Loading...
HomeMy WebLinkAboutFile Documents.1263 Bunny Ct.0015-2023-BCHO (9) Field Plan Set Must Be Printed In Color 1►I APPLICATION ACCEPTED DATE: 2023-02-27 PERMIT NUMBER: 0015-2023-BCHO 4 'p i/ COMMUNITY DEVELOPMENT DEPARTMENT CITY OF ASPEN CITY OF `�,r�P • ASPEN BUILDING PERMIT COVERSHEET CITY OFASPEN PERMIT NO 0015 2023-BCHO These plansmuus a ceptatthe .�� building site or inspection PROPERTY INFORMATION delays may occur.Construction OWNER Homer Heidi C Rev Trust shall conform to these plans.All changes shall be approved by ADDRESS: 1263 BUNNY CT UNIT: the building official. PARCEL ID: 273512243001 LEGAL DESCRIPTION: BUNNY COURT TOWNHOMES CONDO ADDRESS OWNER: HORNER HEIDI C REV TRUST 1263 Bunny Ct SEPARATE PERMITS ARE PERMIT CONTRACTOR: SH BUILDING GROUP LLC __ REQUIRED FOR ELECTRICAL, PLUMBING,MECHANICAL,OR PARCEL I D 273512243001 S DESCRIPTION OF WORK Change order to permit 0047-2022-BRES to include miscellaneous repairs,updates to the HVAC system,and a • CARBONFIRESPRINKLERSMOKEALARM MONOXIDE WO RKAND D I roof replacement. THROUGHOUT DWELL NG UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 SEE NOTES #1 PLANSIt should be known that this review shall not relieve the applicant of their USE OF BUILDING Multi-Family FIRE SPRINKLER REQUIRED? responsibility to comply with the REFERENCES FROM 20151RC requirements of the City of Aspen CV/A=crawl space ventilation required,sec.R408.1 Access required,R408.4 Municipal Code.Pursuant to EE=emergency escape required sec R310.1 EU=enclosed usable space under stairs shall be'''/"Gyp,sec R302.7 Sec.26.104.050,any permit or approval CLASS OF WORK Residential FIRE SPRINKLER TYPE G/D=garage/dwelling separation,sec R302.5 and R302.6 issued in error or otherwise not in STC=Sound transmission class not less than 45 at dwelling separations,app conformity with the requirements of this K Title,shall be void.Similarly,any permit RV=roof and rafter ventilation required,R806.1 or approval issued in reliance upon or REQUIRED SPECIAL A=attic access 22"x 30",30"headroom above,R807.1 l)ri f o,a materially BUILDING TYPE(IRC) SA=smoke alarms installed to NFPA 72 requirements,sec R314 as a resulty false INSPECTIONS CO=carbon monoxide detector per City Ordinance 41 series 2008 statement or representation made in SG=safety glazing required,sec R308.4 the process of obtaining the permit or GR=guardrails,36"min ht,4"max opening;req at 30"drop any point w/in development approval shall,likewise, horizontally,sec R312 be void.Any person having received a CONSTRUCTION TYPE ENERGY CODE COMPLIANCE WFP=window fall protection-operable window<24"AFF&>72"above grade:use opening control device listed to ASTM F2090,sec R312.2 void or voidable permit or approval HR=handrails 34"-38"ht,sec R311.7.8 shall not be relieved from having to SI=stairway illumination,sec R303.7 comply with all applicable terms and WORK CHANGES BUILDING PD=protect against decay,sec R317 conditions of this Title and the City shall OCCUPANCY GROUP(IBC) No REFERENCES FROM 20151MC not be estopped from fully enforcing FOOTPRINT? V=bathroom and balanced whole house mechanical ventilation req. Ordinance 40,2016 same. DE=clothes dryer exhaust,sec 504.Makeup air req'd if over 200 CFM AS=access and service space for maintenance req'd,sec 306 MA=make up air required if hood exhausts greater than 400 CFM,sec 505.2 CODE EDITIONS TOTAL SPA SQ.FT. ET=exhausts terminate 3'from prop line and openings,10'from intakes, SEE NOTES#1 PLANS 501.3.1 lT=intake openings 10'from lot line&contaminant sources(vents,streets), 401.4 OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. D=fasten and seal all REFERENCESF per60R- FROM 2015 IFGCriliEWE DV=direct vent req'd,sec 303.3 ii) CA=combustion air not taken from bedrooms,bathrooms or storage sec 303.3 OD=outdoor appliances must be listed for outdoor use,sec 303.6 17/2 0 2 3 HISTORIC PROPERTY? No TOTAL POOL SQ.FT. REFERENCES FROM 2015 IECC F=new or replacement glazing shall not exceed 0.28 U-Value,NFRC label �yyp npyy,;,r.,y �rky/�C required,Ordinance 40,2016 �'�7R VrK6.ulRalrl.Yf01lG L=75%of lamps in permanently installed lights must be high efficacy,sec j imp R404.1 FIRE SPRINKLER EXISTING? SE=Continuous air barrier required;all exterior joints,cracks,and holes to be caulked,gasketed,sealed,table R402.4.1.1 REFERENCES FROM 2014 n sCrilarila EP=electric panel happy space'30"x36"x78",not in storage,sec 110.26agdad j /20/2023 ZONING FIRE SPRINKLERS REQUIRED • • 0 j • 44A►`R► CITYO(j ASPEN B. Owner Responsibilities: • 1. The project owner,an agent of the owner,or the design professional in responsible charge acting • • • as the owner's agent,is responsible for employing special-inspection services.The special ; G. Building Department Responsibilities: SPECIAL INSPECTION AND TESTING AGREEMENT inspector/agency shall not be in the employ of the