APPLICATION ACCEPTED DATE: 2022-05-06 PERMIT NUMBER: 0052-2022-BRES
, / /
COMMUNITY DEVELOPMENT DEPARTMENT ,P� I ',�,I
`" � SPECIAL INSPECTION REQl71Rl�
BUILDING PERMIT COVERSHEET T
CITY OF
CITY OFASPEN
-High strength bolting ASPEN
PROPERTY INFORMATION -Epoxy anchors
'� o A land use application fora Development Order or Notice of Approval was -Intumescent paint
/1 0' submitted to the Community Development Department prior to final passage of
ADDRESS: 729 W FRANCIS STI UNIT: 44i.y the ordinance on December 6,2021,and was subsequently deemed to be -Spray applied fire resistive materials
PARCEL ID: 273512427801 LEGAL DESCRIPTION: GOLDRUSH 1 I`/, complete b the Community Development rtment Director. -Permanent micro Iles These plans muus eKeept at the
�1 �/ ompee y Ity pmen pe micropiles
GOLD RUSH CONDO ASSOC CITY.-OF ASPEN o The land use application is seeking a Development Order or Notice of Approval
PERMIT CONTRACTOR: JOHN WALKER BU I LDER - fora project consisting of 100%Affordable Housing as that term is defined at building site or inspection
` CITY OFASPEN §26.104.1t0 of the Aspen Municipal Code,or as may be deemed necessary for Special inspection is required per 20151BC
PERMIT, 427Rioran Gde ace.PlAspen,C0 8t6n t cates o ousing he issuance of Certifif Affordable H f100.AAffordableous Hing delays may occur.Construction
0052-2022-BRES or a section 1704.Inspector to verify that copy o/
-.w
Oro)920.5090 project,or as determined by the CommunityDntaropment irector. shall conform to these plans.All
.ripe'.' o The land use application involves Voluntary Section
odern designation agreement for inspection program to be on
DESCRIPTION OF WORK Interior remodel of upper l evel with minor reconfiguration of space.New fixtures&finishes throughout. wow processes that meet the requirements of Section 26.415.025.0 and the job site prior to performing any changes shall be approved by
Re move one existing window.Add two windows and infill. OWNER Gold Rush Condo Assoc NOTICE OF EXEMPT IONAND AUTHORIZATION TO APPLY FOR LAND USE/ 26.415.030. inspections. of all Special Inspector aliiking official.
BUILDING PERMITS DURING THE EFFECTIVE TERM OFORDINANCE#27, o The land use application or administrative request may be necessary to issue P copy P P
ADDRESS SERIES OF 2021 AND ORDINANCE#6,SERIES OF 2022 Community Development Directorexempt building permits as described below,and as detemined by the field reports to be on the job site for
.
Remove and replace all windows and doors with new.U-Factor 0.28 or belie r.Remove existing siding and 729 W Francis#1 inspectors'review if requested.Failure to
with new.No than t building thickness.No t floererea.Nochan to buildingheight. •
Property Address: 729W Francis St The project described above is permitted to submit for building permit review comply may result in denial of inspection.
rep acewi change o g change o ge g . '. because(check all that applv): SEPARATE PERMITS ARE
PARCEL ID 273512427801 Parcel ID Number: 273512427801 o REQUIRED FOR ELECTRICAL,
A building permit application was submitted to the Development PLUMBING,MECHANICAL,OR
' PropeM Owner: GOLD RUSH CONDO ASSOC Department prior to final passage of the ordinance onn December 8,2021,and
SubsequentN deemed tobe complete by the Chief Building Official. FIRE SPRINKLER WORK
Representative/email: phil.lehuelgoutlook.com o It ais a building permit fora project that will not increase the gross square Per thisprojects asbestos inspection report, our project
Exterior footage of development,Net leasable area,or Net livable area of any building P P Y P 1
Scope of Work(Provide narrative here and a separate pdf which is a succinct and and does not meet the definition of demolition. does not require a State asbestos abatement permit. SMOKE ALARMS AND
clear set of supporting documents,to be attached to this form as Exhibit A,such as a It is a building permit fora project that will not increase the Height of any However,the following OSHA regulation must be
Letters of Completeness, Resolutions, Development Orders, Land Use Case building.This includes additions to or replacement of mechanical equipment or strictly adhered to:Standard Title 29,Part 1910.134, CARBON MONOXIDE
wumbers,Building Permit numbers etc. If the representation being made is that the energy efficiency systems pursuant to height exemptions as Set forth at 1910.1001,and 1926.1101 of the Code of Federal DETECTORS REQUIRED
ork does not Involve dimensional changes prohibited by the moratorium provide evelo5.020 of the Aspen Municipal Code,or as determined by the Community g youTHROUGHOUT DWELLING
USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? No existing and proposed calculations,floor Plans and and elevations to be attached: Development Director. Regulations.It is recommended that familiarize
o It is a building permit for commercial and lodge development as stand-alone yourself with these regulations and have a certified UNIT PER CITY OF ASPEN
Interior Remodel of uppern,.Newwtodows and noon,around swlmos.N.charge mrna.sochange In bulldIng heles.
