HomeMy WebLinkAboutFile Documents.508 E Cooper Ave.0006-2023-BCOM (9) 111116 COMcheck Software Version 4.1.5.3
A(1 Mechanical Compliance Certificate
Project Information
Energy Code: 2015 IECC
Project Title: 508 E Cooper ran
0 6/2 0 2 3
Location: Aspen, Colorado
Climate Zone: 7LIANCE
Project Type: Alteration j us tinh
Construction Site: Owner/Agent: Designer/Contractor:
Aspen, CO
Mechanical Systems List
Quantity System Type&Description
1 VRF outdoor unit(Single Zone):
VRF Condensing Unit,Air Cooled w/Heat Recovery Heat Pump
Heating Mode:Capacity=154 kBtu/h,
No minimum efficiency requirement applies
Cooling Mode:Capacity=138 kBtu/h,
No minimum efficiency requirement applies
Fan System: None
2 VRF Indoor Units(Single Zone):
Cooling: 1 each-VRF Zone Fan Unit,Capacity=48 kBtu/h,Air Economizer
No minimum efficiency requirement applies
Fan System: FAN SYSTEM 1 --Compliance(Motor nameplate HP method): Passes
Fans:
FAN 1 Supply,Constant Volume, 1377 CFM,0.5 motor nameplate hp,0.0 fan efficiency grade
1 MUA(Single Zone):
Heating: 1 each-Duct Furnace,Gas,Capacity= 151 kBtu/h
Proposed Efficiency=92.00%Ec, Required Efficiency: 80.00%Ec
Fan System: FAN SYSTEM 2--Compliance(Motor nameplate HP method): Passes
Fans:
FAN 2 Supply,Constant Volume,2400 CFM, 1.5 motor nameplate hp,0.0 fan efficiency grade
Mechanical Compliance Statement
Compliance Statement: The proposed mechanical alteration project represented in this document is consistent with the building
plans, specifications, and other calculations submitted with this permit application.The proposed mechanical systems have been
designed to meet the 2015 IECC requirements in COMcheck Version 4.1.5.3 and to comply with any applicable mandatory
requirements listed in the Inspection Checklist.
Gregory Waldorf- Mechanical Engineer 'ta�.3 Waedai/ 3-15-2023
Name-Title Signature Date
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 1 of 10
Cooper comcheck.cck
COMcheck Software Version 4.1.5.3
ril Inspection Checklist
Energy Code: 2015 IECC
Requirements: 0.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans, specifications, and/or EComplies
[PR2]1 calculations provide all information Does Not
with which compliance can be
determined for the mechanical ❑Not Observable
systems and equipment and ❑Not Applicable
document where exceptions to the
standard are claimed. Load
calculations per acceptable
engineering standards and
handbooks.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 2 of 10
Cooper comcheck.cck
Section
# Footing/Foundation Inspection Complies? Comments/Assumptions
& Req.ID
C403.2.4. Snow/ice melting system sensors for ❑Complies
5, future connection to controls. Freeze ❑Does Not
C403.2.4. protection systems have automatic
6 controls installed. ❑Not Observable
[FO9]3 ❑Not Applicable
Additional Comments/Assumptions:
'High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338-508 E Page 3 of 10
Cooper comcheck.cck
Section
# Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C404.5, 'Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not I
C404.5.2 requirements. Refer to section details. ❑Not Observable
[PL6]3
❑Not Applicable 1
C404.5, Heated water supply piping conforms ❑Complies
C404.5.1, to pipe length and volume ❑Does Not
C404.5.2 ,requirements. Refer to section details. ['Not Observable
[PL6]3
I
❑Not Applicable
C404.5, Heated water supply piping conforms ;❑Complies
C404.5.1, to pipe length and volume i❑Does Not
C404.5.2 requirements. Refer to section details.
[PL6]3 ❑Not Observable
❑Not Applicable
C404.6 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle. ❑Not Applicable
C404.6.3 Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle.cle. ❑Not Applicable
i
C404.6.3 'Pumps that circulate water between a ❑Complies
[PL7]3 heater and storage tank have controls ❑Does Not
that limit operation from startup to
<= 5 minutes after end of heating ❑Not Observable
cycle. I❑Not Applicable
C404.7 Water distribution system that pumps 'EComplies
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a ❑Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water '
entering the cold-water piping to
104°F.
C404.7 'Water distribution system that pumps ❑Complies
[PL8]3 water from a heated-water supplyini
❑Does Not
pipe back to the heated-water source
through a cold water supply pipe is a ['Not Observable
demand recirculation water system. ❑Not Applicable
Pumps within this system have
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
:entering the cold-water piping to
104°F.