contractor,subcontractor or material supplier. I. ppprowe spedai-inspection program.The building department shall approve all special This tome is required for projects needing special inspection and/or testing per Chapter 17 of the International [IBC Sec 1704.111n ease of an owner/contractor,the special inspectottagenc}shall be emplryed inspector and spccinl-inspection requirements. BuildingCode(IRC). as specified b}•the building official. q g spa prro C. Design Professional in Responsible Charge Responsibilities: 2. monitor the inspection.pecis re mein clot ins lion and the buonito that of the shall 1263 Runny CI Aspen CO 81611 0047-2022-BRES li monitor the performance of special inspectors.1IisAler approval,in addition to that of the special Project Address: Permit Number: Design Professional in Responsible Charge definition:An individual who is registered or licensed ie practice their inspector,roust he obtained prior to placement of'concrete,covering of structural steel,or oil Cr respective design profession as defined by the statutory requirements of the professions)registration laws of the Mate or BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as jurisdiction in which the project is to he constructed:who is engaged by the owner to review and coordinate certaiin similar materials. the owner's agent,shall complete Iwo copies of this agreement and the attached Special-inspection and Teslin as ects alike project.as determined by the building official,for compatibility with the design of the building3. Review inspection reports.The building official should review special-inspection prowess lend g p P toP P j s P• d w p' or final re its. Schedule,including the required acknowledgments.A pre-construction conference with the parties involved nay be structure. ports. required to review the special-inspection requirements and procedures. 1. Prepare statement of special inspections.The registered design professional in responsible 4. Perform float Inspection.The building official should perform the f final inspection rind approval i for shall prepare a statement of special inspections in accordance with IBC Section 1705 for for n project iIRC Sec.109.3.11 after the final special-inspection report has been rosiest/al a d APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the prof et which they provide special inspections.Special inspectors shall be approved by the building department prior to submittal by the applicant.The statement of special inspections shall identify the following: approved. a. The materials,systems,components and work required to have special inspection at performing any duties.Special inspectors shrill submit their idenli qualifications and are to personal inlen icWs for testing by the building official or by the registered design professional responsible t�ir pre-qualification.Special inspectors shall display approved identification,as stipulated by the building o0icial, each portion of the work. E 1 when perlumming the function ut'special inspector. b. The type and extent of each special inspection. i Special inspection and testing shall meet the minimum requirements of the International Building Code Section c. The type and extent of each test. - Ij_ t 263 Bunny CL Aspen CO 8'I6'I1 0047-2022 P.iF d. For each type of special inspection,identification as to whether it will be continuoub { Project Address: Permit Number: 1704.'I'hc following conditions are also applicable: Pe l� --___ special inspection or periodic special inspection. 1 A. Special Inspector Responsibilities: D. Contractor Responsibilities: 1 ACKNOWLEDGMENTS I. Notify the special inspector.The contractor is responsible for centri the special inspector t I have read and agree to comply with the conditions of this agreement. I. Signify presence at job site.Special inspectors should nobly contractor personnel of their p pee po rig pe� spa �or P presence and responsibilities at the job site.If required by the building official.they shall sin in agency regarding individual inspections for items listed on the attached schedule and as noteh on on the appropriate form posted with die building permit TTI the building department approved plans.Adequate notice shall be provided so the special inspector 1 has time to become familiar with the project. OW Mstat Works,lea (. ` . PQlx2 Christopher Pena 2/3/23 coanai dwmstahvorkslnc.com 2. Observe assigned work.The special inspector shall observe assigned work for eantormande with } 2. Provide access to approved plans.The contractor is responsible for providing the special the building department approved(.stamped)design drawings,specifications,rind applicablrl ins color access to a d Inns. Special inspection Signature Printed Name Date Email workmanshipprovisions of the International BuildingCode.Architecflcn ineer-reviewed