o Theoa uses
n pa calhas or property.
General Abatement Contractor(GAC)conduct the removal MUNICIPAL CODE 8.15
CLASS OF WORK Residential FIRE SPRINKLER TYPE
of the Asbestos Containing Material(ACM)under
Notice of Approval on the effective date of this ordinance. engineering controls and that once the removal process is
o It is a building permit for 100%affordable housing projects as that term is completed,a visual inspection and clearance air
REQUIRED SPECIAL Due to the circumstances noted below,the above referenced project as defined by defined at§26.pemeit 0 of the Aspen Municipal Code. P P
BUILDING TYPE(IRC) Two family Structural Steel Welding the Scope of Work is exempt from the application of Ordinance#27,Series of 2021 o It is a building permit for demolition or repair of non-habitable structures. monitoring be conducted by an independent,certified Air
INSPECTIONS and Ordinance#6,Series of 2022,and is authorized to pursue a land use review y Ma 2 22 Monitoring Specialist. Furthermore,identified ACM may
and/or building parmit review during the effective tams of Ordinance#27,Series of Issued on 20 this ceifirate is valid through the be in areas which were either not covered in the scope of I It should be known that this review shall
2021 and Ordinance#6, Series of 2022, ordinances which generally place effective date of Ordinance#27,series of 2021 Orrdinance#6,Series of 2022,or the asbestos inspection or were inaccessible or hidden
CONSTRUCTION TYPE VB ENERGY CODE COMPLIANCE Prescri ptive Table moratorium on residential development. This authorization does not guaranteea the any Ordinance which supersedes a provision of these ordinances in a manner which not relieve the applicant of their
issuance of a building permit or approval of any land use application. The applicant is relevant to the Scope of Work. A copy of this certificate is required when applying due to their application during the Construction process
must submit complete information and pursue all authorized approvals in a timely for any land use review or building permit.This Notice is not a Development Order and their Subsequent enclosure or Covering With building responsibility to comply with the
WORK CHANGES BUILDING fashion, adhering to all deadlines for submission, terms of Vested Rights, or Administrative Determination that h subject to appeal. and finish materials.These areas should be inspected requirements of the City of Aspen
OCCUPANCY GROUP(IBC) No
FOOTPRINT? response times required to maintain an active building permit,and NI other Land Use Amer;Stnww Planning Director,for when renovation or demolition activities are scheduled Municipal Code.Pursuant to
Code and Building Code requirements in effect as of Dedmber 8,2021. Any Philip Ou which may disturb the materials within,or beneath these Sec.26.104.050,anypermit or nova
amendments and or additional approvals not addressed or identified in the p100 approval
applicat maybe subject to Ordinance#27,Series of 2021 or Ordinance#6R Se' Community Development Director carriers. issued in error or otherwise not in
CODE EDITIONS 20151RC TOTAL SPA SQ.FT. Disclaimer:This exemption is given based on the information provided by the applicant If Changes are
of 2022. RE Community
made,or the scope,after a more detailed AAew,is found to be subject to ordinance 22,vv /�
Ordinance tie,series of 2022,the exemption may be revoked. RE61EIVEkL�I conformity with the requirements of this
The project described above is permitted to proceed with land use review bec03g05/2022 Exhibit Po Floor plans and elevations representing son,ofwal os/os/zoz2 Title,shall be void.Similarly,any permit
OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. (check all that apply): ASPEN or approval issued in reliance upon or
BUILDING DEPARTMENT ASPEN
BUIIDINGDEPARTMENT as a result of,a materially false
