Loading...
HomeMy WebLinkAboutFile Documents.1050 Matchless Dr.0113-2020-BRES (2) DATE:4/23/2020 MASTER PERMIT: PERMIT NUMBER: , COMMUNITY DEVELOPMENT DEPARTMENT ��N 44 BUILDING PERMIT APPLICATION 4�� ` CITY OF ASPE N PROPERTY INFORMATION 1 ADDRESS 1000 Matchless Drive UNIT# PARCEL ID# 273707411800 TRACT LOT BLOCK OR SUBDIVISION OWNER NAME Racquet Club Condo Association CELL EMAIL BEST CONTACT Bryan May CELL 970.315.2229 EMAIL bmay@bryanmayarchitecture.com NAME PROJECT DETAILS (READ DEFINITIONS BELOW) COMPLETIONMUSE T COMPLETED IN ITS ENTIRETY 1 OF WORK IN DESCRIPTION D TAIL Construction of two new garage buildings and a wildlife resistant trash enclosure per BOA Resolution 004-19 for the Racquet Club Condominium Association HOA. Both buildings are unconditioned. PROJECT 473,150.00 Use of Building Class of Work Fixture Counts Important Review Triggers VALUATION ❑ Commerical ❑■ New ° Toilets,Bidets Major Engineering Review SQFTOF 0 Multi-Family 0 Addition Bathtub •Projects involving less than 50% BUILDING GEA 2,293 ❑■ Single Family 0 Alteration Lavatory(Wash Basin) hardscape area and work affecting W AR ❑ Mixed-Use 0 Repair ° Shower 75%or greater of unit sq ft 2,293a Kitchen Sink(+Disposal) •Projects involving greater than UNITSQFT 0 0 IFFR ° Dishwasher 50%hardscape area and work LOT SIZE El Tenant Finish ° Laundry Bar,Utility Sink affecting 50%or greater of unit (SQ FT) Will there be 0 Demolition ° Clothes Washer sq ft 503FT OF SOIL g 917 any roof/wall 0 Change Order o Floor Sink •Projects involving 1,000+sq ft of DI TURBANCE penetrations? 0 ° Floor Drain soil disturbance area ❑ Yes 0Water Heater(Pan Req) NEW SQ FT 0 No ° #Gas Outlets Water Efficient Landscaping ° Water Treatment •Projects that trigger a major BUILDING 2293 ° Other engineering review FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior or construction authorized is not commenced within affecting 50%or more HARDSCAPE 5447 180 days,or if construction or work is suspended or alterations e ngross square footage AREA abandoned for a period of 180 days at any time after g q g ZONE R-6 work is commenced. DISTRICT i Project Valuation:Cost of project as defined in Valuation Affadavit. Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration. 0 Unit Sq Ft:Gross square footage, not FAR,of permitted unit. H Lot Size:Total surveyed square footage of property. APPROVALS Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved w Building Footprint:Grade floor square footage of the permitted structure. PC 0 Hardscape Area:Square footage of impervious lot surface. Zone District:Underlying zone district of permitted parcel. Zoning HPC Building SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire Building Building Engineering Review Permit Fee Parks Impact CMP Engineering Zoning School Lands Water Review Review(50%) Dedication Stormwater Zoning CMP(50%) TDM Impact Sanitation Review(50%) Energy Code REMP Pedestrian Env. Health Review Payment Amenity Parks CMP(50%) GIS Housing Cash in Lieu Landscape City Use Parks Review Tax Water Tap Efficiency Approved County Use To Issue Utility Review Tax Sanitation Issuance / ( CITY OF ASPEN January2019 130 S. v~/v161 U GALENA ST ASPEN, CO 81611