HomeMy WebLinkAboutFile Documents.1050 Matchless Dr.0113-2020-BRES (2) DATE:4/23/2020 MASTER PERMIT: PERMIT NUMBER:
,
COMMUNITY DEVELOPMENT DEPARTMENT ��N
44
BUILDING PERMIT APPLICATION 4��
` CITY OF ASPE N
PROPERTY INFORMATION
1
ADDRESS 1000 Matchless Drive UNIT# PARCEL ID# 273707411800
TRACT
LOT BLOCK OR SUBDIVISION
OWNER NAME Racquet Club Condo Association CELL EMAIL
BEST CONTACT Bryan May CELL 970.315.2229 EMAIL bmay@bryanmayarchitecture.com
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) COMPLETIONMUSE T
COMPLETED IN ITS ENTIRETY
1
OF
WORK IN DESCRIPTION D TAIL Construction of two new garage buildings and a wildlife resistant trash enclosure per BOA Resolution
004-19 for the Racquet Club Condominium Association HOA. Both buildings are unconditioned.
PROJECT 473,150.00 Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑■ New ° Toilets,Bidets Major Engineering Review
SQFTOF 0 Multi-Family 0 Addition Bathtub •Projects involving less than 50%
BUILDING
GEA 2,293 ❑■ Single Family 0 Alteration Lavatory(Wash Basin) hardscape area and work affecting
W AR
❑ Mixed-Use 0 Repair ° Shower 75%or greater of unit sq ft
2,293a Kitchen Sink(+Disposal) •Projects involving greater than
UNITSQFT 0 0 IFFR ° Dishwasher 50%hardscape area and work
LOT SIZE El Tenant Finish ° Laundry Bar,Utility Sink affecting 50%or greater of unit
(SQ FT) Will there be 0 Demolition ° Clothes Washer sq ft
503FT OF SOIL g 917 any roof/wall 0 Change Order o Floor Sink •Projects involving 1,000+sq ft of
DI TURBANCE penetrations? 0 ° Floor Drain soil disturbance area
❑ Yes 0Water Heater(Pan Req)
NEW SQ FT 0 No ° #Gas Outlets Water Efficient Landscaping
° Water Treatment •Projects that trigger a major
BUILDING 2293 ° Other engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
or construction authorized is not commenced within affecting 50%or more
HARDSCAPE 5447 180 days,or if construction or work is suspended or alterations e ngross square footage
AREA abandoned for a period of 180 days at any time after g q g
ZONE R-6 work is commenced.
DISTRICT i
Project Valuation:Cost of project as defined in Valuation Affadavit.
Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
0 Unit Sq Ft:Gross square footage, not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
w Building Footprint:Grade floor square footage of the permitted structure. PC
0 Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning
HPC
Building
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire
Building Building Engineering
Review Permit Fee Parks Impact
CMP
Engineering Zoning School Lands Water
Review Review(50%) Dedication Stormwater
Zoning CMP(50%) TDM Impact Sanitation
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review Payment Amenity Parks
CMP(50%) GIS Housing Cash in Lieu Landscape
City
Use
Parks Review Tax Water Tap Efficiency
Approved
County Use To Issue
Utility Review Tax Sanitation
Issuance
/
( CITY OF ASPEN January2019 130 S. v~/v161 U
GALENA ST ASPEN, CO 81611