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 4 of 10
Cooper comcheck.cck
Section
# Plumbing Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C404.7 ;Water distribution system that pumps ❑Complies
[PL8]3 water from a heated-water supply ❑Does Not
pipe back to the heated-water source
through a cold-water supply pipe is a Not Observable ll
demand recirculation water system. ❑Not Applicable 1
Pumps within this system have 1
controls that start the pump upon
receiving a signal from the action of a
user of a fixture or appliance and
limits the temperature of the water
:entering the cold-water piping to 1
j 104°F.
Additional Comments/Assumptions:
r--3. i High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 5 of 10
Cooper comcheck.cck
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C402.2.6 ;Thermally ineffective panel surfaces of ❑Complies
[ME41]3 :sensible heating panels have ❑Does Not
:insulation >= R-3.5.
❑Not Observable
❑Not Applicable
C403.2.12 HVAC fan systems at design ❑Complies See the Mechanical Systems list for values.
.1 conditions do not exceed allowable ❑Does Not
[ME65]3 fan system motor nameplate hp or fan
system bhp. Not Observable
❑Not Applicable
C403.2.12;Fans have efficiency grade(FEG) >= ❑Complies
.3 :67.The total efficiency of the fan at ❑Does Not
[ME117]2 :the design point of operation <= 15%
;of maximum total efficiency of the Not Observable
:fan. ❑Not Applicable
C403.2.13'Unenclosed spaces that are heated EComplies
[ME71]2 use only radiant heat. ❑Does Not
['Not Observable
❑Not Applicable
C403.2.3 HVAC equipment efficiency verified. EComplies See the Mechanical Systems list for values.
[ME55]2 ❑Does Not
['Not Observable
❑Not Applicable
C403.2.6. j Demand control ventilation provided EComplies
1 for spaces >500 ft2 and >25 ❑Does Not
[ME59]1 people/1000 ft2 occupant density and
served by systems with air side ['Not Observable
economizer, auto modulating outside ❑Not Applicable
air damper control, or design airflow
i>3,000 cfm.
1
C403.2.6. ;Enclosed parking garage ventilation ❑Complies
2 has automatic contaminant detection ❑Does Not
[ME115]3 and capacity to stage or modulate
:fans to 50%or less of design capacity. Not Observable
❑Not Applicable
C403.2.7 'Exhaust air energy recovery on EComplies
[ME57]1 systems meeting Table C403.2.7(1) ❑Does Not
and C403.2.7(2).
❑Not Observable
❑Not Applicable
C403.2.8 Kitchen exhaust systems comply with EComplies
[ME116]3 replacement air and conditioned ❑Does Not
supply air limitations, and satisfy hood ❑Not Observable
rating requirements and maximum
exhaust rate criteria. ❑Not Applicable
C403.2.9 HVAC ducts and plenums insulated. ;❑Complies
[ME60 2 Where ducts or plenums are installed '❑Does Not
in or under a slab,verification may ❑Not Observable
need to occur during Foundation
Inspection. ❑Not Applicable
C403.2.9 :Ducts and plenums sealed based on EComplies
[ME10]2 static pressure and location. ❑Does Not
❑Not Observable
❑Not Applicable
C403.2.9. 'Ductwork operating >3 in. water EComplies
1.3 column requires air leakage testing. ❑Does Not
[ME11]3
['Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 6 of 10
Cooper comcheck.cck
Section
# Mechanical Rough-In Inspection Complies? Comments/Assumptions
& Req.ID
C403.2.9. ,Ductwork operating >3 in. water ❑Complies
1.3 :column requires air leakage testing. ❑Does Not
[ME11]3
❑Not Observable
❑Not Applicable
C403.2.9. :Ductwork operating >3 in. water ❑Complies
1.3 :column requires air leakage testing. ❑Does Not
[MEAT ,E1 ❑Not Observable
❑Not Applicable
C403.4.2. :Open-or closed circuit cooling towers ❑Complies
3.2.2 :have a separate heat exchanger to ❑Does Not
[ME122]3 j isolate the cooling tower from the ❑Not Observable
heat pump loop, and heat loss is
controlled by shutting down the ❑Not Applicable
circulation pump on the cooling tower
loop.
C403.4.4. ,Multiple zone VAV systems with DDC EComplies See the Mechanical Systems list for values.
6 lof individual zone boxes have static ❑Does Not
[ME110]3 ;pressure setpoint reset controls.
❑Not Observable
, ❑Not Applicable
C403.4.4. :Multiple zone VAV systems with DDC I❑Complies See the Mechanical Systems list for values.
6 of individual zone boxes have static ❑Does Not
[ME110]3 pressure setpoint reset controls.
❑Not Observable
: ❑Not Applicable
C403.4.4. :Multiple zone VAV systems with DDC EComplies See the Mechanical Systems list for values.
6 of individual zone boxes have static I❑Does Not
[ME110]3 pressure setpoint reset controls.