sI rs P approved° P Agency B P 3. Retain special Inspection records.Upon request,the writhe is also responsible Cur reaihing, Robert M.Ferguson Robert M.Ferguson 2/13/23 bferguson@jaywalkerlodge.com drawings may he used only as an aid to inspection. at the job site,all special inspection records completed by the special inspector. , For continuous spccinl-inspection,the special inspector shall he on site at all times observin the E. Inspection of Fabricators: ' Owner° Sign Printed Name Date Email work requiring special inspection.Periodic inspections,Warty,must haveprior approval ha d on I 1. Fabrication of structural assemblies and members.Where fabrication of structural toad-Rearing 9 g tx' Ix ' Y• PP Evolve Structural Design Steven Edmiston 02/09/23 sieve@evolveslruct.com a separate written plan reviewed and approved by the building dcparitnent and the engineer r members and assemblies is being performed on the premises of a fabricator's shop,IBC Section 9 architect of record. 1704.2 shall require special inspection of the fabricated items. 0 Design Professional in Signature - Printed Name Date Email 3. Report nonconforming items.The special inspector shall bring nonconforming items to the 2. Fabrication and implementation procedures.The special inspector shall verify that the ' Responsible Charge" immediate attention of the contractor and note all such items in the daily report.If any item is not fabricator maintains detailed fabrication and quality control procedures that provide a basis fair ,c �r 1lei N�N�i Z/�a/Z3 resolved in a timely manner or is about to be incorporated in the work,the special inspector shall inspection control of the workmanship and the fabricator's ability to conform to approved ' ':i eS l.�l L i' /6T C CAll immediately notify the building department by telephone or in person,notify the engineer o' construction documents and reference standards.The special inspector shall review the procedures Contractor Signs Prated Name Date Email nrohitcct,and peal a discrepancy nonce. for completeness and adequacy relative to code requirements for fabricator's scope of work. 4. Provide timely reports.The special inspector shall complete written inspection reports for each F. Approved Fabricator Responsibilities: t inspection visit and provide the reports on a timely basis determined by the building oficia The 1. Fabrication exempt inspections.Special inspections are not required where work is done o{i the t Approved Signaler Printed Name Date Email I special inspector or inspection agency shall furnish these reports directly to the building o cial. premise of a fabricator registered and approved to perform such work without special inspection. 1 Fabricator*** LCPAN2,iV y,�,1L[LjL( 'r� engineer or architect of record,and others as designated.[hBC Sec.1704.1.2]These reports should If work is done on site that requires special inspection,special inspection will be required. : l `r r,,,,,,,'w C '/ ,"1 �C Z�3 Z 3 j�Y+'IbJe�uru Ind t;�Y/Ku irUry be organized on a daily format and may be submitted weekly at die option of the building o icial. 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written 1 YJJC71t3N LM) I These reports should include: procedural and quality control manuals and periodic auditing of fabrication practices by an t Inspected Signature Printed Name Date Email a. Description of daily inspections and tests made with applicable locations, approved special inspection agency. t Fabricator*** - h. Listing of nonconforming items, 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit Jim Pomeroy3/17/23 Im. omero as en. ov c. Report on how nonconforming items were resolved or unresolved as applicable, certificate of compliance to the building official stating that the work was performed in accordance I City of Aspen Building �' _ I P y@ p g d. Itemized changes authorized by the architect,engineer,and building official if with the approved construction documents. Department: Signature �— Printed Namo Dale Email not included in nonconforming items • 5. Provide Final Inspection Report.The special inspector shall submit a written final report 'see a list of whom nay sign as the°utter on page 7. documenting required special inspections and correction of any discrepancies noted in the a •••True Design Prufesstoual In Renposaihlc Chergc is not requlrod to sign if they perform the Juries as deerrihed in item C ahnve § '••Fisher the Approved Fabricator or Inspected Fabricator must sign.11al1 work is pergmnet a the shop of an Apposed rank-nor,the Spacial inspections prior to the final huilding inspection. ¢¢¢¢ Inspection Agency signature is not required(no geld workl. I •I RECEIVED 1 ibo Somh G.lena Sloe Ao :rim Aspen,COGO ar6n•ip7a I P,970.970.5000 I F.970.97o51V7 1 cis f,apv Es'tiE RECEIVED - . fie„r x, �—� ...MT.., I Is ` C