HISTORIC PROPERTY? No TOTAL POOL SQ.FT. statement or representation made in
the process of obtaining the permit or
development approval shall,likewise,
be void.Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
\"r j, . - _ -- -- D 'eq.- liefifigti)
B. Owner Responsibilities: 11/15/2 O 2 2
1. The project owner,an agent of the owner,or the design professional in responsible charge acting
CITY OF ASPEN as the owner's agent,is responsible for employing special-inspection services.The special
inspector/agency shall not be in the employ of the contractor,subcontractor or material supplier. ky 1 a s
SPECIAL INSPECTION AND TESTING AGREEMENT [IBC Sec 1704.1]In case of an owner/contractor,the special inspector\agency shall be employed
as specified by the building official. Z O N I N G i
This form is required for projects needing special inspection and/or testing per Chapter 17 of the International C. Design Professional in Responsible Charge Responsibilities:
Building Code(IBC). Design Professional in Responsible Charge definition:An individual who is registered or licensed to practice their _ - --
P ant Address:729 W Francis Cl- permit Number.0052-2022-BRES respective design profession as defined by the statutory requirements of the professional registration laws of the state or
roj jurisdiction in which the project is to be constructed;who is engaged by the owner to review and coordinate certain
BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as aspects of the project,as determined by the building official,for compatibility with the design of the building or a Building fie Cr0<a Rap.mibmua:
the owner agent,shall complete two copies ofthis agreement and the attached Special-inspection and Testin setcture. I. A tar-Inaeeemn The building „col, dt Id
'sag P Pg sceansc pmpam. gdmaraa, approve sprs
Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may be 1. Prepare statement of special inspections.The registered design professional in responsible inspectors and special-ins
to review the special-inspection re uirements and procedures. charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for a. Enr.ra spedauespeerbs mods requiring sie.at impeaion.m she bnddms,mpemon shall
required 4 P monitor As Pal een.amel Inspectors.HrslNa approval in addition m cot of Me special
submittal by the applicant.The statement of special inspections shall identify the following: imparor,mmf enobr.inea prior so placement or concrete cares orsmarmal pal,or other
APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for a. The materials,systems,components and work required to have special inspection or similar materials.
which they provide special inspections.Special inspectors shall be approved by the building department prior to testing by the building official or by the registered design professional responsible for 3. RM<n Inspection reports.The building official should review spaahmryeuon ln,psss and
performing any duties.Special inspectors shall submit their qualifications and are subject to personal interviews for each portion of the work. final repnrn. .
pre-qualification.Special t hall display approved identification,as stipulated the buildingofficial, a. Perform seal Impenloo.The building official should saloon the fusel inspection and approval
pre-q pecia inspectors s pay by b. The type and extent of each special inspection. for a project pc See.109.3.I I nem me final speci.wmp:Mice repo.w boo ne.ia..aa and
when performing the function of special inspector. c. The type and extent of each test. appmad.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section d. For each type of special inspection,identification as to whether it will be continuous
1704.The following conditions are also applicable: special inspection or periodic special inspection.