['Not Observable
Not Applicable
C408.2.2. Air outlets and zone terminal devices EComplies
1 have means for air balancing. Does Not
[ME53]3 ❑Not Observable
❑Not Applicable
C403.5, Refrigerated display cases, walk-in EComplies
C403.5.1, coolers or walk-in freezers served by ❑Does Not
C403.5.2 remote compressors and remote
[ME123]3 condensers not located in a ❑Not Observable
condensing unit, have fan-powered ❑Not Applicable
MEcondensers that comply with Sections
C403.5.1 and refrigeration compressor
systems that comply with C403.5.2..
Additional Comments/Assumptions:
High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 7 of 10
Cooper comcheck.cck
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C303.3, ;Furnished O&M manuals for HVAC ❑Complies
C408.2.5. systems within 90 days of system ❑Does Not
3 :acceptance.
[F18]3 [Not Observable
ENot Applicable
C403.2.2 'HVAC systems and equipment ❑Complies
[F127]3 capacity does not exceed calculated ❑Does Not
loads.
ENot Observable
❑Not Applicable
C403.2.4. Heating and cooling to each zone is ❑Complies
1 controlled by a thermostat control. ❑Does Not
[F147]3 Minimum one humidity control device ❑Not Observable
per installed
humidification/dehumidification ❑Not Applicable
system.
C403.2.4. Heating and cooling to each zone is ,❑Complies
1 controlled by a thermostat control. '❑Does Not
[F147]3 Minimum one humidity control device
per installed ['Not Observable
humidification/dehumidification '❑Not Applicable
:system.
C403.2.4. :Heating and cooling to each zone is ❑Complies
1 :controlled by a thermostat control. Does Not
[F147]3 :Minimum one humidity control device
per installed Not Observable
humidification/dehumidification LINot Applicable
;system.
C403.2.4. Heat pump controls prevent ❑Comp iesl
1.1 'supplemental electric resistance heat ❑Does Not
[F142]3 from coming on when not needed.
['Not Observable
LINot Applicable
C403.2.4. Thermostatic controls have a 5 °F ❑Complies
1.2 deadband. ❑Does Not
[F138]3 ENot Observable
ENot Applicable
C403.2.4. Temperature controls have setpoint ❑Complies
1.3 overlap restrictions. ❑Does Not
[F120]3 ENot Observable
ENot Applicable
C403.2.4. Each zone equipped with setback —❑Complies
2 controls using automatic time clock or ❑Does Not
[F139]3 programmable control system.
ENot Observable
ENot Applicable
C403.2.4. Automatic Controls: Setback to 55°F ❑Complies
2.1, (heat) and 85°F (cool); 7-day clock, 2- ❑Does Not
C403.2.4. hour occupant override, 10-hour
ENot Observable
2.2
[F140]3 backup ENot Applicable
C403.2.4. 'Systems include optimum start ❑Complies
2.3 controls. ❑Does Not
[F141]3 ENot Observable
LINot Applicable
C403.2.4. Systems include optimum start ❑Complies
2.3 controls. ❑Does Not
[F141]3
ENot Observable
LINot Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 8 of 10
Cooper comcheck.cck
Section
# Final Inspection Complies? Comments/Assumptions
& Req.ID
C408.2.1 Commissioning plan developed by ❑Complies
[F128]1 registered design professional or ❑Does Not
approved agency.
❑Not Observable
❑Not Applicable
C408.2.3. HVAC equipment has been tested to ❑Complies
1 ensure proper operation. ❑Does Not
[F131]1 ❑Not Observable
❑Not Applicable
C408.2.3. HVAC control systems have been ❑Complies
2 tested to ensure proper operation, ❑Does Not
[F110]1 calibration and adjustment of controls. ❑Not Observable
❑Not Applicable
C408.2.4 Preliminary commissioning report ❑Complies
[F129]1 completed and certified by registered ❑Does Not
design professional or approved
agency. ❑Not Observable
❑Not Applicable
C408.2.5. Furnished HVAC as-built drawings ❑Complies
1 submitted within 90 days of system ❑Does Not
[F17]3 acceptance.
❑Not Observable
❑Not Applicable
C408.2.5. An air and/or hydronic system ❑Complies
3 balancing report is provided for HVAC ❑Does Not
[F143]1 systems.
❑Not Observable
ENot Applicable
C408.2.5. Final commissioning report due to ❑Complies
4 building owner within 90 days of Does Not
[F130]1 receipt of certificate of occupancy.
❑Not Observable
j❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 9 of 10
Cooper comcheck.cck
Project Title: 508 E Cooper Report date: 03/15/23
Data filename: Z:\2022 Projects\22338 508 E C000per\Loads and Calculations\MECHANICAL\22338- 508 E Page 10 of 10
Cooper comcheck.cck