CO einn.wrs I P:970.920.5000 I Si 970.920.5197 I eityoiaspen.com