D. Contractor Responsibilities:
A. Special Inspector Responsibilities: 1. Notify the special inspector.The contractor is responsible for notifying the special inspector or Pro)set Ad4vt 729 West Francis St Units 1r2 penult Naahar. 0052-2022-BRES
1. Signify presence at job site.Special inspectors should notify contractor personnel of their agency regarding individual inspections for items listed on the attached schedule and as noted on
presence and responsibilities at the job site.If required by the building official,they shall sign in the building department approved plans.Adequate notice shall be provided so the special inspector A OWLEDGMENTS
on the a to form fed with the building permit. has time to become familiar with the project. I have and a comply wills the conditions of Nis agreement-
on
ppropria posted g p /
2. Provide access to approved plans-The contractor is responsible for providing the special dF�/�y�
2. Observe assigned work.The special inspector shall observe assigned work for conformance with inspector access to approved plans. �/(AtI AAt AVeC ar t7,a# n 'E'
the building department approved(stamped)design drawings,specifications,and applicable 3- Retain special inspection records.Upon request,the contractor is also responsible for retaining, speid rnsyearon /I m Emil V V. ray1
workmanship provisions of the International Building Code.Architect\engineer-reviewed shop at the job site,all special inspection records completed by the special inspector. Aa'aei'"' �a.•r✓�•�•j ma
drawings may be used only as an aid to inspection. E. Inspection of Fabricators: 138 G LLC alit.9i4,,n S7 ri
Noelle Hernandez 08.22.2022 nchworri816@gmail.com
For continuous special-inspection,the special inspector shall be on site at all times observing the 1. Fabrication of structural assemblies and members.Where fabrication of structural load-bearing arm' Sipape Painted None m Emil
q g specialp inspections, any, prior approvalmembers and assemblies is being performed on the premises of a fabricator's shop,IBC Section Imo encore a OmIPa uc,f/,.�,p/s,a aS Neale Hanuneu oe.zzsox2 work r requiring inspection.Periodic if must have based on d Email aNamuro..min
a separate written plan reviewed and approved by the building department and the engineer or 1704.2 shall require special inspection of the fabricated items. Dear,,,Prorevi9w in Signature primed Name Date Emit
architect of record. 2. Fabrication and implementation procedures.The special inspector shall verify that the Rnpomible
3. Report [ems.The special inspector shall brim nonconforming tams to the fabricator maintains detailed fabrication and quality control procedures that provide a basis for
por g i p p g modcom g i inspection control of the workmanship and the fabricator's ability to conform to approved IL lit Ilr '�12fpk ' o/dRL�jC/ up/ew�p,
immediate attention of the contractor and note all such items in the daily report.If any item is not construction documents and reference standards.The special inspector shall review the procedures eo9bapur Si Pam Nome Dec limo
resolved in a timely manner or is about to be incorporated in the work,the special inspector shall m •Coot
immediately notify the building department by telephone or in person,notify the engineer or for completeness and adequacy relative to code requirements for fabricator's scope of work.
F. Approved Fabricator Responsibilities: App,o.ed Signature Ps;uee Name Date
architect,and post a discrepancy notice. Emil
4. Provide timely reports.The special inspector shall complete written inspection reports for each 1. Fabrication exempt inspections.Special inspections are not required where work is done on the Fabdu r•'raY
inspection visit and toe the reports on a time) basis determined b the building official.The premise of a fabricator registered and approved to perform such work without special inspection. C 6 !�Ao -/��
p provide p Y Y g If work is done on site that requires special inspection,special inspection will be required. r, �� -� .4f�ador(YPrC.T3 �4/�'m
special inspector or inspection agency shall famish these reports directly to the building official, 4 P pe sec pImpacted -Sis •ud N Date Eyg a7
2
engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should . Approval of fabricator.Approval shall be based upon review of the fabricator's written Fabric"'
4
procedural d quality control manuals and periodic auditingof fabrication practices b an <? ''� JustinHahn
be organized on a daily format and may be submitted weeklyt the option of the building official. an qua pe p p y City of Aspen Building -• 11/11/22 ustin.hahn as en.ov
g Y Ya P g j @ P 9 r.,-.,,,
These reports should include: approved special inspection agency. Depanmrnn sisunaa Pruned Nov D.m Emdl3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submita. Description of daily inspections and tests made with applicable locations, ate m eieet�P rout m amour anaemia,
b. Listin ofnoneonformin tams, certificate of compliance to the building official statingthat the work was performed in accordancemnofn.haamRapmsaemaeaa„con„ram,;a;rp.yrarnm,rd,.;aaem;mrm,laec.a,,,.
g gi pp rw�amAmrw�..r"�oeuserseIe.sseerunoinenvan.act.Pam,seeerev.soap-c,drra„e.a,.d.s,.a;,, 1/2022
c. Report on how nonconforming items were resolved or unresolved as applicable, with the approved construction documents.
d. Itemized changes authorized by the architect,engineer,and building official if
not included in nonconforming items
5. Provide Final Inspection Report.The special inspector shall submit a written final report 1 us tinh
documenting required special inspections and correction of any discrepancies noted in the
inspections prior to the final building inspection.
RECEIVED
09/2